KR20010097310A - Revetment structure using natural stones - Google Patents

Revetment structure using natural stones Download PDF

Info

Publication number
KR20010097310A
KR20010097310A KR1020000021275A KR20000021275A KR20010097310A KR 20010097310 A KR20010097310 A KR 20010097310A KR 1020000021275 A KR1020000021275 A KR 1020000021275A KR 20000021275 A KR20000021275 A KR 20000021275A KR 20010097310 A KR20010097310 A KR 20010097310A
Authority
KR
South Korea
Prior art keywords
decorative
stone
retaining wall
stones
wall structure
Prior art date
Application number
KR1020000021275A
Other languages
Korean (ko)
Other versions
KR100400170B1 (en
Inventor
정기종
남연옥
정갑종
Original Assignee
정기종
정갑종
남연옥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정기종, 정갑종, 남연옥 filed Critical 정기종
Priority to KR10-2000-0021275A priority Critical patent/KR100400170B1/en
Publication of KR20010097310A publication Critical patent/KR20010097310A/en
Application granted granted Critical
Publication of KR100400170B1 publication Critical patent/KR100400170B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0275Retaining or protecting walls characterised by constructional features cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

본 발명은, 자연석을 이용한 옹벽구조물에 관한 것으로서, 전면이 외부로 노출되도록 배치되는 복수의 장식석과; 상기 장식석들의 후방에 설치되는 후방프레임과; 상기 각 장식석과 상기 후방프레임을 상호 연결하여 상기 각 장식석을 지지하는 복수의 지지바아를 포함하는 것을 특징으로 한다. 이에 의하여, 시공후, 안정성 및 견고성을 유지할 수 있을 뿐만 아니라 장식석의 배치 높이에 구애를 받지 않고도 용이하게 시공할 수 있게 된다.The present invention relates to a retaining wall structure using natural stones, comprising: a plurality of decorative stones disposed so that the front surface is exposed to the outside; A rear frame installed at the rear of the decorative stones; It characterized in that it comprises a plurality of support bars for supporting each of the decorative stones by connecting each of the decorative stones and the rear frame. As a result, after construction, not only stability and robustness can be maintained, but also construction can be easily performed regardless of the placement height of the decorative stone.

Description

자연석을 이용한 옹벽구조물{REVETMENT STRUCTURE USING NATURAL STONES}Retaining wall structure using natural stone {REVETMENT STRUCTURE USING NATURAL STONES}

본 발명은, 자연석을 이용한 옹벽구조물에 관한 것으로서, 보다 상세하게는, 시공후, 안정성 및 견고성을 유지할 수 있을 뿐만 아니라 장식석의 배치 높이에 구애를 받지 않고도 용이하게 시공할 수 있도록 한 자연석을 이용한 옹벽구조물에 관한 것이다.The present invention relates to a retaining wall structure using a natural stone, and more particularly, a retaining wall using a natural stone that can maintain stability and robustness after construction, and can be easily installed without being concerned with the placement height of the decorative stone. It is about a structure.

옹벽구조물이란, 도로와 경계를 이루는 주택부지, 산기슭 등의 경사면에 설치되어 토압 및 우수 등의 자연조건에 의해 이들이 붕괴되는 것을 방지할 수 있도록 형성된 것을 일컫는다. 이러한, 옹벽구조물은, 그 종류에 따라, 자연석을 이용한 옹벽구조물, 시멘트 벽돌 등을 이용한 옹벽구조물 및 콘크리트를 이용한 옹벽구조물 등으로 나뉠 수 있으며, 최근에는 공기의 단축 및 경제적인 측면을 고려하여 콘크리트를 이용한 옹벽구조물이 많이 반영되는 추세에 있다.Retaining wall structures refer to those formed on inclined surfaces such as housing sites and foothills bounded by roads and formed to prevent their collapse by natural conditions such as soil pressure and storm water. Such a retaining wall structure may be divided into a retaining wall structure using natural stone, a retaining wall structure using cement brick, and a retaining wall structure using concrete, and, in recent years, concrete is used in consideration of the shortening of the air and economic aspects. Many retaining wall structures have been used.

그러나, 일반 산기슭 및 노변 등과는 달리 일반 주택부지에 옹벽구조물을 설치할 경우에는, 그 외관의 미를 창출하기 위해 자연석을 이용한 옹벽구조물을 시공하는 경우도 상당히 많이 증가하고 있다.However, unlike the general foothills and roadsides, when the retaining wall structures are installed in the general housing site, construction of the retaining wall structures using natural stones has increased considerably in order to create a beautiful appearance.

자연석을 이용한 옹벽구조물을 시공하는 경우에는, 전면에 배치되는 장식석의 후방에 별도의 지지석을 배치하고 브래킷 등을 이용하여 장식석과 지지석을 상호 연결지지함으로써 시공이 완료된다.In the case of constructing the retaining wall structure using natural stone, the construction is completed by arranging a separate supporting stone at the rear of the decorative stone disposed on the front and supporting the decorative stone and the supporting stone by using a bracket or the like.

그런데, 이러한 종래의 자연석을 이용한 옹벽구조물에 있어서는, 장식석을 지지하는 지지석의 설치작업 자체가 용이하지 않으므로 전체적인 시공이 그다지 쉽지 않다는 단점이 있을뿐더러 시공작업 후, 안정성 및 견고성을 유지하기가 어려운 단점이 있다. 또한, 지지석을 사용함으로써 장식석을 다단으로 높게 설치하여야 하는 경우에는 그 높이에 제한을 받을 수도 있는 단점이 있다.However, in the conventional retaining wall structure using natural stone, since the installation work itself of the support stone for supporting the decorative stone is not easy, there is a disadvantage that the overall construction is not very easy, and also after the construction work, it is difficult to maintain stability and robustness There is this. In addition, there is a disadvantage that may be limited to the height when the decorative stone to be installed in a high level by using a support stone.

따라서, 본 발명의 목적은, 시공후, 안정성 및 견고성을 유지할 수 있을 뿐만 아니라 장식석의 배치 높이에 구애를 받지 않고도 용이하게 시공할 수 있도록 한 자연석을 이용한 옹벽구조물을 제공하는 것이다.Accordingly, an object of the present invention is to provide a retaining wall structure using a natural stone that can maintain stability and robustness after construction, and can be easily installed without regard to the placement height of the decorative stone.

도 1은 본 발명에 따른 옹벽구조물의 정면도,1 is a front view of a retaining wall structure according to the present invention;

도 2는 본 발명의 제1실시예에 따른 옹벽구조물의 측단면도,2 is a side cross-sectional view of a retaining wall structure according to a first embodiment of the present invention;

도 3은 도 2의 다른 실시예에 따른 도면,3 is a view according to another embodiment of FIG. 2;

도 4는 본 발명의 제2실시예에 따른 옹벽구조물의 측단면도,4 is a side cross-sectional view of a retaining wall structure according to a second embodiment of the present invention;

도 5는 도 4의 다른 실시예에 따른 도면,5 is a view according to another embodiment of FIG. 4;

도 6은 본 발명의 제3실시예에 따른 옹벽구조물의 측단면도,6 is a side cross-sectional view of a retaining wall structure according to a third embodiment of the present invention;

도 7은 본 발명의 제4실시예에 따른 옹벽구조물의 측단면도이다.7 is a side cross-sectional view of the retaining wall structure according to the fourth embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

10 : 장식석 16 : 후방프레임10: decorative stone 16: rear frame

18 : 저면프레임 20 : 지지바아18: bottom frame 20: support bar

22 : 앵커 24 : 지반22: anchor 24: ground

상기 목적은, 본 발명에 따라, 자연석을 이용한 옹벽구조물에 있어서, 전면이 외부로 노출되도록 배치되는 복수의 장식석과; 상기 장식석들의 후방에 설치되는 후방프레임과; 상기 각 장식석과 상기 후방프레임을 상호 연결하여 상기 각 장식석을 지지하는 복수의 지지바아를 포함하는 것을 특징으로 하는 자연석을 이용한 옹벽구조물에 의해 달성된다.According to the present invention, in the retaining wall structure using natural stone, a plurality of decorative stones disposed so that the front surface is exposed to the outside; A rear frame installed at the rear of the decorative stones; It is achieved by a retaining wall structure using a natural stone, characterized in that it comprises a plurality of support bars for supporting each of the decorative stones by interconnecting each of the decorative stones and the rear frame.

여기서, 상기 각 장식석의 하측의 지반 내에 매몰배치되는 저면프레임을 더 포함하도록 구성할 수 있으며, 이 때, 상기 각 장식석을 상기 저면프레임을에 연결지지하도록 앵커를 설치하는 것이 보다 유리하다.Here, it may be configured to further include a bottom frame buried in the ground of the lower side of each decorative stone, wherein it is more advantageous to install an anchor to support each decorative stone to the bottom frame.

한편, 상기 후방프레임과 상기 저면프레임이 동시에 설치되어 있을 경우에는, 연결브래킷을 이용하여 이들을 상호 연결지지하는 것이 바람직하다.On the other hand, when the rear frame and the bottom frame is installed at the same time, it is preferable to mutually support them using a connecting bracket.

이하에서는 첨부도면을 참조하여 본 발명에 대해 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 자연석을 이용한 옹벽구조물의 정면도이고, 도 2는 본 발명의 제1실시예에 따른 옹벽구조물의 측단면도이다. 이들 도면에 도시된 바와 같이, 본 발명에 따른 자연석을 이용한 옹벽구조물은, 전면이 외부로 노출되도록 지반(24)에 기립되게 배치되는 복수의 장식석(10)과, 평면투영시 각 장식석(10)의 배치방향을 따라 장식석(10)들의 후방에 설치되는 후방프레임(16)과, 각장식석(10)과 후방프레임(16)을 상호 연결지지하는 복수의 지지바아(20)를 포함한다.1 is a front view of a retaining wall structure using a natural stone according to the present invention, Figure 2 is a side cross-sectional view of the retaining wall structure according to a first embodiment of the present invention. As shown in these figures, the retaining wall structure using the natural stone according to the present invention, a plurality of decorative stones (10) are arranged standing up on the ground 24 so that the front surface is exposed to the outside, and each decorative stone (in planar projection) A rear frame 16 installed at the rear of the decorative stones 10 along the arrangement direction of the 10, and a plurality of support bars 20 for supporting the angular decoration 10 and the rear frame 16 to each other do.

각 장식석(10) 사이에는, 도면에 도시된 바와 같이, 전면의 외관을 이루도록 설치되는 소장식석과, 소장식석에 비해 그 크기가 작은 복수의 꼬막석이 마련된다. 이들 장식석(10), 소장식석 및 꼬막석들은 산이나 강, 또는 해변 등지에서 채취된 자연석을 주로 이용하게 되는데, 경우에 따라서는, 자연석과 유사한 형태로 인조가공된 인조석을 사용할 수도 있다.As shown in the figure, between each decorative stone 10, a small decorative stone that is installed to form the appearance of the front surface, and a plurality of cockpits having a smaller size than the small decorative stone is provided. These decorative stones (10), collectible stones and cockpits will mainly use natural stones collected from mountains, rivers, beaches, etc. In some cases, artificial stone artificially processed in a similar form to natural stones may be used.

한편, 각 장식석(10)들의 후방에는 장식석(10)의 배치방향을 따라 후방프레임(16)이 설치된다. 후방프레임(16)은, 도 2에서와 같이, 장식석(10)이 단층으로 배치되어 있을 경우, 지반(24)의 평면 방향을 따라 길이방향으로 설치될 수 있으며, 도 4에 도시된 바와 같이, 각 장식석(10)이 다단 층상 배치되어 있을 경우에는 장식석(10)의 높이에 맞추어 상하방향을 따라 길게 설치될 수 있다. 그리고, 각 장식석(10)들을 복수의 지지바아(20)를 통해 후방프레임(16)에 연결됨으로써, 각 장식석(10)들은 견고하게 지지될 수 있게 된다.On the other hand, the rear frame 16 is installed in the rear of each decorative stone 10 along the direction of the decorative stone 10. The rear frame 16, as shown in Figure 2, when the decorative stone 10 is arranged in a single layer, can be installed in the longitudinal direction along the plane direction of the ground 24, as shown in Figure 4 When each decorative stone 10 is arranged in a multi-layered structure, the decorative stone 10 may be installed to be long along the vertical direction in accordance with the height of the decorative stone 10. And, by connecting each of the decorative stones 10 to the rear frame 16 through a plurality of support bars 20, each of the decorative stones 10 can be firmly supported.

또한, 후방프레임(16)은, 도 3에 도시된 바와 같이, 지반(24) 내에 매몰되어 각 장식석(10)의 하측에 배치될 수 있게 된다. 본 고안에서는, 장식석(10)의 후방에 위치한 것을 후방프레임(16)이라 하고, 장식석(10)의 저부에 배치된 것을 저면프레임(18)이라 한다. 이처럼, 장식석(10)의 저부에 저면프레임(18)을 설치할 경우에는, 역시, 각 장식석(10)과 저면프레임(18)을 복수의 앵커(22)를 이용하여 연결지지할 수 있게 된다.In addition, the rear frame 16 is buried in the ground 24, as shown in Figure 3 can be disposed below each decorative stone 10. In the present invention, the rear frame 16 is located at the rear of the decorative stone 10 and the bottom frame 18 is disposed at the bottom of the decorative stone 10. In this way, when the bottom frame 18 is provided at the bottom of the decorative stone 10, each of the decorative stone 10 and the bottom frame 18 can be supported by using a plurality of anchors 22. .

그리고, 장식석(10)이 도 3에 도시된 바와 같이, 단층으로 배치되어 있을 경우에는, 저면프레임(18) 역시, 장식석(10)의 저부에 단일의 부재로 설치될 수 있으나, 도 5에 도시된 바와 같이, 장식석(10)이 다단 층상으로 배치될 경우에는 저면프레임(18) 역시 각 장식석(10)의 하측 선단부에 맞추어 다수개를 배치할 수 있게 된다.And, when the decorative stone 10 is arranged in a single layer, as shown in Figure 3, the bottom frame 18 may also be installed as a single member on the bottom of the decorative stone 10, Figure 5 As shown in the figure, when the decorative stone 10 is arranged in a multi-layered structure, the bottom frame 18 may also be arranged in plural numbers in accordance with the lower tip of each decorative stone 10.

또한, 도 6에 도시된 바와 같이, 장식석(10)이 다단 층상으로 배치되어 있을 경우, 보다 견고하게 장식석(10)을 지지하기 위해서는 다수개의 저면프레임(18)과 후방프레임(16)을 동시에 모두 설치할 수 있게 된다. 이럴 경우, 각 저면프레임(18)과 후방프레임(16)간에는 연결브래킷(26)을 설치하여 이들을 상호 연결지지할 수 있다.In addition, as shown in Figure 6, when the decorative stone 10 is arranged in a multi-layered layer, in order to more firmly support the decorative stone 10, a plurality of bottom frame 18 and the rear frame 16 You can install them all at the same time. In this case, connecting brackets 26 may be installed between the bottom frame 18 and the rear frame 16 so as to mutually support them.

그리고, 도 7에 도시된 바와 같이, 잡석층(28)의 상부에 콘크리트층(32)을 형성하고, 콘크리트층(32)의 상단에 저면프레임(18)을 배치한 다음, 장식석(10)의 후방에 마련된 후방프레임(16)과 저면프레임(18)을 연결브래킷(26)을 이용하여 지지하는 것 또한 본 발명의 실시예를 이룰 수 있다.As shown in FIG. 7, the concrete layer 32 is formed on the top of the rubble layer 28, the bottom frame 18 is disposed on the top of the concrete layer 32, and then the decorative stone 10 is formed. Supporting the rear frame 16 and the bottom frame 18 provided at the rear side by using the connecting brackets 26 can also achieve embodiments of the present invention.

이러한 구성에 의해 본 발명에 따른 자연석을 이용한 옹벽구조물을 시공하는 과정을 설명하면 다음과 같다.Referring to the process of constructing the retaining wall structure using a natural stone according to the present invention by such a configuration as follows.

먼저, 설치대상 경사지(27)의 하선부로부터 소정 구간에 걸쳐 지반(24)을 소정 깊이로 판다. 이 때, 지반(24)의 깊이는 최종적으로 설치되는 옹벽구조물의 설치높이에 따라 가변될 수 있음은 물론이다. 그런 연후에, 저부면에 소정 두께에 걸쳐 잡석층(28)을 마련한 다음 충분한 다짐작업을 하는데, 경우에 따라서는 잡석층(28)을 배치하지 않고 콘크리트로 대체할 수도 있다.First, the ground 24 is dug to a predetermined depth from the underlined portion of the installation target slope 27 over a predetermined section. At this time, the depth of the ground 24 can be varied according to the installation height of the retaining wall structure finally installed. After that, the bottom surface is provided with a rubble layer 28 over a predetermined thickness, and then sufficiently compacted. In some cases, the rubble layer 28 may be replaced with concrete without being disposed.

다짐작업이 완료되면, 미관이 양호한 면이 전면으로 배치되도록 잡석층(28) 위에 장식석(10)을 경사지(27)의 하선부를 따라 나란하게 배열한 후, 장식석(10)과 경사지(27) 사이에 후방프레임(16)을 설치한다. 이 때, 후방프레임(16)은 지반(24)을 향한 단부가 지반(24) 내에 견고히 고정될 수 있도록 지반(24)의 저부면으로부터 더 깊게 고정할 수 있으며, 또한, 전술한 바와 같이, 후방프레임(16)에 더하여 저면프레임(18)을 추가로 설치할 수도 있다. 또한, 저면프레임(18)은 후방프레임(16)의 길이방향에 대해 가로로 배치되는 것이 보다 견고한 상태를 유지할 수 있음은 물론이며, 연결브래킷(26)을 이용하여 저면프레임(18)과 후방프레임(16)을 상호 연결함으로써, 저면프레임(18)과 후방프레임(16)을 상호 견고하게 유지할 수도 있다.When the compaction operation is completed, after arranging the decorative stones 10 on the rubble layer 28 side by side along the underlined part of the inclined land 27 so that the surface having a good aesthetic appearance is disposed in front, the decorative stones 10 and the inclined land 27 The rear frame 16 is installed in between. At this time, the rear frame 16 can be fixed deeper from the bottom surface of the ground 24 so that the end toward the ground 24 can be firmly fixed in the ground 24, and, as described above, the rear In addition to the frame 16, the bottom frame 18 may be further provided. In addition, the bottom frame 18 can be maintained in a more rigid state that is disposed horizontally with respect to the longitudinal direction of the rear frame 16, the bottom frame 18 and the rear frame using the connecting bracket 26, of course. By interconnecting 16, the bottom frame 18 and the rear frame 16 can be firmly held together.

이처럼 후방프레임(16) 및 저면프레임(18)의 설치가 완료되면, 각 장식석(10)과 후방프레임(16)은 지지바아(20)를 통해 각각 연결지지하고, 각 장식석(10)과 저면프레임(18)은 앵커(22)를 통해 연결지지한다. 이 때, 앵커(22) 및 지지바아(20)를 보다 많이 설치하는 것이 장식석(10)의 견고한 설치를 위해 유리하며, 각 앵커(22) 및 지지바아(20)의 일단은 장식석(10)에 일정 깊이 이상 삽입되도록 하고, 타단은 저면프레임(18) 및 후방프레임(16)에 나사 등을 이용하여 고정하는 것이 보다 효과적이다. 또한, 앵커(22) 및 지지바아(20)는 누수에 의해 부식되는 것을 방지하기 위해 비철금속이나 복합재료를 갖는 금속재질로 사용할 수 있으며, 일반 철근으로 사용할 경우에는, 앵커(22) 및 지지바아(20)에 콘크리트를 타설하여 누수에 의한 부식을 방지할 수 있다.When the installation of the rear frame 16 and the bottom frame 18 is completed as described above, each decorative stone 10 and the rear frame 16 is supported by the support bar 20, respectively, and each decorative stone 10 and The bottom frame 18 is connected and supported by the anchor 22. At this time, it is advantageous to install more anchor 22 and the support bar 20 for the firm installation of the decorative stone 10, one end of each anchor 22 and the support bar 20 is decorative stone 10 ) To be inserted more than a predetermined depth, and the other end is more effectively fixed to the bottom frame 18 and the rear frame 16 by using a screw or the like. In addition, the anchor 22 and the support bar 20 may be used as a non-ferrous metal or a metal material having a composite material in order to prevent corrosion due to leakage, when used as a general reinforcing bar, the anchor 22 and the support bar ( 20) Concrete can be poured to prevent corrosion by water leakage.

그리고, 장식석(10)의 형태에 기인하여 지지바아(20) 및 앵커(22)의 설치가 곤란할 경우에는, 장식석(10)에 소정의 삽입공을 형성하고, 삽입공 내에 접착제 등을 충전한 후 이에 연결고리 등을 삽입하여 고정하여 고정된 연결고리에 철근 등을 이용함으로써, 지지바아(20) 및 앵커(22)를 대체할 수도 있음은 물론이다.When the support bar 20 and the anchor 22 are difficult to install due to the shape of the decorative stone 10, a predetermined insertion hole is formed in the decorative stone 10, and an adhesive or the like is filled in the insertion hole. Then, by inserting a connection ring and the like fixed by using a reinforcing bar in the fixed connection ring, the support bar 20 and the anchor 22 can of course be replaced.

이 후, 장식석(10)의 배치 및 지지가 완료되면, 잡석층(28)의 상부영역에 토사층(29)으로 채움작업을 함과 동시에 추가의 잡석층(28a)을 교번적으로 형성하고 다짐작업을 한다. 그리고, 장식석(10)의 사이영역에는 저부영역으로부터 다수의 꼬막석이 충전되도록 할 수도 있는데, 이 때, 각 꼬막석은 미관이 양호한 측면이 전방을 향하도록 하여 몰탈(30)을 사용하여 상호 간의 유격이 방지될 수 있게 적층되도록 한다. 한편, 꼬막석의 상부영역에는 장식석(10)에 비해 상대적으로 작은 크기를 갖는 소장식석을 장식석(10)과 나란하게 배치할 수 있을 뿐만 아니라 각 소장식석들을 보다 견고하게 지지하기 위해 각 장식석(10) 등과 별도의 철근 등을 이용하여 상호 연결할 수도 있음은 물론이다.Thereafter, when the placement and support of the decorative stone 10 is completed, while filling the soil layer 29 in the upper region of the rubble layer 28, additional rubble layer 28a is alternately formed and compacted. Do the work. In addition, a plurality of cockpits may be filled in the area between the decorative stones 10 from the bottom area. In this case, each cockpit may be freed from each other by using a mortar 30 so that the side having a good aesthetic face forward. This is to be laminated so as to be prevented. On the other hand, in the upper region of the kerbstone can be arranged in parallel with the decorative stone 10 having a relatively small size compared to the decorative stone 10 as well as to support each of the small decorative stones more firmly Of course, it can also be connected to each other by using a separate reinforcing bar, such as the decorative stone (10).

이와 같이, 전면이 외부로 노출되도록 배치되는 복수의 장식석(10)과, 평면투영시 각 장식석(10)들의 후방에 설치되는 후방프레임(16)과, 각 장식석(10)과 후방프레임(16)을 상호 연결하여 각 장식석(10)을 지지하는 복수의 지지바아(20)를 포함하도록 구성함으로써, 전체적인 시공비용을 감소시키면서도 시공을 용이하게 할 수 있을 뿐만 아니라 보다 견고하게 장식석을 지지할 수 있게 된다.In this way, a plurality of decorative stones 10 are disposed so that the front surface is exposed to the outside, the rear frame 16 is installed in the rear of each decorative stone 10 in the plane projection, each decorative stone 10 and the rear frame By connecting the (16) to include a plurality of support bars 20 for supporting each decorative stone 10, not only can reduce the overall construction cost, but also facilitate the construction of the decorative stone more firmly I can support it.

전술 및 도시한 실시예들에서는, 장식석(10)을 먼저 배치하고후방프레임(16) 및 저부프레임을 설치하는 것에 관하여 설명하고 있으나, 소정의 위치에 후방프레임(16) 및 저부프레임을 먼저 설치한 연후에 장식석(10)을 일정 위치에 배치하고 각각의 지지바아(20) 및 앵커(22)를 설치할 수도 있음은 물론이다.In the above-described and illustrated embodiments, it is described that the decorative stone 10 is placed first and the rear frame 16 and the bottom frame are installed, but the rear frame 16 and the bottom frame are first installed at a predetermined position. After one year, the decorative stone 10 may be disposed at a predetermined position, and each support bar 20 and the anchor 22 may be installed.

그리고, 장식석(10)들 사이에 소장식석 및 꼬막석을 설치하지 않을 수도 있으며, 이들 대신, 관엽식물 등을 포함한 꽃이나 나무 등을 설치하여 외관을 미려하게 할 수 있음은 물론이다.And, it may not be installed between the decorative stones 10 and collectible stone and kkokseok, instead of these, it is a matter of course that the appearance can be beautiful by installing flowers or trees including house plants and the like.

이상 설명한 바와 같이, 본 발명에 따르면, 시공후, 안정성 및 견고성을 유지할 수 있을 뿐만 아니라 장식석의 배치 높이에 구애를 받지 않고도 용이하게 시공할 수 있도록 한 자연석을 이용한 옹벽구조물이 제공된다.As described above, according to the present invention, there is provided a retaining wall structure using natural stone, which can maintain stability and robustness after construction, and can be easily installed without being concerned with the placement height of the decorative stone.

Claims (3)

자연석을 이용한 옹벽구조물에 있어서,In retaining wall structure using natural stone, 전면이 외부로 노출되도록 배치되는 복수의 장식석과;A plurality of decorative stones arranged so that the front surface is exposed to the outside; 상기 장식석들의 후방에 설치되는 후방프레임과;A rear frame installed at the rear of the decorative stones; 상기 각 장식석과 상기 후방프레임을 상호 연결하여 상기 각 장식석을 지지하는 복수의 지지바아를 포함하는 것을 특징으로 하는 자연석을 이용한 옹벽구조물.Retaining wall structure using a natural stone, characterized in that it comprises a plurality of support bars for supporting each of the decorative stones by connecting each of the decorative stones and the rear frame. 제1항에 있어서,The method of claim 1, 상기 각 장식석의 하측의 지반에 매몰배치되는 저면프레임을 더 포함하며,Further comprising a bottom frame buried in the ground of the lower side of each decorative stone, 상기 각 장식석과 상기 저면프레임을 상호 연결지지하는 앵커를 포함하는 것을 특징으로 하는 자연석을 이용한 옹벽구조물.Retaining wall structure using a natural stone, characterized in that it comprises an anchor for supporting each of the decorative stone and the bottom frame interconnected. 제2항에 있어서,The method of claim 2, 상기 후방프레임과 상기 저면프레임을 상호 연결지지하는 연결브래킷을 포함하는 것을 특징으로 하는 자연석을 이용한 옹벽구조물.Retaining wall structure using a natural stone, characterized in that it comprises a connecting bracket for supporting the rear frame and the bottom frame interconnected.
KR10-2000-0021275A 2000-04-21 2000-04-21 Revetment structure using natural stones KR100400170B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0021275A KR100400170B1 (en) 2000-04-21 2000-04-21 Revetment structure using natural stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0021275A KR100400170B1 (en) 2000-04-21 2000-04-21 Revetment structure using natural stones

Publications (2)

Publication Number Publication Date
KR20010097310A true KR20010097310A (en) 2001-11-08
KR100400170B1 KR100400170B1 (en) 2003-10-01

Family

ID=19666148

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0021275A KR100400170B1 (en) 2000-04-21 2000-04-21 Revetment structure using natural stones

Country Status (1)

Country Link
KR (1) KR100400170B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020087013A (en) * 2002-10-09 2002-11-21 이재경 Process for constructing retaining wall by natural stones

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030085635A (en) * 2002-04-29 2003-11-07 장성기 Structure for slope protection using stone and construction method thereof
KR100467090B1 (en) * 2004-08-12 2005-01-24 주식회사 정진종합엔지니어링건축사사무소 A slope protection equipment for construction
KR102123205B1 (en) 2020-02-07 2020-06-16 (주)삼대주개발 Construction method and mounting structure of retaining wall structure using reinforcing metal and connecting metal
KR102259659B1 (en) 2020-12-08 2021-06-02 목포대학교 산학협력단 Ornamental stone retaining wall structure and construction method using L type anker and strip bar

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100264386B1 (en) * 1998-03-18 2000-08-16 이관희 Method and construction of panel of reinforced siol using unartificial marble
KR100296018B1 (en) * 1999-02-19 2001-07-12 이희종 Revetment structure using natural stones and method for constructing revetment structure using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020087013A (en) * 2002-10-09 2002-11-21 이재경 Process for constructing retaining wall by natural stones

Also Published As

Publication number Publication date
KR100400170B1 (en) 2003-10-01

Similar Documents

Publication Publication Date Title
CN105421470A (en) Construction method for assembled type anchor rod and arch framework combined type ecological slope protection
KR100400170B1 (en) Revetment structure using natural stones
KR100296018B1 (en) Revetment structure using natural stones and method for constructing revetment structure using the same
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
KR100440091B1 (en) Structure of Block type retaining wall and Construction Method thereof
KR200413303Y1 (en) Stone stacked wall structure using steel beam
KR100447331B1 (en) execution method of landscape architecture for cutting ground using blasting stone and landscape architecture apparatus using the same
KR102240949B1 (en) Mounting structure for decorating of wall
KR100797766B1 (en) Revetment-block structure using natural stones
CN210395369U (en) Foundation pit slope soil nail tube wall enclosure structure
KR200279944Y1 (en) A revetment structure of retaining wall which has a removing wave
JPH09195289A (en) Reinforced earth wall surface block and reinforced earth wall surface structure
KR200284588Y1 (en) Artificial waterfall structure using retaining wall
KR100264386B1 (en) Method and construction of panel of reinforced siol using unartificial marble
KR100973914B1 (en) Retaining nature-rock wall with plane rocks and building method thereof
CN219118228U (en) Assembly type soil retaining greening water permeable member
KR200235107Y1 (en) Afforestation Retaining-Wall laying Concrete-block
KR20020041207A (en) Method of Constructing Blocks for Riverside Bank
CN210562222U (en) Combined ecological slope protection
KR200242401Y1 (en) Grounding stone
KR100346947B1 (en) The SEN Retaining Wall
KR101107279B1 (en) retaining wall using reinforcement soil blocks and constuction method of retaining wall using that at cutting ground
KR102338340B1 (en) the improved apparatus for reinforcing slope and the reinforcing slope structure using the same
JP3774459B2 (en) Assembly fence
KR100842034B1 (en) Retaining wall using natural stone and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120917

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130911

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140917

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20151001

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160919

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170919

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20180918

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20190905

Year of fee payment: 17