CN103470093B - Concrete chimney dismantling method - Google Patents

Concrete chimney dismantling method Download PDF

Info

Publication number
CN103470093B
CN103470093B CN201310436264.7A CN201310436264A CN103470093B CN 103470093 B CN103470093 B CN 103470093B CN 201310436264 A CN201310436264 A CN 201310436264A CN 103470093 B CN103470093 B CN 103470093B
Authority
CN
China
Prior art keywords
anchor ear
platform
concrete chimney
hoop
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310436264.7A
Other languages
Chinese (zh)
Other versions
CN103470093A (en
Inventor
吴长德
刘宗辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201310436264.7A priority Critical patent/CN103470093B/en
Publication of CN103470093A publication Critical patent/CN103470093A/en
Application granted granted Critical
Publication of CN103470093B publication Critical patent/CN103470093B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

一种砼烟囱拆除装置,包括定位机构、操作平台和吊装机构;定位机构包括抱箍、连接头和挂耳;抱箍为多段弧形板组成的圆环状结构,各段弧形板的接口处设置有连接头,抱箍外壁上均匀设置有多个挂耳;操作平台包括梯形台、挂钩和栏杆,梯形台的底部设置有斜撑,挂钩和栏杆分别固接在梯形台的两侧,栏杆与梯形台垂直设置,挂钩与挂耳相匹配;吊装机构包括吊装绳、卡具和吊装工具,吊装绳固定在抱箍上,卡具固定安装在砼烟囱侧壁上,吊装绳、卡具和吊装工具配合使用。该拆除装置结构简单,可以使用施工现场的废料进行制作,成本低,且可反复使用,避免材料的浪费;本发明的拆除方法简单易操作,安全性高,不会破会周边建筑物,工作效果高。

A device for dismantling a concrete chimney, including a positioning mechanism, an operating platform, and a hoisting mechanism; the positioning mechanism includes a hoop, a connecting head, and a hanging lug; There is a connecting head at the center of the hoop, and multiple hanging ears are evenly arranged on the outer wall of the hoop; the operating platform includes a trapezoidal platform, hooks and railings, and the bottom of the trapezoidal platform is provided with diagonal braces, and the hooks and railings are respectively fixed on both sides of the trapezoidal platform. The railing and the trapezoidal platform are set vertically, and the hooks match the hanging ears; the hoisting mechanism includes hoisting ropes, fixtures and hoisting tools, the hoisting rope is fixed on the hoop, and the fixtures are fixed on the side wall of the concrete chimney. Used in conjunction with lifting tools. The demolition device has a simple structure, can be made from waste materials at the construction site, has low cost, can be used repeatedly, and avoids waste of materials; the demolition method of the present invention is simple and easy to operate, has high safety, does not damage surrounding buildings, and works The effect is high.

Description

砼烟囱拆除方法Concrete Chimney Removal Method

技术领域 technical field

本发明涉及一种砖混型高耸建筑物的拆除装置及方法,具体地说是一种砼烟囱拆除装置及拆除方法。 The invention relates to a device and method for dismantling a brick-concrete towering building, in particular to a device and method for dismantling a concrete chimney.

背景技术 Background technique

砖混型高耸建筑物的传统拆除方式为爆破或击撞,这种传统拆除方式不仅危险性高,而且破坏性大,一旦力度控制不好就可能会导致其他建筑物的破损。 The traditional demolition method of brick-concrete towering buildings is blasting or impact. This traditional demolition method is not only dangerous, but also destructive. Once the force is not well controlled, it may cause damage to other buildings.

目前,对于砖混型高耸建筑物也可采用阶段性拆除的方式,但是需要搭设较高的脚手架作为操作平台,工程量大,材料浪费严重,而这种阶段性拆除方式多适用于方形或圆筒形建筑物。而烟囱等锥筒结构的高耸建筑物的拆除难度较大,尤其是砼烟囱的拆除,常规拆除方法工期长,工作效率低,不能满足施工进程。 At present, the staged demolition method can also be adopted for brick-concrete high-rise buildings, but it needs to build a high scaffold as an operating platform, which requires a large amount of work and serious waste of materials, and this staged demolition method is mostly suitable for square or round buildings. Tubular buildings. And the demolition difficulty of towering buildings with conical barrel structures such as chimneys is relatively large, especially the demolition of concrete chimneys. The conventional demolition method has a long construction period and low work efficiency, which cannot meet the construction progress.

发明内容 Contents of the invention

本发明是针对背景技术中传统砼烟囱拆除方式的缺陷,一是提供了一种结构简单、可反复使用的砼烟囱的拆除装置,二是提供用这种装置拆除砼烟囱的方法。 The invention aims at the defects of the traditional concrete chimney dismantling method in the background technology. Firstly, it provides a simple-structured and reusable concrete chimney dismantling device; secondly, it provides a method for dismantling the concrete chimney with this device.

本发明采用的技术方案是:一种砼烟囱拆除装置,包括定位机构、操作平台和吊装机构; The technical solution adopted by the present invention is: a concrete chimney demolition device, including a positioning mechanism, an operating platform and a hoisting mechanism;

所述定位机构包括抱箍、连接头和挂耳;抱箍为多段弧形板组成的圆环状结构,各段弧形板的接口处设置有连接头,抱箍外壁上均匀设置有多个挂耳; The positioning mechanism includes a hoop, a connector and a hanging ear; the hoop is a ring-shaped structure composed of multiple arc-shaped plates, and a connector is provided at the interface of each segment of the arc-shaped plate, and a plurality of hanging ear;

所述操作平台包括梯形台、挂钩和栏杆,梯形台的底部设置有斜撑,挂钩和栏杆分别固接在梯形台的两侧,栏杆与梯形台垂直设置,挂钩与所述挂耳相匹配; The operating platform includes a trapezoidal platform, a hook and a railing, the bottom of the trapezoidal platform is provided with a diagonal brace, the hook and the railing are respectively fixed on both sides of the trapezoidal platform, the railing is vertically arranged with the trapezoidal platform, and the hook matches the hanging ear;

所述吊装机构包括吊装绳、卡具和吊装工具,吊装绳固定在抱箍上,卡具固定安装在砼烟囱侧壁上,吊装绳、卡具和吊装工具配合使用。 The hoisting mechanism includes a hoisting rope, a fixture and a hoisting tool, the hoisting rope is fixed on the hoop, the fixture is fixedly installed on the side wall of the concrete chimney, and the hoisting rope, the fixture and the hoisting tool are used together.

连接头包括两个分别固接在抱箍接口处自由端的角钢,其一侧面与抱箍外壁固接,另一侧面抱箍外壁竖向垂直;两角钢之间用双头螺栓连接。 The connector includes two angle steels fixed respectively at the free ends of the hoop interface, one side of which is fixed to the outer wall of the hoop, and the other side is vertically vertical to the outer wall of the hoop; the two angle steels are connected by stud bolts.

挂耳为角钢,其一侧面与抱箍外壁固接,另一侧面与抱箍外壁横向垂直;挂耳的水平面上还设置有与挂钩相配合的长孔。 The hanging lug is an angle steel, one side of which is fixed to the outer wall of the hoop, and the other side is horizontally perpendicular to the outer wall of the hoop; the horizontal surface of the hanging ear is also provided with a long hole matched with the hook.

梯形台为梯形水平架,该梯形台底部固接有三角形的斜撑,斜撑的竖直面与砼烟囱外壁贴合。 The trapezoidal platform is a trapezoidal horizontal frame, and the bottom of the trapezoidal platform is fixedly connected with a triangular diagonal brace, and the vertical surface of the diagonal brace is attached to the outer wall of the concrete chimney.

卡具是由三个角钢焊接而成,两竖直角钢与一水平角钢焊接在一起,其中一竖直角钢上设置有与其垂直的侧耳。 The jig is welded by three angle steels, two vertical angle steels and one horizontal angle steel are welded together, and one of the vertical angle steels is provided with side ears perpendicular to it.

梯形台的栏杆上梁两端设置有预留孔。 Both ends of the upper beam of the railing of the trapezoidal platform are provided with reserved holes.

用所述装置拆除砼烟囱的方法,按照以下步骤进行: The method for removing the concrete chimney with said device is carried out according to the following steps:

A、前期准备 A. Preliminary preparation

a、砼烟囱的拆除顺序是由上至下,先将直径最小的抱箍在地面摆放好,其中一接口的连接头用双头螺栓拧紧且留20mm间隙,另一接口与砼烟囱爬梯位置对应,接口处的两个自由端分别设置有用紧绳器连接在一起的紧固绳;沿抱箍圆周均匀设置四个升降绳吊扣; a. The dismantling sequence of the concrete chimney is from top to bottom. First place the hoop with the smallest diameter on the ground. The connector of one interface is tightened with a stud bolt and a gap of 20mm is left. The other interface is connected to the position of the concrete chimney ladder. Correspondingly, the two free ends at the interface are respectively provided with fastening ropes connected together by a rope tightener; four lifting rope buckles are evenly arranged along the circumference of the hoop;

b、在砼烟囱顶部原平台的爬梯两侧选择两个吊点,各挂一个0.5t的滑轮,将抱箍拉至原平台下1.5m的位置处,施工人员站在爬梯上,利用紧绳器将抱箍接口处拉近,在接口处的连接头上安装可调长螺栓并拧紧; b. Select two lifting points on both sides of the ladder on the original platform at the top of the concrete chimney, hang a 0.5t pulley on each, and pull the hoop to a position 1.5m below the original platform. The construction personnel stand on the ladder and use the tight rope Use the device to pull the hoop interface closer, install and tighten the adjustable length bolt on the connector at the interface;

c、先在地面组装好操作平台,施工人员站在爬梯上用实现安装好的滑轮将各操作平台逐个吊装到位,将操作平台上的挂钩挂在抱箍的挂耳上,焊接牢固,依次安装即可; c. First assemble the operation platform on the ground, and the construction personnel stand on the ladder and use the pulleys that have been installed to hoist each operation platform in place one by one, hang the hook on the operation platform on the hanging ear of the hoop, weld it firmly, and install it in sequence can;

d、在操作平台向上500mm的高度处,绕砼烟囱外壁锁紧一根钢丝绳作为安全绳,施工人员将安装带悬挂在安装绳上; d. At a height of 500mm above the operating platform, a steel wire rope is locked around the outer wall of the concrete chimney as a safety rope, and the construction personnel hangs the installation belt on the installation rope;

B、砼烟囱拆除 B. Removal of concrete chimneys

原平台以上部分拆除:施工人员站在砼烟囱原平台上,用风镐和气割沿砼烟囱圆周从顶部向下打八个豁口,豁口开至原平台下边的位置,原平台及原平台以上的砼烟囱部分均用风镐和气割切成块体拆除; The part above the original platform is demolished: construction workers stand on the original platform of the concrete chimney, and use wind picks and gas cutting to make eight gaps from the top down along the circumference of the concrete chimney. Concrete chimneys are cut into blocks with pneumatic picks and gas cutting;

筒壁部分拆除: Partial removal of the cylinder wall:

a、沿豁口继续向下切割,豁口底部距抱箍定位位置为0.5m; a. Continue to cut down along the notch, and the bottom of the notch is 0.5m away from the positioning position of the hoop;

    b、在豁口下方200mm的筒壁上沿其圆周打八个通孔,其中两个通孔上分别安装一个导链,导链的一端固定在通孔上,另一端分别与一活动绳的两端连接,该活动绳敷设在导链对面的筒壁分体上,两导链同时拉紧,使筒壁分体向烟囱内侧受力,此时用风镐和气割在筒壁分体底部横向切割,该块筒壁分体即向砼烟囱内侧倒下; b. Drill eight through holes along the circumference of the cylinder wall 200mm below the gap, and install a guide chain on two of the through holes, one end of the guide chain is fixed on the through hole, and the other end is respectively connected to two ends of a movable rope end connection, the movable rope is laid on the split body of the tube wall opposite the guide chain, and the two guide chains are tightened at the same time, so that the split body of the tube wall is stressed toward the inner side of the chimney. Cutting, the block wall splits and falls to the inside of the concrete chimney;

c、用相同的方法拆除其他的筒壁分体,拆除一个整圈后,将预制好的卡具均匀挂于四个豁口处,将四个手拉葫芦的一端与卡具上的侧耳连接,另一端与抱箍上的升降绳吊扣连接,调整手拉葫芦链长,实现抱箍下降; c. Use the same method to remove other cylinder wall splits. After removing a full circle, hang the prefabricated clamps evenly on the four gaps, and connect one end of the four chain hoists with the side ears on the clamps. The other end is connected with the lifting rope buckle on the hoop, and the length of the chain hoist is adjusted to realize the lowering of the hoop;

d、砼烟囱的筒壁拆除一节,需要将抱箍和操作平台下调两次,抱箍接口连接头的间隙超过800mm时,在原抱箍上增加一节长度为0.8m的弧形板,连接接口处用连接头和双头螺栓紧固;以此法逐层下降,实现砼烟囱筒壁部分的拆除; d. To remove a section of the wall of the concrete chimney, it is necessary to lower the hoop and the operating platform twice. When the gap between the interface of the hoop exceeds 800mm, add a section of arc-shaped plate with a length of 0.8m to the original hoop to connect The interface is fastened with connectors and stud bolts; in this way, it is lowered layer by layer to realize the removal of the concrete chimney wall;

c、当拆到砼烟囱的底部平台上方时,拆掉抱箍和操作平台,站在底座平台上进行拆除,底部平台的拆除方法与原平台的拆除方法相同。 c. When dismantling to the top of the bottom platform of the concrete chimney, remove the hoop and operating platform, and stand on the base platform for dismantling. The dismantling method of the bottom platform is the same as that of the original platform.

随筒壁半径的增大,将抱箍中的短弧形板换成长弧形板,各弧形板之间用连接头连接。 With the increase of the radius of the cylinder wall, the short arc-shaped plates in the hoop are replaced with long-arc-shaped plates, and the arc-shaped plates are connected by connectors.

当抱箍上出现大于800mm的空位时,加装一个操作平台。 When there is a space greater than 800mm on the hoop, install an operating platform.

与现有技术相比,本发明所公开的拆除装置结构简单,可以使用施工现场的废料进行制作,成本低,且可反复使用,避免材料的浪费;本发明所公开的拆除方法简单易操作,安全性高,不会破会周边建筑物,工作效果高。 Compared with the prior art, the dismantling device disclosed in the present invention has a simple structure, can be made with waste materials at the construction site, has low cost, can be used repeatedly, and avoids waste of materials; the dismantling method disclosed in the present invention is simple and easy to operate, High safety, will not damage the surrounding buildings, high working effect.

附图说明 Description of drawings

图1为本发明中挂耳的结构示意图。 Fig. 1 is a schematic diagram of the structure of the hanging ear in the present invention.

图2为本发明中抱箍接口处结构示意图。 Fig. 2 is a schematic diagram of the structure of the hoop interface in the present invention.

图3为本发明中抱箍及吊装绳安装位置示意图。 Fig. 3 is a schematic diagram of the installation position of the hoop and hoisting rope in the present invention.

图4为本发明中梯形台结构示意图。 Fig. 4 is a schematic diagram of the structure of the trapezoidal platform in the present invention.

图5为本发明中操作平台结构示意图。 Fig. 5 is a schematic structural diagram of the operating platform in the present invention.

图6为拆除装置安装结构示意图。 Figure 6 is a schematic diagram of the installation structure of the removal device.

图7为本发明中卡具结构示意图。 Fig. 7 is a schematic diagram of the structure of the jig in the present invention.

图8为本发明中烟囱筒壁部分结构拆除方式俯视图。 Fig. 8 is a top view of the dismantling method of the wall part of the chimney in the present invention.

图9为本发明中烟囱筒壁部分结构拆除方式侧视图。 Fig. 9 is a side view of the dismantling method of the wall part of the chimney in the present invention.

图中:挂耳1,抱箍2,连接头3,双头螺栓4,升降绳吊扣5,紧固绳6,梯形台7,挂钩8,斜撑9,栏杆10,预留孔11,烟囱筒壁12,安全绳13,操作平台14,爬梯15,豁口16,侧耳17,卡口18,5t导链19,活动绳20,卡具21。 In the figure: hanging lug 1, hoop 2, connector 3, stud bolt 4, lifting rope buckle 5, fastening rope 6, trapezoidal platform 7, hook 8, diagonal brace 9, railing 10, reserved hole 11, chimney Cylinder wall 12, safety rope 13, operating platform 14, climbing ladder 15, gap 16, side ears 17, bayonet 18, 5t guide chain 19, movable rope 20, fixture 21.

具体实施方式 Detailed ways

    下面结合附图和实施例对本发明做进一步说明。 The present invention will be further described below in conjunction with accompanying drawing and embodiment.

本发明一是公开了一种砼烟囱拆除装置,二是公开了一种利用该装置拆除砼烟囱的方法。 The invention firstly discloses a device for removing a concrete chimney, and secondly discloses a method for removing a concrete chimney by using the device.

这种拆除装置包括定位机构、操作平台和吊装机构。 The removal device includes a positioning mechanism, an operating platform and a hoisting mechanism.

定位机构包括抱箍2、连接头3和挂耳1。抱箍为多段弧形板组成的圆环状结构,如图3所示,优选的初始段数为两段,相邻弧形板的接口处设置有连接头。抱箍外壁上均匀设置有多个挂耳。本实施例中,如图2所示,连接头包括两个分别固接在抱箍接口处自由端的角钢,其一侧面与抱箍外壁固接,另一侧面与抱箍外壁竖向垂直,两个角钢的侧面相对设置,且两角钢之间用双头螺栓4连接。如附图1所示,挂耳也为角钢,其一侧面与抱箍外壁固接,另一侧面与抱箍外壁横向垂直,即该侧面为水平面,挂耳的水平面上还设置有与挂钩8相配合的长孔。 The positioning mechanism includes a hoop 2, a connecting head 3 and a hanging ear 1. The hoop is a ring-shaped structure composed of multiple sections of arc-shaped plates, as shown in Figure 3, the preferred initial number of sections is two, and connectors are provided at the interfaces of adjacent arc-shaped plates. A plurality of hanging ears are uniformly arranged on the outer wall of the hoop. In this embodiment, as shown in Figure 2, the connector includes two angle steels respectively fixed at the free ends of the hoop interface, one side of which is fixed to the outer wall of the hoop, and the other side is vertically perpendicular to the outer wall of the hoop. The sides of the two angle steels are arranged oppositely, and the two angle steels are connected with stud bolts 4 . As shown in accompanying drawing 1, the hanging ear is also an angle steel, one side of which is fixed to the outer wall of the hoop, and the other side is transversely perpendicular to the outer wall of the hoop, that is, the side is a horizontal plane, and the horizontal surface of the hanging ear is also provided with a hook 8 matching slotted holes.

抱箍用材质为Q235的100×8扁钢制作1套,连接位置留20mm左右的间隙,根据烟囱直径的变化,分别制作6m、4.8m、3.2m、2.4m、1.6m、0.8m(每个抱箍相差0.8m,等于螺栓的可调尺寸,数量规格可依据烟囱高度调整)的抱箍各一段。根据小平台的尺寸确定抱箍上挂耳的间距,挂耳、连接头与抱箍的焊接均为满焊。 Make a set of hoops with Q235 100×8 flat steel, leave a gap of about 20mm at the connection position, and make 6m, 4.8m, 3.2m, 2.4m, 1.6m, 0.8m respectively according to the change of chimney diameter (each The difference between each hoop is 0.8m, which is equal to the adjustable size of the bolt, and the quantity specification can be adjusted according to the height of the chimney). Determine the spacing of the lugs on the hoop according to the size of the small platform, and the welding of the lugs, connectors and hoops are all fully welded.

操作平台包括梯形台7、挂钩8和栏杆10。梯形台的底部设置有斜撑9,挂钩8和栏杆10分别固接在梯形台7相对的两侧,栏杆10与梯形台7垂直设置,挂钩8与所述挂耳上的长孔相匹配。如附图4-5所示,梯形台7为梯形水平架,该梯形台底部固接有三角形的斜撑9,斜撑的竖直面与砼烟囱的烟囱筒壁12的外壁贴合。梯形台的栏杆10上梁两端设置有预留孔11。 The operating platform includes a trapezoidal platform 7, a hook 8 and a railing 10. The bottom of the trapezoidal platform is provided with diagonal brace 9, and hook 8 and railing 10 are respectively affixed to opposite sides of trapezoidal platform 7, and railing 10 is vertically arranged with trapezoidal platform 7, and hook 8 matches the long hole on the described hanging ear. As shown in accompanying drawing 4-5, the trapezoidal platform 7 is a trapezoidal horizontal frame, and the bottom of the trapezoidal platform is fixedly connected with a triangular diagonal brace 9, and the vertical surface of the diagonal brace is fitted with the outer wall of the chimney tube wall 12 of the concrete chimney. Both ends of the upper beam of the railing 10 of the trapezoidal platform are provided with reserved holes 11 .

梯形台用材质为Q235的∠40×4制作外框,在中间加一道横梁,上面镶嵌-30×3的扁钢7道做底板,梯形台下做三角斜撑,斜撑用材质为Q235的∠50×5角钢制作;平台通过用两个φ18圆钢制作的弯钩与抱箍上的挂耳相连;制作数量根据拆除烟囱的最大直径确定。 The trapezoidal platform is made of Q235 ∠40×4 for the outer frame, and a beam is added in the middle, and 7 flat steel plates of -30×3 are inlaid on it as the bottom plate, and the triangular diagonal bracing is made under the trapezoidal platform, and the diagonal brace is made of Q235. It is made of ∠50×5 angle steel; the platform is connected to the hanging lug on the hoop through two hooks made of φ18 round steel; the production quantity is determined according to the maximum diameter of the demolished chimney.

吊装机构包括吊装绳、卡具21和吊装工具,吊装绳包括安全绳13和活动绳20,吊装绳都与抱箍连接,卡具21固定安装在砼烟囱的烟囱筒壁上,吊装绳、卡具和吊装工具配合使用。 Hoisting mechanism comprises hoisting rope, fixture 21 and hoisting tool, and hoisting rope comprises safety rope 13 and movable rope 20, and hoisting rope is all connected with hoop, and fixture 21 is fixedly installed on the chimney tube wall of concrete chimney, hoisting rope, clip Tools and lifting tools are used together.

卡具21是由三个角钢焊接而成,两竖直角钢与一水平角钢焊接在一起,其中一竖直角钢上设置有与其垂直的侧耳17,两竖直角钢之间形成卡口18。 The jig 21 is welded by three angle steels, two vertical angle steels and one horizontal angle steel are welded together, one of the vertical angle steels is provided with a side ear 17 perpendicular to it, and a bayonet 18 is formed between the two vertical angle steels.

上述的拆除砼烟囱的装置可反复使用,根据所拆建筑物的外径的大小进行变换使用。 The above-mentioned device for removing the concrete chimney can be used repeatedly, and can be converted and used according to the size of the outer diameter of the demolished building.

用该装置拆除砼烟囱,按照以下步骤进行: To remove the concrete chimney with this device, follow the steps below:

A、前期准备 A. Preliminary preparation

以烟囱底部为中心10m直径范围内做好防护,拉警戒线、挂标识牌,严禁非施工人员进入;将场地内清理好,为清运车辆及液压镐车腾路;不要将施工机具放在场地内,避免砸坏。 Take the bottom of the chimney as the center and protect it within a diameter of 10m, draw a cordon and hang a signboard, and non-construction personnel are strictly prohibited from entering; clean up the site to make way for clearing vehicles and hydraulic pick trucks; do not put construction machinery in the In the field, avoid smashing.

a、砼烟囱的拆除顺序是由上至下,先将直径最小的抱箍(即初始的两段抱箍)在地面摆放好,其中一接口的连接头用双头螺栓拧紧且留20mm间隙,使两段抱箍可以自由活动;另一接口与砼烟囱爬梯15的位置对应,接口处的两个自由端分别设置有用紧绳器连接在一起的紧固绳6;沿抱箍圆周均匀设置四个升降绳吊扣5。 a. The sequence of dismantling the concrete chimney is from top to bottom. First place the hoop with the smallest diameter (that is, the initial two sections of hoop) on the ground, and the connector of one interface is tightened with stud bolts and a gap of 20mm is left. , so that the two sections of the hoop can move freely; the other interface corresponds to the position of the concrete chimney ladder 15, and the two free ends at the interface are respectively provided with fastening ropes 6 connected together by a rope tightener; uniformly arranged along the circumference of the hoop Four hoisting rope buckles 5.

b、在砼烟囱顶部原平台的爬梯两侧选择两个可靠的吊点,各挂一个0.5t的滑轮,将抱箍拉至原平台下1.5m的位置处,施工人员站在爬梯上,利用紧绳器将抱箍接口处拉近,在接口处的连接头上安装可调长度的双头螺栓并拧紧。 b. Choose two reliable lifting points on both sides of the ladder on the original platform at the top of the concrete chimney, hang a 0.5t pulley on each, and pull the hoop to a position 1.5m below the original platform. The construction personnel stand on the ladder and use The rope tightener pulls the hoop interface closer, and installs and tightens adjustable-length stud bolts on the connector at the interface.

c、先在地面组装好操作平台,施工人员站在爬梯上用实现安装好的滑轮将各操作平台逐个吊装到位,将操作平台上的挂钩挂在抱箍的挂耳上,焊接牢固,依次安装即可。 c. First assemble the operation platform on the ground, and the construction personnel stand on the ladder and use the pulleys that have been installed to hoist each operation platform in place one by one, hang the hook on the operation platform on the hanging ear of the hoop, weld it firmly, and install it in sequence That's it.

d、在操作平台向上500mm的高度处,绕砼烟囱的烟囱筒壁的外壁锁紧一根钢丝绳作为安全绳,施工人员将安装带悬挂在安装绳上。 d. At a height of 500mm above the operating platform, a steel wire rope is locked around the outer wall of the chimney wall of the concrete chimney as a safety rope, and the construction personnel hang the installation belt on the installation rope.

B、砼烟囱拆除 B. Removal of concrete chimneys

原平台以上部分拆除: The part above the original platform is removed:

施工人员站在砼烟囱原平台上,用风镐和气割沿砼烟囱圆周从顶部向下打八个豁口16,豁口16开至原平台下边的位置,原平台及原平台以上的砼烟囱部分均用风镐和气割切成块体拆除。 Construction workers stood on the original platform of the concrete chimney, and used picks and gas cutters to make eight gaps 16 from the top down along the circumference of the concrete chimney. The gaps 16 were opened to the position below the original platform. Cut into blocks with pneumatic picks and gas cutters for demolition.

筒壁部分拆除: Partial removal of the cylinder wall:

a、沿豁口继续向下切割,豁口底部距抱箍定位位置为0.5m。 a. Continue to cut down along the notch, and the bottom of the notch is 0.5m away from the positioning position of the hoop.

    b、如图8-9所示,在豁口下方200mm的筒壁上沿其圆周打八个通孔,其中两个通孔上分别安装一个5t导链19,导链19的一端固定在通孔上,另一端分别与一活动绳20的两端连接,该活动绳20敷设在导链对面的筒壁分体上,两导链同时拉紧,使筒壁分体向烟囱内侧受力,此时用风镐和气割在筒壁分体底部横向切割,深度约为40mm,该块筒壁分体即向砼烟囱内侧倒下。导链将自动松掉,再用同样的方法拆除其它的分体砼块。拆除后将提升用手拉葫芦从上面移到下面,调整手拉葫芦链长,以链不松为宜。筒壁被拆混凝土块尺寸按两种情况考虑,50米以上采用1.7m×0.8m,50米以下采用1.7m×1.4m,以减少混凝土块体自由落地的震动。 b. As shown in Figure 8-9, eight through holes are drilled along the circumference of the cylinder wall 200mm below the gap, and a 5t guide chain 19 is respectively installed on two of the through holes, and one end of the guide chain 19 is fixed in the through hole The other ends are respectively connected with the two ends of a movable rope 20, the movable rope 20 is laid on the cylinder wall split opposite to the guide chain, and the two guide chains are tightened at the same time, so that the cylinder wall split is stressed towards the inside of the chimney, and this At this time, use a pick and gas cutter to cut horizontally at the bottom of the tube wall split, with a depth of about 40mm, and the tube wall split will fall to the inside of the concrete chimney. The guide chain will be loosened automatically, and then the other split concrete blocks will be removed in the same way. After dismantling, move the chain hoist for lifting from above to below, and adjust the chain length of the chain hoist so that the chain is not loose. The size of the demolished concrete block of the cylinder wall is considered according to two situations, 1.7m×0.8m is used for more than 50 meters, and 1.7m×1.4m is used for less than 50 meters, so as to reduce the vibration of the concrete block when it falls freely.

c、用相同的方法拆除其他的筒壁分体,拆除一个整圈后,将四个预制好的卡具的卡口卡在豁口处,将四个手拉葫芦的一端与卡具上的侧耳17连接,另一端与抱箍上的升降绳吊扣连接,调整手拉葫芦链长,实现抱箍下降;烟囱筒壁上豁口的长度控制在1.7m左右,宽度控制在400mm。 c. Use the same method to remove other cylinder wall splits. After removing a full circle, clamp the bayonets of the four prefabricated clamps at the gaps, and connect one end of the four chain hoists with the side ears on the clamps. 17 connection, the other end is connected with the lifting rope buckle on the hoop, adjust the length of the chain hoist chain to realize the lowering of the hoop; the length of the gap on the chimney wall is controlled at about 1.7m, and the width is controlled at 400mm.

d、砼烟囱的筒壁拆除一节,需要将抱箍和操作平台下调两次,抱箍接口连接头的间隙超过800mm时,在原抱箍上增加一节长度为0.8m的弧形板,即短抱箍,连接接口处用连接头和双头螺栓紧固;以此法逐层下降,实现砼烟囱筒壁部分的拆除。 d. To remove a section of the wall of the concrete chimney, the hoop and the operating platform need to be lowered twice. When the gap between the hoop interface connector exceeds 800mm, add a section of arc-shaped plate with a length of 0.8m to the original hoop, that is The hoop is short, and the connecting interface is fastened with a connecting head and a stud bolt; in this way, it is lowered layer by layer to realize the removal of the concrete chimney wall.

c、当拆到砼烟囱的底部平台上方时,拆掉抱箍和操作平台,站在底座平台上进行拆除,底部平台的拆除方法与原平台的拆除方法相同。 c. When dismantling to the top of the bottom platform of the concrete chimney, remove the hoop and operating platform, and stand on the base platform for dismantling. The dismantling method of the bottom platform is the same as that of the original platform.

随筒壁半径的增大,将抱箍中的短弧形板换成长弧形板,各弧形板之间用连接头连接。 With the increase of the radius of the cylinder wall, the short arc-shaped plates in the hoop are replaced with long-arc-shaped plates, and the arc-shaped plates are connected by connectors.

平台以此方法逐层下降,当抱箍上出现大于800mm的空当时,加装一个小平台,后加平台与抱箍不焊接,用钢线捆绑;下降时如果抱箍遇到爬梯支腿,先将爬梯顶部与烟囱内壁钢筋焊接起来,再将支腿割断;抱箍数量控制在3个以内,随着半径增大不断将短抱箍更换成长抱箍,直至拆到+11.5m米高度。拆到+11.5m后将悬挑操作平台拆掉,人员移到+10.0m平台继续拆除。 The platform is lowered layer by layer in this way. When there is a space greater than 800mm on the hoop, a small platform is added, and the platform is not welded to the hoop, but tied with steel wires; if the hoop meets the legs of the ladder when descending, First weld the top of the ladder to the steel bars on the inner wall of the chimney, and then cut off the outriggers; control the number of hoops within 3, and replace the short hoops with long hoops as the radius increases until the height of +11.5m is removed. After dismantling to +11.5m, the cantilevered operating platform will be dismantled, and the personnel will move to the +10.0m platform to continue dismantling.

Claims (3)

1. a concrete chimney demolition method, utilize concrete chimney demolition device to remove, detaching device comprises detent mechanism, operating platform and hoisting mechanism;
Described detent mechanism comprises anchor ear, connector and hangers; Anchor ear is the circular ring of multistage arc composition, and the interface of each section of arc is provided with connector, and anchor ear outer wall is evenly provided with multiple hangers;
Described operating platform comprises bucking ladder, hook and railing, and the bottom of bucking ladder is provided with diagonal brace, and hook and railing are fixed in the both sides of bucking ladder respectively, and railing is vertical with bucking ladder to be arranged, and hook and described hangers match;
Described hoisting mechanism comprises hoisting rope, jig and lifting device, and hoisting rope is fixed on anchor ear, and jig is fixedly mounted on concrete chimney jambs, hoisting rope, jig and lifting device with the use of;
Described connector comprises the angle steel that two are fixed in anchor ear interface free end respectively, one side and anchor ear outer wall affixed, another side is vertically vertical with anchor ear outer wall; Connect with stud between two angle steel;
Described hangers is angle steel, one side and anchor ear outer wall affixed, another side and anchor ear outer wall are laterally vertical; The horizontal plane of hangers is also provided with and links up with the elongated hole matched;
Described bucking ladder is trapezoid horizontal frame, is connected with leg-of-mutton diagonal brace bottom this bucking ladder, and vertical plane and the concrete chimney outer wall of diagonal brace are fitted;
Described jig is welded by three angle steel, and two vertical angle steel and a horizontal corner steel weld together, and wherein a vertical angle steel is provided with perpendicular picking up the ears;
The railing upper beam two ends of described bucking ladder are provided with preformed hole; It is characterized in that, utilize above-mentioned detaching device to remove concrete chimney and carry out according to following steps:
A, early-stage preparations
The dismounting order of a, concrete chimney is from top to bottom, first anchor ear minimum for diameter is well placed on ground, wherein the connector stud of an interface is tightened and is stayed 20mm gap, another interface is corresponding with concrete chimney climbing ladder position, and two free ends of interface are respectively arranged with the fastening rope linked together with euphroe; Arrange four halliards along anchor ear even circumferential to withhold;
B, select two suspension centres in the cat ladder both sides of concrete chimney top original platform, the pulley of each extension 0.5t, anchor ear is pulled to the position of 1.5m under original platform, constructor stands on cat ladder, utilize euphroe to be furthered by anchor ear interface, the connector of interface installs adjustable stay bolt and tightens;
C, first assemble operating platform on ground, constructor stands in each operating platform to lift with prior mounted pulley by cat ladder one by one and puts in place, hangs on the hangers of anchor ear, firm welding, install the hook on operating platform successively;
D, At The Height at operating platform upwards 500mm, around concrete chimney outer wall locking steel cable as safety rope, mounting strap is suspended in installing rope by constructor;
B, concrete chimney demolition
The above partial demolition of original platform: constructor stands on concrete chimney original platform, eight gap are made a call to downwards along concrete chimney circumference from top with pneumatic pick and gas cutting, gap is opened to the following position of original platform, and concrete chimney part more than original platform and original platform is all removed with the gentle block that cuts off into of pneumatic pick;
Bowl wall portion is removed:
A, continuing cutting downwards along gap, is 0.5m apart from anchor ear position location bottom gap;
B, below gap 200mm barrel on make a call to eight through holes along its circumference, wherein two through holes install a guide chain respectively, one end of guide chain is fixed on through hole, the other end is connected with the two ends of a movable rope respectively, this movable rope is laid in the barrel split on guide chain opposite, and two guide chains are strained simultaneously, makes barrel split stressed inside chimney, now cut in barrel split bottom transverse with pneumatic pick and gas cutting, namely this block barrel split falls down inside concrete chimney;
C, to remove other barrel split by identical method, after removing a whole circle, prefabricated jig is evenly hung on four opening positions, one end of four Chain blocks is connected with picking up the ears on jig, the other end is withheld with the halliard on anchor ear and is connected, adjustment Chain block chain length, realizes anchor ear and declines;
The barrel of d, concrete chimney removes a joint, needs anchor ear and operating platform to lower twice, and when the gap of anchor ear interface connector is more than 800mm, it is the arc of 0.8m that former anchor ear increases a joint length, connecting interface place connector and stud fastening; Successively decline in this way, realize the dismounting of concrete chimney wall part;
E, when above the bottom platform of tearing concrete chimney open, dismantle anchor ear and operating platform, stand on base platform and remove, and the method for dismounting of bottom platform is identical with the method for dismounting of original platform.
2. the method for dismounting concrete chimney according to claim 1, is characterized in that, with the increase of barrel radius, changes the short arc plate in anchor ear into long arc shape plate, connects between each arc with connector.
3. the method for dismounting concrete chimney according to claim 1, is characterized in that, when anchor ear occurring the room being greater than 800mm, installs an operating platform additional.
CN201310436264.7A 2013-09-24 2013-09-24 Concrete chimney dismantling method Active CN103470093B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310436264.7A CN103470093B (en) 2013-09-24 2013-09-24 Concrete chimney dismantling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310436264.7A CN103470093B (en) 2013-09-24 2013-09-24 Concrete chimney dismantling method

Publications (2)

Publication Number Publication Date
CN103470093A CN103470093A (en) 2013-12-25
CN103470093B true CN103470093B (en) 2015-06-10

Family

ID=49795120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310436264.7A Active CN103470093B (en) 2013-09-24 2013-09-24 Concrete chimney dismantling method

Country Status (1)

Country Link
CN (1) CN103470093B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278828B (en) * 2014-09-30 2016-08-24 北京首钢建设集团有限公司 A kind of concrete chimney dismantling operation platform
CN105129599B (en) * 2015-09-01 2018-04-17 中国电建集团山东电力建设第一工程有限公司 A kind of chimney glass reinforced plastic inner cylinder hydraulic pressure lift special hanger and its construction method
CN105715029A (en) * 2016-02-01 2016-06-29 重庆瑜煌电力设备制造有限公司 Anti-fall steel angle tower
CN106522581A (en) * 2016-12-04 2017-03-22 河南理工大学 Method for demolish chimney manually
CN109113369B (en) * 2018-10-04 2020-07-31 司风兵 Safe demolition method for manual demolition of cylindrical building
CN108979199A (en) * 2018-10-04 2018-12-11 司风兵 A kind of safe construction device for cylinder-shaped building manual demolition
CN109505423A (en) * 2018-11-26 2019-03-22 五冶集团上海有限公司 A kind of concrete chimney method for dismounting and its application
CN110294439B (en) * 2019-06-19 2020-08-14 河南省工建集团有限责任公司 Attached lifting scaffold for high-altitude demolition and lifting method
CN111502222A (en) * 2020-05-19 2020-08-07 五冶集团上海有限公司 An attached triangular support platform and its construction method
CN112127697B (en) * 2020-09-27 2022-02-11 广西建工集团冶金建设有限公司 A kind of dismantling method of reinforced concrete chimney
CN112746736A (en) * 2021-01-13 2021-05-04 刘红军 Movable working platform for chimney demolition construction
CN116241061A (en) * 2023-01-30 2023-06-09 中国十七冶集团有限公司 A reusable vertical operation platform setting method
CN119195567B (en) * 2024-11-05 2026-01-23 中国二十二冶集团有限公司 High-altitude dismantling method for concrete chimney

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109233A (en) * 2006-07-18 2008-01-23 班云 Smokestack removing machine and smokestack removing method thereof
CN202039587U (en) * 2011-03-21 2011-11-16 苏州工业园区云白华鼎烟囱制造有限公司 Temporary platform for installing mating flange on steel chimney
CN202577925U (en) * 2012-03-14 2012-12-05 江苏南通二建集团有限公司无锡分公司 Lifting type platform in elevator shaft
CN202745462U (en) * 2012-08-28 2013-02-20 湖北省电力公司随州供电公司 Clamping two-semicircle combined hoops for preventing rod from falling
CN203034773U (en) * 2012-11-12 2013-07-03 中建钢构有限公司 Assembly type operating platform with variable diameter

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4535996B2 (en) * 2005-12-05 2010-09-01 中国電力株式会社 Utility pole installation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109233A (en) * 2006-07-18 2008-01-23 班云 Smokestack removing machine and smokestack removing method thereof
CN202039587U (en) * 2011-03-21 2011-11-16 苏州工业园区云白华鼎烟囱制造有限公司 Temporary platform for installing mating flange on steel chimney
CN202577925U (en) * 2012-03-14 2012-12-05 江苏南通二建集团有限公司无锡分公司 Lifting type platform in elevator shaft
CN202745462U (en) * 2012-08-28 2013-02-20 湖北省电力公司随州供电公司 Clamping two-semicircle combined hoops for preventing rod from falling
CN203034773U (en) * 2012-11-12 2013-07-03 中建钢构有限公司 Assembly type operating platform with variable diameter

Also Published As

Publication number Publication date
CN103470093A (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN103470093B (en) Concrete chimney dismantling method
CN107055347B (en) A kind of Tower crane disassembly structures and methods of high-rise installation
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN109113369B (en) Safe demolition method for manual demolition of cylindrical building
CN113090019A (en) Construction method and construction device for high-rise structure
CN106522581A (en) Method for demolish chimney manually
JP3181041U (en) Mounting member for scaffolding for bridge
CN106400691A (en) Integrated construction process for anti-collision wall formwork
KR101364316B1 (en) Suspended Scaffolding and Platform for the Boiler
CN109854273B (en) Method and equipment for removing shield segments of connecting channels in tunnel
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
CN210888012U (en) Steel column safety operation platform
CN108118885B (en) vertical moving type protection platform and application thereof in steel structure column butt joint construction
EP3425119B1 (en) Demolishing an offshore jacket
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
JP3950800B2 (en) Suspension scaffold
CN112049462A (en) Mechanical dismantling process for high-altitude building
CN105311771A (en) Safety belt suspending device for upper construction of transformer
CN207390874U (en) A kind of movable type supplies installation construction device
CN215160435U (en) Deep basal pit excavation material overhead hoist
CN210561720U (en) Pier stud maintenance repair operation platform
CN214462427U (en) A movable working platform for chimney demolition construction
CN209637771U (en) The shield duct piece of service channel removes equipment in a kind of tunnel
CN114278113A (en) Construction method for dismantling reinforced concrete chimney in complex environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20131225

Assignee: Chen Zhishun

Assignor: China MCC 22 Group Corp., Ltd.

Contract record no.: 2017990000110

Denomination of invention: Concrete chimney dismantling method

Granted publication date: 20150610

License type: Exclusive License

Record date: 20170405

EE01 Entry into force of recordation of patent licensing contract