KR100473612B1 - Form system and frame construction method using the same - Google Patents

Form system and frame construction method using the same Download PDF

Info

Publication number
KR100473612B1
KR100473612B1 KR10-2002-0075116A KR20020075116A KR100473612B1 KR 100473612 B1 KR100473612 B1 KR 100473612B1 KR 20020075116 A KR20020075116 A KR 20020075116A KR 100473612 B1 KR100473612 B1 KR 100473612B1
Authority
KR
South Korea
Prior art keywords
wall
formwork
support
slab
fixed
Prior art date
Application number
KR10-2002-0075116A
Other languages
Korean (ko)
Other versions
KR20040047048A (en
Inventor
이치명
Original Assignee
주식회사 대명기술단건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대명기술단건축사사무소 filed Critical 주식회사 대명기술단건축사사무소
Priority to KR10-2002-0075116A priority Critical patent/KR100473612B1/en
Publication of KR20040047048A publication Critical patent/KR20040047048A/en
Application granted granted Critical
Publication of KR100473612B1 publication Critical patent/KR100473612B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/12Forms, which are completely dismantled after setting of the concrete and re-built for next pouring of elements and beams which are mounted during erection of the shuttering to brace or couple the elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms

Abstract

본 발명은 거푸집 시스템 및 그를 이용한 골조 구축 방법에 관한 것으로, 적어도 하나 이상의 폭 고정형 판넬 및 폭 가변형 판넬 중 어느 하나 또는 그들의 조합에 의해 구성된 벽체부와 상기 벽체부의 상부에 마련된 작업 발판을 포함하는 벽체 거푸집 모듈; 양단에 나사가 가공되어 있고 벽체의 두께에 대응하는 길이를 갖는 간격재와, 간격재의 양단에 체결된 너트와, 일단은 상기 너트와 체결되고 타단은 나비 너트와 체결되는 탭봉 및 상기 간격재의 하부에 형성된 앵커 철근을 포함하는 상기 벽체 거푸집 모듈을 고정하기 위한 고정수단; 및 벽체 콘크리트에 고정되는 'ㄱ'자 형상의 슬래브 거푸집 설치용 브래킷과, 상기 브래킷 상에 설치되는 트러스와, 상기 트러스에 고정되는 지지대와, 상기 지지대에 고정되는 띠장 및 상기 지지대와 띠장에 의해 형성된 격자 상에 고정되는 판넬을 포함하는 슬래브 거푸집 모듈을 포함하는 것을 특징으로 하며, 거푸집 설치 작업이 용이하고, 하층에서 사용한 거푸집을 용이하게 상층으로 이동시킬 수 있으며, 슬래브 거푸집를 모듈화시켜 간편하게 설치할 수 있는 효과가 있다.The present invention relates to a formwork system and a frame construction method using the same, a wall formwork comprising a wall portion formed by any one or a combination of at least one or more width fixed panels and variable width panels and a work scaffold provided on top of the wall portion. module; The spacer is machined at both ends and has a length corresponding to the thickness of the wall, a nut fastened to both ends of the spacer, one end is fastened to the nut and the other end is fastened to the tab bar and the bottom of the spacer Fixing means for fixing the wall formwork module including the formed anchor bars; And a 'b' shaped slab formwork mounting bracket fixed to the wall concrete, a truss mounted on the bracket, a support fixed to the truss, a band fixed to the support and a lattice formed by the support and the band It characterized in that it comprises a slab formwork module including a panel fixed to the top, the formwork installation work is easy, the formwork used in the lower layer can be easily moved to the upper layer, and the effect that can be easily installed by modularizing the slab formwork have.

Description

거푸집 시스템 및 그를 이용한 골조 구축 방법{FORM SYSTEM AND FRAME CONSTRUCTION METHOD USING THE SAME}Formwork system and frame construction method using same {FORM SYSTEM AND FRAME CONSTRUCTION METHOD USING THE SAME}

본 발명은 거푸집 시스템에 관한 것으로, 보다 상세하게는 하층 벽체 시공에 사용되었던 벽체 거푸집을 용이하고 신속하게 상층으로 이동시키고, 슬래브 시공시 요구되는 슬래브 거푸집 지지를 위한 동바리가 필요 없으며, 작업자가 안전하고 효율적으로 작업할 수 있도록 작업 발판이 설치된 거푸집 시스템 및 그를 이용한 골조 구축 방법에 관한 것이다.The present invention relates to a formwork system, and more particularly, to move the wall formwork used in the lower wall construction to the upper floor easily and quickly, and does not require a group for supporting the slab formwork required for the slab construction, the operator is safe and The present invention relates to a formwork system having a working scaffold installed so as to work efficiently, and a method for constructing a frame using the same.

철근콘크리트조 주거용 건축물의 골조는 기둥-보로 이루어지거나, 벽체-슬래브로 이루어진다. 벽체-슬래브로 이루어지는 벽식 구조물 시공의 경우 소정의 크기를 갖는 다수의 거푸집 패널을 연결하여 벽체 및 슬래브 거푸집을 구성하여 설치하고, 슬래브 거푸집의 경우에는 일정한 간격으로 동바리를 받쳐 슬래브 거푸집을 지지한 후 벽체 및 슬래브 거푸집에 콘크리트를 타설하여 하층 벽체와 그 상층의 슬래브를 동시에 구축한다.Frames of reinforced concrete residential buildings are column-beamed or wall-slabd. In the case of wall-slab construction, the wall and slab formwork are installed by connecting a plurality of formwork panels having a predetermined size, and in the case of slab formwork, the slabs are supported by supporting the slab formwork at regular intervals. And concrete is poured into the slab formwork to build the lower wall and the slab of the upper layer at the same time.

즉, 종래의 벽식 구조물은 한쪽의 벽체 거푸집 및 슬래브 거푸집을 설치하고, 벽체 및 슬래브에 철근을 배근하고, 대향면의 벽체 거푸집을 설치한 다음, 벽체 및 슬래브에 콘크리트를 타설하고, 일정한 기간 동안 콘크리트를 양생하고, 벽체 거푸집 및 슬래브 거푸집을 해제한 후, 상층으로 옮기는 공정을 반복하여 시공된다. 이때 슬래브 거푸집의 하부에는 다수의 동바리 또는 비계틀이 일정한 간격으로 설치되어 슬래브 거푸집 및 타설된 콘크리트의 하중 및 작업 하중에 견딜 수 있도록 한다.That is, the conventional wall structure is installed on one wall formwork and slab formwork, reinforcing the reinforcing bar on the wall and slab, install the wall formwork on the opposite surface, then cast concrete on the wall and slab, and the concrete for a certain period of time Curing, release the wall formwork and slab formwork, and then repeat the process of moving to the upper layer is constructed. At this time, the bottom of the slab formwork is provided with a number of clubs or scaffolding at regular intervals to withstand the load and work load of the slab formwork and poured concrete.

그러나 이러한 벽식 구조물의 시공방법에 의하면, 하층의 벽체와 상층의 슬래브 콘크리트가 동시에 타설되는 시공방법이므로, 하층의 벽체 콘크리트의 타설에 사용되었던 거푸집을 재사용하기 위해 상층으로 이동시켜야 할 경우, 작업자가 임시로 설치된 계단을 통하여 거푸집을 옮겨야 하므로 작업이 까다롭고 그로 인해 공사기간이 길어지고 및 공사비용이 상승하는 문제점이 있다.However, according to the construction method of the wall structure, since the construction of the lower wall and the slab concrete of the upper floor is placed at the same time, when the worker was to move to the upper floor to reuse the formwork used for placing the lower wall concrete, the worker temporarily Since the formwork must be moved through the installed staircase, the work is difficult, and thus there is a problem in that the construction period is long and the construction cost is increased.

또한, 슬래브 콘크리트 타설을 위해서는 슬래브 거푸집을 지지하기 위한 다수의 동바리 또는 비계틀을 설치하여야 하고, 재사용을 위해 상층으로 이동시켜야 할 경우, 상기한 벽체 거푸집에서와 동일한 문제점이 발생한다.In addition, when slab concrete is to be laid a number of clubs or scaffolding to support the slab formwork, and when moving to the upper floor for reuse, the same problem occurs in the above-mentioned wall formwork.

또한, 벽체와 슬래브 콘크리트 타설할 때 작업자의 안전을 보장하고 작업을 용이하게 진행할 수 있도록 하는 적절한 수단이 결여되어 있는 실정이다.In addition, there is a lack of suitable means to ensure the safety of workers and to facilitate the operation when placing walls and slab concrete.

본 발명은 상기한 종래 벽식 구조물의 골조 공사의 문제점을 해결하고자 안출된 것으로, 본 발명의 목적은 하층에서 사용되었던 벽체 거푸집을 효과적으로 상층으로 이동시키고, 슬래브 거푸집을 지지하기 위한 동바리 또는 비계틀을 제거함과 동시에, 작업자가 안전하고 효율적으로 작업할 수 있는 거푸집 시스템을 제공하는데 있다.The present invention has been made to solve the problems of the frame structure of the conventional wall structure described above, the object of the present invention is to effectively move the wall formwork used in the lower layer to the upper layer, and to remove the copper bar or scaffold frame for supporting the slab formwork At the same time, to provide a formwork system that allows the operator to work safely and efficiently.

본 발명의 다른 목적은 슬래브 콘크리트 타설을 위한 거푸집, 동바리 등의 지지수단을 일체로 결합시킨 새로운 구조의 슬래브 거푸집 모듈을 제공하는데 있다.Another object of the present invention is to provide a slab formwork module of a new structure in which the support means, such as formwork, copper bar, etc. for slab concrete pouring.

상기한 본 발명의 목적은 적어도 하나 이상의 폭 고정형 판넬 및 폭 가변형 판넬 중 어느 하나 또는 그들의 조합에 의해 구성된 벽체부와, 상기 벽체부의 상부에 마련된 작업 발판으로 구성된 벽체 거푸집 모듈; 양단에 나사가 가공되어 있고 벽체의 두께에 대응하는 길이를 갖는 간격재와, 간격재의 양단에 체결된 너트와, 일단은 상기 너트와 체결되고 타단은 나비 너트와 체결되는 탭봉 및 상기 간격재의 하부에 형성된 앵커 철근으로 구성된 고정수단; 및 'ㄱ'자 형상의 슬래브 거푸집 설치용 브래킷과, 상기 브래킷 상에 설치되는 트러스와, 상기 트러스에 고정되는 지지대와, 상기 지지대에 고정되는 띠장 및 상기 지지대와 띠장에 의해 형성된 격자 상에 고정되는 판넬로 구성된 슬래브 거푸집 모듈을 포함하는 것을 특징으로 하는 거푸집 시스템에 의해 달성된다. An object of the present invention described above is a wall formwork module composed of a wall portion formed by any one or a combination of at least one or more width fixed panels and variable width panels, and a working scaffold provided on the wall portion; The spacer is machined at both ends and has a length corresponding to the thickness of the wall, a nut fastened to both ends of the spacer, one end is fastened to the nut and the other end is fastened to the tab bar and the bottom of the spacer Fixing means consisting of the formed anchor reinforcement; And a 'b' shaped slab formwork mounting bracket, a truss mounted on the bracket, a support fixed to the truss, a band fixed to the support, and a panel fixed on a lattice formed by the support and the strap. It is achieved by a formwork system, characterized in that it comprises a slab formwork module composed of.

상기 작업 발판은 벽체부 상부에 고정하고 그 상부에 놓여질 발판을 지지하기 위한 브래킷, 상기 브래킷 위에 놓여지는 발판, 상기 발판이 브래킷의 상부 외측을 축으로 회전 가능하도록 하는 경첩을 포함하여 구성되는 것이 바람직하다.The work footing is preferably configured to include a bracket for fixing the top of the wall portion and the foot to be placed thereon, a footrest placed on the bracket, the hinge to allow the footrest to rotate about the top of the bracket axially. Do.

상기 슬래브 거푸집 모듈의 슬래브 거푸집 설치용 브래킷은 수직재 및 수평재가 'ㄱ'자 형상으로 연결된 구성으로, 거푸집 모듈의 벽체부의 상부에 수직재를 통하여 고정되며, 상기 트러스를 지지하기 위한 회전지지대가 수평재의 일단에 회전 가능하게 설치되어 있고, 수평재의 중간부분에는 지지대을 지지하기 위한 지지구가 일체로 형성되어 있으며, 일단은 수평재의 단부에 타단은 수직재의 중앙부에 각각 힌지 결합된 실린더에 의해 수평재의 높이 조절이 가능하도록 되어 있는 것이 바람직하다.The slab formwork mounting bracket of the slab formwork module is a configuration in which the vertical member and the horizontal member are connected in a '-' shape, and are fixed to the upper part of the wall of the formwork module through the vertical member, and a rotation support for supporting the truss at one end of the horizontal member. It is rotatably installed, the middle part of the horizontal member is integrally formed with a support for supporting the support, one end of the horizontal member, the other end is adjustable by the cylinder hinged to the center of the vertical member, respectively. It is desirable to do so.

상기 슬래브 거푸집 모듈의 트러스는 상현재, 하현재 및 경사재로 구성되며, 상현재의 하면에는 지지대를 지지하기 위한 다수의 지지대 지지구가 마련되어 있고, 경사재는 철근이나 경량형강을 절곡하여 소정의 길이로 일체로 형성한 것이 바람직하다.The truss of the slab formwork module is composed of an upper chord, a lower chord, and an inclined member, and a lower end of the upper chord is provided with a plurality of support supports for supporting the support, and the inclined material is bent in reinforcement or lightweight steel to a predetermined length. It is preferable to form integrally with the furnace.

본 발명의 목적은 하층에 벽체 거푸집 모듈을 설치하는 공정; 벽체 콘크리트를 타설하고 타설된 콘크리트가 소요강도를 발휘할 수 있도록 충분히 양생하는 벽체 콘크리트 타설 및 양생공정; 내측 거푸집 탈형 및 인상공정; 슬래브 거푸집 모듈 설치공정; 상층 벽체 철근 배근 공정; 외측 거푸집 인상, 고정공정; 슬래브 철근 배근공정; 및 상층 벽체 및 하층 슬래브 콘크리트 타설공정으로 이루어지는 것을 특징으로 하는 건축물 골조 구축 방법에 의해 달성할 수 있다. An object of the present invention is to install a wall formwork module in the lower layer; Wall concrete placing and curing process to pour enough wall concrete and cure enough to show the required strength; Inner formwork demoulding and pulling process; Slab formwork module installation process; Upper wall reinforcement process; Outer formwork lifting, fixing process; Slab reinforcement process; And it can be achieved by the building frame construction method characterized in that the upper wall and the lower slab concrete pouring process.

이때 상기 내측 거푸집 모듈 탈형 및 인상공정은 비계파이프에 의해 서로 연결된 대향하는 내측 벽체 거푸집 모듈이 일체로 상부로 인상되고, 하증 벽체 콘크리트에 매설되어 있는 고정수단에 하단부가 고정되는 공정인 것을 특징으로 한다.At this time, the inner formwork module demoulding and pulling process is characterized in that the opposite inner wall formwork modules connected to each other by the scaffolding pipe is pulled upwards integrally, and the lower end is fixed to the fixing means embedded in the lower wall concrete. .

상기 슬래브 거푸집 모듈 설치공정은 벽체 콘크리트에 복수의 슬래브 거푸집 설치용 브래킷을 일정 간격으로 고정 설치하고, 슬래브 거푸집 설치용 브래킷의 수평재 단부에 회전 가능하게 설치된 회전지지대에 트러스를 올려 고정시킨 후, 트러스의 상현재 하부에 설치된 지지대 지지구 상에 지지대를 설치한 다음, 상기 지지대와 수직으로 띠장을 지지대 상면에 고정시키고, 상기 지지대와 띠장에 의해 형성된 격자 상에 통상의 거푸집 판넬을 고정 설치하는 공정인 것을 특징으로 한다.The slab formwork module installation process is fixed to install a plurality of slab formwork mounting brackets on the wall concrete at regular intervals, and after fixing the truss to the rotatable support rotatably installed on the end of the horizontal member of the slab formwork mounting bracket, the top of the truss After the support is installed on the support, the support is installed on the lower side, and is fixed to the support belt perpendicular to the support and the upper surface of the support, characterized in that the process of installing a conventional formwork panel fixed on the grid formed by the support and the support do.

본 발명의 상기 및 다른 목적, 특정한 장점 및 신규한 특징들은 첨부된 도면들과 연관되어지는 이하의 상세한 설명과 바람직한 실시예들로부터 더욱 분명해질 것이다.The above and other objects, specific advantages and novel features of the present invention will become more apparent from the following detailed description and preferred embodiments associated with the accompanying drawings.

본 발명에 따른 거푸집 시스템의 구성을 상세히 설명하기 전에, 본 발명에 따른 거푸집 시스템을 사용하여 벽체 및 슬래브 콘크리트를 타설하는 공정을 도 1a 내지 1d을 참조하여 간략히 설명하면 다음과 같다.Before describing the configuration of the formwork system according to the present invention in detail, a process of placing walls and slab concrete using the formwork system according to the present invention will be briefly described with reference to FIGS. 1A to 1D.

기초 공사가 완료된 후, 지하층 콘크리트를 타설하고, 1층 벽체 거푸집 설치를 위한 수평작업이 진행된다.After the foundation work is completed, the basement concrete is poured and horizontal work is carried out to install the first-floor wall formwork.

다음으로 도 1a에 도시된 바와 같이, 1층 벽체 철근을 배근하고, 벽체 거푸집 인상작업 및 슬래브 콘크리트 타설을 위한 작업대가 설치된 본 발명에 따른 벽체 거푸집을 설치하고, 1층 벽체 콘크리트를 타설한 후 콘크리트가 설계기준강도에 도달할 때까지 충분히 양생한다.Next, as shown in Figure 1a, reinforce the one-story wall reinforcement, install the wall formwork according to the present invention is installed work platform for wall formwork and slab concrete pouring, concrete after pouring the one-story wall concrete Allow enough curing until the design reference strength is reached.

다음으로 도 1b에 도시된 바와 같이 1층 벽체 거푸집 중 서로 마주보는 내측 거푸집을 탈형, 인상하여 벽체 거푸집 설치용 브래킷에 고정한다. 이때 서로 마주보는 내측거푸집은 작업자의 이동 및 작업을 위해 마련된 비계파이프와 같은 복수의 연결수단에 의해 그 상부가 서로 연결된 상태로 인상되게 된다.Next, as shown in FIG. 1B, the inner formwork facing each other in the one-layer wall formwork is demoulded and pulled up and fixed to the wall formwork mounting bracket. At this time, the inner formwork facing each other is raised by the upper portion connected to each other by a plurality of connecting means, such as a scaffolding pipe provided for the movement and operation of the worker.

다음으로 도 1c에 도시된 바와 같이 본 발명에 따른 슬래브 거푸집 모듈을 설치한다.Next, as shown in Figure 1c is installed a slab formwork module according to the present invention.

마지막으로 도 1d에 도시된 바와 같이 2층 벽체 철근을 배근하고, 외측 거푸집을 인상하여 거푸집 설치용 브래킷에 고정하고, 상기 내측 거푸집과 서로 고정한다음 슬래브 철근을 배근하고, 2층 벽체 및 1층 슬래브 콘크리트를 동시에 타설한다.Finally, as shown in FIG. 1d, the two-story wall reinforcement is reinforced, the outer formwork is raised and fixed to the formwork mounting bracket, and the inner formwork is fixed to each other, and then the slab reinforcement is reinforced, the two-story wall and the one-story slab concrete Pour at the same time.

그 후 상기 1b 내지 1d 공정을 반복함으로써 요구되는 층수의 건축물 골조를 구축하게 된다. After that, by repeating the steps 1b to 1d, the building frame having the required number of floors is constructed.

이하, 본 발명의 일실시예에 따른 거푸집 시스템의 구체적인 구성을 첨부한 도면을 참조하여 상세히 설명한다. Hereinafter, with reference to the accompanying drawings a detailed configuration of the formwork system according to an embodiment of the present invention will be described in detail.

본 발명에 따른 거푸집 시스템은 크게 다수의 거푸집 판넬로 구성되며 상부에는 작업발판이 마련된 벽체 거푸집 모듈(100), 상기 벽체 거푸집 모듈을 수직으로 고정 설치하기 위한 고정수단(200) 및 슬래브 거푸집 모듈(300)로 구성된다.Formwork system according to the present invention is largely composed of a plurality of formwork panels and the upper wall formwork module 100 is provided with a working scaffold, the fixing means 200 and the slab formwork module 300 for vertically fixing the wall formwork module 300 It is composed of

본 발명에 따른 벽체 거푸집 모듈(100)은 적어도 하나 이상의 폭 고정형 판넬(110) 및 폭 가변형 판넬(120) 중 어느 하나 또는 그들의 적절한 조합에 의해 벽체부가 구성되며, 벽체부의 상부에는 작업 발판(400)이 마련되어 있다. The wall formwork module 100 according to the present invention comprises a wall portion formed by any one or at least one of the at least one width fixed panel 110 and the variable width panel 120 or a suitable combination thereof. This is provided.

도 2a에 도시된 바와 같이 상기 폭 고정형 판넬(110)은 직사각형 형상으로 테두리 역할을 하는 프레임(112), 프레임(112)의 높이 방향으로 설치되며 상하 일정 간격으로 이격된 복수의 버팀대(114) 및 프레임(112)의 일측면에 고정된 평판(116)으로 구성된다. 상기 프레임(112)의 수직(111), 수평부재(113)에는 판넬(110)을 상하좌우로 연결시키기 위한 다수의 볼트 체결공(115)이 일정한 간격으로 형성되어 있다. 그리고 상기 복수의 폭 고정형 판넬(110)이 상하좌우로 연결된 경우 최상부 판넬(110)의 평판(116) 상부에는 장공(117)이, 최하부 판넬(110)의 하부에는 통공(118)이 각각 마련되어 있어 후술할 고정수단(200)과 볼트 체결되도록 한다. 상부에 형성된 장공(117)은 후술할 고정수단(200)(구체적으로는 간격재)이 수평을 유지하며 설치될 수 있도록 상하로 길게 형성시킨 것이다.As shown in FIG. 2A, the width fixing panel 110 is installed in the height of the frame 112, the frame 112 serving as an edge in a rectangular shape, and spaced apart at regular intervals up and down by a plurality of props 114. It is composed of a flat plate 116 fixed to one side of the frame (112). A plurality of bolt fastening holes 115 for connecting the panel 110 up, down, left and right are formed at regular intervals on the vertical 111 and the horizontal member 113 of the frame 112. And when the plurality of width fixed panel 110 is connected to the top, bottom, left and right, the long hole 117 is provided on the upper plate 116 of the top panel 110, the through hole 118 is provided below the bottom panel 110, respectively. To be fastened to the fixing means 200 and bolt to be described later. The long hole 117 formed in the upper portion is formed long up and down so that the fixing means 200 (specifically, the spacer) to be described later can be installed while maintaining the horizontal.

도 2b에 도시된 바와 같이 상기 폭 가변형 판넬(120)은 상기 폭 고정형 판넬(110)이 좌우 한 쌍으로 분할된 형태로서 상기 폭 고정형 판넬(110)과의 차이점은 좌우 프레임의 버팀대(124)(124')가 상호 면접하여 좌우 이동됨으로서 폭 가변이 이루어지는 것이며, 소정의 폭으로 가변한 후 한 쌍의 고정구(130)로 고정한 상태에서 그 배면에 고정된 폭의 면적에 맞는 평판(126)을 고정하여 구성된 것이다.As shown in FIG. 2B, the width-variable panel 120 is divided into a pair of left and right width fixed panels 110. The difference from the width-fixed panel 110 is the prop 124 of the left and right frames. 124 ') is variable in width by being interviewed with each other to move left and right, and the flat plate 126 is fixed to the area of the fixed width on the back in a state in which it is variable with a predetermined width and fixed with a pair of fasteners 130. It is composed.

이때 상기에서 언급한 장공(117) 및 통공(118)은 도 2c에 도시된 바와 같이 평판이 아니고, 프레임(112)의 양측 수직부재(111)에 리브(119)를 마련하여 형성시킬 수도 있다.At this time, the above-mentioned long hole 117 and the through hole 118 is not a flat plate, as shown in Figure 2c, it may be formed by providing the ribs 119 on both vertical members 111 of the frame 112.

벽체 거푸집 모듈(100)의 벽체부는 시공하고자 하는 벽체의 폭 및 높이에 대응하여 상기한 폭 고정형(110) 및 가변형 판넬(120)을 적절히 조합하고, 인접하는 판넬의 수직(111),수평부재(113)를 볼트와 너트 등의 체결부재로 연결하여 결합하면 된다.The wall part of the wall formwork module 100 is a combination of the above-mentioned width fixed type 110 and the variable panel 120 as appropriate, corresponding to the width and height of the wall to be constructed, and vertical (111), horizontal member ( 113) may be connected by fastening members such as bolts and nuts.

한편, 다수의 판넬로 구성된 벽체 거푸집 모듈의 벽체부 상부에는 작업자의 이동로 역할을 수행하는 작업발판(400)이 마련되어 있다.On the other hand, the upper part of the wall of the wall formwork module composed of a plurality of panels is provided with a working scaffold 400 to serve as a moving path of the worker.

상기 작업 발판(400)은 벽체부 상부에 고정하고 그 상부에 놓여질 발판을 지지하기 위한 브래킷(420), 상기 브래킷(420) 위에 놓여지는 발판(440), 상기 발판(440)이 브래킷(420)의 상부 외측을 축으로 회전 가능하도록 하는 경첩(460)을 포함하여 구성된다.The working scaffold 400 is fixed to the upper wall portion and the bracket 420 for supporting the scaffold to be placed thereon, the scaffold 440 to be placed on the bracket 420, the scaffold 440 is a bracket 420 It comprises a hinge 460 to be rotatable about the upper outer side of the.

도 3a는 브래킷(420)을 도시한 것으로, 상기 브래킷(420)은 수직재(422), 수평재(424) 및 경사재(426)를 서로 결합하여 구성되며, 벽체부 상부에 고정된다. 그리고 도 3b에 도시된 바와 같이 브래킷(420)의 상면에는 작업자의 수평 이동로 역할을 하는 발판(440)이 놓여지고, 브래킷(420)과 발판(440)은 경첩(460)에 의해 일측에서 서로 힌지 결합된다. 따라서 도 3c에 도시된 바와 같이 발판을 회전시켜 인접하는 브래킷(420) 사이의 공간부(480)를 개방하므로써 공간부(480)는 작업자의 수직 이동로 역할을 하게 된다. FIG. 3A illustrates a bracket 420, and the bracket 420 is configured by combining the vertical member 422, the horizontal member 424, and the inclined member 426 with each other, and is fixed to the upper portion of the wall part. And as shown in Figure 3b, the upper surface of the bracket 420, the footrest 440 which serves as a horizontal movement of the operator is placed, the bracket 420 and the footrest 440 is mutually at one side by the hinge 460 The hinges are combined. Therefore, as shown in Figure 3c by rotating the scaffold to open the space 480 between the adjacent bracket 420, the space 480 serves as a vertical movement of the operator.

한편, 상기한 발판(440)으로는 통상의 합판, 타공판, 철망, 익스펜디드 메탈 등 어느 것이나 가능하다. On the other hand, the scaffold 440 can be any of ordinary plywood, perforated plate, wire mesh, expanded metal, and the like.

도 4는 고정수단(200)을 도시한 것이다.4 shows the fixing means 200.

고정수단(200)은 양단에 나사가 가공되어 있고 벽체의 두께에 대응하는 길이를 갖는 간격재(220)와, 간격재(220)의 양단에 체결된 너트(230)와, 일단은 상기 너트(230)와 체결되고 타단은 나비 너트(250)와 체결되는 탭봉(240) 및 상기 간격재(220)의 하부에 형성된 앵커 철근(260)으로 구성된다.Fixing means 200 is a screw threaded at both ends and has a length corresponding to the thickness of the wall 220, a nut 230 fastened to both ends of the spacer 220, one end is the nut ( 230 and the other end is composed of a tab rod 240 and the anchor reinforcing bar 260 formed in the lower portion of the spacer 220 is fastened to the butterfly nut 250.

상기 간격재(220)의 양측으로는 벽체 거푸집이 설치되며, 간격재(220)의 길이는 벽체의 두께에 의해 결정된다.Wall formwork is installed on both sides of the spacer 220, the length of the spacer 220 is determined by the thickness of the wall.

상기 앵커 철근(260)은 고정수단(200)이 벽체 콘크리트 내부에 충분히 정착할 수 있도록 하는 것으로, 간격재(220)의 하부에 용접되어 연결되며, 'U'자형으로 절곡된 형상을 갖는다. 한편, 앵커 철근(260)의 강도를 증진시키기 위하여 보강재(270)를 추가로 설치하는 것이 바람직하다. The anchor reinforcing bar 260 is to allow the fixing means 200 to be sufficiently fixed in the wall concrete, welded to the lower portion of the spacer 220, has a shape bent in a 'U' shape. On the other hand, it is preferable to further install a reinforcing material 270 to enhance the strength of the anchor reinforcing bar 260.

도 5는 벽체 거푸집 모듈(100)이 설치된 모습을 도시한 것이다. 도 5를 참조하면, 판넬(110)(120)을 상하좌우로 연결하여 구성된 소정의 높이와 폭을 갖는 벽체부(150)의 상부에 작업발판(400)이 설치된 벽체 거푸집 모듈(100)이 시공될 벽체의 두께만큼 이격되어 설치되어 있다. 그리고 벽체 거푸집 모듈(100)의 하단부는 하층 벽체 콘크리트 타설시 매입된 고정수단(200)과 통공을 통해 결합되고, 상단부는 장공을 통해 고정수단의 수평도를 조절하면서 고정시킨다.5 shows the wall formwork module 100 is installed. Referring to FIG. 5, the wall formwork module 100 in which the work scaffold 400 is installed on the upper part of the wall part 150 having a predetermined height and width configured by connecting the panels 110 and 120 to the top, bottom, left and right is constructed. The walls are spaced apart by the thickness of the wall. And the lower end of the wall formwork module 100 is coupled through the through-hole and the fixing means 200 is embedded in the lower wall concrete pouring, the upper end is fixed while adjusting the level of the fixing means through the long hole.

한편, 도 5에 도시된 바와 서로 마주보는 내측 거푸집의 상단부를 다수의 비계파이프(500)를 통해 연결하고, 상기 비계파이프 상에 발판(520)을 놓아 작업자의 작업공간 및 이동로로 활용할 수 있다. 발판(520)으로는 상기 작업발판(400)에 사용되는 발판(440)과 동일하게 통상의 합판, 타공판, 철망, 익스펜디드 메탈 등 어느 것이나 가능하다.Meanwhile, as shown in FIG. 5, the upper ends of the inner formwork facing each other may be connected through a plurality of scaffolding pipes 500, and the scaffolding pipe 520 may be placed on the scaffolding pipe to be used as a work space and a moving path of an operator. . As the scaffold 520, any one of a conventional plywood, a perforated plate, a wire mesh, and an expanded metal may be used, similar to the scaffold 440 used in the work scaffold 400.

도 6는 하증 벽체 콘크리트를 타설하고 내측 벽체거푸집을 인상한 후 슬래브 거푸집 모듈(300)을 설치한 모습을 보인 도면이다. 도시된 바와 같이 슬래브 거푸집 모듈(300)은 슬래브 거푸집 설치용 브래킷(320), 트러스(340), 지지대(360), 띠장(380) 및 판넬(미도시)로 구성된다. 6 is a view showing the slab formwork module 300 is installed after placing the lower concrete wall and raise the inner wall formwork. As shown, the slab formwork module 300 is composed of a slab formwork mounting bracket 320, truss 340, the support 360, the belt 380 and a panel (not shown).

도 6a는 슬래브 거푸집 설치용 브래킷(320)을 도시한 것으로, 상기 슬래브 거푸집 설치용 브래킷(320)은 수직재(322) 및 수평재(324)가 'ㄱ'자 형상으로 연결된 구성으로, 벽체 콘크리트의 상부에 수직재(322)를 통하여 고정되며, 상기 트러스(340)를 지지하기 위한 회전지지대(326)가 수평재(324)의 일단에 회전 가능하게 설치되어 있고, 수평재(324)의 중간부분에는 지지대(360)을 지지하기 위한 지지구(328)가 일체로 형성되어 있으며, 일단은 수평재(324)의 단부에 타단은 수직재(322)의 중앙부에 각각 힌지 결합된 실린더(327)에 의해 수평재(324)의 높이 조절이 가능하도록 되어 있다.Figure 6a shows the slab formwork mounting bracket 320, the slab formwork mounting bracket 320 is a vertical member 322 and the horizontal member 324 is configured in a 'b' shape, the vertical member on the top of the wall concrete Fixed through 322, a rotation support 326 for supporting the truss 340 is rotatably installed at one end of the horizontal member 324, and a support 360 is provided at the middle of the horizontal member 324. Support 328 for supporting is integrally formed, one end is adjusted to the height of the horizontal member 324 by a cylinder 327 hinged to the end of the horizontal member 322, the other end is hinged to the center of the vertical member 322, respectively. This is made possible.

도 6b는 트러스(340)를 도시한 것으로, 상기 트러스(340)는 상현재(342), 하현재(344) 및 경사재(346)로 구성되며, 상현재(342)의 하면에는 지지대(360)를 지지하기 위한 다수의 지지대 지지구(348)가 마련되어 있고, 경사재(346)는 철근이나 경량형강을 절곡하여 소정의 길이로 일체로 형성하는 것이 바람직하다. FIG. 6B illustrates the truss 340. The truss 340 includes an upper chord 342, a lower chord 344, and an inclined member 346, and a support 360 on the bottom surface of the upper chord 342. It is preferable that a plurality of support supports 348 for supporting) are provided, and the inclined material 346 is formed integrally with a predetermined length by bending rebar or lightweight steel.

상기 트러스(340)의 하면에는 트러스(340)의 길이방향과 수직으로 일정한 간격으로 이격된 다수의 지지대(360)가 지지대 지지구(348)에 걸쳐지며, 지지대(360) 상면에는 지지대(360)의 길이방향과 수직으로 일정한 간격으로 이격된 다수의 띠장(380)이 설치되어 있다.On the lower surface of the truss 340, a plurality of supports 360 spaced apart at regular intervals perpendicular to the longitudinal direction of the truss 340 is across the support support 348, the support 360 on the upper surface of the support 360 A plurality of strips 380 are provided spaced at regular intervals perpendicular to the longitudinal direction of the.

그리고 상기 지지대(360)와 띠장(380)에 의해 형성된 격자 위에는 통상적으로 슬래브 거푸집으로 사용되는 소정의 폭과 길이를 갖는 다수의 판넬(미도시)이 설치되어 슬래브 콘크리트 타설을 위한 거푸집의 역할을 하게 된다.In addition, a plurality of panels (not shown) having a predetermined width and length, which are typically used as slab formwork, are installed on the grid formed by the support 360 and the strip 380 to serve as formwork for slab concrete pouring. do.

이상과 같이 구성된 본 발명에 따른 거푸집 시스템을 이용하여 벽체-슬래브 구조의 건축물 골조를 구축하는 과정을 설명하기로 한다.Using the formwork system according to the present invention configured as described above will be described the process of building the building frame of the wall-slab structure.

전체적인 시공 공정의 개요는 도 1a 내지 1d에 도시된 바와 같으며, 각 공정을 보다 세분화하여 도 7에 도시하였다. An overview of the overall construction process is as shown in Figures 1a to 1d, each process is shown in Figure 7 in more detail.

즉, 공정은 하층에 벽체 거푸집 모듈을 설치하는 공정(P100), 벽체 콘크리트를 타설 및 양생공정(P200), 내측 거푸집을 탈형 및 인상공정(P300), 슬래브 거푸집 모듈 설치공정(P400), 상층 벽체 철근 배근 공정(P500), 외측 벽체 거푸집 모듈 인상, 고정공정(P600), 슬래브 철근 배근공정(P700), 상층 벽체 및 하층 슬래브 콘크리트 타설공정(P800)으로 이루어진다. 그 이후 상기 P300 내지 P800공정을 반복함으로써 요구되는 층수의 건축물 골조를 구축하게 된다. That is, the process is the process of installing the wall formwork module in the lower layer (P100), the process of placing and curing the wall concrete (P200), demolding and raising the inner formwork (P300), the slab formwork module installation process (P400), upper wall Rebar reinforcement step (P500), outer wall formwork module lifting, fixing step (P600), slab reinforcement step (P700), the upper wall and the lower slab concrete casting step (P800). After that, by repeating the process P300 to P800 to build a building frame of the required number of floors.

이하 각 공정을 보다 구체적으로 설명한다.Each process is explained in more detail below.

벽체 거푸집 모듈을 설치하는 공정은 도 5를 참조하면, 상부에 작업발판(400)이 설치된 벽체 거푸집 모듈(100)이 시공될 벽체의 두께만큼 이격되어 설치된다. 그리고 벽체 거푸집 모듈(100)의 하부는 하층 벽체 콘크리트 타설시 매입된 고정수단(200)과 평판에 형성된 통공(118) 또는 리브(119)을 통해 결합되고, 상부에는 거푸집 모듈이 상부로 이동될 때 고정되기 위한 고정수단(200)이 설치된다.Referring to Figure 5, the process of installing the wall formwork module, the wall formwork module 100 in which the working scaffold 400 is installed on the top is spaced apart by the thickness of the wall to be constructed. And the lower part of the wall formwork module 100 is coupled through the through hole 118 or ribs 119 formed in the plate and the fixing means 200 embedded in the lower wall concrete pouring, when the formwork module is moved to the upper part Fixing means 200 to be fixed is installed.

다음으로 상기와 같이 벽체 거푸집 모듈(100)이 설치되면, 벽체 콘크리트를 타설하고 타설된 콘크리트가 소요강도를 발휘할 수 있도록 충분히 양생한다.Next, when the wall formwork module 100 is installed as described above, the wall concrete is poured and cured enough to exhibit the required strength.

다음으로 비계파이프(500)에 의해 서로 연결된 대향하는 내측 벽체 거푸집 모듈이 일체로 상부로 인상되고, 하증 벽체 콘크리트에 매설되어 있는 고정수단(200)에 하단부가 고정된다.Next, the opposite inner wall formwork modules connected to each other by the scaffold pipe 500 are pulled up integrally, and the lower end is fixed to the fixing means 200 embedded in the lower wall concrete.

다음으로 도 8a 내지 8d에 도시된 바와 같이 슬래브 거푸집 모듈을 설치한다. 슬래브 거푸집 모듈의 설치공정을 첨부된 도면을 참조하여 보다 상세히 설명한다.Next, the slab formwork module is installed as shown in FIGS. 8A to 8D. The installation process of the slab formwork module will be described in more detail with reference to the accompanying drawings.

먼저, 도 8a에 도시된 바와 같이 벽체 콘크리트에 복수의 슬래브 거푸집 설치용 브래킷(320)을 일정 간격으로 고정 설치한다.First, as shown in FIG. 8a, a plurality of slab formwork mounting brackets 320 are fixedly installed at predetermined intervals on wall concrete.

다음으로, 도 8b에 도시된 바와 같이 슬래브 거푸집 설치용 브래킷(320)의 수평재(324) 단부에 회전 가능하게 설치된 회전 지지대(326)에 트러스(340)를 올려 고정시킨다.Next, as shown in FIG. 8B, the truss 340 is fixed to the rotating support 326 rotatably installed at the end of the horizontal member 324 of the slab formwork mounting bracket 320.

다음으로, 도 8c에 도시된 바와 같이 트러스(340)의 상현재 하부에 설치된 지지대 지지구(348) 상에 지지대(360)를 설치한다.Next, as shown in FIG. 8C, the support 360 is installed on the support support 348 installed at the lower portion of the upper chord of the truss 340.

다음으로, 도 8d에 도시된 바와 같이 상기 지지대(360)와 수직으로 띠장(380)을 지지대 상면에 고정시킨다.Next, as illustrated in FIG. 8D, the belt 380 is fixed to the upper surface of the support perpendicular to the support 360.

마지막으로, 상기 지지대(360)와 띠장(380)에 의해 형성된 격자 상에 통상의 거푸집 판넬(미도시)을 고정 설치하면 된다. Finally, a conventional formwork panel (not shown) may be fixedly installed on the grid formed by the support 360 and the strip 380.

내측 거푸집 모듈 및 슬래브 거푸집 모듈의 설치가 완료되면, 상층 벽체 철근을 배근하고, 외측 거푸집 모듈을 인상하여 고정한 후, 벽체와 슬래브 콘크리트를 일체로 타설한다.When the installation of the inner formwork module and the slab formwork module is completed, the upper wall reinforcement is reinforced, the outer formwork module is raised and fixed, and then the wall and the slab concrete are integrally placed.

상기한 바와 같이 본 발명에 따르면, 벽체와 슬래브 위한 거푸집 설치 작업이 용이하고, 하층에서 사용한 거푸집을 용이하게 상층으로 이동시킬 수 있으며, 슬래브 거푸집를 모듈화시켜 간편하게 설치할 수 있는 효과가 있다.According to the present invention as described above, the formwork for the wall and slab is easy to install work, the formwork used in the lower layer can be easily moved to the upper layer, there is an effect that can be easily installed by modularizing the slab formwork.

비록 본 발명이 상기에서 언급한 바람직한 실시예와 관련하여 설명되어졌지만, 발명의 요지와 범위로부터 벗어남이 없이 다양한 수정이나 변형을 하는 것이 가능하다. 따라서 첨부된 특허청구범위는 본 발명의 요지에 속하는 어떠한 수정이나 변형도 포함할 것이다.Although the present invention has been described with reference to the above-mentioned preferred embodiments, it is possible to make various modifications or variations without departing from the spirit and scope of the invention. Accordingly, the appended claims will include any modifications or variations that fall within the spirit of the invention.

도 1a 내지 1d는 본 발명에 따른 골조 구축 방법의 각 공정을 간략히 보여주는 개략도.1a to 1d are schematic diagrams showing briefly each step of the frame construction method according to the present invention.

도 2a 내지 2c는 본 발명에 따른 벽체 거푸집 모듈을 구성하는 판넬의 다양한 실시예를 보인 사시도.Figure 2a to 2c is a perspective view showing various embodiments of the panel constituting the wall formwork module according to the present invention.

도 3a는 본 발명에 따른 벽체 거푸집 모듈을 구성하는 작업발판의 브래킷을 보인 사시도.Figure 3a is a perspective view showing the bracket of the working scaffold constituting the wall formwork module according to the present invention.

도 3b 및 3c는 본 발명에 따른 벽체 거푸집 모듈을 구성하는 작업발판을 보인 사시도.3b and 3c are perspective views showing the working scaffold constituting the wall formwork module according to the present invention.

도 4는 본 발명에 따른 고정수단을 도시한 분해사시도.4 is an exploded perspective view showing a fixing means according to the present invention.

도 5는 본 발명에 따른 벽체 거푸집 모듈이 설치된 모습을 도시한 단면도. 5 is a cross-sectional view showing a state in which the wall formwork module according to the present invention is installed.

도 6는 하증 벽체 콘크리트를 타설하고 내측 벽체거푸집을 인상한 후 슬래브 거푸집 모듈을 설치한 모습을 보인 사시도.Figure 6 is a perspective view showing the slab formwork module is installed after placing the lower concrete wall and raise the inner wall formwork.

도 6a는 본 발명에 따른 슬래브 거푸집 모듈의 슬래브 거푸집 설치용 브래킷을 도시한 사시도.Figure 6a is a perspective view showing a slab formwork mounting bracket of the slab formwork module according to the present invention.

도 6b는 본 발명에 따른 슬래브 거푸집 모듈의 트러스를 도시한 사시도.Figure 6b is a perspective view of the truss of the slab formwork module according to the present invention.

도 7는 본 발명에 따른 골조 구축 방법의 각 공정을 보인 흐름도.7 is a flow chart showing each step of the skeleton building method according to the present invention.

도 8a 내지 8d는 슬래브 거푸집 모듈의 설치공정을 보인 개략도.8a to 8d are schematic views showing the installation process of the slab formwork module.

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

100 : 벽체 거푸집 모듈 110 : 폭 고정형 판넬100: wall formwork module 110: width fixed panel

117 : 장공 118 : 통공117: long hole 118: through hole

120 : 폭 가변형 판넬 130 : 고정구120: variable width panel 130: fixture

200 : 고정수단 300 : 슬래브 거푸집 모듈200: fixing means 300: slab formwork module

320 : 슬래브 거푸집 설치용 브래킷 340 : 트러스320: slab formwork mounting bracket 340: truss

400 : 작업발판 420 : 작업발판 설치용 브래킷400: working footrest 420: working footrest mounting bracket

440 : 발판 500 : 비계파이프440: scaffold 500: scaffolding pipe

Claims (7)

복수의 판넬을 연결하여 구성된 벽체부와, 상기 벽체부의 상부에 마련된 작업 발판을 포함하는 벽체 거푸집 모듈;A wall formwork module including a wall portion formed by connecting a plurality of panels and a work scaffold provided on the wall portion; 양단에 나사가 가공되어 있고 벽체의 두께에 대응하는 길이를 갖는 간격재와, 상기 간격재의 양단에 체결된 너트와, 일단은 상기 너트와 체결되고 타단은 나비 너트와 체결되는 탭봉 및 상기 간격재의 하부에 형성된 앵커 철근을 포함하는 상기 벽체 거푸집 모듈을 고정하기 위한 고정수단; 및A spacer having a screw threaded at both ends and having a length corresponding to the thickness of the wall; a nut fastened to both ends of the spacer; a tab rod having one end fastened to the nut and the other end fastened to a butterfly nut; and a lower part of the spacer. Fastening means for fixing the wall formwork module including an anchor reinforcement formed in the wall; And 경화된 하층 벽체 콘크리트에 설치되는 'ㄱ'자 형상의 슬래브 거푸집 설치용 브래킷과, 상기 브래킷 상에 설치되는 트러스와, 상기 트러스에 고정되는 지지대와, 상기 지지대에 고정되는 띠장 및 상기 지지대와 띠장에 의해 형성된 격자 상에 고정되는 판넬을 포함하는 슬래브 거푸집 모듈을 포함하며,'B' shaped slab formwork mounting brackets installed on the hardened lower wall concrete, trusses mounted on the brackets, supports fixed to the trusses, bands fixed to the supports, and by means of the supports and bands A slab formwork module comprising a panel secured to the formed grid; 상층 벽체 콘크리트와 하층 슬래브 콘크리트를 동시에 타설할 수 있는 거푸집 시스템. Formwork system for pouring both upper and lower slab concrete simultaneously. 제 1 항에 있어서,The method of claim 1, 상기 작업 발판은 벽체부 상부에 고정하고 그 상부에 놓여질 발판을 지지하기 위한 브래킷, 상기 브래킷 위에 놓여지는 발판, 상기 발판이 브래킷의 상부 외측을 축으로 회전 가능하도록 하는 경첩을 포함하는 거푸집 시스템.The work scaffolding system comprises a bracket for fixing the top of the wall portion and for supporting the scaffold to be placed thereon, a scaffold placed on the bracket, and a hinge for allowing the scaffold to pivot about the top outside of the bracket. 제 1 항에 있어서,The method of claim 1, 상기 슬래브 거푸집 모듈의 슬래브 거푸집 설치용 브래킷은 수직재 및 수평재가 'ㄱ'자 형상으로 연결된 구성으로, 거푸집 모듈의 벽체부의 상부에 수직재를 통하여 고정되며, 상기 트러스를 지지하기 위한 회전 지지대가 수평재의 일단에 회전 가능하게 설치되어 있고, 수평재의 중간부분에는 지지대을 지지하기 위한 지지구가 일체로 형성되어 있으며, 일단은 수평재의 단부에 타단은 수직재의 중앙부에 각각 힌지 결합된 실린더에 의해 수평재의 높이 조절이 가능하도록 되어 있는 것을 특징으로 하는 거푸집 시스템.The slab formwork mounting bracket of the slab formwork module is a configuration in which the vertical member and the horizontal member are connected in a '-' shape, and are fixed to the upper part of the wall of the formwork module through the vertical member, and a rotation support for supporting the truss at one end of the horizontal member. It is rotatably installed, the middle part of the horizontal member is integrally formed with a support for supporting the support, one end of the horizontal member, the other end is adjustable by the cylinder hinged to the center of the vertical member, respectively. A formwork system, characterized in that 제 1 항에 있어서,The method of claim 1, 상기 슬래브 거푸집 모듈의 트러스는 상현재, 하현재 및 경사재로 구성되며, 상현재의 하면에는 지지대를 지지하기 위한 다수의 지지대 지지구가 마련되어 있고, 경사재는 철근이나 경량형강을 절곡하여 소정의 길이로 일체로 형성한 것을 특징으로 하는 거푸집 시스템.The truss of the slab formwork module is composed of an upper chord, a lower chord, and an inclined member, and a lower end of the upper chord is provided with a plurality of support supports for supporting the support, and the inclined material is bent in reinforcement or lightweight steel to a predetermined length. Formwork system, characterized in that formed integrally with. 하층에 벽체 거푸집 모듈을 설치하는 공정(P100); 벽체 콘크리트를 타설하고 타설된 콘크리트가 소요강도를 발휘할 수 있도록 충분히 양생하는 벽체 콘크리트 타설 및 양생공정(P200); 내측 거푸집 탈형 및 인상공정(P300); 슬래브 거푸집 모듈 설치공정(P400); 상층 벽체 철근 배근 공정(P500); 외측 거푸집 인상, 고정공정(P600); 슬래브 철근 배근공정(P700); 및 상층 벽체 및 하층 슬래브 콘크리트 타설공정(P800)으로 이루어지는 것을 특징으로 하는 건축물 골조 구축 방법.Installing a wall formwork module in the lower layer (P100); A wall concrete pouring and curing process for pouring wall concrete and curing the cast concrete so as to exhibit the required strength (P200); Inner formwork demoulding and pulling process (P300); Slab formwork module installation process (P400); Upper wall reinforcement process (P500); Outside formwork lifting, fixing process (P600); Slab reinforcement step (P700); And Building frame construction method comprising the upper wall and lower slab concrete pouring process (P800). 제 5 항에 있어서,The method of claim 5, wherein 상기 내측 거푸집 모듈 탈형 및 인상공정(P300)은 비계파이프에 의해 서로 연결된 대향하는 내측 벽체 거푸집 모듈이 일체로 상부로 인상되고, 하증 벽체 콘크리트에 매설되어 있는 고정수단에 하단부가 고정되는 공정인 것을 특징으로 하는 건축물 골조 구축 방법.The inner formwork module demoulding and pulling process (P300) is a process in which the opposite inner wall formwork modules connected to each other by scaffolding pipes are pulled upwards integrally, and the lower end is fixed to fixing means embedded in lower wall concrete. Building frame construction method to use. 제 5 항에 있어서,The method of claim 5, wherein 상기 슬래브 거푸집 모듈 설치공정(P400)은 벽체 콘크리트에 복수의 슬래브 거푸집 설치용 브래킷을 일정 간격으로 고정 설치하고, 슬래브 거푸집 설치용 브래킷의 수평재 단부에 회전 가능하게 설치된 회전지지대에 트러스를 올려 고정시킨 후, 트러스의 상현재 하부에 설치된 지지대 지지구 상에 지지대를 설치한 다음, 상기 지지대와 수직으로 띠장을 지지대 상면에 고정시키고, 상기 지지대와 띠장에 의해 형성된 격자 상에 통상의 거푸집 판넬을 고정 설치하는 공정인 것을 특징으로 하는 건축물 골조 구축 방법.The slab formwork module installation process (P400) is fixed to install a plurality of slab formwork mounting brackets on the wall concrete at regular intervals, and fixed by lifting the truss to the rotating support installed rotatably on the horizontal member end of the slab formwork mounting bracket, the truss The process of installing the support on the support is installed on the upper side of the top of the support, and then fixing the belt to the upper surface of the support perpendicular to the support, and fixing the usual form panel on the grid formed by the support and the belt Building frame construction method, characterized in that.
KR10-2002-0075116A 2002-11-29 2002-11-29 Form system and frame construction method using the same KR100473612B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0075116A KR100473612B1 (en) 2002-11-29 2002-11-29 Form system and frame construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0075116A KR100473612B1 (en) 2002-11-29 2002-11-29 Form system and frame construction method using the same

Publications (2)

Publication Number Publication Date
KR20040047048A KR20040047048A (en) 2004-06-05
KR100473612B1 true KR100473612B1 (en) 2005-03-17

Family

ID=37342503

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0075116A KR100473612B1 (en) 2002-11-29 2002-11-29 Form system and frame construction method using the same

Country Status (1)

Country Link
KR (1) KR100473612B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5956206U (en) * 1982-10-05 1984-04-12 日鐵建材工業株式会社 Support device for bridge deck overhang formwork
JPH0754341A (en) * 1993-08-12 1995-02-28 Marufuji Shiitopairu Kk Land slide protective corner unit
KR970058603U (en) * 1996-04-25 1997-11-10 김관호 Cover beam for slab concrete pouring and transport setter
KR0176018B1 (en) * 1996-07-11 1999-04-01 공용조 Slab formwork support device for building and construction method of slab formwork using same
KR19990078743A (en) * 1998-11-06 1999-11-05 김장열 Construction method using mold equipped with shape steel and plywood
KR20000033450A (en) * 1998-11-23 2000-06-15 정영재 Horizontal supporting bar for supporting mold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5956206U (en) * 1982-10-05 1984-04-12 日鐵建材工業株式会社 Support device for bridge deck overhang formwork
JPH0754341A (en) * 1993-08-12 1995-02-28 Marufuji Shiitopairu Kk Land slide protective corner unit
KR970058603U (en) * 1996-04-25 1997-11-10 김관호 Cover beam for slab concrete pouring and transport setter
KR0176018B1 (en) * 1996-07-11 1999-04-01 공용조 Slab formwork support device for building and construction method of slab formwork using same
KR19990078743A (en) * 1998-11-06 1999-11-05 김장열 Construction method using mold equipped with shape steel and plywood
KR20000033450A (en) * 1998-11-23 2000-06-15 정영재 Horizontal supporting bar for supporting mold

Also Published As

Publication number Publication date
KR20040047048A (en) 2004-06-05

Similar Documents

Publication Publication Date Title
US4372906A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4272050A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4495131A (en) Method for pre-casting steel reinforced concrete box-like modules
US4508308A (en) Reinforcement structure for reinforced-concrete buildings
JP3524075B2 (en) Formwork equipment and formwork method
KR100433561B1 (en) Wall ascending slab descending concrete casting method
CA1151892A (en) Prefabricated load bearing structure
KR100473612B1 (en) Form system and frame construction method using the same
US6082059A (en) Pour and set concrete construction system
KR100361047B1 (en) Construction mold
JP2000234410A (en) Driven form and slab construction method making use thereof
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JPH1129910A (en) Method for constructing concrete pier
KR200184988Y1 (en) Establishment structure forming system using kicker block
KR200265793Y1 (en) The gap adjustable equipment of system form which is using box structure forming
US20090301002A1 (en) System for constructing a semi-prefabricated building
RU2032047C1 (en) Building skeleton erection method
KR20190025784A (en) Form system and frame construction method using thesame
JPH07216822A (en) Bridge pier and construction method thereof by self-rising type form construction method
US4455270A (en) Construction process including slab sliding support and comprising simultaneous wall erection
CN115637776B (en) Pavement sandwich structure building and construction method thereof
KR20010049143A (en) Wall-climbing forming system using kicker block
RU79904U1 (en) COMBINED-SHIELD FORMWORK FOR CONSTRUCTION OF THE MONOLITHIC MODULE OF SMALL-SIZED BUILDING FROM CONCRETE MIX
JP2611882B2 (en) Construction method of stairs
JPH0145301Y2 (en)

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
LAPS Lapse due to unpaid annual fee