KR102362063B1 - System support - Google Patents

System support Download PDF

Info

Publication number
KR102362063B1
KR102362063B1 KR1020200103943A KR20200103943A KR102362063B1 KR 102362063 B1 KR102362063 B1 KR 102362063B1 KR 1020200103943 A KR1020200103943 A KR 1020200103943A KR 20200103943 A KR20200103943 A KR 20200103943A KR 102362063 B1 KR102362063 B1 KR 102362063B1
Authority
KR
South Korea
Prior art keywords
elevator hoistway
fixing
pipe
fixed
wall
Prior art date
Application number
KR1020200103943A
Other languages
Korean (ko)
Inventor
김동산
Original Assignee
김동산
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김동산 filed Critical 김동산
Priority to KR1020200103943A priority Critical patent/KR102362063B1/en
Application granted granted Critical
Publication of KR102362063B1 publication Critical patent/KR102362063B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • E04G1/367Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes specially adapted for elevator shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements

Abstract

The present invention relates to a system support for elevator hoistway construction, and more particularly to the system support for elevator hoistway construction that is provided in a hoistway for installation of a form for the construction of the hoistway for an elevator, made of joists, laterals and vertical members. Through a fixing unit that is interpolated to be able to slide and protrude on the joists, after the fixing unit protrudes according to the size of the elevator hoistway, the end of the fixing unit is fixed to an inner wall (W) of the elevator hoistway to fix the system support, thereby ensuring the safety of workers.

Description

엘리베이터 승강통로 시공용 시스템 서포트{SYSTEM SUPPORT}System support for elevator hoistway construction {SYSTEM SUPPORT}

본 발명은 엘리베이터 승강통로 시공용 시스템 서포트에 관한 것으로서, 보다 상세하게는 엘리베이터용 승강통로 시공을 위한 거푸집 설치를 위해 승강통로에 구비되는 것으로 장선, 횡재 및 수직재로 이루어지되, 상기 장선에 슬라이딩 돌출 가능하게 내삽되는 고정유닛을 통하여, 엘리베이터 승강통로 크기에 맞게 상기 고정유닛을 돌출시킨 후, 고정유닛의 단부를 엘리베이터 승강통로 내벽(W)에 고정함에 따라 시스템 서포트를 고정하여 작업자의 안전을 보장하는 엘리베이터 승강통로 시공용 시스템 서프트에 관한 것이다.The present invention relates to a system support for elevator hoisting passage construction, and more particularly, provided in a hoisting passage for installing a formwork for elevator hoisting passage construction. Elevator that secures the safety of workers by fixing the system support by fixing the end of the fixing unit to the inner wall (W) of the elevator hoistway after protruding the fixing unit according to the size of the elevator hoistway through the fixed unit interpolated It relates to the system support for the construction of the hoistway.

일반적으로 고층건물을 시공할 때 안전사고 위험이 많지만, 특히 가장 많은 곳중의 하나가 엘리베이터 승강통로이다. 엘리베이터 승강통로는 콘크리트벽체를 시공할 때 뿐만 아니라 콘크리트벽체를 시공한 후에 엘리베이터 설치까지는 바닥에서 상층부까지 통공을 이루기 때문에 작업자들의 한 번 실족으로 귀중한 생명을 잃게 되는 부분이다. 이러한 엘리베이터 승강통로 내부에서 수행되는 제반작업 뿐만 아니라 그 콘크리트벽체작업 등을 안정하게 진행할 수 있도록 하는 것이 절실히 요구된다.In general, there is a lot of risk of safety accidents when constructing high-rise buildings, but one of the most common places is the elevator hoistway. Elevator hoistway is a part where workers lose their precious lives in one trip because they make a hole from the floor to the upper floor not only during the construction of the concrete wall but also after the construction of the concrete wall until the elevator is installed. It is urgently required to stably proceed not only the general work performed inside the elevator hoistway, but also the concrete wall work.

이와 관련된 종래기술로는 등록실용신안 제20-0489367호 "엘리베이터 승강 통로 시공용 작업대"(이하 '종래기술1'이라 함.), 공개특허 제10-2010-0123012호 "건축용 비계"(이하 '종래기술2'라 함.), 등록특허 제10-0140904호 "엘리베이터 피트용 비계"(이하 '종래기술3'이라 함.)르 들 수 있다.As related prior art, Registered Utility Model No. 20-0489367 "Workbench for Elevator Elevator Passage Construction" (hereinafter referred to as 'Prior Art 1'), Patent Publication No. 10-2010-0123012 "Building Scaffolding" (hereinafter referred to as ' 'Prior art 2'), Patent Registration No. 10-0140904 "scaffolding for elevator pits" (hereinafter referred to as 'prior art 3').

먼저, 상기 종래기술1은 4각상자 형상으로 되어 승강통로에 배치되고, 승강통로에서 크레인에 매달려 승강되며, 승강통로 벽면에 설치한 앙카볼트에 착탈 가능케 고정되는 고정작업부와 고정작업부 상측에 배치되어 형틀 설치용 받침형틀의 체결구에 형성된 걸고리에 결합하는 추락방지걸대와 슬라브 상면에 접촉하는 개폐형 스토퍼가 구비된 설치물 시공작업부와, 설치물 시공작업부 상측에 배치되어 작업대를 크레인고리에 연결하고, 분리하는 준비작업부로 구성되어 엘리베이터 승강통로에 안전하고 편리하게 장치되고 분리될 수 있게 구성되어 승강통로 시공이 용이한 엘리베이터 승강통로 시공용 작업대에 관한 것이다.First, the prior art 1 has a rectangular box shape and is arranged in the elevator passage, and is lifted by hanging from a crane in the elevator passage, and is detachably fixed to the anchor bolt installed on the wall of the elevator passage. The installation construction work part is equipped with a fall-prevention hanger that is disposed and is coupled to the hook formed in the fastener of the pedestal for installation of the formwork, and an open/close type stopper in contact with the upper surface of the slab. , It relates to a workbench for elevator hoistway construction, which is composed of a preparatory work unit to separate and safely and conveniently installed in the elevator hoistway and can be separated so that the hoistway construction is easy.

또한 종래기술2는 길이방향을 관통하는 통공(12a)이 형성되는 한편, 통공(12a)으로부터 열십자 방향으로 결합홈(12b)이 형성된 연결판(12)이 길이방향에 하나이상 간격을 두고 용접되어 부착된 제1수직바(10)와; 상기 연결판(12)의 결합홈(12b)에 안내 결합되도록 양단에 절개홈(21)이 형성되고, 절개홈(21)에는 결합돌편(22)이 안내되어 용접 부착된 수평바(20)와; 상기 결합돌편(22)이 안내 결합되도록 길이방향에 하나 이상 간격을 두고 결합고리(31)가 용접 부착된 제2수직바(30);로 구성된 것을 특징으로 하는바, 제1수직바의 길이방향에 용접 설치된 연결판의 결합홈 및 제2수직바의 결합고리에 수평바의 양단측에 마련된 쇄기형태의 결합돌편을 꽂아 결합하여 건축공사시 사용하기 위한 임시 가설물인 건축용 비계를 제시하고 있다.In addition, in the prior art 2, a through hole 12a passing through the longitudinal direction is formed, while the connecting plate 12 in which a coupling groove 12b is formed in a crisscross direction from the through hole 12a is welded at one or more intervals in the longitudinal direction. and a first vertical bar 10 attached thereto; Incision grooves 21 are formed at both ends to be guide-coupled to the coupling groove 12b of the connecting plate 12, and the coupling protrusion piece 22 is guided in the cut-out groove 21, so that the welding-attached horizontal bar 20 and ; A second vertical bar (30) to which the coupling ring (31) is welded at one or more intervals in the longitudinal direction so that the coupling protrusion piece (22) is guided and coupled to each other; A scaffold for construction, which is a temporary temporary structure for use in construction work, is presented by inserting and combining the wedge-shaped coupling stones provided on both ends of the horizontal bar into the coupling groove of the connecting plate welded to the installation and the coupling ring of the second vertical bar.

그러나 엘리베이터는 건물의 크기 및 용도, 설계에 따라 다양한 크기로 이루어지며, 이에 따라 건설되는 엘리베이터 승강통로 또한 설계의도에 따라 다양한 너비를 갖게 되며, 종래기술들의 경우에는 엘리베이터 설치를 위한 통로의 너비 크기에 따라 작업대의 크기를 달리 설계하여 설치해야 하는 한계가 있다.However, the elevator is made in various sizes according to the size, use, and design of the building, and the elevator hoistway constructed accordingly also has various widths according to the design intention. Therefore, there is a limitation in designing and installing a different size of the workbench.

즉, 엘리베이터 통로의 넓이, 폭 등의 차이로 인하여 각 현장마다 엘리베이터 치수에 맞게 각 파이프를 절단 및 용접하여 설치해야하는 한계가 있다.That is, due to the difference in the width and width of the elevator passage, there is a limitation in that each pipe must be cut and welded to fit the elevator dimensions at each site.

또한 상기 종래기술3은 직육면체로 만들어지며 소정의 높이마다 둘레을 따라 가운데 구멍이 수직하게 뚫린 연결편(11)들이 형성되고 상부에는 이음부(12)가 일체로 부착되는 수직봉(10)들과, 상기 연결편(11)들에 연결촉(21)들이 끼워져서 상기 수직봉들을 지지시켜 주는 수평봉(20)들과, 상기 연결촉(21)에 끼워져서 고정되며 외측으로 연장되는 가동봉(30)과, 상기 수평봉과 가동봉의 상부에 설치되는 발판부(40)로 구성하되, 상기 가동봉(30)은 연결편(11)에 고정되는 외관(31)과, 상기 외관에 삽입되며 수평으로 기둥이 되며 그 외축연장부가 콘크리트벽체 내면부에 지지되는 내관(32)과, 상기 내관의 가동길이를 조절하는 가동조절밸브(33)로 구성되어, 엘리베이터 피트내부에 설치되어 콘크리트벽체 타설시 내부 거푸집판넬을 지지하여 주면서도 제반작업 수행시 작업대로 사용할 수 있도록 하는 기술에 관한 것이나,In addition, in the prior art 3, vertical bars 10 made of a rectangular parallelepiped, connecting pieces 11 having a center hole vertically drilled along the circumference at a predetermined height are formed, and a joint 12 is integrally attached to the upper portion thereof; Horizontal bars 20 for supporting the vertical bars by inserting connecting points 21 into the connecting pieces 11, and a movable bar 30 that is fixedly fitted to the connecting points 21 and extends outward; It consists of a footrest part 40 installed on the horizontal rod and the movable rod, wherein the movable rod 30 has an exterior 31 fixed to the connecting piece 11, and is inserted into the exterior to become a horizontal pillar and its outer shaft The extension is composed of an inner tube 32 supported on the inner surface of the concrete wall, and a movable control valve 33 for controlling the movable length of the inner tube, installed inside the elevator pit to support the inner formwork panel when pouring the concrete wall. It relates to technology that can be used as a workbench when performing various tasks,

상기 종래기술3은 승강통로 내부 벽면에 단순히 밀착 방식으로 흔들림을 고정하고, 승강통로 내부에 고정되는 부분은 수직봉의 하부에 해당함에 따라, 승강통로 또는 피트의 깊이가 깊으면 상기 수직봉의 길이가 길어질 수 밖에 없는 한계가 있다.In the prior art 3, the shaking is simply fixed to the inner wall of the elevator passage, and the part fixed inside the passageway corresponds to the lower part of the vertical rod. There are unavoidable limitations.

따라서 본 발명은 상기 문제를 해결하기 위해 안출한 것으로서,Therefore, the present invention has been devised to solve the above problem,

엘리베이터 승강통로 내부에 설치되는 멍에, 장선 및 수직재를 포함하되, 상기 장선에 내삽되어 인출가능하게 구비되는 고정유닛을 더 구비하여 엘리베이터 승강통로의 크기(폭)에 따라 상기 고정유닛을 인출시켜 엘리베이터 승강통로 내벽(W)에 고정할 수 있도록 고안된 엘리베이터 승강통로 시공용 시스템 서프트를 제공함을 목적으로 한다.Including a yoke, a joist, and a vertical member installed inside the elevator hoistway, and further comprising a fixing unit that is interpolated into the joist and provided to be withdrawn, the fixing unit is drawn out according to the size (width) of the elevator hoistway to elevate the elevator An object of the present invention is to provide a system support for elevator hoistway construction designed to be fixed to the inner wall of the passage (W).

또한 상기 수직재에는 발판부재를 안착시킬 수 있는 지지부재를 구비하여 작업자가 엘리베이터 승강통로에서 손쉽고 안전하게 제반작업을 가능하게 하는 엘리베이터 승강통로 시공용 시스템 서포트를 제공함을 목적으로 한다.In addition, the vertical member is provided with a support member capable of seating the scaffold member to provide a system support for the elevator hoistway construction that enables the operator to easily and safely perform various tasks in the elevator hoistway.

나아가 상기 고정유닛은 고정부재에 의해 견고하게 엘리베이터 승강통로 내벽(W)에 고정될 수 있도록 하여 상기 시스템 서포트가 엘리베이터 승강통로 내부에 견고하게 고정되어 안전성을 높이고자 하는 엘리베이터 승강통로 시공용 시스템 서포트를 제공함을 또 하나의 목적으로 한다.Furthermore, the fixing unit can be firmly fixed to the inner wall of the elevator hoistway by a fixing member so that the system support is firmly fixed inside the elevator hoistway to increase safety. Another purpose is to provide.

아울러 수직재와 엘리베이터 승강통로 내벽(W) 사이에 낙하물방지부재가 더 구비되어 안전성을 보다 향상시키고자 하는 엘리베이터 승강통로 시공용 시스템 서포트를 제공함을 목적으로 한다.In addition, a falling object prevention member is further provided between the vertical member and the inner wall of the elevator hoistway (W) to provide a system support for the elevator hoistway construction to further improve safety.

상기와 같은 목적을 달성하기 위하여, 본 발명에 따른 엘리베이터 승강통로 시공용 시스템 서포트는In order to achieve the above object, the system support for elevator hoistway construction according to the present invention is

서로 이격되어 나란하게 배열되는 복수개의 멍에;a plurality of yokes spaced apart from each other and arranged side by side;

상기 멍에 상부에 상기 멍에와 직교하는 방향으로 구비되는 복수개의 장선;a plurality of joists provided on the upper part of the yoke in a direction orthogonal to the yoke;

상기 장선 상부에 구비되는 연결부재에 결합되어, 상기 장선으로부터 수직방향으로 구비되는 수직재;a vertical member coupled to a connecting member provided on the joist and provided in a vertical direction from the joist;

상기 장선에 내삽되어 인출 가능하게 구비되는 인출파이프과, 상기 인출파이프 단부에 구비되는 고정파이프 및 상기 고정파이프를 상기 엘리베이터 승강통로 내벽에 고정하는 고정부재를 포함하여 이루어지는 고정유닛;a fixing unit comprising a lead-out pipe interpolated into the joist to be withdrawn, a fixing pipe provided at an end of the lead-out pipe, and a fixing member for fixing the fixing pipe to an inner wall of the elevator hoistway;

을 포함하여 이루어져,consists of,

상기 엘리베이터 승강통로의 크기에 맞게 상기 고정유닛의 인출파이프를 상기 장선으로부터 슬라이딩 방식으로 돌출시킨 후, 상기 고정파이프를 엘리베이터 승강통로의 내벽에 고정함으로서 상기 시스템 서포트를 엘리베이터 승강통로 내부에 고정하는 것을 특징으로 한다.After the extraction pipe of the fixing unit is protruded from the joists in a sliding manner to fit the size of the elevator hoistway, the system support is fixed to the inside of the elevator hoistway by fixing the fixed pipe to the inner wall of the elevator hoistway. do it with

이상과 같이 본 발명에 따른 엘리베이터 승강통로 시공용 시스템 서포트는As described above, the system support for elevator hoistway construction according to the present invention is

엘리베이터 승강통로 내부에 구비되어 작업자가 엘리베이터 통로용 거푸집 설치, 콘크리트 타설 등의 제반작업이 가능하도록 이루어지는 것으로, 장선으로부터 인출 가능하게 구비되며 엘리베이터 승강통로 내벽(W)에 고정되는 고정유닛을 통하여 엘리베이터 승강통로의 너비 또는 폭이 달라지더라도 이에 대응하여 고정하여 설치 편의성을 향상시킬 수 있다.It is provided inside the elevator passageway so that the operator can install the formwork for the elevator passageway, concrete pouring, etc. Even if the width or width of the passage is changed, it is possible to improve the convenience of installation by fixing it in response.

즉, 현장 상황에 맞게 파이프 등을 절단 및 용접할 필요가 없다.That is, there is no need to cut and weld the pipe or the like according to the field situation.

또한 상기 고정유닛은 고정부재 및 고정파이프에 의해 엘리베이터 승강통로 내벽(W)에 견고하게 고정됨에 따라 시스템 서포트의 흔들림을 방지하여 안전성을 확보할 수 있으며,In addition, the fixing unit is firmly fixed to the inner wall (W) of the elevator hoistway by the fixing member and the fixing pipe, so it is possible to secure safety by preventing the shaking of the system support,

고정파이프와 수직재 사이 공간에 낙하물방지부재를 더 도입함으로서 작업도구 및 작업자가 떨어져 인명피해가 발생하는 것을 미연에 방지할 수 있다.By further introducing a falling object prevention member into the space between the fixed pipe and the vertical member, it is possible to prevent in advance that the work tool and the worker fall and cause personal injury.

도 1 및 도 2는 본 발명에 따른 시스템 서포트의 서로 다른 방향의 측면도
도 3은 본 발명에 따른 시스템 서포트의 평면도
도 4는 본 발명에 따른 시스템 서포트의 서로 다른 방향의 상세도
도 5는 본 발명에 따른 시스템 서포트의 고정유닛의 상세도
도 6은 본 발명에 따른 시스템 서포트의 밀착유닛의 상세도
도 7은 본 발명에 따른 시스템 서포트의 설치된 상태를 나타낸 평면도
1 and 2 are side views in different directions of a system support according to the invention;
3 is a plan view of a system support according to the present invention;
4 is a detailed view in different directions of a system support according to the invention;
5 is a detailed view of the fixing unit of the system support according to the present invention;
6 is a detailed view of the adhesion unit of the system support according to the present invention
7 is a plan view showing an installed state of the system support according to the present invention;

이하 첨부된 도면을 참고하여 본 발명을 상세히 설명하도록 한다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는 바, 구현예(態樣, aspect)(또는 실시예)들을 본문에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. Since the present invention can have various changes and can have various forms, implementation examples (態樣, aspects) (or embodiments) will be described in detail in the text. However, this is not intended to limit the present invention to the specific disclosed form, it should be understood to include all modifications, equivalents and substitutes included in the spirit and scope of the present invention.

각 도면에서 동일한 참조부호, 특히 십의 자리 및 일의 자리 수, 또는 십의 자리, 일의 자리 및 알파벳이 동일한 참조부호는 동일 또는 유사한 기능을 갖는 부재를 나타내고, 특별한 언급이 없을 경우 도면의 각 참조부호가 지칭하는 부재는 이러한 기준에 준하는 부재로 파악하면 된다.In each drawing, the same reference sign, particularly the number of the tens and one digit, or the reference numerals having the same tens, one, and alphabet, indicates a member having the same or similar function, and, unless otherwise specified, each The member indicated by the reference sign may be regarded as a member conforming to these standards.

또 각 도면에서 구성요소들은 이해의 편의 등을 고려하여 크기나 두께를 과장되게 크거나(또는 두껍게) 작게(또는 얇게) 표현하거나, 단순화하여 표현하고 있으나 이에 의하여 본 발명의 보호범위가 제한적으로 해석되어서는 안 된다.In addition, in each drawing, components are expressed in exaggeratedly large (or thick), small (or thin) or simplified in size or thickness in consideration of convenience of understanding, but the protection scope of the present invention is limited by this. it shouldn't be

본 명세서에서 사용한 용어는 단지 특정한 구현예(태양, 態樣, aspect)(또는 실시예)를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, ~포함하다~ 또는 ~이루어진다~ 등의 용어는 명세서 상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used herein is only used to describe a specific embodiment (aspect, aspect, aspect) (or embodiment), and is not intended to limit the present invention. The singular expression includes the plural expression unless the context clearly dictates otherwise. In the present application, terms such as comprises or consists of are intended to designate that the features, numbers, steps, operations, components, parts, or combinations thereof described in the specification exist, but one or more other features It is to be understood that it does not preclude the possibility of the presence or addition of numbers, steps, operations, components, parts, or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless defined otherwise, all terms used herein, including technical and scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with the meaning in the context of the related art, and should not be interpreted in an ideal or excessively formal meaning unless explicitly defined in the present application. does not

본 발명에 따른 엘리베이터 승강통로 시공용 시스템 서포트(S)는 장선(10), 멍에(20), 수직재(30) 및 고정유닛(40)을 포함하여 이루어지는 것으로, 도면을 참조하여 각각의 구성에 대하여 보다 상세하게 설명하도록 한다.The system support (S) for elevator hoistway construction according to the present invention is made to include a joist 10, a yoke 20, a vertical member 30 and a fixing unit 40, with reference to the drawings for each configuration It will be described in more detail.

본 발명은 엘리베이터를 설치하기 위한 승강통로에 구비되는 것으로, 외부에서 제작후 크레인을 이용하여 엘리베이터 승강통로(P) 내부에 위치시킨 후 고정하는 것이 바람직하며, 이는 후술하는 인양고리를 통하여 이루어질 수 있다.The present invention is provided in the hoistway for installing the elevator, and after being manufactured from the outside, it is preferable to position it inside the elevator hoistway (P) using a crane and then fix it, which can be done through a lifting ring to be described later. .

본 발명은 복수의 장선(10)과 멍에(20)를 직교하게 구비하여 하부틀(F)을 형성하는 것으로, 상기 장선(10)과 멍에(20)는 각각 사각의 파이프로 이루어지는 것이 바람직하며, 상기 고정유닛(40) 및 후술하는 밀착유닛(50)을 위하여 상기 장선(10) 및 멍에(20)는 내부가 비어있는 각파이프로 이루어진다.The present invention is to form a lower frame (F) by providing a plurality of joists (10) and yokes (20) orthogonally, and it is preferable that the joists (10) and yokes (20) are each made of a rectangular pipe, For the fixing unit 40 and the close contact unit 50 to be described later, the joists 10 and the yoke 20 are made of an empty angular pipe.

도1 내지 도3에 도시된 바와 같이 상기 멍에(20)와 장선(10)은 하부틀(F)을 형성하는 것으로, 서로 이격되도록 멍에(20)가 복수개로 구비되되, 도면에 도시된 바와 같이 두 개의 멍에(20)가 나란하게 배열되는 것이 바람직하나, 이 두 멍에(20) 중간에 또 다른 멍에(20)가 더 구비되는 것도 가능하며, 이에 권리범위를 제한 해석해서는 안 된다.1 to 3, the yoke 20 and the joist 10 form a lower frame F, and a plurality of yokes 20 are provided to be spaced apart from each other, as shown in the drawings. It is preferable that the two yokes 20 are arranged side by side, but it is also possible that another yoke 20 is further provided in the middle of the two yokes 20, and this should not be construed as limiting the scope of rights.

상기 멍에(20) 상부에는 상기 멍에(20)와 직교하는 방향으로 장선(10)이 구비되게 되는데, 이 장선(10)은 도3에 도시된 바와 같이, 두 개의 멍에(20) 각 단부 쪽 상부에 구비되는 한 쌍의 외측장선(11)과, 이 외측장선(11) 내부에 구비되는 내측장선(12)으로 이루어질 수 있으며, 상기 내측장선(12)은 도면에 도시된 바와 같이, 상기 한 쌍의 외측장선(11) 사이에 2개가 구비되는 것이 바람직하나, 그 크기에 따라 1개 또는 3개 이상으로 구비되는 것도 가능하며 이에 권리범위를 제한 해석해서는 안 된다.A joist 10 is provided on the upper portion of the yoke 20 in a direction orthogonal to the yoke 20. As shown in FIG. 3, the joist 10 is the upper portion of each end of the two yokes 20. It may be composed of a pair of outer joists 11 provided in the It is preferable that two are provided between the outer joists 11, but it is also possible to provide one or three or more depending on the size, and this should not be construed as limiting the scope of rights.

상기 한 쌍의 멍에(20) 양측에는 각각 인양고리(21)가 볼팅결합을 통하여 구비되게 되는데, 이 인양고리(21)는 앞서 언급한 바와 같이, 크레인을 이용하여 엘리베이터 승강통로(P) 내부에 위치시키기 위한 것으로, 인양고리(21)의 형상은 다양하게 구현될 수 있으며, 이에 권리범위를 제한 해석해서는 안 된다.A lifting ring 21 is provided on both sides of the pair of yokes 20 through bolting, and the lifting ring 21 is, as mentioned above, inside the elevator hoistway P by using a crane. For positioning, the shape of the lifting ring 21 may be implemented in various ways, and the scope of the rights should not be limited thereto.

또한 본 발명은 한 층의 승강통로의 건설이 완료되면, 상기 크레인을 이용하여 한 층 위로 올린 후, 다시 고정하여 다음 층의 승강통로를 제작하는 것으로, 상기 인양고리(21)에 크레인이 상시로 연결되는 것도 가능하며, 이에 권리범위를 제한 해석해서는 안 된다.In addition, the present invention is to manufacture the elevator passage for the next floor by lifting it up one floor using the crane and fixing it again when the construction of the elevator passage on one floor is completed, and the crane is installed on the lifting ring 21 at all times. Connections are also possible, and the scope of rights should not be construed as being limited.

상기 장선(10)에는 수직재(30)가 더 구비되게 되어 시스템 서포트를 구성하게 되는데, 상기 수직재(30) 또한 각파이프로 이루어지는 것이 바람직하며, 상기 수직재(30)를 상기 장선(10) 상부에 수직방향으로 고정 결합하기 위하여 상기 장선(10) 상부에는 별도의 연결부재(14)가 더 구비되게 된다.The joist 10 is further provided with a vertical member 30 to constitute a system support, and the vertical member 30 is also preferably made of a angular pipe, and the vertical member 30 is vertically placed on the upper portion of the joist 10 . A separate connecting member 14 is further provided on the upper portion of the joist 10 for fixed coupling in the direction.

보다 정확하게는 한 쌍의 멍에(20)와 외측장선(11)의 교차점(C) 및 상기 한 쌍의 외측장선(11)의 각 중앙에 상기 연결부재(14)가 구비되고, 이 각각의 연결부재(14)에 수직재(30)가 수직방향으로 결합되는 구조로 이루어져, 총 6개의 수직재(30)가 상기 장선(10) 상부에 구비되어 작업공간을 형성하고 있으나, 상기 외측장선(11)의 각 중앙에 구비되는 연결부재(14)는 필수적인 구성요소는 아니며, 중앙이 아닌 일정간격 이격되어 복수개로 구비되는 것도 가능하며, 이에 권리범위를 제한 해석해서는 안 된다.More precisely, the connecting member 14 is provided at the intersection C of the pair of yokes 20 and the outer joists 11 and at each center of the pair of outer joists 11, and each of the connecting members It consists of a structure in which the vertical member 30 is vertically coupled to the 14, and a total of six vertical members 30 are provided on the joists 10 to form a working space, but each of the outer joists 11 The connection member 14 provided in the center is not an essential component, and it is possible to provide a plurality of portions spaced apart from the center by a predetermined interval, and this should not be construed as limiting the scope of rights.

다시, 도4에 도시된 바와 같이, 상기 연결부재(14)는 장선(10) 상부에 볼팅결합되는 몸체(141)와, 상기 몸체(141) 상부에 구비되어 상기 수직재(30)에 내삽되는 내삽부(143)로 이루어지며, 상기 몸체(141)에는 외측으로 돌출되는 결합링(R)이 구비되어, 후술하는 지지부재(60)가 끼움 결합 될 수 있도록 구성된다.Again, as shown in FIG. 4 , the connecting member 14 includes a body 141 that is bolted to the upper part of the joist 10 , and an interpolation that is provided on the body 141 and is interpolated into the vertical member 30 . Consists of a portion 143, the body 141 is provided with a coupling ring (R) protruding outward, it is configured so that the support member 60 to be described later can be fitted.

아울러 상기 수직재(30)의 상부에는 상기 내삽부(143)와 마찬가지로 내격이 작은 내장부(31)가 더 구비되어 있으며, 이에 따라 복수의 수직재(30)를 상하방향으로 중첩 결합시킬 수 있으며, 상기 수직재(30)의 외면에도 상하 방향으로 서로 이격된 복수의 결합링(R)이 구비되어 현장 상황에 맞게 지지부재(60)의 위치를 선택하여 끼움 결합할 수 있도록 이루어진다.In addition, the upper part of the vertical member 30 is further provided with an internal part 31 having a small internal spacing, similar to the interpolation part 143, so that a plurality of vertical members 30 can be overlapped and coupled in the vertical direction, and the A plurality of coupling rings (R) spaced apart from each other in the vertical direction are also provided on the outer surface of the vertical member 30 so that the position of the support member 60 can be selected and fitted to suit the field situation.

상기 지지부재(60)는 도1 및 도2에 도시된 바와 같이, 각파이프로 이루어지며, 인접하는 동일높이의 결합링(R)에 수평방향으로 끼워지는 것으로, 양단부에 상기 결합링(R)이 끼움 결합되도록 끼움홈이 형성된 끼움부재(61)가 구비되는 것이 바람직하다.As shown in Figs. 1 and 2, the support member 60 is made of an angular pipe and is horizontally fitted to a coupling ring (R) of the same height adjacent to the coupling ring (R) at both ends. It is preferable that a fitting member 61 having a fitting groove formed therein is provided so as to be fitted.

즉, 상기 지지부재(60)는 서로 이격된 수직재(30) 중 인접하는 수직재(30) 사이에 횡방향으로 구비되는 것으로, 이 수직재(30)들 상부에 발판부재(70)가 안착되어 작업자가 작업할 수 있는 공간을 확보하게 되며, 보다 정확하게는 상기 발판부재(70)의 테두리가 상기 수직재(30)의 상면에 높이는 구조로, 상기 수직재(30)들의 내부 공간을 채우게 되며, 이는 도7의 평면도에 나타나 있다.That is, the support member 60 is provided in the transverse direction between adjacent vertical members 30 among the vertical members 30 spaced apart from each other. A space to work is secured, and more precisely, the rim of the scaffolding member 70 has a structure that is raised to the upper surface of the vertical member 30, and fills the internal space of the vertical member 30, which is shown in FIG. shown on the floor plan.

아울러, 본 발명은 가새(G)를 이용하여 상기 수직재(30)들을 대각선 방향으로 더 고정함으로서 흔들림을 방지하고 내구성 및 안전성을 높일 수 있으며, 이러한 가새(G)는 종래에 공지된 기술로서, 자세한 설명은 생략하도록 한다.In addition, the present invention can prevent shaking and increase durability and safety by further fixing the vertical members 30 in the diagonal direction using a brace (G), and this brace (G) is a known technique in the prior art, detailed The description will be omitted.

상기와 같은 구성에 의해 본 발명은 작업자가 엘리베이터 승강통로(P) 내부에서 제반작업을 수행할 수 있도록 하는 것으로, 안전성을 확보하기 위하여 상기 엘리베이터 승강통로(P) 내부에 고정될 필요가 있으며, 이를 위하여 본 발명은 고정유닛(40)을 더 구비하는 것을 특징으로 한다.According to the above configuration, the present invention enables the operator to perform various operations inside the elevator hoistway P, and it is necessary to be fixed inside the elevator hoistway P to ensure safety, and this The present invention is characterized in that it further comprises a fixing unit (40).

보다 정확하게는 거푸집 등의 제반작업을 진행하고자 하는 층의 하부층(제반작업이 완료된 층)에 고정되고, 작업 완료 후, 이를 내벽(W)으로부터 다시 분리시킨 후 크레인을 동작하여 상승시켜 다음층에 고정하는 공정을 반복하게 된다.More precisely, the formwork is fixed to the lower layer (the floor where the general work is completed) of the floor where the general work such as formwork is to be carried out, and after the work is completed, it is separated from the inner wall (W) again and lifted by operating a crane and fixed to the next floor the process will be repeated.

먼저, 상기 고정유닛(40)은 도1 및 도2, 도4[A] 및 도5에 도시된 바와 같이, 상기 장선(10)에 내삽되어 인출 가능하게 구비되는 인출파이프(41)과, 상기 인출파이프(41) 단부에 구비되는 고정파이프(42) 및 상기 고정파이프(42)를 상기 엘리베이터 승강통로(P) 내벽(W)에 고정하는 고정부재(43)를 포함하여 이루어진다.First, as shown in Figs. 1 and 2, Figs. 4 [A] and Fig. 5, the fixing unit 40 is interpolated into the joist 10 and provided so as to be withdrawn from the lead pipe 41, and the It comprises a fixing pipe 42 provided at the end of the lead pipe 41 and a fixing member 43 for fixing the fixing pipe 42 to the inner wall W of the elevator hoistway P.

도5를 참조하여 상기 고정유닛(40)만 분리하여 살펴보면, 상기 고정유닛(40)은 상기 장선(10)에 인입되는 인출파이프(41)가 구비되고, 이 인출파이프(41) 상부 단부에 구비되되 상기 인출파이프(41)와 직교하는 방향으로 결합되는 고정파이프(42) 및 상기 고정파이프(42)를 엘리베이터 승강통로(P) 내벽(W)에 고정하는 고정부재(43)를 포함하여 이루어진다.Referring to FIG. 5, when only the fixing unit 40 is separated and looked at, the fixing unit 40 is provided with a lead-out pipe 41 that is drawn into the joist 10, and is provided at the upper end of the lead-out pipe 41. However, it comprises a fixing pipe 42 coupled in a direction perpendicular to the withdrawal pipe 41 and a fixing member 43 for fixing the fixing pipe 42 to the inner wall W of the elevator hoistway P.

보다 상세하게는 상기 인출파이프(41)는 각각의 장선(10)에 내삽되도록, 복수개가 구비되어 있으며, 본 발명에서는 4개의 장선(10)이 구비됨에 따라 상기 인출파이프(41) 또한 4개가 서로 이격되어 구비되고, 상기 각각의 인출파이프(41) 단부를 연결하도록 상기 인출파이프(41)와 직교하는 방향으로 고정파이프(42)가 상부에 구비되게 된다.In more detail, a plurality of the lead pipes 41 are provided to be interpolated into each joist 10, and in the present invention, as four joists 10 are provided, the lead pipes 41 are also four each other. It is provided to be spaced apart, and the fixing pipe 42 is provided on the upper part in a direction orthogonal to the outgoing pipe 41 so as to connect the ends of the respective outgoing pipes 41 .

이 때 상기 고정파이프(42)와 인출파이프(41)는 볼팅결합을 통하여 견고하게 고정되어 있으나, 용접 등의 결합방식을 이용하는 것도 가능하며 이에 권리범위를 제한 해석해서는 안 된다.At this time, the fixing pipe 42 and the lead pipe 41 are firmly fixed through bolting, but it is also possible to use a coupling method such as welding, and this should not be interpreted as limiting the scope of rights.

다시 상기 고정파이프(42)는 상기 엘리베이터 승강통로(P) 내벽(W)에 밀착되는 것으로, 보다 상세하게 설명하면, 한 쌍의 고정파이프(42)가 이격부(421)를 형성하며 상하 방향으로 이격 구비되고, 이 한 쌍의 고정파이프(42)가 이격된 상태를 유지할 수 있도록 상기 인출파이프(41)와 고정파이프(42)를 연결하는 볼트(422) 중 이격부(421)를 관통하는 부분을 용접하여 견고하게 고정시키도록 한다.Again, the fixed pipe 42 is in close contact with the inner wall W of the elevator hoistway P, and in more detail, a pair of fixed pipes 42 form a spaced portion 421 in the vertical direction. A portion passing through the spaced portion 421 of the bolts 422 connecting the lead pipe 41 and the fixed pipe 42 to be spaced apart provided and the pair of fixed pipes 42 can maintain a spaced state Weld to make it firmly fixed.

또한 상기 이격부(421)에는 고정부재(43)가 구비되어 상기 고정파이프(42)를 엘리베이터 승강통로(P) 내벽(W)에 밀착 가압하여 고정하도록 이루어지며,In addition, the separation portion 421 is provided with a fixing member 43 so as to fix the fixing pipe 42 by pressing it in close contact with the elevator hoistway (P) inner wall (W),

상기 고정부재(43)는 상기 엘리베이터 승강통로(P) 내벽(W)에 구비되는 앙카볼트(A)에 일측이 결합되는 조인너트(431)와, 상기 엘리베이터 승강통로(P) 내벽(W) 방향으로 이격부(421)를 관통하여 상기 조인너트(431)의 타측에 결합되는 고정볼트(432) 및 상기 고정볼트(432) 외면에 결합되어 상기 고정부재(43)의 내측을 엘리베이터 승강통로(P) 내벽(W) 방향으로 가압하는 고정너트(433)를 포함하여 이루어진다.The fixing member 43 includes a join nut 431 having one side coupled to an anchor bolt (A) provided on the inner wall (W) of the elevator hoistway (P), and the elevator hoistway (P) inner wall (W) direction A fixing bolt 432 coupled to the other side of the joint nut 431 through the spaced portion 421 and coupled to the outer surface of the fixing bolt 432 to pass the inside of the fixing member 43 into the elevator hoistway (P) ) comprising a fixing nut 433 for pressing in the inner wall (W) direction.

또한 상기 조인너트(431)의 타측에 고정볼트(432)를 체결할 때 상기 고정볼트(432)를 상기 조인너트(431) 타측에 체결한 후 용접하여 고정력을 향상시키는 것이 좋으며, 상기 고정볼트(432)는 헤드가 없는 무두볼트로 이루어져 상기 고정너트(433)가 외면에 결합될 수 있도록 하며, 보다 가압력을 높이기 위하여 상기 고정너트(433) 이전에 고정와셔(435)를 더 끼우는 것이 좋다.In addition, when fastening the fixing bolt 432 to the other side of the join nut 431, it is good to improve the fixing force by welding the fixing bolt 432 to the other side of the join nut 431, and the fixing bolt ( 432 is made of a headless headless bolt so that the fixing nut 433 can be coupled to the outer surface, and it is preferable to insert the fixing washer 435 before the fixing nut 433 to further increase the pressing force.

상기와 같이 조립이 완료된 후, 상기 조인너트(431)를 이격부(421)를 관통시켜 상기 앙카볼트(A)에 체결한 후, 상기 고정너트(433)를 조여 상기 고정파이프(42)를 고정와셔(435) 및 고정너트(433)가 가압하여 엘리베이터 승강통로(P) 내벽(W)에 밀착 고정하게 되고,After the assembly is completed as described above, the joint nut 431 is passed through the spacer 421 to be fastened to the anchor bolt A, and then the fixing nut 433 is tightened to fix the fixing pipe 42 . The washer (435) and the fixing nut (433) are pressed and fixed in close contact with the inner wall (W) of the elevator hoistway (P),

제반작업이 완료되면 상기 고정너트(433)를 풀어 상기 조인너트(431)를 앙카볼트(A)에서 푼 다음에 다음 층 앙카볼트(A)에 재결합하는 방식으로 작업이 진행되게 된다.When all the work is completed, the work is performed in such a way that after loosening the joint nut 431 from the anchor bolt (A) by loosening the fixing nut (433), and then recombining it with the anchor bolt (A) of the next layer.

즉, 상기와 같은 고정유닛(40)을 통하여 본 발명은 다양한 크기의 엘리베이터 승강통로(P) 폭에 맞게 상기 고정유닛(40)을 상기 장선(10)으로부터 인출시켜 고정할 수 있어, 설치 효율성 및 안전성을 모두 확보할 수 있다.That is, through the fixing unit 40 as described above, the present invention can extract and fix the fixing unit 40 from the joists 10 to fit the width of the elevator hoistway P of various sizes, so that installation efficiency and All safety can be ensured.

또한 고정유닛(40)이 인출된 상태를 보다 안전하게 홀딩하기 위하여 상기 장선(10)에는 장홀(LH)이 형성되고, 상기 인출파이프(41)에는 상기 볼트공(BH)이 형성되며, 이 장홀(LH)과 볼트공(BH)을 관통하여 결합하는 홀딩볼트가 더 구비되는 것이 바람직하나, 이에 권리범위를 제한 해석해서는 안 된다.In addition, in order to more safely hold the state in which the fixing unit 40 is drawn out, a long hole (LH) is formed in the joist 10, and the bolt hole (BH) is formed in the lead pipe 41, and this long hole ( It is preferable that a holding bolt that penetrates through the LH) and the bolt hole (BH) is further provided, but this should not be interpreted as limiting the scope of the right.

아울러, 본 발명은 작업 시 흔들리는 것을 방지하기 위하여, 상기 엘리베이터 승강통로(P) 내벽(W) 중 다른 벽면, 즉 상기 고정유닛(40)에 의해 고정되지 않는 방향의 벽면(내벽(W))에 밀착 고정하는 밀착유닛(50)을 더 구비하고 있다.(도4[B] 및 도6 참조)In addition, in the present invention, in order to prevent shaking during operation, the other wall of the inner wall (W) of the elevator hoistway (P), that is, the wall in the direction not fixed by the fixing unit (40) (inner wall (W)) It further includes a close contact unit 50 that is fixed in close contact. (See Figs. 4 [B] and Fig. 6)

상기 밀착유닛(50)은 상기 각각의 멍에(20)에 내삽되는 복수의 연장파이프(51)와, 상기 연장파이프(51)의 단부에 상기 연장파이프(51)와 직교하는 방향으로 결합되는 밀착파이프(52)로 이루어져 있으며,The adhesion unit 50 includes a plurality of extension pipes 51 interpolated into each of the yokes 20 , and an adhesion pipe coupled to an end of the extension pipe 51 in a direction perpendicular to the extension pipe 51 . (52) consists of,

상기 고정유닛(40)과 마찬가지로, 상기 엘리베이터 승강통로(P) 너비에 맞게 상기 연장파이프(51)를 상기 멍에(20)로부터 인출시켜 상기 밀착파이프(52)가 엘리베이터 승강통로(P) 내벽(W)에 밀착되도록 하고, 앞서 언급한 장선(10)과 고정파이프(42)에 구비되는 장홀(LH) 및 볼트공(BH)이 상기 멍에(20)와 연장파이프(51)에 동일하게 구비되어 상기 홀딩볼트를 통하여 고정함에 따라 인출상태, 즉 상기 엘리베이터 승강통로(P) 내벽(W)에 밀착파이프(52)가 밀착된 상태를 유지하여 흔들림을 방지하도록 한다.Similarly to the fixing unit 40, the extension pipe 51 is drawn out from the yoke 20 to fit the width of the elevator hoistway P, so that the close contact pipe 52 is formed on the inner wall of the elevator hoistway P. ), and the long hole (LH) and bolt hole (BH) provided in the above-mentioned joist 10 and fixed pipe 42 are provided in the same way in the yoke 20 and the extension pipe 51, As it is fixed through the holding bolt, the pull-out state, that is, the close contact pipe 52 is maintained in close contact with the inner wall W of the elevator hoistway P to prevent shaking.

일반적으로 엘리베이터 승강통로(P)는 상하 수직방향으로 이루어지는 통로로, 그 틈새로 작업도구나 작업자가 떨어져 인명사고가 발생하는 문제가 있다.In general, the elevator hoistway (P) is a passage made in the vertical direction, and there is a problem in that a work tool or a worker falls through the gap, resulting in a human accident.

따라서 본 발명은 이러한 문제를 해결하기 위하여 낙하물방지부재(N)를 더 구비하고 있는데, 상기 낙하물방지부재(N)는 그물망으로 제작되며, 설치 위치는 상기 수직파이프와 엘리베이터 승강통로(P)의 내벽(W) 사이인 것을 특징으로 한다. Therefore, the present invention is further provided with a falling object preventing member (N) in order to solve this problem, the falling object preventing member (N) is made of a mesh, and the installation location is the vertical pipe and the inner wall of the elevator hoistway (P) (W) It is characterized in that between.

보다 바람직하게는 상기 낙하물방지부재(N)의 일단을 상기 장선(10)과 멍에(20) 단부에 고정하고, 상기 낙하물방지부재(N)의 또 다른 단부를 상기 고정파이프(42)와 밀착파이프(52)에 고정하여, 고정유닛(40)과 밀착유닛(50)을 인출시키면 자연스럽게 낙하물방지부재(N)가 펼쳐져 그 틈새를 막을 수 있도록 하여 작업 편의성 및 안전성을 모두 확보할 수 있도록 하는 것이 좋으나,More preferably, one end of the falling object prevention member (N) is fixed to the end of the joist (10) and the yoke (20), and the other end of the falling object prevention member (N) is connected to the fixing pipe (42) and the close contact pipe It is good to secure both work convenience and safety by fixing to 52 and withdrawing the fixed unit 40 and the close contact unit 50 to naturally spread the falling object prevention member (N) to close the gap. ,

현장 상황에 따라 낙하물방지부재(N)를 별도로 구비하여, 상기 고정유닛(40) 및 밀착유닛(50)을 통해 시스템 서포트를 승강통로에 고정한 후, 별도로 틈새에 설치하는 것도 가능하며 이에 권리범위를 제한 해석해서는 안 된다.It is also possible to separately provide a falling object prevention member (N) according to the site situation, fix the system support to the hoistway through the fixing unit 40 and the close contact unit 50, and then install it in a separate gap. It should not be construed as limiting.

또 이상에서 본 발명을 설명함에 있어 첨부된 도면을 참조하여 특정 형상과 구조 및 구성을 갖는 엘리베이터 승강통로 시공용 시스템 서포트를 위주로 설명하였으나 본 발명은 당업자에 의하여 다양한 수정, 변경 및 치환이 가능하고, 이러한 수정, 변경 및 치환은 본 발명의 보호범위에 속하는 것으로 해석되어야 한다.In addition, in the above description of the present invention, with reference to the accompanying drawings, the system support for elevator hoistway construction having a specific shape, structure and configuration has been mainly described, but the present invention is capable of various modifications, changes and substitutions by those skilled in the art, Such modifications, changes and substitutions should be construed as falling within the protection scope of the present invention.

S : 시스템 서포트 P : 엘리베이터 승강통로
F : 하부틀 C : 교차점
R : 결합링 A : 앙카볼트
G : 가새 LH : 장홀
BH : 볼트공 N : 낙하물방지부재
10 : 장선 11 : 외측장선
12 : 내측장선 14 : 연결부재
141 : 몸체 143 : 내삽부
20 : 멍에 21 : 인양고리
30 : 수직재 31 : 내장부
40 : 고정유닛 41 : 인출파이프
42 : 고정파이프 421 : 이격부
422 : 볼트 43 : 고정부재
431 : 조인너트 432 : 고정볼트
433 : 고정너트 435 : 고정와셔
50 : 밀착유닛 51 : 연장파이프
52 : 밀착파이프
60 : 지지부재 61 : 끼움부재
70 : 발판부재
S : System support P : Elevator hoistway
F : lower frame C : intersection
R : Coupling ring A : Anchor bolt
G : brace LH : long hole
BH: Bolt hole N: Falling object prevention member
10: joists 11: outer joists
12: inner joist 14: connecting member
141: body 143: interpolation part
20: yoke 21: lifting ring
30: vertical material 31: interior part
40: fixed unit 41: take-out pipe
42: fixed pipe 421: spaced part
422: bolt 43: fixing member
431: join nut 432: fixing bolt
433: fixing nut 435: fixing washer
50: adhesion unit 51: extension pipe
52: tight pipe
60: support member 61: fitting member
70: scaffold member

Claims (4)

서로 이격되어 나란하게 배열되는 복수개의 멍에(20);
상기 멍에(20) 상부에 상기 멍에와 직교하는 방향으로 구비되는 복수개의 장선(10);
상기 장선(10) 상부에 구비되는 연결부재(14)에 결합되어, 상기 장선(10)으로부터 수직방향으로 구비되는 수직재(30);
상기 장선(10)에 내삽되어 인출 가능하게 구비되는 인출파이프(41)와, 상기 인출파이프(41) 단부에 구비되는 고정파이프(42) 및 상기 고정파이프(42)를 엘리베이터 승강통로 내벽에 고정하는 고정부재(43)를 포함하여 이루어지는 고정유닛(40);
상기 고정유닛(40)의 고정파이프(42)는, 이격부(421)를 형성하도록 상하로 이격되는 한 쌍의 고정파이프이고, 상기 이격부(421)를 통하여 상기 고정부재(43)가 엘리베이터 승강통로 내벽에 고정 설치되되,
상기 고정부재(43)는,
상기 엘리베이터 승강통로 내벽에 구비되는 앙카볼트에 일측이 결합되는 조인너트(431)와, 상기 엘리베이터 승강통로 내벽 방향으로 상기 이격부(421)를 관통하여 상기 조인너트의 타측에 결합되는 고정볼트(432) 및 상기 고정볼트 외면에 결합되어 상기 고정부재의 내측을 엘리베이터 승강통로의 내벽 방향으로 가압하는 고정너트(433)를 포함하여 이루어짐으로써,
엘리베이터 승강통로의 크기에 맞게 상기 고정유닛(40)의 인출파이프(41)를 상기 장선(10)으로부터 슬라이딩 방식으로 돌출시킨 후, 상기 고정파이프(42)를 엘리베이터 승강통로의 내벽(W)에 고정함으로서 시스템 서포트를 엘리베이터 승강통로(P) 내부에 고정하는 것을 특징으로 하는 엘리베이터 승강통로 시공용 시스템 서포트.
A plurality of yokes 20 spaced apart from each other and arranged side by side;
a plurality of joists 10 provided on the yoke 20 in a direction orthogonal to the yoke;
a vertical member 30 coupled to the connecting member 14 provided on the joist 10 and provided in a vertical direction from the joist 10;
The lead pipe 41 interpolated into the joist 10 and provided to be drawn out, the fixed pipe 42 provided at the end of the take-out pipe 41, and the fixed pipe 42 are fixed to the inner wall of the elevator hoistway a fixing unit 40 comprising a fixing member 43;
The fixed pipe 42 of the fixed unit 40 is a pair of fixed pipes that are vertically spaced apart to form a spacer 421 , and the fixed member 43 moves the elevator up and down through the spacer 421 . It is fixedly installed on the inner wall of the passage,
The fixing member 43,
A join nut 431 having one side coupled to an anchor bolt provided on the inner wall of the elevator hoistway, and a fixing bolt 432 coupled to the other side of the join nut through the spacer 421 in the direction of the inner wall of the elevator hoistway ) and a fixing nut 433 coupled to the outer surface of the fixing bolt and pressing the inside of the fixing member in the direction of the inner wall of the elevator hoistway ,
After the extraction pipe 41 of the fixing unit 40 is protruded from the joist 10 in a sliding manner according to the size of the elevator hoistway, the fixing pipe 42 is fixed to the inner wall W of the elevator hoistway. System support for elevator hoistway construction, characterized in that by fixing the system support inside the elevator hoistway (P).
제 1 항에 있어서,
상기 각각의 연결부재(14) 및 수직재(30)에는 결합링(R)이 구비되고,
인접하는 동일 높이에 있는 한 쌍의 결합링이 양측에 끼워지는 지지부재(60) 및 상기 지지부재(60) 상부에 안착되는 발판부재(70)가 더 구비되는 것을 특징으로 하는 엘리베이터 승강통로 시공용 시스템 서포트.
The method of claim 1,
A coupling ring (R) is provided on each of the connecting member 14 and the vertical member 30,
Elevator hoistway construction, characterized in that the support member (60) fitted on both sides of a pair of adjacent coupling rings at the same height and the scaffold member (70) seated on the upper part of the support member (60) are further provided system support.
삭제delete 제 1 항 또는 제 2 항에 있어서,
상기 엘리베이터 승강통로 내벽에 고정되는 고정파이프(42)와 상기 수직재(30) 사이에는 낙하물방지부재(N)가 더 구비되는 것을 특징으로 하는 엘리베이터 승강통로 시공용 시스템 서포트.
3. The method of claim 1 or 2,
System support for elevator hoistway construction, characterized in that a falling object prevention member (N) is further provided between the fixed pipe 42 fixed to the inner wall of the elevator hoistway and the vertical member 30.
KR1020200103943A 2020-08-19 2020-08-19 System support KR102362063B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200103943A KR102362063B1 (en) 2020-08-19 2020-08-19 System support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200103943A KR102362063B1 (en) 2020-08-19 2020-08-19 System support

Publications (1)

Publication Number Publication Date
KR102362063B1 true KR102362063B1 (en) 2022-02-11

Family

ID=80266259

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200103943A KR102362063B1 (en) 2020-08-19 2020-08-19 System support

Country Status (1)

Country Link
KR (1) KR102362063B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950001044A (en) * 1993-06-26 1995-01-03 김태희 Internal formwork construction method of vertical hollow structure and its device
JP3158414U (en) * 2009-12-15 2010-04-02 株式会社ハマックス Scaffolding structure and safety net support used therefor
JP2012241473A (en) * 2011-05-23 2012-12-10 Daifuzi Co Ltd Support material for temporary scaffold plate and method of installing temporary scaffold using the same
KR20130063524A (en) * 2013-05-27 2013-06-14 코리아디엠주식회사 Temporary resources for constructing corrugated bulkhead of cargo ship

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950001044A (en) * 1993-06-26 1995-01-03 김태희 Internal formwork construction method of vertical hollow structure and its device
JP3158414U (en) * 2009-12-15 2010-04-02 株式会社ハマックス Scaffolding structure and safety net support used therefor
JP2012241473A (en) * 2011-05-23 2012-12-10 Daifuzi Co Ltd Support material for temporary scaffold plate and method of installing temporary scaffold using the same
KR20130063524A (en) * 2013-05-27 2013-06-14 코리아디엠주식회사 Temporary resources for constructing corrugated bulkhead of cargo ship

Similar Documents

Publication Publication Date Title
JP4823790B2 (en) Column unit and method of building building using column unit
US9506266B2 (en) Concrete deck with lateral force resisting system
KR200417438Y1 (en) Bracket structure for girder and slab construction
KR101980304B1 (en) Piping installation apparatus and piping construction method using the same
JP6603824B2 (en) Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling
KR101616302B1 (en) Scaffolding for the footboard support bracket
KR102362063B1 (en) System support
JP2013238095A (en) Construction method of reinforced concrete skeleton and reinforced concrete structural skeleton
KR0140904B1 (en) Scaffolding for an elevator pit
KR20090032478A (en) Apparatus preventing separation of cage for construction
KR101772468B1 (en) The modular support member for construction precast member and construction method
CN112593717B (en) Fixing device for inclined support of prefabricated wallboard in board descending area
CN209907886U (en) Adjustable assembled stair construction platform
JP2001329700A (en) Temporary jointing method for column during building demolition in jack system
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JPH10299290A (en) Removing method of top section of ultrahigh cylindrical structure and scaffold for removal work
CN102720341B (en) Frame column construction operation rack and mounting method thereof
JP2013129961A (en) Temporary fixation method for steel staircase and pipe support for supporting steel staircase
KR102599396B1 (en) Automatic release device for lifting gangform safely and gangform system having the same
KR101854159B1 (en) External scaffold joint structure
CN209942195U (en) Construction operation platform of high-rise hollow area
CN214885399U (en) Adjustable operation construction equipment of steel column
KR20130104923A (en) Assembled gang form
CN213087392U (en) Elevator shaft lifting type construction steel platform
KR102437398B1 (en) Easy-to-install integrated slab euroform system

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant