KR20020050185A - The method to manufacture break to sand by construction waste - Google Patents

The method to manufacture break to sand by construction waste Download PDF

Info

Publication number
KR20020050185A
KR20020050185A KR1020020001560A KR20020001560A KR20020050185A KR 20020050185 A KR20020050185 A KR 20020050185A KR 1020020001560 A KR1020020001560 A KR 1020020001560A KR 20020001560 A KR20020001560 A KR 20020001560A KR 20020050185 A KR20020050185 A KR 20020050185A
Authority
KR
South Korea
Prior art keywords
screen
crushing
sand
classification
crushed
Prior art date
Application number
KR1020020001560A
Other languages
Korean (ko)
Other versions
KR100521764B1 (en
Inventor
안선희
Original Assignee
안선희
주식회사 대호에코텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안선희, 주식회사 대호에코텍 filed Critical 안선희
Priority to KR10-2002-0001560A priority Critical patent/KR100521764B1/en
Publication of KR20020050185A publication Critical patent/KR20020050185A/en
Application granted granted Critical
Publication of KR100521764B1 publication Critical patent/KR100521764B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/42Drive mechanisms, regulating or controlling devices, or balancing devices, specially adapted for screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B13/00Grading or sorting solid materials by dry methods, not otherwise provided for; Sorting articles otherwise than by indirectly controlled devices
    • B07B13/04Grading or sorting solid materials by dry methods, not otherwise provided for; Sorting articles otherwise than by indirectly controlled devices according to size

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Disintegrating Or Milling (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

PURPOSE: A manufacturing method of crushed sand is provided to achieve the mass production of crushed sand of a uniform high quality by effectively utilizing construction waste and to solve the problem of environmental contamination. CONSTITUTION: The manufacturing method of crushed sand using construction waste consists of a pre-treatment process for obtaining regenerated material comprised of a material input step, a first pulverizing step, a first classifying step, an underwater separating step, a second pulverizing step, a second classifying step, and a third pulverizing step; and an after-treatment process for obtaining final crushed sand comprised of a regenerated material input step, a first classifying step, a first pulverizing step, a second classifying step, a second pulverizing and grinding step, and a third classifying step.

Description

건설폐기물을 이용한 부순모래 제조방법 {The method to manufacture break to sand by construction waste}Crushed sand manufacturing method using construction waste {The method to manufacture break to sand by construction waste}

본 발명은 건설용 골재를 제조하기 위한 방법에 관한 것으로, 특히 건설 폐기물의 재활용 처리공정을 통해 양질의 부순모래를 제조하기 위한 것이다.The present invention relates to a method for manufacturing aggregate for construction, and in particular, to produce high quality crushed sand through the recycling process of construction waste.

골재란 몰탈이나 콘크리트를 만들기 위해 시멘트와 물과 함께 섞는 모래, 자갈 등의 재료를 말하는데, 종래에는 주로 경제적인 이유에서 시멘트 페이스트와 혼합되는 단순한 충전재로 여겨왔으나 , 최근에는 그 품질의 양부가 콘크리트 특성에 매우 큰 영향을 미치는 것으로 밝혀지고 있다.Aggregate refers to materials such as sand and gravel, which are mixed with cement and water to make mortar or concrete. In the past, it was considered as a simple filler mixed with cement paste mainly for economic reasons. It turns out to have a very big impact.

일반적으로 건설용 골재로서 하천골재가 이상적이지만 80년대 이후 천연골재의 과다한 대량채취로 생태계 파괴의 심각성과 자연보호차원의 각종 규제로, 굵은 골재는 1990년 이전 이미 반입이 중단되어 쇄석으로 대체되었고, 잔골재는 고갈상태로서 건설산업에 크다란 위협이 되고 있다.Generally, river aggregates are ideal as construction aggregates, but due to the excessive collection of natural aggregates since the 1980s, due to the seriousness of ecosystem destruction and various regulations in terms of nature protection, coarse aggregates have been discontinued before 1990 and replaced with crushed stone. Fine aggregates are depleted and pose a threat to the construction industry.

특히 잔골재의 경우는 천연자원 이외에 부순모래등 골재자원을 개발하여 품종을 다양화시키고 있으나, 부순모래는 불량한 입형 및 미립분 함유량, 육지모래는 점토 함유량, 바다 모래는 염분 함유량, 산모래는 연질 풍화물 등에 의하여 전반적으로 품질이 악화되고 있는 실정이다.In the case of fine aggregates, in addition to natural resources, aggregate varieties such as crushed sand have been developed to diversify varieties, but crushed sand has poor granular and fine powder content, land sand has clay content, sea sand has salt content, and mountain sand has soft wind. Overall quality is deteriorated due to cargo.

이에 대한 대응으로 일본 등 외국에서는 큰크리트용 잔골재로서 부순모래의 활용에 대한 괄목할만한 진전이 있으나, 국내의 경우 굵은 골재는 이미 부순돌(쇄석)을 이용하는 것이 보편화되어 있음에도 불구하고 부순모래(쇄사)에대한 개발이나 활용은 매우 미흡한 상황이다.In response, there has been remarkable progress in the use of crushed sand as a fine aggregate in foreign countries such as Japan.However, in Korea, crushed sand (crushed sand) is used despite the fact that coarse aggregates have already been widely used. The development or utilization of the technology is very poor.

부순모래는 천연모래와 달리 암석을 크럿셔 등으로 파쇄하여 인공적으로 만든 잔골재를 말하며, 국내에서는 부순돌 생산시에 발생되는 석분(입경 8mm 이하의 부산물로 생산량의 25-30%정도가 발생)을 원재료로 사용하는 경우가 대부분이였다.Crushed sand, unlike natural sand, refers to fine aggregates made artificially by crushing rocks with crushers.In Korea, crushed sand is produced by the production of crushed stones (by-product having a particle diameter of 8mm or less, which generates about 25-30% of the production). Most of them were used as raw materials.

최근에는 천연 잔골재의 부족으로 부순모래의 원재료 구하기가 어려워져 입경 15-40mm의 부순돌로 하기도 한다.Recently, due to the lack of natural fine aggregates, it is difficult to obtain raw materials of crushed sand, which is also called crushed stone having a particle diameter of 15-40 mm.

그런데, 그 제조과정에서 분쇄,분급,수처리 등 여러 단계를 거쳐 제조되는 것으로 그 품질이 열악하고 ,제조시스템이 조금이라도 변화하는 경우 생산되는 부순모래의 품질이 매우 큰 차이가 나타나고 있다.By the way, in the manufacturing process is produced through a number of steps, such as grinding, classification, water treatment, the quality is poor, the quality of the crushed sand produced when there is a slight change in the manufacturing system is showing a very big difference.

기본적으로 부순모래의 제조시스템은 파쇄장치, 분급장치로 구성되며, 파쇄 및 분급방법에 따라 건식과 습식으로 나누어진다.Basically, the crushed sand manufacturing system is composed of crushing device and classification device, and it is divided into dry and wet according to the crushing and classification method.

구체적인 제조설비를 살펴 보면, 크렛셔를 정점으로 해서 재료공급장치( 호퍼, 피더), 콘베이어 벨트, 스크린, 탁수처리시설,제어기기 및 경우에 따라서는 집진장치,건조장치 등이 필요하다.Looking at the specific manufacturing equipment, a feeder (hopper, feeder), conveyor belt, screen, turbidity treatment facility, a control device and, in some cases, a dust collector, a drying device, etc. are required with the crater as the top.

이때 중요한 것은 각각의 공정별 장치가 목적과 용도에 맞게 적절하게 조합배치되어야만 요구되는 품질의 부순모래를 제조할 수 있다는 점이며, 선택된 장치의 구성상의 배열 및 순환경로에 따라 품질의 균일성 확보가 곤란한 문제점이 있다.In this case, it is important that each process-specific device can be manufactured according to the purpose and use properly to produce the impure sand of the required quality, and to ensure the uniformity of quality according to the arrangement and circulation path of the selected device. There is a difficult problem.

본 발명은 상기 문제점을 해결하는 동시에 재활용되지 못하여 환경문제 및 자원낭비가 되는 건설폐기물을 효율적으로 활용하여 품질이 균등하고 우수한 부순모래를 생산할 수 있는 생산방법을 제공하는데 있다.The present invention is to provide a production method that can produce a uniform and excellent crushed sand by efficiently utilizing the construction waste that can not be recycled and at the same time can not be recycled environmental problems and waste of resources.

이를 위해 본 발명은 전공정과 후공정이 독립적으로 구성되면서 연속적으로 반복되면서 대량생산이 가능하다는데 그 특징이 있다.To this end, the present invention is characterized in that it is possible to mass-produce while repeating continuously while the front and back processes are configured independently.

전공정은 원료투입-> 1차 파쇄 -> 1차분급 -> 수중선별 -> 2차 파쇄 ->2차분급-> 3차 파쇄 -> 재생원료 생산 순으로 진행되고,The entire process proceeds in the order of raw material input-> 1st crushing-> 1st classification-> Underwater classification-> 2nd crushing-> 2nd classification-> 3rd crushing-> Recycling raw materials production,

후공정은 재생원료 투입-> 1차 분급 -> 1차 파쇄 -> 2차 분급 ->2차 파쇄 및 연마 -> 3차 분급 -> 최종 제품(부순모래) 생산으로 완성된다.The post-process is completed by adding recycled materials-> 1st classification-> 1st crushing-> 2nd classification-> 2nd crushing and polishing-> 3rd classification-> Production of final product (crushed sand).

건설폐기물을 이용한 부순모래 생산에 있어, 채택되는 공정별 장치 및 순환경로에 의해 최종제품의 품질 및 균일성 확보에 큰 영향을 미치므로,상기와 같이 본 발명은 정형화된 시스템을 제시하여 순차적인 연속방식의 공정설비를 배치하여 전후공정의 흐름이 원활히 진행될 수 있도록 하는데 또다른 목적이 있다.In the production of crushed sand using construction waste, the process-specific device and circulation path have a great influence on securing the quality and uniformity of the final product. As described above, the present invention proposes a formal system and sequentially Another purpose is to arrange the process equipment of the method so that the flow of the post-process can be smoothly performed.

도1 (가) 본 발명에 있어 전공정의 구성도, (나) 흐름도1 (a) Configuration diagram of the previous step in the present invention, (b) Flow chart

도2 (가) 본 발명에 있어 후공정의 구성도, (나) 흐름도Figure 2 (A) Configuration diagram of the post-process in the present invention, (B) Flow chart

(도면의 주요부호에 대한 설명)(Description of Major Symbols in Drawings)

1. 11. 투입장치 2. 5. 죠 크러셔 (Jaw Crusher)1. 11. Dosing device 2. 5. Jaw crusher

3.6.11.13.15. 진동식 스크린 (Vibrator Screen)3.6.11.13.15. Vibrator Screen

4.물탱크 7.12. 콘 그러셔(Cone Crusher)4.Water tank 7.12. Cone Crusher

14.샌드 유닛(Sand Unit) 16. 임팩트 크러셔(Impact Crusher)14.Sand Unit 16.Impact Crusher

본 발명은 전공정과 후공정이 독립적으로 수행되면서 연속적으로 반복된다.The present invention is continuously repeated while the previous and subsequent steps are performed independently.

전공정은 원료투입-> 1차 파쇄 -> 1차분급 -> 2차 파쇄 ->2차분급-> 3차 파쇄 -> 재생원료 생산 순으로 진행되고,The entire process proceeds in the order of input of raw materials-> 1st crushing-> 1st classification-> 2nd crushing-> 2nd classification-> 3rd crushing-> recycled raw materials production,

후공정은 재생원료 투입-> 1차 분급 -> 1차 파쇄 -> 2차 분급 -> 2차 파쇄 및 연마 -> 3차 분급 ->최종 제품(부순모래) 생산으로 완성된다.The post-process is completed by adding recycled raw materials-> 1st classification-> 1st crushing-> 2nd classification-> 2nd crushing and polishing-> 3rd classification-> Final product (crushed sand) production.

상기 전공정과 후공정은 개별적으로 분리독립하여 운영되는 방식이지만,본 발명의 목적을 달성하기 위해서는 후공정은 전공정에 연설하여 설치되어야 한다.Although the previous process and the after process is operated separately and independently, in order to achieve the object of the present invention, the post process must be installed by speaking to the previous process.

본 발명의 주요 구성인 스크린은 별도의 언급이 없는 한 평면식 또는 경사식 진동 체걸음 방식을 채택하고 있으며 모두 스크린으로 칭하되, 다만 각 단계별로 구분하여 별칭한다. 또한, 체눈의 크기는 임의로 셋팅할 수 있으며, 습식 또는 건식을 채택한다.Screen, which is the main configuration of the present invention, unless otherwise stated, adopts a planar or inclined vibrating diaphragm system, and all are referred to as screens, but are aliased for each step. In addition, the size of the body can be arbitrarily set and adopts wet or dry.

본 발명에 사용되는 장치는 구동을 위해 동력발생장치로서 전기모터를 사용하여 운전되는 것이나, 각 장치에 별도의 엔진을 장착하여 유압구동모터를 채용할 수 있다.The apparatus used in the present invention is driven by using an electric motor as a power generating device for driving, but a separate engine may be mounted to each device to employ a hydraulic driving motor.

또한 ,본 발명에서는 별도의 언급이 없는 한 각 공정별 장치는 이송수단인 콘베이어벨트에 의해 연결되어 있고, 콘베어벨트 상에는 미세입자가 투과될 정도의 구멍이 천공되어 있음을 밝힌다.In addition, in the present invention, unless otherwise stated, the device for each process is connected by a conveyer belt, which is a conveying means, and reveals that holes are formed on the conveyor belt to the extent that fine particles are permeated.

I.전공정 (前)I. Preprocess

본 발명에서 전공정은 건설폐기물을 공급기에 투입하고 조 크러셔(Jaw Crusher)에 의해 콘크리트,폐석들을 파쇄한 후, 철재류 및 토사를 분리배출하고 나머지를 수중선별장치에 이송시켜 습식에 의한 분진제거 및 종이,목재 등의 이물질제거를 하고, 조 크러셔 및 콘 크러셔( Cone Crusher)를 통해 제2차 및 3차 분쇄를 한 후, 스크린을 통해 입자 크기별로 분류하여 제1차 재생 원료를 생산하는 과정이다.In the present invention, the entire process is to put the construction waste in the feeder and crush the concrete, waste rocks by jaw crusher (Jaw Crusher), and then to separate and discharge the iron and earth and sediment to the underwater sorting device to remove dust and paper by wet After removing foreign substances such as wood, second and third grinding through jaw crusher and cone crusher, and then sorting by particle size through the screen to produce the first recycled raw materials.

도 1의 (가)는 본 발명에 의한 전공정을 나타낸 구성도이고 , (나)는 흐름도로서,상기 과정을 각각의 도면을 참조하여 상술한다.FIG. 1A is a configuration diagram showing a previous process according to the present invention, and FIG. 1B is a flow chart, which will be described in detail with reference to the respective drawings.

제1단계(재료투입)First step (material input)

건설폐기물을 덤프 트럭이나 포크레인 등의 장비를 이용하여 진동공급기가 장착된 호퍼(1)에 투입한다. 이때 건축폐기물은 주로 폐콘크리트나 폐석이 되고, 크기별로 선택적 투입이 가능하다.The construction waste is input to the hopper (1) equipped with a vibration feeder using equipment such as a dump truck or a fork crane. At this time, the construction waste is mainly waste concrete or waste-rock, it is possible to selectively input by size.

제2단계(1차파쇄)Second stage (primary crushing)

상기 투입물은 파쇄장치인 조 크러셔(2)에서 1차 파쇄되고, 컨베이어벨트로이송되어지는데 이 과정에서 목재류 및 철재류 중 재활용이 가능한 것은 별도장치로 선별되어 외부로 반출되고, 기타 재활용이 어려운 것들은 소각시설로 운송되어 처분한다.The input is first crushed in the jaw crusher (2), which is crushed and conveyed to the conveyor belt in this process, which can be recycled out of wood and steel is sorted as a separate device and taken out to the outside, incineration of other difficult to recycle Transported to facility for disposal.

조 크러셔(Jaw Crusher)에 의해 콘크리트,폐석들을 파쇄되면서, 목재류 , 철재류 등의 이물질 및 토사가 분리배출된다. 토사의 경우는 컨베이어벨트로 이송되는 과정에서 미세한 입자는 자연히 배출되어지고 , 제1차 분급시 배출되며 남은 토사분은 수중선별장치에서 걸러진다.As crushing concrete and waste-rock by jaw crusher, foreign substances such as timber and iron materials and soil are separated and discharged. In the case of earth and sand, fine particles are naturally discharged in the process of conveying to the conveyor belt, and are discharged during the first classification, and the remaining soil is filtered out of the underwater sorting device.

제3단계 (1차분급)3rd stage (primary classification)

건식방식의 체걸음 진동스크린(3)에 의해 이물질,토사 및 골재가 분급되어지고,이때 체걸음을 통과하지 못한 원재료는 수중선별 처리를 거쳐 파쇄장치인 조 크러셔로 투입되고, 토사는 분리되어 외부로 배출되는 단계이다.The foreign body, soil and aggregate are classified by the dry sieve vibrating screen (3). At this time, raw materials that do not pass the sieve are put into the jaw crusher, which is a crushing device through underwater treatment, and the soil is separated and To be discharged.

수중처리장치(4)는 물탱크(41)와 물탱크 하단에 설비된 집수조(42)로 구성된다. 물탱크에는 물을 보충하기 위해 별도의 보조물탱크를 구비하거나 펌프를 통해 용수를 공급하며, 부유된 이물질을 제거하기 위한 모터 등의 별도의 동력장치 및 스크루 등을 설치한다. 상기 물탱크(41)에 투입된 건설폐기물에서 나무,스치로폴 등의 가벼운 폐기물과 이물질 등은 별도의 동력장치인 모터 등을 이용하여 제거한다.The water treatment apparatus 4 is composed of a water tank 41 and a water collecting tank 42 installed at the bottom of the water tank. The water tank is provided with a separate auxiliary tank for water replenishment, or supplies water through a pump, and installs a separate power device such as a motor and a screw to remove suspended foreign substances. Light waste and foreign substances such as wood, sciropol, etc. are removed from the construction waste put into the water tank 41 by using a motor, such as a separate power unit.

상기 진동스크린(3)에서 켄베이어벨트를 타고 이송되어온 토사는 일단 물탱크에 침수되고, 물탱크에 설치된 스크루에 의해 이송되어 집수조에 모여 침전이 되면 침전된 토사를 포크레인 등으로 외부로 방출시킨다.The soil that has been transported in the vibrating screen (3) by the kenveyor belt is submerged in the water tank, and then transported by a screw installed in the water tank to collect in the water collecting tank to settle out of the sedimentary soil to the fork lane or the like.

골재는 콘베이어벨트를 타고 물탱크(41)를 거쳐 바로 죠 크러쉬(5)로 이송되어져 파쇄되고, 이가운데 입자직경 50mm 이상의 조골재는 제3차 파쇄장치인 콘 크러셔(6)에 이송되어 파쇄과정을 거치게 된다.Aggregate is conveyed to the jaw crusher 5 directly through the water tank 41 through the conveyor belt and is crushed, and coarse aggregate having a particle diameter of 50 mm or more is transferred to the crusher 6, which is the third crusher, to perform the crushing process. Going through.

제4단계(2차파쇄)4th step (secondary shredding)

상기 수중처리단계를 거친 골재는 조 크러셔에 의해 2차 파쇄가 이루어지고 콘베이어벨트를 타고 제2차 스크린으로 이송된다.Aggregate that has undergone the water treatment step is subjected to secondary crushing by the jaw crusher and is conveyed to the secondary screen by a conveyor belt.

제5단계(2차분급)5th stage (secondary classification)

건식방식의 진동스크린을 통해 골재의 크기별로 분급이 이루어 진다.Classification is made by the size of aggregate through the dry type vibration screen.

체눈크기를 50mm이상 입자는 통과할수 없도록 조정하고, 통과된 입자는 크기별로 15mm 이하, 25mm 이하, 50mm이하로 구분시켜 콘베이어벨트로 배출하여 적재할수 있도록 한다.The grain size is adjusted so that more than 50mm of particles cannot pass, and the passed particles are classified into 15mm or less, 25mm or less and 50mm or less by size to be discharged and loaded with conveyor belt.

한편 , 2차 스크린(5)을 통과하지 못한 골재는 제3차 파쇄 및 연마과정을 거치도록 콘 크러셔(6)로 이송시킨다.Meanwhile, aggregate that does not pass through the secondary screen 5 is transferred to the cone crusher 6 to undergo the third crushing and polishing process.

제7단계(3차 파쇄)7th step (3rd shredding)

상기 2차 스크린(5)를 통과하지 못한 골재들은 콘 크러셔(6)에 의해 다시 파쇄되고 연마되어, 다시 스크린(5)으로 복귀되어 일정 기준치를 만족한 골재가 될때까지 순환반복 공정을 거치게 된다.Aggregates that do not pass through the secondary screen 5 are crushed and polished again by the cone crusher 6, and then returned to the screen 5 to undergo a repetitive cycle until the aggregate meets a predetermined standard value.

상기 최종적으로 파쇄된 건설폐기물은 입자크기별로 (13mm 이하 골재 ,14- 25mm 골재, 50mm이하의 골재) 생산되어, 필요와 용도에 따라 제품화되어 외부로 배출될 수 있고,본 발명의 목적에 부합되도록 부순모래 생산을 위하여 후공정에 투입된다.The finally crushed construction waste is produced by the particle size (13mm or less aggregate, 14-25mm aggregate, 50mm or less aggregate), can be productized according to the needs and uses and discharged to the outside, to meet the purpose of the present invention It is put into the post process for the production of crushed sand.

그런데, 상기 1차 내지3차에 걸친 파쇄과정은 단지 재생골재를 생산하기 위한 파쇄공정의 일부를 담당하는 것이고, 파쇄된 콘크리트를 단순히 크기별로 분류하는 과정이어서 분류가 이루어진 후에도 품질이 저급하다. 특히, 강제적 파쇄과정에서 입형이 불량하고 몰탈의 부착량이 많을 뿐 아니라 연석의 비율이 높고 골재 표면에 시멘트,모래 등의 미립분이 많이 부착되어 있다. 따라서, 양질의 부순모래로서 이용되기 위해서는 별도의 재처리가 필요한 것이다.However, the first to third crushing process is only responsible for a part of the crushing process for producing recycled aggregate, the quality is poor even after the classification is made simply because the process of classifying the crushed concrete by size. In particular, in the forcible crushing process, poor granularity, high mortar adhesion amount, high curb ratio, and fine particles such as cement and sand are attached to the aggregate surface. Therefore, separate reprocessing is required to be used as a high quality crushed sand.

II

I.후공정(後)I. Post-process

본 발명에서 후공정은 전공정에서 파쇄된 재생골재의 입형과 품질을 개선하여,최종적으로 7mm이하의 부순모래를 제조하는 과정이다.In the present invention, the post process is to improve the granularity and quality of the recycled aggregate crushed in the previous process, and finally to produce a crushed sand of less than 7mm.

도2는 본 발명에 의한 후공정을 나타내는 공정도로서 ,도2를 참조하여 본 발명을 설명한다.Fig. 2 is a process chart showing a post process according to the present invention, with reference to Fig. 2 to illustrate the present invention.

제1단계 (재료투입)Stage 1 (Material Input)

원재료가 입고되는 철판 사각콘형 호퍼에 진공공급기(Vibrator feeder)가 장착된다. 전공정에서 생산된 원재료를 선택적으로 투입할 수 도 있고, 크기에 상관없이 고루 투입할 수 도 있다. 상기 공급기(1)는 재료를 투입받아 콘베이어벨트를 통해, 골재가 선별된 후 파쇄될 수 있도록 진동스크린과 연결되어 있고, 분급 이후는 역시 콘베이어벨트를 통해 진동스크린의 배출부 일측에 배치된 콘 크러셔와 연결되어 있다.A vacuum feeder is installed in the iron plate square cone hopper into which raw materials are received. Raw materials produced in the previous process can be selectively added, or they can be added evenly regardless of size. The feeder 1 is connected to a vibrating screen through the conveyor belt to input the material, the aggregate is sorted and then crushed, and after the classification, the cone crusher is disposed on one side of the discharge part of the vibrating screen through the conveyor belt. Connected with

제2단계 (1차 분급)2nd stage (1st classification)

본 공정은 파쇄기에 투입시키기 이전의 과정으로서, 생산라인의 능력 및 생산제품의 물성치를 고려하여 체눈의 크기 및 시설의 용량을 결정한다.This process is the process before input to the crusher, and determines the size of the body and the capacity of the facility considering the capacity of the production line and the properties of the product.

본 발명에서는 상기 투입된 재료들을 제1차 진동스크린(2)에 수용받고 건식 분급이 이루어지는데 체눈을 13mm 이상의 입자가 걸리도록 한다.이 과정에서 그 이하의 미분은 제거되고 콘베이어를 통해 외부로 배출된다. 이때 입자 크기가 13mm 이상의 골재는 파쇄를 위해 콘 크러셔로 이송된다.In the present invention, the injected materials are accommodated in the first vibrating screen 2 and dry classification is performed so that the body takes particles of 13 mm or more. In this process, the fine powder is removed and discharged to the outside through the conveyor. . Aggregates of 13 mm or more in particle size are then transferred to the cone crusher for crushing.

제3단계 ( 1차 파쇄)3rd stage (1st shredding)

골재를 파쇄하기 위한 장치는 매우 다양한 종류가 있는데, 본 발명에서는 콘 크러셔 (Cone-Crusher)를 채택한다.There are a wide variety of devices for crushing aggregates, the present invention employs a cone-crusher (Cone-Crusher).

본 발명에서는 13mm이상의 굵은 골재는 콘 크러셔로 1차 파쇄를 하고, 제2차 진동스크린(14)으로 배송된다.In the present invention, the coarse aggregate of 13 mm or more is first crushed by the cone crusher, and is delivered to the second vibrating screen 14.

제4단계 (2차 분급)4th stage (2nd classification)

상기 1차 파쇄를 거친 골재들은 습식방식으로 제2차 스크린을 거치게 되는데, 2차 분급단계에서는 크게 3가지 경로를 가진다.The aggregates subjected to the first fracture are subjected to the second screen in a wet manner, and have three paths in the secondary classification step.

첫째, 제2차 진동스크린을 통해 13mm이상의 굵은 입자들은 선별되어 다시 상기 2차 콘 크러셔로 재투입되어 다시 파쇄처리를 거쳐야 한다. 파쇄 가공후에는 순환 콘베이어벨트를 따라 제3차 분급이 이루어지도록 스크린에 복귀된다.First, coarse particles larger than 13 mm are screened through the second vibrating screen, re-introduced into the secondary cone crusher, and subjected to crushing again. After crushing, the screen is returned to the third classification along the circulating conveyor belt.

둘째, 일정 입자크기를 만족한 골재들은 바로 제3차 스크린으로 이송되어 세척과정을 거치게 되고 , 이후 제3차 스크린 배출구 일지점에 구비되어 콘베이어벨트와 연결되어 있는 임펙트 크러셔에 투입되어 제2차 파쇄 및 연마과정을 거치게 된다.Second, aggregates satisfying a certain particle size are immediately transferred to the third screen for washing, and then the second screen is put into the impact crusher which is provided at one point of the third screen outlet and connected to the conveyor belt. And polishing process.

세째, 스크린을 통과하면서 미분이 제거된 3.0mm 이하의 입자는 샌드유닛에 의해 포집되고, 제품으로 반출된다.Third, 3.0 mm or less particles having fine powder removed while passing through the screen are collected by the sand unit and carried out to the product.

제5단계 (2차 파쇄 및 연마단계)5th step (2nd crushing and polishing step)

상기 2차 분급에서 주로 3-13mm사이의 입자들이 콘베이어벨트로 이송되어와 임팩트크러셔(16)를 통해 일정치 이하로 파쇄가공된다. 이때 파쇄와 함께 입형구조가 크게 개선된다.In the secondary classification, mainly particles between 3-13 mm are transferred to the conveyor belt and shredded to a predetermined value or less through the impact crusher 16. At this time, the granular structure is greatly improved with fracture.

임팩트 크러셔를 통해 분쇄 및 연마를 거쳐 분급을 위해 제3차 스크린(15)으로 이송된다.The impact crusher is crushed and polished and then transferred to the third screen 15 for classification.

제6단계(3차분급)6th step (3rd classification)

본 공정은 습식방식에 의하여 스크린을 거치는 단계인데, 크게 3가지 경로로 구분된다.This process is a step that goes through the screen by a wet method, it is divided into three major paths.

첫째, 상기 제2차 진동스크린에서 이송되어온 7mm이하의 소망하는 크기의 부순모래는 골재배출용 콘베이어벨트를 통해 제품으로 출하될 수 있으나, 입형개선을 위해서는 임팩트 크러셔의 제2차 연마과정을 거칠 수 있다.First, the crushed sand having a desired size of 7 mm or less transferred from the second vibrating screen may be shipped as a product through an aggregate discharge conveyor belt, but the secondary crushing process of the impact crusher may be performed to improve the standing shape. have.

둘째, 7mm 이상은 2차 파쇄를 위해 임펙트 크러셔에서 파쇄 및 연마과정을 거치면서 입형이 크게 개선되며, 파쇄 및 연마후 다시 3차 스크린으로 순환되어져와 입자크기의 조건을 만족할때까지 반복순환과정을 거쳐 최종제품으로 배출된다.Second, the granules of 7mm or more go through the crushing and polishing process in the impact crusher for the second crushing, and the shape is greatly improved. After the crushing and polishing, it is circulated to the tertiary screen again and repeats the circulation process until the condition of the particle size is satisfied. It is discharged to the final product.

세째, 미분이 제거된 3.0mm 이하의 입자는 모래포집장치인 샌드 유닛(SandUnit)으로 포집되고, 제품으로 반출된다.Third, 3.0 mm or less particles having fine powder removed are collected in a sand unit, which is a sand collecting device, and carried out to a product.

상기 과정에서 주로 0.08-3.00mm사이의 입자는 잔모래로서 샌드 유닛장치에 포집되어 제품으로 반출되고, 0.08 mm이하의 미분들은 시크너 탱크로 집결되어 처리된다.In the above process, particles between 0.08-3.00mm are collected as sand and collected in the sand unit, and transported to the product, and fine powders of 0.08mm or less are collected and treated in a thinner tank.

한편, 부순모래 제조과정에서 매우 중요한 상황의 하나는 생산과정에서 유출되는 오탁수 및 미분을 처리하는 문제이다.오탁수는 환경오염을 유발하므로 그대로 유출시켜서는 안되고 자체 공정내에서 정수로 만들어야 하고, 재사용이 가능하도록 순환공급하는 것이 필요하다.On the other hand, one of the most important situations in the production of crushed sand is the problem of treating the effluent and fines flowing out from the production process.The effluent causes environmental pollution, so it should not be discharged as it is, but should be purified in its own process and reused. It is necessary to circulate to make this possible.

제2차 내지 제3차 분급 단계에서 포집된 주로 0.08mm- 3.00mm사이의 잔모래는 샌드 유닛에 일단 모아져, 제품으로 반출되지만 그 이하의 미분들은 시크너 탱크(Thickner Tank)에 압송된다.The fine sand, usually between 0.08 mm and 3.00 mm, collected in the second to third classification stages is collected once in the sand unit and taken out to the product, but the fine powders below are transported to a thicker tank.

시크너 탱크는 미분을 응집처리하는 장치로서, 미분처리와 용수처리를 위해 고분자 응집제의 투여와 물 보충공급장치를 구비하고 있다. 응집제의 보관 및 공급을 위해 약품처리조를 별도로 구비하고, 필요할때마다 별도의 동력장치인 고압모터를 사용하여 시크너 탱크에 응집제를 압송한다. 이때 사용되는 응집제로서는 폴리아크릴 아마이트 에멀전, 황산 알미늄 등이 선택될 수 있다.The thinner tank is a device for flocculating fine powder, and is equipped with a device for administering a polymer flocculant and a water replenishing and supply device for fine powder treatment and water treatment. A chemical treatment tank is provided separately for the storage and supply of the flocculant. When necessary, the flocculant is pumped to the Seekner tank by using a high-pressure motor, which is a separate power device. At this time, as the flocculant used, polyacrylamide emulsion, aluminum sulfate and the like can be selected.

상기 시크너탱크에 응집처리된 미분들은 일시적으로 미분 저장조에 저장된다. 미분 저장조는 응집된 미분을 여과기로 이송하기 위한 예비 저장조이다. 여과기(filter press)에 이송된 미분은 여과되어 수분 8% 상태의 케익 상태가 되면, 외부로 배출한다. 상기 배출물은 성토나 복토용으로 사용되거나,별도로 준비된 케익 매립지에다 매립처리한다.The fine powder coagulated in the thinner tank is temporarily stored in the fine storage tank. The differential reservoir is a preliminary reservoir for transferring the aggregated fine powder to the filter. The fine powder transferred to the filter press is filtered and discharged to the outside when it becomes a cake state of 8% moisture. The discharge is landfilled in a cake landfill used for fill or cover, or separately prepared.

본 발명에 의하여 페콘크리트 폐기물을 1일 1,500톤을 투입하면, 전공정에서 토분 ( 35 %)이 제거된후, 골재는 13mm , 25mm , 40mm 입자크기별로 각각 10 %, 15 %, 40 % 의 재생골재가 생산된다. 또한 상기 재생골재를 투입하여 후공정을 거치면 양질의 7mm이하의 부순모래가 1일 약 975 톤 생산되는 것이다.When 1,500 tons of peconcrete waste is added per day according to the present invention, after the soil (35%) is removed in the previous process, the aggregate is recycled by 10%, 15% and 40% for each 13mm, 25mm and 40mm particle size. Aggregate is produced. In addition, the recycled aggregate is put through a post-process to produce about 975 tons of fine sand less than 7mm per day.

재생골재는 골재를 필요로 하는 모든 수요처에서 사용할수 있으나, 아스콘 골재와 콘크리트 골재의 사용은 KS규격을 사용하도록 하고 있으므로, 동 규격을 만족하는 것이 필요하다.Recycled aggregates can be used in all demands that require aggregates, but ascon aggregates and concrete aggregates require KS standards, so it is necessary to meet these standards.

국내의 부순모래의 품질에 대한 규격은 KS-F-2527 콘크리트용 부순모래로 정하고 있으며, 그 사용원석은 현무암, 안산암, 사암, 석회암 및 이에 준하는 석질을 가진것으로 명시하고 있다.The standard for the quality of crushed sand in Korea is defined as KS-F-2527 crushed sand for concrete, and its use is indicated as having basalt, andesite, sandstone, limestone and equivalent stone.

본 발명에 의한 건설폐기물을 이용한 부순모래의 경우, 물성치 실험결과 아래와 같이 KS규격 항목을 만족한 것으로 나타났다.In the case of the crushed sand using construction waste according to the present invention, the physical property test results showed that the KS standard items were satisfied as follows.

KS규격과 본 발명에 의한 시험치 비교 표Table of comparison of test values according to KS standard and present invention

항목 / 구분Item / Category 부순모래(KS-F-2527)규격치Crushed sand (KS-F-2527) 콘크리토용재생골재(KS-F-2523) 규격치Recycled Aggregate for Concrete (KS-F-2523) 본 발명에 의한시험치Test value according to the present invention 건조비중Drying weight 2.5 이상2.5 or more 2.20 이상2.20 or more 2.402.40 흡수율(%)Absorption rate (%) 3.0 이하3.0 or less 5.0 이하5.0 or less 4.204.20 안정성(%)stability(%) 10 이하below 10 ·· 3.003.00 손실량(%)Loss amount (%) 7.0 이하7.0 or less 5.0 이하5.0 or less 2.002.00 실적율(%)% Of performance 53.0 이상53.0 or more 53.0 이상53.0 or more 54.054.0

(손실량:0.08㎜ 체 통과율)(Loss: 0.08mm sieve passage rate)

특히, 부순모래의 특성중 가장 중요한 것은 입형이 모나고 표면이 거칠며 미립분을 많이 포함할 가능성이 있는 것인데, 상기 항목중 흡수율 및 실적율, 미립분함유량(손실량)이 품질판정의 가장 중요한 요소가 된다.In particular, the most important of the characteristics of the crushed sand is that the granules are rough, the surface is rough, and there is a possibility of containing a lot of fine particles. Among the above items, the absorption rate, the performance rate, and the fine powder content (loss amount) are the most important factors do.

실적율의 하한치(53%이상)을 만족하는 것이 양질의 부순모래라 할 수있는데, 본 발명에 의한 생산공정의 결과 54%이상을 나타내어 고품질을 부순모래로 판정 되었다.It can be said that it satisfies the lower limit (more than 53%) of the performance rate, and it is a high quality crushed sand. As a result of the production process according to the present invention, it shows 54% or more, and high quality was determined as crushed sand.

또한, 부순모래의 생산시에는 다량의 미립분이 발생하므로 이를 규정치 이하(손실량 7% 이하)로 제거하지 않으면 콘크리트의 물성에 악영향을 미치게 되는데, 본 발명의 경우 2%이하로 매우 우수한 물성을 나타내고 있다.In addition, a large amount of fines are generated during the production of crushed sand, so if it is not removed below a specified value (less than 7% of loss), it will adversely affect the physical properties of the concrete. .

본 발명은 재활용되지 못하여 환경문제 및 자원낭비가 되는 건설폐기물을 효율적으로 활용하여 품질이 균등하고 우수한 부순모래를 생산할 수 있는 생산방법을 제공한다.The present invention provides a production method that can produce a uniform and excellent crushed sand by using the construction waste that can not be recycled is an environmental problem and waste of resources efficiently.

또한, 본 발명은 전공정과 후공정이 독립적으로 구성되면서 연속적으로 반복되면서 대량생산이 가능한데, 채택되는 공정별 장치 및 다단계 순환경로에 의한 보다 정형화된 시스템을 제시하여 전후공정의 흐름이 원활히 진행되고, 특히 후공정에서 입형이 크게 개선되고 품질이 우수한 부순모래를 생산할 수 있다.In addition, the present invention can be mass-produced while being continuously repeated as the previous process and the subsequent process is configured independently, by presenting a more formal system by the process-specific device and the multi-stage circulation path, the flow of the back and forth process smoothly proceeds In particular, in the post-process, granularity is greatly improved and high-quality crushed sand can be produced.

Claims (3)

건설폐기물을 이용하여 부순모래를 제조하는 전,후공정으로 구성된 생산시스템에 있어서,In the production system consisting of the front and rear processes of manufacturing crushed sand using construction waste, 전공정은 건설폐기물을 덤프 트럭이나 포크레인 등의 장비를 이용하여 진동공급기가 장착된 호퍼(1)에 투입하는 1단계;Pre-process is the first step of injecting the construction waste into the hopper (1) equipped with a vibration feeder using equipment such as dump truck or fork lane; 상기 투입물은 파쇄장치인 조 크러셔(2)에서 1차 파쇄되고, 컨베이어벨트로 이송되어지는데 이 과정에서 목재류 및 철재류 중 재활용이 가능한 것은 별도장치로 선별되어 외부로 반출되고, 기타 재활용이 어려운 것들은 소각시설로 운송되어 처분하는 2단계;The input is first crushed in the jaw crusher 2, which is a crushing device, and is transferred to the conveyor belt. In this process, the wood and steel materials can be recycled as a separate device, and the other materials are difficult to recycle. Two stages of transportation to a facility for disposal; 건식방식의 체걸음 진동스크린(3)에 의해 이물질,토사 및 골재가 분급되어지고,이때 체걸음을 통과하지 못한 원재료는 수중선별 처리를 거쳐 파쇄장치인 조 크러셔로 투입되고, 토사는 분리되어 외부로 배출되는 3단계;The foreign body, soil and aggregate are classified by the dry sieve vibrating screen (3). At this time, raw materials that do not pass the sieve are put into the jaw crusher, which is a crushing device through underwater treatment, and the soil is separated and 3 stages are discharged to; 상기 수중처리단계를 거친 골재는 조 크러셔에 의해 2차 파쇄가 이루어지고 콘베이어벨트를 타고 제2차 스크린으로 이송되는 4단계;Aggregate subjected to the underwater treatment step is the second crushing by the jaw crusher and is carried to the second screen on the conveyor belt; 상기 진동스크린을 통해 골재의 크기별로 분급이 이루어지고, 2차 스크린(5)을 통과하지 못한 골재는 제3차 파쇄 및 연마과정을 거치도록 콘 크러셔(6)로 이송되는 5단계;Classification is made by the size of the aggregate through the vibrating screen, the aggregate that does not pass through the secondary screen (5) is transferred to the cone crusher (6) to undergo a third crushing and grinding process; 상기 2차 스크린(5)를 통과하지 못한 골재들은 콘 크러셔(6)에 의해 다시 파쇄되고 연마되어, 다시 스크린(5)으로 복귀되어 일정 기준치를 만족한 골재가 될때까지 순환반복 공정을 거치게 되는 6단계;및 상기 최종적으로 파쇄된 건설폐기물은 입자크기별로 생산되어, 필요와 용도에 따라 제품화되어 외부로 배출되거나 후공정에 투입되는 것을 특징으로 하는 전공정과,Aggregates that do not pass through the secondary screen (5) are crushed and polished again by the cone crusher (6), and returned to the screen (5) again to go through a cycle repeated process until the aggregate meets a certain reference value And the final crushed construction waste is produced for each particle size, and is commercialized according to needs and uses, and discharged to the outside or put into a post process, 상기 전공정에서 파쇄된 재생골재의 입형과 품질을 개선하기 위하여 후공정은, 전공정에서 생산된 원재료를 선택적 또는 크기에 상관없이 호퍼에 진공공급기가 장착된 공급기(1)에 재료를 투입받는 제1단계;In order to improve the granularity and quality of the recycled aggregate crushed in the previous process, the post process may include a material receiving the material into the feeder 1 equipped with a vacuum feeder in the hopper regardless of the size or size of the raw materials produced in the previous process. Stage 1; 상기 투입된 재료들을 제1차 진동스크린(2)에 수용받아 분급이 이루어지기 위하여 체눈을 조절하여 일정기준 크기 이상의 입자가 걸리도록 하고, 이 과정에서 일정기준 이하의 미분은 제거되고 일정기준 이상의 골재는 파쇄를 위해 콘 크러셔로 이송되는 제2단계;The input material is accommodated in the first vibrating screen (2) to adjust the body so that the classification is made to take particles of a predetermined size or more, in this process fine powder below a certain standard is removed and aggregates above a certain standard are A second step of transferring to the cone crusher for crushing; 상기 이송된 골재는 콘 크러셔로 1차 파쇄되고, 제2차 진동스크린(14)으로 배송되는 제3단계;The transferred aggregate is first broken into a cone crusher and delivered to the second vibrating screen (14); 상기 제2차 스크린으로 이송된 골재는 크게 3가지 경로를 통해 분급되는데, (a) 제2차 진동스크린을 통해 일정기준 이상의 굵은 입자들은 선별되어 다시 상기 2차 콘 크러셔로 재투입되어 다시 파쇄처리를 거치며, 파쇄 가공후에는 순환 콘베이어벨트를 따라 제3차 분급이 이루어지도록 스크린에 복귀되고, (b) 일정 입자크기를 만족한 골재들은 바로 제3차 스크린으로 이송되어 세척과정을 거치게 되고 , 이후 제3차 스크린 배출구 일지점에 구비되어 콘베이어벨트와 연결되어 있는 임펙트 크러셔에 투입되어 제2차 파쇄 및 연마과정을 거치게 되며, (c) 스크린을 통과하면서 미분이 제거된 3.0mm 이하의 입자는 샌드유닛에 의해 포집되고, 제품으로반출되는 제4단계;Aggregate transported to the secondary screen is classified into three main paths. (A) Coarse particles of a predetermined standard or more are selected through the secondary vibration screen and re-introduced into the secondary cone crusher to be crushed again. After the shredding process, the screen is returned to the third sorting along the circulating conveyor belt. (B) Aggregates satisfying the predetermined particle size are immediately transferred to the third screen for cleaning. It is placed in the impact screen crusher which is installed at one point of the third screen outlet and is connected to the conveyor belt to undergo the second crushing and polishing process. A fourth step that is collected by the unit and taken out to the product; 상기 2차 분급에서 이송된 입자들이 임팩트크러셔(16)를 통해 일정치 이하로 파쇄가공와 함께 입형구조가 크게 개선되며, 상기 임팩트 크러셔를 통해 분쇄 및 연마를 거쳐 분급을 위해 제3차 스크린(15)으로 이송되는 제5단계;Particles transferred from the secondary classification are greatly improved with the crushing process below the predetermined value through the impact crusher 16, and the granular structure is greatly improved, and through the impact crusher, the third screen 15 for the classification through grinding and grinding. A fifth step of transferring to the; 상기 제3차 스크린으로 이송된 골재는 크게 3가지 경로로 분급되는데, (a), 상기 제2차 진동스크린에서 이송되어온 일정기준 이하의 소망하는 크기의 부순모래는 골재배출용 콘베이어벨트를 통해 제품으로 출하될 수 있으나, 입형개선을 위해서는 임팩트 크러셔의 제2차 연마과정을 거칠 수 있고, (b) 일정기준 이상은 2차 파쇄를 위해 임펙트 크러셔에서 파쇄 및 연마과정을 거치면서 입형이 크게 개선되며, 파쇄 및 연마후 다시 3차 스크린으로 순환되어져와 입자크기의 조건을 만족할때까지 반복순환과정을 거쳐 최종제품으로 배출되며, (c) 미분이 제거된 3.0mm 이하의 입자는 모래포집장치인 샌드 유닛(Sand Unit)으로 포집되어, 제품으로 반출되는 것을 특징으로 하는 후공정을 포함한 건축폐기물을 이용한 부순모래 제조방법Aggregate conveyed to the third screen is classified into three main paths, (a), the crushed sand of a desired size below a predetermined standard conveyed from the second vibrating screen is a product through the aggregate discharge conveyor belt It can be shipped as, but it can go through the secondary polishing process of the impact crusher for the improvement of the standing, (b) the mold is greatly improved by the crushing and polishing process in the impact crusher for the secondary crushing After crushing and grinding, it is circulated to the tertiary screen again and discharged to the final product through the repetitive circulation process until the condition of particle size is satisfied. Crushed sand manufacturing method using building waste including post-processing, which is collected as a sand unit and carried out as a product 제1항에 있어서,The method of claim 1, 전공정의 제3단계 (1차분급)에서 입자직경 50mm 이상의 조골재는 분급되어 제3차 파쇄장치인 콘 크러셔(6)에 이송되어 파쇄과정을 거치게 되고,In the third stage (primary classification) of the previous process, coarse aggregates having a particle diameter of 50 mm or more are classified and transferred to the cone crusher 6, which is the third crushing device, to undergo a crushing process. 제5단계(2차분급)에서 체눈크기를 50mm이상 입자는 통과할수 없도록 조정하고, 통과된 입자는 크기별로 15mm 이하, 25mm 이하, 50mm이하로 구분시켜 콘베이어벨트로 배출하여 적재할수 있도록 하며,In the 5th step (secondary classification), the grain size is adjusted so that more than 50mm particles cannot pass, and the passed particles are classified into 15mm or less, 25mm or less, and 50mm or less, so that they can be discharged and loaded into the conveyor belt. 후공정의 제2단계 (1차 분급)에서 체눈을 13mm 이상의 입자가 걸리도록 하여 이 과정에서 그 이하의 미분은 제거되고 ,입자 크기가 13mm 이상의 골재는 파쇄를 위해 콘 크러셔로 이송되며,In the second stage of the post process (primary classification), the body is caught with more than 13mm of particles, in the process, the fine powder is removed, aggregates of more than 13mm in size are transferred to the cone crusher for crushing, 제4단계 (2차 분급)에서 입자 크기별로 3가지 경로로 분급되는데, (a)스크린을 통해 13mm이상의 굵은 입자들은 선별되어 다시 상기 2차 콘 크러셔로 재투입되어 다시 파쇄처리를 거치고, 가공후에는 순환 콘베이어벨트를 따라 제3차 분급이 이루어지도록 스크린에 복귀되며, (b) 3- 13mm 사이의 입자크기를 만족한 골재들은 바로 제3차 스크린으로 이송되어 세척과정을 거치게 되고 , 이후 제3차 스크린 배출구 일지점에 구비되어 콘베이어벨트와 연결되어 있는 임펙트 크러셔에 투입되어 제2차 파쇄 및 연마과정을 거치게 되며, (c) 스크린을 통과하면서 미분이 제거된 3.0mm 이하의 입자는 샌드유닛에 의해 포집되고, 제품으로 반출되며,In the 4th step (secondary classification), three kinds of particle sizes are classified into three paths. (A) Coarse particles larger than 13 mm are screened through the screen, re-introduced into the secondary cone crusher, and then crushed again. Is returned to the screen for the third classification along the circulating conveyor belt, and (b) aggregates satisfying the particle size between 3 and 13 mm are immediately transferred to the third screen for cleaning. It is provided at one point of the outlet screen of the car screen and put into the impact crusher connected to the conveyor belt to undergo the second crushing and polishing process. Collected by the product and taken out to the product, 제6단계(3차분급)에서 입자 크기별로 3가지 경로로 분급되는데, (a) 7mm이하의 소망하는 크기의 부순모래는 골재배출용 콘베이어벨트를 통해 제품으로 출하될 수 있으나, 입형개선을 위해서는 임팩트 크러셔의 제2차 연마과정을 거칠 수 있고, (b) 7mm 이상은 2차 파쇄를 위해 임펙트 크러셔에서 파쇄 및 연마과정을 거치면서 입형이 크게 개선되며, 파쇄 및 연마후 다시 3차 스크린으로 순환되어져와 입자크기의 조건을 만족할때까지 반복순환과정을 거쳐 최종제품으로 배출되며, (c), 미분이 제거된 3.0mm 이하의 입자는 모래포집장치인 샌드 유닛(Sand Unit)으로 포집되고, 제품으로 반출되는 것을 특징으로 하는 건설폐기물을 이용한 부순모래 제조방법.In the sixth step (tertiary classification), three kinds of particles are classified into three paths. (A) Crushed sand of desired size of 7 mm or less can be shipped to the product through an aggregate discharge conveyor belt. Secondary grinding process of impact crusher can be carried out. It is discharged to the final product through the repetitive circulation process until the condition of the particle size is satisfied. (C) The fine particles less than 3.0mm are collected in the sand unit, which is a sand collecting device. Crushed sand manufacturing method using construction waste, characterized in that exported to. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 후공정의 분급 단계에서 포집된 주로 0.08mm- 3.00mm사이의 잔모래는 샌드 유닛에 일단 모아져 제품으로 반출되고, 그 이하의 미분들은 시크너 탱크(Thickner Tank)에 압송되어 응집처리되고, 상기 응집된 미분들은 일시적으로 미분 저장조에 저장된 후 여과기에 이송되고 여과후 수분 8% 상태의 케익 상태가 되면, 외부로 배출되는 과정을 포함한 건설폐기물을 이용한 부순모래 제조방법The fine sand, usually between 0.08mm and 3.00mm, collected in the classification stage of the post process is collected in the sand unit and taken out as a product. The fine powders are temporarily stored in the fines storage tank and then transferred to the filter, and when the cake is in the state of 8% moisture after filtration, the method for producing crushed sand using construction waste including the process of discharging to the outside
KR10-2002-0001560A 2002-01-10 2002-01-10 The method to manufacture break to sand by construction waste KR100521764B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0001560A KR100521764B1 (en) 2002-01-10 2002-01-10 The method to manufacture break to sand by construction waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0001560A KR100521764B1 (en) 2002-01-10 2002-01-10 The method to manufacture break to sand by construction waste

Publications (2)

Publication Number Publication Date
KR20020050185A true KR20020050185A (en) 2002-06-26
KR100521764B1 KR100521764B1 (en) 2005-10-17

Family

ID=27725619

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0001560A KR100521764B1 (en) 2002-01-10 2002-01-10 The method to manufacture break to sand by construction waste

Country Status (1)

Country Link
KR (1) KR100521764B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020042569A (en) * 2002-04-27 2002-06-05 기준호 method and apparatus for remanufacturing aggregate exploit waste concrete
KR20030067411A (en) * 2002-02-08 2003-08-14 인선이엔티 주식회사 Recycling and classifying and feeding construction waste articles
WO2004098779A1 (en) * 2003-05-07 2004-11-18 Hoon Il Park Construction waste sorting system and method of the same
KR100509923B1 (en) * 2002-06-29 2005-08-24 삼영플랜트주식회사 method and apparatus for manufacturing aggregate used of ultra sand roller mill
KR100804785B1 (en) * 2007-11-12 2008-02-20 김이업 Method and apparatus for homogenizing mixed circulation aggregate by controlling size in circulation aggregate and homogenizing apparatus of circulation aggregate thereof
KR101316942B1 (en) * 2011-04-29 2013-10-11 선인종합개발유한회사 Construction aggregate packing method
CN109877134A (en) * 2019-02-01 2019-06-14 北京建工资源循环利用投资有限公司 A kind of the small modular processing system and method for disposal of building waste
CN110215996A (en) * 2019-06-18 2019-09-10 日昌升集团有限公司 A kind of mechanism sandstone production technology
CN112892819A (en) * 2021-01-14 2021-06-04 中铁四局集团第二工程有限公司 Construction process for dry-method sand making production of cyclone machine
CN112976281A (en) * 2021-03-11 2021-06-18 北京都市绿源环保科技有限公司 Method for batching by adopting directional grading distribution device
CN115970846A (en) * 2022-12-28 2023-04-18 中国水利水电第三工程局有限公司 Sandstone processing method for producing twelve aggregates

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100649953B1 (en) 2004-08-27 2006-11-27 유한회사 그린산업 a device for manufacturing of an aggregate and soil using construction waste
KR100660142B1 (en) * 2005-01-24 2006-12-20 이명섭 Method and system for producing dried sand
JP5574876B2 (en) 2010-08-11 2014-08-20 鎌長製衡株式会社 Gypsum waste material recycling equipment
KR101447245B1 (en) 2013-12-10 2014-10-23 성산환경주식회사 Production Method and Equipment of Recycled Aggregate mixed with Furnace Slag Controlling it's Bulk Density and Weight
KR102074127B1 (en) * 2019-02-07 2020-02-06 (주)하이콘코리아 A Method for Producing a Pipe Filling Sand with an Industrial Waste

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5061878A (en) * 1973-10-04 1975-05-27
JPS5851994U (en) * 1981-09-29 1983-04-08 ユ−シ−産業株式会社 Fusing film cutting device for synthetic resin tubular nets
JP3140665B2 (en) * 1994-11-24 2001-03-05 三菱重工業株式会社 Method for producing recycled aggregate from cement / concrete mass
KR100235319B1 (en) * 1998-01-21 1999-12-15 오종택 Recycling techniques of construction waste meterial
KR100263819B1 (en) * 1998-07-24 2000-08-16 이종구 The method of producing pulverized gravels and grinded sand for building materials and a apparatus for proceeding the same

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030067411A (en) * 2002-02-08 2003-08-14 인선이엔티 주식회사 Recycling and classifying and feeding construction waste articles
KR20020042569A (en) * 2002-04-27 2002-06-05 기준호 method and apparatus for remanufacturing aggregate exploit waste concrete
KR100509923B1 (en) * 2002-06-29 2005-08-24 삼영플랜트주식회사 method and apparatus for manufacturing aggregate used of ultra sand roller mill
WO2004098779A1 (en) * 2003-05-07 2004-11-18 Hoon Il Park Construction waste sorting system and method of the same
KR100804785B1 (en) * 2007-11-12 2008-02-20 김이업 Method and apparatus for homogenizing mixed circulation aggregate by controlling size in circulation aggregate and homogenizing apparatus of circulation aggregate thereof
KR101316942B1 (en) * 2011-04-29 2013-10-11 선인종합개발유한회사 Construction aggregate packing method
CN109877134A (en) * 2019-02-01 2019-06-14 北京建工资源循环利用投资有限公司 A kind of the small modular processing system and method for disposal of building waste
CN109877134B (en) * 2019-02-01 2024-02-02 北京建工资源循环利用投资有限公司 Small-sized modularized treatment system and treatment method for construction waste
CN110215996A (en) * 2019-06-18 2019-09-10 日昌升集团有限公司 A kind of mechanism sandstone production technology
CN112892819A (en) * 2021-01-14 2021-06-04 中铁四局集团第二工程有限公司 Construction process for dry-method sand making production of cyclone machine
CN112976281A (en) * 2021-03-11 2021-06-18 北京都市绿源环保科技有限公司 Method for batching by adopting directional grading distribution device
CN112976281B (en) * 2021-03-11 2022-10-11 北京都市绿源环保科技有限公司 Method for batching by adopting directional grading distribution device
CN115970846A (en) * 2022-12-28 2023-04-18 中国水利水电第三工程局有限公司 Sandstone processing method for producing twelve aggregates
CN115970846B (en) * 2022-12-28 2024-04-26 中国水利水电第三工程局有限公司 Sand and stone processing method for producing twelve aggregates

Also Published As

Publication number Publication date
KR100521764B1 (en) 2005-10-17

Similar Documents

Publication Publication Date Title
CN209005920U (en) A kind of cracking and sorting processing system of building waste
KR100235319B1 (en) Recycling techniques of construction waste meterial
KR100521764B1 (en) The method to manufacture break to sand by construction waste
KR100497318B1 (en) Manufacturing method and apparatus for recycle sand exploiting construction waste concrete
KR100850762B1 (en) Dust seperating method and the apparatus using improved structure of motor-screen
CN110813483A (en) Construction waste crushing and sorting treatment system
CN102838307A (en) Method and system for treating construction waste
KR20030004243A (en) Manufacturing method and apparatus for recycle aggregate used ultra roller mill.
JP2008080329A (en) Material recovery system and material recovery method
CN207170486U (en) A kind of MSW Incineration Plant clinker recycling and regenerated aggregate are classified preparation system
CN204294609U (en) A kind of fixed building rubbish process for producing line
CN209577009U (en) A kind of new type water sand washing production device
CN211100741U (en) Shield muck zero-emission treatment system
CN202779142U (en) Fixed type building rubbish treatment system
CN108658489A (en) A kind of production technology making high strength recycled aggregate using construction waste
KR20020042569A (en) method and apparatus for remanufacturing aggregate exploit waste concrete
CN101525218B (en) Technology for making sand from sandstone
KR100358687B1 (en) The constructive recycling methods and instruments of Reclaimed waste.
KR100277280B1 (en) Method and system of recycling rubbish of construction
KR100660142B1 (en) Method and system for producing dried sand
KR20060103708A (en) A device for manufacturing sand using construction waste and rock which treatment water and water
KR100434799B1 (en) The Method of Production for Recycling Sand using Construction Waste and Apparatus thereof
CN115445741A (en) Method for preparing sand by utilizing rock waste high-yield preparation machine
KR200311094Y1 (en) Manufacturing method and apparatus for recycle sand exploiting construction waste concrete
KR20020024355A (en) Manufacturing Device of Remaking gravel

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B601 Maintenance of original decision after re-examination before a trial
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20030929

Effective date: 20050728

S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20091007

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee