KR101367706B1 - Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof - Google Patents

Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof Download PDF

Info

Publication number
KR101367706B1
KR101367706B1 KR1020120028709A KR20120028709A KR101367706B1 KR 101367706 B1 KR101367706 B1 KR 101367706B1 KR 1020120028709 A KR1020120028709 A KR 1020120028709A KR 20120028709 A KR20120028709 A KR 20120028709A KR 101367706 B1 KR101367706 B1 KR 101367706B1
Authority
KR
South Korea
Prior art keywords
positioning
steel frame
web
prosthetic bone
bracket steel
Prior art date
Application number
KR1020120028709A
Other languages
Korean (ko)
Other versions
KR20130106982A (en
Inventor
김선국
홍원기
김정태
나영주
김지훈
Original Assignee
(주)케이에이치하우징솔루션스
경희대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이에이치하우징솔루션스, 경희대학교 산학협력단 filed Critical (주)케이에이치하우징솔루션스
Priority to KR1020120028709A priority Critical patent/KR101367706B1/en
Publication of KR20130106982A publication Critical patent/KR20130106982A/en
Application granted granted Critical
Publication of KR101367706B1 publication Critical patent/KR101367706B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 발명은 브래킷철골에 보철골을 연결하기 위한 구조로써,
PC기둥유닛(C)에 설치된 브래킷철골(100); PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되는 보철골(10); 및, 상기 브래킷철골(100) 타단의 웨브와 상기 보철골(10) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200);를 포함하여 구성되되,
상기 포지셔닝플레이트(200)는 일부가 상기 브래킷철골(100)에 선설치되고 상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10)의 일단이 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서,
상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 제공한다.
더불어 상기 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 시공하기 위한 방법으로,
(1) PC기둥유닛(C)의 브래킷철골(100)에 상기 포지셔닝플레이트(200)를 설치하는 포지셔닝플레이트설치단계; (2) 상기 보철골(10)이 설치된 PC보유닛(B)을 양중하는 PC보유닛양중단계; (3) 양중된 상기 보철골(10)이 설치된 PC보유닛(B)을 하강시켜 상기 보철골(10)의 일단이 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서, 상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿도록 상기 보철골(10)을 임시 거치시키는 PC보유닛거치단계; 및, (4) 기타 플레이트를 설치하고 볼트 및 너트를 사용하여 체결하는 본체결단계;를 포함하여 구성되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법을 제공한다.
The present invention is a structure for connecting the prosthesis to the bracket steel frame,
Bracket steel frame 100 installed on the PC column unit (C); Prosthetic bone 10 is installed on the PC beam unit (B) is one end is coupled to the other end of the bracket steel frame (100); And a pair of positioning plates 200 for connecting the web of the other end of the bracket steel frame 100 and the web of the one end of the prosthetic bone 10.
The positioning plate 200 is partially installed in the bracket steel frame 100 and the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 are formed to be inclined in a shape corresponding to the prosthetic bone ( One end of the 10) is installed on the other end of the bracket steel frame 100 by the weight of the PC beam unit (B),
Since the upper end of the positioning plate 200 abuts the lower portion of the upper flange of the prosthetic bone 10, the prosthetic bone 10 is temporarily mounted so that the positioning of the composite PC member is automatically performed. Providing a prosthetic connection structure for.
In addition, as a method for constructing a prosthesis connection structure for self-positioning the composite PC member,
(1) a positioning plate installation step of installing the positioning plate 200 on the bracket steel frame 100 of the PC column unit (C); (2) the PC beam unit lifting step of lifting the PC beam unit (B) in which the prosthesis 10 is installed; (3) while lowering the PC prosthesis unit (B) on which the prosthetic bone 10 is mounted, one end of the prosthetic bone 10 is installed at the other end of the bracket steel frame 100 by its own weight, and the positioning plate ( PC beam unit mounting step of temporarily mounting the prosthetic bone 10 so that the upper end of the 200 is in contact with the lower portion of the upper flange of the prosthetic bone 10; And, (4) provides a construction method of the prosthetic bone connection structure for the self-positioning of the composite PC member, characterized in that it comprises a ;;

Description

합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법{Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof}Steel connection structure for self-positioning of composite precast concrete member and construction method thereof

본 발명은 기둥에 설치된 브래킷철골에 보철골을 연결하기 위한 구조로써, 개선된 포지셔닝플레이트가 설치된 브래킷철골과 보철골의 상호 구조로 인하여 상기 보철골이 자동으로 상하좌우 포지셔닝(위치잡기)되어 임시 거치되는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법에 관한 것이다.
The present invention is a structure for connecting the prosthetic bone to the bracket steel frame installed in the column, due to the mutual structure of the bracket steel frame and the prosthesis with the improved positioning plate is automatically placed (positioning) the temporary positioning (positioning) The present invention relates to a prosthetic bone connection structure and a construction method thereof for self-positioning a composite PC member.

일반적으로 PC구조는 보철골(10)이 설치된 PC보유닛(B)을 양중하여 상기 보철골(10)을 기둥에 설치된 브래킷철골(100)에 연결해야 한다.
In general, the PC structure should be connected to the bracket steel frame 100, the prosthetic bone 10 is installed on the pole by lifting the PC prosthesis unit (B) is installed prosthesis 10.

도 1은 종래의 보철골 연결구조를 도시한 것이고, 도 2는 종래의 보철골 연결구조의 문제점을 도시한 것이다.1 illustrates a conventional prosthetic bone connection structure, and FIG. 2 illustrates a problem of the conventional prosthetic bone connection structure.

종래의 보철골 연결구조의 경우, 먼저 도 1(a)와 같이 보철골(10)이 설치된 PC보유닛(B)을 양중하여 기둥에 선설치된 브래킷철골(100)에 수평으로 임시거치하고 이어서 도 1(b)와 같이 플레이트(20)를 사용하여 보철골(10)의 웨브와 브래킷철골(100)의 웨브를 결합한다.
In the case of a conventional prosthetic bone connection structure, first, temporarily placed horizontally on the bracket steel frame 100 installed on the column by lifting the PC beam unit (B) installed with the prosthetic bone 10 as shown in Figure 1 (a) and then The web of the prosthetic bone 10 and the web of the bracket steel frame 100 using the plate 20 as shown in (b).

상기 종래의 보철골 연결구조는 기둥에 연직도 이탈이나 시공오차가 발생하여 보설치 공간이 확보되지 않아 도 2(a)에 도시된 바와 같이 시공시 상하축선이 불일치하거나, 시공오차로 인하여 도 2(b)에 도시된 바와 같이 시공시 좌우축선이 불일치하여 시공이 어려운 단점이 있다. 그리고 PC보유닛(B) 설치시 보철골(10)의 포지셔닝(위치잡기)을 위하여 많은 인력 및 시간이 투입되고 시공품질을 확보하기 어려웠으며 안전사고 위험이 높은 문제점이 있다.
The conventional prosthetic bone connection structure is a vertical deviation departure or construction error occurs in the column does not secure the space for installation of the prosthesis, as shown in Figure 2 (a) during construction, the vertical axis is inconsistent, or due to construction errors Figure 2 As shown in (b), there is a disadvantage in that construction is difficult due to the inconsistency of the left and right axes during construction. In addition, when installing the PC beam unit (B), a lot of manpower and time is put into the positioning (positioning) of the prosthetic bone 10, it is difficult to secure construction quality, and there is a high risk of safety accidents.

본 발명은 상기한 바와 같은 종래의 제반 문제점을 해소하기 위해서 제시되는 것이다. 그 목적은 다음과 같다.SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems of the related art. The purpose is as follows.

첫째, 기존의 플레이트를 개선한 포지셔닝플레이트를 사용하여 기둥의 연직도 이탈이나 시공오차에도 불구하고 정확히 시공할 수 있는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공하고자 한다. First, to provide a prosthetic bone connection structure and construction method for the self-positioning of the composite PC member that can be accurately installed despite the vertical deviation of the column or construction errors using the positioning plate improved the existing plate.

둘째, 미숙련공도 합성 PC보유닛의 자중을 이용한 중력 하강이라는 단순작업으로 보철골 시공을 마칠 수 있어 소정의 품질이 보장되고 안전사고 위험이 적은 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공하고자 한다. Secondly, prosthetic bone construction can be completed by the simple operation of gravity lowering using self-weight of synthetic PC beam unit. To provide a construction method.

셋째, 보철골의 포지셔닝을 위해 고공에서 기둥간격을 벌리고, 좁히는 위험한 부가작업이 줄어들어 공기 및 원가절감 효과가 높은 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공하고자 한다.Third, it is to provide a prosthetic joint connection structure and construction method for the self-positioning of composite PC member having high air and cost saving effect by reducing the risk of additional side work to open the gap between the narrow, high narrowing for positioning the prosthetic bone.

넷째, 기존의 철골은 접합 후 플랜지(flange)와 웨브(web)의 보강 플레이트(plate)를 양면에 덧대어 접합 부위를 보강하므로 접합시간이 길어지고 안전의 위험이 있으나, 웨브와 플랜지를 동시에 보강하는 포지셔닝플레이트를 이용하여 접합시간 단축 및 안전시공을 위한 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공하고자 한다.
Fourth, the existing steel frame reinforces the joining part by reinforcing the flange and web reinforcing plate on both sides after joining, which increases the joining time and risks of safety. It is to provide a prosthetic bone connection structure and a construction method for the self-positioning of the composite PC member for shortening the time and safe construction by using a positioning plate.

상기한 기술적 과제를 해결하기 위해 본 발명은 브래킷철골에 보철골을 연결하기 위한 구조로써,In order to solve the above technical problem, the present invention is a structure for connecting the prosthetic bone to the bracket steel frame,

PC기둥유닛(C)에 설치된 브래킷철골(100); PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되는 보철골(10); 및, 상기 브래킷철골(100) 타단의 웨브와 상기 보철골(10) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200);를 포함하여 구성되되,Bracket steel frame 100 installed on the PC column unit (C); Prosthetic bone 10 is installed on the PC beam unit (B) is one end is coupled to the other end of the bracket steel frame (100); And a pair of positioning plates 200 for connecting the web of the other end of the bracket steel frame 100 and the web of the one end of the prosthetic bone 10.

상기 포지셔닝플레이트(200)는 일부가 상기 브래킷철골(100)에 선설치되고 상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10)의 일단이 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서,The positioning plate 200 is partially installed in the bracket steel frame 100 and the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 are formed to be inclined in a shape corresponding to the prosthetic bone ( One end of the 10) is installed on the other end of the bracket steel frame 100 by the weight of the PC beam unit (B),

상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 제공한다.
Since the upper end of the positioning plate 200 abuts the lower portion of the upper flange of the prosthetic bone 10, the prosthetic bone 10 is temporarily mounted so that the positioning of the composite PC member is automatically performed. Providing a prosthetic connection structure for.

