JPH10299290A - Removing method of top section of ultrahigh cylindrical structure and scaffold for removal work - Google Patents

Removing method of top section of ultrahigh cylindrical structure and scaffold for removal work

Info

Publication number
JPH10299290A
JPH10299290A JP10442297A JP10442297A JPH10299290A JP H10299290 A JPH10299290 A JP H10299290A JP 10442297 A JP10442297 A JP 10442297A JP 10442297 A JP10442297 A JP 10442297A JP H10299290 A JPH10299290 A JP H10299290A
Authority
JP
Japan
Prior art keywords
scaffold
ultra
tubular structure
high tubular
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10442297A
Other languages
Japanese (ja)
Other versions
JP3028071B2 (en
Inventor
Yoshio Kuroki
義雄 黒木
Keisuke Kako
啓介 加來
Takemitsu Korogi
武光 興梠
Hisanori Yoshiyanagi
尚徳 吉柳
Toshio Wakabayashi
敏男 若林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP9104422A priority Critical patent/JP3028071B2/en
Publication of JPH10299290A publication Critical patent/JPH10299290A/en
Application granted granted Critical
Publication of JP3028071B2 publication Critical patent/JP3028071B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To shorten the term of works and prevent even the coming-fly falling disaster of concrete blocks at the time of demolition, and to improve safety by obviating previous works such as scaffold assembly on a field and eliminating the demolition of the top section of an ultrahigh cylindrical structure such as a chimney to be removed at the top section. SOLUTION: A hanging frame 3 and an internal scaffold 4 and external scaffolds 5 hung down from the hanging frame 3 are suspended by a crane, etc., and the hanging frame 3 is installed at the top section of the ultrahigh cylindrical structure such as a chimney 2 as a scaffold for upper works. The internal scaffold 4 is hung down into the ultrahigh cylindrical structure and the external scaffolds 5 to the outside of the ultrahigh cylindrical structure respectively, hangers 26 hung down from the hanging frame 3 are mounted on the top section to be removed in a section higher than the place of the cutting of the ultrahigh cylindrical structure by using these hanging frame 3, internal scaffold 4 and external scaffolds 5. The place of the cutting is cut, the hanging frame 3 is suspended by the crane, etc., and the internal scaffold 4, the external scaffolds 5 and the cut top section are lowered simultaneously on the ground together with the hanging frame 3 and demolished and disassembled.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、煙突などの超高筒
状構造物の頂部を撤去する方法および撤去作業用足場に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for removing the top of a super-high cylindrical structure such as a chimney, and a scaffold for removing work.

【0002】[0002]

【従来の技術】煙突やサイロなどの超高筒状コンクリー
ト構造物を新耐震設計基準に適合させ安全性を向上させ
るために、頂部をカットして撤去することがあり、撤去
の方法として煙突の場合、従来、例えば煙突に周囲に地
上から頂部まで足場を現場で組み立て、足場上からの作
業で頂部より小ブロックに分割解体し、この分割解体し
たコンクリートブロックをクレーンで吊り出し搬出した
り、あるいは、分割解体したコンクリートブロックを煙
突の内部に落下させ、下部の開口部から搬出する。
2. Description of the Related Art In order to improve the safety of ultra-high cylindrical concrete structures such as chimneys and silos in order to comply with the new seismic design standards and improve safety, there are cases where the top is cut and removed. In the past, in the past, for example, assembling a scaffold from the ground to the top around the chimney, dividing and disassembling into small blocks from the top by work from the scaffold, and lifting and carrying out the divided and dismantled concrete blocks with a crane, or Drop the concrete block that has been dismantled into the chimney and carry it out through the lower opening.

【0003】または、煙突に隣接してタワークレーンを
設置し、このタワークレーンで吊り上げたコンクリート
圧砕機を遠隔操作して頂部から小割して所要長をカット
する。
[0003] Alternatively, a tower crane is installed adjacent to the chimney, and the concrete crusher suspended by the tower crane is remotely operated to cut the required length by cutting the concrete crusher from the top.

【0004】[0004]

【発明が解決しようとする課題】煙突などの超高筒状構
造物は、精油所などの工場に設置される場合がほとんど
であり、煙突などの頂部の撤去作業は工場内の装置が定
期修理などのために停止する短い期間内に同時に作業す
る必要がある。他方、稼働中は煙突に接近しての足場組
立などの事前作業が不可能であるために、前記期間内に
煙突の頂部撤去のために必要な全ての作業を終了させる
ことは困難である。
In most cases, super-high cylindrical structures such as chimneys are installed in factories such as refineries, and the work of removing the tops of chimneys and the like is regularly repaired by equipment in the factory. It is necessary to work at the same time within a short period of time to stop for etc. On the other hand, since it is impossible to perform a preliminary operation such as assembling a scaffold near the chimney during operation, it is difficult to complete all the operations required for removing the top of the chimney within the period.

【0005】さらに、煙突の隣接場所には様々な設備や
装置が存在し、これらの設備や装置を避けながら総足場
や中間ステージなどの足場を現場で組立てるには工期と
費用を要し、安全性も十分に確保することが難しい。
[0005] Furthermore, various facilities and equipment exist in the place adjacent to the chimney, and assembling a scaffold such as a total scaffold or an intermediate stage at the site while avoiding these facilities and equipment requires a construction period and cost, and is safe. It is difficult to secure sufficient performance.

【0006】また、高所で分割解体し、この分割解体し
た頂部のコンクリートブロックを、頂部から下方の地上
に落下させるため、解体時のコンクリートブロックの飛
来落下災害も発生しやすく、安全性に問題があった。
Further, since the concrete block at the top, which is divided and dismantled at a high place, is dropped from the top to the ground below the top, the concrete block is likely to be dropped and dismantled during disassembly, which is a problem in safety. was there.

【0007】[0007]

【発明が解決しようとする課題】本発明の目的は前記従
来例の不都合を解消し、足場組立などの事前作業を現場
で行わずにすみ、また、撤去する煙突などの超高筒状構
造物の頂部の解体を頂部で行わずにすむから、工期の短
縮と解体時のコンクリートブロックの飛来落下災害も防
止できて安全性の向上を図ることができる超高筒状構造
物の頂部撤去方法および撤去作業用足場を提供すること
にある。
SUMMARY OF THE INVENTION An object of the present invention is to eliminate the disadvantages of the prior art and eliminate the need for prior work such as assembling a scaffold on site and to remove a super-high cylindrical structure such as a chimney to be removed. Since the top is not dismantled at the top, the method of removing the top of the ultra-high tubular structure, which can shorten the construction period and also prevent the concrete block from falling and falling at the time of dismantling and improve safety, To provide a scaffold for removal work.

【0008】[0008]

【課題を解決するための手段】本発明は前記目的を達成
するため、撤去方法として、第1に吊り架台およびここ
から吊り下ろした内部足場と外部足場とをクレーンなど
の機械で吊り上げて、前記吊り架台を上部作業用足場と
して煙突などの超高筒状構造物の頂部に設置し、内部足
場を超高筒状構造物の内側に、外部足場を超高筒状構造
物の外側にそれぞれ吊り下ろし、これら吊り架台、内部
足場および外部足場を使用して、超高筒状構造物の切断
箇所よりも上部の撤去しようとする超高筒状構造物の頂
部部分に吊り架台から吊り下ろした吊り金具を取り付
け、切断箇所を切断後、吊り架台をクレーンなどの機械
で吊り上げて、該吊り架台といっしょに内部足場、外部
足場と切断された頂部部分を同時に地上に下ろし解体す
ることを要旨とするものである。
According to the present invention, in order to achieve the above object, as a removing method, first, a hanging stand and an internal scaffold and an external scaffold suspended therefrom are lifted by a machine such as a crane. A hanging platform is installed on the top of a super-high tubular structure such as a chimney as an upper working scaffold, and an internal scaffold is suspended inside the super-high tubular structure and an external scaffold is suspended outside the ultra-high tubular structure. Using the hanging stand, the internal scaffold, and the external scaffold, the suspension suspended from the suspension stand on the top portion of the ultra-high tubular structure to be removed above the cut portion of the ultra-high tubular structure. After attaching the metal fittings and cutting the cut point, the hanging stand is lifted by a machine such as a crane, and the internal scaffolding together with the hanging stand, the external scaffold and the cut top portion are simultaneously lowered to the ground and dismantled. Than it is.

【0009】第2に、吊り金具は、超高筒状構造物の側
部の対向位置に穿設した貫通孔を支持孔として、この支
持孔にチャンネル材を貫通させて挿入すること、第3
に、吊り上げ時の変形防止のための締付けバンドを超高
筒状構造物の撤去しようとする頂部部分の周囲に巻回す
ることを要旨とするものである。
Secondly, the hanging metal fitting is formed by inserting a channel material into the supporting hole by using a through hole formed at a position facing the side of the ultra-high cylindrical structure as a supporting hole.
In addition, the gist of the present invention is that a tightening band for preventing deformation during lifting is wound around a top portion of the ultra-high tubular structure to be removed.

【0010】第4に、超高筒状構造物の撤去しようとす
る頂部部分の内部と外部にそれぞれ縦バタとリング状の
横バタによる補強材を配設し、これらの内外の補強材を
ボルトで連結して撤去部分を1回の切断で分離するこ
と、第5に、超高筒状構造物の撤去しようとする頂部部
分に生じている弱部やクラック部に薬液注入し、撤去部
分を1回の切断で分離することを要旨とするものであ
る。
Fourthly, reinforcing members are provided inside and outside the top portion of the ultra-high cylindrical structure to be removed by means of vertical flutter and ring-shaped horizontal flutter, respectively, and these inner and outer reinforcing materials are bolted. Fifthly, a chemical solution is injected into a weak portion or a crack portion generated at the top portion of the ultra-high tubular structure to be removed, and the removed portion is separated by a single cut. The gist of the present invention is to separate by one cutting.

【0011】第6に、超高筒状構造物の撤去しようとす
る頂部部分は、複数段に分割して切断することを要旨と
するものである。
Sixth, the gist of the present invention is that the top portion of the ultra-high tubular structure to be removed is divided into a plurality of stages and cut.

【0012】第7に、構造として、超高筒状構造物の上
端に設置される上部作業足場としての吊り架台と、ここ
から超高筒状構造物の内部に吊り下ろされる内部足場
と、超高筒状構造物の外部に吊り下ろされる外部足場と
で構成することを要旨とするものである。
Seventh, as a structure, a suspension base as an upper working scaffold installed at the upper end of the ultra-high tubular structure, an internal scaffold suspended from the inside of the ultra-high tubular structure from here, The gist of the present invention consists of an external scaffold suspended outside the high cylindrical structure.

【0013】第8に、外部足場は超高筒状構造物を囲む
ように吊り架台から吊り材を吊り下げ、この吊り材間に
水平つなぎ材を設け、該水平つなぎ材に張り出し足場板
を設けたこと、第9に、外部足場の張り出し足場板は水
平つなぎ材に回動自在に取り付けられることを要旨とす
るものである。
Eighth, the external scaffold suspends a suspending member from a suspending stand so as to surround the ultra-high tubular structure, a horizontal connecting member is provided between the suspending members, and an overhanging scaffold plate is provided on the horizontal connecting member. Ninth, in the ninth aspect, the overhanging scaffold plate of the external scaffold is rotatably attached to the horizontal tether.

【0014】請求項1記載の本発明によれば、超高筒状
構造物の頂部撤去のために必要な足場は、地上で予め組
み上げた吊り架台およびここから吊り下ろした内部足場
と外部足場とをクレーンなどの機械で吊り上げて頂部に
設置するだけでよいから、現場での作業が削減でき、工
期が短縮する。そして、切断後は、吊り架台をクレーン
などの機械で再度吊り上げて、該吊り架台といっしょに
内部足場、外部足場と切断された頂部部分を同時に地上
に下ろし解体することにより、解体作業を地上で行うこ
とができ、高所作業を低減できるだけでなく、解体した
コンクリートブロックなどが上方から飛来することもな
く、安全性が向上する。
According to the first aspect of the present invention, the scaffold necessary for removing the top of the ultra-high tubular structure includes a suspension base previously assembled on the ground and an internal scaffold and an external scaffold suspended therefrom. It is only necessary to lift the cranes with a machine such as a crane and install them on the top, so that work on site can be reduced and the construction period can be shortened. Then, after cutting, the suspension base is lifted again by a machine such as a crane, and the internal scaffold, the external scaffold and the cut top portion are simultaneously lowered and dismantled together with the suspension base to perform dismantling work on the ground. This can not only reduce work at heights, but also improve the safety without dismantling concrete blocks or the like from flying from above.

【0015】請求項2記載の本発明によれば、前記作用
に加えて、切断して撤去しようとする超高筒状構造物の
頂部を吊支する吊り金具は、超高筒状構造物の側部の対
向位置に穿設した貫通孔を支持孔として、この支持孔に
チャンネル材を貫通させて水平に挿入するから、切断し
た頂部の荷重を吊り金具に均等にかけることができ、吊
り架台と一体化させて安定よく切断した頂部を吊支する
ことができる。
According to the second aspect of the present invention, in addition to the above-described operation, the hanging bracket for suspending and supporting the top of the ultra-high cylindrical structure to be cut and removed is provided. Since the channel material is penetrated into the support hole, and the channel material is inserted horizontally, the through hole formed at the position opposite to the side portion is used as a support hole, so that the load on the cut top can be evenly applied to the hanging bracket, and And the top portion that has been stably cut can be suspended.

【0016】請求項3記載の本発明によれば、前記作用
に加えて、吊り上げ時の変形防止のための締付けバンド
を超高筒状構造物の撤去しようとする頂部部分の周囲に
巻回することで、吊り金具の設置箇所で超高筒状構造物
に外方への引張力が作用して超高筒状構造物が切断され
ようとしても、これを防止でき超高筒状構造物の形状を
保持できる。
According to the third aspect of the present invention, in addition to the above-described operation, a tightening band for preventing deformation during lifting is wound around the top portion of the ultra-high tubular structure to be removed. In this way, even if the ultra-high tubular structure is cut off due to the outward tensile force acting on the ultra-high tubular structure at the place where the hanging bracket is installed, this can be prevented, and the ultra-high tubular structure can be prevented from being cut. The shape can be maintained.

【0017】請求項4記載の本発明によれば、前記作用
に加えて、超高筒状構造物の撤去しようとする頂部部分
の内部と外部にそれぞれ縦バタとリング状の横バタによ
る補強材を配設し、これらの内外の補強材をボルトで連
結すれば、頂部部分を内側と外側から押さえて形状保持
でき、より効果的に頂部部分を一体化した状態にして一
度で切断できる。
According to the fourth aspect of the present invention, in addition to the above-mentioned function, a reinforcing member is provided by a vertical flap and a ring-shaped horizontal flap on the inside and outside of the top portion where the ultra-high tubular structure is to be removed, respectively. If the inner and outer reinforcing members are connected by bolts, the top portion can be held down from inside and outside to maintain the shape, and the top portion can be more effectively integrated and cut at once.

【0018】請求項5記載の本発明によれば、請求項4
記載の本発明と同様に、超高筒状構造物の撤去しようと
する頂部部分に生じている弱部やクラック部に薬液注入
すれば、頂部部分の形状を保持でき、より効果的に頂部
部分を一体化した状態にして撤去部分を1回の切断で分
離することができる。
According to the present invention described in claim 5, according to claim 4,
Similarly to the present invention described above, if a chemical solution is injected into a weak portion or a crack portion generated in the top portion where the ultra-high tubular structure is to be removed, the shape of the top portion can be maintained, and the top portion can be more effectively used. Can be separated and the removed portion can be separated by one cut.

【0019】請求項6記載の本発明によれば、超高筒状
構造物の劣化状況によっては、頂部を一度の切断で撤去
せずに、複数段に分割して切断することも可能であり、
超高筒状構造物の状態に対応した切断方法を採用でき
る。
According to the sixth aspect of the present invention, it is possible to cut the top part into a plurality of stages without removing the top part by one cutting, depending on the deterioration state of the ultra-high tubular structure. ,
A cutting method corresponding to the state of the ultra-high tubular structure can be adopted.

【0020】請求項7記載の本発明によれば、構造とし
て、上部作業足場としての吊り架台と、ここから超高筒
状構造物の内部に吊り下ろされる内部足場と、超高筒状
構造物の外部に吊り下ろされる外部足場とで構成したか
ら、吊り架台を超高筒状構造物の頂部に設置するだけで
超高筒状構造物の内部と外部とにそれぞれ作業足場を同
時に簡単に設置でき、各種作業の作業性もよいものとな
る。
According to the present invention, as a structure, a suspension base as an upper working scaffold, an internal scaffold suspended from the inside of the ultra-high tubular structure, and an ultra-high tubular structure are provided. It consists of an external scaffold that is suspended from the outside of the building, so simply setting the suspension base on the top of the ultra-high tubular structure enables easy installation of the work scaffolds inside and outside the ultra-high tubular structure at the same time. The workability of various operations can be improved.

【0021】請求項8記載の本発明によれば、前記作用
に加えて、外部足場は超高筒状構造物を囲むように吊り
架台から吊り材を吊り下げ、この吊り材間に水平つなぎ
材を設け、該水平つなぎ材に張り出し足場板を設けたか
ら、超高筒状構造物の周囲に簡単に設置できる。
According to the present invention as set forth in claim 8, in addition to the above-mentioned effects, the external scaffold suspends the suspension from the suspension base so as to surround the ultra-high tubular structure, and a horizontal connecting member is provided between the suspensions. And the overhanging scaffold plate is provided on the horizontal connecting member, so that it can be easily installed around the ultra-high tubular structure.

【0022】請求項9記載の本発明によれば、前記作用
に加えて、外部足場の張り出し足場板は水平つなぎ材に
回動自在に取り付けたから、超高筒状構造物の周囲に既
設点検歩廊や新設点検歩廊が鍔状に突出していても、外
部足場を構造物の上方から挿入して設置する際や、切断
後に引き上げる際には、張り出し足場板を上方に回動し
てはね上げた状態にしておけば、張り出し足場板が点検
歩廊にぶつかることがなく、外部足場を構造物にそって
支障なく昇降できる。
According to the ninth aspect of the present invention, in addition to the above-described operation, the overhanging scaffold plate of the external scaffold is rotatably attached to the horizontal tether, so that the existing inspection corridor is provided around the ultra-high tubular structure. When the external scaffold is projected from the top of the structure and installed or when it is lifted after cutting, the overhanging scaffolding board must be swung upwards and flipped up, even if the new inspection corridor projects in a flange shape. If this is done, the overhanging scaffold plate will not hit the inspection corridor, and the external scaffold can be moved up and down along the structure without any trouble.

【0023】[0023]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の超高筒状構造
物の撤去作業用足場の実施形態を示す縦断正面図で、本
発明の超高筒状構造物の撤去作業用足場1は、例えば煙
突2などの超高筒状構造物の上端に設置される上部作業
足場としての吊り架台3と、ここから超高筒状構造物の
内部に吊り下ろされる内部足場4と、超高筒状構造物の
外部に吊り下ろされる外部足場5とで構成する。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a vertical cross-sectional front view showing an embodiment of a scaffold for removing ultra-high tubular structures of the present invention. The scaffold 1 for removing ultra-high tubular structures of the present invention is a superstructure such as a chimney 2. A suspension base 3 as an upper working scaffold installed at the upper end of the high tubular structure, an internal scaffold 4 suspended from the inside of the ultra-high tubular structure from here, and a suspender outside the ultra-high tubular structure It consists of an external scaffold 5 to be lowered.

【0024】吊り架台3は、図3、図4にも示すように
上部主桁6と下部主桁7とで主たる部分を構成するもの
で、上部主桁6と下部主桁7はそれぞれI型鋼などによ
る鋼材6a,7aを2本、対向させたものを、下部主桁
7を下方位置にしてその上に上部主桁6を全体が十字状
になるように組み合わせてボルトで固定し、さらに、対
向する鋼材6a,7a同士、上部主桁6と下部主桁7相
互を鋼材によるつなぎ材8で結合して、全体を平面略8
角形状に形成し、周囲に手摺り10を立設する。
As shown in FIGS. 3 and 4, the suspension base 3 constitutes a main part of an upper main girder 6 and a lower main girder 7, and the upper main girder 6 and the lower main girder 7 are each an I-shaped steel. Two steel materials 6a and 7a made of the same are opposed to each other, and the upper main girder 6 is combined with the lower main girder 7 so that the whole is in a cross shape and fixed with bolts. The opposing steel members 6a, 7a, the upper main girder 6 and the lower main girder 7 are connected to each other by a connecting member 8 made of steel, and the entire surface is substantially flat.
It is formed in a square shape, and a handrail 10 is erected around the periphery.

【0025】上部主桁6、下部主桁7の上面および上部
主桁6と下部主桁7の間にチェッカープレートなどによ
る足場板9を載せる。この場合、煙突2の外側に取り付
けてある既設の煙突タラップ11を昇降するためや煙突2
の内部を昇降するための開口部12、13を確保するため、
この部分には足場板9を配設しないようにする。
A scaffold 9 such as a checker plate is placed on the upper surfaces of the upper main girder 6 and the lower main girder 7 and between the upper main girder 6 and the lower main girder 7. In this case, it is necessary to move the existing chimney ramp 11 attached to the outside of the
To secure the openings 12, 13 for raising and lowering the inside of the
The scaffold plate 9 is not provided in this portion.

【0026】また、上部主桁6には撤去作業用足場1を
吊り上げるためのフック14を中心部近傍の4箇所に設け
ておく。
The upper main girder 6 is provided with hooks 14 for lifting the scaffold 1 for removal work at four locations near the center.

【0027】内部足場4は、図1、図3にも示すように
前記吊り架台3の下部から垂設した対向する吊り材15に
適宜間隔でドーナツ状の足場板16を水平に取付ける。
As shown in FIGS. 1 and 3, the internal scaffold 4 horizontally attaches donut-shaped scaffold plates 16 to opposing suspending members 15 vertically suspended from the lower portion of the suspending stand 3 at appropriate intervals.

【0028】外部足場5は、前記つなぎ材8から吊り材
17を、煙突2に設置した状態でその外側を囲むように適
宜間隔で垂設し、この吊り材17間を水平つなぎ材18で結
合して枠組みを構成し、これに適宜間隔でエキスパンド
メタルなどによる足場板19を複数段取り付けた。
The external scaffold 5 is formed from the connecting material 8
17 are installed at the chimney 2 and suspended at appropriate intervals so as to surround the outside of the chimney 2, and the hanging members 17 are connected by a horizontal connecting member 18 to form a frame, and expanded metal or the like is provided at appropriate intervals. Scaffolding boards 19 were installed in multiple stages.

【0029】さらに作業条件に対応させて必要箇所に、
足場板19から内方、すなわち煙突2のある方向に向けて
張り出し足場板20を上方にはね上げ可能なよう回動自在
に設ける。この場合、既設の煙突タラップ11がある箇所
に配設される張り出し足場板について、図5に示すよう
に最下段に位置する張り出し足場板20aはこの煙突タラ
ップ11をさけるように張り出し長を短くし、これより上
段に位置する張り出し足場板20bについては、さらに開
口部12からの昇降の妨げにならないよう、平面において
該開口部12内に突出しないように張り出し長をもっと短
いものに形成する。
Further, in the necessary places corresponding to the working conditions,
A scaffold plate 20 is provided so as to protrude inward from the scaffold plate 19, that is, in the direction in which the chimney 2 is located, and to be rotatable so as to be able to be flipped upward. In this case, regarding the overhanging scaffolding plate arranged at the location where the existing chimney ramp 11 is located, the overhanging scaffolding plate 20a located at the lowermost stage is shortened so as to avoid the chimney ramp 11 as shown in FIG. The overhanging scaffolding plate 20b located at an upper level than this is further formed to have a shorter overhang length so as not to protrude into the opening 12 in a plane so as not to hinder the ascending and descending from the opening 12.

【0030】図中21は上下の足場板19間で吊り材17間に
設ける斜め材、22は足場板19を設けた箇所で吊り材17間
に設ける手摺りを示す。
In the drawing, reference numeral 21 denotes an oblique member provided between the upper and lower scaffolding plates 19 and between the hanging members 17, and reference numeral 22 denotes a handrail provided between the hanging members 17 at the position where the scaffolding plate 19 is provided.

【0031】次に、かかる撤去作業用足場1を使用して
超高筒状構造物である煙突2の頂部を切断して撤去する
方法を説明する。まず、図6に示すように撤去作業用足
場1を組み立てるための仮柱23を施工場所の近くの地上
で方形に組み立て、図7に示すようにこの仮柱23を使用
して撤去作業用足場1を地上で組み上げる。
Next, a method of cutting and removing the top of the chimney 2 which is an ultra-high cylindrical structure using the scaffold 1 for removing work will be described. First, as shown in FIG. 6, a temporary pillar 23 for assembling the scaffold 1 for assembling work is assembled in a rectangular shape on the ground near the construction site, and as shown in FIG. Build 1 on the ground.

【0032】煙突2の頂部の上端にはパッドを予め取り
付けるなどして補強し、水平状態としておき、組み上げ
が完了した撤去作業用足場1を、図8のように吊り架台
3に設けてあるフック14を利用してクレーン24などの機
械で吊り上げ、図9に示すように煙突2に上から挿入す
る。
At the upper end of the top of the chimney 2, a pad is reinforced in advance by attaching it in advance to keep it in a horizontal state, and the scaffold 1 for removal work that has been assembled is provided on a hook provided on a hanging stand 3 as shown in FIG. Using 14, it is lifted by a machine such as a crane 24 and inserted into the chimney 2 from above as shown in FIG. 9.

【0033】この挿入時、外部足場5に設けてある張り
出し足場板20はこれを回動して上方にはね上げたた状態
としておき、煙突2の外周面に鍔状に突設してある既設
の点検歩廊25にぶつからないようにする。
At the time of this insertion, the overhanging scaffold plate 20 provided on the external scaffold 5 is turned up and flipped upward, and is provided on the outer peripheral surface of the chimney 2 in a flange shape. Avoid hitting the inspection corridor 25.

【0034】これにより、吊り架台3の下部主桁7が煙
突2の頂部の上端に接して載置され、内部足場4が煙突
2の内部に挿入され、外部足場5の張り出し足場板20を
水平位置に回動すれば、外部足場5が煙突2の外周囲に
設置される。このとき、幅の狭い張り出し足場板20a,
20bが既設の煙突タラップ11と対向するように位置決め
る。
As a result, the lower main girder 7 of the suspension base 3 is placed in contact with the upper end of the top of the chimney 2, the internal scaffold 4 is inserted into the chimney 2, and the overhanging scaffold plate 20 of the external scaffold 5 is horizontally moved. When pivoted to the position, the external scaffold 5 is installed around the chimney 2. At this time, the narrow overhanging scaffold 20a,
Positioning is performed so that 20b faces the existing chimney ramp 11.

【0035】このようにして撤去作業用足場1が煙突2
の頂部に設置されたならば、後述の吊り金具の設置位置
や設置段数を決定するため、この撤去作業用足場1を使
用して煙突2のコンクリート劣化状態を把握する。この
劣化状態の把握作業は撤去作業用足場1上からの目視や
コアのコンクリートのサンプリングにより行う。
In this manner, the scaffold 1 for removal work is provided with the chimney 2
If it is installed on the top of the stack, the concrete-degraded state of the chimney 2 is grasped using the removal work scaffold 1 in order to determine the installation position and the number of installation steps of the hanging metal fittings described later. The work of grasping the deterioration state is performed by visual observation from the scaffold 1 for removal work or by sampling the core concrete.

【0036】他方、切断位置より下方の煙突2の周囲に
新設の点検歩廊27を取り付ける。この作業は外部足場5
を使用して行う。
On the other hand, a new inspection corridor 27 is installed around the chimney 2 below the cutting position. This work is on external scaffold 5
Done using

【0037】劣化状態と吊り金具の設置段数の関係につ
いて説明すると、煙突2を吊り金具で吊り上げるという
ことは、吊り金具の設置位置に引張力が作用することに
なり、劣化による弱部に吊り金具を設置すると、吊り上
げたときにこの部位で煙突2が切断されてしまう。そこ
で、吊り金具を多数段に設置することとして、最下段の
吊り金具を弱部の下に設置すれば、弱部をすくい上げる
ことになり、弱部に引張力が作用しないことになる。こ
のために、コンクリート劣化による弱部を予め判断する
ものである。
Explaining the relationship between the state of deterioration and the number of stages of hanging metal fittings, lifting the chimney 2 with the hanging metal means that a pulling force acts on the installation position of the hanging metal fitting, and the hanging metal fitting is attached to the weak part due to deterioration. Is installed, the chimney 2 is cut at this position when it is lifted. Therefore, if the hanging metal fittings are installed in many stages, and the lowermost hanging metal fitting is installed below the weak portion, the weak portion is scooped up and no tensile force acts on the weak portion. For this reason, a weak part due to concrete deterioration is determined in advance.

【0038】そして、劣化状態から弱部が判断されて、
例えば図2に示すように吊り金具26を2段にセットする
ことに決定した場合は、内部足場4および外部足場5を
使用して吊り金具26の設置位置で煙突2の側部に貫通孔
を穿設し、これを支持孔28としてここにチャンネル材に
よる吊り金具26を水平に貫通させて挿入し、モルタルな
どの充填剤を支持孔28に注入して吊り金具26を支持孔28
に固定する。
Then, the weak part is determined from the deterioration state,
For example, as shown in FIG. 2, when it is determined that the hanging metal fittings 26 are set in two stages, the through holes are provided on the side of the chimney 2 at the installation position of the hanging metal fittings 26 using the internal scaffold 4 and the external scaffold 5. This is used as a support hole 28, and a hanging metal fitting 26 made of a channel material is horizontally inserted and inserted into the supporting hole 28, a filler such as mortar is injected into the supporting hole 28, and the hanging metal fitting 26 is inserted into the supporting hole 28.
Fixed to

【0039】本実施形態のように吊り金具26を2段に設
置する場合、上下段の吊り金具26は互いにクロスするよ
うに位置決め、吊り架台3から吊り下ろした吊り棒29で
あるネジ棒で上段の吊り金具26を支承し、下段の吊り金
具26は上段の吊り金具26と同じく別の吊り棒29で連結す
る。
In the case where the hanging metal fittings 26 are installed in two stages as in this embodiment, the upper and lower hanging metal fittings 26 are positioned so as to cross each other, and are mounted on the upper row with the screw rods as the hanging rods 29 suspended from the hanging base 3. , And the lower hanging metal fitting 26 is connected to another hanging rod 29 similarly to the upper hanging metal fitting 26.

【0040】次に、外部足場5を使用してこの吊り金具
26の設置位置の直上方位置と、切断箇所の直上方位置
で、煙突2の周囲に締付バンド30を巻回する。この締付
バンド30は、吊り上げ時における煙突2の変形防止と、
コンクリート表面の剥離防止のためのものであり、巻回
位置は目視判断により自由に決定する。
Next, using the external scaffold 5,
The tightening band 30 is wound around the chimney 2 at a position immediately above the installation position of 26 and a position immediately above the cut position. This tightening band 30 prevents deformation of the chimney 2 during lifting,
This is for preventing the concrete surface from peeling, and the winding position is freely determined by visual judgment.

【0041】なお、表面剥離が小さい部分については煙
突2の周面にガムテープなどを巻き付けてもよい。
Note that a gum tape or the like may be wrapped around the chimney 2 at the portion where the surface peeling is small.

【0042】また、内部足場4を使用して煙突2の内部
の耐火レンガの撤去作業を行う。
Further, the refractory brick inside the chimney 2 is removed using the internal scaffold 4.

【0043】以上のようにして吊り金具26の設置と締付
バンド30の巻回が終了したならば、外部足場5を利用
し、予め設定された切断箇所aをワイヤーソーなどの切
断機械を使用して切断する。この場合は、切断される煙
突2の頂部は締付バンド30で一体化され変形防止の手段
が施されているから、一度の切断で切断を完了できる。
なお、必要に応じて締付バンド30の設置位置に対応させ
て煙突2の内部にパイプサポートを取り付ければ、さら
に効果的に一体化を図ることが可能となる。
After the installation of the hanging bracket 26 and the winding of the tightening band 30 have been completed as described above, a cutting machine such as a wire saw is used to cut the preset cutting point a using the external scaffold 5. And cut it. In this case, since the top of the chimney 2 to be cut is integrated with the fastening band 30 and is provided with a means for preventing deformation, the cutting can be completed by one cut.
If a pipe support is mounted inside the chimney 2 in accordance with the installation position of the tightening band 30 as necessary, it is possible to achieve more effective integration.

【0044】切断が完了すれば、図10のようにクレーン
等を使用して撤去作業用足場1を吊り上げる。このと
き、吊り棒29、吊り金具26により切断された煙突2の頂
部も撤去作業用足場1といっしょに吊り上げられる。こ
の状態で切断された煙突2の頂部は2段の吊り金具26に
均等に荷重がかかっているから、水平に保持され、ま
た、締付バンド30によって形状保持される。
When the cutting is completed, the removal work scaffold 1 is lifted using a crane or the like as shown in FIG. At this time, the top of the chimney 2 cut by the hanging rod 29 and the hanging fitting 26 is also lifted together with the removal work scaffold 1. Since the top of the chimney 2 cut in this state is equally loaded on the two-stage hanging fittings 26, the chimney 2 is held horizontally and the shape is held by the tightening band 30.

【0045】また、吊り上げ時に新設の点検歩廊27が外
部足場5の方向に突出しているが、挿入時と同様にして
張り出し足場板20を上方に回動してはね上げておけば、
新設の点検歩廊27が外部足場5の引き抜きの妨げになる
ことはない。
Also, the newly installed inspection corridor 27 protrudes in the direction of the external scaffold 5 at the time of lifting, but if the overhanging scaffold plate 20 is turned upward and flipped up in the same manner as at the time of insertion,
The newly installed inspection corridor 27 does not hinder the pulling out of the external scaffold 5.

【0046】このようにして図11のように撤去作業用足
場1と一緒に撤去した煙突2の頂部を地上に下ろし、地
上で解体する。
As shown in FIG. 11, the top of the chimney 2 removed together with the scaffold 1 for removal work is lowered to the ground and disassembled on the ground.

【0047】前記実施形態では切断した煙突2の形状保
持のための手段として締付バンド30を使用したが、これ
に限定されるものではなく、撤去方法の第2実施形態と
して図12、図13に示すように頂部部分の内部と外部にそ
れぞれ例えば縦バタ31とリング状の横バタ32による補強
材を配設し、これらの内外の補強材をボルト33で連結
し、締付バンド30を併用することもでき、このようにす
れば煙突2の形状保持をさらに強固にものとすることが
でき、1度の切断も容易となる。
In the above-described embodiment, the fastening band 30 is used as a means for maintaining the shape of the cut chimney 2. However, the present invention is not limited to this, and a second embodiment of the removing method is shown in FIGS. As shown in the figure, reinforcing materials are provided inside and outside the top part by, for example, vertical flaps 31 and ring-shaped horizontal flaps 32, and these inner and outer reinforcing materials are connected by bolts 33, and the tightening band 30 is also used. By doing so, the shape of the chimney 2 can be more firmly maintained, and a single cut becomes easier.

【0048】また、第3実施形態として、図14に示すよ
うに劣化状況によっては複数回に分割して切断箇所a,
b,cを切断してもよい。この場合も撤去作業用足場1
と切断した煙突2の部分は同時に吊り上げるものである
ため、撤去作業用足場1も煙突2と同レベルで切断する
必要があり、また、撤去により上段の吊り架台3も撤去
されてしまうから、2回目以降の切断に際しては、切断
後の残っている煙突2の上端に吊り架台3を再度設置す
る必要がある。
As a third embodiment, as shown in FIG. 14, depending on the deterioration situation, the cut portions a,
b and c may be cut. Also in this case, the scaffold for removal work 1
Since the part of the chimney 2 that has been cut off is to be lifted at the same time, the scaffold 1 for removal work also needs to be cut off at the same level as the chimney 2, and the removal of the suspension gantry 3 at the upper stage due to removal also requires 2 At the time of cutting after the first time, it is necessary to install the suspension base 3 again at the upper end of the chimney 2 remaining after cutting.

【0049】第4実施形態として、図示は省略するが煙
突2の弱部やクラック部に薬液の注入を行って一体化を
図り、切断回数を1度とすることもできる。
In the fourth embodiment, although not shown, the weak portion and the crack portion of the chimney 2 can be integrated by injecting a chemical into the chimney 2 so that the number of cuts can be one.

【0050】なお、前記実施形態では超高筒状構造物と
して煙突2を例に説明したが、これに限定されるもので
はなく、超高筒状構造物であればサイロその他の構造物
にも適用できる。
In the above-described embodiment, the chimney 2 is described as an example of the super-high cylindrical structure. However, the present invention is not limited to this. Applicable.

【0051】[0051]

【発明の効果】以上述べたように本発明の超高筒状構造
物の頂部撤去方法は、超高筒状構造物の頂部撤去のため
に必要な足場は、地上で予め組み上げた吊り架台および
ここから吊り下ろした内部足場と外部足場とをクレーン
などの機械で吊り上げて頂部に設置するだけでよいか
ら、現場での作業が削減でき、工期が短縮する。そし
て、切断後は、吊り架台をクレーンなどの機械で再度吊
り上げて、該吊り架台といっしょに内部足場、外部足場
と切断された頂部部分を同時に地上に下ろし解体するこ
とにより、解体作業を地上で行うことができ、高所作業
を低減できるだけでなく、解体したコンクリートブロッ
クなどが上方から飛来することもなく、安全性が向上す
る。
As described above, according to the method for removing the top of an ultra-high tubular structure according to the present invention, the scaffold necessary for removing the top of the ultra-high tubular structure is provided by a suspension base previously assembled on the ground and It is only necessary to lift the internal scaffold and the external scaffold suspended from here by a machine such as a crane and install it on the top, so that work on site can be reduced and the construction period can be shortened. Then, after cutting, the suspension base is lifted again by a machine such as a crane, and the internal scaffolding, the external scaffold and the cut top part are simultaneously lowered and dismantled together with the suspension base to perform dismantling work on the ground. This can not only reduce work at heights, but also improve the safety without dismantling concrete blocks or the like from flying from above.

【0052】また、切断して撤去しようとする超高筒状
構造物の頂部を吊支する吊り金具は、超高筒状構造物の
側部の対向位置に穿設した貫通孔を支持孔として、この
支持孔にチャンネル材を貫通させて水平に挿入するか
ら、切断した頂部の荷重を吊り金具に均等にかけること
ができ、吊り架台と一体化させて安定よく切断した頂部
を吊支することができる。
Also, the hanging bracket for suspending the top of the ultra-high tubular structure to be cut and removed is provided with a through hole formed at a position facing the side of the ultra-high tubular structure as a support hole. Since the channel material is penetrated into this support hole and inserted horizontally, the load of the cut top can be evenly applied to the hanging bracket, and the cut top can be stably integrated by integrating with the hanging stand. Can be.

【0053】吊り上げ時の変形防止のための締付けバン
ドを超高筒状構造物の撤去しようとする頂部部分の周囲
に巻回することで、吊り金具の設置箇所で超高筒状構造
物に外方への引張力が作用して超高筒状構造物が切断さ
れようとしても、これを防止でき超高筒状構造物の形状
を保持できる。
By wrapping a tightening band around the top portion of the ultra-high tubular structure to be removed to prevent deformation during lifting, the ultra-high tubular structure can be removed from the ultra-high cylindrical structure at the place where the hanging bracket is installed. Even if the ultra-high tubular structure is cut by the pulling force acting in the direction, this can be prevented and the shape of the ultra-high tubular structure can be maintained.

【0054】超高筒状構造物の撤去しようとする頂部部
分の内部と外部にそれぞれ縦バタとリング状の横バタに
よる補強材を配設し、これらの内外の補強材をボルトで
連結すれば、頂部部分を内側と外側から押さえて形状保
持でき、より効果的に頂部部分を一体化した状態にして
一度で切断できる。
If reinforcing materials are provided inside and outside the top portion of the ultra-high tubular structure to be removed by a vertical flutter and a ring-like horizontal flutter, respectively, and these inner and outer reinforcing materials are connected by bolts. The shape of the top portion can be held by pressing the top portion from the inside and the outside, so that the top portion can be cut more effectively at a time with the top portion integrated.

【0055】超高筒状構造物の撤去しようとする頂部部
分に生じている弱部やクラック部に薬液注入すれば、頂
部部分の形状を保持でき、より効果的に頂部部分を一体
化した状態にして撤去部分を1回の切断で分離すること
ができる。
When a chemical solution is injected into a weak portion or a crack formed in the top portion of the ultra-high cylindrical structure to be removed, the shape of the top portion can be maintained and the top portion can be more effectively integrated. Then, the removed portion can be separated by one cutting.

【0056】超高筒状構造物の劣化状況によっては、頂
部を一度の切断で撤去せずに、複数段に分割して切断す
ることも可能であり、超高筒状構造物の状態に対応した
切断方法を採用できる。
Depending on the state of deterioration of the ultra-high tubular structure, it is possible to cut the top into a plurality of stages without removing the top by one cutting, and to cope with the state of the ultra-high tubular structure. Cutting method can be adopted.

【0057】構造として、上部作業足場としての吊り架
台と、ここから超高筒状構造物の内部に吊り下ろされる
内部足場と、超高筒状構造物の外部に吊り下ろされる外
部足場とで構成したから、吊り架台を超高筒状構造物の
頂部に設置するだけで超高筒状構造物の内部と外部とに
それぞれ作業足場を同時に簡単に設置でき、各種作業の
作業性もよいものとなる。
The structure includes a suspension platform as an upper working scaffold, an internal scaffold suspended from the inside of the ultra-high tubular structure, and an external scaffold suspended from the outside of the ultra-high tubular structure. Therefore, by simply installing the suspension base on the top of the ultra-high tubular structure, work scaffolds can be easily installed simultaneously inside and outside of the ultra-high tubular structure at the same time, and the workability of various work is good. Become.

【0058】外部足場は超高筒状構造物を囲むように吊
り架台から吊り材を吊り下げ、この吊り材間に水平つな
ぎ材を設け、該水平つなぎ材に張り出し足場板を設けた
から、超高筒状構造物の周囲に簡単に設置できる。
The external scaffold was suspended from a suspension frame so as to surround the ultra-high tubular structure, and a horizontal connecting member was provided between the hanging members, and an overhanging scaffold plate was provided on the horizontal connecting member. It can be easily installed around cylindrical structures.

【0059】外部足場の張り出し足場板は水平つなぎ材
に回動自在に取り付けたから、超高筒状構造物の周囲に
既設点検歩廊や新設点検歩廊が鍔状に突出していても、
外部足場を構造物の上方から挿入して設置する際や、切
断後に引き上げる際には、張り出し足場板を上方に回動
してはね上げた状態にしておけば、張り出し足場板が点
検歩廊にぶつかることがなく、外部足場を構造物にそっ
て支障なく昇降できるものである。
Since the overhanging scaffold plate of the external scaffold is rotatably attached to the horizontal connecting member, even if the existing inspection corridor or the new inspection corridor protrudes in a flange shape around the ultra-high tubular structure,
When the external scaffold is inserted from above the structure and installed, or when it is lifted after being cut, if the overhanging scaffolding board is turned up and flipped up, the overhanging scaffolding board will hit the inspection corridor. The external scaffold can be moved up and down along the structure without hindrance.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の超高筒状構造物の撤去作業用足場の実
施形態を示す縦断正面図である。
FIG. 1 is a vertical sectional front view showing an embodiment of a scaffold for removing ultra-high tubular structures according to the present invention.

【図2】本発明の超高筒状構造物の撤去作業用足場の実
施形態を示す側面図である。
FIG. 2 is a side view showing an embodiment of a scaffold for removing ultra-high tubular structures according to the present invention.

【図3】本発明の超高筒状構造物の撤去作業用足場の実
施形態を示す図1の平面図である。
FIG. 3 is a plan view of FIG. 1 showing the embodiment of the scaffold for removing ultra-high tubular structures of the present invention.

【図4】本発明の超高筒状構造物の撤去作業用足場の実
施形態を示す吊り架台の縦断正面図である。
FIG. 4 is a longitudinal sectional front view of a suspension base showing an embodiment of a removing work scaffold for an ultra-high tubular structure of the present invention.

【図5】本発明の超高筒状構造物の撤去作業用足場の実
施形態を示す図1のA−A線断面図である。
FIG. 5 is a sectional view taken along the line AA of FIG. 1 showing the embodiment of the scaffold for removing ultra-high tubular structures of the present invention.

【図6】本発明の超高筒状構造物の頂部撤去方法の第1
実施形態を示す第1工程の正面図である。
FIG. 6 shows a first method of removing the top of the ultra-high tubular structure of the present invention.
It is a front view of the 1st process showing an embodiment.

【図7】本発明の超高筒状構造物の頂部撤去方法の第1
実施形態を示す第2工程の正面図である。
FIG. 7 shows a first method of removing the top of the ultra-high tubular structure according to the present invention.
It is a front view of the 2nd process showing an embodiment.

【図8】本発明の超高筒状構造物の頂部撤去方法の第1
実施形態を示す第3工程の正面図である。
FIG. 8 shows the first method of removing the top of the ultra-high tubular structure of the present invention.
It is a front view of the 3rd process showing an embodiment.

【図9】本発明の超高筒状構造物の頂部撤去方法の第1
実施形態を示す第4工程の正面図である。
FIG. 9 shows a first method of removing the top of the ultra-high tubular structure according to the present invention.
It is a front view of the 4th process showing an embodiment.

【図10】本発明の超高筒状構造物の頂部撤去方法の第
1実施形態を示す第5工程の正面図である。
FIG. 10 is a front view of a fifth step showing the first embodiment of the method of removing the top of the ultra-high tubular structure of the present invention.

【図11】本発明の超高筒状構造物の頂部撤去方法の第
1実施形態を示す第6工程の正面図である。
FIG. 11 is a front view of a sixth step showing the first embodiment of the method of removing the top of the ultra-high tubular structure of the present invention.

【図12】本発明の超高筒状構造物の頂部撤去方法の第
2実施形態を示す縦断正面図である。
FIG. 12 is a vertical sectional front view showing a second embodiment of the method for removing the top portion of the ultra-high tubular structure of the present invention.

【図13】本発明の超高筒状構造物の頂部撤去方法の第
2実施形態を示す横断平面図である。
FIG. 13 is a cross-sectional plan view showing a second embodiment of the method of removing the top of the ultra-high tubular structure according to the present invention.

【図14】本発明の超高筒状構造物の頂部撤去方法の第
3実施形態を示す縦断正面図である。
FIG. 14 is a longitudinal sectional front view showing a third embodiment of the method for removing the top of the ultra-high tubular structure of the present invention.

【符号の説明】[Explanation of symbols]

1…撤去作業用足場 2…煙突 3…吊り架台 4…内部足場 5…外部足場 6…上部主桁 7…下部主桁 6a,7a…鋼材 8…つなぎ材 9…足場板 10…手摺り 11…煙突タラップ 12…開口部 13…開口部 14…フック 15…吊り材 16…足場板 17…吊り材 18…水平つなぎ材 19…足場板 20,20a,20b…張り出し足場板 21…斜め材 22…手摺り 23…仮柱 24…クレーン 25…点検歩廊 26…吊り金具 27…点検歩廊 28…支持孔 29…吊り棒 30…締付バンド 31…縦バタ 32…横バタ 33…ボルト DESCRIPTION OF SYMBOLS 1 ... Scaffold for removal work 2 ... Chimney 3 ... Suspension stand 4 ... Internal scaffold 5 ... External scaffold 6 ... Upper main girder 7 ... Lower main girder 6a, 7a ... Steel material 8 ... Connecting material 9 ... Scaffold plate 10 ... Handrail 11 ... Chimney ramp 12 ... Opening 13 ... Opening 14 ... Hook 15 ... Hanging material 16 ... Scaffolding plate 17 ... Hanging material 18 ... Horizontal tethering material 19 ... Staffing plate 20,20a, 20b ... Extending scaffolding plate 21 ... Diagonal material 22 ... Hand Slider 23 ... Temporary column 24 ... Crane 25 ... Inspection corridor 26 ... Hanging bracket 27 ... Inspection stairway 28 ... Support hole 29 ... Hanging rod 30 ... Tightening band 31 ... Vertical flutter 32 ... Horizontal flutter 33 ... Bolt

───────────────────────────────────────────────────── フロントページの続き (72)発明者 吉柳 尚徳 福岡県福岡市博多区博多駅前三丁目12番10 号 鹿島建設株式会社九州支店内 (72)発明者 若林 敏男 福岡県福岡市博多区博多駅前三丁目12番10 号 鹿島建設株式会社九州支店内 ──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Naotonori Yoshiyanagi 3-12-10 Hakata-ekimae, Hakata-ku, Fukuoka City Kashima Construction Co., Ltd.Kyushu Branch (72) Inventor Toshio Wakabayashi Hakata-ku, Hakata-ku, Fukuoka City, Fukuoka Prefecture 3-12-10 Ekimae Kashima Corporation Kyushu Branch

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 吊り架台およびここから吊り下ろした内
部足場と外部足場とをクレーンなどの機械で吊り上げ
て、前記吊り架台を上部作業用足場として煙突などの超
高筒状構造物の頂部に設置し、内部足場を超高筒状構造
物の内側に、外部足場を超高筒状構造物の外側にそれぞ
れ吊り下ろし、これら吊り架台、内部足場および外部足
場を使用して、超高筒状構造物の切断箇所よりも上部の
撤去しようとする超高筒状構造物の頂部部分に吊り架台
から吊り下ろした吊り金具を取り付け、切断箇所を切断
後、吊り架台をクレーンなどの機械で吊り上げて、該吊
り架台といっしょに内部足場、外部足場と切断された頂
部部分を同時に地上に下ろし解体することを特徴とする
超高筒状構造物の頂部撤去方法。
1. A suspending platform and an internal scaffold and an external scaffold suspended from the suspending platform are lifted by a machine such as a crane, and the suspending platform is installed on a top of an ultra-high tubular structure such as a chimney as an upper working scaffold. Then, the internal scaffold is suspended inside the ultra-high tubular structure, and the external scaffold is suspended outside the ultra-high tubular structure, and the suspension platform, the internal scaffold, and the external scaffold are used to form the ultra-high tubular structure. Attach the hanging bracket hanging from the suspension base to the top of the ultra-high tubular structure to be removed above the cut section of the object, cut the cut point, lift the suspension base with a crane or other machine, A method of removing the top of an ultra-high tubular structure, comprising simultaneously dropping an internal scaffold, an external scaffold, and a cut top portion together with the hanging stand onto the ground and disassembling.
【請求項2】 吊り金具は、超高筒状構造物の側部の対
向位置に穿設した貫通孔を支持孔として、この支持孔に
チャンネル材を貫通させて挿入する請求項1記載の超高
筒状構造物の頂部撤去方法。
2. The suspension according to claim 1, wherein the suspension fitting is a through hole formed at a position facing the side of the ultra-high tubular structure as a support hole, and the channel material is inserted through the support hole. How to remove the top of a high tubular structure.
【請求項3】 吊り上げ時の変形防止のための締付けバ
ンドを超高筒状構造物の撤去しようとする頂部部分の周
囲に巻回する請求項1または請求項2に記載の超高筒状
構造物の頂部撤去方法。
3. The ultra-high tubular structure according to claim 1, wherein a tightening band for preventing deformation during lifting is wound around the top portion of the ultra-high tubular structure to be removed. How to remove the top of things.
【請求項4】 超高筒状構造物の撤去しようとする頂部
部分の内部と外部にそれぞれ縦バタとリング状の横バタ
による補強材を配設し、これらの内外の補強材をボルト
で連結して撤去部分を1回の切断で分離する請求項1か
ら請求項3のいずれかに記載の超高筒状構造物の頂部撤
去方法。
4. A reinforcing member is provided inside and outside of a top portion of the super-high tubular structure to be removed by a vertical flutter and a ring-shaped horizontal flutter, and these inner and outer reinforcing members are connected by bolts. The method for removing a top portion of an ultra-high tubular structure according to any one of claims 1 to 3, wherein the removed portion is separated by one cutting.
【請求項5】 超高筒状構造物の撤去しようとする頂部
部分に生じている弱部やクラック部に薬液注入し、撤去
部分を1回の切断で分離する請求項1から請求項3のい
ずれかに記載の超高筒状構造物の頂部撤去方法。
5. The method according to claim 1, wherein a chemical solution is injected into a weak portion or a crack portion formed in a top portion of the ultra-high cylindrical structure to be removed, and the removed portion is separated by one cutting. A method for removing the top of an ultra-high tubular structure according to any one of the above.
【請求項6】 超高筒状構造物の撤去しようとする頂部
部分は、複数段に分割して切断する請求項1から請求項
3のいずれかに記載の超高筒状構造物の頂部撤去方法。
6. The top removal of the ultra-high tubular structure according to any one of claims 1 to 3, wherein the top portion of the ultra-high tubular structure to be removed is divided into a plurality of stages and cut. Method.
【請求項7】 超高筒状構造物の上端に設置される上部
作業足場としての吊り架台と、ここから超高筒状構造物
の内部に吊り下ろされる内部足場と、超高筒状構造物の
外部に吊り下ろされる外部足場とで構成することを特徴
とする超高筒状構造物の頂部撤去作業用足場。
7. A suspension base as an upper working scaffold installed at an upper end of an ultra-high tubular structure, an internal scaffold suspended from the suspension platform inside the ultra-high tubular structure, and an ultra-high tubular structure A scaffold for removing the top of an ultra-high tubular structure, characterized by comprising an external scaffold suspended outside the ceiling.
【請求項8】 外部足場は超高筒状構造物を囲むように
吊り架台から吊り材を吊り下げ、この吊り材間に水平つ
なぎ材を設け、該水平つなぎ材に張り出し足場板を設け
た請求項7記載の超高筒状構造物の頂部撤去作業用足
場。
8. The external scaffold wherein a hanging member is hung from a hanging frame so as to surround the ultra-high tubular structure, a horizontal connecting member is provided between the hanging members, and an overhanging scaffold plate is provided on the horizontal connecting member. Item 7. A scaffold for removing a top portion of an ultra-high tubular structure according to Item 7.
【請求項9】 外部足場の張り出し足場板は水平つなぎ
材に回動自在に取り付けられる請求項8記載の超高筒状
構造物の頂部撤去作業用足場。
9. The scaffold according to claim 8, wherein the overhanging scaffold plate of the external scaffold is rotatably attached to the horizontal tether.
JP9104422A 1997-04-22 1997-04-22 Top removal method and scaffold for removal work of ultra-high tubular structure Expired - Fee Related JP3028071B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9104422A JP3028071B2 (en) 1997-04-22 1997-04-22 Top removal method and scaffold for removal work of ultra-high tubular structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9104422A JP3028071B2 (en) 1997-04-22 1997-04-22 Top removal method and scaffold for removal work of ultra-high tubular structure

Publications (2)

Publication Number Publication Date
JPH10299290A true JPH10299290A (en) 1998-11-10
JP3028071B2 JP3028071B2 (en) 2000-04-04

Family

ID=14380264

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9104422A Expired - Fee Related JP3028071B2 (en) 1997-04-22 1997-04-22 Top removal method and scaffold for removal work of ultra-high tubular structure

Country Status (1)

Country Link
JP (1) JP3028071B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1023768C2 (en) * 2003-06-27 2004-12-28 Sagro Aannemingsmij Zeeland B Factory chimney demolition method, by removing top concrete segment and its inner lining and placing on ground
JP2011153452A (en) * 2010-01-27 2011-08-11 Jfe Steel Corp Method of reinforcing tower-like structure
JP2018159196A (en) * 2017-03-22 2018-10-11 アイシン精機株式会社 Opening/closing body control device for vehicle
JP2019206817A (en) * 2018-05-28 2019-12-05 松島工業株式会社 Demolition method for steel tower- supported chimney and demolishing device for steel tower-supported chimney
JP2020002617A (en) * 2018-06-28 2020-01-09 山九株式会社 Demolition method of cylindrical structure
CN115095118A (en) * 2022-08-26 2022-09-23 中化二建集团有限公司 Method for constructing coke quenching tower by suspended integrally-installed support
KR102537075B1 (en) * 2023-02-28 2023-05-30 (주)승조이앤씨 Put-on type mounted work platform of main tower for bridge, and mounting method of the work platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1023768C2 (en) * 2003-06-27 2004-12-28 Sagro Aannemingsmij Zeeland B Factory chimney demolition method, by removing top concrete segment and its inner lining and placing on ground
JP2011153452A (en) * 2010-01-27 2011-08-11 Jfe Steel Corp Method of reinforcing tower-like structure
JP2018159196A (en) * 2017-03-22 2018-10-11 アイシン精機株式会社 Opening/closing body control device for vehicle
JP2019206817A (en) * 2018-05-28 2019-12-05 松島工業株式会社 Demolition method for steel tower- supported chimney and demolishing device for steel tower-supported chimney
JP2020002617A (en) * 2018-06-28 2020-01-09 山九株式会社 Demolition method of cylindrical structure
CN115095118A (en) * 2022-08-26 2022-09-23 中化二建集团有限公司 Method for constructing coke quenching tower by suspended integrally-installed support
KR102537075B1 (en) * 2023-02-28 2023-05-30 (주)승조이앤씨 Put-on type mounted work platform of main tower for bridge, and mounting method of the work platform

Also Published As

Publication number Publication date
JP3028071B2 (en) 2000-04-04

Similar Documents

Publication Publication Date Title
US4231148A (en) Elevator erection method
AU2010346421B2 (en) Scaffold and methods for installing or removing such a scaffold
CN103470093B (en) Concrete chimney dismantling method
JP6603824B2 (en) Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling
JP3028071B2 (en) Top removal method and scaffold for removal work of ultra-high tubular structure
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
JP2012052306A (en) Stack dismantlement method
JP6678308B2 (en) Chimney dismantling scaffold
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
JP5075398B2 (en) Construction method of tower-like PC structure and tension system device
CN114278113A (en) Construction method for dismantling reinforced concrete chimney in complex environment
JP3452816B2 (en) Temporary construction method of work scaffold for tower structure
JP3220397B2 (en) Elevating scaffold
JPS6320985B2 (en)
JP2007297867A (en) Building demolition method
JP2551192B2 (en) Integrated lifting method for piping
JPH09177070A (en) Method and device for placing of steel bar cage for deep foundation
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
CN220131842U (en) Dismounting workbench for coke oven gas cabinet
CN213418440U (en) Coating operation platform
CN211622551U (en) Scaffold protection shed and scaffold protection shed mounting structure
JPH09310484A (en) Large space applicable suspended scaffold constructing system
JP2021188263A (en) Structure dismantling system and structure dismantling method
KR20210088811A (en) Construction Method and Device of Floor Structure in Elevator's Machine Room in Apartment Building Using Hanging Structural Method
JPH03194093A (en) Elevating step for erecting steel frame

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090204

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120204

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150204

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees