KR200407092Y1 KR2020050032096U KR20050032096U KR200407092Y1 KR 200407092 Y1 KR200407092 Y1 KR 200407092Y1 KR 2020050032096 U KR2020050032096 U KR 2020050032096U KR 20050032096 U KR20050032096 U KR 20050032096U KR 200407092 Y1 KR200407092 Y1 KR 200407092Y1
Authority
KR
South Korea
Prior art keywords
panel
support structure
girder
support member
cantilever portion
Prior art date
Application number
KR2020050032096U
Other languages
Korean (ko)
Inventor
서승권
Original Assignee
(주)핸스건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)핸스건설 filed Critical (주)핸스건설
Priority to KR2020050032096U priority Critical patent/KR200407092Y1/en
Application granted granted Critical
Publication of KR200407092Y1 publication Critical patent/KR200407092Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material

Abstract

본 고안은 캔틸레버부의 PC 패널 지지구조에 관한 것으로서, 더욱 상세하게는 교량의 돌출부에 일단이 고정 지지되고 타단이 자유로운 보 형태를 이루는 캔틸레버부의 PC 패널을 지지하는 구조에 관한 것이다.The present invention relates to a PC panel supporting structure of the cantilever portion, and more particularly, to a structure for supporting the PC panel of the cantilever portion having one end fixedly supported on the protrusion of the bridge and the other end being free.

본 고안의 실시예에 따른 PC 패널 지지구조에 의하면, 콘크리트 거더의 상부에

Figure 112005065145853-utm00001
형상으로 형성된 전단철근과, 상기 전단철근의 상부 모서리에 길이방향으로 배열되는 철근과, 상기 콘크리트 거더의 상부에 외측으로 돌출되게 설치되는 PC 패널 및 상기 PC 패널과 전단철근에 고정되고, 철근에 의해 상부가 지지되어 PC 패널을 고정 지지하는 지지부재를 포함한다.According to the PC panel support structure according to an embodiment of the present invention, the upper portion of the concrete girder
Figure 112005065145853-utm00001
Shear reinforcement formed in the shape, reinforcing bars arranged in the longitudinal direction at the upper edge of the shear reinforcement, PC panel is installed to protrude outward on the upper portion of the concrete girder and fixed to the PC panel and shear reinforcement, by reinforcement The upper part is supported and includes a support member for fixedly supporting the PC panel.

상기한 본 고안에 따르면, 동바리나 거푸집을 설치하지 않고 PC 패널을 지지하여 슬래브를 시공할 수 있기 때문에 PC 패널과 슬래브의 시공이 간편하고 용이하며 시공기간을 줄일 수 있을 뿐만 아니라 동바리나 거푸집을 설치하거나 해체하지 않아도 되어 안전하고 경제적이다.According to the present invention described above, since the slab can be installed by supporting the PC panel without installing the copper bar or the formwork, the construction of the PC panel and the slab is simple and easy, and the construction period can be shortened, and the copper bar or the formwork is installed. It is safe and economical because it does not need to be removed or dismantled.

교량, 캔틸레버, PC 패널, 거더, 프리캐스팅, 지지구조. Bridge, cantilever, PC panel, girder, precasting, supporting structure.

Description

캔틸레버부의 피씨 패널 지지구조 {Support Structure for PC Panel of Cantilever Part}Support Structure for PC Panel of Cantilever Part}

도 1a와 도 1b는 교량에 설치되는 캔틸레버부의 예를 나타내는 도면,1A and 1B are views showing an example of a cantilever part installed in a bridge;

도 2a와 도 2b는 본 고안의 제1실시예에 따른 PC패널 지지구조의 사시도와 정단면도,2A and 2B are a perspective view and a front sectional view of the PC panel support structure according to the first embodiment of the present invention;

도 3a와 도 3b는 본 고안의 제2실시예에 따른 PC패널 지지구조의 사시도와 정단면도,3A and 3B are a perspective view and a front sectional view of the PC panel support structure according to the second embodiment of the present invention;

도 4a와 도 4b는 본 고안의 제3실시예에 따른 PC패널 지지구조의 사시도와 정단면도,4A and 4B are a perspective view and a front sectional view of the PC panel support structure according to the third embodiment of the present invention;

도 5는 본 고안의 제4실시예에 따른 PC패널 지지구조의 사시도,5 is a perspective view of a PC panel support structure according to a fourth embodiment of the present invention;

도 6a와 도 6b는 본 고안의 제5실시예에 따른 PC패널 지지구조의 사시도와 정단면도,6A and 6B are a perspective view and a front sectional view of the PC panel support structure according to the fifth embodiment of the present invention;

도 7a와 도 7b는 본 고안의 제6실시예에 따른 PC패널 지지구조의 사시도와 정단면도,7A and 7B are a perspective view and a front sectional view of the PC panel support structure according to the sixth embodiment of the present invention;

도 8a와 도 8b는 본 고안의 제7실시예에 따른 PC패널 지지구조의 사시도와 정단면도,8A and 8B are a perspective view and a front sectional view of the PC panel support structure according to the seventh embodiment of the present invention;

도 9는 본 고안의 제8실시예에 따른 PC패널 지지구조의 사시도이다.9 is a perspective view of a PC panel support structure according to an eighth embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10: 콘크리트 거더 11: 전단철근10: concrete girder 11: shear rebar

12: 멈치 14: 스틸 거더12: Stop 14: Steel Girder

15: 상부 플랜지 16: 스터드 볼트15: upper flange 16: stud bolt

17: 고정 와이어 20: PC 패널17: fixed wire 20: PC panel

21: 운반 및 체결고리 22: 운반고리21: Carrying and fastening ring 22: Carrying ring

23,24: 철근 25: L형강23, 24: Rebar 25: L section steel

26: 외벽 27: 체결부재26: outer wall 27: fastening member

28: 고정부재 31: T형강28: fixing member 31: T-shaped steel

32: 철판 33: 플랫 바32: iron plate 33: flat bar

34: ㅁ형강 35: L형강34: K-beam 35: L-beam

36: I형강 37: 강선36: I-beam 37: steel wire

38: 턴 버클 39: 철근38: turn buckle 39: rebar

40: 버팀대 50: 슬래브40: Prop 50: Slab

본 고안은 캔틸레버부의 PC 패널 지지구조에 관한 것으로서, 더욱 상세하게는 교량의 돌출부에 일단이 고정 지지되고 타단이 자유로운 보 형태를 이루는 캔틸레버부의 PC 패널을 지지하는 구조에 관한 것이다.The present invention relates to a PC panel supporting structure of the cantilever portion, and more particularly, to a structure for supporting the PC panel of the cantilever portion having one end fixedly supported on the protrusion of the bridge and the other end being free.

일반적으로 아파트의 베란다나 교량의 슬래브 돌출부 등과 같은 구조물을 건축하기 위해서는 일단이 고정 지지되고 타단이 자유로운 보 형태의 캔틸레버(cantilever)를 시공해야 한다.In general, in order to construct a structure such as a veranda of an apartment or a slab protrusion of a bridge, a cantilever of a beam type having a fixed end and a free end is required.

교량 건설에 있어 거더(girder)와 거더 사이에 슬래브를 시공하거나 또는 외측 거더에 돌출부(외측 캔틸레버부)를 시공하기 위해서는 일단에 거푸집을 설치하고, 설치된 거푸집에 콘크리트를 타설 및 양생하는 과정을 거치게 된다.In the construction of bridges, in order to construct slabs between girders and girders or to project protrusions (outer cantilever sections) to outer girders, formwork is installed at one end and concrete is laid and cured at the installed formwork. .

도 1a에 도시된 바와 같이, 양 거더((2a,2b),(2b,2c)) 사이는 양 거더 상단에 프리캐스트 콘크리트 패널(Precast Concrete Panel, 이하 PC 패널(4))을 걸치듯 올려놓고 슬래브(6)를 시공하기 위해 콘크리트를 타설 및 양생하면 되어 시공이 수월하다.As shown in Figure 1a, between the two girders ((2a, 2b), (2b, 2c)) and put the precast concrete panel (PC panel (4)) on the top of both girders In order to construct the slab 6, it is easy to construct the concrete by pouring and curing.

그러나 외측 거더(2a,2c)의 일측부로 돌출되는 돌출부(캔틸레버부(8a))를 시공하기 위해서는 먼저 가로대, 세로대 및 지지대로 이루어지는 캔틸레버 브래킷(동바리)을 설치하고, 그 상부에 합판 등의 판재를 놓고 상기 캔틸레버 브래킷과 볼트 등으로 결합한 다음 각 모서리를 마무리하여 거푸집을 완성한 후 콘크리트를 타설하여 양생함으로써 시공을 완료한다.However, in order to construct the protrusion (cantilever part 8a) projecting to one side of the outer girders 2a, 2c, first, a cantilever bracket (cutter) made of a crossbar, a longitudinal rod, and a support bar is installed, and a plate such as plywood is installed on the upper part. Lay out and combine the cantilever bracket and bolts, and then finish each corner to finish the formwork to finish the construction by pouring concrete.

타설된 콘크리트의 양생과정이 끝나면 시공과정과 역순으로 캔틸레버 브래킷에서 볼트 등을 제거하고, 합판을 떼어내는 거푸집 해체작업을 하게 된다.After curing process of pour concrete, bolts are removed from cantilever bracket in the reverse order of construction process, and formwork is dismantled to remove plywood.

그러나 이와 같은 캔틸레버 시공방법은 캔틸레버 브래킷의 설치 및 해체 작업의 번거롭고 불편하며 시공기간이 길어지는 문제점이 있다.However, such a cantilever construction method has a problem that the installation and dismantling work of the cantilever bracket is cumbersome and inconvenient, and the construction period is long.

또한, 도 1b에 도시한 바와 같이 교량의 폭이 넓어 교각(1)을 좌우로 인접되 게 설치하는 경우에, 양 교각(1)에 각각 설치된 내측 거더(2c) 사이에 돌출부(캔틸레버부(8b))를 시공하기 위해서 각각의 내측 거더(2c)에 상기한 방식으로 거푸집을 반복해서 설치 및 해체해야 하는 문제점이 있었다.In addition, as shown in FIG. 1B, when the width of the bridge is wide and the pier 1 is installed adjacently to the left and right, a protrusion (cantilever portion 8b) is provided between the inner girders 2c respectively provided in the pier 1. In order to construct)), there was a problem in that the formwork was repeatedly installed and dismantled on each inner girder 2c in the above-described manner.

상술한 문제점을 해결하기 위하여 안출된 본 고안은 동바리나 거푸집을 설치하지 않고 PC 패널을 지지하여 슬래브를 시공할 수 있기 때문에 PC 패널과 슬래브의 시공이 간편하고 용이하며 시공기간을 줄일 수 있을 뿐만 아니라 동바리나 거푸집을 설치하거나 해체하지 않아도 되어 안전하고 경제적인 캔틸레버부의 PC 패널 지지구조를 제공하는데 목적이 있다.The present invention devised to solve the above-described problems can be installed in the slab by supporting the PC panel without installing the copper bar or formwork, so that the construction of the PC panel and the slab is simple and easy, and the construction period can be reduced. The purpose is to provide a safe and economical PC panel support structure without installing or dismantling a copper bar or formwork.

상술한 목적을 달성하기 위한 본 고안의 실시예에 따른 교량의 캔틸레버부의 PC 패널 지지구조는, 콘크리트 거더의 상부에

Figure 112005065145853-utm00002
형상으로 형성된 전단철근과, 상기 전단철근의 상부 모서리에 길이방향으로 배열되는 철근과, 상기 콘크리트 거더의 상부에 외측으로 돌출되게 설치되는 PC 패널 및 상기 PC 패널과 전단철근에 고정되고 철근에 의해 상부가 지지되어 PC 패널을 고정 지지하는 지지부재를 포함한다.PC panel support structure of the cantilever portion of the bridge according to an embodiment of the present invention for achieving the above object, the upper portion of the concrete girder
Figure 112005065145853-utm00002
Shear reinforcement formed in the shape, reinforcing bars arranged in the longitudinal direction at the upper edge of the shear reinforcement, PC panel is installed to protrude outward on the upper portion of the concrete girder and fixed to the PC panel and the shear reinforcement and upper by reinforcement It is supported and includes a support member for fixing and supporting the PC panel.

이하 본 고안의 실시예에 대하여 첨부된 도면을 참고로 그 구성 및 작용을 설명하기로 한다.Hereinafter, the configuration and operation of the embodiments of the present invention will be described with reference to the accompanying drawings.

도 2a와 도 2b는 본 고안의 제1실시예에 따른 PC패널 지지구조의 사시도와 정단면도이다.2A and 2B are a perspective view and a front sectional view of the PC panel support structure according to the first embodiment of the present invention.

도시된 바와 같이, 콘크리트 거더(10a)의 전단철근(11a)과, 상기 전단철근 (11a)의 상부 모서리에 길이방향으로 배열되는 철근(39a)과, 프리캐스팅 방식으로 제작된 PC 패널(20a)에 매입되어 상부로 돌출되게 형성된 운반 및 체결고리(21)와, 상기 운반 및 체결고리(21)에 상하가 역전되게 끼워져 체결되는 T형강(31)을 포함하여 구성된다. As shown, the shear reinforcement (11a) of the concrete girder (10a), the reinforcement (39a) arranged in the longitudinal direction at the upper edge of the shear reinforcement (11a), and the PC panel 20a manufactured by the precasting method It is configured to include a transport and fastening ring 21 is formed to protrude to the upper portion and the T-shaped steel 31 is fastened to the upper and lower inverted and fastened to the transport and fastening ring 21.

콘크리트 거더(10a)에는 전단철근(11a)의 일부가 매입되고 나머지는 상부로 돌출되게 배근되어

Figure 112005065145853-utm00003
형상의 전단철근(11a)이 형성된다.Part of the shear reinforcing bar (11a) is embedded in the concrete girder (10a) and the rest is arranged to protrude upward
Figure 112005065145853-utm00003
Shear reinforcing bars 11a are formed.

철근(23,24)을 교차되도록 배근하고, 운반 및 체결고리(21)의 일부가 상부로 돌출되게 다수 배치한 상태에서, 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 PC 패널(20a)을 한판으로 제작한다.Reinforcing the reinforcing bars (23, 24) to intersect, and in a state in which a large number of parts of the transport and fastening ring 21 is arranged to protrude upward, the concrete is cast and cured, the PC panel 20a by precasting method in the factory Make a bout.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20a)을 공사 현장으로 운반하여 운반 및 체결고리(21)에 T형강(31)을 상하가 역전되게 끼워 체결하고, 전단철근(11a)의 상부 모서리에 철근(39a)을 길이방향으로 배열한다. In this way, the PC panel 20a manufactured in one plate by the precasting method is transported to the construction site, and the T-shaped steel 31 is fastened upside down and fastened to the transport and fastening ring 21, and the shear reinforcement 11a is The reinforcing bar 39a is arranged in the longitudinal direction at the upper edge.

크레인에 상기 운반 및 체결고리(21)를 연결하여 상기 PC 패널(20a)이 콘크리트 거더(10a)에 걸친 상태에서 외측을 향하도록 위치시키고, 상기 전단철근(11a)과 T형강(31)이 접하는 부위는 용접하여 고정시킨다. The transport and fastening ring 21 is connected to a crane so that the PC panel 20a faces outward in a state spanning the concrete girder 10a, and the shear reinforcing bars 11a and the T-shaped steel 31 are in contact with each other. The site is fixed by welding.

다음 상기 콘크리트 거더(10a)의 상부와 PC 패널(20a)의 상부에 미도시된 철근을 배근하고 콘크리트를 타설/양생함으로써 슬래브(50a)의 시공이 완료된다.Next, the construction of the slab 50a is completed by placing the non-shown reinforcing bar on the upper part of the concrete girder 10a and the upper part of the PC panel 20a and placing / curing concrete.

이와 같이, PC 패널(20a)의 운반 및 체결고리(21)에 지지부재의 일종으로 T형강(31)이 체결되고, PC 패널(20a)의 일부가 콘크리트 거더(10a) 상부에 걸쳐진 상태에서, 상기 T형강(31)이 용접에 의해 콘크리트 거더(10a)의 전단철근(11a)에 고정되고, T형강(31)의 상부가 전단철근(11a) 상부 모서리에 설치된 철근(39a)에 의해 고정 지지되기 때문에, 동바리와 거푸집을 설치하지 않아도 콘크리트 거더(10a)와 PC 패널(20a) 상부에 슬래브(50a)를 시공할 수 있다.As described above, the T-shaped steel 31 is fastened to the transport and fastening ring 21 of the PC panel 20a as a kind of support member, and a part of the PC panel 20a is over the concrete girder 10a. The T-shaped steel 31 is fixed to the shear reinforcement 11a of the concrete girder 10a by welding, and the upper portion of the T-shaped steel 31 is fixedly supported by the reinforcement 39a provided at the upper edge of the shear reinforcement 11a. Therefore, it is possible to construct the slab 50a on the concrete girder 10a and the PC panel 20a without installing a club and formwork.

도 3a와 도 3b는 본 고안의 제2실시예에 따른 PC패널 지지구조의 사시도와 정단면도이다.3A and 3B are a perspective view and a front sectional view of the PC panel support structure according to the second embodiment of the present invention.

도시된 바와 같이, 콘크리트 거더(10b)의 전단철근(11b)과, 상기 전단철근(11b)의 상부 모서리에 길이방향으로 배열되는 철근(39b)과, 프리캐스팅 방식으로 제작된 PC 패널(20b)에 매입되어 상부로 돌출되게 형성된 L형강(25)과, 상기 L형강(25) 사이의 PC 패널(20b)에 매입되어 상부로 돌출되게 형성된 운반고리(22a)와, 상기 상부로 돌출된 L형강(25)에 수직으로 체결되는 철판(32)을 포함하여 구성된다.As shown, the shear reinforcement (11b) of the concrete girder (10b), the reinforcement (39b) arranged in the longitudinal direction at the upper edge of the shear reinforcement (11b), and the PC panel 20b manufactured by the precast method L-shaped steel 25, which is embedded in the projecting to the upper portion, the carrier ring 22a is formed in the PC panel 20b between the L-shaped steel 25 to protrude upward, and the L-shaped steel protruding upwards It is configured to include an iron plate 32 fastened perpendicularly to the (25).

콘크리트 거더(10b)에는 전단철근(11b)의 일부가 매입되고 나머지는 상부로 돌출되게 배근되어

Figure 112005065145853-utm00004
형상의 전단철근(11b)이 형성된다.Part of the shear reinforcing bar (11b) is embedded in the concrete girder (10b) and the rest is arranged to protrude upward
Figure 112005065145853-utm00004
Shear reinforcing bars 11b are formed.

철근(23,24)을 교차되도록 배근하고, L형강(25)과 운반고리(22a)의 일부가 상부로 돌출되게 다수 배치한 상태에서, 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 PC 패널(20b)을 한판으로 제작한다.In the state where the reinforcing bars 23 and 24 are arranged to intersect, and a large number of the L-shaped steel 25 and a part of the carrying ring 22a are arranged to protrude upward, the concrete is poured and cured, and the PC is precast. The panel 20b is manufactured by a single board.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20b)을 공사 현장으로 운반하여, 상부로 돌출된 L형강(25)에 철판(32)을 수직으로 세워 밀착시킨 상태에서 핀이나 볼트 등의 체결부재(27)를 이용하여 체결하고, 전단철근(11b)의 상부 모서리에 철근(39b)을 길이방향으로 배열한다. In this way, the PC panel 20b manufactured in one plate by the precasting method is transported to the construction site, and the iron plate 32 is placed vertically on the L-shaped steel 25 protruding upward, and the pins and bolts, etc. Fastening using the fastening member 27, the reinforcing bar (39b) is arranged in the longitudinal direction on the upper edge of the shear reinforcing bars (11b).

크레인에 상기 운반고리(22a)를 연결하여 상기 PC 패널(20b)이 콘크리트 거더(10b)에 걸친 상태에서 외측을 향하도록 위치시키고, 상기 전단철근(11b)과 철판(32)이 접하는 부위는 용접을 하여 고정시킨다.The carrier ring 22a is connected to a crane so that the PC panel 20b faces outward in a state spanning the concrete girder 10b, and a portion where the shear reinforcing bars 11b and the iron plate 32 contact each other is welded. To fix it.

다음 상기 콘크리트 거더(10b)의 상부와 PC 패널(20b)의 상부에 미도시된 철근을 배근하고 콘크리트를 타설/양생함으로써 슬래브(50b)의 시공이 완료된다.Next, the construction of the slab 50b is completed by placing the non-shown reinforcing bar on the upper part of the concrete girder 10b and the upper part of the PC panel 20b and placing / curing concrete.

이와 같이, PC 패널(20b)의 L형강(25)에 지지부재의 일종으로 철판(32)이 체결되고, PC 패널(20b)의 일부가 콘크리트 거더(10b) 상부에 걸쳐진 상태에서, 상기 철판(32)이 용접에 의해 콘크리트 거더(10b)의 전단철근(11b)에 고정되고, 철판(32)의 상부가 전단철근(11b) 상부 모서리에 설치된 철근(39b)에 의해 고정 지지되기 때문에, 동바리와 거푸집을 설치하지 않아도 콘크리트 거더(10b)와 PC 패널(20b) 상부에 슬래브(50b)를 시공할 수 있다.In this way, the iron plate 32 is fastened to the L-shaped steel 25 of the PC panel 20b as a kind of support member, and the part of the PC panel 20b is over the concrete girder 10b, and the iron plate ( 32 is fixed to the shear reinforcement 11b of the concrete girder 10b by welding, and the upper part of the iron plate 32 is fixedly supported by the reinforcement 39b provided at the upper edge of the shear reinforcement 11b. Even without installing the formwork, the slab 50b can be constructed on the concrete girder 10b and the PC panel 20b.

도 4a와 도 4b는 본 고안의 제3실시예에 따른 PC패널 지지구조의 사시도와 정단면도이다.4A and 4B are a perspective view and a front sectional view of the PC panel support structure according to the third embodiment of the present invention.

도시된 바와 같이, 콘크리트 거더(10c)의 전단철근(11c)과, 상기 전단철근(11c)의 내측 상부에 길이방향으로 배열되는 버팀대(40a)와, 프리캐스팅 방식으로 제작된 PC 패널(20c)에 매입되어 외측으로 돌출되게 형성된 플랫 바(flat bar,33)와, 상기 PC 패널(20c)에 매입되어 상부로 돌출되게 형성된 운반고리(22b)를 포함하여 구성된다.As shown, the shear reinforcement (11c) of the concrete girder (10c), the brace 40a arranged in the longitudinal direction on the inner upper portion of the shear reinforcement (11c), and the PC panel 20c produced by the precasting method It is configured to include a flat bar (33) embedded in the protruded to protrude outwards, and a carrier ring (22b) embedded in the PC panel (20c) to protrude upward.

콘크리트 거더(10c)에는 전단철근(11c)의 일부가 매입되고 나머지는 상부로 돌출도록 배근되어

Figure 112005065145853-utm00005
형상의 전단철근(11c)이 형성된다.Part of the shear reinforcing bar (11c) is embedded in the concrete girder (10c) and the rest is arranged to protrude upwards
Figure 112005065145853-utm00005
Shear reinforcement 11c of shape is formed.

철근(23,24)을 교차되도록 배근하고, 플랫 바(33)의 일부가 외측으로, 운반고리(22b)의 일부가 상부로 돌출되게 다수 배치한 상태에서, 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 PC 패널(20c)을 한판으로 제작한다.Reinforce the bars 23 and 24 so as to intersect, and in a state in which a plurality of flat bars 33 are arranged outward and a part of the transport ring 22b is protruded upward, the concrete is poured and cured to be free from the factory. The PC panel 20c is produced in a single plate by the casting method.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20c)을 공사 현장으로 운반하고, 전단철근(11c)에 의해 형성된 내측 공간의 상부에 버팀대(40a)를 수직으로 세워 길이방향으로 배열한다. In this way, the PC panel 20c produced in a single plate by the precasting method is transported to the construction site, and the brace 40a is vertically arranged on the upper portion of the inner space formed by the shear reinforcing bars 11c and arranged in the longitudinal direction.

크레인에 상기 운반고리(22b)를 연결하여 상기 PC 패널(20c)이 콘크리트 거더(10c)에 걸친 상태에서 외측을 향하도록 위치시키고, 상기 플랫 바(33)와 전단철근(11c)이 접하는 부위는 용접을 하여 고정시킨다.The carrier ring 22b is connected to a crane, and the PC panel 20c is positioned to face outward in a state spanning the concrete girder 10c, and the flat bar 33 and the shear reinforcing bar 11c are in contact with each other. Weld and fix.

다음 상기 콘크리트 거더(10c)의 상부와 PC 패널(11c)의 상부에 미도시된 철근을 배근하고 콘크리트를 타설/양생함으로써 슬래브(50c)의 시공이 완료된다.Next, the construction of the slab 50c is completed by placing the non-shown reinforcing bar on the upper part of the concrete girder 10c and the upper part of the PC panel 11c and placing / curing concrete.

이와 같이, PC 패널(20c)에 지지부재의 일종으로 플랫 바(33)가 돌출되게 형성되고, PC 패널(20c)의 일부가 콘크리트 거더(10c) 상부에 걸쳐진 상태에서, 상기 플랫 바(33)가 용접에 의해 콘크리트 거더(10c)의 전단철근(11c)에 고정되고, 플랫 바(33)의 상부가 전단철근(11c)에 지지되는 버팀대(40a)에 의해 고정 지지되기 때문에 동바리와 거푸집을 설치하지 않아도 콘크리트 거더(10c)와 PC 패널(20c) 상부에 슬래브(50c)를 시공할 수 있다.As described above, the flat bar 33 is formed to protrude from the PC panel 20c as a kind of support member, and the flat bar 33 is in a state in which a part of the PC panel 20c is placed over the concrete girder 10c. Is fixed to the shear reinforcement 11c of the concrete girder 10c by welding, and the upper part of the flat bar 33 is fixedly supported by the brace 40a supported by the shear reinforcement 11c. Even without the slab 50c can be installed on the concrete girder 10c and the PC panel 20c.

도 5는 본 고안의 제4실시예에 따른 PC패널 지지구조의 사시도이다.5 is a perspective view of a PC panel support structure according to a fourth embodiment of the present invention.

제4실시예가 도 4의 제3실시예와 다른 것은, 플랫 바(33) 대신에 지지부재의 일종으로 ㅁ형강(34)을 PC 패널(20d)에 매입되어 외측으로 돌출되게 배근하여 PC 패널(20d)을 프리캐스팅 방식으로 제작하고, 상기 ㅁ형강(34)을 전단철근(11d)에 용접에 의해 고정한다는 것이다.The fourth embodiment is different from the third embodiment of FIG. 4, instead of the flat bar 33, the K-shaped steel 34 is embedded in the PC panel 20d and is disposed to protrude outwards to form a PC panel ( 20d) is manufactured by the precasting method, and the K-shaped steel 34 is fixed to the shear bar 11d by welding.

도 6a와 도 6b는 본 고안의 제5실시예에 따른 PC패널 지지구조의 사시도와 정단면도이다.6A and 6B are a perspective view and a front sectional view of the PC panel support structure according to the fifth embodiment of the present invention.

도시된 바와 같이, 콘크리트 거더(10e)의 전단철근(11e)과, 상기 전단철근(11e)의 상부 모서리에 길이방향으로 배열되는 철근(39c)과, 프리캐스팅 방식으로 제작된 PC 패널(20e)에 매입되어 상부와 외측으로 돌출되게 형성된 I형강(36)과, 상기 PC 패널(20e)에 배입되어 상부로 돌출되게 형성된 운반고리(22d)를 포함하여 구성된다.As shown, the shear reinforcement 11e of the concrete girder 10e, the reinforcement 39c arranged in the longitudinal direction at the upper edge of the shear reinforcement 11e, and the PC panel 20e manufactured by the precasting method. It is configured to include an I-shaped steel (36) embedded in the protruding to the top and the outside, and a carrier ring (22d) is inserted into the PC panel (20e) protruding upward.

콘크리트 거더(10e)에는 전단철근(11e)의 일부가 매입되고 나머지는 상부로 돌출되게 배근되어

Figure 112005065145853-utm00006
형상의 전단철근(11e)이 형성된다.Part of the shear reinforcing bar (11e) is embedded in the concrete girder (10e) and the rest is arranged to protrude upward
Figure 112005065145853-utm00006
Shear reinforcing bars 11e are formed.

철근(23,24)을 교차되도록 배근하고, I형강(36)의 일부가 상부 및 외측으로, 운반고리(22d)의 일부가 상부로 돌출되게 다수 배치한 상태에서, 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 PC 패널(20e)을 한판으로 제작한다.Reinforce the bars 23 and 24 so as to intersect, and cast and cure concrete in a state in which a plurality of I-shaped steels 36 are arranged at the top and the outside and a part of the transport ring 22d is protruded upward. PC panel 20e is produced in a single plate by the precast method.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20e)을 공사 현장으로 운반하고, 전단철근(11e)의 상부 모서리에 철근(39c)을 길이방향으로 배열한다. In this way, the PC panel 20e manufactured in one plate by the precasting method is transported to the construction site, and the reinforcing bars 39c are arranged in the longitudinal direction at the upper edge of the shear reinforcing bars 11e.

크레인에 상기 운반고리(22d)를 연결하여 상기 PC 패널(20e)이 콘크리트 거더(10e)에 걸친 상태에서 외측을 향하도록 위치시키고, 상기 I형강(36)과 전단철근 (11e)이 접하는 부위는 용접을 하여 고정시킨다.The carrier ring 22d is connected to a crane so that the PC panel 20e faces outward in the state spanning the concrete girder 10e, and the portion where the I-beams 36 and the shear reinforcing bars 11e contact each other. Weld and fix.

다음, 상기 콘크리트 거더(10e)의 상부와 PC 패널(20e)의 상부에 미도시된 철근을 배근하고 콘크리트를 타설/양생함으로써 슬래브(50e)의 시공이 완료된다.Next, the construction of the slab 50e is completed by reinforcing the not shown reinforcing bar on the upper part of the concrete girder 10e and the upper part of the PC panel 20e and placing / curing concrete.

이와 같이, PC 패널(20e)의 상부와 외측에 지지부재의 일종으로 I형강(36)이 돌출되게 형성되고, PC 패널(20e)의 일부가 콘크리트 거더(10e) 상부에 걸쳐진 상태에서, 상기 I형강(36)이 용접에 의해 콘크리트 거더(10e)의 전단철근(11e)에 고정되고, I형강(36)의 상부가 전단철근(11e) 상부 모서리에 설치된 철근(39c)에 의해 고정 지지되기 때문에, 동바리와 거푸집을 설치하지 않아도 콘크리트 거더(10e)와 PC 패널(20e) 상부에 슬래브(50e)를 시공할 수 있다.As described above, the I-shaped steel 36 is formed to protrude from the upper and outer sides of the PC panel 20e as a kind of support member, and a part of the PC panel 20e is over the upper part of the concrete girder 10e. Since the section steel 36 is fixed to the shear reinforcement 11e of the concrete girder 10e by welding, and the upper part of the I section steel 36 is fixedly supported by the reinforcing bar 39c provided at the upper edge of the shear reinforcement 11e. It is possible to construct the slab 50e on the concrete girder 10e and the PC panel 20e without installing a copper bar and formwork.

도 7은 본 고안의 제6실시예에 따른 PC패널 지지구조의 사시도이다.7 is a perspective view of a PC panel support structure according to a sixth embodiment of the present invention.

제6실시예가 도 6의 제5실시예와 다른 것은, 지지부재의 일종으로 I형강(36) 대신에 L형강(35)을 PC패널(20f)에 매입되어 상부 및 외측으로 돌출되게 배근하여 PC 패널(20f)을 프리캐스팅 방식으로 제작하여, 상기 L형강(35)을 용접에 의해 콘크리트 거더(10f)의 전단철근(11f)에 고정한다는 것이다.The sixth embodiment is different from the fifth embodiment of FIG. 6, in which the L-shaped steel 35 is embedded in the PC panel 20f instead of the I-shaped steel 36 to protrude upward and outward so as to support the PC. The panel 20f is manufactured by a precasting method, and the L-shaped steel 35 is fixed to the shear reinforcement 11f of the concrete girder 10f by welding.

도 8a와 도 8b는 본 고안의 제7실시예에 따른 PC패널 지지구조의 사시도와 정단면도이다.8A and 8B are a perspective view and a front sectional view of the PC panel support structure according to the seventh embodiment of the present invention.

도시된 바와 같이, 콘크리트 거더(10g)의 전단철근(11g)과, 상기 전단철근(11g)의 상부 모서리에 길이방향으로 설치되는 철근(39e)과, 외벽(26)이 형성되도록 프리캐스팅 방식으로 제작된 PC 패널(20g)에 매입되어 상부로 돌출되게 형성된 운반고리(22f)와, 상기 외벽(26)에 일단이 고정되고 타단은 상기 철근(39e)의 상부 에 고정되는 강선(37)과, 상기 강선(37) 사이에 연결되어 강선(37)의 길이를 조절하는 턴 버클(38)과, 상기 콘크리트 거더(10g) 상부에서 형성되어 PC 패널(20g)이 내측으로 밀리지 않도록 하는 멈치(12)를 포함하여 구성된다.As shown, the shear reinforcement (11g) of the concrete girder (10g), the reinforcing bar (39e) installed in the longitudinal direction at the upper edge of the shear reinforcement (11g), and the outer wall 26 in a precast manner A carrier ring 22f embedded in the manufactured PC panel 20g and protruding upward, a steel wire 37 fixed at one end to the outer wall 26 and fixed at an upper end of the reinforcing bar 39e; A turn buckle 38 connected between the steel wires 37 to adjust the length of the steel wires 37 and a stop 12 formed at an upper portion of the concrete girder 10g to prevent the PC panel 20g from being pushed inward. It is configured to include.

콘크리트 거더(10g)에는 전단철근(11g)의 일부가 매입되고 나머지는 상부로 돌출되며, 전단철근(11g) 외측의 콘크리트 거더(10g) 상부에는 멈치(12)가 상부로 돌출되게 형성된다.A part of the shear reinforcing bar (11g) is embedded in the concrete girder (10g) and the rest protrudes upward, and the stopper (12) is formed to protrude upward in the upper part of the concrete girder (10g) outside the shear bar (11g).

철근(23,24)을 교차되도록 배근하고, 운반고리(22f)의 일부가 상부로 돌출되게 다수 배치한 상태에서 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 외벽(26)이 형성된 PC 패널(20g)을 한판으로 제작한다.PC panel formed by reinforcing the reinforcing bars (23, 24) to intersect, and placing and curing concrete in a state in which a plurality of transport rings (22f) are arranged in a large number, and cast and cured to form the outer wall (26) in the factory. (20g) to make a bout.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20g)을 공사 현장으로 운반하고, 전단철근(11g)의 일측 상부 모서리에 철근(39e)을 길이방향으로 배열한다. In this way, the PC panel 20g, which is produced in a single plate by the precasting method, is transported to the construction site, and the reinforcing bars 39e are arranged in the longitudinal direction at one upper edge of the shear bar 11g.

크레인에 상기 운반고리(22f)를 연결하여 상기 PC 패널(20g)이 콘크리트 거더(10g)에 걸쳐지고 멈치(12)에 의해 밀리지 않도록 한 상태에서 외측을 향하도록 위치시키고, 상기 외벽(26)에 고정된 고정볼트와 같은 고정부재(28)에 철근(39e)을 강선(37)으로 연결하여 고정하되, 강선(37) 사이에 턴 버클(38)을 연결하여 강선(37)의 길이를 조절하여, PC 패널(20g)이 수평을 유지하도록 한다.The carrier ring 22f is connected to a crane, and the PC panel 20g is positioned to face outward in a state not to be pushed by the stopper 12 by being covered by the concrete girder 10g, and on the outer wall 26. By connecting the reinforcing bar (39e) to the fixing member 28, such as a fixed fixing bolt with a steel wire 37 to be fixed, by connecting a turn buckle 38 between the steel wire 37 to adjust the length of the steel wire 37 The PC panel 20g is kept horizontal.

다음 상기 콘크리트 거더(10g)의 상부와 PC 패널(20g)의 상부에 미도시된 철근을 배근하고 콘크리트를 타설/양생함으로써 슬래브(50g)의 시공이 완료된다.Next, the construction of the slab 50g is completed by reinforcing the not shown reinforcing bar on the upper part of the concrete girder 10g and the upper part of the PC panel 20g and placing / curing concrete.

이와 같이 PC 패널(20g)에 외벽(26)이 형성되고, PC 패널(20g)의 일부가 콘 크리트 거더(10g) 상부에 멈치(12)에 의해 움직이지 않도록 걸쳐진 상태에서, 상기 외벽(26)과 철근(39e)이 강선(37)에 의해 연결되어 PC 패널(20g)이 고정 지지되기 때문에, 동바리와 거푸집을 설치하지 않아도 콘크리트 거더(10g)와 PC 패널(20g) 상부에 슬래브(50g)를 시공할 수 있다.As described above, the outer wall 26 is formed on the PC panel 20g, and a part of the PC panel 20g is placed over the concrete girder 10g so as not to move by the stop 12. Since the reinforcing bar 39e is connected by the steel wire 37 so that the PC panel 20g is fixedly supported, the slab 50g is placed on the concrete girder 10g and the PC panel 20g without installing the copper bar and the formwork. Can be installed.

도 9는 본 고안의 제8실시예에 따른 PC패널 지지구조의 사시도이다.9 is a perspective view of a PC panel support structure according to an eighth embodiment of the present invention.

제8실시예는 스틸 거더(14)에 PC 패널(20)을 지지하는 구조이다.The eighth embodiment is a structure for supporting the PC panel 20 in the steel girder 14.

PC 패널(20)의 구조는 제1실시예 내지 제7실시예와 같고, 도 9에서는 지지부재의 일종으로 I형강을 사용한 PC 패널(도 6a 및 도 6b 참조)을 들어 설명한다.The structure of the PC panel 20 is the same as that of the first to seventh embodiments, and in Fig. 9, a PC panel (see Figs. 6A and 6B) using I-shaped steel as a kind of supporting member will be described.

도시된 바와 같이, 스틸 거더(14) 상부에 돌출된 다수 스터드 볼트(stud bolt,16)와, 프리캐스팅 방식으로 제작된 PC 패널(20e)에 매입되어 상부와 외측으로 돌출되게 형성된 I형강(36)과, 상기 PC 패널(20e)의 상부로 돌출되게 형성된 운반고리(22d)와, 상기 스터드 볼트(16)에 양 단이 고정되는 고정 와이어(17)를 포함하여 구성된다.As shown, a plurality of stud bolts 16 protruding from the upper part of the steel girder 14 and an I-shaped steel 36 formed to protrude outward and outward by being embedded in the PC panel 20e manufactured by the precasting method. ), A carrier ring 22d formed to protrude upward of the PC panel 20e, and a fixing wire 17 fixed at both ends to the stud bolt 16.

스틸 거더(14)의 상부 플랜지(15) 상부에는 다수의 스터드 볼트(16)가 상부로 돌출된다.A plurality of stud bolts 16 protrude upward from the upper flange 15 of the steel girder 14.

철근(23,24)을 교차되도록 배근하고, I형강(36)이 상부 및 외측으로, 운반고리(22d)가 상부로 돌출되게 다수 배치한 상태에서, 콘크리트를 타설하고 양생하여 공장에서 프리캐스팅 방식에 의해 PC 패널(20e)을 한판으로 제작한다.In the state where the reinforcing bars 23 and 24 are arranged to intersect, and a plurality of I-shaped steels 36 are disposed so as to protrude upwards and outwards, and the carrier ring 22d protrudes upwards, the concrete is cast and cured to be precast in the factory. By this, the PC panel 20e is produced in a single plate.

이와 같이 프리캐스팅 방식에 의해 한판으로 제작된 PC 패널(20e)을 공사 현장으로 운반하고, 길이방향의 스터드 볼트(16) 상부를 고정 와이어(17)로 연결한 다. In this way, the PC panel 20e, which is manufactured in a single plate by the precasting method, is transported to the construction site, and the top of the longitudinal stud bolt 16 is connected to the fixing wire 17.

크레인에 상기 운반고리(22d)를 연결하여 상기 PC 패널(20e)이 콘크리트 거더(14)에 걸친 상태에서 외측을 향하도록 위치시키고, 상기 I형강(36)과 상부 플랜지(15)가 접하는 부위는 용접을 하여 고정시킨다.The carrier ring 22d is connected to a crane so that the PC panel 20e faces outward in a state spanning the concrete girder 14, and the portion where the I-shaped steel 36 and the upper flange 15 contact each other. Weld and fix.

다음 상기 스틸 거더(14)의 상부와 PC 패널(20e)의 상부에 미도시된 철근을 배근하고, 콘크리트 타설 양생함으로써 슬래브의 시공이 완료된다.Next, reinforcing bars not shown in the upper part of the steel girder 14 and the upper part of the PC panel 20e are completed, and the construction of the slab is completed by curing the concrete.

이와 같이 PC 패널(20e)에 I형강(36)이 돌출되게 형성되고, PC 패널(20e)의 일부가 스틸 거더(14) 상부에 걸쳐진 상태에서, 상기 I형강(36)이 용접에 의해 상부 플랜지(15)에 고정되고 상부의 고정 와이어(17)에 의해 고정 지지되기 때문에 동바리와 거푸집을 설치하지 않아도 스틸 거더(14)와 PC 패널(20e) 상부에 슬래브를 시공할 수 있다.Thus, the I-shaped steel 36 protrudes from the PC panel 20e, and the part of the PC panel 20e is overlaid on the upper part of the steel girder 14, and the I-shaped steel 36 is welded to the upper flange by welding. Since it is fixed to (15) and fixedly supported by the upper fixing wire 17, it is possible to construct a slab on the steel girder 14 and the PC panel 20e upper part without installing the clubs and the formwork.

이상에서는 지지부재로, T형강(31), 철판(32), 플랫 바(33), ㅁ형강(34), L형강(35), I형강(36), 강선(37)을 예를 들었으나, 래티스 거더(lattice girder) 등도 PC 패널(20)에 배근하여 사용할 수 있다.In the above, as the support member, T-shaped steel 31, iron plate 32, flat bar 33, K-shaped steel 34, L-shaped steel 35, I-shaped steel 36, steel wire 37 are exemplified. , A lattice girder and the like can also be used by being placed on the PC panel 20.

이상 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 고안을 설명하기 위한 목적에서 사용된 것일 뿐 의미 한정이나 실용신안등록청구범위에 기재된 본 고안의 범위를 제한하기 위하여 사용된 것이 아니다.In the drawings and the detailed description of the preferred embodiments are disclosed, the specific terminology used herein is for the purpose of describing the invention only, limiting the scope of the invention as defined in the meaning or utility model registration claims. It was not used to

그러므로 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 고안의 진정한 기술적 보호 범위는 실용신안 등록청구범위의 기술적 사상에 의해 정해져야 할 것이다.Therefore, those skilled in the art can be various modifications and other equivalent embodiments from this, and the true technical protection scope of the present invention should be determined by the technical spirit of the utility model registration claims.

이하에서 살펴본 바와 같이 본 고안에 의하면, 동바리나 거푸집을 설치하지 않고 PC 패널을 지지하여 슬래브를 시공할 수 있기 때문에 PC 패널과 슬래브의 시공이 간편하고 용이하며 시공기간을 줄일 수 있을 뿐만 아니라 동바리나 거푸집을 설치하거나 해체하지 않아도 되어 안전하고 경제적이다.As described below, according to the present invention, since the slab can be constructed by supporting the PC panel without installing the copper bar or the formwork, the construction of the PC panel and the slab is simple and easy, and the construction period can be shortened. Safe and economical as there is no need to install or dismantle formwork.

Claims (16)

콘크리트 거더의 상부에
Figure 112005065145853-utm00007
형상으로 형성된 전단철근과;
On top of concrete girder
Figure 112005065145853-utm00007
Shear reinforcement formed in the shape;
상기 전단철근의 상부 모서리에 길이방향으로 배열되는 철근과;Rebars arranged in the longitudinal direction at the upper edge of the shear rebar; 상기 콘크리트 거더의 상부에 외측으로 돌출되게 설치되는 PC 패널; 및A PC panel installed to protrude outward from an upper portion of the concrete girder; And 상기 PC 패널과 전단철근에 고정되고, 철근에 의해 상부가 지지되어 PC 패널을 고정 지지하는 지지부재를 포함하는 캔틸레버부의 PC 패널 지지구조.The PC panel support structure of the cantilever portion is fixed to the PC panel and the shear reinforcement, the upper portion is supported by the reinforcing bar including a support member for fixing and supporting the PC panel.
스틸 거더의 상부 플랜지에 돌출 형성된 다수의 스터드 볼트와;A plurality of stud bolts protruding from the upper flange of the steel girder; 상기 스터드 볼트의 상부에 고정되어 양 스터드 볼트를 연결하는 고정 와이어와;A fixing wire fixed to an upper portion of the stud bolt to connect both stud bolts; 상기 스틸 거더의 상부에 외측으로 돌출되게 설치되는 PC 패널; 및A PC panel protruding outward from an upper portion of the steel girder; And 상기 PC 패널과 상부 플랜지에 고정되고, 고정 와이어에 의해 상부가 지지되어 PC 패널을 고정 지지하는 지지부재를 포함하는 캔틸레버부의 PC 패널 지지구조.And a support member fixed to the PC panel and the upper flange, the upper part being supported by a fixing wire to fix and support the PC panel. 제 2 항에 있어서,The method of claim 2, 상기 지지부재는 PC 패널에 매입되어 PC 패널의 외측으로 돌출된 플랫 바인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the flat bar is embedded in the PC panel protruding out of the PC panel. 제 2 항에 있어서,The method of claim 2, 상기 지지부재는 PC 패널에 매입되어 PC 패널의 외측으로 돌출된 ㅁ형강인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the K-shaped steel embedded in the PC panel protruding out of the PC panel. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 지지부재는 PC 패널 상부에 형성된 운반 및 체결고리에 상하가 역전되게 끼워져 체결되는 T형강인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the T-shaped steel is inserted into the upper and lower inverted fastening to the transport and fastening ring formed on the PC panel. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 지지부재는 PC 패널에 매입되어 PC 패널의 상부로 돌출된 L형강에 수직으로 세워져 체결되는 철판인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is embedded in the PC panel PC panel support structure of the cantilever portion, characterized in that the iron plate is vertically fastened to the L-shaped steel protruding to the upper portion of the PC panel. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 지지부재는 상기 PC 패널에 매입되어 PC 패널의 상부 및 외측으로 돌출된 I형강인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.Wherein the support member is embedded in the PC panel PC panel support structure of the cantilever portion, characterized in that the I-shaped steel protruding to the top and outside of the PC panel. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 지지부재는 상기 PC 패널에 매입되어 PC 패널의 상부 및 외측으로 돌출된 L형강인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the L-shaped steel protruding to the top and the outside of the PC panel embedded in the PC panel. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 지지부재는 상기 PC 패널에 매입되어 PC 패널의 상부 및 외측으로 돌출된 래티스 거더인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.And the support member is a lattice girder which is embedded in the PC panel and protrudes outward and outward of the PC panel. 콘크리트 거더의 상부에
Figure 112005065145853-utm00008
형상으로 형성된 전단철근과;
On top of concrete girder
Figure 112005065145853-utm00008
Shear reinforcement formed in the shape;
상기 전단철근의 내측 상부에 수직으로 세워져 길이방향으로 배열되는 버팀대와;A brace vertically erected vertically on an inner upper portion of the shear rebar; 상기 콘크리트 거더의 상부에 외측으로 돌출되게 설치되는 PC 패널; 및A PC panel installed to protrude outward from an upper portion of the concrete girder; And 상기 PC 패널과 전단철근에 고정되고, 버팀대에 의해 상부가 지지되어 PC 패널을 고정 지지하는 지지부재를 포함하는 캔틸레버부의 PC 패널 지지구조.The PC panel support structure of the cantilever portion is fixed to the PC panel and the shear reinforcement, and includes a support member which is supported by the brace and fixed to support the PC panel.
제 10 항에 있어서,The method of claim 10, 상기 지지부재는 PC 패널에 매입되어 PC 패널의 외측으로 돌출된 플랫 바인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the flat bar is embedded in the PC panel protruding out of the PC panel. 제 10 항에 있어서,The method of claim 10, 상기 지지부재는 PC 패널에 매입되어 PC 패널의 외측으로 돌출된 ㅁ형강인 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.The support member is a PC panel support structure of the cantilever portion, characterized in that the K-shaped steel embedded in the PC panel protruding out of the PC panel. 콘크리트 거더의 상부에
Figure 112005065145853-utm00009
형상으로 형성된 전단철근과;
On top of concrete girder
Figure 112005065145853-utm00009
Shear reinforcement formed in the shape;
상기 전단철근의 상부 모서리에 길이방향으로 배열되는 철근과;Rebars arranged in the longitudinal direction at the upper edge of the shear rebar; 상기 콘크리트 거더의 상부에 외측으로 돌출되게 설치되고 외벽이 형성된 PC 패널; 및A PC panel installed to protrude outward on an upper portion of the concrete girder and having an outer wall formed thereon; And 상기 외벽과 철근에 양 단이 연결되어 PC 패널을 고정 지지하는 강선을 포함하는 캔틸레버부의 PC 패널 지지구조.PC panel support structure of the cantilever portion including a steel wire which is connected to both ends of the outer wall and the reinforcing bar to fix and support the PC panel.
스틸 거더의 상부 플랜지에 돌출 형성된 다수의 스터드 볼트와;A plurality of stud bolts protruding from the upper flange of the steel girder; 상기 스터드 볼트의 상부에 고정되어 양 스터드 볼트를 연결하는 고정 와이어와;A fixing wire fixed to an upper portion of the stud bolt to connect both stud bolts; 상기 스틸 거더의 상부에 외측으로 돌출되게 설치되고 외벽이 형성된 PC 패널; 및A PC panel protruding outward from an upper portion of the steel girder and having outer walls formed thereon; And 상기 외벽과 고정 와이어에 양 단이 연결되어 PC 패널을 고정 지지하는 강선을 포함하는 캔틸레버부의 PC 패널 지지구조.PC panel support structure of the cantilever portion including a steel wire which is connected to both ends of the outer wall and the fixing wire to fix and support the PC panel. 제 13 항 또는 제 14 항에 있어서,The method according to claim 13 or 14, 상기 강선 사이에는 강선의 길이를 조절하여 PC 패널의 수평을 유지하는 턴 버클이 연결되는 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.PC panel support structure of the cantilever portion, characterized in that the turn buckle is connected between the steel wire to adjust the length of the steel wire to maintain the horizontal level of the PC panel. 제 13 항 또는 제 14 항에 있어서,The method according to claim 13 or 14, 상기 콘크리트 거더나 스틸 거더의 상부에는 PC 패널이 내측으로 밀리는 것을 방지하는 멈치가 설치되는 것을 특징으로 하는 캔틸레버부의 PC 패널 지지구조.PC panel support structure of the cantilever portion, characterized in that the upper stop of the concrete girder or steel girder is provided with a stop to prevent the PC panel is pushed inward.
KR2020050032096U 2005-11-12 2005-11-12 Support Structure for PC Panel of Cantilever Part KR200407092Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020050032096U KR200407092Y1 (en) 2005-11-12 2005-11-12 Support Structure for PC Panel of Cantilever Part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020050032096U KR200407092Y1 (en) 2005-11-12 2005-11-12 Support Structure for PC Panel of Cantilever Part

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050108301 Division 2005-11-12

Publications (1)

Publication Number Publication Date
KR200407092Y1 true KR200407092Y1 (en) 2006-01-24

Family

ID=49296150

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020050032096U KR200407092Y1 (en) 2005-11-12 2005-11-12 Support Structure for PC Panel of Cantilever Part

Country Status (1)

Country Link
KR (1) KR200407092Y1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100728106B1 (en) 2006-09-15 2007-06-14 한국건설기술연구원 Cantilever construction structure of slab for bridge and the method thereof
KR101074171B1 (en) 2009-01-21 2011-10-14 주식회사 공간이동 multi notch-plate.
KR101674306B1 (en) * 2015-07-24 2016-11-09 성균관대학교산학협력단 Structure for composite beam girder
KR101765762B1 (en) * 2015-12-16 2017-08-07 주식회사 신원알피씨 Cantilever part for bridge and constructing method thereof
JP2018135668A (en) * 2017-02-21 2018-08-30 三井住友建設株式会社 Lateral reinforcement rigid structure of steel beam
KR102227639B1 (en) * 2019-10-01 2021-03-12 김수명 Steel composite precast slab

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100728106B1 (en) 2006-09-15 2007-06-14 한국건설기술연구원 Cantilever construction structure of slab for bridge and the method thereof
KR101074171B1 (en) 2009-01-21 2011-10-14 주식회사 공간이동 multi notch-plate.
KR101674306B1 (en) * 2015-07-24 2016-11-09 성균관대학교산학협력단 Structure for composite beam girder
KR101765762B1 (en) * 2015-12-16 2017-08-07 주식회사 신원알피씨 Cantilever part for bridge and constructing method thereof
JP2018135668A (en) * 2017-02-21 2018-08-30 三井住友建設株式会社 Lateral reinforcement rigid structure of steel beam
KR102227639B1 (en) * 2019-10-01 2021-03-12 김수명 Steel composite precast slab

Similar Documents

Publication Publication Date Title
KR200407092Y1 (en) Support Structure for PC Panel of Cantilever Part
KR101196472B1 (en) Steel-Concrete composite Crossbeam having T-shaped beam and construction methods using the same
KR100923564B1 (en) Precast concrete panel, construction method and structure of precast concrete panel using steel plate
JP2004339867A (en) Half precast concrete slab and method of constructing the slab
KR100938876B1 (en) Stay-in-place precast concrete panel
KR200406615Y1 (en) T shape precast concrete panel
JP3841493B2 (en) Construction method of viaduct using PCa concrete member
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR200233599Y1 (en) Installation structure for reinforcing rod of bent
KR200207380Y1 (en) A column&#39;s reinforcing rod for a round pier
KR101194866B1 (en) Rahmen bridge construction method using longitudinal and lateral steel member
JPH09221706A (en) Floor slab for road surface and layout method thereof
JPH10227010A (en) Steel form with main reinforcement for bridge floor panel and bridge floor panel construction method using it
JPH101914A (en) Method of constructing floor slab of road
JP3945668B2 (en) Construction method of concrete pier
JPH1136229A (en) Construction method for reinforced concrete bridge pier
JPH1129910A (en) Method for constructing concrete pier
KR101071647B1 (en) Steel hybrid girder using re-used angle
JP6555623B2 (en) Concrete structure and construction method thereof
KR100650444B1 (en) Cantilever part construction method of bridge
JPH05239810A (en) Constructing method for reinforced concrete arch bridge
JP2004270259A (en) Slab form and slab structure
KR200172618Y1 (en) Panel brazing bracket for supporting bar constructing ceiling using concrete construction
JPH06185108A (en) Constructing method for beam
KR20120124129A (en) Non-supporting rc top down construction method using hybrid formwork beam

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130117

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140120

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150119

Year of fee payment: 10

EXPY Expiration of term