KR200184988Y1 - Establishment structure forming system using kicker block - Google Patents

Establishment structure forming system using kicker block Download PDF

Info

Publication number
KR200184988Y1
KR200184988Y1 KR2019990025971U KR19990025971U KR200184988Y1 KR 200184988 Y1 KR200184988 Y1 KR 200184988Y1 KR 2019990025971 U KR2019990025971 U KR 2019990025971U KR 19990025971 U KR19990025971 U KR 19990025971U KR 200184988 Y1 KR200184988 Y1 KR 200184988Y1
Authority
KR
South Korea
Prior art keywords
wall
formwork
concrete
kicker block
reinforcement
Prior art date
Application number
KR2019990025971U
Other languages
Korean (ko)
Inventor
전찬진
Original Assignee
주식회사해동슈퍼데크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사해동슈퍼데크 filed Critical 주식회사해동슈퍼데크
Priority to KR2019990025971U priority Critical patent/KR200184988Y1/en
Application granted granted Critical
Publication of KR200184988Y1 publication Critical patent/KR200184988Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

일체형의 거푸집을 조립된 상태로 상부로 수직 이동시켜 키커블럭에 고정 설치함으로서 거푸집 설치시간을 단축할 수 있으며, 공사의 정밀도를 향상시키고, 공사기간을 단축시키며, 이에 따른 시공비가 절감될 수 있도록, 벽체가 형성될 콘크리트바닥에 설치되는 키커블럭과, 벽체가 형성될 부분에 배근되는 옹벽철근과 보강근으로 이루어진 벽체철근과, 벽체철근의 양측에서 조립된 상태로 상기 키커블럭에 고정되는 벽체거푸집과, 상기 벽체거푸집의 상단부에 설치되는 키커블럭 거푸집과, 설치된 벽체거푸집과 키커블럭 거푸집에 콘크리트를 타설하고, 소정의 기간동안 양생하여 형성되는 벽체 콘크리트와, 양생된 벽체 콘크리트에 그 다음상층의 옹벽철근과 보강근을 배근하여 형성되는 상층 벽체철근과, 상기 벽체거푸집을 해체하고, 해체된 벽체거푸집을 크레인 등으로 수직 인상하여 상기 벽체 콘크리트 타설시 형성된 키커블럭에 조립되는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트와, 상기 상층에 배근되는 벽체철근과, 벽체거푸집 해체 및 헤체된 벽체거푸집을 수직 인상하여 키커블럭에 조립하는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트의 형성을 반복적으로 할 수 있도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조를 제공한다.In order to reduce the installation time, improve the precision of construction, shorten the construction period, and thereby reduce the construction cost, by moving the formwork of the integrated form vertically to the top and fixed to the kicker block. A kicker block installed on the concrete floor on which the wall is to be formed, a wall reinforcement consisting of a retaining wall reinforcement and a reinforcement bar arranged on the portion where the wall is to be formed, and a wall formwork fixed to the kicker block in an assembled state on both sides of the wall reinforcement; The kicker block formwork installed on the upper end of the wall formwork, the wall concrete formed on the installed wall formwork and the kicker block formwork, the wall concrete formed by curing for a predetermined period, and the retaining wall reinforcement of the next upper layer on the cured wall concrete; The upper wall reinforcement formed by reinforcing reinforcement, and the wall formwork dismantled, the dismantled wall The wall formwork is assembled to the kicker block formed when the wall concrete is poured by vertically raising the formwork with a crane, and the upper kicker block formwork assembled to the upper part of the installed wall formwork, and connected to the wall at the position corresponding to the position of each floor. Wall and slab concrete formed by curing the slab formwork, the wall formwork and the slab formwork, and curing the wall and the slab concrete for a predetermined period of time, the wall reinforcement to be disposed on the upper layer, and the wall formwork dismantling And a wall formwork for vertically raising the hemmed wall formwork and assembling it to the kicker block, an upper layer kicker block formwork assembled to the upper part of the installed wall formwork, and a slab formwork installed by connecting to a wall at a position corresponding to the position of each floor. , Concrete is poured into the wall formwork and slab formwork, and It provides a steel formwork installation structure using a kicker block that can be formed to repeatedly form the walls and slabs concrete formed by curing the concrete of the walls and slabs during the period.

Description

키커블럭을 이용한 철재 거푸집 설치구조{ESTABLISHMENT STRUCTURE FORMING SYSTEM USING KICKER BLOCK}Steel formwork installation structure using kicker block {ESTABLISHMENT STRUCTURE FORMING SYSTEM USING KICKER BLOCK}

본 고안은 키커블럭(kicker block)을 이용한 철재 거푸집 설치구조에 관한 것으로서, 더욱 상세하게는 아파트와 같이 동일한 크기의 옹벽을 연속적으로 형성하는데 사용되는 거푸집을 옹벽크기와 맞게 일체형으로 조립하고, 콘크리트 타설 후 상기 일체형의 거푸집을 상부로 수직 이동시켜 키커블럭에 고정 설치함으로서 거푸집 설치시간을 단축할 수 있도록 이루어진 키커블럭을 이용한 철재 거푸집 설치구조에 관한 것이다.The present invention relates to a steel formwork installation structure using a kicker block. More specifically, the formwork used to continuously form the same size retaining wall, such as an apartment, is integrally assembled to match the retaining wall size, and concrete is poured. After the one-piece formwork to move vertically to the fixed installation on the kicker block to the steel formwork installation structure using a kicker block made to shorten the formwork installation time.

일반적으로 건축물과 같은 구조물에 있어서의 벽식 구조물의 시공은, 건물의 벽체나 바닥에 소정의 크기를 갖는 다수의 패널을 결합하여 벽체거푸집을 설치하고, 슬라브는 거푸집에 일정한 간격으로 동바리를 받쳐서 슬라브거푸집을 설치한 후, 상기 벽체 및 슬라브 거푸집에 콘크리트를 타설하여 벽체와 그 상측의 슬라브를 동시에 구축한다.In general, the construction of wall structures in a structure such as a building is to install a wall formwork by combining a plurality of panels having a predetermined size on the wall or floor of the building, and the slab is supported by the copper bars at regular intervals in the formwork, After the installation, the concrete is placed on the wall and slab formwork to build the wall and the slab on the upper side at the same time.

이러한 구조물의 시공에 있어서 통상적인 아파트의 골조는 기둥이나 벽체 및 슬라브로 이루어지며, 벽식 구조의 골조는 벽체 및 슬라브가 연결되어 일체로 이루어진다.In the construction of such a structure, the frame of a typical apartment is composed of pillars, walls and slabs, and the frame of the wall structure is integrally formed by connecting walls and slabs.

상기와 같은 벽식 구조로 이루어지는 아파트 등의 건물은 1개층씩 벽체 및 슬라브 거푸집을 설치하고, 철근을 배근한 다음 콘크리트를 타설한 후, 대략 7∼21일 동안 콘크리트를 양생하고, 거푸집을 해체한 다음, 그 상층의 거푸집을 설치하는 공정을 반복하여 골조공사를 행한다.Buildings such as apartments with the wall structure as described above are installed on the wall and slab formwork by one floor, reinforce the reinforcing bars, and after pouring concrete, curing the concrete for about 7 to 21 days, and then dismantling the formwork. Frame construction is repeated by repeating the process of installing the upper formwork.

즉 종래의 벽식 구조 아파트의 골조 시공방법은 한쪽의 벽체거푸집 및 슬래브거푸집을 설치하고, 벽체 및 슬라브에 철근을 배근하고, 대향면의 벽체거푸집을 설치한 다음, 벽체 및 슬라브에 대한 콘크리트를 타설한 다음, 일정한 기간동안 콘크리트를 양생하고, 벽체거푸집 및 슬라브 거푸집을 해체하는 공정을 반복하는 것으로 이루어진다.In other words, the frame construction method of the conventional wall-structured apartment is to install one wall formwork and slab formwork, reinforce the reinforcement to the wall and slab, install the wall formwork on the opposite side, and then cast concrete for the wall and the slab. Next, the process of curing the concrete for a certain period and dismantling the wall formwork and the slab formwork is repeated.

상기에서 슬라브 거푸집의 하부에는 다수의 동바리가 일정한 간격으로 설치되어 상기 슬라브 거푸집 및 이 거푸집에 타설된 콘크리트의 하중 및 작업하중을 받을 수 있도록 지지된다.In the lower part of the slab formwork, a plurality of clubs are installed at regular intervals to support the slab formwork and the load and working load of the concrete placed on the formwork.

상기 거푸집은 목재로 이루어진 패널(panel), 금속으로 이루어진 메탈폼(metal form) 또는 합성수지로 이루어진 플라스틱폼(plastic form) 등이 사용된다.The formwork includes a panel made of wood, a metal form made of metal, or a plastic form made of synthetic resin.

그러나, 상기와 같이 이루어지는 종래의 벽식 구조 아파트의 골조 시공방법에 의하면, 동바리를 사용하여 슬라브 거푸집을 지지하므로, 1개층씩 차례로 슬라브공사를 행하여야 되고, 이로 인하여 필수적으로 각 층별로 콘크리트의 양생기간이 필요하므로, 복수 층으로 이루어진 건물의 경우 기본적으로 골조공사에 필요한 공사기간이 길다.However, according to the frame construction method of the conventional wall-structured apartment as described above, because the slab formwork is used by using the copper bar, the slab construction must be performed one by one, thereby essentially curing period of each floor Since it is necessary, in the case of a multi-storey building, the construction period required for the framework is basically long.

그리고 현장에서 거푸집 및 동바리를 설치하므로, 작업에 많은 인력을 요하고, 정밀한 시공이 어려우며, 공사기간이 많이 소요된다.In addition, since the formwork and the copper bar are installed at the site, a lot of manpower is required for work, precise construction is difficult, and a lot of construction time is required.

또한 거푸집을 해체할 때에 거푸집에 손상이 많이 발생하고, 폐자재의 발생이 많고, 해체된 거푸집을 운반하는 데에도 많은 인력 및 비용이 소요되며, 동바리 및 거푸집 등의 자재를 보관하기 위한 보관장소를 필요로 한다.Also, when the formwork is dismantled, the formwork is damaged a lot, there is a lot of waste materials, and it takes a lot of manpower and cost to transport the dismantled formwork, and a storage place for storing materials such as copper and formwork. in need.

본 고안은 상기한 바와 같은 종래의 문제점을 해결하기 위하여 안출된 것으로서, 본 고안의 목적은 수직으로 변화가 적은 콘크리트 벽과 슬라브로 구성된 고층 아파트나 오피스텔과 같은 철근콘크리트 구조 및 초고층의 철골구조 옹벽에, 옹벽크기와 맞게 일체형으로 거푸집을 설치하고, 콘크리트 타설 후 상기 일체형의 거푸집을 조립된 상태로 상부로 수직 이동시켜 키커블럭에 고정 설치함으로서 거푸집 설치시간을 단축할 수 있으며, 공사의 정밀도를 향상시키고, 공사기간을 단축시키며, 이에 따른 시공비가 절감될 수 있도록 한 키커블럭을 이용한 철재 거푸집 설치구조를 제공하는데 있다.The present invention was devised to solve the conventional problems as described above, the object of the present invention is to reinforce concrete structure and high-rise steel structure retaining wall such as a high-rise apartment or officetel composed of a vertically small concrete wall and slab It is possible to shorten the form installation time by installing the formwork in one piece to fit the retaining wall size, and fix the formwork in the kicker block by moving the integrated formwork vertically to the top after assembling the concrete. In order to shorten the construction period and reduce construction costs, the steel formwork installation structure using the kicker block is provided.

도 1은 본 고안에 따른 키커블럭을 이용한 철재 거푸집 설치구조를 나타내는 설치 순서도.1 is an installation flowchart showing the steel formwork installation structure using a kicker block according to the present invention.

도 2a 및 도 2b는 본 고안에 적용된 키커블럭을 나타내는 평면도 및 정면도.2a and 2b is a plan view and a front view showing a kicker block applied to the present invention.

도 3은 옹벽철근 배근을 나타내는 정면도.3 is a front view showing a retaining wall reinforcement;

도 4는 본 고안에 따른 벽체거푸집이 설치되는 것을 나타내는 단면도.Figure 4 is a cross-sectional view showing that the wall formwork according to the present invention is installed.

도 5는 본 고안에 적용되는 벽체거푸집을 나타내는 정면도.5 is a front view showing a wall formwork applied to the present invention.

도 6은 도 5의 벽체거푸집이 설치되는 것을 나타내는 평면도.6 is a plan view showing that the wall formwork of Figure 5 is installed.

도 7a 및 도 7b는 본 고안에 적용된 라쳇을 나타내는 평면도.7A and 7B are plan views showing ratchets applied to the present invention.

도 8은 상층의 옹벽 철근배근을 나타내는 단면도.8 is a cross-sectional view showing the retaining wall reinforcement of the upper layer.

도 9는 본 고안에 따른 벽체거푸집이 수직 인상되는 것을 나타내는 정면도.Figure 9 is a front view showing that the wall formwork according to the present invention is vertically pulled.

도 10은 상부층의 벽체와 슬래브에 동시에 콘크리트를 타설하는 것을 나타내는 측면도이다.Fig. 10 is a side view showing the concrete being cast on the wall and the slab of the upper layer at the same time.

본 고안이 제안하는 키커블럭을 이용한 철재 거푸집 설치구조는, 벽체가 형성될 콘크리트바닥에 설치되는 키커블럭과, 벽체가 형성될 부분에 배근되는 옹벽철근과 보강근으로 이루어진 벽체철근과, 벽체철근의 양측에서 조립된 상태로 상기 키커블럭에 고정되는 벽체거푸집과, 상기 벽체거푸집의 상단부에 설치되는 키커블럭 거푸집과, 설치된 벽체거푸집과 키커블럭 거푸집에 콘크리트를 타설하고, 소정의 기간동안 양생하여 형성되는 벽체 콘크리트와, 양생된 벽체 콘크리트에 그 다음상층의 옹벽철근과 보강근을 배근하여 형성되는 상층 벽체철근과, 상기 벽체거푸집을 해체하고, 해체된 벽체거푸집을 크레인 등으로 수직 인상하여 상기 벽체 콘크리트 타설시 형성된 키커블럭에 조립되는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트와, 상기 상층에 배근되는 벽체철근과, 벽체거푸집 해체 및 헤체된 벽체거푸집을 수직 인상하여 키커블럭에 조립하는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트의 형성을 반복적으로 할 수 있도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조를 제공한다.The steel formwork installation structure using the kicker block proposed by the present invention includes a kicker block installed on the concrete floor on which the wall is to be formed, a wall reinforcement consisting of a retaining wall reinforcement and a reinforcing bar that is disposed on the wall where the wall is to be formed, and both sides of the wall reinforcement. The wall formwork fixed to the kicker block in the assembled state in the state, the kicker block formwork installed on the upper end of the wall formwork, and the concrete is placed in the installed wall formwork and the kicker block formwork, the wall formed by curing for a predetermined period The upper wall reinforcement formed by reinforcing the retaining wall reinforcement and the reinforcing bar of the next upper layer to the concrete and the cured wall concrete, and the wall formwork are dismantled, and the dismantled wall formwork is vertically raised by a crane or the like to form the wall concrete. Wall formwork assembled on the kicker block, and image assembled on the upper part of the installed wall formwork Kicker block formwork, slab formwork is installed by connecting to the wall at a position corresponding to the position of each floor, and the concrete is poured into the wall formwork and slab formwork, and is formed by curing the concrete of the wall and slab for a predetermined period Wall and slab concrete, wall reinforcing bars arranged on the upper layer, wall formwork for vertically lifting the wall formwork and dismantling the wall formwork and assembling it on the kicker block, and the upper layer kicker block formwork assembled on the installed wall formwork; The slab formwork is installed by connecting to the wall at a position corresponding to the position of each floor, and the wall and slab concrete formed by pouring concrete to the wall formwork and the slab formwork for a predetermined period of time Iron using kicker blocks that can be formed repeatedly It provides a mold fitting structure.

이하, 본 고안의 바람직한 실시예에 대하여 첨부한 도면을 참조하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

먼저 도 1 내지 도 4에 도시된 바와 같이, 본 고안에 따른 키커블럭을 이용한 철재 거푸집 설치구조의 일실시예는, 벽체가 형성될 콘크리트바닥면에 키커블럭 거푸집을 설치한 후 상기 키커블럭 거푸집에 콘크리트를 타설하여 설치되는 키커블럭(2)과, 벽체가 형성될 부분에 배근되는 옹벽철근과 보강근으로 이루어진 벽체철근(4)과, 상기 벽체철근(4)의 양측에서 상기 키커블럭(2)에 고정 설치되는 철재로 이루어진 벽체거푸집(6)과, 상기 벽체거푸집(6)의 상단부에 설치되는 키커블럭 거푸집과, 설치된 벽체거푸집(6)과 키커블럭 거푸집(8)에 콘크리트를 타설하고, 소정의 기간동안 양생하여 형성되는 벽체콘크리트와, 양생된 벽체 콘크리트에 그 다음 상층의 옹벽철근(4a)과 보강근을 배근하여 형성되는 상층 벽체철근과, 상기 벽체거푸집(6)을 벽체 콘크리트로부터 탈형하여 조립된 상태로 벽체거푸집(6)을 해체하고, 해체된 벽체거푸집(6)을 크레인 등으로 수직 인상하여 상기 벽체 콘크리트 타설시 형성된 키커블럭(2a)에 조립하는 벽체거푸집(6)과, 설치된 벽체거푸집(6)의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치의 벽체에 연결하여 설치되는 슬라브거푸집(10)과, 상기 벽체거푸집(6) 및 슬라브거푸집(10)에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트의 형성을 반복적으로 수행할 수 있도록 이루어진다.First, as shown in Figures 1 to 4, one embodiment of the steel formwork installation structure using a kicker block according to the present invention, after installing the kicker block formwork on the concrete floor surface to be formed on the kicker block formwork A kicker block (2) installed by pouring concrete, a wall reinforcement (4) consisting of a retaining wall reinforcement and a reinforcement bar arranged on a portion where a wall is to be formed, and the kicker block (2) on both sides of the wall reinforcement (4). Concrete is placed on the wall formwork 6 made of steel to be fixedly installed, the kicker block formwork installed on the upper end of the wall formwork 6, and the installed wall formwork 6 and the kicker block formwork 8, The wall concrete formed by curing during the period, the upper wall reinforcement formed by placing the retaining wall 4a and the reinforcing bar on the cured wall concrete, and the wall formwork 6 are wall concrete. The wall formwork 6 for disassembling the wall formwork 6 in the assembled state by demolding from the wall, and vertically lifting the dismantled wall formwork 6 with a crane or the like and assembling it to the kicker block 2a formed when the wall concrete is placed. , The upper layer kicker block formwork assembled to the upper part of the installed wall formwork 6, the slab formwork 10 is installed by connecting to the wall of the position corresponding to the position of each floor, and the wall formwork 6 and the slab formwork ( 10) is poured into the concrete, it is made to repeatedly perform the formation of the wall and slab concrete formed by curing the concrete of the wall and slab for a predetermined period.

상기 키커블럭(2)은 도 2a 및 도 2b에 도시된 바와 같이 벽체거푸집을 위하여 설치되는 것으로서, 슬라브 하단에서 약150mm~400mm의 높이로 벽체거푸집이 설치될 양쪽의 끝 부분에 설치된다.The kicker block 2 is installed for wall formwork as shown in FIGS. 2A and 2B, and is installed at both ends of the wall formwork at a height of about 150 mm to 400 mm at the bottom of the slab.

상기 키커블럭(2)을 설치할 때는 레이저 측정기를 이용하여 키커블럭 거푸집의 정확한 위치를 확인하여 정밀하게 시공하여야 한다.When installing the kicker block 2, it is necessary to check the exact position of the kicker block formwork by using a laser measuring device and construct it precisely.

상기 키커블럭(2)은 키커블럭 거푸집을 사용하여 설치하며, 상기 키커블럭 거푸집은 조립 해체될 수 있는 것으로서, 1층 지상부의 구조체 공사 착수시 사용하고, 계속 벽체거푸집(6)의 상부에 설치하여 반복적으로 사용할 수 있다.The kicker block 2 is installed using a kicker block formwork, and the kicker block formwork can be disassembled and used at the start of the structure work on the ground floor of the first floor, and continues to be installed on the top of the wall formwork 6. Can be used repeatedly.

상기 키커블럭(2)은 1층 바닥 콘크리트 타설시 동시에 설치할 수도 있고, 바닥 콘크리트 타설 후 설치할 수도 있다.The kicker block 2 may be installed at the same time when the first-floor concrete is poured, or may be installed after the bottom concrete is poured.

이러한 키커블럭(2)은 하층부의 수직철근과 콘크리트에 정확하고 견고하게 설치하여야 하며, 이러한 키커블럭(2)에는 복수의 관통구멍(12)이 수평방향으로 뚫려있다.The kicker block 2 should be installed accurately and firmly on the vertical reinforcing bar and concrete of the lower layer. The kicker block 2 has a plurality of through holes 12 drilled in the horizontal direction.

콘크리트 바닥면에 키커블럭(2)을 설치하는 과정이 완료되면, 레이저 광파 측정기로 다시 한번 정밀 검사를 하여 상기 키커블럭(2)의 위치, 수평도 및 치수의 정밀도를 확인한 후, 도 3에 도시한 바와 같이 벽체가 형성될 부분에 벽체철근과 보강근을 배근을 하여 옹벽철근(4)을 설치한다.When the process of installing the kicker block 2 on the concrete floor surface is completed, the inspection is performed once again with a laser wave meter to confirm the position, horizontality, and precision of the kicker block 2, and then, shown in FIG. 3. As described above, the retaining wall reinforcing bar 4 is installed by reinforcing the wall reinforcement and the reinforcing bar at the portion where the wall is to be formed.

상기 옹벽철근(4)은, 하층부 옹벽철근 배근시 하층부 슬라브에서 연장된 하층부 옹벽철근에 묶어서 배근하고, 상기 옹벽철근(4) 배근시 상층부의 슬라브가 설치되는 높이보다 더 높게 연장되도록 배근하여, 상층부의 옹벽철근을 묶을 수 있도록 한다.The retaining wall reinforcement 4 is tied to the lower retaining wall reinforcement extending from the lower layer slab when the lower retaining wall reinforcement is reinforcement, and reinforces and extends higher than the height at which the slab of the upper layer is installed when the retaining wall reinforcement 4 is reinforcement. Allow the retaining wall to be tied.

옹벽철근(4) 및 보강근을 배근하여 벽체철근이 설치되면, 도 4에 도시한 바와 같이 철재로 이루어진 벽체거푸집(6)을 크레인으로 인상하여, 옹벽철근(4)의 양측에 벽체거푸집(6)을 설치하고, 벽체거푸집(6)에 형성된 구멍(14)과 상기 키커블럭(2)에 형성된 관통구멍(12)을 일치시킨 후, 상기 구멍(12)(14)에 고강도 볼트(16)를 삽입하고, 상기 고강도 볼트(16)의 양쪽에 너트(18)를 나사 체결하여 벽체거푸집(6)을 고정 설치한다.이러한 상태로 벽체거푸집(6)의 설치가 완료되면, 상기 벽체거푸집(6)의 상단부에 키커블럭 거푸집(8)을 고정 설치한다.When the wall reinforcement is installed by reinforcing the retaining wall reinforcing bar 4 and the reinforcing bar, as shown in FIG. 4, the wall formwork 6 made of steel is lifted by a crane, and wall formwork 6 is provided on both sides of the retaining wall reinforcing bar 4. And the through hole 12 formed in the kicker block 2 and the hole 14 formed in the wall die 6, and then insert the high-strength bolt 16 into the hole 12, 14 Then, the nut 18 is screwed on both sides of the high-strength bolt 16 to fix and install the wall formwork. When the wall formwork 6 is installed in this state, the wall formwork 6 Fix the kicker block formwork (8) on the upper part.

상기 고강도 볼트(16)는 파이프 슬리브를 사용하지 않고 용이하게 빼낼 수 있도록 양단 직경이 다르게 되어 있으며, 벽체거푸집(6)의 설치를 쉽고 빠르게 하며, 옹벽의 두께를 정확하게 유지하는 역할을 하고, 벽체거푸집(6)이 연속적으로 직상부로 이동할 때마다 반복 사용한다.The high-strength bolt 16 is different in diameter at both ends so that it can be easily taken out without using a pipe sleeve, and facilitates the installation of the wall formwork 6 easily and quickly, and maintains the thickness of the retaining wall accurately. Whenever (6) moves to the upper part consecutively, it is used repeatedly.

상기 벽체거푸집(6)은 도 5에 도시한 바와 같이 일정한 간격으로 수직 배치된 철재 보강프레임(20)에 다수의 메탈폼(22)을 연결볼트나 연결핀으로 연결하여 제작되며, 콘크리트 타설시 수평압력과 변형에 저항하는 강성을 충분히 가지도록 설계되어 있으며, 100회 이상 사용 가능한 내구성 및 고정밀도로 제작되어 있다.The wall formwork 6 is manufactured by connecting a plurality of metal foams 22 with connecting bolts or connecting pins to the steel reinforcing frame 20 vertically arranged at regular intervals, as shown in FIG. It is designed to have sufficient rigidity to resist pressure and deformation, and is manufactured with durability and high precision that can be used more than 100 times.

또 상기 벽체거푸집(6)의 상부에는 그 상층부의 작업을 위하여 작업대(23)가 설치되어 있다.In addition, the work table 23 is installed in the upper part of the wall formwork 6 for the work of the upper layer.

상기 벽체거푸집(6)은 도 6에 도시한 바와 같이 각 유니트 별로 볼트 체결되어 벽체가 설치되는 구조에 따라서 4각형으로 조립할 수도 있고, 상기 4각형에서 하나의 거푸집이 없는 형상으로 조립할 수도 있으며, 2개의 면이 직각으로 이루어진 형상으로 조립할 수도 있다.As shown in FIG. 6, the wall formwork 6 may be assembled into a quadrangular shape according to the structure in which the bolts are fastened to each unit, and the wall is installed. The dogs may be assembled in a shape consisting of right angles.

또 상기 벽체거푸집(6)의 한쪽 끝 부분에는 도 7a 및 도 7b에 도시된 것처럼 수직방향으로 위치하는 더블힌지(24)가 설치되고, 상기 벽체거푸집(6)의 양쪽 끝 부분에는 상기 더블힌지(24)를 접거나 펼 수 있는 라쳇(턴버클)(26)이 연결되어 벽체거푸집(6)의 탈형을 인력으로 쉽고 빠르게 할 수 있도록 되어 있다.One end of the wall formwork 6 is provided with a double hinge 24 located in the vertical direction as shown in FIGS. 7A and 7B, and the double hinges are formed at both ends of the wall formwork 6. The ratchet (turnbuckle) 26, which can be folded or unfolded 24, is connected to enable easy and rapid demoulding of the wall formwork 6 by manpower.

상기 더블힌지(24)는 벽체거푸집(6)을 탈형, 수직인상, 조립시키는 작동부위의 부품으로서 수직방향의 피아노 힌지를 이중으로 하여 정교하고 견고하게 제작한다.The double hinge 24 is a part of the operation part for demoulding, vertically raising, and assembling the wall formwork 6, so that the vertical hinge of the piano is doubled and manufactured precisely and firmly.

상기 라쳇(26)은 원형의 단면을 갖추며 내주면에 나사부가 형성되고 수동으로 회전시킬 수 있는 레버(28)가 결합된 연결부(30)와, 한쪽이 상기 연결부(30)의 내측에서 이동 신축 가능하게 나사 결합되고, 다른 쪽은 벽체거푸집(6)에 각각 힌지 고정되며, 오른나사와 왼나사가 형성된 한 쌍의 볼트(32)로 이루어진다.The ratchet 26 has a circular cross section and has a threaded portion formed on an inner circumferential surface thereof and a connecting portion 30 coupled with a lever 28 which can be rotated manually, and one side of the ratchet 26 is movable and stretchable inside the connecting portion 30. Screwed, the other side is hinged to the wall formwork 6, respectively, and consists of a pair of bolts 32 formed with the right and left screws.

벽체거푸집(6)을 설치할 때는 도 7a에서와 같이 볼트(32)가 연결부(30) 외측으로 길어지도록 레버(28)를 회전시켜 양쪽 벽체거푸집(6)이 직각으로 접하여 위치되도록 한다.When installing the wall formwork 6, as shown in Figure 7a to rotate the lever 28 so that the bolt 32 is extended to the outside of the connection portion 30 so that both wall formwork 6 is placed in contact with the right angle.

벽체거푸집(6) 및 키커블럭 거푸집(8)이 설치되면, 벽체 콘크리트를 타설하는데, 이때 키커블럭 거푸집(8)에도 콘크리트를 타설하여 그 상층의 키커블럭(2a)을 동시에 설치하고, 일정기간의 양생괴정을 거치면 하부층 벽체(34)가 완성된다.When the wall formwork 6 and the kicker block formwork 8 are installed, the wall concrete is poured. At this time, the kicker block formwork 8 is concreted and the upper layer kicker block 2a is installed at the same time. Through the curing mass, the lower wall 34 is completed.

상기 키커블럭(2a) 하단부는 하부층 벽체(34)보다 얇게 형성하여 슬라브 콘크리트가 연결될 수 있는 걸림턱(36)이 형성되도록 한다.The lower end of the kicker block 2a is formed to be thinner than the lower layer wall 34 so that the locking step 36 to which the slab concrete can be connected is formed.

하부층 벽체(34)가 양생되면 도 8에 도시된 바와 같이 벽체거푸집(6) 상단부에 설치된 작업대(23)에서 그 상층의 벽체철근 배근을 하여 옹벽철근(4a)을 배근하는데, 이때 하부층에서 연장 설치된 옹벽철근(4)에 상층 옹벽철근(4a)을 묶어서 배근한다.When the lower layer wall 34 is cured, as shown in FIG. 8, the worktable 23 installed at the upper end of the wall formwork 6 reinforces the wall reinforcement of the upper layer to reinforce the retaining wall reinforcement 4a. The upper retaining wall reinforcing bar 4a is tied to the retaining wall reinforcing bar 4 to be placed.

그 다음 상층의 옹벽철근(4a)이 배근되면, 하부층의 벽체(34)에서 벽체거푸집(6)을 해체하는데, 이러한 벽체거푸집(6)의 해체를 하기 위하여 먼저 도 4에서와 같이 벽체거푸집(6)을 고정하고 있던 고강도 볼트(16)의 양측 너트(18)를 풀고, 도 7b에 도시된 바와 같이 상기 레버(28)를 벽체거푸집(6)을 설치할 때의 반대방향으로 회전시키면, 벽체거푸집(6)에 힌지 결합된 볼트(32)들이 연결부(30) 중앙부분으로 이동하면서 짧아져 더블힌지(24)가 접혀지고, 이에 따라 벽체(34)에서 벽체거푸집(6)이 탈형되어 벽체거푸집(6)이 해체된다.Then, when the retaining wall reinforcement 4a of the upper layer is disposed, the wall formwork 6 is dismantled from the wall 34 of the lower layer. In order to dismantle the wall formwork 6, as shown in FIG. Loosen the nuts 18 on both sides of the high-strength bolt 16, which was fixed, and rotate the lever 28 in the opposite direction when the wall formwork 6 is installed, as shown in FIG. 7B. 6) the bolts 32 hinged to the hinges are shortened as they move to the center portion of the connection part 30, thereby folding the double hinges 24, thereby deforming the wall formwork 6 from the wall 34 to form the wall formwork 6 ) Is dismantled.

이와 같은 방법으로 벽체거푸집(6)의 양쪽 끝 부분에 설치된 라쳇(26)의 레버(28)를 회전시킴으로서, 벽체(34)에서 벽체거푸집(6)을 쉽고 빠르게 탈형할 수 있다.By rotating the levers 28 of the ratchet 26 provided at both ends of the wall formwork 6 in this manner, the wall formwork 6 can be demolished easily and quickly from the wall 34.

따라서 종래와 같이 각 층마다 거푸집을 설치하고 해체하는 방법에 비하여 본 실시예의 벽체거푸집(6)은 조립된 상태로 탈형 할 수 있으므로 인력의 절감 및 공사기간을 단축할 수 있다.Therefore, the wall formwork 6 of the present embodiment can be demoulded in an assembled state as compared to the method of installing and dismantling formwork for each floor as in the prior art, thereby reducing manpower and reducing construction period.

하부층의 벽체거푸집(6)이 탈형되면, 도 9에서와 같이 크레인을 이용하여 상기 벽체거푸집(6)을 상층 벽체철근(4a)이 배근된 곳으로 수직 인상한 다음, 벽체 콘크리트 타설시 형성된 키커블럭(2a)에 상기 벽체거푸집(6)을 고정 설치한다.When the wall formwork 6 of the lower layer is demoulded, as shown in FIG. 9, the wall formwork 6 is vertically raised to the place where the upper wall reinforcing bar 4a is placed by using a crane, and then the kicker block formed when the wall concrete is poured. The wall formwork 6 is fixedly installed at (2a).

수직인상 하여 벽체거푸집(6)이 설치되면 벽체거푸집(6)의 상단부에 상층 키커블럭 거푸집을 설치하고, 도 10에 도시된 바와 같이 걸림턱(36) 하부층 벽체(34)에 각재(38) 및 이 각재를 지지하고 볼트 등을 이용하여 해체 가능하게 고정되는 까치발(40)을 설치하고, 데크거더(42)와 데크패널(44)로 이루어진 철근트러스 데크(46)를 상기 각재(38)에 지지한 후, 상기 데크거더(42)에 보강근을 배근하여 슬라브 거푸집을 설치한다.When the wall formwork 6 is installed vertically, the upper layer kicker block formwork is installed at the upper end of the wall formwork 6, and as shown in FIG. This bracket is installed, and the bracket feet 40 are installed to be disassembled using bolts or the like, and the reinforcement truss deck 46 formed of the deck girder 42 and the deck panel 44 is supported by the shell 38. After that, the slab formwork is installed by reinforcing the reinforcement to the deck girder 42.

상기 슬라브 거푸집을 설치한 다음에는 전기 배관용 박스의 배치와 전기배관을 하고, 배관 검사와 배근검사가 완료되면, 벽체거푸집(6)과 철근트러스 데크(46)에 콘크리트를 타설하여 벽체와 슬라브를 형성한다.After the slab formwork is installed, the electrical piping box is arranged and the electric piping is completed.When the pipe inspection and the reinforcement inspection are completed, concrete is poured into the wall formwork 6 and the reinforcement truss deck 46 to form walls and slabs. Form.

즉, 상부층의 벽체와 슬래브에 동시에 콘크리트를 타설함으로서 벽체거푸집(6)을 수직인상 가능하게 한다.That is, by pouring concrete simultaneously on the wall and the slab of the upper layer, the wall formwork 6 can be vertically lifted.

벽체 및 슬라브 콘크리트가 타설된 다음에는 일정시간 동안 벽체 및 슬라브 콘크리트를 양생한 후, 상기 상층 벽체철근 배근부터 벽체 및 슬라브 콘크리트 양생을 반복하여 모든 층에 대한 골조공사를 행한다.After the wall and slab concrete is poured, the wall and slab concrete are cured for a predetermined time, and then the wall and slab concrete curing is repeated from the upper wall reinforcement to perform frame construction for all the floors.

상기 설명에서는 주로 벽식 구조 아파트에 대하여 설명하였지만, 그 이외의 일반 건물에도 적용할 수 있다.In the above description, the wall-type apartments have been mainly described, but can be applied to other general buildings.

또한 상기에서는 본 고안의 바람직한 실시예를 예시하여 설명되어 있으나, 이에 한정되지는 않으며, 실용신안등록청구범위와 고안의 상세한 설명 및 첨부한 도면의 범위 내에서 여러 가지로 변형하여 실시하는 것도 가능하다.In addition, the present invention has been described by way of example, but is not limited thereto, but may be modified and practiced in various ways within the scope of the utility model registration claims and the invention and the accompanying drawings. .

상기와 같이 이루어지는 본 고안에 의한 키커블럭을 이용한 철재 거푸집 설치구조는, 벽체 콘크리트 타설 후 일체형으로 이루어진 거푸집을 조립된 상태로 상부로 수직 이동시켜 키커블럭에 고정 설치함으로 작업과정을 대폭적으로 단축할 수 있다.Steel formwork installation structure using the kicker block according to the present invention made as described above, by placing the formwork consisting of a one-piece after the wall concrete is vertically moved to the top to be fixed to the kicker block can significantly shorten the work process. have.

또한 주로 수입에 의존하는 합판 및 목재를 사용하지 않고, 금속재로 이루어진 거푸집을 해체하여 반복 사용함으로, 수입 대체 효과는 물론이고 공사의 정밀도 향상과 건설 폐자제의 발생을 억제할 수 있다.In addition, by dismantling formwork made of metal materials without using plywood and wood, which are mainly dependent on imports, it is possible not only to import substitution effect, but also to improve construction precision and suppress construction waste.

그리고 공장에서 제작한 벽체거푸집 및 철근트러스 데크를 현장에서 조립하여 사용하고, 동바리를 거의 사용하지 않으므로 현장작업을 최소화하여 인력을 절감할 수 있으며, 거푸집 및 철근작업에 필요한 공간 및 동바리나 거푸집용 자재를 보관하기 위한 공간을 감축할 수 있다.In addition, the wall formwork and reinforcement truss decks manufactured at the factory are assembled and used on-site, and since there is little use of copper barns, the work force can be reduced by minimizing on-site work, and the space required for formwork and rebar work and materials for copper bar or formwork. Reduce the space for storing

Claims (5)

벽체가 형성될 콘크리트바닥에 설치되는 키커블럭과, 벽체가 형성될 부분에 배근되는 옹벽철근과 보강근으로 이루어진 벽체철근과, 벽체철근의 양측에서 조립된 상태로 상기 키커블럭에 고정되는 벽체거푸집과, 상기 벽체거푸집의 상단부에 설치되는 키커블럭 거푸집과, 설치된 벽체거푸집과 키커블럭 거푸집에 콘크리트를 타설하고, 소정의 기간동안 양생하여 형성되는 벽체 콘크리트와, 양생된 벽체 콘크리트에 그 다음상층의 옹벽철근과 보강근을 배근하여 형성되는 상층 벽체철근과, 상기 벽체거푸집을 해체하고, 해체된 벽체거푸집을 크레인 등으로 수직 인상하여 상기 벽체 콘크리트 타설시 형성된 키커블럭에 조립되는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트와, 상기 상층에 배근되는 벽체철근과, 벽체거푸집 해체 및 헤체된 벽체거푸집을 수직 인상하여 키커블럭에 조립하는 벽체거푸집과, 설치된 벽체거푸집의 상부에 조립되는 상층 키커블럭 거푸집과, 각 층의 위치에 대응하는 위치에서 벽체에 연결하여 설치되는 슬라브거푸집과, 상기 벽체거푸집 및 슬라브거푸집에 콘크리트를 타설하고, 소정의 기간동안 벽체 및 슬라브의 콘크리트를 양생하여 형성되는 벽체 및 슬라브 콘크리트의 형성을 반복적으로 할 수 있도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조.A kicker block installed on the concrete floor on which the wall is to be formed, a wall reinforcement consisting of a retaining wall reinforcement and a reinforcement bar arranged on the portion where the wall is to be formed, and a wall formwork fixed to the kicker block in an assembled state on both sides of the wall reinforcement; The kicker block formwork installed on the upper end of the wall formwork, the wall concrete formed on the installed wall formwork and the kicker block formwork, the wall concrete formed by curing for a predetermined period, and the retaining wall reinforcement of the next upper layer on the cured wall concrete; The upper wall reinforcement formed by reinforcing reinforcement, the wall formwork is dismantled, and the wall formwork is assembled to the kicker block formed when the wall concrete is laid by vertically lifting the dismantled wall formwork with a crane or the like, and on the upper part of the installed wall formwork. The upper kicker block formwork to be assembled and the wall at the position corresponding to the position of each floor Slab formwork and slab formwork, which are installed in connection with the wall and slab formwork, and the wall and slab concrete formed by curing the concrete of the wall and the slab for a predetermined period of time, the wall reinforcement that is placed in the upper layer, and the wall Wall formwork for disassembling formwork and dismantled wall formwork vertically to assemble to kicker block, upper kicker block formwork to be assembled on top of installed wall formwork, and slabs installed by connecting to the wall at the position corresponding to each floor location Forming structure of steel formwork using kicker block which is made to form concrete in the formwork, the wall formwork and slab formwork, and to cure walls and slabs concrete formed by curing concrete of walls and slabs for a predetermined period. . 청구항 1에 있어서, 상기 벽체거푸집은 한쪽 끝 부분에 수직방향으로 더블힌지를 설치하고, 상기 더블힌지를 벽체거푸집 설치시 펴고, 해체시 접을 수 있도록 하여 상기 벽체거푸집의 길이가 가변될 수 있도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조.The kicker according to claim 1, wherein the wall formwork is provided with a double hinge installed at one end portion in a vertical direction, the double hinge is spread when the wall formwork is installed, and the wall formwork can be folded so that the length of the wall formwork can be changed. Steel formwork installation structure using blocks. 청구항 1에 있어서, 상기 벽체거푸집의 설치는 벽체거푸집에 형성된 구멍과 키커블럭에 형성된 관통구멍에 고강도 볼트를 삽입하고, 상기 고강도 볼트의 양쪽에 너트를 조인 후, 벽체거푸집의 양쪽 끝 부분에 결합된 라쳇을 조절하여 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조.The method of claim 1, wherein the installation of the wall formwork is to insert a high-strength bolt into the hole formed in the wall formwork and the through-hole formed in the kicker block, tighten the nuts on both sides of the high-strength bolt, and is coupled to both ends of the wall formwork Steel formwork installation structure using kicker block made by adjusting ratchet. 청구항 1에 있어서, 상기 벽체거푸집의 해체는 벽체거푸집의 양쪽 끝부분에 결합된 라쳇(턴버클)을 회전시켜, 벽체거푸집의 한쪽 끝 부분 수직방향으로 설치된 더블힌지를 접혀지도록 하여, 벽체거푸집을 조립된 상태로 탈형시킬 수 있도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조.The wall formwork according to claim 1, wherein the disassembly of the wall formwork rotates a ratchet (turnbuckle) coupled to both ends of the wall formwork, thereby folding a double hinge installed at one end of the wall formwork in a vertical direction, thereby assembling the wall formwork. Steel formwork installation structure using kicker block made to demould in state. 청구항 1에 있어서, 상기 슬라브와 벽체의 연결은, 키커블럭 하단부에 형성된 걸림턱과, 이 걸림턱 외측의 하부층 벽체에 각재를 지지하는 까치발을 설치하고, 데크거더와 데크패널로 이루어진 철근트러스 데크를 상기 걸림턱 및 각재에 지지한 후, 철근트러스 데크에 콘크리트를 타설하여 벽체와 슬라브를 연결하도록 이루어지는 키커블럭을 이용한 철재 거푸집 설치구조.The method of claim 1, wherein the slab and the wall is connected to the hooking jaw formed on the lower end of the kicker block, the lower jaw outside the hooking jaw to install a bracket to support the material, the reinforcement truss deck consisting of deck girder and deck panel The steel formwork installation structure using the kicker block is made to connect the wall and the slab by placing concrete on the reinforcing truss deck after supporting the hanging jaw and the angle material.
KR2019990025971U 1999-11-24 1999-11-24 Establishment structure forming system using kicker block KR200184988Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990025971U KR200184988Y1 (en) 1999-11-24 1999-11-24 Establishment structure forming system using kicker block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019990025971U KR200184988Y1 (en) 1999-11-24 1999-11-24 Establishment structure forming system using kicker block

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1019990058721A Division KR20010049143A (en) 1999-12-17 1999-12-17 Wall-climbing forming system using kicker block

Publications (1)

Publication Number Publication Date
KR200184988Y1 true KR200184988Y1 (en) 2000-06-15

Family

ID=19598044

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990025971U KR200184988Y1 (en) 1999-11-24 1999-11-24 Establishment structure forming system using kicker block

Country Status (1)

Country Link
KR (1) KR200184988Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101141972B1 (en) 2012-02-06 2012-05-04 지에스건설 주식회사 Method for constructing side wall of storage tank for liquefied natural gas(lng) using rebar panel
KR101255047B1 (en) * 2011-05-09 2013-04-16 주식회사 한빛구조엔지니어링 The assembly formwork unit and the method of supporting soil pressure in rock section for topdown
KR102256121B1 (en) * 2020-05-27 2021-05-27 배기동 The construction method of a building with an intermediate floor on each floor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101255047B1 (en) * 2011-05-09 2013-04-16 주식회사 한빛구조엔지니어링 The assembly formwork unit and the method of supporting soil pressure in rock section for topdown
KR101141972B1 (en) 2012-02-06 2012-05-04 지에스건설 주식회사 Method for constructing side wall of storage tank for liquefied natural gas(lng) using rebar panel
KR102256121B1 (en) * 2020-05-27 2021-05-27 배기동 The construction method of a building with an intermediate floor on each floor

Similar Documents

Publication Publication Date Title
US4372906A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
KR100738410B1 (en) Support system for Flying form and Concreate slab construction method using the same
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
US4272050A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4495131A (en) Method for pre-casting steel reinforced concrete box-like modules
US20090121373A1 (en) Method and Apparatus for Construction
US4508308A (en) Reinforcement structure for reinforced-concrete buildings
KR100945426B1 (en) System for elevating forms for construction and method for constructing a plurality of walls of building simultaneously using the same
KR200184988Y1 (en) Establishment structure forming system using kicker block
KR100433561B1 (en) Wall ascending slab descending concrete casting method
KR20010049143A (en) Wall-climbing forming system using kicker block
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
JPH0657956A (en) Construction of concrete structure
KR100361047B1 (en) Construction mold
JP3421298B2 (en) Internal stairs for buildings and method of construction
CN113482328A (en) Integral hoisting installation construction method for steel pipe template of outer shear wall
AU2005287894B2 (en) Method and apparatus for construction
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
CN110185254A (en) A kind of Combined aluminum alloy template system and its application method
KR100473612B1 (en) Form system and frame construction method using the same
CN216787893U (en) Prefabricated shear wall positioner
KR100363008B1 (en) Form work for separating and constructing slab and wall by using deck plate attaching steel reinforcement and gang form
KR100336710B1 (en) inconer and outconer assembling apparatus for gang form using segregation pouring method and deck plate equipped reinforced steel bar
KR930005579Y1 (en) Prefabricated shutterings
JP3413101B2 (en) Outer formwork device for manufacturing outer shell PCa column members

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee