CN204294609U - A kind of fixed building rubbish process for producing line - Google Patents

A kind of fixed building rubbish process for producing line Download PDF

Info

Publication number
CN204294609U
CN204294609U CN201420718592.6U CN201420718592U CN204294609U CN 204294609 U CN204294609 U CN 204294609U CN 201420718592 U CN201420718592 U CN 201420718592U CN 204294609 U CN204294609 U CN 204294609U
Authority
CN
China
Prior art keywords
finished product
semi
belt conveyor
elementary
producing line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420718592.6U
Other languages
Chinese (zh)
Inventor
刘永强
刘纲领
杨得欣
李宝龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU ZHONGYI MINING MACHINERY CO Ltd
Original Assignee
ZHENGZHOU ZHONGYI MINING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU ZHONGYI MINING MACHINERY CO Ltd filed Critical ZHENGZHOU ZHONGYI MINING MACHINERY CO Ltd
Priority to CN201420718592.6U priority Critical patent/CN204294609U/en
Application granted granted Critical
Publication of CN204294609U publication Critical patent/CN204294609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Abstract

The utility model discloses a kind of fixed building rubbish process for producing line.This production line adopts primary breakup device to carry out primary breakup to the building waste that charging gear is discharged, so that the reinforcing bar in building waste is effectively separated with concrete, the mass concrete that mixes in building waste and reinforcing bar is avoided to cause damage to the follow-up material conveying device that goes out, secondary breakup device is then adopted to carry out second-time breakage to isolated semi-finished product again, to be again separated with reinforcing bar by the concrete in semi-finished product, reduce the severity of mixing up of finished product materials; Simultaneously, the mode of the semi-product material that elementary Vibration Screen is selected by wet concentration or selection by winnowing is separated by semi-finished product separator, so that the light impurities (as dust, silt etc.) in semi-finished product is removed, so not only can reduce the load of secondary breakup, and in the finished product that secondary breakup is obtained, the separation degree of concrete and reinforcing bar is better.

Description

A kind of fixed building rubbish process for producing line
Technical field
The utility model relates to a kind of fixed building rubbish process for producing line.
Background technology
Building waste mainly refers in Process of Urban Development, the materials such as the reinforced concrete block that removal house etc. produces, tile block.Along with the quickening of China's urban construction paces, create increasing building waste.Most building waste, without any process, is transported to suburb or mountain area, outdoor placement or landfill.These building waste part land occupations, cause the waste of resource; The dust pollution air, the heavy metal pollution underground water that produce in building waste transport, process of banking up, cause environmental pollution; Meeting spoiled soil structure after building waste landfill, causes ground settlement simultaneously.
China has had certain technology at present, after building waste process, effectively utilizes as regenerated resources.Prior art carries out manual sorting building waste, and plastics, wood, irony thing are sorted out recycling; Do building aggregate and sand after remaining concrete and tile block carry out fragmentation, screening, cleaning, can be used to do concrete or non-burning brick etc.
Building waste processing item is an emerging project, and owing to being the cycling and reutilization of building waste, be environmental protection project, increasing people participates in this project.Often ore reduction screening plant is used in prior art, design building garbage disposal flow process, and building waste is different from common ore, containing a lot of foreign material in building waste, need to be separated, and containing armored concrete in building waste, reinforcing bar is needed to be separated with concrete, so in actual use, occur that in building waste, foreign material process is not thorough, reinforcing bar is separated with concrete and does not thoroughly cause conveying equipment loss serious, and the foreign material such as plastics, wood need the many problems of manual sorting etc.
Utility model content
The purpose of this utility model is to provide a kind of fixed building rubbish process for producing line, and being intended to the impurity such as plastics, wood in the building waste existed in solution prior art needs the problem of manual sorting.
In order to realize above object, in the utility model, the technical scheme of fixed building rubbish process for producing line is as follows:
Fixed building rubbish process for producing line, comprise the charging gear set gradually from front to back along handling process direction, primary breakup device, elementary tramp iron separator, elementary vibratory sieve, the semi-finished product separator of winnowing type or wet concentration formula, secondary breakup device, secondary tramp iron separator, secondary vibratory sieve, the discharging opening of charging gear connects the charging aperture of primary breakup device, the first outfeed belt conveyor is provided with between the discharging opening of primary breakup device and elementary tramp iron separator, the second outfeed belt conveyor is provided with between the charging aperture of elementary tramp iron separator and elementary vibratory sieve, the 3rd outfeed belt conveyor is provided with between the semi-finished product discharging opening of elementary vibratory sieve and the charging aperture of semi-finished product separator, the 4th outfeed belt conveyor is provided with between the discharging opening of semi-finished product separator and the charging aperture of secondary breakup device, the 5th outfeed belt conveyor of the secondary tramp iron separator present position of approach is provided with between the discharging opening of secondary breakup device and the charging aperture of secondary vibratory sieve.
Semi-finished product separator is the stone scrubber of wet concentration formula.
Primary breakup device and secondary breakup device are respectively Taw crushing apparatus and reaction type breaker.
The discharging opening of secondary breakup device is connected with secondary oscillating feeder.
Breaker at different levels and/or vibratory sieve at different levels and/or separator are connected with deduster.
The bottom blanking port of secondary breakup device is connected with the finished product separator of winnowing type or wet concentration formula.
The coarse fodder outlet of elementary vibratory sieve is connected on primary breakup device and/or charging gear by returning charge conveyer.
The bottom blanking port of elementary vibratory sieve is connected to the feed side of the 5th outfeed belt conveyor, and the discharging opening of secondary breakup device is connected to the feed side of the 5th outfeed belt conveyor by the 6th outfeed belt conveyor.
The miscellaneous object outlet of semi-finished product separator is connected with foreign material conveyer.
Charging gear and breaker at different levels are in below ground level.
The utility model adopts primary breakup device to carry out primary breakup to the building waste that charging gear is discharged, so that the reinforcing bar in building waste is effectively separated with concrete, the mass concrete that mixes in building waste and reinforcing bar is avoided to cause damage to the follow-up material conveying device that goes out, secondary breakup device is then adopted to carry out second-time breakage to isolated semi-finished product again, to be again separated with reinforcing bar by the concrete in semi-finished product, reduce the severity of mixing up of finished product materials; Simultaneously, the mode of the semi-product material that elementary Vibration Screen is selected by wet concentration or selection by winnowing is separated by semi-finished product separator, so that the light impurities (as dust, silt etc.) in semi-finished product is removed, so not only can reduce the load of secondary breakup, and the separation degree of concrete and reinforcing bar is better in the finished product making secondary breakup obtain, thus to solve in prior art the impurity such as plastics, wood in building waste and need the problem of manual sorting, and improve the levels of precision of building waste sorting.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment of the present utility model.
Detailed description of the invention
The embodiment of fixed building rubbish process for producing line in the utility model: as shown in Figure 1, this production line comprises the raw material cabin 1, raw material oscillating feeder 2, primary breakup device 3, elementary oscillating feeder 4, the elementary tramp iron separator 6 of self-tipping type, elementary vibratory sieve 9, primary separation device 12, secondary breakup device 16, secondary oscillating feeder 15, the secondary tramp iron separator 17 of self-tipping type, secondary vibratory sieve 20, secondary separator 21, the finished bin that set gradually from front to back along handling process direction.The main process circuit of this production line is: the discharging opening of raw material cabin 1 is connected on the charging aperture of raw material oscillating feeder 2, the discharging opening of raw material oscillating feeder 2 is connected on the charging aperture of primary breakup device, the discharging opening of primary breakup device is connected on the charging aperture of elementary oscillating feeder 4, the first outfeed belt conveyor 5 is provided with between the discharging opening of elementary oscillating feeder 4 and elementary tramp iron separator 6, the second outfeed belt conveyor 7 is provided with between elementary tramp iron separator 6 and the charging aperture of elementary vibratory sieve 9, the 3rd outfeed belt conveyor 11 is provided with between the semi-finished product discharging opening of elementary vibratory sieve 9 and the charging aperture of primary separation device 12, the 4th outfeed belt conveyor 14 is provided with between the discharging opening of primary separation device 12 and the charging aperture of secondary breakup device, the discharging opening of secondary breakup device is connected on the charging aperture of secondary oscillating feeder 15, the 5th outfeed belt conveyor 18 of approach secondary tramp iron separator 17 present position is provided with between the discharging opening of secondary oscillating feeder 15 and the charging aperture of secondary vibratory sieve 20, the bottom blanking port of secondary vibratory sieve 20 is connected on the charging aperture of secondary separator 21.Feed back circuit is: primary breakup device coarse fodder outlet with the charging aperture of primary breakup device between be provided with belt-type returning charge conveyer 13.Batch mixing circuit is: the bottom blanking port of elementary vibratory sieve 9 is connected to the feed side of the 5th outfeed belt conveyor 18, the discharging opening of secondary oscillating feeder 15 is connected to the feed side of the 5th outfeed belt conveyor 18 by the 6th outfeed belt conveyor 10, the exit side of the 5th outfeed belt conveyor 18 is connected on the charging aperture of secondary vibratory sieve 20.Impurities removal circuit is: the impurity discharging port of primary separation device 12 is connected with foreign material conveyer.Dedusting circuit is: breaker, vibratory sieve, oscillating feeder and separator are all connected to by pipeline in the import of deduster 19.Finished product conveying circuit: the discharging opening of secondary separator 21 connects the first finished bin 25 by the first finished product conveyer 22, the fines outlet of secondary vibratory sieve 20 is connected second finished bin 26 and three finished bin 27 respectively by the second finished product conveyer 23 with the 3rd finished product conveyer 24 correspondence with coarse fodder outlet.
This enforcement Central Plains feed bin 1 and raw material oscillating feeder 2 form the charging gear of this production line; Primary breakup device is Taw crushing apparatus, and secondary breakup device is reaction type breaker, to be consisted of the broken segment of whole production line primary breakup device and secondary breakup device; First to the 6th outfeed belt conveyor is belt conveyor and forms the semi-product material transport portion of whole production line; Elementary vibratory sieve 9 and secondary vibratory sieve 20 form material screening, the classification part of this production line; First to the 3rd finished product conveyer is also belt conveyor and forms the finished product material transport portion of whole production line; Primary separation device 12 adopts stone scrubber, with lightweight thing processing section in the semi-finished product forming whole production line; Foreign material conveyer also adopts belt conveyor, is responsible for the foreign material of stone scrubber to be delivered to foreign material heap; Deduster 19 forms the dust pelletizing system of this production line; Secondary separator 21 adopts bucket sand washer, removes to carry out separation to fine sand in finished product; Elementary tramp iron separator 6 and secondary tramp iron separator 17 form the deironing part of this production line.
In the present embodiment, production line in use, and building waste enters elementary oscillating feeder 4 by raw material cabin 1, evenly enters primary breakup device 3 carry out just break process through raw material oscillating feeder 2, material after process evenly enters the first outfeed belt conveyor 5 through elementary oscillating feeder 4, after the deironing of elementary tramp iron separator 6, enters the second outfeed belt conveyor 7, then enters that elementary vibratory sieve 9 carries out sieving, classification, larger material enters raw material cabin 1 through returning charge conveyer 13 and carries out circulation fragmentation, semi-product material enters primary separation device 12 through the 3rd outfeed belt conveyor 11, by buoyancy of water in the tank of primary separation device 12, the foreign material in semi-product material are transferred out by foreign material conveyer, then material enters secondary breakup device 16 through the 4th outfeed belt conveyor 14 and carries out finished breaking, after broken, material evenly enters the 5th outfeed belt conveyor 18 by secondary oscillating feeder 15 and is jointly delivered to the 6th outfeed belt conveyor 10 with the substrate material of elementary vibratory sieve 9, material enters secondary vibratory sieve 20 and sieves after the deironing of secondary tramp iron separator 17, classification, the finished product material sieved out enters finished room through the second finished product conveyer 23 and the 3rd finished product outfeed belt conveyor, secondary vibratory sieve 20 substrate material enters secondary separator 21 by chute, contained dust and tiny foreign material in removing fine sand, finished product material enters finished room via the first outfeed belt conveyor 5 again.In process of production, deduster 19 absorbs the dust produced in fragmentation, screening process, thus reduces the dust pollution produced in building waste processing procedure.
Bear in production line in the present embodiment building waste feed, fragmentation, separation equipment be arranged on below ground level, reduce the distance between equipment and material loading height, reduce the noise that produces in equipment running process to the pollution of surrounding environment; The oscillating feeder added under breaker avoid broken after material particularly part reinforcing bar to the damage of belt conveyor; Use reaction type breaker, reinforcing bar effectively can be separated with concrete; Only use two disintegrating apparatus, decrease production line main equipment, simplify building waste process for producing linear flow journey, reduce construction and running cost; Foreign material that can not be broken in use stone scrubber removing building waste, better can remove the foreign material in building waste, and not need to drop into a large amount of manually sorting.Building waste after this production line process has become sandstone aggregate, can be used for making concrete or non-burning brick, municipal administration brick etc., also can dispose nearby, use as raw material such as highway subgrade bed course, the sclerosis of road surface, community, achieve the recycling of building waste.Isolated irony thing and the recyclable recycling of part foreign material in process building waste process.
In the above-described embodiments, primary separation device selects stone scrubber, bucket sand washer selected by secondary separator, namely primary separation device and secondary separator adopt wet concentration formula separation equipment, in other embodiments, primary separation device also can adopt winnowing type separation equipment, as dry type lightweight thing seperator etc.

Claims (10)

1. fixed building rubbish process for producing line, it is characterized in that, comprise the charging gear set gradually from front to back along handling process direction, primary breakup device, elementary tramp iron separator, elementary vibratory sieve, the semi-finished product separator of winnowing type or wet concentration formula, secondary breakup device, secondary tramp iron separator, secondary vibratory sieve, the discharging opening of charging gear connects the charging aperture of primary breakup device, the first outfeed belt conveyor is provided with between the discharging opening of primary breakup device and elementary tramp iron separator, the second outfeed belt conveyor is provided with between the charging aperture of elementary tramp iron separator and elementary vibratory sieve, the 3rd outfeed belt conveyor is provided with between the semi-finished product discharging opening of elementary vibratory sieve and the charging aperture of semi-finished product separator, the 4th outfeed belt conveyor is provided with between the discharging opening of semi-finished product separator and the charging aperture of secondary breakup device, the 5th outfeed belt conveyor of the secondary tramp iron separator present position of approach is provided with between the discharging opening of secondary breakup device and the charging aperture of secondary vibratory sieve.
2. fixed building rubbish process for producing line according to claim 1, is characterized in that, semi-finished product separator is the stone scrubber of wet concentration formula.
3. fixed building rubbish process for producing line according to claim 1, is characterized in that, primary breakup device and secondary breakup device are respectively Taw crushing apparatus and reaction type breaker.
4. fixed building rubbish process for producing line according to claim 1, is characterized in that, the discharging opening of secondary breakup device is connected with secondary oscillating feeder.
5. fixed building rubbish process for producing line according to claim 1, is characterized in that, breaker at different levels and/or vibratory sieve at different levels and/or separator are connected with deduster.
6. fixed building rubbish process for producing line according to claim 1, is characterized in that, the bottom blanking port of secondary breakup device is connected with the finished product separator of winnowing type or wet concentration formula.
7. fixed building rubbish process for producing line as claimed in any of claims 1 to 6, is characterized in that, the coarse fodder outlet of elementary vibratory sieve is connected on primary breakup device and/or charging gear by returning charge conveyer.
8. fixed building rubbish process for producing line as claimed in any of claims 1 to 6, it is characterized in that, the bottom blanking port of elementary vibratory sieve is connected to the feed side of the 5th outfeed belt conveyor, and the discharging opening of secondary breakup device is connected to the feed side of the 5th outfeed belt conveyor by the 6th outfeed belt conveyor.
9. fixed building rubbish process for producing line as claimed in any of claims 1 to 6, is characterized in that, the miscellaneous object outlet of semi-finished product separator is connected with foreign material conveyer.
10. fixed building rubbish process for producing line as claimed in any of claims 1 to 6, is characterized in that, charging gear and breaker at different levels are in below ground level.
CN201420718592.6U 2014-11-26 2014-11-26 A kind of fixed building rubbish process for producing line Active CN204294609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420718592.6U CN204294609U (en) 2014-11-26 2014-11-26 A kind of fixed building rubbish process for producing line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420718592.6U CN204294609U (en) 2014-11-26 2014-11-26 A kind of fixed building rubbish process for producing line

Publications (1)

Publication Number Publication Date
CN204294609U true CN204294609U (en) 2015-04-29

Family

ID=53100191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420718592.6U Active CN204294609U (en) 2014-11-26 2014-11-26 A kind of fixed building rubbish process for producing line

Country Status (1)

Country Link
CN (1) CN204294609U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105964377A (en) * 2016-05-24 2016-09-28 张义 Automatic separation system and method for steel bars and concrete of abandoned concrete beam column piles
CN106733098A (en) * 2016-12-31 2017-05-31 常州春秋华城基础工程有限公司 A kind of environment-friendly type building decoration refuse disposal installation
CN107309249A (en) * 2017-08-02 2017-11-03 北京加隆工程机械有限公司 A kind of stacked construction refuse resource processing equipment
CN108855587A (en) * 2018-04-24 2018-11-23 浙江双金机械集团股份有限公司 A kind of building waste method for screening and separating
CN108971189A (en) * 2018-06-04 2018-12-11 石家庄市市政建设总公司 A kind of complicated ingredient building waste processing system
CN109482627A (en) * 2019-01-07 2019-03-19 福建南方路面机械有限公司 A kind of building waste processing line and processing method
CN113210401A (en) * 2021-04-21 2021-08-06 山东华屹环境科技工程有限公司 Module mobile type construction waste recycling treatment production line

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105964377A (en) * 2016-05-24 2016-09-28 张义 Automatic separation system and method for steel bars and concrete of abandoned concrete beam column piles
CN105964377B (en) * 2016-05-24 2018-03-27 张义 A kind of discarded concrete beam column stake reinforcing bar and concrete automatic separation system and method
CN106733098A (en) * 2016-12-31 2017-05-31 常州春秋华城基础工程有限公司 A kind of environment-friendly type building decoration refuse disposal installation
CN106733098B (en) * 2016-12-31 2019-01-29 常州春秋华城基础工程有限公司 A kind of environment-friendly type building decoration refuse disposal installation
CN107309249A (en) * 2017-08-02 2017-11-03 北京加隆工程机械有限公司 A kind of stacked construction refuse resource processing equipment
CN108855587A (en) * 2018-04-24 2018-11-23 浙江双金机械集团股份有限公司 A kind of building waste method for screening and separating
CN108855587B (en) * 2018-04-24 2022-04-19 浙江双金机械集团股份有限公司 Construction waste screening and separating method
CN108971189A (en) * 2018-06-04 2018-12-11 石家庄市市政建设总公司 A kind of complicated ingredient building waste processing system
CN109482627A (en) * 2019-01-07 2019-03-19 福建南方路面机械有限公司 A kind of building waste processing line and processing method
CN109482627B (en) * 2019-01-07 2024-03-19 福建南方路面机械股份有限公司 Construction waste treatment line and treatment method
CN113210401A (en) * 2021-04-21 2021-08-06 山东华屹环境科技工程有限公司 Module mobile type construction waste recycling treatment production line

Similar Documents

Publication Publication Date Title
CN204294609U (en) A kind of fixed building rubbish process for producing line
CN209005920U (en) A kind of cracking and sorting processing system of building waste
KR100582847B1 (en) Selecting apparatus and its method for recycling construction waste material
CN202779142U (en) Fixed type building rubbish treatment system
CN102838307A (en) Method and system for treating construction waste
CN201442005U (en) Construction waste comprehensive treatment equipment
CN105127176A (en) Building-rubbish resource treatment and use integrated treating method and treating system thereof
CN108176697A (en) Build composting sorting total system and processing method
CN103406329A (en) Method for comprehensively treating and utilizing household garbage incineration slag
CN110976478B (en) Recycling treatment process for demolition and decoration wastes
CN111530597A (en) Dry sand making method by environment-friendly recycling of waste limestone
CN207170486U (en) A kind of MSW Incineration Plant clinker recycling and regenerated aggregate are classified preparation system
CN106746820A (en) The production technology that a kind of road engineering slag gathers materials
CN206535848U (en) Building waste processing system
CN112452502A (en) Fine basalt machine-made sandstone aggregate production line and process flow thereof
KR100358687B1 (en) The constructive recycling methods and instruments of Reclaimed waste.
CN110903044A (en) System and method for cooperatively treating construction waste by using cement kiln
CN110078452B (en) Inorganic binder manufactured by classifying and treating building solid waste regenerated aggregate and preparation method thereof
CN103264043A (en) Construction waste sorting machine and classification system thereof
KR20020050185A (en) The method to manufacture break to sand by construction waste
KR100277280B1 (en) Method and system of recycling rubbish of construction
CN113751465A (en) Resource disposal process for construction waste and decoration waste
KR20060085438A (en) Method and system for producing dried sand
CN109046755B (en) Production and processing system and process for full-scale waste rock disposal and utilization
CN207592419U (en) A kind of building waste specification processing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant