CN213087392U - Elevator shaft lifting type construction steel platform - Google Patents
Elevator shaft lifting type construction steel platform Download PDFInfo
- Publication number
- CN213087392U CN213087392U CN202021765859.9U CN202021765859U CN213087392U CN 213087392 U CN213087392 U CN 213087392U CN 202021765859 U CN202021765859 U CN 202021765859U CN 213087392 U CN213087392 U CN 213087392U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel platform
- platform
- elevator shaft
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses an elevator shaft lifting type construction steel platform, which comprises two triangular support frames, a steel platform and support legs, wherein the steel platform 2 uses channel steel as a main beam, a secondary beam is arranged at every 300mm of the main beam, a decorative steel plate is welded on the steel platform, and four lifting rings are welded on the main beam of the steel platform; two triangular support frames are welded below the steel platform main beam, the vertical edges of the two triangular support frames are connected into a whole through a plurality of steel pipes, the vertical edge extending parts of the triangular support frames are support legs, the outer sides of the support legs are respectively welded with transverse short channel steel vertically, and the protruding parts of each support leg support the upper opening of the elevator shaft door opening and are fixed. When the steel platform is lifted vertically, the protruding parts of the support legs can rotate automatically when abutting against the upper opening of the door opening, and the vertical lifting of the whole body is not hindered. The utility model relates to a rationally, can have enough to meet the need the use, material saving adopts concatenation installation shaping in the off-site precast yard, simple manufacture, and construction convenience is quick.
Description
Technical Field
The utility model belongs to the building field, concretely relates to elevartor shaft promotes formula construction steel platform.
Background
Along with the continuous development of high-rise and super high-rise buildings, the safety problem of the elevator shaft part is particularly important, and how to reduce the safety risk of the elevator shaft part in the high-rise and super high-rise construction in a standardized shaping mode not only can facilitate the construction, but also has simple manufacture, safe and convenient operation, economy and certain universality.
The traditional scaffold in the construction stage of the elevator shaft generally adopts a floor type or I-steel overhanging steel pipe scaffold, and has potential safety hazards due to higher erection height, higher cost and inconvenient operation. Therefore, the elevator shaft construction lifting platform is designed and manufactured through field investigation by the inventor, the elevator shaft construction lifting platform has the advantages of high safety performance, convenience in operation, low cost and the like, and has high practical application and popularization values.
Disclosure of Invention
The utility model aims to provide an elevator shaft lifting type construction steel platform which can be repeatedly used, is green and saves cost; need not every layer and set up fastener formula scaffold frame, improved safe construction and construction progress to construction cost has been practiced thrift. Can promote along with the rising successive layer of major structure, the installation is easy and simple to handle, and the handling is swift for construction speed, safe operation is secure.
The utility model discloses an aim at and solve its main technical problem and adopt following technical scheme to realize:
an elevator shaft lifting type construction steel platform comprises two triangular support frames, a steel platform and support legs, wherein the steel platform uses channel steel as a main beam, a secondary beam is arranged at each 300mm interval of the main beam, a pattern steel plate is welded on the steel platform, and four lifting rings are welded on the main beam of the steel platform; two triangular support frames are welded below the steel platform main beam, the vertical edges of the two triangular support frames are connected into a whole through a plurality of steel pipes, the vertical edge extending parts of the triangular support frames are support legs, the outer sides of the support legs are respectively welded with transverse short channel steel vertically, and the protruding parts of each support leg support the upper opening of the elevator shaft door opening and are fixed.
And furthermore, the steel platform main beam is welded by adopting 14# channel steel.
Furthermore, the secondary beam is a square tube with the thickness of 50mm multiplied by 50mm and the thickness of 4 mm.
Furthermore, the triangular support frame is welded by adopting 20# channel steel.
Furthermore, the hanging ring is formed by welding reinforcing steel bars with the diameter of 20 mm.
Furthermore, the pattern steel plate is 5mm thick, and a turning plate with the width of 200mm is arranged on each side except the opposite side of the elevator opening.
Furthermore, the length of the transverse short channel steel is 200mm, and the distance from the transverse short channel steel to the bottom is controlled to be 200 mm-250 mm.
The utility model can be repeatedly used, is green and saves cost; need not every layer and set up fastener formula scaffold frame, improved safe construction and construction progress to construction cost has been practiced thrift. Can promote along with the rising successive layer of major structure, the installation is easy and simple to handle, and the handling is swift for construction speed, safe operation is secure. Can make different operation platform hoisting frames according to the size and the floor layer height of elevartor shaft, the suitability is stronger. The method is mainly suitable for operation and safety protection in the elevator shaft of the building construction engineering.
Drawings
FIG. 1 is a schematic view of the main body of the present invention (without the steel plate and secondary beam with patterns),
figure 2 is a top view of the present invention,
figure 3 is a reference diagram of the use state (lifting state) of the utility model,
fig. 4 is a reference diagram of the usage state (platform usage state) of the present invention.
In the figure: 1. triangular support frame, 2, steel platform, 3, decorative pattern steel sheet, 4, rings, 5, stabilizer blade, 6, horizontal short channel steel, 7, secondary beam.
Detailed Description
The invention is described in further detail below with reference to the following figures and examples:
referring to fig. 1-4, an elevator shaft lifting type construction steel platform comprises two triangular support frames 1, a steel platform 2 and support legs 5, wherein the steel platform 2 uses channel steel as a main beam, a secondary beam 7 is arranged at the interval of every 300mm of the main beam, a pattern steel plate 3 is welded on the steel platform, and four lifting rings 4 are welded on the main beam of the steel platform; two triangular support frames 1 are welded below the main beam of the steel platform, the vertical edges of the two triangular support frames 1 are connected into a whole through a plurality of steel pipes, the vertical edge extending parts of the triangular support frames 1 are support legs 5, the outer sides of the support legs 5 are respectively welded with transverse short channel steel 6, and the protruding parts of each support leg support the upper opening of the elevator shaft door opening and are fixed.
And the steel platform main beam is welded by adopting 14# channel steel.
The secondary beam 7 is a square rectangular tube with the thickness of 50mm multiplied by 50mm and the thickness of 4 mm.
The triangular support frame 1 is welded by 20# channel steel.
The lifting ring 4 is formed by welding reinforcing steel bars with the diameter of 20 mm.
The patterned steel plate 3 is 5mm thick, and each side except the opposite side of the elevator opening is provided with a 200mm wide turning plate.
The length of the transverse short channel steel 6 is 200mm, and the distance from the transverse short channel steel to the bottom is controlled to be 200 mm-250 mm, so that an L shape is formed.
Two triangular support frames are adopted, and the operation platform frame body is assembled by using a transverse support. Elevator shaft triangle steel platform lower part L type landing leg card is unanimous to the one deck floor face under the construction layer, and the width is unanimous with the elevator door opening, and upper portion operation platform card adopts the wooden wedge to fix on the bracket channel-section steel that the shear force wall was reserved, forms stable supporting platform. And fixing steel plates on the platform frame body in a welding mode to form a tool type operation platform, and adjusting the construction platform in the elevator shaft according to different elevator shaft sizes.
The construction sequence is as follows: tripod manufacturing → tripod hoisting → upper frame body installation → structure construction → dismantling (or hoisting out) the steel pipe frame → lifting the tripod.
Hoisting a section steel tripod: the steel platform is installed from two layers and used in a circulating way towards the upper layer by layer. When the steel platform is hoisted, the platform is slightly lifted into an elevator shaft by a tower crane at a certain angle, one end of the lower part of the triangular support with the short-groove steel support is arranged on one side of an elevator shaft door, and when the short-groove steel support blocks the lower edge of an elevator door opening, the operating platform is slowly leaned on the elevator shaft wall. Four steel ropes of the lifting platform device are slightly longer than two steel ropes close to the triangular short support, so that the platform device is convenient to place. When the shear wall and beam column concrete in the elevator shaft reach the strength requirement, the side mold can be detached for platform hoisting. When the steel platform is hoisted, four hoisting points are required to be respectively hung with ropes, and are hoisted simultaneously, and one or two steel wire ropes are strictly forbidden to pass through the hoisting ring for hoisting.
Lifting an elevator shaft operating frame: lifting the whole elevator shaft operating platform layer by layer, wherein the whole elevator shaft operating platform is positioned at one layer below a construction layer; when the elevator shaft construction operation frame is lifted, the upper frame body is firstly dismantled, when the fixed channel steel at the bottom of the support is clamped on the upper beam, only the other side is lifted, when the frame body passes through the clamping part, the lower part of the frame body is fixed on the beam when reaching the specified part, and the frame body is stably placed.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any form, and any simple modification, equivalent change and modification made by the technical spirit of the present invention to the above embodiments do not depart from the technical solution of the present invention.
Claims (7)
1. The utility model provides an elevartor shaft promotes formula construction steel platform which characterized in that: the steel platform comprises two triangular support frames (1), a steel platform (2) and support legs (5), wherein channel steel is used as a main beam of the steel platform (2), a secondary beam is arranged at the interval of every 300mm of the main beam, a pattern steel plate (3) is welded on the steel platform, and four lifting rings (4) are welded on the main beam of the steel platform; two triangle-shaped support frames (1) are welded below the steel platform girder, the vertical edges of the two triangle-shaped support frames (1) are connected into a whole through a plurality of steel pipe welding, the vertical edge extending parts of the triangle-shaped support frames (1) are support legs (5), the outer sides of the support legs (5) are respectively welded with transverse short channel steel (6) vertically, and the protruding parts of each support leg support against the upper opening of the elevator shaft door opening and are fixed.
2. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: and the steel platform main beam is welded by adopting 14# channel steel.
3. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: the secondary beam (7) adopts a square rectangular tube with the thickness of 50mm multiplied by 50mm and the thickness of 4 mm.
4. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: the triangular support frame (1) is welded by 20# channel steel.
5. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: the hanging ring (4) is formed by welding reinforcing steel bars with the diameter of 20 mm.
6. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: the patterned steel plate (3) is 5mm thick, and a turning plate with the width of 200mm is arranged on each side except the opposite side of the elevator opening.
7. An elevator shaft elevating construction steel platform as set forth in claim 1, wherein: the length of the transverse short channel steel (6) is 200mm, and the distance from the transverse short channel steel to the bottom is controlled to be 200 mm-250 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021765859.9U CN213087392U (en) | 2020-08-21 | 2020-08-21 | Elevator shaft lifting type construction steel platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021765859.9U CN213087392U (en) | 2020-08-21 | 2020-08-21 | Elevator shaft lifting type construction steel platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213087392U true CN213087392U (en) | 2021-04-30 |
Family
ID=75631669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021765859.9U Active CN213087392U (en) | 2020-08-21 | 2020-08-21 | Elevator shaft lifting type construction steel platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213087392U (en) |
-
2020
- 2020-08-21 CN CN202021765859.9U patent/CN213087392U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106939707A (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN111255217A (en) | Elevator shaft shaping operation platform and operation method thereof | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN113235913B (en) | Construction equipment and method for hanging, splicing and lifting vertical templates of building | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
JP3074765U (en) | Pillar building construction system equipment | |
CN213087392U (en) | Elevator shaft lifting type construction steel platform | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN211173007U (en) | Novel tripod of encorbelmenting | |
CN206174441U (en) | Elevator shaft operation platform | |
CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
CN111704058B (en) | Hoisting and lifting device | |
CN210438301U (en) | Light slat lifting device for building partition wall | |
CN211257761U (en) | Lifting type elevator shaft operating platform | |
CN211114849U (en) | Device for controlling lifting of cast-in-place wet joint bottom die of precast beam | |
CN212317450U (en) | Swing arm type elevator shaft construction operation platform | |
CN211341606U (en) | Operating platform for structural light well part | |
CN206034874U (en) | Elevator shaft combined type integral lifting operation platform | |
CN206903178U (en) | Hoisting type elevator steel platform | |
CN214270021U (en) | Operation radius lengthening device for tower crane | |
CN215519871U (en) | Combined elevator shaft operating frame | |
CN110606435A (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN217759925U (en) | BIM-based steel operating platform for light production well | |
CN213898077U (en) | High-rise building construction operation elevator shaft and lighting well operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |