KR19990033876U KR2019980000003U KR19980000003U KR19990033876U KR 19990033876 U KR19990033876 U KR 19990033876U KR 2019980000003 U KR2019980000003 U KR 2019980000003U KR 19980000003 U KR19980000003 U KR 19980000003U KR 19990033876 U KR19990033876 U KR 19990033876U
Authority
KR
South Korea
Prior art keywords
vertical column
sideways
frame
bolts
insert
Prior art date
Application number
KR2019980000003U
Other languages
Korean (ko)
Other versions
KR200170498Y1 (en
Inventor
강창수
Original Assignee
강창수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강창수 filed Critical 강창수
Priority to KR2019980000003U priority Critical patent/KR200170498Y1/en
Publication of KR19990033876U publication Critical patent/KR19990033876U/en
Application granted granted Critical
Publication of KR200170498Y1 publication Critical patent/KR200170498Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

본고안은 건축물의 수직기둥을 성형할 때 상기 수직기둥내의 적당한 위치에 일체로 "U"형으로 설치하여 수직기둥에 횡보를 설치하기 매우 용이하도록 한 건축용 횡보설치골조에 관한 것이다.The present invention relates to a construction sideways frame for construction that is very easy to install sideways on the vertical column by integrally installed in a "U" shape at a proper position in the vertical column when forming the vertical column of the building.

상기와 같은 본고안은 양단에 나사부가 형성된 2개의 "L"형볼트의 선단에 각각 스터드볼트가 체결되는 인서트너트를 결합하고,As described above, this insert combines insert nuts to which stud bolts are fastened to the ends of two “L” bolts each of which has threaded portions,

상기 인서트너트의 선단을 수직기둥성형용거푸집의 횡보설치위치에 설치한 위치선정판의 구멍에 결합되도록한다음 "L"형볼트의 타측단을 커플링너트로 결합하여 "U"형골조를 구성하였다.The end of the insert nut is to be coupled to the hole of the positioning plate installed at the transverse mounting position of the vertical column forming die, and then the other end of the "L" bolt is coupled with the coupling nut to form a "U" frame. It was.

여기서, 상기 "U"형골조는, "L"형볼트의 양단의 길이를 달리하여 수직기둥성형용거푸집의 횡보설치위치에 설치한 위치선정판에 구멍의 폭넓이에 따라 알맞게 조절하도록 구성하였다.Here, the "U" frame is configured to be appropriately adjusted according to the width of the hole in the positioning plate installed at the transverse mounting position of the vertical column forming die by varying the length of both ends of the "L" type bolt.

상기와 같이 본고안은 수직기둥내에 설치가 용이하도록 분해조립이 자유로운 "U"형골조를 구성하여 수직기둥을 성형하기 위해서 다수의 철근을 엮어놓은 철근골조사이로 삽입 및 고정설치가 용이하며, 앵커볼트의 전방에 위치선정판을 구비하여 횡보를 설치하고자하는 위치에 수평으로 정확하게 앵커볼트를 고정할 수 있으며, 상기 앵커볼트의 양단에 수직장공내에 인서트되는 인서트너트를 형성하고 스터트볼트로 횡보를 연결하도록 하여 횡보를 설치한 후에 만약 횡보의 결합부분에 이상이 생기면 앵커볼트의 교체가 필요없이 앵커볼트의 인서트너트에 결합된 스터드볼트만을 간단히 교체하면 되므로 횡보의 보수가 용이한등 전체적으로 횡보의 설치 및 보수가 용이하여 사용이 장구하며 무엇보다도 안전사고의 위험을 미연에 방지하여 귀중한 인명재해가 없도록 하는등 실사용에 있어서 매우 유용한 것이다.As described above, this proposal is composed of a "U" frame that can be easily disassembled and assembled so that it can be easily installed in a vertical column. Anchor bolts can be fixed horizontally precisely at the position where the side beams are to be installed by providing a positioning plate at the front side of the anchor bolts, forming insert nuts inserted into the vertical holes at both ends of the anchor bolts, and connecting the side beams with the stud bolts. After installation of the sideways, if there is an abnormality in the coupling part of the sideways, simply replace the stud bolts attached to the insert nuts of the anchor bolts without the need to replace the anchor bolts. Easy to use and easy to repair Also very useful in preventing the risk of accidents from occurring in the actual use, such as so valuable life disaster.

Description

건축용 횡보설치골조Construction sideways installation frame

본고안은 건축물의 수직기둥을 성형할 때 상기 수직기둥내의 적당한 위치에 일체로 "U"형으로 설치하여 수직기둥에 횡보를 설치하기 매우 용이하도록 한 건축용 횡보설치골조에 관한 것이다.The present invention relates to a construction sideways frame for construction that is very easy to install sideways on the vertical column by integrally installed in a "U" shape at a proper position in the vertical column when forming the vertical column of the building.

일반적으로 각종 건축물을 구축하기 위해서는 건물을 지탱해 주기 위한 수직기둥이 반드시 설치되는데 필요에 따라서는 상기 수직기둥과 수직기둥을 사이에 별도의 횡보를 설치하여야할 경우가 있었다.Generally, in order to build various buildings, vertical pillars for supporting a building must be installed, but there is a case where a separate side beam is required between the vertical pillar and the vertical pillar as necessary.

이와같이 상기 수직기둥과 수직기둥사이의 적당한 위치에 횡보를 설치하고자 할 때 종래에는 첨부도면 도1 내지 도2a 및 도2b에 도시된 바와같이 "U"형으로 절곡되고 양단에 너트(2)가 체결되도록 나사부(1a)가 형성된 단일체의 앵커볼트(1)를 구성하여, 첨부도면 도2a에 도시된 바와 같이 수직기둥(100)을 성형하기 위한 철근골조사이에 움직이지 않도록 설치한후 거푸집(110)을 완성한 상태에서 상기 거푸집(110)내부로 시멘트를 부어 양생시켜서 수직기둥(100)을 완성한 다음에 거푸집(110)을 떼어낸후 완성된 수직기둥(100)의 표면으로 양단이 돌출된 단일체의 앵커볼트(1) 양단으로 첨부도면 도2b에 도시된 바와같이 횡보(200)의 플랜지(210)에 형성한 볼트삽입공(210a)을 삽입하여 나사부(1a)가 돌출되도록 한다음, 상기 나사부(1a)에 너트(2)를 체결하여 횡보(200)를 연결설치하도록 건축용 횡보설치골조를 구성하였다.As described above, when a horizontal beam is installed at a proper position between the vertical column and the vertical column, conventionally, the U is bent into a “U” shape as shown in FIGS. 1 to 2A and 2B and the nut 2 is fastened to both ends. Forming the anchor bolt (1) of the unitary body formed with a screw portion (1a) so as to be, as shown in Figure 2a attached to the reinforcement bone irradiation for forming the vertical column 100 does not move to formwork 110 After completing the vertical pillar 100 by pouring cement into the mold 110 and curing the mold 110 in a completed state, the mold 110 is detached and then anchor bolts of a single body having both ends protruded to the surface of the completed vertical pillar 100. (1) Insert the bolt insertion hole 210a formed in the flange 210 of the lateral beam 200 at both ends so as to protrude the threaded portion 1a as shown in FIG. 2B. Um, so as to install the transverse connection 200 by tightening the nut (2) on the threaded portion (1a) formed the installation frame construction remained flat.

그러나, 이와같은 종래의 건축용 횡보설치골조는 앵커볼트(1)가 "U"형으로 절곡된 단일체로 형성되어 있기 때문에 상기 단일체로된 앵커볼트(1)를 수직기둥(100)을 성형하기 위해서 다수의 철근을 엮어놓은 철근골조사이로 삽입하여 고정설치하기가 매우 어려웠으며, 횡보(200)를 설치하고자 하는 정확한 위치에 앵커볼트(1)를 고정하기가 여간 까다로운게 아니였다.However, such a conventional construction sideways mounting frame has a plurality of anchor bolts 1 to form a vertical column 100 because the anchor bolt 1 is formed in a single body bent in a "U" shape. It was very difficult to fix and install by inserting the reinforcing bars of the reinforcing bar, and it was not difficult to fix the anchor bolt (1) in the exact position to install the sideways (200).

따라서, 상기 앵커볼트(1)가 정확하게 수평으로 설치되지 않는 경우가 많아 횡보(200)를 수평으로 결합하기가 어려웠던 것이다.Therefore, the anchor bolt 1 is often not installed horizontally, it is difficult to combine the horizontal beams 200 horizontally.

그리고, 종래의 방법으로 횡보(200)를 설치한 후 건물이나 교각 등의 각종 건축물을 완성한다음에는 만약 앵커볼트(1)의 결합부분이나 횡보(200)에 이상이 생기면 횡보(200)가 무너지거나 할 염려가 있어 재산상은 물론 귀중한 인명사고의 위험을 초래할 수 있으므로 사후관리나 보수를 철저히 해야하는데 종래의 앵커볼트(1)는 앵커볼트(1)의 양단나사부(1a)가 일단 훼손되면 수직기둥(100)내에 박혀있는 앵커볼트(1)의 교체가 전혀 불가능하므로 횡보(200)의 보수에 막대한 지장을 초래하였던 것이다.Then, after installing the lateral beam 200 in a conventional manner and completing various buildings such as buildings or piers, if the coupling part or the lateral beam 200 of the anchor bolt 1 is abnormal, the lateral beam 200 collapses or There is a risk of property damage as well as the risk of valuable personal accidents, so follow-up management or maintenance must be thoroughly. Conventional anchor bolt (1) once the both ends of the anchor bolt (1a) of the vertical column ( Since it is impossible to replace the anchor bolt (1) embedded in the 100 at all was to cause a huge obstacle to the repair of the sideways (200).

본고안은 상기와 같은 종래의 제반 문제점을 감안하여 안출한 것으로, 앵커볼트의 구성을 달리하여 수직기둥을 성형하기 위해서 다수의 철근을 엮어놓은 철근골조사이로 삽입 및 고정설치가 용이하도록 하며, 앵커볼트의 전방에 위치선정판을 구비하여 횡보를 설치하고자하는 위치에 수평으로 정확하게 앵커볼트를 고정할 수 있도록 하며, 상기 앵커볼트의 양단에 수직 장공내에 인서트되는 인서트너트를 형성하고 스터트볼트로 횡보를 연결하도록 하여 횡보를 설치한 후에 만약 횡보의 결합부분에 이상이 생기면 앵커 볼트의 교체가 필요없이 앵커볼트의 인서트너트에 결합된 스터드볼트만을 간단히 교체하여 횡보를 보수를 용이하도록 하는등 전체적으로 횡보의 설치 및 보수를 용이하도록 하며, 안전사고의 위험을 미연에 방지하도록 하는데 그 목적을 둔 것이다.This proposal was devised in view of the above-mentioned problems in the related art, and it is easy to insert and fix installation with a reinforcing bar bone checker which is woven a plurality of reinforcing bars in order to form a vertical column by varying the configuration of the anchor bolt. A positioning plate is provided at the front of the anchor bolt to accurately fix the anchor bolt horizontally at the position where the lateral beam is to be installed, and forms an insert nut inserted into the vertical slot at both ends of the anchor bolt, After installing the sideways after connecting the sideways, if there is an abnormality in the coupling side of the sideways, no need to replace the anchor bolts. And easy to repair It aims to prevent the risk of safety accidents in advance.

도1은 종래의 건축용 횡보설치골조의 구성상태를 나타낸 분해사시도.1 is an exploded perspective view showing a configuration of a conventional construction sideways mounting frame;

도2는 종래의 건축용 횡보설치골조의 설치상태도로서,Figure 2 is a state diagram of the installation of the conventional construction sideways frame,

도2a는 수직기둥에 설치한 상태도.Figure 2a is a state installed in the vertical column.

도2b는 횡보를 설치한 상태도.Figure 2b is a state in which the sideways are installed.

도3은 본고안의 전체구성상태를 나타낸 분해사시도.3 is an exploded perspective view showing the overall configuration of the present invention.

도4는 본고안의 조립상태도.4 is an assembled state of the present invention.

도5는 본고안의 설치상태도로서,5 is an installation state diagram of the present invention;

도5a는 수직기둥에 설치한 상태도.Figure 5a is a state installed in the vertical column.

도5b는 횡보를 설치한 상태도.Fig. 5B is a state in which sideways are installed.

♣ 도면의 주요부분에 대한 부호의 설명 ♣♣ Explanation of symbols for main part of drawing ♣

10: "L"형볼트 15: 커플링너트10: "L" type bolt 15: Coupling nut

20: 인서트너트 30: 스터드볼트20: insert nut 30: stud bolt

40: 너트 50: 위치선정판40: nut 50: positioning plate

51: 구멍 100: 수직기둥51: hole 100: vertical column

110: 수직기둥성형용거푸집 200: 횡보110: die for vertical column molding 200: sideways

210: 플랜지 210a: 볼트삽입공 300: "U"형골조210: flange 210a: bolt insertion hole 300: "U" frame

상기와 같은 목적을 달성하기 위한 본고안은 첨부도면 도3, 도4에 도시된 바와같이 양단에 나사부가 형성된 한쌍의 "L"형볼트(10)의 선단에 각각 스터드볼트(30)가 체결되는 인서트너트(20)를 결합하고,The present invention for achieving the above object is the stud bolt 30 is fastened to each of the front end of the pair of "L" type bolt 10 is formed with both ends as shown in Figure 3, 4 attached drawings Joining the insert nut 20,

상기 인서트너트(20)의 선단을 수직기둥성형용거푸집(110)의 횡보(200)설치위치에 설치한 위치선정판(50)의 구멍(51)에 결합되도록한다음 "L"형볼트(10)의 타측단을 커플링너트(15)로 결합하여 "U"형골조(300)를 구성하여서 된 것이다.The tip of the insert nut 20 is coupled to the hole 51 of the positioning plate 50 installed at the side beam 200 installation position of the vertical column forming die 110, and then the "L" type bolt 10 By coupling the other end of the coupling to the coupling nut 15 is to form a "U" frame (300).

여기서, 상기 "U"형골조(300)는, "L"형볼트(10)의 양단의 길이를 달리하여 수직기둥성형용거푸집(110)의 횡보(200)설치위치에 설치한 위치선정판(50)의 구멍(51)의 폭넓이에 따라 알맞게 조절하도록 구성하였다.Here, the "U" -shaped frame 300, the position selection plate installed in the horizontal beam 200 installation position of the vertical column forming die 110 by varying the length of both ends of the "L" type bolt (10) It was configured to adjust according to the width of the hole 51 of 50).

상기와 같이 구성된 본고안을 이용하여 교각이나 건물 등의 각종 건축물의 수직기둥(100)에 필요에따라 횡보(200)를 연계하여 설치하고자 할경우에는 먼저, 첨부도면 도5a에 도시된 바와같이 콘크리트로된 수직기둥(100)을 성형하기 위하여 설치되는 수직기둥성형용거푸집(110)내면의 정확한 횡보설치위치에 구멍(51)이 형성된 위치선정판(50)을 못이나 나사 등을 이용하여 고정설치한다.If you want to install the sideways 200 in connection with the vertical pillars 100 of various buildings such as bridge piers or buildings by using the above-configured as described above, first, as shown in Figure 5a attached drawings Fixing installation of the position selection plate 50 having the holes 51 formed in the correct sideways installation position on the inner surface of the vertical column forming die 110 installed to form the vertical column 100 by using nails or screws do.

그런다음, 상기 위치선정판(50)의 구멍(51)으로 양단에 나사부(10a)가 형성된 한쌍의 "L"형볼트(10)의 선단에 각각 나사결합된 인서트너트(20)의 선단을 삽입한후 상기 수직기둥성형용거푸집(110)의 외면에서 위치선정판(50)의 구멍(51)로 인서트너트(20)에 볼트(41)를 체결한다.Then, the ends of the insert nuts 20 which are screwed to the ends of the pair of "L" bolts 10 formed with the threaded portions 10a at both ends are inserted into the holes 51 of the positioning plate 50. Then, the bolt 41 is fastened to the insert nut 20 by the hole 51 of the positioning plate 50 on the outer surface of the vertical column forming die 110.

상기와 같이 하여 위치선정판(50)에 한쌍의 "L"형볼트(10)를 고정 설치한 다음에는 고정설치된 한쌍의 "L"형볼트(10)의 타측단을 양측내연에 나사부가 형성된 커플링너트(15)를 이용하여 결합하여 "U"형골조(300)를 만들되, 첨부도면 도4에 도시된 바와같이 일측 "L"형볼트(10)의 타측단에 먼저 커플링너트(15)를 깊숙히 결합한다.After the pair of "L" type bolts 10 are fixedly installed on the positioning plate 50 as described above, the other end of the pair of fixed "L" type bolts 10 is fixed to both sides of the inner threaded couple. Combination using the ring nut 15 to make the "U" shaped frame 300, as shown in Figure 4, the coupling nut 15 to the other end of one side "L" type bolt 10 first Combine deeply.

그런다음, 상기 커플링너트(15)가 결합된 일측 "L"형볼트(10)의 타측단과 타측 "L"형볼트(10)의 타측단을 일치시킨다음 일측 "L"형볼트(10)에 깊숙히 결합되어있던 커플링너트(15)를 적당히 풀어서 타측 "L"형볼트(10) 마저 결합하면 아주 간편하게 수직기둥(100)을 성형하기위하여 수직, 또는 수평으로 엮어놓은 철근사이에 "U"형골조(300)를 삽입 설치할수 있게 된다.Then, the other end of the other side of the "L" type bolt 10 coupled to the coupling nut 15 and the other end of the other "L" type bolt 10 coincide, and then the one side "L" type bolt 10 If you loosen the coupling nut (15), which is deeply coupled to the other side, and combine the other side "L" type bolt (10), it is very easy to form the vertical column (100) "U" between reinforcing bars vertically or horizontally. It is possible to insert the mold frame 300.

상기와 같은 방법으로 횡보(200)를 설치하고자 하는 정확한 위치에 본고안의 "U"형골조(300)를 아주 간편하게 수직기둥(100)을 성형하기 위하여 수직 또는 수평으로 엮어놓은 철근사이에 삽입설치한 다음에는 상기 "U"형 골조(300)를 철근에 철사 등의 와이어를 이용하여 움직이지 않게 단단히 묶어서 고정한다.In the same way as described above to install the horizontal frame (200) in the "U" frame skeleton of the present invention in a very simple way to form a vertical column (100) inserted between the reinforcing rods woven vertically or horizontally Next, the "U" -type skeleton 300 is securely tied to the reinforcement using wires such as wires.

상기와 같이 하여 본고안의 "U"형골조(300)의 설치가 완료되면 수직기둥(100)을 세우기 위한 나머지 수직기둥성형용거푸집(110)의 설치를 완료한후 상기 수직기둥성형용거푸집(110)내로 콘크리트를 쏟아부어 양생시켜 수직기둥(100)이 완성되면 상기 위치선정판(50)의 구멍(51)으로부터 인서트너트(20)에 체결된 상태의 볼트(41)를 전부 풀러서 결합을 해지시킨다음 수직기둥성형용거푸집(110)을 전부 떼어낸다.When the installation of the "U" frame framework 300 of the present disclosure is completed as described above, after completing the installation of the remaining vertical column forming dies 110 to erect the vertical column 100, the vertical column forming dies 110 After pouring the concrete into the curing and the vertical column 100 is completed by loosening all the bolts 41 in the state fastened to the insert nut 20 from the hole 51 of the positioning plate 50 to release the coupling Then remove all the vertical column forming die (110).

상기와 같이 하면 첨부도면 도5b에 도시된 바와같이 본고안의 "U"형골조(300)는 상기 콘크리트 양생된 수직기둥(100)내에 파뭍혀 수직기둥(100)과 일체가 되고 인써트너트(40)의 선단만이 수직기둥(100)의 표면으로 약간 돌출되게 보이게 된다.As described above, as shown in FIG. 5B, the U-shaped frame 300 of the present invention is broken into the vertically cured vertical pillar 100 to be integrated with the vertical pillar 100 and the insert nut 40. Only the tip of the vertical pillar 100 will appear to protrude slightly to the surface.

따라서, 수직기둥(100)의 표면으로 보이는 인서트너트(20)의 선단으로 양단에 나사부가 형성된 스터드볼트(30)를 나사체결한다음, 상기 스터드볼트(30)에 횡보(200)의 선단에 일체로 형성된 플랜지(210)의 볼트삽입공(210a)을 삽입한후 플랜지(210)내면으로 돌출되는 스터드볼트(30)에 고정너트(40)를 체결하면 아주 간편하고 견고하게 수직기둥(100)에 횡보(200)를 고정설치할수 있다.Therefore, after screwing the stud bolts 30 having threaded portions at both ends with the tip of the insert nut 20 which is seen as the surface of the vertical column 100, the stud bolts 30 are integrally connected to the front end of the cross beam 200. After inserting the bolt insertion hole 210a of the flange 210 formed by the fastening nut 40 to the stud bolt 30 protruding into the flange 210 inner surface is very simple and firmly to the vertical column 100 The sideways 200 can be fixedly installed.

상기와 같이 건물이나 교각 등의 각종 건축물의 건축시 횡보(200)를 필요로 하는 위치의 수직기둥(100)내에 본고안의 "U"형골조(300)를 아주 간편하면서도 정확하고, 견고하게 고정설치한후에 상기 "U"형골조(300)를 이용하여 횡보(200)를 매우 용이하게 연결설치한후에 마무리작업공정을 끝마쳐 완성된 건축물을 사용중 상기 횡보(200)의 결합부분 특히 횡보(200)의 플랜지(210)가 결합된 스터드볼트(30)에 이상이 생겼을 경우에는 이를 즉시 보수하여 횡보(200)의 붕괴를 막아야 하는데 이때에는 고정너트(40)를 풀러낸다음 횡보(200)의 플랜지(210)부분을 스터드볼트(30)에서 떼어낸상태에서 인서트너트(20)에 나사결합된 훼손된 상태의 스터드볼트(30)를 나사분해하고 새로운 스터드볼트(30)로 교체한다음 상기 새로운 스터드볼트(30)에 횡보(200)의 플랜지(210)부분을 결합한다음 고정너트(40)로 체결하여 아주 간편하게 보수를 완료하거나 횡보(200)를 움직이지 않고 보수를 하여야 할 경우에는 고정너트(40)를 풀러낸다음 횡보(200)의 플랜지(210)부분을 스터드볼트(30)에서 떼어내지 않은 상태에서 그대로 훼손된 상태의 스터드볼트(30)를 돌려서 인서트너트(20)에서 분해한다음 새로운 스터드볼트(30)를 횡보(200)의 플랜지(210)에 형성된 볼트삽입공(120a)을 통하여 인서트너트(20)에 결합한 다음 고정너트(40)로 체결하여 횡보(200)를 전혀 움직이지 않으면서도 아주 간편하게 보수를 완료할 수 있다.As described above, the "U" frame framework 300 of the present invention is very simple, accurate, and firmly fixed in the vertical column 100 at the position requiring the lateral beam 200 during the construction of various buildings such as buildings and piers. After connecting the lateral beams 200 using the "U" frame framework 300 very easily and then finishing the finishing work process, the coupling part of the lateral beams 200, especially the flange of the lateral beams 200, is in use. If the (210) is coupled to the stud bolt (30) has an abnormality, it should be repaired immediately to prevent the collapse of the sideways 200, in which case the fixing nut 40 is released and the flange 210 of the sideways 200 With the part removed from the stud bolt 30, the damaged stud bolt 30 screwed to the insert nut 20 is dismantled and replaced with a new stud bolt 30. Couple the flange 210 of the side beams 200 to the stud bolts 30 and then fasten them with the fixing nuts 40 to complete the repair very easily or to repair the side bars 200 without moving the fixing nuts ( 40) After loosening, remove the flange 210 of the side beams 200 from the stud bolt 30, and then disassemble it from the insert nut 20 by turning the stud bolt 30 in the damaged state. The bolt 30 is coupled to the insert nut 20 through the bolt insertion hole 120a formed on the flange 210 of the side beam 200 and then fastened to the fixing nut 40 to move the side beam 200 without moving at all. It's very easy to complete a repair.

상기와 같은 본고안은 수직기둥내에 설치가 용이하도록 분해조립이 자유로운 "U"형골조를 구성하여 수직기둥을 성형하기 위해서 다수의 철근을 엮어놓은 철근골조사이로 삽입 및 고정설치가 용이하며, 앵커볼트의 전방에 위치선정판을 구비하여 횡보를 설치하고자하는 위치에 수평으로 정확하게 앵커볼트를 고정할 수 있으며, 상기 앵커볼트의 양단에 수직장공내에 인서트되는 인서트너트를 형성하고 스터트볼트로 횡보를 연결하도록 하여 횡보를 설치한 후에 만약 횡보의 결합부분에 이상이 생기면 앵커볼트의 교체가 필요없이 앵커볼트의 인서트너트에 결합된 스터드볼트만을 간단히 교체하면 되므로 횡보의 보수가 용이한등 전체적으로 횡보의 설치 및 보수가 용이하여 사용이 장구하며 무엇보다도 안전사고의 위험을 미연에 방지하여 귀중한 인명재해가 없도록 하는등 실사용에 있어서 매우 획기적이고 신규 유용한 고안이다.As described above, the "U" frame is freely disassembled and assembled so that it can be easily installed in the vertical column, and the steel frame is easily inserted and fixed by forming a steel beam woven to form a vertical column. Anchor bolts can be fixed horizontally precisely at the position where the side beams are to be installed by providing a positioning plate at the front side of the anchor bolts, forming insert nuts inserted into the vertical holes at both ends of the anchor bolts, and connecting the side beams with the stud bolts. After installation of the sideways, if there is an abnormality in the coupling part of the sideways, simply replace the stud bolts attached to the insert nuts of the anchor bolts without the need to replace the anchor bolts. Easy to use and easy to repair It is a very innovative and new useful design in practical use, such as preventing the risk of tea ceremony safety accidents so as to prevent valuable human accidents.

Claims (2)

양단에 나사부가 형성된 2개의 "L"형볼트의 선단에 각각 스터드볼트가 체결되는 인서트너트를 결합하고,Combine the insert nuts to which the stud bolts are fastened to the ends of the two "L" bolts, each of which has a threaded portion, 상기 인서트너트의 선단을 수직기둥성형용거푸집의 횡보설치위치에 설치한 위치선정판의 구멍에 결합되도록한다음 "L"형볼트의 타측단을 커플링너트로 결합하여 "U"형골조를 구성함을 특징으로 하는 건축용 횡보설치골조.The end of the insert nut is to be coupled to the hole of the positioning plate installed at the transverse mounting position of the vertical column forming die, and then the other end of the "L" bolt is coupled with the coupling nut to form a "U" frame. Construction sideways installation frame, characterized in that. 제1항에 있어서,The method of claim 1, 상기 "U"형골조는, "L"형볼트의 양단의 길이를 달리하여 수직기둥성형용거푸집의 횡보설치위치에 설치한 위치선정판의 구멍의 폭넓이에 따라 알맞게 조절하도록 구성함을 특징으로 하는 건축용 횡보설치골조.The "U" frame is characterized in that it is configured to be appropriately adjusted according to the width of the hole of the positioning plate installed in the sideways installation position of the vertical column forming die by varying the length of both ends of the "L" type bolt Construction sideways installation frame.
KR2019980000003U 1998-01-05 1998-01-05 A building for horizontal beam establishment structure KR200170498Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019980000003U KR200170498Y1 (en) 1998-01-05 1998-01-05 A building for horizontal beam establishment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019980000003U KR200170498Y1 (en) 1998-01-05 1998-01-05 A building for horizontal beam establishment structure

Publications (2)

Publication Number Publication Date
KR19990033876U true KR19990033876U (en) 1999-08-16
KR200170498Y1 KR200170498Y1 (en) 2000-02-01

Family

ID=19530968

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019980000003U KR200170498Y1 (en) 1998-01-05 1998-01-05 A building for horizontal beam establishment structure

Country Status (1)

Country Link
KR (1) KR200170498Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100420941B1 (en) * 2001-08-07 2004-03-04 조성호 Ladder laid a wall of construction and method of constructing thereof
KR20130086832A (en) * 2012-01-26 2013-08-05 한국전력공사 Portable compressor for water stop rubber tunnel concrete segment
KR20190033134A (en) * 2017-09-21 2019-03-29 김윤기 Parapet direct connecting girder type bridge

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101304440B1 (en) * 2013-01-28 2013-09-04 홍성모 Guide wall and baffle wall junctions absence of unnecessary
KR102223810B1 (en) * 2019-04-03 2021-03-04 삼성물산 주식회사 Bracket connection structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100420941B1 (en) * 2001-08-07 2004-03-04 조성호 Ladder laid a wall of construction and method of constructing thereof
KR20130086832A (en) * 2012-01-26 2013-08-05 한국전력공사 Portable compressor for water stop rubber tunnel concrete segment
KR20190033134A (en) * 2017-09-21 2019-03-29 김윤기 Parapet direct connecting girder type bridge

Also Published As

Publication number Publication date
KR200170498Y1 (en) 2000-02-01

Similar Documents

Publication Publication Date Title
KR101490808B1 (en) Prefabricated steel frame equipped with removable concrete form for composite member of steel and concrete
KR101011417B1 (en) System Formwork for FSM
KR102011412B1 (en) Joint for Precast Beam and Columns
KR200170498Y1 (en) A building for horizontal beam establishment structure
KR20180042007A (en) Joint for Precast Beam and Columns
KR100401671B1 (en) Composite beam with prestressed precast concrete panel
JP3881135B2 (en) Connecting structure of floor slabs using concrete truss with concrete slab in bridge girder
KR100737841B1 (en) Clamp for fixing a concrete form
KR200426053Y1 (en) The connection architecture of supports in sheeting apparatus
KR20070001410A (en) Mounting structure of steel cross-beam in multi-girder concrete bridge and its construction method
KR20090054511A (en) Pre-cast concrete elments and construction method using thereof for upper portion of bridge
KR200357642Y1 (en) Reinforcement structure of inconner panel
KR100376780B1 (en) PSC beam fixing method
KR100322486B1 (en) Molding bar for formwork and installation method using formwork
KR100433700B1 (en) Mold system for slab concrete of bridge
KR100339440B1 (en) Construction method using mold equipped with shape steel and plywood
JPH06272311A (en) Connecting structure of precast concrete column and steel framed beam
KR102273072B1 (en) Wall mold construction method and the mold structure in which the construction property is improved
KR200347093Y1 (en) Mold system for slab concrete of bridge
JP4122409B2 (en) Anchor bolt fixing structure and anchor bolt fixing method
KR200314944Y1 (en) Constructing mould installation
KR200201606Y1 (en) The psc bridge beam which can institute slab mold and safety net
KR102271112B1 (en) Twin leg bolt, steel bar spacing maintenance fixed structure and method using the same
KR102298690B1 (en) Prefabricated steel frame for composite member of steel and concrete with ferrocement form and construction method of composite member using the same
KR101071647B1 (en) Steel hybrid girder using re-used angle

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20031118

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee