KR20000012310A - The jointing distribution method of concrete and the concrete inter ceptive net - Google Patents

The jointing distribution method of concrete and the concrete inter ceptive net Download PDF

Info

Publication number
KR20000012310A
KR20000012310A KR1019990052122A KR19990052122A KR20000012310A KR 20000012310 A KR20000012310 A KR 20000012310A KR 1019990052122 A KR1019990052122 A KR 1019990052122A KR 19990052122 A KR19990052122 A KR 19990052122A KR 20000012310 A KR20000012310 A KR 20000012310A
Authority
KR
South Korea
Prior art keywords
concrete
wire
overlapping
net
placing
Prior art date
Application number
KR1019990052122A
Other languages
Korean (ko)
Inventor
임성빈
Original Assignee
임성빈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임성빈 filed Critical 임성빈
Priority to KR1019990052122A priority Critical patent/KR20000012310A/en
Publication of KR20000012310A publication Critical patent/KR20000012310A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8658Walls made by casting, pouring, or tamping in situ made in permanent forms using wire netting, a lattice or the like as form leaves

Abstract

PURPOSE: The concrete continued establishment method is provided to reduce the construction period by establishing concrete immediately without disassembling an interception member while connecting concrete at the middle end part of the concrete establishment. CONSTITUTION: The concrete connection method has the steps of: cutting and bending(13) an interception net for forming a horizontal unit(7) and a vertical unit(8) by bending the lower end of the concrete interception net(6) in 90 degree so the graduation size of a net eye as to be 2¯4cm horizontally and vertically using a wire(5) twisted 2¯3 strips of a piano steel wire which is 1¯1.5mm; overlapping(14) the interception nets for overlapping the net eyes to be crossed one another by overlapping twofold or threefold as overlapping 2¯3 number of concrete interception net(6) formed in the cutting/bending process(13) of the interception net; establishing(15) the interception net for combining the wire(6) of the concrete interception net(6) where the up/down wires(2,3) penetrate and the up/down wires(2,3) with a combination wire(9).

Description

콘크리트 이어치기방법 및 그 콘크리트 차단망{The jointing distribution method of concrete and the concrete inter ceptive net}The jointing distribution method of concrete and the concrete inter ceptive net}

본 발명은 기초콘크리트나 슬라브 등의 콘크리트 구조물을 구축하기 위하여 콘크리트를 타설할 경우에 그 콘크리트를 타설하는 면적이 광대하여 1일 예상작업량만큼 콘크리트 타설을 한 뒤에 콘크리트타설 중단부를 마감하는 콘크리트 이어치기방법 및 그 콘크리트 차단망에 관한 것으로, 더욱 상세하게는 콘크리트 중단부에 콘크리트를 막아주는 차단부재를 고인장력을 가진 피아노선으로 형성한 콘크리트차단망을 적어도 2겹이상으로 겹쳐지게 설치하여 겹쳐진 차단망에 의해 콘크리트를 차단하게 하고, 콘크리트타설 중단부인 이어치기부에서 콘크리트 차단부재를 해체하지 않고 곧 바로 콘크리트를 타설할 수 있도록 하여 공사기간을 단축시킬 수 있슴과 아울러 이어치기부의 콘크리트 접착력이 증가될 수 있도록 하기 위한 것이다.The present invention is a concrete joint method for finishing the concrete placing stops after the concrete is placed as much as the expected amount of work per day when the concrete is poured in order to build a concrete structure such as foundation concrete or slab And a concrete screening net, and more particularly, a concrete screening net formed of a piano wire having a high tensile strength with a blocking member that blocks concrete at a concrete interruption part. To block concrete, and to allow concrete to be cast right away without dismantling the concrete blocking member at the joint, which is the concrete stopping part, to shorten the construction period and increase concrete adhesion of the joint. It is to.

일반적으로 광대(廣大)한 면적을 가지는 기초 콘크리트나 슬라브, 옹벽 등을 구축할 경우에는 콘크리트의 타설량이 매우 많아서 하루에 그 넓은 곳에 콘크리트를 모두 타설할 수 없어서 도 7과 같이 넓은 작업면적을 하루에 작업할 만큼씩 구획(區劃)을 나누어서 콘크리트를 타설하게 된다.In general, when constructing a foundation concrete, slab, retaining wall, etc. having a vast area, the amount of concrete is so much that it is not possible to pour all of the concrete in a wide area in one day, so a large working area as shown in Figure 7 The concrete will be poured by dividing the sections by the work.

상기와 같이 구획을 나누어서 콘크리트를 타설하는 경우에 종래의 작업방법은 도 1에서 보는 바와같이, 콘크리트를 타설할 바닥면(1)에 상하부철근(2,3)을 일정간격을 설치한 뒤에, 구획을 나누는 경계부에 콘크리트의 타설을 중단하는 거푸집(10)을 세워 설치하는데, 이렇게 거푸집(10)을 설치하기 위해서는 상하부철근(2,3)이 관통할 수 있도록 거푸집(10)에 구멍을 뚫고 그 관통된 구멍으로 상하부철근(2,3)을 삽입 관통한다.In the case of placing concrete by dividing the partitions as described above, a conventional work method, as shown in Figure 1, after installing the upper and lower reinforcing bars (2, 3) on the bottom surface (1) on which concrete is to be placed, To install the formwork 10 to stop the casting of concrete at the boundary that divides, in order to install the formwork 10 so that the upper and lower reinforcing bars (2, 3) can be drilled through the formwork (10) The upper and lower reinforcing bars (2, 3) are inserted through the holes.

그 뒤 거푸집(10)의 외측으로 노출된 상하부철근(2,3)을 철사 등의 결속철사(9)를 이용하여 거푸집(10)과 상하부철근(2,3)이 고정될 수 있게 하며, 거푸집(10)의 후방에 받침목(11)을 받쳐지도록 설치하여 콘크리트(4)를 타설했을 경우에 발생하는 압력으로 부터 거푸집(10)이 붕괴되지 않도록 한다.Then, using the binding wire (9) such as wire to the upper and lower reinforcing bar (2,3) exposed to the outside of the formwork (10), the formwork 10 and the upper and lower reinforcing bars (2,3) can be fixed, The back of the (10) is installed so as to support the support (11) so that the formwork 10 is not collapsed from the pressure generated when the concrete (4) is poured.

상기와 같이 거푸집(10)을 설치한 뒤에 거푸집(10)이 설치되어 있는 안쪽에 콘크리트를 타설하여 목적하는 바대로의 슬라브나 기초 콘크리트의 일부를 구축하게 하고, 이렇게 타설한 콘크리트가 양생되어 굳어지면 그 다음날이나 그 다음 작업에 상기 거푸집(10)을 해체한 뒤에 콘크리트 이어치기를 위하여 2차(다음작업)분의 콘크리트를 타설할 수 있을 만큼 상기와 동일한 방법으로 거푸집(10)을 설치한 뒤에 또 다시 콘크리트를 타설하여 콘크리트 이어치기 작업을 진행한다.After the formwork 10 is installed as above, the concrete is poured into the inside where the formwork 10 is installed so as to build a part of the slab or the foundation concrete as desired, and when the poured concrete is cured and hardened, After disassembling the formwork 10 on the next day or the following work, install the formwork 10 in the same manner as above so that the second (next work) concrete can be poured in order to connect the concrete. The concrete is poured again to continue the concrete stitching work.

이와 같은 콘크리트 이어치기작업을 연속하여 목적하는 바대로 광대한 슬라브 등의 콘크리트 구축물을 구축하게 되는 것이다.This concrete joint work is to continue to build a concrete slab, such as a vast slab as desired.

그러나 종래의 콘크리트 이어치기방법은 콘크리트 타설중단부에 거푸집을 설치할 때 상하부철근이 관통될 수 있도록 구멍을 뚫고, 받침목을 세우는 등의 거푸집 설치상의 번거롭고 불편한 문제와, 거푸집 설치시간이 많이 소요되는 문제와, 그리고 상하부철근을 설치하기 위한 구멍을 거푸집에 뚫게 되므로 거푸집이 손상되어 거푸집의 수명이 단축되는 비경제적인 문제를 지니고 있었다.However, the conventional concrete joining method is cumbersome and inconvenient in forming the formwork such as drilling holes to erect the upper and lower reinforcing bars when installing the formwork at the end of the concrete placing, and setting up the support, In addition, since the hole for installing the upper and lower reinforcing bar was drilled in the formwork, the formwork was damaged and the lifespan of the formwork was reduced.

또한, 상기와 같이 거푸집을 설치한 상태에서 콘크리트를 타설하고 그 콘크리트가 양생된 뒤에는 거푸집을 반드시 해체해야 하므로 거푸집을 해체하는데에 따른 작업시간과 인력이 더 소요되므로 공사기간이 연장되고 그로 인하여 공사비용이 상승되는 문제가 있었고, 상기와 같이 콘크리트가 양생되어 거푸집을 해체한 뒤에는 거푸집 해체면이 매끈한 평면이므로 이어치기면의 콘크리트 구조물의 강도가 저하되는 등의 비합리적인 문제점이 있었다.In addition, after the concrete is installed in the state in which the formwork is installed as described above, after the concrete is cured, the formwork must be dismantled, so the work time and manpower required to dismantle the formwork is extended, and thus the construction cost is extended. There was a problem of this rise, and after the concrete is cured as described above, after dismantling the formwork, since the form dismantling surface is a smooth plane, there was an unreasonable problem such as deterioration of the strength of the concrete structure of the connecting surface.

본 발명은 상기의 문제점을 해결하기 위하여 콘크리트 중단부에 콘크리트를 막아주는 차단부재를 고인장력을 가진 피아노선을 꼬아서 만든 콘크리트 차단망을 적어도 2겹이상으로 겹쳐지게 설치하여 겹쳐진 차단망에 의해 콘크리트를 차단하게 하고, 콘크리트 차단망을 설치한 후 콘크리트를 타설하여 1차로 콘크리트 구조물을 구축하며, 타설한 콘크리트가 양생되어 콘크리트 이어치기를 수행시 콘크리트차단망을 해체하지 않고 곧 바로 콘크리트를 타설할 수 있도록 하여 공사기간을 단축시킬 수 있슴과 아울러 이어치기부의 콘크리트 접착력이 증가될 수 있도록 하기 위한 것이다.The present invention is to solve the above problems by installing a concrete blocking net that is made by twisting the piano wire having a high tensile force to the concrete block to prevent the concrete to overlap at least two or more layers of concrete by overlapping Block concrete, install concrete screening network and pour concrete first to build concrete structure, and when the concrete is cured, the concrete can be poured immediately without disassembling the concrete screening network. In order to shorten the construction period and to increase the concrete adhesion of the seam.

상기의 목적을 달성하기 위한 본 발명에 따른 콘크리트 이어치기방법은, 1∼1.5mm의 피아노강선 2∼3가닥을 꼰 와이어를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성한 콘크리트 차단망의 하단부를 90°로 절곡시켜 수평부와 수직부를 형성하는 차단망 절곡단계와, 상기 차단망 절곡단계에서 형성된 2∼3개의 콘크리트 차단망을 겹치되 2∼3중으로 겹쳐져서 그물눈이 서로 어긋나게 겹치는 차단망 겹침단계와, 상기 차단망 겹침단계에서 겹쳐진 콘크리트 차단망의 수평부가 바닥면에 안착되고 수직부가 수직으로 세워지도록 하되, 수평부의 그물눈으로 상하부철근을 관통시킨 뒤에 상하부철근이 관통한 콘크리트 차단망의 와이어와 상하부철근를 결속철사로 결속하는 차단망 설치단계와, 상기 콘크리트 차단망이 설치된 바닥면에 콘크리트를 타설하는 콘크리트 타설단계로 이루어 진다.Concrete connecting method according to the present invention for achieving the above object, concrete formed so that the scale of the mesh is 2 to 4cm each using a wire braided wire 2-3 strands of 1 ~ 1.5mm piano wire A bending net bending step of forming a horizontal part and a vertical part by bending the lower end of the blocking net at 90 °, and overlapping two or three concrete blocking nets formed in the bending net bending step, overlapping two or three times so that the meshes are shifted from each other. Overlapping step of overlapping screening network, and the horizontal part of the overlapping concrete screening network in the step of overlapping the screening network is to be seated on the floor and the vertical part is erected vertically, but the upper and lower reinforcing concrete blocks after penetrating upper and lower reinforcing bars through the horizontal mesh Blocking network installation step of binding the wires of the mesh and the upper and lower reinforcement with the binding wires, and the bottom of the concrete It is made of concrete pouring step of placing concrete.

또한, 본 발명의 콘크리트 차단망은, 1∼1.5mm의 피아노강선 2∼3가닥을 꼬아 와이어를 형성한 뒤에, 이 와이어를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성한 콘크리트 차단망을 형성하고, 상기 콘크리트 차단망의 하단부를 90°로 절곡시켜 수평부와 수직부를 형성한 것을 특징으로 한다.In addition, the concrete screening net of the present invention is a concrete formed by twisting two to three strands of a 1 to 1.5 mm piano steel wire to form a wire, and using the wire to form a scale of 2 to 4 cm each. Forming a screening net, the lower end of the concrete screening net is bent by 90 °, characterized in that the horizontal and vertical parts were formed.

도 1은 종래의 콘크리트 이어치기방법을 설명하기 위한 설명도.1 is an explanatory diagram for explaining a conventional concrete joining method.

도 2는 본 발명의 콘크리트 이어치기방법을 설명하기 위한 설명도.2 is an explanatory diagram for explaining a concrete joining method of the present invention.

도 3은 본 발명에 의한 콘크리트 차단망을 도시한 개략도.Figure 3 is a schematic diagram showing a concrete blocking network according to the present invention.

도 4는 도 3의 "A"부를 확대 도시한 부분 확대도.4 is an enlarged view of a portion “A” of FIG. 3 enlarged.

도 5의 (가)(나)는 본 발명의 사용상태를 확대도시한 부분발췌 측단면도.Figure 5 (a) (b) is an enlarged partial cross-sectional side view showing a state of use of the present invention.

도 6은 도 5의 (나)에 있어서 "B"방향에서 본 도면.Fig. 6 is a view seen from the direction “B” in Fig. 5B.

도 7은 넓은 콘크리트 타설부를 도시한 개략도.7 is a schematic view showing a wide concrete pouring portion.

도 8은 본 발명의 콘크리트 이어치기방법을 나타내는 공정도이다.8 is a process chart showing the concrete stitching method of the present invention.

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

1 : 바닥면 2 : 상부철근 3 : 하부철근1: Bottom 2: Upper rebar 3: Lower rebar

4 : 콘크리트 5 : 와이어 6 : 콘크리트 차단망4 concrete 5 wire 6 concrete screen

7 : 수평부 8 : 수직부 9 : 결속철사7: horizontal part 8: vertical part 9: binding wire

10 : 거푸집 11 : 받침목 12 : 자갈10: die 11: base 12: gravel

이하 본 발명을 도 2 내지 도 8을 참고하여 설명하면 다음과 같다.Hereinafter, the present invention will be described with reference to FIGS. 2 to 8.

본 발명에 의한 콘크리트 이어치기방법은 도 8에서 보는 바와 같이, 1∼1.5mm의 피아노강선 2∼3가닥을 꼰 와이어(5)를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성한 콘크리트 차단망(6)의 하단부를 90°로 절곡시켜 수평부(7)와 수직부(8)를 형성하는 차단망 절곡단계(13)와, 상기 차단망 절곡단계(13)에서 형성된 2∼3개의 콘크리트 차단망(6)을 겹치되 2∼3중으로 겹쳐져서 그물눈이 서로 어긋나게 겹치는 차단망 겹침단계(14)와, 상기 차단망 겹침단계(14)에서 겹쳐진 콘크리트 차단망(6)의 수평부(7)가 바닥면(1)에 안착되고 수직부(8)가 수직으로 세워지도록 하되, 수평부(7)의 그물눈으로 상하부철근(2,3)을 관통시킨 뒤에 상하부철근(2,3)가 관통한 콘크리트 차단망(6)의 와이어(5)와 상하부철근(2,3)을 결속철사(9)로 결속하는 차단망 설치단계(15)와, 상기 콘크리트 차단망(6)이 설치된 바닥면(1)에 콘크리트(4)를 타설하는 콘크리트 타설단계(16)로 이루어 진다.Concrete stitching method according to the present invention, as shown in Figure 8, using a wire (5) braided two to three strands of piano steel of 1 to 1.5mm is formed so that the scale of the mesh is 2 to 4cm each horizontally and vertically Bending network bending step 13 to form the horizontal portion 7 and the vertical portion 8 by bending the lower end of the concrete screening network 6 by 90 °, and 2 to 2 formed in the screening network bending step (13) Overlapping the three concrete screening nets (6), but overlapping the overlapping net meshes overlapping each other by overlapping in two to three, and the horizontal portion of the concrete screening net (6) overlapped in the screening nets overlapping step (14) (7) is seated on the bottom surface (1) and the vertical portion (8) to be erected vertically, but the upper and lower reinforcement (2,3) after the upper and lower reinforcing bars (2,3) through the mesh of the horizontal portion (7) Installation stage for binding the wires 5 and the upper and lower reinforcing bars 2 and 3 of the concrete barrier net 6 penetrated by the binding wire 9 It takes place in 15 and the network of concrete blocks concrete placement step of pouring concrete (4) to the bottom surface (1) (6) are installed (16).

또한, 본 발명의 콘크리트 차단망은 도 2 내지 도 6에서 보는 바와 같이, 광대한 면적에 기초 콘크리트나 슬라브를 구축하기 위하여 바닥면에 상하부철근(2,3)를 설치한 뒤에 콘크리트를 타설하고, 콘크리트타설 예상작업량을 감안하여 콘크리트타설 중단부에 콘크리트 차단부재를 설치하여 1차분의 콘크리트 타설작업을 완료하며, 그 다음에 콘크리트타설 중단부에 이어서 콘크리트를 이어치기하는 것에 사용된다.In addition, the concrete screening net of the present invention, as shown in Figures 2 to 6, after installing the upper and lower reinforcing bars (2, 3) on the floor in order to build a foundation concrete or slab in a vast area, In consideration of the projected amount of concrete placement, the concrete blocking member is installed at the end of the concrete placing to complete the primary concrete placing work, which is then used to connect the concrete following the stopping portion of the concrete placing.

상기 콘크리트 차단부재, 즉 콘크리트 차단망(6)은 고인장력을 가진 1∼1.5mm의 피아노강선 2∼3가닥을 꼬아 와이어(5)를 형성한 뒤에, 이 와이어(5)를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성되며, 상기 콘크리트 차단망(6)의 하단부를 90°로 절곡시켜 바닥면(1)에 안착될 수평부(7)와 상하부철근(2,3)이 관통하여 상하부철근(2,3)과 콘크리트 차단망(6)의 와이어(5)와 결속철사(9)로서 묶여서 고정되며 콘크리트(4)가 흘러내리는 것을 차단하는 수직부(8)가 형성된다.The concrete barrier member, that is, the concrete barrier net 6 is twisted 2-3 strands of 1 ~ 1.5mm piano steel wire having a high tensile force to form a wire (5), then using the wire (5) scale of the mesh It is formed so that the size is 2 to 4 cm in width and length, respectively, the lower end of the concrete screen 6 is bent at 90 ° to the horizontal portion 7 and the upper and lower reinforcement (2, 3) to be seated on the bottom surface (1) A vertical portion 8 is formed through which the upper and lower reinforcing bars 2 and 3 and the wire 5 and the binding wire 9 of the concrete screen 6 are bound and fixed, and the concrete 4 is prevented from flowing down.

상기와 같이 구성되어 있는 본 발명의 작용 관계를 도 2 내지 도 8을 참고하여 설명하면 다음과 같다.Referring to Figures 2 to 8 the operational relationship of the present invention configured as described above is as follows.

콘크리트의 타설량이 너무 많아서 1회에 콘크리트의 타설이 불가능한 콘크리트나 슬라브, 보, 옹벽 등의 콘크리트 구조물에 콘크리트를 타설하고자 할 경우에는 도 7에서와 같이 1회에 콘크리트를 타설할 수 있는 량만큼 구획하여 한 개의 구획씩 콘크리트를 타설하게 되는데, 도면상 "C"선은 콘크리트 차단망(6)이 설치되는 구획선을 나타내고 있으며, 이 구획선에 콘크리트 차단망(6)를 설치하게 된다.If you want to pour concrete on concrete structures such as slabs, beams, retaining walls, etc., where concrete can't be poured at one time because the amount of concrete is too high, you can partition the amount of concrete at once. By placing the concrete one by one, the "C" line in the drawing indicates the partition line is installed concrete barrier net 6, the concrete barrier net 6 will be installed in this partition line.

상기 콘크리트 차단망(6)을 구획선에 설치하기 전에 콘크리트를 타설할 바닥면(1)에는 구획별로 도 2에서 보는 바와 같이 상하부철근(2,3)이 일정간격으로 설치되어 있어야 하며, 상하부철근(2,3)이 콘크리트를 타설할 바닥면(1)에 설치된 상태에서 구획선상에 콘크리트 차단망(6)을 설치하는데, 그 과정을 다음과 같이 설명한다.Before installing the concrete barrier net (6) in the partition line, the bottom surface (1) on which concrete is to be placed, the upper and lower reinforcement (2, 3) should be installed at regular intervals as shown in Figure 2 for each section, the upper and lower reinforcement ( 2,3) installs the concrete screening net (6) on the partition line with the concrete installed on the floor (1), the process will be described as follows.

즉, 2∼3개의 콘크리트 차단망(6)을 겹친 상태에서 이렇게 2∼3중으로 겹쳐진 콘크리트 차단망(6)을 구획선상에 설치하는데, 이 콘크리트 차단망(6)의 수평부(7)가 바닥면(1)에 안착되도록 설치하되 수평부(7)의 단부가 콘크리트가 타설되는 방향으로 향하도록 안착시키면서, 수직부(8)측의 그물눈으로는 도 5 및 도 6과 같이 상하부철근(2,3)이 관통되도록 한다.That is, in the state where two or three concrete screening nets 6 are overlapped, the concrete screening nets 6 overlapped in this manner are installed on the partition line, and the horizontal part 7 of the concrete screening net 6 is at the bottom. It is installed so as to be seated on the surface (1), while the end of the horizontal portion 7 is seated in the direction in which the concrete is placed, the upper and lower reinforcement (2, 3) to pass through.

이때, 상기 콘크리트 차단망(6)의 2∼3중으로 겹쳐진 상태이므로 겹쳐진 전후방 콘크리트 차단망(6)의 그물눈은 더욱더 좁아진 상태가 된다. 이렇게 겹쳐진 수직부(8)측의 그물눈으로 상하부철근(2,3)을 관통시킨 뒤에는 그물눈을 관통한 상하부철근(2,3)과 상하부철근(2,3) 주위의 그물눈 와이어(5)를 결속철사(9)로서 묶어서 겹쳐진 콘크리트 차단망(6)이 상하부철근(2,3)에 고정되어 구회선상에 고정될 수 있게 된다.At this time, because the overlapping state of the two or three of the concrete screen 6, the mesh of the overlapping front and rear concrete screen 6 becomes even narrower. After the upper and lower reinforcing bars 2 and 3 are penetrated by the meshes on the side of the overlapping vertical section 8, the upper and lower bars 2 and 3 penetrating the mesh and the mesh wires 5 around the upper and lower reinforcing bars 2 and 3 are bound. The superimposed concrete barrier net 6 bundled as the wire 9 is fixed to the upper and lower reinforcing bars 2 and 3 so that it can be fixed on the circumferential line.

상기와 같이 콘크리트 차단망(6)의 설치작업이 완료된 뒤에 콘크리트를 타설하면 도 2 및 도 5,6에서 보는 바와 같이 콘크리트에 포함되어 있는 자갈(12)이 콘크리트 차단망(6)에 걸리게 되나, 콘크리트중에 포함되어 있는 모래와 시멘트 그리고 물이 혼합된 묽은 콘크리트 물은 콘크리트 차단망(6)의 그물눈을 통하여 일부가 새어나오게 되지만, 상기 자갈(12)이 콘크리트 차단망(6)에 걸려 있는 상태이므로 콘크리트 차단망(6)에 인접한 콘크리트 물만 조금 새어나오다 더 이상은 새어 나오지 않게 된다.When the concrete is poured after the installation of the concrete barrier net 6 is completed as described above, as shown in FIGS. 2 and 5 and 6, the gravel 12 included in the concrete is caught by the concrete barrier net 6, Dilute concrete water mixed with sand, cement and water contained in the concrete will leak through the mesh of the concrete screen 6, but the gravel 12 is suspended in the concrete screen 6 Only the concrete water adjacent to the concrete screen 6 leaks a little and no longer leaks.

참고로 상기 콘크리트 차단망(6)의 그물눈의 크기가 가로 세로 20∼40mm정도이고, 이러한 크기의 그물눈을 가진 콘크리트 차단망(6)을 이중으로 겹치면 도 6에서와 같이 10∼20mm 정도로 작아지게 되는데, 콘크리트에 사용되는 자갈(12)의 크기는 25∼40mm 의 크기이므로 콘크리트 차단망(6)의 그물눈 사이로 자갈(12)이 빠져나오지 않게 되는 것이다.For reference, the size of the mesh of the concrete screen 6 is about 20 to 40mm in width, and when overlapping the concrete screen 6 with a mesh of such a size is reduced to 10 to 20mm as shown in FIG. , The size of the gravel 12 used for concrete is 25 to 40mm in size so that the gravel 12 does not escape between the mesh of the concrete screen 6.

상기와 같이 한 개의 구획된 공간에 콘크리트를 타설하고 그 타설된 콘크리트가 양생된 뒤에는 다음의 구획공간에 상기와 같은 방법으로 콘크리트 차단망(6)을 설치하고 콘크리트를 타설하여 콘크리트 이어치기를 연속하여 수행하게 된다.After placing concrete in one partitioned space as described above and curing the poured concrete, the concrete block net 6 is installed in the following partition space in the same way as described above, and concrete is poured in succession. Will be performed.

상기와 같이 콘크리트 이어치기작업을 수행하는 과정에서 상하부철근(2,3)과 고정된 콘크리트 차단망(6)을 해체하지 않고 콘크리트를 타설하게 되므로 콘크리트 구조물의 강도가 향상되는 효과가 있고, 도 5의 (나)와 같이 콘크리트 차단망(6)에 걸린 자갈(12)에 의해 콘크리트 타설 중단부가 심하게 요철부를 형성하게 되어 콘크리트 이어치기작업을 수행시 콘크리트 연결부의 접합강도를 증가시키게 되는 효과가 있게 된다.In the process of performing the concrete joint work as described above, since the concrete is poured without dismantling the upper and lower reinforcing bars (2,3) and the fixed concrete screen (6), the strength of the concrete structure is improved, Figure 5 As shown in (b), the concrete placing interruption portion is severely formed by the gravel 12 caught on the concrete barrier net 6, thereby increasing the joint strength of the concrete connection when the concrete stitching operation is performed. .

그리고, 도 7에서 보는 바와 같이 구획선(D)이 직선이 아닌 불규칙한 곡선일 경우에 본 발명의 콘크리트 차단망(6)은 피아노선으로 제작된 것이므로 절곡이 가능하여 불규칙한 곡선부위에도 설치가 자유로운 잇점이 있는 것이다.And, as shown in Figure 7 when the partition line (D) is not a straight curve, the concrete blocking network 6 of the present invention is made of a piano wire, so it can be bent, the advantage that can be installed even irregular curve site It is.

상기와 같이 본 발명의 콘크리트 이어치기방법 및 그 콘크리트 차단망은, 콘크리트 중단부에 콘크리트를 막아주는 차단부재를 고인장력을 가진 피아노선을 꼬아서 만든 콘크리트 차단망을 적어도 2겹이상으로 겹쳐지게 설치하여 겹쳐진 차단망에 의해 콘크리트를 차단하게 하고, 콘크리트 차단망을 설치한 후 콘크리트를 타설하여 1차로 콘크리트 구조물을 구축하며, 타설한 콘크리트가 양생되어 콘크리트 이어치기를 수행시 콘크리트차단망을 해체하지 않고 곧 바로 콘크리트를 타설하여 공사기간을 단축시키면서 콘크리트 구조물의 강도를 증가시키게 되는 효과와, 이어치기부가 울퉁불퉁하게 요철부를 형성하므로 어어치기부의 콘크리트 접착력이 증가되는 등의 매우 유용한 효과가 있는 것이다.As described above, the concrete hooking method of the present invention and the concrete screening net, the concrete blocking net made by twisting the piano wire having a high tensile force to the block member blocking the concrete at the concrete interruption portion is installed to overlap at least two or more layers Block concrete by overlapping barrier nets, install concrete barrier nets, and then construct concrete structures first, and do not dismantle concrete barrier nets when splicing concrete is cured. As soon as the concrete is poured to shorten the construction period, the effect of increasing the strength of the concrete structure, and since the joints are formed unevenly bumps, there is a very useful effect such as increasing the concrete adhesive strength of the fitting.

Claims (2)

광대한 면적에 기초 콘크리트나 슬라브 등의 콘크리트 구조물을 구축하기 위하여 바닥면에 상하부철근(2,3)을 설치한 뒤에 콘크리트를 타설하고, 콘크리트타설 예상작업량을 감안하여 콘크리트타설 중단부에 콘크리트 차단부재를 설치하여 1차분의 콘크리트 타설작업을 완료하며, 그 다음에 콘크리트타설 중단부에 이어서 콘크리트를 이어치기 하는 것에 있어서,In order to construct a concrete structure such as foundation concrete or slab on a large area, concrete is placed after installing upper and lower reinforcing bars (2,3) on the floor, and the concrete blocking member at the end of concrete placing in consideration of the expected work of concrete placing. To complete the first concrete pouring work, and then to continue the concrete following the concrete placing stops, 1∼1.5mm의 피아노강선 2∼3가닥을 꼰 와이어(5)를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성한 콘크리트 차단망(6)의 하단부를 90°로 절곡시켜 수평부(7)와 수직부(8)를 형성하는 차단망 절곡단계(13)와,Using a wire 5 braided with 2-3 strands of piano wire of 1 to 1.5 mm, the lower end of the concrete barrier net 6 formed so that the scale of the mesh becomes 2 to 4 cm horizontally and vertically is bent at 90 ° and horizontally Block network bending step (13) to form a portion (7) and the vertical portion (8), 상기 차단망 절곡단계(13)에서 형성된 2∼3개의 콘크리트 차단망(6)을 겹치되 2∼3중으로 겹쳐져서 그물눈이 서로 어긋나게 겹치는 차단망 겹침단계(14)와,Overlapping two or three concrete screening nets (6) formed in the screening network bending step (13), but overlapping the overlapping nets overlapping with each other by overlapping 2 to 3, 상기 차단망 겹침단계(14)에서 겹쳐진 콘크리트 차단망(6)의 수평부(7)가 바닥면(1)에 안착되고 수직부(8)가 수직으로 세워지도록 하되, 수평부(7)의 그물눈으로 상하부철근(2,3)을 관통시킨 뒤에 상하부철근(2,3)이 관통한 콘크리트 차단망(6)의 와이어(5)와 상하부철근(2,3)을 결속철사(9)로 결속하는 차단망 설치단계(15)와,The horizontal part 7 of the concrete blocking net 6 overlapped in the overlapping step 14 is seated on the floor 1 and the vertical part 8 is erected vertically, but the mesh of the horizontal part 7 The upper and lower reinforcing bars (2, 3) through the upper and lower reinforcing bars (2, 3) through the wire (5) and the upper and lower reinforcing bars (2, 3) of the concrete barrier net 6 through the binding wire (9) Block network installation step (15), 상기 콘크리트 차단망(6)이 설치된 바닥면(1)에 콘크리트(4)를 타설하는 콘크리트 타설단계(16)로 이루어 지는 것을 특징으로 하는 콘크리트 이어치기방법.The concrete joining method, characterized in that the concrete blocking network (6) is made of a concrete placing step (16) for placing concrete (4) on the bottom surface (1). 광대한 면적에 기초 콘크리트나 슬라브 등의 콘크리트 구축물을 구축시 콘크리트 이어치기부에 설치하여 콘크리트의 흘러내림을 차단하는 것에 있어서,In the construction of concrete structures such as foundation concrete and slabs in a large area, it is installed in the concrete joints to block the flow of concrete. 1∼1.5mm의 피아노강선 2∼3가닥을 꼬아 와이어(5)를 형성한 뒤에, 이 와이어(5)를 이용하여 그물눈의 눈금 크기가 가로 세로 각각 2∼4cm 가 되도록 형성한 콘크리트 차단망(6)을 형성하고, 상기 콘크리트 차단망(6)의 하단부를 90°로 절곡시켜 수평부(7)와 수직부(8)를 형성한 것을 특징으로 하는 콘크리트 차단망.Concrete wire mesh (6) formed by twisting two to three strands of 1 to 1.5 mm piano wire to form a wire (5), and using the wire (5) so that the scale of the mesh becomes 2 to 4 cm in width and length (6). ) And the lower end portion of the concrete barrier net (6) by bending 90 ° to form a horizontal barrier (7) and a vertical barrier (8).
KR1019990052122A 1999-11-23 1999-11-23 The jointing distribution method of concrete and the concrete inter ceptive net KR20000012310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990052122A KR20000012310A (en) 1999-11-23 1999-11-23 The jointing distribution method of concrete and the concrete inter ceptive net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990052122A KR20000012310A (en) 1999-11-23 1999-11-23 The jointing distribution method of concrete and the concrete inter ceptive net

Publications (1)

Publication Number Publication Date
KR20000012310A true KR20000012310A (en) 2000-03-06

Family

ID=19621350

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990052122A KR20000012310A (en) 1999-11-23 1999-11-23 The jointing distribution method of concrete and the concrete inter ceptive net

Country Status (1)

Country Link
KR (1) KR20000012310A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100411896B1 (en) * 2001-05-28 2003-12-24 윤석현 Carrying out of reinforced concrete
CN106930532A (en) * 2017-03-15 2017-07-07 中交第三公路工程局有限公司 Improve the new casting method of Surface Quality of Concrete
KR20210098100A (en) * 2020-01-31 2021-08-10 김미라 Separator for placing concrete separately or filling water for waterproof test
CN115341763A (en) * 2022-09-02 2022-11-15 中铁四局集团第三建设有限公司 Arc-shaped concrete slope pouring device and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100411896B1 (en) * 2001-05-28 2003-12-24 윤석현 Carrying out of reinforced concrete
CN106930532A (en) * 2017-03-15 2017-07-07 中交第三公路工程局有限公司 Improve the new casting method of Surface Quality of Concrete
KR20210098100A (en) * 2020-01-31 2021-08-10 김미라 Separator for placing concrete separately or filling water for waterproof test
CN115341763A (en) * 2022-09-02 2022-11-15 中铁四局集团第三建设有限公司 Arc-shaped concrete slope pouring device and construction method thereof

Similar Documents

Publication Publication Date Title
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN103410332A (en) Concrete hollow block reinforced wall construction technology
KR101777176B1 (en) Construction method of cast-in-placed-pile using steel pipes having different shapes to each other
KR20190042193A (en) Method for constructing wall structure using precast double wall
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
CN106555453A (en) A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
KR200381303Y1 (en) Form system for joint between retaining wall and slab of basement floor
KR20080100740A (en) Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same
KR101954155B1 (en) Bridge with full-deck and protective wall, and construction method for the same
KR102298436B1 (en) Vertical concrete structure and method for constructing the same
CN111456105B (en) Construction method of post-pouring belt of underground garage bottom plate
KR20000012310A (en) The jointing distribution method of concrete and the concrete inter ceptive net
KR100758504B1 (en) Method of construction for underground diaphragm wall and underground diaphragm wall structure
KR20200136127A (en) Deck plate wall installation method using underground pavement
KR100640244B1 (en) Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports
CN211499326U (en) Synchronous construction structures of concrete infilled wall and cast-in-place structure
CN109680852B (en) Composite floor slab and construction method and splicing method thereof
KR100203012B1 (en) Executing method of building works used a pc slab
KR100485480B1 (en) Diaphragm-wall connecting system
JPH0913486A (en) Concrete structure body
JP4194034B2 (en) Method for joining reinforced concrete members
CN210529757U (en) Pipe gallery wall unit and connecting structure of pipe gallery wall and cast-in-place bottom plate
KR102547643B1 (en) Constructing Method for Concrete Construction using Lightweight Molding Panel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application