더불어 상기 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 시공하기 위한 방법으로,In addition, as a method for constructing a prosthesis connection structure for self-positioning the composite PC member,

(1) PC기둥유닛(C)의 브래킷철골(100)에 상기 포지셔닝플레이트(200)를 설치하는 포지셔닝플레이트설치단계; (2) 상기 보철골(10)이 설치된 PC보유닛(B)을 양중하는 PC보유닛양중단계; (3) 양중된 상기 보철골(10)이 설치된 PC보유닛(B)을 하강시켜 상기 보철골(10)의 일단이 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서, 상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿도록 상기 보철골(10)을 임시 거치시키는 PC보유닛거치단계; 및, (4) 기타 플레이트를 설치하고 볼트 및 너트를 사용하여 체결하는 본체결단계;를 포함하여 구성되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법을 제공한다.
(1) a positioning plate installation step of installing the positioning plate 200 on the bracket steel frame 100 of the PC column unit (C); (2) the PC beam unit lifting step of lifting the PC beam unit (B) in which the prosthesis 10 is installed; (3) while lowering the PC prosthesis unit (B) on which the prosthetic bone 10 is mounted, one end of the prosthetic bone 10 is installed at the other end of the bracket steel frame 100 by its own weight, and the positioning plate ( PC beam unit mounting step of temporarily mounting the prosthetic bone 10 so that the upper end of the 200 is in contact with the lower portion of the upper flange of the prosthetic bone 10; And, (4) provides a construction method of the prosthetic bone connection structure for the self-positioning of the composite PC member, characterized in that it comprises a ;;

본 발명에 따르면 다음과 같은 효과가 기대된다.According to the present invention, the following effects are expected.

첫째, 기존의 플레이트를 개선한 포지셔닝플레이트를 사용하여 기둥의 연직도 이탈이나 시공오차에도 불구하고 정확히 시공할 수 있는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공한다. First, it provides a prosthesis connection structure and construction method for the self-positioning of the composite PC member that can be accurately installed despite the vertical deviation of the column or the construction error using the positioning plate improved the existing plate.

둘째, 미숙련공도 합성 PC보유닛의 자중을 이용한 중력 하강이라는 단순작업으로 보철골 시공을 마칠 수 있어 소정의 품질이 보장되고 안전사고 위험이 적은 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공한다. Secondly, prosthetic bone construction can be completed by the simple operation of gravity lowering using self-weight of synthetic PC beam unit. Provide construction method.

셋째, 보철골의 포지셔닝을 위해 고공에서 기둥간격을 벌리고, 좁히는 위험한 부가작업이 줄어들어 공기 및 원가절감 효과가 높은 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공한다.Third, prosthetic bone connection structure and construction method for self-positioning composite PC member having high air and cost saving effect by reducing the risk of additional side work to increase the gap and narrow the gap at high altitude for positioning the prosthetic bone.

넷째, 기존의 철골은 접합 후 플랜지(flange)와 웨브(web)의 보강 플레이트(plate)를 양면에 덧대어 접합 부위를 보강하므로 접합시간이 길어지고 안전의 위험이 있으나, 웨브와 플랜지를 동시에 보강하는 포지셔닝플레이트를 이용하여 접합시간 단축 및 안전시공을 위한 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조 및 이의 시공방법을 제공한다.
Fourth, the existing steel frame reinforces the joining part by reinforcing the flange and web reinforcing plate on both sides after joining, which increases the joining time and risks of safety. Providing a prosthetic bone connection structure and a construction method for the self-positioning of the composite PC member for reducing the joining time and safe construction using a positioning plate to.

도 1은 종래의 보철골 연결구조를 도시한 것이다.
도 2는 종래의 보철골 연결구조의 문제점을 도시한 것이다.
도 3은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 도시한 것이다.
도 4는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.
도 5는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.
도 6은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.
도 7 내지 10은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법의 과정을 도시한 것이다.
도 11은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법에서 보철골 및 브래킷철골의 결합과정을 도시한 것이다.
도 12 내지 15는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예의 시공방법의 과정을 도시한 것이다.
도 16은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예의 시공방법에서 보철골 및 브래킷철골의 결합과정을 도시한 것이다.
1 illustrates a conventional prosthetic bone connection structure.
Figure 2 illustrates a problem of the conventional prosthetic connection structure.
Figure 3 illustrates a prosthesis connection structure for self positioning of the composite PC member of the present invention.
Figure 4 illustrates another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention.
Figure 5 illustrates another embodiment of the prosthesis connection structure for self positioning of the composite PC member of the present invention.
Figure 6 illustrates another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention.
7 to 10 show the process of the method of construction of the prosthetic bone connection structure for self-positioning the composite PC member of the present invention.
Figure 11 illustrates the process of coupling the prosthetic bone and bracket steel in the construction method of the prosthetic bone connection structure for the self-positioning composite PC member of the present invention.
12 to 15 show the process of the construction method of another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention.
Figure 16 shows the coupling process of the prosthetic bone and bracket steel in the construction method of another embodiment of the prosthetic bone connection structure for self-positioning the composite PC member of the present invention.

이하 첨부한 도면과 함께 상기와 같은 본 발명의 개념이 바람직하게 구현된 실시예를 통하여 본 발명을 더욱 상세하게 설명한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

1. 합성 1. Synthesis PCPC 부재의 Absent 셀프self 포지셔닝을Positioning 위한  for 보철골Prosthetic bone 연결구조 Connection structure

도 3은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 도시한 것이다.Figure 3 illustrates a prosthesis connection structure for self positioning of the composite PC member of the present invention.

본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조는 도 1(a)에 도시된 바와 같이 브래킷철골에 보철골을 연결하기 위한 구조로써,Prosthetic bone connection structure for self-positioning the composite PC member of the present invention is a structure for connecting the prosthetic bone to the bracket steel as shown in Figure 1 (a),

PC기둥유닛(C)에 설치된 브래킷철골(100); PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되는 보철골(10); 및, 상기 브래킷철골(100) 타단의 웨브와 상기 보철골(10) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200);를 포함하여 구성되되,Bracket steel frame 100 installed on the PC column unit (C); Prosthetic bone 10 is installed on the PC beam unit (B) is one end is coupled to the other end of the bracket steel frame (100); And a pair of positioning plates 200 for connecting the web of the other end of the bracket steel frame 100 and the web of the one end of the prosthetic bone 10.

상기 포지셔닝플레이트(200)는 일부가 상기 브래킷철골(100)에 선설치되고 상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10)의 일단이 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서, 상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 한다.
The positioning plate 200 is partially installed in the bracket steel frame 100 and the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 are formed to be inclined in a shape corresponding to the prosthetic bone ( One end of the 10) is installed on the other end of the bracket steel frame 100 by the weight of the PC beam unit (B), the upper end of the positioning plate 200 abuts the lower portion of the upper flange of the prosthesis (10) Since the prosthetic bone 10 is temporarily mounted, it is characterized in that the vertical positioning left and right automatically.

상기 브래킷철골(100) 및 상기 보철골(10)은 통상적으로 사용되는 I형강을 이용할 수도 있으나 도 3(a)에 도시된 바와 같이 상부플랜지와 웨브로만 구성된 T형으로 하는 것이 바람직하다. The bracket steel frame 100 and the prosthetic bone 10 may use a conventional I-shaped steel, but is preferably made of a T-type consisting of only the upper flange and the web as shown in Figure 3 (a).

그리고 상기 포지셔닝플레이트(200)의 상단 단면은 아래에 도시된 바와 같이, 모따기형(Chamfer type) 또는 V컷형(V-cut type)으로 하는 것이 상기 보철골(10) 일단의 웨브의 삽입을 고려할 때 바람직하다.In addition, when the upper end surface of the positioning plate 200 has a chamfer type or a V-cut type as shown below, the insertion of the web at one end of the prosthetic bone 10 is considered. desirable.

Figure 112012022837065-pat00001
Figure 112012022837065-pat00001

도 4는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.Figure 4 illustrates another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention.

도 4에 도시된 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예에서 상기 포지셔닝플레이트(200)는 상단이 절곡되어 웨브보강플레이트(210`) 및 상부플랜지보강플레이트(220`)로 구성되는 포지셔닝플레이트(200`)가 되고,In another embodiment of the prosthetic bone connection structure for self-positioning the composite PC member of the present invention shown in Figure 4 the positioning plate 200 is bent at the top of the web reinforcing plate 210` and the upper flange reinforcing plate 220 Position plate consisting of `) (200`),

상기 상부플랜지보강플레이트(220`)가 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 한다. 이때 상기 포지셔닝플레이트(200`)는 웨브보강플레이트(210`) 및 상부플랜지보강플레이트(220`)로 나뉘어 절곡되므로 절곡 부위가 자동적으로 아래 그림과 같이 상술한 모따기형(Chamfer type) 또는 V컷형(V-cut type)의 모양을 이루어 도 11의 ②에 도시된 것처럼 상기 보철골(10) 일단의 웨브의 삽입이 용이하다.Since the upper flange reinforcing plate 220 ′ is in contact with the lower portion of the upper flange of the prosthetic bone 10, the prosthetic bone 10 is temporarily mounted, and thus the up, down, left and right positioning is automatically performed. At this time, the positioning plate 200` is divided into a web reinforcing plate 210` and an upper flange reinforcing plate 220` so that the bending portion is automatically chamfered type (Chamfer type) or V-cut type (as shown below). V-cut type) to facilitate the insertion of one end of the prosthetic bone 10, as shown in ② of FIG.

Figure 112012022837065-pat00002
Figure 112012022837065-pat00002

그리고 본 발명은 도 3(b) 및 도 4(b)에 도시된 바와 같이, 상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브가 맞닿는 대응면은 상부에서 수직으로 내려오다 중단에서 경사지게 형성되는 것을 특징으로 할 수 있다.
3 (b) and 4 (b), the corresponding surface where the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 come into contact with each other descends vertically from the top. It may be characterized by being formed obliquely at the interruption.

도 5는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.Figure 5 illustrates another embodiment of the prosthesis connection structure for self positioning of the composite PC member of the present invention.

도 5에 도시된 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예는 브래킷철골에 보철골을 연결하기 위한 구조로써,Another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention shown in Figure 5 is a structure for connecting the prosthesis to the bracket steel,

PC기둥유닛(C)에 설치된 역T형의 브래킷철골(100`); PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되는 역T형의 보철골(10`); 및, 상기 브래킷철골(100`) 타단의 웨브와 상기 보철골(10`) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200``);를 포함하여 구성되되,Inverted T-shaped bracket steel frame 100` installed on the PC column unit (C); An inverted T-shaped prosthetic bone 10 'installed on the PC beam unit B and having one end coupled to the other end of the bracket steel frame 100; And a pair of positioning plates (200``) for connecting the web of the other end of the bracket steel frame (100`) and the web of the end of the prosthetic bone (10`);

상기 포지셔닝플레이트(200``)는 일부가 상기 보철골(10`)에 선설치되고 상기 브래킷철골(100`) 타단의 웨브와 보철골(10`) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10`)의 일단이 상기 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100`)의 타단에 설치되면서, 상기 포지셔닝플레이트(200``)의 하단이 상기 브래킷철골(100`)의 하부플랜지 상부에 맞닿아 상기 보철골(10`)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 한다.The positioning plate 200 ″ is partially installed on the prosthetic bone 10 ′, and the web of the other end of the bracket steel 100 ′ and the web of one end of the prosthetic bone 10 ′ are formed to be inclined to correspond to each other. One end of the prosthetic bone 10` is installed at the other end of the bracket steel frame 100` by the weight of the PC prosthesis unit B, and the lower end of the positioning plate 200`` is the bracket steel frame ( The prosthetic bone 10` is temporarily placed in contact with the upper portion of the lower flange of the 100 '), so that the up, down, left and right positioning is automatically performed.

도 5는 도 1과 다르게 웨브와 하부프렌지로만 구성된 역T형 철골은 보철골로 이용하고 있으며, 이로 인하여 필연적으로 상기 포지셔닝플레이트(200``)는 일부가 상기 보철골(10`)에 선설치되고, 상기 포지셔닝플레이트(200``)의 하단이 상기 브래킷철골(100`)의 하부플랜지 상부에 맞닿는 구조가 된다.
FIG. 5 is an inverted T-shaped steel frame composed of only a web and a lower flange differently from FIG. 1, and thus, the positioning plate 200 `` is inevitably partially installed in the prosthetic bone 10 ′. The lower end of the positioning plate 200 ″ is in contact with the upper portion of the lower flange of the bracket steel frame 100 ′.

도 6은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예를 도시한 것이다.Figure 6 illustrates another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention.

도 6에 도시된 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예는 상기 포지셔닝플레이트(200``)는 하단이 절곡되어 웨브보강플레이트(210```) 및 하부플랜지보강플레이트(220```)로 구성되는 포지셔닝플레이트(200```)가 되고,Another embodiment of the prosthetic bone connection structure for the self-positioning of the composite PC member of the present invention shown in Figure 6 is the positioning plate 200`` is bent at the bottom of the web reinforcing plate 210```and the lower flange Positioning plate (200 `` `) consisting of a reinforcing plate (220` ``),

상기 하부플랜지보강플레이트(220```)가 상기 브래킷철골(100`)의 하부플랜지 상부에 맞닿아 상기 보철골(10`)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 한다.
The lower flange reinforcing plate (220 ') is in contact with the upper portion of the lower flange of the bracket steel frame (100') is characterized in that the positioning of the upper and lower, left and right automatically because it is temporarily mounted.

그리고 본 발명은 도 5(b) 및 도 6(b)에 도시된 바와 같이, 상기 브래킷철골(100`) 타단의 웨브와 보철골(10`) 일단의 웨브가 맞닿는 대응면은 상부에서 수직으로 내려오다 중단에서 경사지게 형성되는 것을 특징으로 할 수 있다.
5 (b) and 6 (b), the corresponding surface where the web of the other end of the bracket steel frame 100 ′ and the web of one end of the prosthetic bone 10 ′ abut is vertically from the top. It may be characterized in that it is formed inclined at the interruption.

2. 합성 2. Synthesis PCPC 부재의 Absent 셀프self 포지셔닝을Positioning 위한  for 보철골Prosthetic bone 연결구조의 시공방법 Construction method of connection structure

도 7 내지 10은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법의 과정을 도시한 것이고, 도 11은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법에서 보철골 및 브래킷철골의 결합과정을 도시한 것이다.
7 to 10 show the process of the construction method of the prosthetic bone connection structure for the self-positioning of the composite PC member of the present invention, Figure 11 is the construction of the prosthetic bone connection structure for the self-positioning of the composite PC member of the present invention In the method shows the process of coupling the prosthetic bone and bracket steel.

본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 시공방법은 도 3 또는 도 4의 상기 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 시공하기 위한 방법으로,Construction method of the prosthetic bone connection structure for the self-positioning of the composite PC member of the present invention is a method for constructing the prosthetic bone connection structure for the self-positioning of the composite PC member of Figure 3 or 4,

(1) PC기둥유닛(C)의 브래킷철골(100)에 상기 포지셔닝플레이트(200)를 설치하는 포지셔닝플레이트설치단계;(1) a positioning plate installation step of installing the positioning plate 200 on the bracket steel frame 100 of the PC column unit (C);

(2) 도 7에 도시된 바와 같이 상기 보철골(10)이 설치된 PC보유닛(B)을 양중하는 PC보유닛양중단계;(2) PC beam unit lifting step of lifting the PC beam unit (B), the prosthetic bone 10 is installed as shown in FIG.

(3) 도 8 내지 9 그리고 도 11의 ① 내지 ④에 도시된 바와 같이 양중된 상기 보철골(10)이 설치된 PC보유닛(B)을 하강시켜 상기 보철골(10)의 일단이 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서, 상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿도록 상기 보철골(10)을 임시 거치시키는 PC보유닛거치단계; 및,(3) As shown in Figs. 8 to 9 and Figs. 1 to ④ of Fig. 11, the prosthetic bone 10, which is lifted up, is lowered, and the one end of the prosthetic bone 10 is lowered by its own weight. PC beam unit mounting step of temporarily mounting the prosthesis 10 while being installed at the other end of the bracket steel frame 100, the upper end of the positioning plate 200 abuts the lower portion of the upper flange of the prosthesis (10); And

(4) 도 10 및 도 11의 ⑤에 도시된 바와 같이 통상적으로 사용되는 기타 플레이트를 설치하고 볼트 및 너트를 사용하여 체결하는 본체결단계;(4) a body fastening step of installing other plates commonly used as shown in ⑤ of FIGS. 10 and 11 and fastening them using bolts and nuts;

를 포함하여 구성되는 것을 특징으로 한다.
And a control unit.

도 12 내지 15는 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예의 시공방법의 과정을 도시한 것이고, 도 16은 본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예의 시공방법에서 보철골 및 브래킷철골의 결합과정을 도시한 것이다.
12 to 15 show the process of the construction method of another embodiment of the prosthesis connection structure for self-positioning the composite PC member of the present invention, Figure 16 is a prosthetic connection for self-positioning the composite PC member of the present invention In the construction method of another embodiment of the structure is shown the coupling process of the prosthetic bone and bracket steel.

본 발명의 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조의 다른 실시예의 시공방법은 도 5 또는 도 6의 상기 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조를 시공하기 위한 방법으로,The construction method of another embodiment of the prosthetic bone connection structure for self-positioning the composite PC member of the present invention is a method for constructing the prosthetic bone connection structure for self-positioning the composite PC member of Figure 5 or 6,

(1) 보철골(10`)에 상기 포지셔닝플레이트(200``)를 선설치하는 포지셔닝플레이트설치단계;(1) a positioning plate installation step of pre-installing the positioning plate 200`` on the prosthesis 10 ';

(2) 도 12에 도시된 바와 같이 상기 보철골(10`)이 설치된 PC보유닛(B)을 양중하는 PC보유닛양중단계;(2) PC beam unit lifting step of lifting the PC beam unit (B), the prosthetic bone (10 ') is installed as shown in FIG.

(3) 도 13 내지 14 그리고 도 16의 ① 내지 ④에 도시된 바와 같이 양중된 상기 보철골(10`)이 설치된 PC보유닛(B)을 하강시켜 상기 보철골(10`)의 일단이 자중에 의해서 상기 브래킷철골(100`)의 타단에 설치되면서, 상기 포지셔닝플레이트(200``)의 하단이 상기 보철골(10`)의 하부플랜지 상부에 맞닿도록 상기 보철골(10`)을 임시 거치시키는 PC보유닛거치단계; 및,(3) As shown in Figs. 13 to 14 and 16 to 1 to ④, one end of the prosthetic bone 10 'is lowered by lowering the PC prosthesis unit B on which the prosthetic bone 10' is mounted. While being installed at the other end of the bracket steel frame (100 '), the prosthesis (10') is temporarily mounted so that the lower end of the positioning plate (200 ') abuts the upper upper flange of the prosthesis (10') PC auxiliary unit mounting step; And

(4) 도 15 및 도 11의 ⑤에 도시된 바와 같이 통상적으로 사용되는 기타 플레이트를 설치하고 볼트 및 너트를 사용하여 체결하는 본체결단계;(4) a main body fastening step of installing other plates commonly used as shown in ⑤ of FIGS. 15 and 11 and fastening them using bolts and nuts;

를 포함하여 구성되는 것을 특징으로 한다.
And a control unit.

결론으로 본 발명은 기존의 플레이트를 개선한 포지셔닝플레이트를 사용하여 기둥의 연직도 이탈이나 시공오차에도 불구하고 정확히 시공할 수 있으며, 미숙련공도 합성 PC보의 무게를 이용한 중력 하강이라는 단순작업으로 보철골의 포지셔닝을 마칠 수 있어 소정의 품질이 보장되고 안전사고 위험이 적고, 보철골의 포지셔닝이라는 부가작업이 줄어들어 공기 및 원가절감 효과가 높으며, 웨브와 플랜지를 동시에 보강하는 포지셔닝 플레이트를 이용하여 접합시간 단축 및 안전시공이 가능한 장점이 있다.
In conclusion, the present invention can be accurately installed despite the vertical deviation of the column or the construction error using the positioning plate improved the existing plate, the unskilled prosthesis by the simple operation of gravity lowering using the weight of the synthetic PC beam Positioning can be completed, guaranteeing a certain quality, reducing the risk of safety accidents, reducing additional work such as positioning of the prosthetic bone, reducing air and cost, and reducing the joining time by using a positioning plate that reinforces web and flange at the same time And safe construction has the advantage that it is possible.

본 발명은 상기에서 언급한 바와 같이 바람직한 실시예와 관련하여 설명되었으나, 본 발명의 요지를 벗어남이 없는 범위 내에서 다양한 수정 및 변형이 가능하며, 다양한 분야에서 사용 가능하다. While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the invention.

따라서 본 발명의 청구범위는 이건 발명의 진정한 범위 내에 속하는 수정 및 변형을 포함한다.
It is therefore intended that the appended claims cover such modifications and variations as fall within the true scope of the invention.

B: PC보유닛
C: PC기둥유닛
10, 10`: 보철골
20: 플레이트
100, 100`: 브래킷철골
200, 200`, 200``, 200```: 포지셔닝플레이트
210`, 210```: 웨브보강플레이트
220`: 상부플랜지보강플레이트
220```: 하부플랜지보강플레이트
B: PC Beam Unit
C: PC pillar unit
10, 10`: prosthetic bone
20: plate
100, 100 `: bracket steel
200, 200`, 200``, 200```: Positioning Plate
210`, 210```: Web reinforcement plate
220`: Upper Flange Reinforcement Plate
220```: Lower Flange Reinforcement Plate

Claims (10)

브래킷철골에 보철골을 연결하기 위한 구조로써,
PC기둥유닛(C)에 설치되고 상부플랜지와 웨브로만 구성된 T형의 브래킷철골(100);
PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되며 상부플랜지와 웨브로만 구성된 T형의 보철골(10); 및,
상기 브래킷철골(100) 타단의 웨브와 상기 보철골(10) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200);
를 포함하여 구성되되,
상기 포지셔닝플레이트(200)는 일부가 상기 브래킷철골(100)에 선설치되고 상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10)의 일단이 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100)의 타단에 설치되면서,
상기 포지셔닝플레이트(200)의 상단이 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
As a structure for connecting the prosthesis to the bracket steel frame,
T-shaped bracket steel 100 installed in the PC column unit (C) and consisting of only the upper flange and the web;
T-prosthesis 10 is installed in the PC beam unit (B) is coupled to the other end of the bracket steel frame 100, consisting of only the upper flange and the web; And
A pair of positioning plates 200 connecting the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10;
, ≪ / RTI >
The positioning plate 200 is partially installed in the bracket steel frame 100 and the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 are formed to be inclined in a shape corresponding to the prosthetic bone ( One end of the 10) is installed on the other end of the bracket steel frame 100 by the weight of the PC beam unit (B),
Since the upper end of the positioning plate 200 abuts the lower portion of the upper flange of the prosthetic bone 10, the prosthetic bone 10 is temporarily mounted so that the positioning of the composite PC member is automatically performed. Prosthetic joint structure.
제1항에서,
상기 포지셔닝플레이트(200)는 상단이 절곡되어 웨브보강플레이트(210`) 및 상부플랜지보강플레이트(220`)로 구성되는 포지셔닝플레이트(200`)가 되고,
상기 상부플랜지보강플레이트(220`)가 상기 보철골(10)의 상부플랜지 하부에 맞닿아 상기 보철골(10)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
In claim 1,
The positioning plate 200 is bent at the top to be a positioning plate 200` consisting of a web reinforcing plate 210` and an upper flange reinforcing plate 220`,
Self-positioning of the composite PC member characterized in that the upper flange reinforcing plate 220` is in contact with the lower portion of the upper flange of the prosthetic bone 10 is temporarily mounted so that the upper and lower left and right positioning Prosthetic joint structure for the.
제1항 또는 제2항에서,
상기 브래킷철골(100) 타단의 웨브와 보철골(10) 일단의 웨브가 맞닿는 대응면은 상부에서 수직으로 내려오다 중단에서 경사지게 형성되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
3. The method according to claim 1 or 2,
The corresponding surface where the web of the other end of the bracket steel frame 100 and the web of one end of the prosthetic bone 10 comes into contact with each other is vertically descended from the top, and is formed to be inclined at an interruption. .
브래킷철골에 보철골을 연결하기 위한 구조로써,
PC기둥유닛(C)에 설치되고 웨브와 하부플랜지로만 구성된 역T형의 브래킷철골(100`);
PC보유닛(B)에 설치되어 상기 브래킷철골(100)의 타단에 일단이 결합되며 웨브와 하부플랜지로만 구성된 역T형의 보철골(10`); 및,
상기 브래킷철골(100`) 타단의 웨브와 상기 보철골(10`) 일단의 웨브를 연결하는 1쌍의 포지셔닝플레이트(200``);
를 포함하여 구성되되,
상기 포지셔닝플레이트(200``)는 일부가 상기 보철골(10`)에 선설치되고 상기 브래킷철골(100`) 타단의 웨브와 보철골(10`) 일단의 웨브는 상호대응하는 형상으로 경사지게 형성되어 상기 보철골(10`)의 일단이 상기 PC보유닛(B)의 자중에 의해서 상기 브래킷철골(100`)의 타단에 설치되면서,
상기 포지셔닝플레이트(200``)의 하단이 상기 브래킷철골(100`)의 하부플랜지 상부에 맞닿아 상기 보철골(10`)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
As a structure for connecting the prosthesis to the bracket steel frame,
An inverted T-shaped bracket steel frame 100 'installed on the PC column unit C and composed of only a web and a lower flange;
An inverted T-shaped prosthesis (10`) having one end coupled to the other end of the bracket steel frame (100) and having only a web and a lower flange installed on the PC beam unit (B); And
A pair of positioning plates (200``) for connecting the web of the other end of the bracket steel frame (100`) and the web of one end of the prosthetic bone (10`);
, ≪ / RTI >
The positioning plate 200 ″ is partially installed on the prosthetic bone 10 ′, and the web of the other end of the bracket steel 100 ′ and the web of one end of the prosthetic bone 10 ′ are formed to be inclined to correspond to each other. One end of the prosthetic bone 10` is installed on the other end of the bracket steel frame 100` by the weight of the PC beam unit (B),
The lower end of the positioning plate (200``) abuts the upper portion of the lower flange of the bracket steel frame (100 '), so that the prosthesis (10') is temporarily mounted, the composite PC member, characterized in that the positioning up and down automatically Prosthetic joint structure for self positioning.
제4항에서,
상기 포지셔닝플레이트(200``)는 하단이 절곡되어 웨브보강플레이트(210```) 및 하부플랜지보강플레이트(220```)로 구성되는 포지셔닝플레이트(200```)가 되고,
상기 하부플랜지보강플레이트(220```)가 상기 브래킷철골(100`)의 하부플랜지 상부에 맞닿아 상기 보철골(10`)이 임시 거치되므로 상하좌우 포지셔닝이 자동으로 되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
5. The method of claim 4,
The positioning plate 200 ″ is bent at the bottom to be a positioning plate 200 ′ ″ consisting of a web reinforcement plate 210 ′ ″ and a lower flange reinforcement plate 220 ′ ″,
The lower flange reinforcing plate (220 `` `) is in contact with the upper portion of the lower flange of the bracket steel frame (100`) because the prosthesis (10 ') is temporarily mounted, synthetic PC, characterized in that the positioning up and down automatically Prosthetic bone connection structure for self positioning of members.
제4항 또는 제5항에서,
상기 브래킷철골(100`) 타단의 웨브와 보철골(10`) 일단의 웨브가 맞닿는 대응면은 상부에서 수직으로 내려오다 중단에서 경사지게 형성되는 것을 특징으로 하는 합성 PC부재의 셀프 포지셔닝을 위한 보철골 연결구조.
5. The method according to claim 4 or 5,
Prosthesis for self-positioning composite PC member, characterized in that the mating surface of the other end of the web and the prosthetic bone 10` end of the bracket steel frame (100`) is inclined at the interruption vertically from the top Connection structure.
삭제delete 삭제delete 삭제delete 삭제delete
KR1020120028709A 2012-03-21 2012-03-21 Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof KR101367706B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120028709A KR101367706B1 (en) 2012-03-21 2012-03-21 Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120028709A KR101367706B1 (en) 2012-03-21 2012-03-21 Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof

Publications (2)

Publication Number Publication Date
KR20130106982A KR20130106982A (en) 2013-10-01
KR101367706B1 true KR101367706B1 (en) 2014-02-28

Family

ID=49630520

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120028709A KR101367706B1 (en) 2012-03-21 2012-03-21 Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof

Country Status (1)

Country Link
KR (1) KR101367706B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101864198B1 (en) * 2015-10-07 2018-07-16 경희대학교 산학협력단 the SRC connection structure between precast concrete column and precast concrete beam, the plate connection structure between precast concrete upper column and precast concrete lower column
KR101872298B1 (en) * 2016-04-28 2018-06-29 경희대학교 산학협력단 the rigid connection structure between precast concrete column and precast concrete beam
KR101891963B1 (en) * 2016-05-24 2018-08-28 경희대학교 산학협력단 the improved hybrid precast concrete beam for saving the rebar and the rigid connection structure between precast concrete column and precast concrete beam using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100059267A (en) * 2008-11-26 2010-06-04 고려대학교 산학협력단 Method for constructing steel beam by using y-type connector

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100059267A (en) * 2008-11-26 2010-06-04 고려대학교 산학협력단 Method for constructing steel beam by using y-type connector

Also Published As

Publication number Publication date
KR20130106982A (en) 2013-10-01

Similar Documents

Publication Publication Date Title
CN203174770U (en) Connection structure of prefabricated column and construction site base and building
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN103452039B (en) Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof
CN202969586U (en) Prefabricated concrete beam-column anchor welding combined structure
CN105332452A (en) Dragline curtain wall support system with steel truss at top and construction method thereof
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN105088969A (en) Closure method for multi-tower single-cable-plane cable-stayed bridge
KR101367706B1 (en) Steel Connection Structure For Self-Positioning of Composite Precast Concrete Member And Construction Method Thereof
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
KR101334071B1 (en) The needless filling structure in the junction of pc beam and vertical member
CN103669665A (en) Elevation difference joint construction technology for steel bar truss floor deck construction
CN109702387B (en) Method for manufacturing steel structure of tower column lining of cable-stayed bridge
CN202787330U (en) Post-cast strip template
CN109797902A (en) Prefabrication ash wall body plate
CN103758347B (en) Large-span RC girder plated construction late poured band support underpinning construction method
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
KR101609837B1 (en) Rahmen bridge with horseshoe shape hinge and method constructing Rahmen bridge thereof
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
CN103615058B (en) A kind of constraint steel plate construction of super high-rise steel plate concrete shear wall and construction method thereof
CN106032705A (en) Integrated casting molding construction method of reinforced concrete floor system
CN103572891B (en) A kind of pregroove plate
CN215858257U (en) Connecting structure of prefabricated bay window and floor slab
CN211549324U (en) Bearing wall rear opening door hole structure
CN110905220B (en) Reinforced concrete structure buckling-restrained energy-dissipation brace installation construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170201

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171220

Year of fee payment: 5