KR101903628B1 - Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof - Google Patents

Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof Download PDF

Info

Publication number
KR101903628B1
KR101903628B1 KR1020180012676A KR20180012676A KR101903628B1 KR 101903628 B1 KR101903628 B1 KR 101903628B1 KR 1020180012676 A KR1020180012676 A KR 1020180012676A KR 20180012676 A KR20180012676 A KR 20180012676A KR 101903628 B1 KR101903628 B1 KR 101903628B1
Authority
KR
South Korea
Prior art keywords
wall
panels
reinforcing
panel
bars
Prior art date
Application number
KR1020180012676A
Other languages
Korean (ko)
Inventor
임갑주
이강덕
강성민
Original Assignee
제일피씨텍 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 제일피씨텍 주식회사 filed Critical 제일피씨텍 주식회사
Priority to KR1020180012676A priority Critical patent/KR101903628B1/en
Application granted granted Critical
Publication of KR101903628B1 publication Critical patent/KR101903628B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders

Abstract

The present invention relates to a double PC wall with enhanced seismic performance and a method for constructing a PC wall structure using the same that are capable of making a double PC wall having inside and outside PC panels in a factory in such a manner as to be conveniently assembled to a base in a construction site, thereby doubly strengthening seismic performance through structural strength with respect to vibrations like earthquake. According to the present invention, the double PC wall includes: a plurality of first and second main bars spaced apart from each other by a given distance inside first and second PC panels; first and second sleeves disposed on the lower ends of the first and second main bars in such a manner as to be coupled to anchor bars; first and second truss bars facing the first and second main bars in such a manner as to be disposed in a longitudinal direction; and a plurality of upper and lower connection bars spaced apart from each other by a given distance to connect tops and undersides of the first and second main bars thereto.

Description

내진 성능이 강화된 더블 PC벽체 및 이를 이용한 PC벽체 구조물의 시공방법{Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a double-walled PC wall structure,

본 발명은 내진 성능이 강화된 더블 PC벽체 및 이를 이용한 PC벽체 구조물의 시공방법에 관한 것으로, 더욱 상세하게는 외력에도 쉽게 유동되거나 파손되지 않도록 서로 소정 간격 이격되어 설치되는 2개의 PC패널로 구성되는 내진 성능이 강화된 PC벽체와 이를 이용한 더블 PC벽체 구조물의 시공방법에 관한 것이다.The present invention relates to a double PC wall reinforced with seismic performance and a method of constructing a PC wall structure using the same. More particularly, the present invention relates to a double PC wall structure having two PC panels installed at a predetermined interval And a method of constructing a double PC wall structure using the PC wall.

건축물을 시공할 때에는 일반적으로 터파기 후 바닥에 기초를 형성하고, 형성된 기초 위에 벽체를 시공하기 위한 거푸집을 설치한 다음, 거푸집 속으로 콘크리트를 타설하여 소정 시간 동안 양생하며, 콘크리트가 완전히 경화되고 나면 거푸집을 제거하는 순서로 진행된다.When constructing a building, generally, a foundation is formed on the floor after the earthquake, a mold for constructing the wall is installed on the formed foundation, concrete is poured into the mold and cured for a predetermined time, and when the concrete is completely cured The process proceeds in the order of removing the form.

그러나 이와 같이 현장에서 콘크리트 타설하면, 거푸집을 설치하고 제거하는 데에 많은 시간과 인력이 소요되고, 또한 타설된 콘크리트가 완전히 경화되기까지 다른 작업을 진행할 수 없던 문제가 있다.However, when the concrete is laid on the site in this way, it takes a lot of time and manpower to install and remove the formwork, and further work can not be carried out until the poured concrete is completely cured.

따라서 근래에는 현장에 거푸집을 설치하여 콘크리트를 타설하는 대신, 공장에서 미리 제작된 소정 크기의 콘크리트 패널(이하 본 발명에서는 설명의 편의를 위해 내, 외측의 콘크리트 패널을 각각 'PC패널'로 지칭하여 설명하고, 내, 외측의 PC패널을 포함하여 구성된 하나의 구조물을 '더블 PC벽체'로 지칭하여 설명한다)을 현장으로 운반하여 현장에 미리 시공된 기초 위에 조립한 다음, 내, 외측 PC패널 사이에 콘크리트를 타설하는 프리캐스트 공법(precast method)이 널리 사용되고 있다.Therefore, in recent years, instead of placing concrete on a site by placing a concrete structure, a concrete panel of a predetermined size manufactured in the factory (hereinafter, the concrete panels inside and outside are referred to as 'PC panels' A single structure including the inside and outside PC panels will be referred to as a " double PC wall ") is assembled on a prefabricated site in the field, and then the inside and outside PC panels A precast method for pouring concrete into concrete is widely used.

이러한 프리캐스트 공법은 거푸집을 설치하고 제거할 필요가 없으므로 시공 시간이 단축되고, 공장에서 미리 제작된 패널을 사용하므로 외벽의 시공 품질이 우수한 장점이 있다.This precast method does not need to install and remove the formwork, thus shortening the construction time and using the prefabricated panel in the factory, which is advantageous in the construction quality of the outer wall.

그러나 프리캐스트 공법은 미리 형성된 기초 위에 내, 외측 벽을 구성하는 2개의 PC패널을 현장에서 소정 간격 이격하여 설치한 다음, 이들 PC패널 사이로 콘크리트를 타설하여 경화시키는 과정에서 내, 외측 PC패널이 콘크리트의 압력으로 인해 간격이 벌어지는 등의 문제가 발생할 수 있다.However, in the precast method, two PC panels constituting inner and outer walls are formed on a prefabricated base at a predetermined interval in the field, and then concrete is laid between the PC panels to cure the inner and outer PC panels. A gap may be generated due to the pressure of the fluid.

또한, 지진 등의 진동에 의해 내, 외측의 PC패널과 내, 외측 PC패널 사이의 콘크리트 및 내, 외측 PC패널 위에 안착되는 슬래브패널이 따로 분리되면서 쉽게 파손될 수 있고, 이렇게 파손된 건물은 쉽게 무너져 내릴 수 있기 때문에 큰 인명사고로 이어질 수 있는 문제가 있다.In addition, the vibration between the inner and outer PC panels, the inner and outer PC panels, and the slab panel seated on the inner and outer PC panels can be easily broken due to vibration such as an earthquake, and the damaged building can be easily broken There is a problem that can lead to a major personal accident because it can get off.

따라서 최근에는 내, 외측 벽을 구성하는 2개의 PC패널을 현장에서 조립한 다음, 내, 외측 PC패널을 타이볼트 등의 결합부재를 이용하여 서로 강건하게 결합하여 콘크리트 타설시 PC패널의 설치 간격이 벌어지지 않으면서 지진 등의 외력에도 2개의 PC패널이 쉽게 분리되지 않도록 하고 있다.Therefore, recently, two PC panels constituting the inner and outer walls are assembled in the field, and inner and outer PC panels are firmly joined to each other by using a joining member such as a tie bolt, so that the installation interval of the PC panel So that the two PC panels can not be easily separated even when an external force such as an earthquake occurs.

상기와 같은 목적의 종래기술로는 등록특허공보 제1785627호의 PC패널을 이용한 구조물 시공방법을 예로 들 수 있는데, 이 특허문헌에 개시된 구조물 시공방법에서는 외측 PC패널이 기초 바닥면의 내부에 매립된 상태로 설치되되, 내측 PC패널과 상부 슬래브패널의 연결부에 돌기와 홈을 형성하여 이에 의해 결합되도록 함에 따라 각 구성을 더욱 견고하게 결합하고 있다.As a conventional technique for such a purpose, a method of constructing a structure using a PC panel of JP-A-1785627 is exemplified. In the structure construction method disclosed in this patent document, the outer PC panel is embedded in the bottom of the foundation And the protrusions and the grooves are formed at the connection part between the inner PC panel and the upper slab panel so that they are coupled to each other.

그러나 상기 특허문헌의 구조물 시공방법에 따르면, PC벽체가 기초 바닥면의 내부에 매립되어 설치됨에 따라 기초 바닥면의 연결부의 강도가 일부 향상될 수는 있으나, 시공 난이도가 전반적으로 상승하여 현장에서 설치하기가 쉽지 않고, 또한 상부 슬래브패널과 PC벽체는 돌기와 홈의 결합으로 서로 결합되므로 여전히 구조적 강도가 취약한 문제가 있다.However, according to the construction method of the patent document, since the PC wall is embedded in the floor of the foundation, the strength of the connection part of the foundation floor can be improved to some extent. However, The upper slab panel and the PC wall are coupled to each other by the combination of the projections and the grooves, so that the structural strength is still weak.

또 다른 종래기술로는 등록특허공보 제1574253호의 PC패널을 이용한 트윈 월 구조체 구조물의 시공방법을 예로 들 수 있는데, 이 특허문헌에 개시된 구조물의 시공방법에서는 제1, 2 PC패널 사이에 설치 간격을 유지시킴과 동시에 상호 연결하여 고정시키는 스페이서를 추가로 설치하고 있다.Another conventional technique is a method of constructing a twin wall structure structure using a PC panel of Japanese Patent No. 1574253. In the construction method of the structure disclosed in this patent document, And a spacer for fixing and interconnecting them is installed at the same time.

그러나 상기 특허문헌에 개시된 방법은 작업자가 현장에서 많은 개수의 스페이서를 일일이 조립하여야 하므로 스페이서를 설치하는 데에 많은 시간이 소요되는 문제가 있다.However, in the method disclosed in the above patent document, since a large number of spacers are individually assembled in the field, it takes a lot of time to install the spacers.

KR 10-1785627 B1 (2017. 09. 29.)KR 10-1785627 B1 (Sep. 29, 2017) KR 10-1574253 B1 (2015. 11. 27.)KR 10-1574253 B1 (Nov. 27, 2015) KR 10-1720473 B1 (2017. 03. 21.)KR 10-1720473 B1 (2017. 03. 21.) KR 10-1533426 B1 (2015. 06. 26.)KR 10-1533426 B1 (June 26, 2015) KR 10-1670553 B1 (2016. 10. 24.)KR 10-1670553 B1 (Oct. 24, 2016)

따라서 본 발명은 상기와 같은 종래의 PC벽체와 이를 이용한 시공방법이 가지는 문제점을 해결하기 위해 안출된 것으로, 본 발명이 해결하고자 하는 과제는 내, 외측 PC패널을 포함하여 구성되는 더블 PC벽체를 공장에서 일체로 제작한 다음, 현장에서 기초에 조립 설치하는 것만으로 간편하게 설치할 수 있고, 아울러 지진 등의 진동으로부터 구조적 강성이 향상된 내진 성능이 강화된 더블 PC벽체 및 이를 이용한 PC벽체 구조물의 시공방법을 제공하는 것이다.Accordingly, the present invention has been made to solve the problems of the conventional PC wall and the construction method using the same, and it is an object of the present invention to provide a double PC wall structure including inner and outer PC panels, A double PC wall reinforced with seismic performance improved in structure rigidity from vibration such as earthquake, and a construction method of a PC wall structure using the same can be provided .

상기의 과제를 해결하기 위한 본 발명에 따른 더블 PC벽체는, 제1, 2 PC패널의 내부에 각각 소정 간격을 두고 복수 개가 설치되는 제1, 2 주철근; 상기 제1, 2 주철근의 하단에 설치되면서 상기 앵커철근과 결합되는 제1, 2 슬리브; 상기 제1, 2 주철근에 서로 마주하여 길이를 따라 설치되는 제1, 2 트러스철근; 및 상기 제1, 2 주철근의 상부와 하부를 각각 연결하도록 소정 간격 이격되어 설치되는 복수 개의 상, 하부 연결철근을 포함하는 것을 특징으로 한다.According to an aspect of the present invention, there is provided a double PC wall structure comprising: first and second main steel bars provided in a plurality of first and second PC panels at predetermined intervals; First and second sleeves installed at the lower ends of the first and second cast steel bars and coupled to the anchor steel bars; First and second truss reinforcing bars disposed along the length of the first and second cast iron bars; And a plurality of upper and lower connecting bars spaced apart from each other by a predetermined distance to connect upper and lower portions of the first and second cast iron bars, respectively.

그리고 본 발명은 상기 제1, 2 주철근 사이에 상기 제1, 2 PC패널의 설치 간격을 유지하면서 외력에 의한 강도를 보강하는 보강트러스가 더 설치되는 것을 또 다른 특징으로 한다.The present invention is further characterized in that a reinforcing truss for reinforcing the strength by an external force is further provided between the first and second cast iron bars while maintaining the spacing between the first and second PC panels.

또한, 본 발명은 상기 보강트러스가 상기 제1, 2 주철근에 양측이 고정되면서 서로 소정 간격 이격되어 설치되는 사각 틀 모양의 제1, 2 측면프레임; 상기 제1, 2 측면프레임의 상부에 "X"자 모양으로 설치되는 한 쌍의 상부앵글; 및 상기 제1, 2 측면프레임의 하부에 "X"자 모양으로 설치되는 한 쌍의 하부앵글을 포함하고, 상기 제1, 2 측면프레임에는 "X"자 모양으로 설치되는 보강앵글이 설치되는 것을 또 다른 특징으로 한다.The reinforcing truss may be installed on the first and second side frames in a rectangular frame shape with the reinforcing truss being spaced apart from the first and second main reinforcement rods. A pair of upper angles provided on upper portions of the first and second side frames in an "X" And a pair of lower angles provided in the lower portion of the first and second side frames in an "X" shape, wherein the first and second side frames are provided with reinforcing angles provided in an "X & It is another feature.

한편, 상기의 과제를 해결하기 위한 본 발명에 따른 더블 PC벽체를 이용한 PC벽체 구조물의 시공방법은, 터파기된 바닥에 버림 콘크리트를 타설하는 버림 콘크리트 타설단계; 버림 콘크리트된 바닥 위에 복수 개의 앵커철근의 상부가 위로 노출되도록 나란하게 배치하고, 철근을 추가로 배치한 다음, 콘크리트를 타설하여 기초부를 형성하는 기초부 형성단계; 일체로 제작된 PC벽체의 제1, 2 PC패널 하단에 구비되는 제1, 2 슬리브와 상기 앵커철근을 서로 연결하여 상기 더블 PC벽체를 기립 설치하는 PC벽체 고정단계; 설치된 상기 제2 PC패널의 측면에 대각선 방향으로 복수 개의 프롭서포트를 설치하는 서포트 설치단계; 상기 기초부 위에 복수 개의 거더를 설치하고, 복수 개의 슬래브패널을 상기 더블 PC벽체의 위에 수평으로 설치하여 상기 슬래브패널의 일단으로 돌출되어 하향 절곡되는 주철근을 상기 제2 PC패널의 제2 트러스 철근에 삽입하고, 상기 제2 PC패널의 상단으로 돌출되는 제2 주철근과 상기 주철근을 서로 연결하여 고정하는 슬래브패널 설치단계; 및 상기 제1, 2패널 사이 및 상기 슬래브패널 위에 콘크리트를 타설하고 양생하는 콘크리트 타설 및 양생단계를 포함하는 것을 특징으로 한다.According to another aspect of the present invention, there is provided a method of constructing a PC wall structure using a double PC wall, the method comprising: placing a forked concrete on a floor; A base forming step of disposing a plurality of anchor reinforcing bars on the abandoned concrete floor in such a manner that the upper portions of the reinforcing bars are exposed upwardly, placing additional reinforcing bars, and then pouring concrete to form a base portion; A PC wall fixing step of connecting the first and second sleeves provided at the lower ends of the first and second PC panels of the integrally manufactured PC wall with the anchor reinforcing bars to stand up the double PC wall; A support mounting step of installing a plurality of pro supports in a diagonal direction on a side surface of the installed second PC panel; A plurality of girders are provided on the base portion, and a plurality of slab panels are horizontally installed on the double PC wall to project a downwardly bent main iron projecting to one end of the slab panel to the second truss reinforcing bars of the second PC panel And a second slab panel mounting step of connecting and fixing the second main steel bars protruding to the upper end of the second PC panel to the main steel bars; And a concrete pouring and curing step of pouring and curing the concrete between the first and second panels and on the slab panel.

그리고 본 발명은 상기 슬래브패널 설치단계가 일단이 하향 절곡되어 상기 제1 PC패널의 제1 트러스 철근에 삽입되고, 상기 슬래브패널의 위쪽으로 소정 간격 이격되면서 수평으로 복수 개의 보강철근을 배열하는 보강철근 설치단계; 상기 보강철근과 상기 슬래브패널의 상기 주철근을 "ㄷ"자 모양을 가지는 복수 개의 스트랩을 이용하여 상호 연결하는 스터럽 설치단계를 더 포함하는 것을 또 다른 특징으로 한다.In the present invention, the slab panel mounting step may include a step of folding down one end of the slab panel to be inserted into the first truss reinforcing bars of the first PC panel, spacing a predetermined distance above the slab panel, and arranging a plurality of reinforcing bars horizontally Installation phase; Further comprising a stirrup installing step of interconnecting the reinforcing steel bars and the main steel bars of the slab panel using a plurality of straps having a "C" shape.

본 발명에 따른 PC벽체는 내, 외측을 구성하는 제1, 2 PC패널이 상, 하부 연결철근에 의해 일체로 제작되고, 이에 의해 공사 현장에서 내, 외측의 PC패널이 한 번에 설치되므로 시공 시간이 크게 단축됨과 동시에 제1, 2 PC패널 사이로 콘크리트가 타설되어 큰 압력이 작용하더라도 제1, 2 PC패널의 설치 간격이 벌어지지 않으면서 시공 품질과 강성이 크게 향상된다.Since the first and second PC panels constituting the inside and the outside of the PC wall according to the present invention are integrally manufactured by the upper and lower connecting reinforcing bars so that the inside and outside PC panels are installed at one time in the construction site, The time is greatly shortened and the installation gap of the first and second PC panels is not increased even if a large pressure is applied due to the concrete being laid between the first and second PC panels. Thus, the construction quality and the rigidity are greatly improved.

또한, 본 발명은 제1, 2 PC패널 사이에 보강트러스가 설치되어 지진 등의 외력에도 제1, 2 PC패널이 쉽게 파손되지 않는다.In addition, in the present invention, the reinforcing truss is provided between the first and second PC panels, so that the first and second PC panels are not easily broken even by an external force such as an earthquake.

그리고 본 발명은 PC벽체가 기초부에 설치된 다음, 슬래브패널이 설치될 때, 제2 PC패널의 제2 주철근과 슬래브패널의 주철근이 철사 등으로 서로 강건하게 고정되고, 이에 더해 보강철근과 스터럽에 의해 PC벽체와 슬래브패널이 구조적으로 강건하게 결합된 상태에서 콘크리트가 타설되므로 지진 등의 큰 외력이 작용하더라도 PC벽체와 슬래브패널 간에 변형과 파손이 방지되고, 그 결과 건물의 내진 성능이 향상된다.In the present invention, when the PC wall is installed on the base portion, and the slab panel is installed, the second main frame of the second PC panel and the main frame of the slab panel are firmly fixed to each other by a wire or the like, The PC wall and the slab panel are structurally and rigidly coupled to each other. Therefore, even when a large external force such as an earthquake acts, deformation and damage are prevented between the PC wall and the slab panel, and as a result, the seismic performance of the building is improved.

도 1은 본 발명에 따른 내진 성능이 강화된 더블 PC벽체의 예를 보인 도면.
도 2는 도 1에 따른 제1, 2 주철근과 상부 연결철근의 예를 보인 부분 확대도면.
도 3은 도 1에 따른 제1, 2 슬리브와 하부 연결철근의 예를 보인 부분 확대도면.
도 4는 본 발명에 따른 제1, 2 주철근에 상, 하부 연결철근이 설치되는 예를 보인 사시도.
도 5는 본 발명에 따른 보강트러스의 예를 보인 사시도.
도 6은 본 발명에 따른 내진 성능이 강화된 PC벽체를 이용한 PC벽체 구조물의 시공방법을 보인 공정도.
도 7은 본 발명에 따른 기초부의 예를 보인 도면.
도 8 및 도 9는 도 7에 따른 기초부에 PC벽체가 설치되는 예를 보인 도면.
도 10은 본 발명에 따른 기초부의 앵커철근과 슬리브가 결합되는 예를 보인 부분 확대도면.
도 11 및 도 12는 본 발명에 따른 거더 및 슬래브패널이 설치되는 예를 보인 도면.
도 13은 본 발명에 따른 보강철근과 스터럽이 설치되는 예를 보인 도면.
도 14 및 도 15는 본 발명에 따른 PC벽체의 제1, 2 PC패널 사이 및 슬래브패널 위로 콘크리트가 타설되는 예를 보인 도면.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing an example of a double PC wall with enhanced seismic performance according to the present invention; FIG.
2 is a partially enlarged view showing an example of first and second cast iron bars and an upper connecting steel bar according to FIG. 1;
3 is a partial enlarged view showing an example of the first and second sleeves and the lower connection reinforcing bars according to FIG.
4 is a perspective view showing an example in which upper and lower connecting bars are installed on first and second steel bars according to the present invention;
5 is a perspective view showing an example of a reinforcing truss according to the present invention.
6 is a process diagram showing a construction method of a PC wall structure using a PC wall having enhanced seismic performance according to the present invention.
7 is a view showing an example of a base portion according to the present invention.
Figs. 8 and 9 are views showing an example in which a PC wall is installed in a base portion according to Fig. 7; Fig.
10 is a partially enlarged view showing an example in which an anchor reinforcing bar and a sleeve of a base part are combined with each other according to the present invention.
11 and 12 are views showing an example in which a girder and a slab panel according to the present invention are installed.
13 is a view showing an example in which a rebar and a stirrup according to the present invention are installed.
14 and 15 are views showing an example in which concrete is placed between first and second PC panels of a PC wall according to the present invention and on a slab panel.

이하에서는 본 발명의 바람직한 실시예를 도시한 첨부도면에 따라 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 내, 외측 PC패널을 포함하여 구성되는 더블 PC벽체를 공장에서 일체로 제작한 다음, 현장에서 기초에 조립 설치하는 것만으로 간편하게 설치할 수 있고, 아울러 지진 등의 진동으로부터 구조적 강성이 향상된 내진 성능이 강화된 더블 PC벽체 및 이를 이용한 PC벽체 구조물의 시공방법을 제공하고자 하는 것으로, 이러한 본 발명의 더블 PC벽체(3)는 도 1 내지 도 3에 도시된 바와 같이 제1, 2 주철근(10A, 10B), 제1, 2 슬리브(20A, 20B), 제1, 2 트러스철근(30A, 30B) 및 상, 하부 연결철근(40A, 40B)을 포함한다.The present invention can be easily installed only by assembling a double PC wall body including inner and outer PC panels integrally in the factory and assembling it on the ground, The double PC wall 3 of the present invention is a double PC wall having enhanced performance and a method of constructing the PC wall wall structure using the same. First and second truss reinforcing bars 30A and 30B and upper and lower connecting reinforcing bars 40A and 40B.

제1, 2 주철근(10A, 10B)은 더블 PC벽체(3)가 기초부(1)의 앵커철근(2)에 의해 하단이 고정되어 건물(또는 구조물)의 실, 내외측 벽을 구성하도록 설치될 때, 더블 PC벽체(3)가 외력에 의해 쉽게 파손되지 않도록 뼈대 역할을 하여 강도를 보강하는 구성이다.The first and second cast iron rods 10A and 10B are installed so that the double PC wall body 3 is fixed at the lower end by the anchor reinforcing bars 2 of the base portion 1 to constitute the room and the inner and outer walls of the building The double PC wall 3 functions as a skeleton so as not to be easily damaged by an external force, thereby reinforcing the strength.

이러한 제1, 2 주철근(10A, 10B)은 도 1 및 도 2에 도시된 바와 같이 제1 PC패널(3A)과 제2 PC패널(3B)이 서로 소정 간격 이격되어 실, 내외측 벽을 구성하도록 서로 소정 간격을 두고 복수 개가 배치(배근)된다.As shown in FIGS. 1 and 2, the first and second cast iron rods 10A and 10B are formed such that the first PC panel 3A and the second PC panel 3B are spaced apart from each other by a predetermined distance, (Arranged) at a predetermined interval from each other.

이때 제1, 2 주철근(10A, 10B) 사이에는 제1, 2 주철근(10A, 10B)과 교차되도록 복수 개의 보조철근(도시하지 않음)이 더 배치되고, 이러한 제1, 2 주철근(10A, 10B)과 보조철근은 철사 등으로 서로 고정되며, 이에 의해 제1, 2 주철근(10A, 10B)이 강건하게 고정됨과 동시에 제1, 2 주철근(10A, 10B)에 기초하여 콘크리트가 타설됨에 따라 제조되는 제1, 2 PC패널(3A, 3B)의 구조적 강성도 향상된다.At this time, a plurality of auxiliary reinforcing bars (not shown) are further disposed between the first and second main steels 10A and 10B so as to cross the first and second main steels 10A and 10B. The first and second main steels 10A and 10B And the auxiliary reinforcing bars are fixed to each other by wire or the like so that the first and second main reinforcing rods 10A and 10B are firmly fixed and the concrete is installed based on the first and second main reinforcing rods 10A and 10B The structural stiffness of the first and second PC panels 3A and 3B is also improved.

제1, 2 슬리브(20A, 20B)는 더블 PC벽체(3)가 기초부(1)에 구비된 앵커철근(2)에 의해 기립 설치될 때, 앵커철근(2)과 결합되어 더블 PC벽체(3)를 쉽게 고정시킬 수 있게 하는 구성이다.The first and second sleeves 20A and 20B are combined with the anchor reinforcing bars 2 when the double PC wall 3 is erected by the anchor reinforcing bars 2 provided on the foundation 1 to form a double PC wall 3) can be easily fixed.

이러한 제1, 2 슬리브(20A, 20B)는 상하로 연통된 삽입공(H)이 형성된 원통 모양의 관체로 이루어지면서 그 상부가 도 3에 도시된 바와 같이 제1, 2 주철근(10A, 10B) 의 하단에 소정 깊이로 삽입되어 설치 고정되고, 이에 의해 제1, 2 슬리브(20A, 20B)의 설치 위치가 외력에도 유동되지 않으면서 강건하게 유지된다.The first and second sleeves 20A and 20B are cylindrical tubes each having an insertion hole H communicated in the up and down direction and the upper portion thereof is connected to the first and second cast iron rods 10A and 10B, So that the mounting positions of the first and second sleeves 20A and 20B do not flow to the external force and are held firmly.

그리고 제1, 2 슬리브(20A, 20B)의 하부 일측에는 일측 방향으로 소정 길이 돌출되도록 몰탈 충진용 주입구(21)가 구비되고, 이에 의해 제1, 2 슬리브(20A, 20B)의 하부로 삽입되는 앵커철근(2)이 몰탈 충진에 의해 제1, 2 슬리브(20A, 20B)에 고정된다.The first and second sleeves 20A and 20B have injection ports 21 for injecting the molten metal so as to protrude by a predetermined length in one direction on the lower side of the first and second sleeves 20A and 20B. The anchor reinforcing bars 2 are fixed to the first and second sleeves 20A and 20B by mortar filling.

또한, 제1, 2 슬리브(20A, 20B)의 상부 일측에는 일측 방향으로 소정 길이 돌출되면서 몰탈 충진용 주입구(21)에 비해 상대적으로 지름이 작게 형성되는 몰탈 배출구(23)가 구비되고, 이에 의해 슬리브 내부에 충진되는 몰탈이 몰탈 배출구(23)로 배출되는 것이 확인될 때까지 충분히 충진될 수 있으며, 이에 의해 제1, 2 슬리브(20A, 20B)에 앵커볼트(2)가 강건하게 고정된다.The first and second sleeves 20A and 20B have a mallet discharge port 23 protruding in a predetermined direction in one direction and having a diameter smaller than that of the injection port 21 for filling the mortar, The anchor bolts 2 are firmly fixed to the first and second sleeves 20A and 20B until the mortar filled in the sleeve is confirmed to be discharged to the mortar outlet 23. [

또한, 제1, 2 슬리브(20A, 20B)의 삽입공(H)에는 제1, 2 주철근(10A, 10B)이 삽입되는 정도를 제한하는 걸림돌기(22)가 돌출 형성된다.The insertion holes H of the first and second sleeves 20A and 20B are formed with protruding locking projections 22 for restricting the extent to which the first and second cast iron rods 10A and 10B are inserted.

제1, 2 트러스철근(30A, 30B)은 철근 등의 강재를 지그재그로 연결하여 제1, 2 PC패널(3A, 3B)에 작용하는 외력에 의한 변형을 감소시키는 구성이다.The first and second truss reinforcing bars 30A and 30B have a structure in which a steel material such as a reinforcing bar is staggered to reduce deformation due to an external force acting on the first and second PC panels 3A and 3B.

이러한 제1, 2 트러스철근(30A, 30B)은 도 2 및 도 3에 도시된 바와 같이 제1, 2 주철근(10A, 10B)에 철사 등을 이용하여 서로 마주보도록 강건하게 고정되면서 제1, 2 주철근(10A, 10B)의 길이를 따라 길이를 가지도록 설치된다.As shown in FIGS. 2 and 3, the first and second truss reinforcing bars 30A and 30B are firmly fixed to the first and second cast iron rods 10A and 10B so as to face each other by using a wire or the like, And is set to have a length along the length of the cast iron ropes 10A and 10B.

또한, 제1, 2 트러스철근(30A, 30B)은 제1, 2 주철근(10A, 10B)을 뼈대로 하여 콘크리트가 타설되어 제1, 2 PC패널(3A, 3B)이 제조될 때, 제1, 2 패널(3A, 3B)을 이루는 콘크리트로부터 제1, 2 트러스철근(30A, 30B)의 1/3 ~ 1/2이 노출되도록 설치된다.The first and second truss reinforcing bars 30A and 30B are formed so that when the first and second PC panels 3A and 3B are manufactured by pouring concrete with the first and second cast iron rods 10A and 10B as skeletons, And 1/3 to 1/2 of the first and second truss reinforcing bars 30A and 30B are exposed from the concrete constituting the two panels 3A and 3B.

이에 의해 현장에서 제1, 2 PC패널(3A, 3B)이 서로 이격된 공간 사이로 콘크리트가 타설되면, 제1, 2 PC패널(3A, 3B)과 현장 타설된 콘크리트층이 제1, 2 트러스철근(30A, 30B)에 의해 구조적으로 강건하게 결합되게 되고, 이에 의해 지진 진동 등의 외력에도 제1, 2 PC패널(3A, 3B)과 현장 타설된 콘크리트층이 따로 분리되지 않으면서 구조적인 강성이 향상된다.As a result, when the concrete is poured between spaces where the first and second PC panels 3A and 3B are spaced apart from each other in the field, the first and second PC panels 3A and 3B and the concrete layer placed on- The first and second PC panels 3A and 3B and the concrete layer laid on-site are not separated from each other even by an external force such as an earthquake vibration or the like, .

상, 하부 연결철근(40A, 40B)은 제1, 2 주철근(10A, 10B)의 상, 하부를 서로 연결하여 제1, 2 PC패널(3A, 3B)을 일체로 연결하는 구성이다.The upper and lower connection reinforcing bars 40A and 40B are configured to integrally connect the first and second PC panels 3A and 3B by connecting the upper and lower portions of the first and second cast iron bars 10A and 10B to each other.

이러한 상, 하부 연결철근(40A, 40B)은 도 4에 도시된 바와 같이 "ㅁ"자 모양의 철근으로 이루어지면서 제1, 2 주철근(10A, 10B)의 상, 하부에 각각 소정 폭 중첩되도록 소정 간격을 두고 복수 개가 배치된 다음, 철사 등을 이용하여 제1, 2 주철근(10A, 10B)에 강건하게 고정된다.As shown in FIG. 4, the upper and lower connecting bars 40A and 40B are made of reinforcing bars of " ㅁ "-shaped, and are fixed to upper and lower portions of the first and second cast iron bars 10A and 10B, A plurality of wires are arranged at intervals and then fixed firmly to the first and second cast iron rods 10A and 10B using wire or the like.

상기와 같은 상, 하부 연결철근(40A, 40B)에 의해 제1, 2 주철근(10A, 10B)을 뼈대로 하여 소정 두께로 콘크리트가 타설되어 제1, 2 PC패널(3A, 3B)이 형성되면, 제1, 2 PC패널(3A, 3B)이 상, 하부 연결철근(40A, 40B)에 의해 따로 분리되지 않고 일체로 유지된다.When the first and second PC panels 3A and 3B are formed by placing concrete with a predetermined thickness using the first and second cast iron rods 10A and 10B as the skeleton by the upper and lower connection reinforcing bars 40A and 40B, The first and second PC panels 3A and 3B are integrally held without being separated by the upper and lower connecting reinforcing bars 40A and 40B.

이에 의해 공사 현장에서 크레인 등을 이용하여 내, 외측 PC패널을 따로 설치하지 않고 본 발명에 따른 더블 PC벽체(3)를 운반하여 제1, 2 PC패널(3A, 3B)을 한 번에 설치할 수 있고, 그 결과 PC벽체를 전체적으로 설치하는 데에 소요되는 시간이 크게 단축된다.Accordingly, the first and second PC panels 3A and 3B can be installed at one time by transporting the double PC wall 3 according to the present invention without separately installing the inner and outer PC panels by using a crane or the like As a result, the time required for installing the PC wall as a whole is greatly shortened.

이에 더해 제1, 2 PC패널(3A, 3B) 사이의 이격된 공간으로 콘크리트가 충전될 때, 콘크리트에 의해 발생하는 압력에도 제1, 2 PC패널(3A, 3B)의 설치 간격이 벌어지지 않으면서 벽체의 시공 품질이 균일하게 담보된다.In addition, when the concrete is filled in the spaced-apart spaces between the first and second PC panels 3A and 3B, the installation space of the first and second PC panels 3A and 3B is not increased by the pressure generated by the concrete The construction quality of the wall is secured evenly.

한편, 제1, 2 주철근(10A, 10B) 사이에는 제1, 2 PC패널(3A, 3B)의 설치 간격을 유지하면서 외력에 의한 강도를 보강하기 위한 보강트러스(50)가 더 설치될 수 있는데, 이러한 보강트러스(50)는 도 5에 도시된 바와 같이 제1, 2 주철근(10A, 10B)에 고정되면서 서로 소정 간격 이격되어 설치되는 사각 틀 모양의 제1, 2 측면프레임(51, 52)과, 상기 제1, 2 측면프레임(51, 52)을 서로 연결하도록 제1, 2 측면프레임(51, 52)의 상, 하부에 각각 "X"자 모양으로 설치되는 한 쌍의 상부앵글(53)과 하부앵글(54)을 포함한다.Meanwhile, a reinforcing truss 50 may be further provided between the first and second main ropes 10A and 10B for reinforcing the strength of the first and second PC panels 3A and 3B by the external force while maintaining the spacing between the first and second PC panels 3A and 3B As shown in FIG. 5, the reinforcing truss 50 includes first and second side frames 51 and 52 which are fixed to the first and second main reinforcing rods 10A and 10B and spaced apart from each other by a predetermined interval, And a pair of upper angles 53 (53) provided on upper and lower sides of the first and second side frames (51, 52) so as to connect the first and second side frames (51, 52) And a lower angle 54. As shown in Fig.

그리고 제1, 2 측면프레임(51, 52)에는 "X"자 모양으로 설치되는 보강앵글(51A, 52A)이 설치된다.The first and second side frames 51 and 52 are provided with reinforcing angles 51A and 52A provided in an "X" shape.

상기와 같은 보강트러스(50)의 구성에 의해 제1, 2 PC패널(3A, 3B) 사이의 이격된 공간으로 콘크리트가 타설되면, 제1, 2 트러스철근(30A, 30B)과 상, 하부 연결철근(40A, 40B)에 더하여 보강트러스(50)에 의해 제1, 2 PC패널(3A, 3B)이 일체로 연결되면서 간격이 벌어지는 것이 더욱 방지되고, 이에 더해 더블 PC벽체(3)에 큰 외력이 작용하더라도 제1, 2 PC패널(3A, 3B)과 제1, 2 PC패널(3A, 3B) 사이에 충전된 콘크리트층이 강건하게 결합된 상태를 유지하면서 쉽게 분리되거나 파손되지 않는다.When the concrete is poured into the spaced spaces between the first and second PC panels 3A and 3B by the construction of the reinforcing truss 50 as described above, the first and second truss reinforcing bars 30A and 30B and the upper and lower connection The first and second PC panels 3A and 3B are integrally connected to each other by the reinforcing truss 50 in addition to the reinforcing bars 40A and 40B to further prevent the gap from spreading. The concrete layers filled between the first and second PC panels 3A and 3B and the first and second PC panels 3A and 3B are not easily separated or broken while maintaining a firmly coupled state.

상기와 같이 구성되는 본 발명에 따른 내진 성능이 강화된 더블 PC벽체를 이용하여 PC벽체 구조물을 시공할 때에는 도 6에 도시된 바와 같이 버림 콘크리트 타설단계(S10), 기초부 형성단계(S20), PC벽체 고정단계(S30), 서포트 설치단계(S40), 거더 및 슬래브패널 설치단계(S50) 및 콘크리트 타설 및 양생단계(S60)를 따라 진행되고, 이하에서는 이러한 시공 방법에 따라 설명한다.When constructing the PC wall structure using the double PC wall reinforced with earthquake-resistant performance according to the present invention as described above, as shown in FIG. 6, the concrete pouring step S10, the foundation forming step S20, The PC wall fixing step S30, the support installing step S40, the girder and slab panel installing step S50, and the concrete pouring and curing step S60. Hereinafter, this construction method will be described.

(1) 버림 콘크리트 타설단계(S10)(1) Injection of abandoned concrete (S10)

이 단계는 건물(또는 구조물)이 시공되는 바닥을 소정 깊이로 터파기한 다음, 대략 5~10cm의 두께로 콘크리트를 타설하는 것으로, 이러한 버림 콘크리트 타설단계(S10)에 의해 후술되는 기초부 형성단계(S20)에서 기초부(1)를 형성하기 위한 철근 등의 배치를 균일하게 시공할 수 있게 된다.This step is to tile the bottom of the building (or structure) to a predetermined depth and then to pour the concrete to a thickness of about 5 to 10 cm. In this step of pouring concrete, The arrangement of the reinforcing bars or the like for forming the foundation 1 can be uniformly applied.

(2) 기초부 형성단계(S20)(2) Foundation part formation step (S20)

이 단계는 버림 콘크리트 타설단계(S10)에서 만들어진 콘크리트 바닥 위에 소정 간격을 두고 기초 철근과 앵커철근(2)을 배치한 다음, 콘크리트를 타설하여 도 7에 도시된 바와 같이 기초부(1)를 형성하는 것이다.In this step, the foundation reinforcing bars and the anchor reinforcing bars 2 are disposed at a predetermined interval on the concrete floor formed in the cast concrete leaving step S10, and then the concrete is laid to form the foundation 1 as shown in FIG. .

이때 앵커철근(2)은 상단이 기초부(1)의 바닥으로부터 소정 높이로 수직 돌출되도록 설치되고, 이에 의해 후술되는 더블 PC벽체(3)의 제1, 2 슬리브(20A, 20B)에 앵커철근(2)이 삽입되면서 더블 PC벽체(3)의 설치 위치가 안내된다.At this time, the anchor reinforcing bars 2 are installed such that the upper ends of the anchor reinforcing bars 2 are vertically protruded from the bottom of the base portion 1 to a predetermined height so that the first and second sleeves 20A and 20B of the double PC wall 3, The installation position of the double PC wall 3 is guided.

(3) PC벽체 고정단계(S30)(3) PC wall fixing step (S30)

이 단계는 기초부 형성단계(S20)에서 앵커철근(2)이 구비된 기초부(1)가 형성되고 나면, 도 8 및 도 9에 도시된 바와 같이 크레인 등을 이용하여 공장에서 미리 제작된 더블 PC벽체(3)를 기초부(1)로 이동시킨 다음, 작업자의 지시에 따라 기초부(1) 위에 더블 PC벽체(3)를 수직으로 세워 설치하는 것이다.8 and 9, after the foundation 1 having the anchor reinforcing bars 2 is formed in the foundation forming step S20, The PC wall body 3 is moved to the base portion 1 and then the double PC wall body 3 is vertically installed on the base portion 1 in accordance with an instruction from the operator.

이때 작업자는 더블 PC벽체(3)의 저면으로 노출되는 제1, 2 슬리브(20A, 20B)의 삽입공(H)에 도 10에 도시된 바와 같이 앵커철근(2)의 상단이 삽입되도록 위치 조절하고, 몰탈 충진용 주입구(21)에 무수축 몰탈을 충진하여 앵커철근(2)을 제1, 2 슬리브(20A, 20B)에 강건하게 고정시킨다.At this time, the operator adjusts the position so that the upper end of the anchor steel bar 2 is inserted into the insertion hole H of the first and second sleeves 20A and 20B exposed to the bottom of the double PC wall 3 as shown in FIG. Shrinkage mortar is filled in the injection port 21 for filling the mortar and the anchor reinforcing bar 2 is firmly fixed to the first and second sleeves 20A and 20B.

위와 같은 더블 PC벽체(3)는 기초부(1) 위에 건물(또는 구조물)의 벽체를 이루도록 반복하여 전체적으로 설치된다.The above-mentioned double PC wall 3 is installed as a whole repeatedly so as to form a wall of a building (or a structure) on the foundation 1.

(4) 서포트 설치단계(S40)(4) Support installation step (S40)

이 단계는 PC벽체 고정단계(S30)에서 설치된 더블 PC벽체(3) 중에서 실내측에 위치되는 제2 PC패널(3B)에 도 8 및 도 9에 도시된 바와 같이 프롭서포트(P)를 설치하는 것이다.This step is to install the prop support P as shown in Figs. 8 and 9 on the second PC panel 3B located on the indoor side of the double PC wall 3 installed in the PC wall fixing step S30 will be.

이때 프롭서포트(P)는 제2 PC패널(3B)을 대각선 방향으로 지지하도록 바닥과 제2 PC패널(3B)에 볼트 등을 이용하여 강건하게 고정 설치된다.At this time, the pro-support P is firmly fixed to the floor and the second PC panel 3B by bolts or the like so as to support the second PC panel 3B in a diagonal direction.

(5) 거더 및 슬래브패널 설치단계(S50)(5) girder and slab panel installation step (S50)

이 단계는 PC벽체 고정단계(S30)와 서포트 설치단계(S40)를 통해 더블 PC벽체(3)가 전체적으로 설치되고 나면, 도 11 내지 도 12에 도시된 바와 같이 기초부(1) 위에 복수 개의 거더(도면부호 없음)를 설치한 다음, 복수 개의 슬래브패널(4)을 더블 PC벽체(3)의 제2 PC패널(3B) 위에 수평으로 설치하는 것이다.11 to 12, when the double PC wall 3 is installed as a whole through the PC wall fixing step S30 and the support installing step S40, (Not shown), and then horizontally arranges a plurality of slab panels 4 on the second PC panel 3B of the double PC wall 3.

이때 슬래브패널(4)의 일단으로 돌출되어 하향 절곡되는 주철근(4A)은 도 13 및 도 14에 도시된 바와 같이 제2 PC패널(3B)의 제2 트러스철근(30B)에 삽입되어 고정되고, 제2 PC패널(3B)의 상단으로 돌출되는 제2 주철근(10B)에 의해 슬래브패널(4)의 일단이 지지되도록 함과 동시에 제2 주철근(10B)과 슬래브패널(4)의 주철근(4A)은 철사 등을 이용하여 서로 고정된다.At this time, the cast iron muscle 4A protruding from the one end of the slab panel 4 and bent downward is inserted and fixed to the second truss reinforcing bar 30B of the second PC panel 3B as shown in Figs. 13 and 14, One end of the slab panel 4 is supported by the second main reinforcing bars 10B projecting to the upper end of the second PC panel 3B and the second main reinforcing bars 10B and the main reinforcing bars 4A of the slab panel 4, Are fixed to each other by using wire or the like.

그리고 슬래브패널(4)이 설치되고 나면, "ㄱ"자 모양이 되도록 일단이 하향 절곡된 보강철근(5)을 슬래브패널(4) 위쪽으로 소정 간격 이격하여 배치하고, 이에 의해 하향 절곡된 일단을 제1 PC패널(3A)의 제1 트러스 철근(30A)에 삽입하여 고정하는 보강철근 설치단계(S51)가 진행된다.After the slab panel 4 is installed, the reinforcing bars 5 whose one ends are bent downward are arranged above the slab panel 4 with a predetermined distance therebetween so as to have a " A rebar reinforcing bar installation step S51 for inserting and fixing the first truss reinforcing bars 30A of the first PC panel 3A is performed.

이에 더해 보강철근 설치단계(S51)가 진행된 다음에는, 설치된 보강철근(5)과 슬래브패널(4)의 주철근(4A)을 "ㄷ"자 모양을 가지는 복수 개의 스터럽(6)을 이용하여 상호 연결하는 스터럽 설치단계(S52)가 진행된다.The rebar 5 and the main rebar 4A of the slab panel 4 are connected to each other using a plurality of stirrups 6 having a "C" shape, (S52).

이에 의해 더블 PC벽체(3)와 슬래브패널(4)이 구조적으로 보강철근(5)과 스터럽(6)에 의해 연결된 상태에서 후술되는 콘크리트 타설 및 양생단계(S60)에서 콘크리트가 전체적으로 타설된 다음 양생(경화)되므로, 구조적으로 더블 PC벽체(3)와 슬래브패널(4)이 강건하게 결합되고, 이에 의해 지진 등의 진동에 의해 큰 외력이 작용하더라도 더블 PC벽체(3)와 슬래브패널(4)이 쉽게 단절(파손)되어 무너지지 않으면서 건물의 내진 성능이 향상된다.As a result, in the state where the double PC wall 3 and the slab panel 4 are structurally connected by the rebar 5 and the stirrup 6, the concrete is entirely installed in the concrete pouring and curing step S60 to be described later, The double PC wall 3 and the slab panel 4 are structurally rigidly coupled to each other so that the double PC wall 3 and the slab panel 4 can be securely fixed to each other even if a large external force is applied due to vibration, The seismic performance of the building is improved without collapsing (breakage).

(6) 콘크리트 타설 및 양생단계(S60)(6) Concrete pouring and curing step (S60)

이 단계는 슬래브패널 설치단계(S50)에서 슬래브패널(4)이 설치되고 나면, 더블 PC벽체(3)의 제1, 2패널(3A, 3B) 사이와 슬래브패널(4) 위에 콘크리트를 타설하여 양생하는 것으로서, 이에 의해 더블 PC벽체(3)를 이용한 시공이 완료된다.In this step, after the slab panel 4 is installed in the slab panel installation step S50, concrete is placed between the first and second panels 3A and 3B of the double PC wall 3 and the slab panel 4 As a result, the construction using the double PC wall 3 is completed.

이상 설명한 바와 같이 본 발명은 내, 외측을 구성하는 더블 PC벽체의 제1, 2 PC패널이 상, 하부 연결철근에 의해 일체로 제작되고, 이에 의해 공사 현장에서 내, 외측의 PC패널이 한 번에 설치되므로 시공 시간이 크게 단축되며, 제1, 2 PC패널 사이에 보강트러스가 설치되므로 지진 등의 외력에도 제1, 2 PC패널이 쉽게 파손되지 않는다.As described above, according to the present invention, the first and second PC panels of the double PC walls constituting inner and outer sides are integrally manufactured by the upper and lower connecting bars, whereby the inner and outer PC panels are fixed And the reinforcing truss is installed between the first and second PC panels. Therefore, the first and second PC panels are not easily damaged even by an external force such as an earthquake.

또한, 본 발명은 PC벽체를 기초부에 설치한 다음, 슬래브패널을 설치할 때, 제2 주철근과 슬래브패널의 주철근이 철사 등으로 서로 강건하게 고정되고, 또한 보강철근과 스터럽에 의해 PC벽체와 슬래브패널이 강건하게 결합된 상태에서 콘크리트가 타설되어 지붕을 형성하기 때문에 지진 등의 큰 외력이 작용하더라도 PC벽체와 슬래브패널 간에 변형과 파손이 방지되므로 결과적으로 건물의 내진 성능이 향상된다.Further, in the present invention, after the PC wall is installed on the foundation, when the slab panel is installed, the second main iron core and the main iron core of the slab panel are firmly fixed to each other by a wire or the like, and also the PC wall and the slab Since the concrete is poured into the roof in a state where the panel is rigidly connected, the roof is formed. Therefore, even if a large external force such as an earthquake acts, deformation and damage are prevented between the PC wall and the slab panel.

위에서는 설명의 편의를 위해 바람직한 실시예를 도시한 도면과 도면에 나타난 구성에 도면부호와 명칭을 부여하여 설명하였으나, 이는 본 발명에 따른 하나의 실시예로서 도면상에 나타난 형상과 부여된 명칭에 국한되어 그 권리범위가 해석되어서는 안 될 것이며, 발명의 설명으로부터 예측 가능한 다양한 형상으로의 변경과 동일한 작용을 하는 구성으로의 단순 치환은 당업자가 용이하게 실시하기 위해 변경 가능한 범위 내에 있음은 지극히 자명하다고 볼 것이다.Although the preferred embodiments of the present invention have been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims. It is to be understood that the scope of the present invention should not be interpreted as being limited only by the scope of the present invention and that the scope of the present invention should not be construed to be interpreted to limit the scope of the present invention. .

1: 기초부 2: 앵커철근
3: 더블 PC벽체 3A: 제1 PC패널
3B: 제2 PC패널 4: 슬래브패널
4A: 주철근 5: 보강철근
6: 스터럽 10A: 제1 주철근
10B: 제2 주철근 20A: 제1 슬리브
20B: 제2 슬리브 21: 몰탈 충진용 주입구
22: 걸림돌기 23: 몰탈 배출구
30A: 제1 트러스철근 30B: 제2 트러스철근
40A: 상부 연결철근 40B: 하부 연결철근
50: 보강트러스 51: 제1 측면프레임
51A: 보강앵글 52: 제2 측면프레임
52A: 보강앵글 53: 상부앵글
54: 하부앵글 H: 삽입공
P: 프롭서포트
1: Foundation part 2: Anchor steel
3: Double PC wall 3A: 1st PC panel
3B: second PC panel 4: slab panel
4A: Cast iron root 5: Rebar
6: stirrup 10A: primary steels
10B: second main steel rope 20A: first sleeve
20B: second sleeve 21: mortar filling inlet
22: Stopper 23: Mortar outlet
30A: first truss reinforcing bar 30B: second truss reinforcing bar
40A: upper connection reinforcing bar 40B: lower connection reinforcing bar
50: reinforcing truss 51: first side frame
51A: reinforcing angle 52: second side frame
52A: reinforcing angle 53: upper angle
54: Lower angle H: Insertion hole
P: Pro-support

Claims (5)

삭제delete 삭제delete 삭제delete 더블 PC벽체(3)를 이용한 PC벽체 구조물의 시공방법에 있어서,
터파기된 바닥에 버림 콘크리트를 타설하는 버림 콘크리트 타설단계(S10);
버림 콘크리트된 바닥 위에 복수 개의 앵커철근(2)의 상부가 위로 노출되도록 나란하게 배치하고, 철근을 추가로 배치한 다음, 콘크리트를 타설하여 기초부(1)를 형성하는 기초부 형성단계(S20);
일체로 제작된 더블 PC벽체(3)의 제1, 2 PC패널(3A, 3B) 하단에 구비되는 제1, 2 슬리브(20A, 20B)와 상기 앵커철근(2)을 서로 연결하여 상기 더블 PC벽체(3)를 기립 설치하는 PC벽체 고정단계(S30);
설치된 상기 제2 PC패널(3B)의 측면에 대각선 방향으로 복수 개의 프롭서포트(P)를 설치하는 서포트 설치단계(S40);
상기 기초부(1) 위에 복수 개의 거더를 설치하고, 복수 개의 슬래브패널(4)을 상기 더블 PC벽체(3)의 위에 수평으로 설치하여 상기 슬래브패널(4)의 일단으로 돌출되어 하향 절곡되는 주철근(4A)을 상기 제2 PC패널(3B)의 제2 트러스 철근(30B)에 삽입하고, 상기 제2 PC패널(3B)의 상단으로 돌출되는 제2 주철근(10B)과 상기 주철근(4A)을 서로 연결하여 고정하는 거더 및 슬래브패널 설치단계(S50); 및
상기 제1, 2패널(3A, 3B) 사이 및 상기 슬래브패널(4) 위에 콘크리트를 타설하고 양생하는 콘크리트 타설 및 양생단계(S60);
를 포함하고,
상기 PC벽체 고정단계(S30)에서는,
상기 제1, 2 슬리브(20A, 20B)의 하부 일측에 구비되는 몰탈 충진용 주입구(21)를 통해 상기 제1, 2 슬리브(20A, 20B)의 내부에 몰탈을 충진하되, 충진된 몰탈이 상부 일측에 구비되는 몰탈 배출구(23)를 통해 배출되는 것이 확인될 때까지 충진되며,
상기 거더 및 슬래브패널 설치단계(S50)는,
일단이 하향 절곡되어 상기 제1 PC패널(3A)의 제1 트러스 철근(30A)에 삽입되고, 상기 슬래브패널(4)의 위쪽으로 소정 간격 이격되면서 수평으로 복수 개의 보강철근(5)을 배열하는 보강철근 설치단계(S51); 및
상기 보강철근(5)과 상기 슬래브패널(4)의 상기 주철근(4A)을 "ㄷ"자 모양을 가지는 복수 개의 스터럽(6)을 이용하여 상호 연결하는 스터럽 설치단계(S52)를 포함하면서, 상기 슬래브패널(4)의 일측단이 상기 제2 PC패널(3B)의 상단으로 돌출 형성되는 제2 주철근(10B)에 의해 지지되도록 설치함과 동시에 상기 슬래브패널(4)의 상기 주철근(4A)과 상기 제2 주철근(10B)을 상호 철사로 연결하며,
상기 PC벽체 고정단계(S30)의 상기 더블 PC벽체(3)는,
상기 제1, 2 PC패널(3A, 3B)의 내부에 각각 소정 간격을 두고 복수 개가 설치되는 제1, 2 주철근(10A, 10B);
상기 제1, 2 주철근(10A, 10B)의 하단에 설치되면서 상기 앵커철근(2)과 결합되는 제1, 2 슬리브(20A, 20B);
상기 제1, 2 주철근(10A, 10B)에 서로 마주하여 길이를 따라 설치되는 제1, 2 트러스철근(30A, 30B); 및
상기 제1, 2 주철근(10A, 10B)의 상부와 하부를 횡방향으로 각각 연결하도록 소정 간격 이격되어 설치되는 복수 개의 상, 하부 연결철근(40A, 40B);
을 포함하고,
상기 제1, 2 주철근(10A, 10B) 사이에는,
상기 제1, 2 PC패널(3A, 3B)의 설치 간격을 유지하면서 강도를 보강하는 보강트러스(50)가 설치되어 상기 제1, 2 PC패널(3A, 3B)과 일체로 구성되며,
상기 보강트러스(50)는,
상기 제1, 2 주철근(10A, 10B)에 양측이 고정되면서 서로 소정 간격 이격되어 설치되는 사각 틀 모양의 제1, 2 측면프레임(51, 52);
상기 제1, 2 측면프레임(51, 52)의 상부에 "X"자 모양으로 설치되는 한 쌍의 상부앵글(53); 및
상기 제1, 2 측면프레임(51, 52)의 하부에 "X"자 모양으로 설치되는 한 쌍의 하부앵글(54);
을 포함하고,
상기 제1, 2 측면프레임(51, 52)에는,
"X"자 모양으로 설치되는 보강앵글(51A, 52A)이 설치되며,
상기 제2 주철근(10B)은,
슬래브패널(4)의 일측단을 지지함과 동시에 상기 슬래브패널(4)의 주철근(4A)과 철사로 연결되도록 상기 제2 PC패널(3B)의 상단으로 소정 길이 돌출 형성되고,
상기 제1, 2 슬리브(20A, 20B)에는,
일측 방향으로 소정 길이 돌출되도록 하부 일측에 구비되는 몰탈 충진용 주입구(21);
상기 제1, 2 주철근(10A, 10B)이 삽입되는 삽입공(H)의 내부에 구비되면서 상기 제1, 2 주철근(10A, 10B)의 삽입 정도를 제한하도록 돌출 형성되는 걸림돌기(22); 및
하부 일측에 구비되면서 일측 방향으로 소정 길이 돌출되고, 상기 몰탈 충진용 주입구(21)에 비해 상대적으로 지름이 작게 형성되는 몰탈 배출구(23);
를 포함하며,
상기 상, 하부 연결철근(40A, 40B)은,
"ㅁ"자 모양의 철근으로 이루어지면서 상기 제1, 2 주철근(10A, 10B)을 연결하도록 소정 폭 중첩되도록 소정 간격을 두고 복수 개가 설치되는 것을 특징으로 하는 내진 성능이 강화된 더블 PC벽체를 이용한 PC벽체 구조물의 시공방법.
A method of constructing a PC wall structure using a double PC wall (3)
Placing a discarded concrete on a laid discarded floor (S10);
(S20) of arranging the plurality of anchor reinforcing bars (2) in such a manner that the upper portions of the plurality of anchor reinforcing bars (2) are exposed on the abandoned concrete floor, arranging the reinforcing bars further, ;
The first and second sleeves 20A and 20B provided at the lower ends of the first and second PC panels 3A and 3B of the integrally manufactured double PC wall 3 and the anchor reinforcing bars 2 are connected to each other, A PC wall fixing step S30 for standing up the wall 3;
A support installing step (S40) of installing a plurality of pro supports (P) in a diagonal direction on the side surface of the installed second PC panel (3B);
A plurality of girders are provided on the foundation part 1 and a plurality of slab panels 4 are installed horizontally on the double PC wall body 3 so as to protrude to one end of the slab panel 4, (4A) is inserted into the second truss reinforcing bars (30B) of the second PC panel (3B), and the second main reinforcing bars (10B) projecting to the upper end of the second PC panel (3B) A girder and a slab panel installation step (S50) for connecting and fixing each other; And
A concrete pouring and curing step (S60) for pouring and curing concrete between the first and second panels (3A, 3B) and the slab panel (4);
Lt; / RTI >
In the PC wall fixing step S30,
The mortar is filled in the first and second sleeves (20A, 20B) through a mortar filling inlet (21) provided at a lower side of the first and second sleeves (20A, 20B) Is filled until it is confirmed to be discharged through the mallet discharge port 23 provided at one side,
The girder and slab panel installation step (S50)
One end is bent downward and inserted into the first truss reinforcing bar 30A of the first PC panel 3A, and a plurality of reinforcing bars 5 are horizontally arranged at a predetermined distance above the slab panel 4 Reinforcing steel installing step (S51); And
And a stirrup installing step (S52) of interconnecting the reinforcing steel bar (5) and the main steel rods (4A) of the slab panel (4) by using a plurality of stirrers (6) The first end of the slab panel 4 is supported by the second main reinforcing rope 10B protruding from the upper end of the second PC panel 3B and the other end of the main reinforcing rope 4A of the slab panel 4 The second main steel rods 10B are connected to each other by a wire,
The double PC wall 3 of the PC wall fixing step S30 may be formed by,
First and second main steels 10A and 10B provided inside the first and second PC panels 3A and 3B at predetermined intervals;
First and second sleeves 20A and 20B installed at the lower ends of the first and second cast iron bars 10A and 10B and coupled to the anchor steel bar 2;
First and second truss reinforcing bars 30A and 30B disposed along the length of the first and second cast iron rods 10A and 10B; And
A plurality of upper and lower connecting bars 40A and 40B spaced apart from each other by a predetermined distance so as to connect the upper and lower portions of the first and second cast iron bars 10A and 10B in the lateral direction;
/ RTI >
Between the first and second main steels 10A and 10B,
A reinforcing truss 50 for reinforcing the strength of the first and second PC panels 3A and 3B while maintaining the spacing between the first and second PC panels 3A and 3B is integrally formed with the first and second PC panels 3A and 3B,
The reinforcing truss (50)
First and second side frames (51, 52) having a rectangular frame shape and being spaced apart from each other with both sides fixed to the first and second cast iron rods (10A, 10B);
A pair of upper angles (53) installed in an upper portion of the first and second side frames (51, 52) in an "X" And
A pair of lower angles (54) installed at the lower portions of the first and second side frames (51, 52) in an "X"
/ RTI >
In the first and second side frames 51 and 52,
Reinforcing angles 51A and 52A provided in an "X" shape are provided,
The second cast iron rope 10B,
A first end of the slab panel 4 is protruded from the upper end of the second PC panel 3B by a predetermined length so as to be connected to the main iron core 4A of the slab panel 4 by a wire,
In the first and second sleeves 20A and 20B,
A mortar filling inlet 21 provided at one side of the lower portion so as to protrude by a predetermined length in one direction;
A locking protrusion 22 provided inside the insertion hole H into which the first and second cast iron rods 10A and 10B are inserted to protrude to limit the degree of insertion of the first and second cast iron rods 10A and 10B; And
A mallet discharge port (23) protruding in a predetermined direction at one side of the lower part and formed to have a smaller diameter than the injection port for filling the mortar (21);
/ RTI >
The upper and lower connecting reinforcing bars 40A,
And a plurality of reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete reinforced concrete structures Construction method of PC wall structure.
삭제delete
KR1020180012676A 2018-02-01 2018-02-01 Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof KR101903628B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180012676A KR101903628B1 (en) 2018-02-01 2018-02-01 Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180012676A KR101903628B1 (en) 2018-02-01 2018-02-01 Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof

Publications (1)

Publication Number Publication Date
KR101903628B1 true KR101903628B1 (en) 2018-10-02

Family

ID=63863988

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180012676A KR101903628B1 (en) 2018-02-01 2018-02-01 Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof

Country Status (1)

Country Link
KR (1) KR101903628B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235886A (en) * 2018-11-05 2019-01-18 中欧云建科技发展有限公司 A kind of quick production and for building half prefabricated system automatically docked
CN109594688A (en) * 2019-01-16 2019-04-09 中建局集团建设发展有限公司 A kind of double skin wall constructions of steel truss and its construction method
KR101937680B1 (en) * 2018-10-04 2019-04-11 제일피씨텍 주식회사 Prefabricated Precast Structure and Construction Method Thereof
CN110318483A (en) * 2019-06-27 2019-10-11 罗志康 A kind of precast concrete sandwich wall with ribbing
KR102232106B1 (en) * 2020-05-14 2021-03-25 한국콘크리트산업 주식회사 The intergration structure between hollow column and double well panel and construction method thereof
KR20220145443A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using hoop shaped member

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101193895B1 (en) * 2012-08-01 2012-10-29 대한이.이엔.씨(주) Structure of sandwich pannel with precast concrete and cast in place concrete
KR101630235B1 (en) * 2015-02-09 2016-06-14 주식회사 태영피씨엠 Precast truss wall structure and construction method of underground structure using thereof
KR101645525B1 (en) * 2015-12-30 2016-09-07 이형훈 Twin wall and twin wall structure produced by using twin wall
KR101762155B1 (en) * 2016-04-08 2017-07-27 이형훈 Twin wall having detachable truss and the manufacturing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101193895B1 (en) * 2012-08-01 2012-10-29 대한이.이엔.씨(주) Structure of sandwich pannel with precast concrete and cast in place concrete
KR101630235B1 (en) * 2015-02-09 2016-06-14 주식회사 태영피씨엠 Precast truss wall structure and construction method of underground structure using thereof
KR101645525B1 (en) * 2015-12-30 2016-09-07 이형훈 Twin wall and twin wall structure produced by using twin wall
KR101762155B1 (en) * 2016-04-08 2017-07-27 이형훈 Twin wall having detachable truss and the manufacturing method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101937680B1 (en) * 2018-10-04 2019-04-11 제일피씨텍 주식회사 Prefabricated Precast Structure and Construction Method Thereof
CN109235886A (en) * 2018-11-05 2019-01-18 中欧云建科技发展有限公司 A kind of quick production and for building half prefabricated system automatically docked
CN109594688A (en) * 2019-01-16 2019-04-09 中建局集团建设发展有限公司 A kind of double skin wall constructions of steel truss and its construction method
CN110318483A (en) * 2019-06-27 2019-10-11 罗志康 A kind of precast concrete sandwich wall with ribbing
KR102232106B1 (en) * 2020-05-14 2021-03-25 한국콘크리트산업 주식회사 The intergration structure between hollow column and double well panel and construction method thereof
KR20220145443A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using hoop shaped member
KR102467631B1 (en) 2021-04-21 2022-11-18 아이에스동서(주) PC double pannel using hoop shaped member

Similar Documents

Publication Publication Date Title
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
WO2019206193A1 (en) Prefabricated wall panel, connection structure thereof and construction method therefor
CN109537811B (en) Manufacturing method of prefabricated column and assembling method of column beam
KR100742577B1 (en) Composite structural framing system
KR101937680B1 (en) Prefabricated Precast Structure and Construction Method Thereof
KR101663132B1 (en) Self-supporting type column structure
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR100862005B1 (en) Manufacturing method of segmental internally confined hollow concrete filled tube
KR100775359B1 (en) Concrete-mold assembly and construction method using the same
JP6855296B2 (en) Building foundation structure and its construction method
CN106032705A (en) Integrated casting molding construction method of reinforced concrete floor system
JP2017014713A (en) Existing concrete structure reinforcement structure
KR100640244B1 (en) Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
CN210976062U (en) Assembled frame construction combination system
KR100626326B1 (en) concrete structure
CN112359965A (en) Precast concrete assembled structure with rib mold structure and construction method thereof
KR101150369B1 (en) Complex girder for building
JP3039295B2 (en) Manufacturing method of prefabricated member of mixed structure
KR20220027411A (en) Construction Method of Reinforced Concrete Wall Using U-Bar Prefabricated Assembly
JPH0657710A (en) Construction of concrete main tower
JP2000160687A (en) Construction method for composite structure and precast concrete column
TWI822635B (en) Construction structure
JPH08302808A (en) Connecting method of large pc wall board
JP2019148108A (en) Bridge pier construction method

Legal Events

Date Code Title Description
AMND Amendment
E601 Decision to refuse application
AMND Amendment
GRNT Written decision to grant
X701 Decision to grant (after re-examination)