Prefabrication ash wall body plate
Technical field
The present invention relates to building material technical field more particularly to a kind of prefabrication ash wall body plates.
Background technique
With the development of the social economy, assembled architecture technology in China's is developed rapidly and applies in recent years.Assembly
Formula concrete structure is assembled, is connected using precast concrete as main member, bound fraction it is cast-in-place and formed coagulation
Soil structure.The current assembly concrete in China shears wall member, and grout sleeve is mostly used to link.But grout sleeve lacks quality
Detection means, the emphasis that connection reliability is always disputed in the industry, it is therefore necessary to design a kind of new concrete assembled
Wallboard, to guarantee the reliable connection of shear wall vertically.
Summary of the invention
Technical problem solved by the invention is to provide a kind of prefabrication ash wall body plate.This is prefabricated assembled to build
The characteristic that ash wall body plate has both assembled wallboard and bar splicing ash wall body plate is built, reliable connection, tool are realized by cast-in-place concrete
Have the advantages that firm and reliable connection, construction efficiency are high.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of prefabrication ash wall body plate,
It is characterized in that: including internal layer prefabricated board, outer preform plate, being spaced apart between internal layer prefabricated board and outer preform plate using multiple
The connection of prefabricated connecting framework, prefabricated connecting framework vertical distribution in long strip, two adjacent prefabricated connecting frameworks and internal layer
The rectangular cavity formed between prefabricated board, outer preform plate is as pouring construction hole, the internal layer prefabricated board, outer preform plate
It is inside equipped with horizontal reinforcement and vertical reinforcement, is equipped with prefabricated installation bracer, prefabricated installation bracer below the inside and outside layer prefabricated board
For upright strip and upper end is connect with prefabricated connecting framework, and the upper end of prefabricated installation bracer and internal layer prefabricated board, outer layer are pre-
The both ends of making sheet and prefabricated connecting framework integration pouring molding, the horizontal reinforcement and vertical reinforcement be equipped with extend in,
The overlap joint steel bar end of outer preform plate.
Further, the prefabricated installation bracer inner face is parallel with internal layer prefabricated board inner face, outside and outer preform plate
Outside is parallel, two sides are parallel with the two sides of prefabricated connecting framework.
Further, the inside and outside side of the prefabricated connecting framework is equipped with template mounting hole.
Further, the internal layer prefabricated board, outer preform plate include insulating layer.
For the present invention in construction, the prefabrication ash wall body plate on upper layer is using prefabricated installation block supports in lower layer
In prefabrication ash wall body plate, the prefabricated installation bracer region between upper and lower layer is as delay-pour joint band, prefabricated installation support
Block plays the role of supporting and fixing upper layer prefabrication ash wall body plate.The inside and outside side of prefabricated installation bracer installs mould
After plate, using pouring construction hole to the delay-pour joint band joints cement around prefabricated installation bracer, structure connection is carried out.The present invention
With the construction of assembled wallboard Fast Installation, the high characteristic of building template utilization rate, construction efficiency is reduced, in pouring construction hole
Reliable connection is realized with after delay-pour joint band joints cement.
Detailed description of the invention
Fig. 1 is the schematic perspective view of prefabrication ash wall body plate of the invention.
Fig. 2 is the overlooking structure diagram of prefabrication ash wall body plate of the invention.
Fig. 3 is the side structure schematic diagram of prefabrication ash wall body plate of the invention.
Corresponding component names in figure are as follows: 1 internal layer prefabricated board;2 outer preform plates;3 prefabricated connecting frameworks;4 pouring constructions
Hole;5 horizontal reinforcements;6 vertical reinforcements;7 prefabricated installation bracers;8 template mounting holes.
Specific embodiment
Shown in please referring to Fig.1 to Fig.3, the present invention provides a kind of prefabrication ash wall body plate, including internal layer prefabricated board
1, outer preform plate 2 is connected between internal layer prefabricated board and outer preform plate using multiple prefabricated connecting frameworks 3 being spaced apart,
Prefabricated connecting framework vertical distribution in long strip, two adjacent prefabricated connecting frameworks and internal layer prefabricated board, outer preform plate it
Between the rectangular cavity that is formed as pouring construction hole 4, be equipped with horizontal reinforcement 5 in the internal layer prefabricated board, outer preform plate
With vertical reinforcement 6, the inside and outside layer prefabricated board lower section is equipped with prefabricated installation bracer 7, and prefabricated installation bracer is upright strip
And upper end is connect with prefabricated connecting framework, the upper end of prefabricated installation bracer and internal layer prefabricated board, outer preform plate and prefabricated connection
The both ends of skeleton integration pouring molding, the horizontal reinforcement and vertical reinforcement, which are equipped with, extends taking for inside and outside layer prefabricated board
Connect steel bar end.The inner face of the prefabricated installation bracer is parallel with internal layer prefabricated board inner face, outside is parallel with outside outer preform plate,
Two sides are parallel with the two sides of prefabricated connecting framework.The inside and outside side of the prefabricated connecting framework is equipped with template mounting hole 8.
The internal layer prefabricated board, outer preform plate include insulating layer.
Prefabrication ash wall body plate of the present invention is prefabricated in the factory, and in the specific implementation, internal layer prefabricated board 1, outer layer are pre-
The thickness of making sheet 2 is not less than 40mm, and when precast wall body has thermal requirements, insulating layer can be with internal layer prefabricated board 1 or outer preform
Plate 2 is prefabricated together.When site operation, first utilize prefabricated installation block supports under the prefabrication ash wall body plate on upper layer
In the prefabrication ash wall body plate of layer, overlap joint steel bar end is attached, the inside and outside side of prefabricated installation bracer installs mould
After plate, using pouring construction hole to the delay-pour joint band joints cement around prefabricated installation bracer, realize that upper and lower layer structure connects
Knot.
The above is only highly preferred embodiment of the present invention, is not intended to limit the present invention in any form, and is appointed
What those skilled in the art, without departing from the scope of the technical proposal of the invention, using in the method for the disclosure above
Appearance makes many possible changes and modifications to technical solution of the present invention, is all within the protection scope of the claims.