KR100339440B1 - Construction method using mold equipped with shape steel and plywood - Google Patents
Construction method using mold equipped with shape steel and plywood Download PDFInfo
- Publication number
- KR100339440B1 KR100339440B1 KR1019990031912A KR19990031912A KR100339440B1 KR 100339440 B1 KR100339440 B1 KR 100339440B1 KR 1019990031912 A KR1019990031912 A KR 1019990031912A KR 19990031912 A KR19990031912 A KR 19990031912A KR 100339440 B1 KR100339440 B1 KR 100339440B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel
- clamp
- plywood
- construction
- formwork
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Abstract
Description
본 발명은 교량 및 건물 가설을 위해 축조된 교각상부와 건물의 슬라브 콘크리트 타설전에 설치되는 거푸집을 시공하는 방법에 관한 것으로서, 더욱 상세하게는 교각 상단부에 다수개의 스틸 박스가 설치된 상태에서 각각의 스틸 박스 상부 플랜지의 돌출부에 강합성 거푸집인 형강을 50㎝ 간격으로 배치하여 설치한 후 볼트로 고정시킨다음 형강 상부에 합판을 설치할 수 있는 교량 및 건물 가설시 사용되는 강합성 슬래브 거푸집 시공방법에 관한 것이다.The present invention relates to a method for constructing a pier upper part and a formwork installed before slab concrete pouring of a building for bridge and building construction, and more specifically, each steel box in a state where a plurality of steel boxes are installed at the upper end of the pier. It is related to the method of constructing the composite slab formwork used in the construction of bridges and buildings where the plywood can be installed on the upper part of the flange after fixing the section steel, which is a rigid formwork, is installed at intervals of 50 centimeters.
일반적으로, 종래의 교량가설에 따른 교량상부 슬라브 콘크리트 타설을 위해구조물 공사에 있어서 거푸집을 설치하는데는 첫째, 도 5 에 나타낸 바와 같이 교각(140) 상단에 설치되는 다수개의 스틸 박스(120) 하부 플랜지(280)의 돌출부위에 목재브레싱 동바리공(220)을 설치한 후 종방향으로 목재빔(160)을 깔고 바닥판 거푸집(100)을 설치하며 상기, 거푸집(100)의 목재빔(160) 상단부에 합판(240)을 스틸 박스(120) 높이와 일치되게 고정 설치한 상태에서 스틸 박스(120)와 거푸집(100) 상부에 콘크리트 타설을 하고 콘크리트 타설이 완료되면 거푸집(100)을 해체하는 작업을 실시하고 있는데 상기와 같은 시공은 콘크리트면 노출로 균열발생시 추적조사 및 유지보수 관리가 용이한 장점도 있지만 시공성이 매우 불량하고 안정성 및 크레인 해체가 불가능한 고소교량에 매우 불리할 뿐만 아니라 공기가 많이 소요됨과 또한, 하부가 공용중인 경우 낙하물 방지시설이 필요하게 되며 공사비가 과다하게 소비되는 문제점이 있었다.In general, in order to install the formwork in the construction of the structure for the upper slab concrete pouring bridge according to the conventional bridge hypothesis, first, as shown in Figure 5 a plurality of steel box 120 lower flanges installed on top of the pier 140 After installing the wood brushing copper ball 220 on the protruding portion of the 280, the wood beam 160 in the longitudinal direction is laid and the bottom plate formwork 100 is installed, and the upper part of the wood beam 160 of the formwork 100 The concrete box is placed on the steel box 120 and the formwork 100 in a state in which the plywood 240 is fixed to match the height of the steel box 120, and the concrete form is completed, and then the formwork 100 is dismantled. The above construction has the advantage that it is easy to track and inspect and maintain the maintenance when the crack occurs due to the exposed concrete surface. As well as very unfavorable and that the falling object protection facilities if you need air soyodoem and also lower the public had a lot of problems that cost is excessive consumption.
둘째, 도 6 에 나타낸 바와 같이 교각(140) 상단부에 다수개의 스틸 박스(120)를 설치한 상태에서 이 각각의 스틸 박스(120) 사이에 홈(200)이 파진 데크 플레이트(180)의 거푸집(100)을 시공하여 상단부에 콘크리트를 타설하게 되며 콘크리트 작업이 완료되어도 거푸집을 해체하지 않고 영구적으로 활용하게 된다.Second, as shown in FIG. 6, in the state where the plurality of steel boxes 120 are installed at the upper end of the bridge 140, the grooves 200 are formed between the respective deck boxes 180 in which the grooves 200 are broken between the steel boxes 120. The construction of 100) places the concrete on the upper part and it is used permanently without dismantling the formwork even when the concrete work is completed.
그런데, 상기와 같은 시공은 시공성 및 안정성이 우수하고 또한, 하부공용중인 교량 및 고소교량에 우수하며 공기단축이 가능함과 공사비가 저렴하게 되는데 비해 감사 지적사항으로 엄격히 제한적용이 되고 있으며 콘크리트면 미노출로 점검이 불가하여 유지관리 측면에서 매우 불리함과 동시에 상부 플렌지에 용접함으로써 용접응력이 발생하여 강도가 저하되게 되는 문제점도 있었다.However, the construction as described above is excellent in workability and stability, excellent in bridges and high-rise bridges under construction, air shortening is possible, and construction costs are low. There is a problem in that the inspection is not very disadvantageous in terms of maintenance and at the same time the welding stress is generated by welding to the upper flange to reduce the strength.
본 발명은 상기한 문제점을 해결하기 위하여 안출한 것으로서, 그 목적은 교각 상단부에 설치된 스틸 박스 사이에 강합성 슬래브 거푸집을 제작 설치함으로써 공장 제작으로 공기단축이 가능하고 콘크리트면 노출로 균열발생시 추적조사 및 유지보수관리가 용이하며 또한, 시공성 및 안정성이 우수함과 동시에 공사비를 저감시킬 수 있는 교량 가설시 사용되는 강합성 슬래브 거푸집 시공방법을 제공하는 것이다.The present invention has been made in order to solve the above problems, the purpose is to produce a steel composite slab formwork between the steel box installed on the upper end of the pier can be shortened by air production in the factory manufacturing and the crack investigation by the concrete surface exposure and It is to provide a method of constructing a composite slab formwork used in the construction of bridges, which can be easily maintained and managed, and has excellent workability and stability while reducing construction costs.
본 발명은 상기한 목적을 달성하기 위하여 각각의 스틸 박스 사이에 설치하는 강합성 거푸집에 있어 형강 상단 내부에 각목을 볼트로 조립하고 이 형강 양측 상단부와 스틸 박스 하부 끝단에 지지부재를 용접 및 볼트로 고정시키며 스틸 박스 상부 끝단에 클램프를 위치시킨 상태에서 상기 지지부재와 볼트로 조립 고정시키되 이 클램프와 지지부재 사이에 보호판을 설치함과 또한, 형강 상부에 합판을 설치한 시공 방법을 제공함에 의해 달성된다.In order to achieve the above object, the present invention is a steel composite die installed between each steel box in order to assemble the lumber with bolts inside the upper section of the section steel and weld and bolt the support members at both ends of the section steel and the lower end of the steel box It is achieved by fixing and assembling and fixing with the support member and the bolt while the clamp is placed at the upper end of the steel box, and providing a construction method in which a protective plate is installed between the clamp and the support member, and a plywood is installed on the upper part of the steel box. do.
도 1 은 본 발명이 장착된 상태를 나타낸 개략도1 is a schematic diagram showing a state in which the present invention is mounted
도 2 은 본 발명을 나타낸 정단면예시도Figure 2 is a front cross-sectional view illustrating the present invention
도 3 은 본 발명을 나타낸 평단면예시도Figure 3 is a plan sectional view showing the present invention
도 4 는 본 발명의 일측 단면예시도4 is a side cross-sectional view of the present invention
도 5 및 도 6 은 종래의 거푸집을 설치한 상태를 나타낸 개략단면도5 and 6 is a schematic cross-sectional view showing a state in which the conventional formwork is installed
도 7 은 본 발명의 거푸집을 설치한 또 다른 실시예를 나타낸 예시도7 is an exemplary view showing another embodiment in which the formwork of the present invention is installed
도 8 및 도 9 는 도 7 의 일부를 나타낸 확대예시도8 and 9 are enlarged exemplary views showing a part of FIG. 7;
도 10 및 도 11 은 본 발명의 또 다른 실시예를 나타낸 예시도10 and 11 are exemplary views showing still another embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
(10) : 강합성 거푸집(10): steel composite formwork
(12) : 형강(12): section steel
(14) : 클램프14: clamp
(16) : 보호판16: protector
(18) : 지지부재(18): support member
(20) : 각목20: each item
(22) : 합판(22): plywood
(24) : 탭(24) tab
(26)(28) : 볼트(26) (28): Bolt
(30) : 스틸 박스30: steel box
(32) : 교각(32): piers
(34) : 상부 플랜지34: upper flange
(36) : 하부 플랜지36: lower flange
이하, 첨부된 도면을 참조하여 본 발명의 시공법 및 작용을 설명하면 다음과 같다.Hereinafter, the construction method and operation of the present invention with reference to the accompanying drawings.
도 1 은 본 발명이 장착된 상태를 나타낸 개략도를,1 is a schematic view showing a state in which the present invention is mounted,
도 2 은 본 발명을 나타낸 정단면예시도를,Figure 2 is a front cross-sectional view illustrating the present invention,
도 3 은 본 발명을 나타낸 평단면예시도를,3 is a plan cross-sectional view illustrating the present invention,
도 4 는 본 발명의 일측 단면예시도를 도시한 것으로서, 교량 가설시 사용되는 거푸집을 강합성(강재+합판)으로 제작 시공한 것에 있어서, 상기 강합성 거푸집(10)의 시공은 형강(12) 내부 상단에 각목(20)을 내장하여 볼트(26)로 고정시키고 형강(12) 양측 상단 내부에 지지부재(18)의 양측을 형강(12)에 용접 고정 설치하며 또한, 형강(12) 상부에 용접 고정된 지지부재(18)의 일부와 각목(20)의 상부면에 고정되게 합판(22)을 제작 설치한 상태에서 각각의 지지부재(18)를 스틸 박스(30) 상부 플랜지(34) 끝단 하부에 각각 위치시킨다.4 is a cross-sectional illustration of one side of the present invention, in the construction of the formwork used in the construction of the bridge to the steel composite (steel + plywood) in the construction, the construction of the steel composite formwork (10) is a section steel 12 Inside the upper end of the lumber 20 to be fixed with bolts 26, both sides of the support member 18 to the inside of the upper end of both sides of the shape steel 12 is welded fixed to the shape steel 12, and also on top of the shape steel 12 In the state where the plywood 22 is manufactured and installed to be fixed to a part of the weld-fixed support member 18 and the upper surface of the lumber 20, each support member 18 is end of the steel box 30 and the upper flange 34. Place them at the bottom respectively.
또한, 상기 각각의 스틸 박스(30) 상부 플랜지(34)의 돌출부 상단에 클램프(14)를 거취시키고 이 클램프(14)와 지지부재(18)를 볼트(28)로 고정시키되 상기 각각의 클램프(14)와 지지부재(18) 사이에 보호판(16)을 삽입 설치하며 강합성 거푸집(10)을 스틸 박스(30) 상에 50㎝ 간격으로 배치 설치한다.In addition, the clamp 14 is mounted on the top of the protrusion of the upper flange 34 of each steel box 30, and the clamp 14 and the support member 18 are fixed by bolts 28, respectively. The protective plate 16 is inserted and installed between the 14 and the support member 18, and the rigid formwork 10 is disposed on the steel box 30 at 50 cm intervals.
첨부된 도면중 미설명 부호 (24)는 탭이며, (36)은 하부 플랜지이다.In the accompanying drawings, reference numeral 24 denotes a tab, and 36 is a lower flange.
상기와 같은 시공법을 참조하여 본 발명의 작용을 설명하겠다.The operation of the present invention will be described with reference to the construction method as described above.
상기, 형강(12)의 내측 상단에는 각목(20)을 삽입시키고 이 각목(20)이 삽입 설치된 형강(12)의 외부에서 볼트(26)로 고정시키고 형강(12)의 양측 내부 상단에는 지지부재(18)의 일측은 형강(12)에 용접시켜 고정하고 타측은 형강(12)의 외부로 돌출되게 형성하여 용접고정된 지지부재(18)의 일부와 각목(20)의 상부면에 합판(22)을 고정시켜서 형강(12)의 외부로 돌출된 지지부재(18)를 스틸박스(30)의 상부플랜지(34) 끝단 하부에 위치시키고 상부에는 클램프(14)를 거취하여 볼트(28)로 고정시킬 때 클램프(14)와 지지부재(18)사이에 발생되는 공간에 보호판(16)을 삽입시켜 볼트(28)로 체결시킨 거푸집(10)과 스틸박스(30)의 상부에 슬라브 콘크리트를 타설하게 되고 콘크리트 타설 작업이 완료되면 각각의 클램프(14)와 지지부재(18)에 체결되어 있는 볼트(28)를 풀어 형강(12) 양측 상단 내부에 용접 고정된 지지부재(18)와 형강(12) 상부의 합판(22)으로 시공된 강합성 거푸집(10)을 슬라브 콘크리트로부터 해체시키게 되므로 해체 작업이 편리하게 되며 상기 각각의 스틸 박스(30) 상부 플랜지(34) 상부에 거취된 클램프(14)는 콘크리트 타설에 의해 스틸 박스(30) 상부에 고정되게 된다.The inner end of the section steel 12 is inserted into the lumber 20 and fixed to the bolt 26 from the outside of the section steel 12 is inserted into the corner wood 20 and the support member on the inner top of both sides of the section steel 12 One side of the 18 is welded and fixed to the section steel 12 and the other side is formed to protrude to the outside of the section steel 12, the plywood 22 to a part of the welded fixed support member 18 and the top surface of the lumber 20 ) Is fixed to the support member 18 protruding out of the shape steel 12 to the lower end of the upper flange 34 of the steel box 30, the clamp 14 in the upper portion is fixed by a bolt (28) When the protection plate 16 is inserted into the space generated between the clamp 14 and the support member 18 when placing the slab concrete on the top of the formwork 10 and the steel box 30 fastened with a bolt 28 When the concrete pouring work is completed, loosen the bolts 28 fastened to the clamps 14 and the support member 18, respectively, the amount of the steel 12 The steel composite formwork 10, which is constructed of the support member 18 welded and fixed to the inside of the side top and the plywood 22 on the upper part of the steel 12, is dismantled from slab concrete, so that the dismantling work is convenient and the respective steel boxes The clamp 14 taken on the upper flange 34 is fixed to the upper portion of the steel box 30 by concrete pouring.
또한, 상기 슬라브 콘크리트 타설 완료후 강합성 거푸집(10)의 해체가 가능하게 되므로 콘크리트면 노출로 교량에 균열이 발생시 추적 조사가 가능하게 되는 것이다.In addition, since the steel composite formwork 10 can be dismantled after the slab concrete is completed, it will be possible to investigate when cracks occur in the bridge due to the exposed concrete surface.
또한, 본 발명의 또 다른 실시예를 설명하면 다음과 같다.In addition, another embodiment of the present invention will be described.
실시예1Example 1
도 7 내지 도 9 는 본 발명의 교량 가설시 사용되는 거푸집의 또 다른 실시예를 도시한 것으로서, 교량 가설시 PC 빔(500) 상부에 슬라브 콘크리트를 타설하기 위해 PC 빔(500) 사이에 슬래브 거푸집(10)을 시공하는데 있어 도 8 에 나타낸 바와같이 거푸집(10)은 PC 빔(500) 양측 끝단부에 클램프(14)를 용접 고정시킨 상태에서 이 클램프(14) 하부에 앵글(38)을 위치시켜 클램프(14)와 앵글(38)을 볼트(28)로 고정시키고 볼트(28)와 클램프(14) 사이에 와셔(40)를 삽입하며 클램프(14)와 앵글(38) 사이에 철판(52)을 삽입한다.7 to 9 show another embodiment of the formwork used in the bridge construction of the present invention, the slab formwork between the PC beam 500 for placing slab concrete on top of the PC beam 500 during the bridge construction As shown in FIG. 8, in the construction of 10, the die 10 is positioned at an angle 38 below the clamp 14 while welding the clamp 14 to both ends of the PC beam 500. Fix the clamp 14 and the angle 38 with the bolt 28, insert the washer 40 between the bolt 28 and the clamp 14, and the steel plate 52 between the clamp 14 and the angle 38. Insert).
또한, 상기 각각의 앵글(38) 일측부에 브라켓(54)을 용접 고정하고 브라켓(54)에 사각파이프(50)를 내장시켜 볼트(28')로 고정시키며 이 사각파이프(50) 상부에 각목(20)을 거취시킴과 각목(20) 상단부에 합판(22)을 거취시킨 구성으로 되어진 것이다.In addition, the bracket 54 is welded and fixed to one side of each angle 38, and the square pipe 50 is embedded in the bracket 54 to be fixed by bolts 28 ′, and the square pipe 50 is placed on top of the square pipe 50. Take off (20) and the plywood (22) in the upper end of the wood board (20) is to be configured.
첨부된 도면중 미설명 부호 (42)는 철근이고, (300)은 거더이며, (400)은 캔틸레버이다.In the accompanying drawings, reference numeral 42 is a reinforcing bar, 300 is a girder, and 400 is a cantilever.
그리고, 도 9 는 좌·우 끝에 위치한 PC 빔(500)의 한쪽에 거푸집(10)을 시공하는 것으로서, 사각파이프(50) 일측 끝단 외부에 브라켓(54)을 형성하고 사각파이프(50) 상단부에 각목(20)을 거취시킨 상태에서 이 브라켓(54)을 PC 빔(500) 일측 상단부에 고정되어 있는 고정부재(46)에 힌지(48) 고정시키고 PC 빔(500) 상단 끝부에 클램프(14)를 고정시켜 고정부재(46)와 일체로 고정된 앵글(38)과 볼트(28)로 고정시키며 또한, PC 빔(500)에 사각파이프(50)를 직선되게 형성하여 상기 사각파이프(50)가 하방향으로 처짐을 방지하기 위해 사각파이프(50)와 형강(12a)의 일측부에 대각 방향으로 파이프(44)를 힌지(48a) 고정시킨다.And, Figure 9 is to form the die 10 on one side of the PC beam 500 located at the left and right ends, forming a bracket 54 on the outside of one end of the square pipe 50 and the upper end of the square pipe 50 The bracket 54 is fixed to the fixing member 46 fixed to the upper end of one side of the PC beam 500 in the state where the wood block 20 is removed, and the clamp 14 is attached to the upper end of the PC beam 500. Fixed by the angle 38 and the bolt 28 fixed integrally with the fixing member 46, and the square pipe 50 is formed in a straight line on the PC beam 500, the square pipe 50 is In order to prevent deflection in the downward direction, the pipe 44 is fixed to the hinge 48a in a diagonal direction to one side of the square pipe 50 and the shaped steel 12a.
상기, 각목(20) 상단부에 합판(22)을 거취시키고 볼트(28)와 클램프(14) 사이에 와셔(40)를 형성한다.The plywood 22 is removed from the upper end of the lumber 20 and a washer 40 is formed between the bolt 28 and the clamp 14.
상기의 거푸집 시공이 완료된 후 도 7 에서와 같이 거푸집(10) 상단부에 슬라브 콘크리트(700)를 타설하고 슬라브 콘크리트(700)가 응고된 후 거푸집(10)을 해체하게 된다.After the formwork is completed, the slab concrete 700 is poured into the top of the formwork 10 as shown in FIG. 7, and the formwork 10 is dismantled after the slab concrete 700 is solidified.
실시예2Example 2
도 10 및 도 11 은 건물 시공시 사용되는 거푸집을 설치하는 구조를 도시한 것으로서, 도 10 은 합판(4) 하부에 각목(3)을 못(5)으로 고정시키고 이 각목(3) 하단부에 형강(2)을 스크류(6)로 체결하며 형강(2) 일측 끝단 외부에 다수개의 홀(56)이 천공된 브라켓(54)을 형성하여 이 브라켓(54)에 플레이트(7)를 용접 고정시킴과 또한, 플레이트(7) 하단 끝부에 앵글(38)을 고정시킨 상태에서 합판(4)과 합판(4) 사이에 H-빔(600)을 위치시켜 이 H-빔(600) 하부 앵글(38)과 볼트(8)로 체결하되 이 볼트(8) 사이에 클램프(9)를 체결한다.10 and 11 show the structure for installing the formwork used in the building construction, Figure 10 is fixed to the bottom of the plywood (4) with a nail (3) with a nail (5) and the section steel at the bottom of the wooden (3) (2) is fastened with a screw (6) to form a bracket (54) with a plurality of holes (56) perforated outside one end of the shaped steel (2) to weld and fix the plate (7) on the bracket (54); In addition, the H-beam 600 is positioned between the plywood 4 and the plywood 4 with the angle 38 fixed to the lower end of the plate 7 so that the lower angle 38 of the H-beam 600 is lower. And bolt (8) to fasten the clamp (9) between the bolt (8).
이와 같이 거푸집(1)을 체결한 상태에서 합판(4) 상단에 슬라브 콘크리트(700)를 타설하게 된다.As such, the slab concrete 700 is poured on the top of the plywood 4 while the formwork 1 is fastened.
도 11 은 합판(4) 하부에 각목(3)을 못(5)으로 고정시키고 이 각목(3) 하단부에 형강(2)을 스크류(6)로 체결하며 형강(2) 일측 끝단부에 플레이트(7)를 고정시킨 상태에서 합판(4)과 합판(4) 사이에 H-빔(600)을 위치시켜 이 H-빔(600) 상부 끝단에 플레이트(8)와 볼트(7)로 체결하되 이 볼트(8) 사이에 클램프(9)를 체결한 상태에서 합판(4) 상단에 슬라브 콘크리트(700)를 타설하게 된다.11 is fixed to the bottom of the plywood (4) with a nail (5), fastening the section steel (2) with a screw (6) at the lower end of the corner board (3) and the plate (on one end of the section steel (2) 7) while fixing the H-beam 600 between the plywood (4) and the plywood (4) by fastening the plate (8) and bolt (7) to the upper end of the H-beam 600, In the state in which the clamps 9 are fastened between the bolts 8, the slab concrete 700 is poured on the top of the plywood 4.
본 발명은 교량 가설시 슬라브 콘크리트 타설을 위해 사용되는 교각 상부에 설치한 스틸 박스 및 PC 빔 사이에 강재와 합판으로 형성 제작된 강합성 거푸집을 스틸 박스로부터 50㎝ 간격으로 배치 설치한 후 강합성 거푸집의 형강 양측 상단부에 용접 고정되어 있는 지지부재와 스틸 박스의 상부 플랜지 상부에 거취된 클램프를 볼트로 고정 설치함으로써 규격화된 시공으로 시공성이 우수하고 거푸집의 강재사용으로 안정성이 우수하게 되며 또한, 강합성 거푸집을 공장에서 제작하여 설치하므로 인해 공기단축이 가능하다.The present invention is a steel composite formwork made of steel and plywood between the steel box and the PC beam installed on the top of the pier used for slab concrete pouring during the construction of the bridge is installed at 50cm intervals from the steel box and then the steel composite formwork By installing bolts on the support member that is welded and fixed on the upper end of both sides of the section steel and bolts on the upper flange of the steel box, the construction is excellent in standardized construction and the stability is excellent by using the steel of the formwork. Since the formwork is manufactured and installed at the factory, it is possible to shorten the air.
그리고, 하부공용중인 교량 및 고소교량에 우수하고 강합성 거푸집을 제작 설치후 슬라브 콘크리트의 타설 작업이 완료되면 거푸집의 해체가 가능하여 콘크리트면 노출로 교량의 균열발생시 추적조사 및 유지보수관리가 용이함과 또한, 교량 작업시 공사비를 저감시킬수 있도록 한 매우 유용한 발명인 것이다.Also, after the slab concrete is finished and installed, it is possible to dismantle the form after the installation and manufacture of steel composite formwork. In addition, it is a very useful invention that can reduce the construction cost when working bridges.
Claims (3)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR19980047415 | 1998-11-06 | ||
KR1019980047415 | 1998-11-06 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19990078743A KR19990078743A (en) | 1999-11-05 |
KR100339440B1 true KR100339440B1 (en) | 2002-05-31 |
Family
ID=37480175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990031912A KR100339440B1 (en) | 1998-11-06 | 1999-08-04 | Construction method using mold equipped with shape steel and plywood |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100339440B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020033125A (en) * | 2002-03-06 | 2002-05-04 | 전병철 | supporting structure for slab form of steel frame concrete structure |
KR100473612B1 (en) * | 2002-11-29 | 2005-03-17 | 주식회사 대명기술단건축사사무소 | Form system and frame construction method using the same |
CN109518603A (en) * | 2018-12-06 | 2019-03-26 | 北京市政路桥股份有限公司 | A kind of efficient steel-mixes combined bridge deck structure of transvers plate and usage |
-
1999
- 1999-08-04 KR KR1019990031912A patent/KR100339440B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR19990078743A (en) | 1999-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20180045140A (en) | The structure of non-binding dismantling formwork beams and deck plates without the need to secure jobs | |
JP2994222B2 (en) | Construction method of cast-in-place slab of precast concrete girder and its formwork | |
KR100310619B1 (en) | Cast support structure of top plate of reinforced concrete building | |
KR101256774B1 (en) | Constrcution method of end cross beam for integrating continuity of supporting portion and preventing falling down of psc girder | |
KR20090027052A (en) | Precast concrete panel, construction method and structure of precast concrete panel using steel plate | |
KR100339440B1 (en) | Construction method using mold equipped with shape steel and plywood | |
KR20190084712A (en) | Prefabricated column assembly with foundation reinforcement part | |
KR100631029B1 (en) | Precasted concrete plate assembly and the construction method using thereof | |
KR100634344B1 (en) | Composite slab and the joint structure | |
KR101463106B1 (en) | The precast concrete pillar and girder connecting structure for a building | |
JP2001026909A (en) | Connection structure of floor slab using three- dimensional truss with concrete form in bridge girder | |
KR20010044894A (en) | Slab sheeting construction-method for bridge | |
JP3701078B2 (en) | Road slab construction method | |
KR100469638B1 (en) | Support construction for slab of prestressed concrete beam of bridge | |
KR20130103420A (en) | Structure for clean room using composite beam | |
JPS6059210A (en) | Replacing method of bridge reinforced concrete floor panel | |
JPH022738Y2 (en) | ||
KR100499976B1 (en) | Prestressed reinforced concrete using prestressed concrete wire and T-shaped steel plate and method for constructing bridge using the same | |
KR101078292B1 (en) | Concrete slab mold assembly and method for constructing slab | |
KR100377576B1 (en) | Slab sheeting support | |
KR200351989Y1 (en) | Concrete slab sheeting apparatus For P.C beam girder bridge | |
JPH0352803Y2 (en) | ||
KR200180256Y1 (en) | Slab sheeting structure for bridge | |
KR0145358B1 (en) | Method of building slabs | |
CN220202430U (en) | Steel-concrete composite beam structure of assembled cantilever arm support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
G15R | Request for early opening | ||
N231 | Notification of change of applicant | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20090311 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |