CN207959534U - A kind of connection structure of wallboard and coupling beam - Google Patents
A kind of connection structure of wallboard and coupling beam Download PDFInfo
- Publication number
- CN207959534U CN207959534U CN201820237374.9U CN201820237374U CN207959534U CN 207959534 U CN207959534 U CN 207959534U CN 201820237374 U CN201820237374 U CN 201820237374U CN 207959534 U CN207959534 U CN 207959534U
- Authority
- CN
- China
- Prior art keywords
- coupling beam
- sleeve
- wallboard
- reinforcing bar
- transverse steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model discloses the connection structures of a kind of wallboard and coupling beam,The coupling beam is located at the top L-type indentation, there of wallboard body,Coupling beam is internally provided with 2 groups of transverse direction main reinforcements,It is fixedly connected by the first transverse steel and the second transverse steel between the wallboard body and coupling beam,The end of first transverse steel and the second transverse steel is equipped with lateral connection sleeve,First transverse steel and the second transverse steel are connected separately with the first additional connector reinforcing bar and the second additional connector reinforcing bar by lateral connection sleeve,Vertical stirrup is arranged in the first additional connector reinforcing bar and the junction of the second additional connector reinforcing bar and wallboard body,The downside of the coupling beam end is fixedly connected by vertical branch sleeve with wallboard body,The utility model is using prefabricated and a small amount of cast-in-place,Improve prefabrication and assembly construction rate,And optimize the anchoring requirement of bar connecting,It can accomplish quickly,Easy construction,With very high practicability.
Description
Technical field
The utility model is related to technical field of buildings, the connection structure of specially a kind of wallboard and coupling beam.
Background technology
As the improvement of people's living standards, everybody requirement for building is also higher and higher.Especially for building wall
The selection of plate, it is secured from the initial building wall board that do not require nothing more than till now securely, also require building wall board can light, heat preservation with
And it is easily installed.Therefore it is badly in need of a kind of novel building self-heat conserving structural envelope integrated wallboard and company now in building field
The connection structure of beam is met the requirements.
Utility model content
The purpose of this utility model is to provide a kind of connection structure of self-heat conserving structural envelope integrated wallboard and coupling beam,
To solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides the following technical solutions:A kind of connection structure of wallboard and coupling beam, packet
Wallboard body and coupling beam are included, the coupling beam is located at the top L-type indentation, there of wallboard body, wallboard body, coupling beam and top L-type
The connecting portion of indentation, there is designed with heat preservation hole and fills thermal insulation material, and coupling beam is internally provided with 2 groups of transverse direction main reinforcements, the wallboard
It is fixedly connected by the first transverse steel and the second transverse steel between ontology and coupling beam, first transverse steel and the second cross
It is equipped with lateral connection sleeve to the end of reinforcing bar, first transverse steel and the second transverse steel pass through lateral connection sleeve
It is connected separately with the first additional connector reinforcing bar and the second additional connector reinforcing bar, the first additional connector reinforcing bar and second
The junction of additional connector reinforcing bar and wallboard body is arranged vertical stirrup, and the concrete joint that filling is poured after passing through pour it is whole
It closes, and sets thermal insulation material in concrete, the downside of the coupling beam end is fixed by vertical branch sleeve and wallboard body to be connected
It connects.
Preferably, the heat preservation hole for filling thermal insulation material is set in the wallboard body and coupling beam ontology, junction is poured few
Concrete is measured, and interior set keeps the temperature the heat preservation hole of hole area phasor with former wallboard, while filling thermal insulation material in hole.
Preferably, the L-shaped notch of the wallboard body and coupling beam junction, and L-type notch length meets binodal machinery company
Connect installation operation required distance.
Preferably, the lateral connection sleeve and vertical branch sleeve are to be mechanically connected sleeve, binodal machinery for binodal
Butt muff includes connecting rod, and the left and right ends of the connecting rod are respectively arranged with the first sleeve connector and are connected with second sleeve
Head.
Preferably, it is provided with horizontal hoop on the vertical branch sleeve in the wallboard body, constrains vertical branch sleeve
And the vertical reinforcement in insertion sleeve.Horizontal hoop is set at upper angle L-type indentation, there sleeve when after-pouring concrete and constrains connection
Vertical reinforcement in sleeve and insertion sleeve.
Compared with prior art, the utility model has the beneficial effects that:The connection of the utility model a kind of wallboard and coupling beam
Structure and corresponding ontology, scientific structure, novelty are easy to operate, and doing l-shaped by wallboard body and coupling beam ontology junction lacks
Mouthful, and L-type notch length meets binodal mechanical splice installation operation required distance, wallboard body top top is connect with coupling beam
Branch sleeve is reserved in the end of first transverse steel, and connector sleeve is reserved in the end of second transverse steel of construction on wallboard body top
Cylinder, the extension elongation of the lateral main reinforcement of coupling beam meets binodal mechanical connection and requires, and the first additional connector reinforcing bar and second is attached
Connector reinforcing bar is added to be connect respectively with the first transverse steel and the second transverse steel by branch sleeve, while additional hooping, and
Placing concrete, forms whole, using prefabricated and a small amount of cast-in-place, improves prefabrication and assembly construction rate, and optimize the anchor of bar connecting
It Gu requiring, can accomplish quickly, easy construction, reduce live formwork and concreting, it is cost-effective.With very high practicality
Property, greatly improve the connection structure of a kind of wallboard and coupling beam using functional, consistent with wall service life heat preservation
Material ensure that the using effect and utilization benefit of self-heat conserving prefabricated panel, be suitble to be widely popularized.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model wallboard body structural schematic diagram;
Fig. 3 is the utility model coupling beam structural schematic diagram;
Fig. 4 is the utility model additional bar part-structure schematic diagram;
Fig. 5 is that the binodal of the utility model is mechanically connected tube-in-tube structure schematic diagram;
Fig. 6 is the wallboard body overlooking structure diagram of the utility model.
In figure:1 wallboard body, 2 first transverse steels, 3 second transverse steels, 4 lateral connection sleeves, 5 vertical connector sleeves
Cylinder, 6 coupling beams, 7 lateral main reinforcements, 8 concrete joints, 9 first additional bars, 10 second additional bars, 11 horizontal hoops, 12 are vertically
Stirrup, 13 vertical reinforcements, 14 thermal insulation materials.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 6 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of connection structure of wallboard and coupling beam, including
Wallboard body 1 and coupling beam 6, the coupling beam 6 are located at the top L-type indentation, there of wallboard body 1, wallboard body 1, coupling beam 6 and top
The connecting portion of portion's L-type indentation, there is designed with heat preservation hole and fills thermal insulation material 14, and coupling beam 6 is internally provided with 2 groups of transverse direction main reinforcements
7, it is fixedly connected with the second transverse steel 3 by the first transverse steel 2 between the wallboard body 1 and coupling beam 6, described first is horizontal
It is equipped with lateral connection sleeve 4, the lateral steel of first transverse steel 2 and second to the end of reinforcing bar 2 and the second transverse steel 3
Muscle 3 is connected separately with 9 and second additional connector reinforcing bar 10 of the first additional connector reinforcing bar by lateral connection sleeve 4, described
Vertical stirrup 12 is arranged in first additional connector reinforcing bar, 9 and second additional connector reinforcing bar 10 and the junction of wallboard body 1, and
The concrete joint 8 that filling is poured after pours integration, and thermal insulation material 14 is set in concrete, under 6 end of the coupling beam
Side is fixedly connected by vertical branch sleeve 5 with wallboard body 1.
Specifically, the lateral connection sleeve 4 and vertical branch sleeve 5 are to be mechanically connected sleeve, binodal machine for binodal
Tool butt muff includes connecting rod, and the left and right ends of the connecting rod are respectively arranged with the first sleeve connector and second sleeve connects
Connector.
Specifically, being provided with horizontal hoop 11 on vertical branch sleeve 5 in the wallboard body 1, vertical connection is constrained
Vertical reinforcement 13 in sleeve 5 and insertion sleeve.
Operation principle:The connection structure of the utility model a kind of wallboard and coupling beam, in use, wallboard body 1 connects with coupling beam 6
L-shaped notch is done at the place of connecing, and L-type notch length meets mechanical splice installation operation required distance, 1 top top of wallboard body with
Reserve lateral connection sleeve 4, the lateral steel of construction second on 1 top of wallboard body in the end for the first transverse steel 2 that coupling beam 6 connects
Lateral connection sleeve 4 is also reserved in the end of muscle 3, and the extension elongation of the lateral main reinforcement 7 of coupling beam 6 meets mechanical connection and requires, installation
When, 9 and second additional connector reinforcing bar 10 of the first additional connector reinforcing bar is lateral by lateral connection sleeve 4 and first respectively
Reinforcing bar 2 and the connection of the second transverse steel 3, while vertical stirrup is set, and a small amount of concrete is poured, it is formed whole.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood as the case may be
Concrete meaning in the present invention.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (3)
1. the connection structure of a kind of wallboard and coupling beam, including wallboard body (1) and coupling beam (6), it is characterised in that:The coupling beam
(6) it is located at the top L-type indentation, there of wallboard body (1), the connection of wallboard body (1), coupling beam (6) and top L-type indentation, there
Position is designed with heat preservation hole and fills thermal insulation material (14), and coupling beam (6) is internally provided with 2 groups of transverse direction main reinforcements (7), the wallboard sheet
It is fixedly connected with the second transverse steel (3) by the first transverse steel (2) between body (1) and coupling beam (6), the described first lateral steel
The end of muscle (2) and the second transverse steel (3) is equipped with lateral connection sleeve (4), first transverse steel (2) and the second cross
The first additional connector reinforcing bar (9) and the second additional connector steel are connected separately with by lateral connection sleeve (4) to reinforcing bar (3)
Muscle (10), the junction of the first additional connector reinforcing bar (9) and the second additional connector reinforcing bar (10) and wallboard body (1)
Vertical stirrup (12) is set, and the concrete joint (8) for pouring filling after passing through pours integration, and sets thermal insulation material in concrete
(14), the downside of coupling beam (6) end is fixedly connected by vertical branch sleeve (5) with wallboard body (1).
2. the connection structure of a kind of wallboard and coupling beam according to claim 1, it is characterised in that:The lateral connection sleeve
(4) and vertical branch sleeve (5) is to be mechanically connected sleeve for binodal, and binodal mechanical splice sleeve includes connecting rod, the company
The left and right ends of extension bar are respectively arranged with the first sleeve connector and second sleeve connector.
3. the connection structure of a kind of wallboard and coupling beam according to claim 1, it is characterised in that:The wallboard body (1)
On vertical branch sleeve (5) on be provided with horizontal hoop (11), constrain vertical in vertical branch sleeve (5) and insertion sleeve
Reinforcing bar (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820237374.9U CN207959534U (en) | 2018-02-10 | 2018-02-10 | A kind of connection structure of wallboard and coupling beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820237374.9U CN207959534U (en) | 2018-02-10 | 2018-02-10 | A kind of connection structure of wallboard and coupling beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207959534U true CN207959534U (en) | 2018-10-12 |
Family
ID=63738756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820237374.9U Active CN207959534U (en) | 2018-02-10 | 2018-02-10 | A kind of connection structure of wallboard and coupling beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207959534U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343160A (en) * | 2018-02-10 | 2018-07-31 | 南通联泷建筑材料有限公司 | A kind of connection structure of wallboard and coupling beam |
-
2018
- 2018-02-10 CN CN201820237374.9U patent/CN207959534U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343160A (en) * | 2018-02-10 | 2018-07-31 | 南通联泷建筑材料有限公司 | A kind of connection structure of wallboard and coupling beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108343160A (en) | A kind of connection structure of wallboard and coupling beam | |
CN108678220B (en) | Concrete shear wall with integrally installed reinforcing steel bar templates | |
CN107288256A (en) | Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof | |
CN207959534U (en) | A kind of connection structure of wallboard and coupling beam | |
CN108867934B (en) | T-shaped wall connecting structure and assembled building structure system | |
CN105019579B (en) | Masonry filler wall reinforcement and plastering constructional column and construction method thereof | |
CN107366385A (en) | A kind of thermal insulation structure post and its construction method | |
CN209243966U (en) | A kind of connecting node of heat-insulation wall plate | |
CN203583720U (en) | Light-weight steel structure and light-weight concrete cast-in-place wall body | |
CN208650446U (en) | A kind of two layers of plug-in wall of clear-water concrete and the plug-in wall connecting node of standard construct | |
CN207700444U (en) | Steel joist and the fixed heat preservation decoration integrative shear wall assembly system of outer armor | |
CN109853804A (en) | A kind of assembled steel concrete composite floor system applied to steel house | |
CN205840082U (en) | A kind of BRT Lightweight core mould close rib composite floor structure | |
CN211421475U (en) | Connecting structure of prefabricated wall and beam | |
CN208441257U (en) | A kind of mounting structure of assembling-type precast hybrid beam and stiffened column | |
CN207959532U (en) | A kind of structure that wallboard is connect with coupling beam | |
CN209227841U (en) | Wall and Liangping face interconnection structure and assembled arthitecutral structure system | |
CN210712505U (en) | Shallow slot type connection structure of steel plate combination beam and steel plate combination beam | |
CN109797902A (en) | Prefabrication ash wall body plate | |
CN207469617U (en) | A kind of parapet position assembled room grid beam structure | |
CN207553409U (en) | Special-shaped complete prefabricated inclined roof and its connection structure with Cast-in-situ Beam | |
CN106121077B (en) | A kind of antidetonation connection structure of prestressed concrete double T plate | |
CN207714148U (en) | Cast-in-situ box girder mold plate connecting mechanism and cast-in-situ box girder support shuttering | |
CN110761399A (en) | Vertical splicing structure of prefabricated wall board and assembling method thereof | |
CN215483757U (en) | Wall body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 226100 Room 2, No. 38, Group 52, Dexin Village, Haimen Street, Haimen City, Nantong City, Jiangsu Province Patentee after: Nantong Lianhuang Assembly Building Technology Co., Ltd. Address before: 226100 Room 2, No. 38, Group 52, Dexin Village, Haimen Street, Haimen City, Nantong City, Jiangsu Province Patentee before: Nantong Lian Long constructional materials Co., Ltd |