KR101184719B1 - Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof - Google Patents
Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof Download PDFInfo
- Publication number
- KR101184719B1 KR101184719B1 KR1020120046788A KR20120046788A KR101184719B1 KR 101184719 B1 KR101184719 B1 KR 101184719B1 KR 1020120046788 A KR1020120046788 A KR 1020120046788A KR 20120046788 A KR20120046788 A KR 20120046788A KR 101184719 B1 KR101184719 B1 KR 101184719B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- slab
- steel
- block
- precast girder
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
본 발명은 기성파일과 바닥판 슬래브 겸 프리캐스트거더의 강결블럭 제작방법 및 이를 이용한 라멘교의 시공방법에 관한 것으로 라멘구조체의 하부구조(교대, 교각)는 기초말뚝이, 그리고 상부구조는 바닥판 슬래브 겸 프리캐스트거더가 분담하는 제작공법이다.
The present invention relates to a method for manufacturing a rigid block of a ready-made pile and a slab and precast girder, and a method of constructing a ramen bridge using the same. The lower structure (alternation, piers) of the ramen structure is a foundation pile, and the upper structure is a bottom plate slab. It is a manufacturing method shared by precast girder.
다시 말하면, 본 발명의 하부구조를 기성파일로 대체하고, 또 바닥판 슬래브와 프리캐스트거더를 하나의 부재로 단일화함으로써 일반라멘교의 시공보다 공사비를 대폭 절감할 수 있을 뿐만 아니라 급속시공이 가능하며 벽체나 기둥이 고강도의 슬랜더한 기성파일로 대체됨으로 인해 유연도가 증가되어 내진 성능이 향상되는 구조적 장점을 갖게 된다.
In other words, by replacing the substructure of the present invention with ready-made piles and unifying the floor slab slab and the precast girder into one member, the construction cost can be drastically reduced as well as rapid construction and wall construction than the construction of the general ramen bridge. As the pillars are replaced with high strength slender ready-made piles, the flexibility is increased, which has the structural advantage of improving seismic performance.
콘크리트 몰탈을 강결공간(S)에 타설하여 강결처리된 2차강결블럭을 형성함과 동시에 2차강결블럭에 의하여 1차강결블럭과, 그리고 바닥판 슬래브 겸 프리캐스트거더를 구조적으로 일체화된 라멘구조가 형성되게 함으로써 기성파일 두부와 바닥판이 포함된 프리캐스트 거더의 강결 블록제작의 구조적 안전성 및 시공의 편리성이 배가되는 유용한 발명이다.
The concrete mortar is poured into the stiffening space (S) to form a hardened secondary steel block, and at the same time, the second steel block blocks the first steel block and the bottom plate slab and precast girder structurally. It is a useful invention that doubles the structural safety and convenience of construction of the rigid block manufacturing of precast girders including a ready-made pile head and bottom plate.
통상 기성파일은 수직으로 작용하는 축력을 받는 구조체로서 많이 쓰이며 교량의 경우 상부 거더를 지지하는 교대 및 교각의 하부에 매입되어 교량의 상부하중을 지지하며 교대의 경우 토압 등의 횡방향 하중에 의하여 파일에 작용하는 휨 모멘트에 저항한다. (도2)
The conventional pile is generally used as a structure that receives vertical force and is used in the case of bridges, which are embedded in the lower part of the bridge and the bridge supporting the upper girder to support the upper load of the bridge. Resists bending moments acting on (Figure 2)
기성파일 중 강관파일, PHC 파일 등은 비교적 큰 휨모멘트에 저항하므로 이들 파일은 축방향 압축력뿐만 아니라 횡방향 하중으로 인한 휨모멘트에도 저항 가능한 구조체로도 충분히 활용될 수 있다
Steel pipe pile, PHC pile, etc. among ready-made piles resist relatively large bending moments, so these piles can be used as structures capable of resisting not only axial compressive forces but also bending moments due to lateral loads.
먼저 교각이 없이 기성파일이 기초 역할과 교각의 역할을 하는 종래의 공법을 살펴본다.
First, the conventional construction method in which a ready-made file plays a role of a foundation and a pier without a pier is described.
통상 교대나 교각 없이 기성파일이 기초역할과 교대나 교각의 역할을 하는 구조물은 해양 어프로치 제티(APPROACH JETTY; 해양에 선박이 접안할 수 있는 돌핀 안벽과 육상을 연결하는 교량)에 많이 쓰이는데 이는 수중에 교각 공사가 어려우므로 대구경 강관이나 PHC파일을 기초지지층에 매입하고 파일두부 정리를 한 후 파일 상단에 철근콘크리트 래터럴블럭(LATERAL BLOCK)을 설치하여 받침이 설치된 코핑(COPING)부를 형성한 후 프리캐스트 거더를 받침상에 설치하고 바닥판 슬래브를 타설 양생하여 교량을 완성시키는 공법이다. (도3)
Structures in which a ready-made pile acts as a foundation and as a shift or a pier without a shift or a pier are commonly used in the APPROACH JETTY, which is a bridge connecting the land with a dolphin wall that can be docked by the ship to the sea. As the pier construction is difficult, buy large-diameter steel pipe or PHC pile on the foundation support layer, clean up the pile head, install the reinforced concrete lateral block at the top of the pile, and form the coping part with the base installed. It is a method to install the bridge on the base and cure the bottom plate slab to finish the bridge. (Figure 3)
또한 가설교량의 경우 급속시공과 자재의 재활용을 위하여 H파일이나 강관파일을 기초 지지층에 매입하고 파일두부정리를 한 후 파일 상단에 H형강으로 래터럴 블록을 설치하여 코핑부를 형성하고 I형강 거더를 코핑상에 거치한 후 복공판을 깔아 가교를 완성시키는 공법이다. (도4)
In addition, in the case of temporary bridges, H piles or steel pipe piles are embedded in the foundation support layer for rapid construction and material recycling, pile heads are cleaned, and lateral blocks are installed with H-beams at the top of piles to form coping sections and nose-shaped I-girder girders. It is a method of finishing crosslinking by placing a perforated plate after placing on a ping board. (Figure 4)
어프로치 제티의 경우 래터럴 블록 받침상에 거더가 놓이면 이에 따라 파압, 풍압 등 횡방향력에 따른 파일상단의 횡방향 변위가 크며 이를 줄이기 위하여 필요시 경사파일을 매입한다. In the case of approach jetty, when the girders are placed on the lateral block support, the lateral displacement of the pile is large due to the lateral force such as wave pressure and wind pressure.
통상 어프로치 제티는 돌핀 안벽에 화물선이 접안하고 이 화물을 육지에 운송하는 통로 역할을 하며 또한 구조물의 유지관리 통로의 역할 등 산업용 구조물에 많이 사용된다.
Approach Jetty is commonly used in industrial structures such as cargo ships docked on the dolphin's inner wall, and serves as a passageway for transporting cargo on land.
가설교량의 경우 본 교량 설치를 위한 용도로 가설되며 구조물은 통상강재(I형강 등)로 이루어지며 본 교량 가설 후 강재를 해체한다.
Temporary bridges are constructed for the purpose of installing this bridge, and the structure is made of ordinary steel (I-shaped steel, etc.) and the steel is dismantled after the construction of this bridge.
상기와 같이 교각이 없이 기성파일이 기초역할과 교각의 역할을 하는 종래공법은 공기절감과 경제적인 장점을 가지나 사용성의 문제 등으로 도로교보다는 산업용 구조체의 역할과 지속적인 하중을 지지하는 안정된 구조물보다는 가설교량 등으로 많이 활용되었다.
As mentioned above, the conventional construction method where the existing pile plays the role of the foundation and the pier without the pier has air saving and economic advantages, but it is a temporary bridge rather than a stable structure that supports the role of the industrial structure and the continuous load rather than the road bridge due to problems of usability. It was utilized a lot.
종래의 교대나 교각을 갖는 교량의 프리캐스트 거더를 이용한 라멘교 제작공법에 관하여 살펴본다.A method of manufacturing a ramen bridge using a precast girder of a bridge having a conventional shift or piers will be described.
최근에 동바리 설치 없이 프리캐스트 거더를 제작하여 기 설치된 적정높이의 교대나 교각상에 단부가 I형강으로 돌출된 프리캐스트 거더를 제작하여 거치하고 우각부를 강재로 강결 혹은 철근 배근하여 우각부와 바닥판 슬래브부에 콘크리트를 타설 양생하여 우각부를 강결시킨 다양한 라멘교 제작공법이 개발 실용화 되어있다. (도5)
Recently, the precast girders are manufactured without installing the club, and the precast girders with end portions protruding from the I-beams are installed on the alternating or pier at the appropriate height. A variety of ramen bridge manufacturing methods have been developed and put into practical use by stiffening concrete at the slab by curing concrete. (Figure 5)
이들 공법의 경우 경제성면에서 철근콘크리트 라멘교(지간장 / 15m내외)보다 장지간(20~45m)의 라멘교를 지향하며 우각부 및 교각부의 강결방식에 다양성을 갖는다.
In the case of these constructions, they are more economically reinforcing than the reinforced concrete ramen bridge (between the length of 15m) and the long ramen bridge (20 ~ 45m), and have a variety of methods of hardening of the ridge and piers.
이들 공법의 경우 거더 설치 후 바닥판 슬래브 타설에 따른 거더단면의 증가와 교대와 교각의 단면 강성이 커서 전체적인 단면이 커지게 되고 공기가 길어지며 공사비가 증가된다. In the case of these methods, after the girder is installed, the girder section is increased and the cross section stiffness of the alternating and piers is increased due to the slab casting.
또한 복잡한 우각부 처리등도 공기지연과 공사비 증가의 요인이 된다.
In addition, complicated recesses can also cause delays and increase construction costs.
본 발명은 중소형 지간을 갖는 라멘교 제작에 있어서 축력에 큰 저항력을 가질 뿐 아니라 휨응력에도 큰 저항을 갖는 기성파일(강관파일, PHC파일)을 지반에 매입(항타나 프리보링)하여 지지기초로써의 역할과 교각이나 교대의 역할을 하도록 함으로써 According to the present invention, a ready-made pile (steel pipe pile, PHC pile) having not only a large resistance to axial force but also a large bending resistance stress is fabricated in the ground of a ramen bridge having a small and medium-sized span (driven or prebored) as a support base. By playing roles and piers or shifts
첫째, 라멘교의 기초를 포함한 하부구조를 기성파일로 대체하여 급속시공이 가능하고 공사비를 대폭 절감하며 고강도의 슬랜더한 기성말뚝으로 대체됨으로 인한 유연도 증가로 내진성능 등 구조적 장점을 향상시키고자함에 그 목적이 있고,
First, to replace the substructure including the foundation of the ramen bridge with ready-made piles, it is possible to rapidly construct, significantly reduce the construction cost, and to improve structural advantages such as seismic performance by increasing the flexibility by replacing the high-strength slender ready-made piles. For that purpose,
상부구조를 상ㆍ하 단부 보강돌출철근을 갖는 바닥판 슬래브 겸 프리캐스트거더를 적용함으로써, By applying the top plate slab and precast girder with upper and lower end reinforcement bars,
둘째, 상부구조의 바닥판 슬래브 타설 공정이 생략되어 공기가 그만큼 감축될 뿐 아니라 구조적으로도 두께가 그만큼 줄어들어 경제적인 슬랜더한 단면을 형성하도록 함에 다른 목적이 있으며,
Secondly, the bottom plate slab casting process of the superstructure is omitted so that the air is not only reduced that much, but also structurally reduced in thickness to form an economic slender cross section.
콘크리트 몰탈을 강결공간(S)에 타설하여 강결처리된 2차강결블럭을 형성함과 동시에 2차강결블럭에 의하여 1차강결블럭과, 그리고 바닥판 슬래브 겸 프리캐스트거더를 구조적으로 일체화된 라멘구조가 형성되게 함으로써 The concrete mortar is poured into the stiffening space (S) to form a hardened secondary steel block, and at the same time, the second steel block blocks the first steel block and the bottom plate slab and precast girder structurally. By forming
셋째, 기성파일 두부와 바닥판이 포함된 프리캐스트 거더의 강결 블록제작의 구조적 안전성 및 시공의 편리성을 부여하는데 또 다른 목적이 있다.
Third, another purpose is to provide structural safety and convenience of construction of the rigid block manufacturing of precast girders including a ready-made pile head and bottom plate.
본 발명의 기성파일(10)과 바닥판 슬래브 겸 프리캐스트거더의 강결블럭 제작방법에 대하여 설명하면 다음과 같다.
The method for manufacturing a rigid block of the ready-made
본 발명은 라멘교의 하부구조(교대, 교각)는 기성파일(10)이, 그리고 상부구조는 바닥판 슬래브 겸 프리캐스트거더(30)가 분담하는 제작방법이다.
The present invention is a manufacturing method in which the lower structure (alternation, pier) of the ramen bridge is a ready pile (10), and the upper structure is shared by the bottom plate slab and precast girder (30).
기성파일(10)의 상단에는 수평면상으로 1차강결블럭(20)을 일체로 형성하되 파일두부보강철근(22)이 매입되어있으면서 파일두부매입깊이(h)보다 큰 두께로 형성되고, 또 1차강결블럭(20)에 매설된 상부돌출철근(24)이 강결공간(S)에 돌출되어있는 한편, 바닥판 슬래브 겸 프리캐스트거더(30)를 1차강결블럭(20) 상부에 거치하여 강결공간(S)을 형성하되 강결공간(S)에는 바닥판 슬래브 겸 프리캐스트거더(30)에서 수평방향으로 돌출된 상ㆍ하 단부 보강철근(32a)(32b)과, 그리고 1차강결블럭(20)에서 돌출된 상부돌출철근(24)이 설치되어있고, 강결공간(S)의 시공은 커플러(34)와 같은 연결부재에 의하여 상ㆍ하 단부 보강철근(32a)(32b)을 서로 연결한 다음, 콘크리트(C) 몰탈로 강결공간(S)을 타설하여 2차강결블럭(40)을 형성함으로써 기성파일과 바닥판 슬래브 겸 프리캐스트거더의 강결블럭 제작방법이다.
The
이를 좀더 구체적으로 설명하면 다음과 같다.
This will be described in more detail as follows.
먼저 교대나 교각 위치에 지질조사를 근거로 기성파일(강관파일, PHC파일)이 라멘교를 충분히 지지할 수 있는 깊이로 파일을 항타 또는 프리보링 후 매입하여 고정시키고, 파일 두부를 정리한 후 파일두부보강철근(22)을 배근한 후 일련의 파일 두부를 감싸도록 거푸집을 설치하고 상부돌출철근(24)을 포함한 철근을 배근하고 콘크리트(C)를 타설 양생하여 1차 강결블럭(20)을 형성한다. First, the pile is piled up after driving or pre-boring to the depth that the ready-made pile (steel pipe pile, PHC pile) can sufficiently support the ramen bridge based on the geological survey at the position of the shift or piers. After reinforcing the reinforcing reinforcing bar (22), the formwork is installed so as to cover a series of pile tofu, the reinforcing bar including the upper protruding reinforcing bar (24) is poured and curing of concrete (C) is formed to form the
1차 강결블럭(20)에는 기성파일(10)의 상단부와, 파일두부보강철근(22)과, 그리고 상부돌출철근(24)의 하단부가 매입되어있다. 상부돌출철근(24)의 상단부는 강결공간(S)에 돌출되어있다. 1차 강결블럭(20)의 두께는 파일두부매입깊이(h)보다 큰 두께를 갖는다.
An upper end of the ready-made
다음으로 상ㆍ하 단부 돌출보강철근(32a)(32b)을 갖는 바닥판 슬래브 겸 프리캐스트거더(30)를 제작한다.
Next, a bottom plate slab and
제작된 바닥판 슬래브 겸 프리캐스트거더(30)를 강결공간(S)이 형성되도록 1차강결블럭(20) 상부에 거치한다.The manufactured slab slab and
이때 1차강결블럭(20) 상부에 거치되는 바닥판 슬래브 겸 프리캐스트거더(30)는 2개 이상 횡방향으로 밀접되게 배치된다. 그러나 소규모 교량, 즉 인도교나 자전거교량 등은 바닥판 슬래브 겸 프리캐스트거더(30)를 1개 설치해도 무방하다. 어느 경우나 본 발명의 기술내용은 동일하다.
At this time, the bottom plate slab and
강결공간(S)에는 상부돌출철근(24)과, 그리고 상ㆍ하 단부 보강철근(32a)(32b)이 위치되어있다.
In the firming space S, the upper protruding reinforcing
그 다음으로 상ㆍ하 단부 보강철근(32a)(32b)을 커플러(34)로 서로 연결한 후, 강결공간(S)에 콘크리트(C) 몰탈을 타설하여 2차강결블럭(40)을 일체로 강결ㆍ제작한다.Next, the upper and lower
강결공간(S)의 시공에 의하여 형성된 2차강결블럭(40)은 1차강결블럭(20)과 바닥판 슬래브 겸 프리캐스트거더(30)를 일체화 강결되게 한다.
The secondary steel-
여기서 1차 강결블럭(20)은 일련의 기성파일(10)두부를 정확한 기하학형상이 유지되게 하면서 강결하는 역할을 한다. 2차 강결블럭(40)은 1차 강결블럭(20)과 함께 기성파일(10)과 바닥판 슬래브 겸 프리캐스트거더(30)를 일체로 강결하는 역할을 한다. (도8a, 도8b참조)
Here, the
또한 기초의 지지층(G)(암반)이 깊지 않을 경우 철근콘크리트 확대기초에 기성파일(10) 하단을 매입 강결하여 라멘교를 지지하도록 한다.
In addition, when the foundation support layer (G) (rock) is not deep, the bottom of the ready-made
본 발명은 큰 축력을 지지하며 또한 큰 휨응력에 저항이 가능한 기성파일을 라멘교의 하부구조(교대, 교각)로 사용함으로써 라멘교 제작의 공기를 단축하고 공사비를 절감하며, 고강도의 슬랜더한 기성파일은 유연도가 커서 내진 등 구조적인 이점을 갖는 라멘교 제작이 가능하다.
The present invention uses a ready-made pile that supports large axial force and is able to resist large bending stresses as a substructure of the ramen bridge (shift, piers) to shorten the air of the ramen bridge production and reduce construction cost, and high strength slender ready-made pile The high flexibility allows the fabrication of ramen bridges with structural advantages such as earthquake resistance.
또한, 본 발명의 바닥판 슬래브 겸 프리캐스트거더는 바닥판 슬래브와 거더가 하나로 된 거더이므로 바닥판 슬래브 타설 공정이 생략되어 공기가 감축되며 단면을 줄일 수 있어 시공이 경제적으로 이루어지는 효과가 있다.
In addition, since the bottom slab slab and precast girder of the present invention is a girder consisting of the bottom slab slab and the girder as one, the bottom slab slab casting process is omitted, the air is reduced and the cross section can be reduced, the construction is economically effective.
본 발명의 기성말뚝과 바닥판 슬래브 겸 프리캐스트거더의 강결블럭 제작방법 및 라멘교 시공방법은 중소형 라멘교 제작시 타공법에 비해 제작 공기를 단축하고 공사비를 절감하며 내진 등의 구조적 장점을 갖는 유용한 발명이다.
The method of manufacturing the rigid block of the ready-made pile and the bottom plate slab and precast girder and the ramen bridge construction method of the present invention are useful in having the structural advantages such as shortening the manufacturing air, reducing the construction cost, and earthquake resistance, etc. Invention.
[도1] 본 발명의 바닥판 슬래브 겸 프리캐스트거더에 단면의 경량화 및 장경간화를 위해 종방향 강선을 긴장 정착한 상태도
[도2] 통상적인 기성파일에 시공된 교량의 설치상태도
[도3] 교대나 교각 없이 기성파일이 기초역할과 교대나 교각의 역할을 하는 구조물인 해양 어프로치 제티의 설치상태도
[도4] 복공판을 깔아 가교를 완성시키는 가설교량의 설치상태도
[도5] 동바리 설치 없이 프리캐스트 거더를 제작하여 우각부와 바닥판 슬래브에 콘크리트를 타설 양생하여 우각부를 강결시킨 라멘교량의 설치상태도
[도6] 본 발명의 라멘교를 설치한 종단면도
[도7] 도6의 평면도
[도8a] 도6의 "A"(교각부)의 확대도
[도8b] 도6의 "B"(교대부)의 확대도
[도9a] 본 발명의 2개 이상의 바닥판 슬래브 겸 프리캐스트거더를 횡방향으로 맞대어 거치 후 강선에 인장력을 가하면서 라멘교를 설치하는 모습을 보인 한 종단면도
[도9b] 도9a에 의하여 설치된 라멘교의 횡단면도1 is a state in which the longitudinal steel wire is tension-fixed in the bottom plate slab and precast girder of the present invention to reduce the weight and length of the cross section.
2 is a state diagram of the bridge constructed on a conventional ready-made pile
3 is a state diagram of the marine approach jetty, which is a structure in which a ready-made pile serves as a foundation and a shift or a pier without a shift or a pier.
4 is a state diagram of the construction of the temporary bridge to complete the bridge by laying the perforated plate
[Figure 5] The installation state of the ramen bridge to stiffen the right corner by making concrete cast on the right corner and the bottom slab by making a precast girder without installing the copper bar
Fig. 6 is a longitudinal sectional view in which the ramen bridge of the present invention is installed.
7 is a plan view of FIG.
8A is an enlarged view of "A" (pier part) in FIG.
8B is an enlarged view of "B" (shift part) in FIG.
Figure 9a is a longitudinal cross-sectional view showing the installation of a ramen bridge while applying a tensile force to the steel wire after passing two or more bottom plate slab and precast girder of the present invention in the transverse direction.
Fig. 9b A cross sectional view of the ramen bridge installed in Fig. 9a.
기성파일과 바닥판 슬래브 겸 프리캐스트거더의 강결블럭을 이용한 라멘교의 시공방법을 도6, 도7, 도8a, 도8b, 도9a, 도9b에 의하여 구체적으로 설명하면 다음과 같다.
The construction method of the ramen bridge using the ready pile and the rigid block of the slab and precast girder will be described in detail with reference to FIGS. 6, 7, 8a, 8b, 9a, and 9b.
⒜ 기성파일(10)을 교각 및 교대부 지반 소요 위치에서 지지층(G)까지 항타 매입한 후 일정한 높이로 파일두부를 정리하는 단계;
(B) arranging the pile head to a constant height after the pile is driven from the position of the required piling and alternating ground to support layer (G);
⒝ 파일중공부에 파일두부보강철근(22)과, 그리고 상부돌출철근(24)을 포함한 철근을 배근하고, 이를 포함한 일련의 파일두부를 감싸는 거푸집을 설치하고, 콘크리트(C)를 타설 양생하며 파일상단에서 파일직경이상의 파일두부가 매입되도록 1차강결블럭(20)을 형성하는 단계;
부 에 Install pile head reinforcing bars (22) and reinforcing bars including upper protrusions (24) in pile hollows, install formwork covering piles of pile heads including them, and pour and cure concrete (C). Forming a primary
⒞ 상ㆍ하 단부 돌출보강철근(32a)(32b)을 갖는 바닥판 슬래브 겸 프리캐스트거더(30)를 제작하는 단계;
(B) fabricating a bottom plate slab and
⒟ ⒞단계에서 제작된 바닥판 슬래브 겸 프리캐스트거더(30)를 강결공간(S)이 형성되도록 1차강결블럭(20) 상부에 거치하되 강결공간(S)에는 상부돌출철근(24)과, 그리고 상ㆍ하 단부 보강철근(32a)(32b)이 위치되게 바닥판 슬래브 겸 프리캐스트거더(30)를 거치하는 단계;
바닥 Mount the bottom slab slab and
⒠ 강결공간(S)내의 상ㆍ하 단부 보강철근(32a)(32b)을 커플러(34)로 서로 연결한 다음, 강결공간(S)에 콘크리트 몰탈을 타설하여 2차강결블럭(40)을 일체로 강결ㆍ제작하는 단계;를 포함함을 특징으로 하는 기성파일과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법이다.
(2) The upper and lower end reinforcing bars (32a) and (32b) in the steelmaking space (S) are connected to each other by a coupler (34), and then concrete mortar is placed in the steelmaking space (S) to integrate the second steelmaking block (40). The method of construction of the ramen bridge using a ready-made pile and a slab and precast girder, characterized in that it comprises a step of hardening and manufacturing.
여기에다 ⒟단계에서 바닥판 슬래브 겸 프리캐스트거더(30)를 1차강결블럭(20) 상부에 거치하기 전에 1차 강결블럭(20) 상부에 고강도 스티로폼(26)을 설치한 다음 바닥판 슬래브 겸 프리캐스트거더(30)를 거치하는 단계;를 포함함을 특징으로 하는 기성파일(10)과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법이다.
In addition, the high-strength styrofoam (26) is installed on the top of the primary hardening block (20) before the bottom plate slab and precast girder (30) is mounted on the upper part of the primary steel block (20). Mounting the
또한 ⒟단계에서 1차강결블럭(20) 상부에 횡방향 쉬스관이 설치된 2개 이상의 바닥판 슬래브 겸 프리캐스트거더(30)를 횡방향으로 맞대어 거치한 후, 횡방향 강선(36)을 긴장 정착하여 바닥판 슬래브 겸 프리캐스트거더(30)를 일체화하는 단계;를 포함함을 특징으로 하는 기성파일과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법이다.
In addition, after the two or more bottom plate slab and
통상 교량 제작 시 기성 파일은 기초지반에 매입하고 지상에 철근 콘크리트 교대나 교각을 파일두부와 강결하여 설치하며 이때 파일은 주로 수직 축력에 저항한다.(도2)
Normally, when the bridge is manufactured, the ready pile is embedded in the foundation ground, and reinforced concrete shifts or piers are firmly installed on the ground with the pile head, and the pile mainly resists the vertical axial force.
기성파일(10) 중 강관파일은 휨저항력이 매우 크며 콘크리트와 강선긴장으로 제작된 PHC파일은 콘크리트의 강도가 80MPa로 매우 크고 또한 강선긴장으로 휨저항력이 크다.
The steel pipe pile of the ready-made
따라서 본 발명에서는 기성파일(10)을 교대나 교각을 대체하여 라멘교의 수직부재로 사용하며 또한 기성파일(10)을 지반의 지지층(G)까지 매입하여 라멘교를 지지하는 기초의 역할을 하도록 한다.Therefore, in the present invention, the ready-made
파일이 지중에 매입되어 있을 때는 휨응력이 적게 발생하나 본 발명에서와 같이 지상으로 노출되어 수직재로써 라멘교를 형성할 경우는 휨응력이 크게 발생하므로 이에 대한 휨저항력이 큰 강관파일이나 PHC파일이 적용에 적합하다.
When the pile is embedded in the ground, less bending stress is generated, but when the ramen bridge is formed as a vertical member by being exposed to the ground as in the present invention, the bending stress is largely generated. Therefore, a steel pipe pile or PHC pile having a large bending resistance is applied to the application. Suitable.
기성파일(10)로 교대나 교각을 대체함으로써 철근콘크리트의 교대와 교각의 작업공정이 생략되어 공기가 단축되고 공사비를 절감할 수가 있다.
By replacing shifts or piers with ready-made
또한 수직재가 슬림해져서 내진 등의 구조성능을 높이고 파일기초에 작용하는 사하중이 줄어들어 기초공사비가 줄어든다. In addition, the vertical material is slim, which improves structural performance such as earthquake resistance and reduces the dead weight acting on the pile foundation, thereby reducing the basic construction cost.
기성파일(10)을 지반의 지지층(G)까지 매입하기 위하여 디젤함마로 항타하거나 지지층(G)까지의 토질이 견고하여 항타 매입이 어려울 경우는 T4등의 장비를 이용하여 프리보링후 파일을 지지층까지 매입할 수 있다.
In order to purchase the ready pile (10) to the ground support layer (G) to the ground or to support the ground layer (G) is hard to purchase when the driving is difficult because the soil to the support layer (G) to support the pile after pre-boring the support layer You can purchase until.
파일매입은 지반상의 정확한 위치를 선점하여 지지층까지 매입하고 수직도를 시방서상의 오차범위내로 정밀 시공한다.
The pile is preoccupied with the exact position on the ground, and is embedded up to the support layer.
이후 1차 강결블럭(20)이 설치될 일정한 높이로 파일두부를 컷팅하여 정리한다. After that, the pile head is cut and arranged to a certain height at which the first
이때 기성파일(10)은 라멘교의 수직재와 파일기초의 역할을 한다.
At this time, the ready-made
이 단계에서 기성파일(10)이 설치될 지반이 얕은 깊이에서 암반 등의 지지층이 형성되어 있을 경우 파일기초대신 철근콘크리트 확대기초를 적용할 수 있으며 이 경우 기성파일(10)과 확대기초의 강결을 위하여 기성파일(10) 하부가 파일하단에서 파일직경이상으로 확대기초에 매입하여 강결 처리한다.
At this stage, if the foundation on which the ready-made
확대기초의 콘크리트 타설 양생시까지 파일 수직도는 시방서상의 오차 범위 내에서 유지되어야 한다.
The pile verticality shall be maintained within the tolerances of the specification until the concrete foundation curing of the expanded foundation.
1차강결블럭(20)의 제작에 대하여 설명하면 다음과 같다.
Referring to the production of the
교대나 교각부의 기성파일(10)은 1본이상이 일렬로 배치된다.The ready-made
파일 두부를 1차 강결블럭(20)과 일체화하기 위해 기성파일(10) 중공부에 파일두부 보강철근(22)을 배근한다.
In order to integrate the pile head with the
이후 일련의 파일두부를 감싸도록 거푸집을 설치하고 상부돌출철근(24)과 함께 전체적인 배근을 하고 콘크리트(C)를 타설 양생하여 1차 강결블럭(20)을 형성한다. After installing a formwork to wrap a series of pile heads, and the overall reinforcement with the upper protrusion reinforcement (24) and cast the concrete (C) to form the
이때 파일과 1차 강결블럭(20)의 강결을 위해 파일 상단에서 파일직경이상의 파일두부가 내측과 외측모두 매입되도록 1차강결블럭(20)을 제작한다. At this time, for the firmness of the pile and the
상부돌출철근(24)은 2차 강결블럭(40)과 1차강결블럭(20)과의 강결을 위한 보강재이다.
The
본 발명 라멘교 제작에 있어서 수직재의 높이가 비교적 낮고 기성파일(10)이 설치될 지반이 얕은 깊이에서 암반 등의 지지층이 형성되어 있을 경우 철근콘크리트 확대기초와 일련의 기성파일(10)의 결합구조 및 기성파일(10)과 1차강결블럭(20)의 결합구조를 플랜트에서 제작하고, 본 구조체의 확대기초를 지지할 지반을 소요레벨로 평탄하게 정리한 후 구조체를 운반하여 소요위치에 설치 할 수 있다.(도6)
In the present invention, when the height of the vertical material is relatively low and the ground on which the ready-made
본 발명의 라멘교의 시공방법에 대하여 설명하면 다음과 같다.
The construction method of the ramen bridge of this invention is demonstrated as follows.
상ㆍ하 단부 돌출보강철근(32a)(32b)을 갖는 바닥판 슬래브 겸 프리캐스트거더(30)를 제작하여 강결공간(S)이 형성되도록 1차강결블럭(20) 상부에 거치한다.A bottom plate slab and a
프리캐스트 거더 거치 전에 거더와 접촉되는 1차 강결블럭(20) 상에 고강도 스티로폼(26)을 설치하여 거더하중이 1차 강결블럭(20)에 균일하게 전달되게 한다. 고강도 스티로폼(26)은 2차 강결블럭(40) 콘크리트(C)타설시 거푸집으로서의 역할을 한다.
The
강결공간(S)내의 상ㆍ하 단부 보강철근(32a)(32b)을 커플러(34)로 서로 연결한 다음, 강결공간(S)에 콘크리트 몰탈을 타설하여 2차강결블럭(40)을 일체로 강결ㆍ제작한다. The upper and lower
교각부 또는 교대부의 2차강결블럭(40)은 2차사하중(포장, 경계석) 및 활하중(공용하중)재하 시 발생하는 상부 부모멘트에 저항한다.
The
바닥판 슬래브 겸 프리캐스트거더(30)는 바닥판 슬래브역할을 겸하고 있으므로 그 형상은 두께가 균일한 판넬 형상이다.
Since the bottom plate slab and
본 발명의 바닥판 슬래브 겸 프리캐스트거더(30)는 단면의 경량화 및 장경간화를 위하여 종방향 강선을 긴장 정착하여 제작할 수 있다. (도1)
The bottom plate slab and
본 발명의 바닥판 슬래브 겸 프리캐스트거더(30)는 바닥판 슬래브와 거더가 하나로 된 거더이므로 바닥판 슬래브 타설 공정이 생략되어 공기가 감축되며 단면이 날렵해 경제적이다.
Since the bottom slab slab and
교각이나 교대가 일련의 기성파일(10)로 구성되어 상부 폭이 클 경우 본 발명의 바닥판 슬래브 겸 프리캐스트거더(30)를 운반거치시의 중량에 따른 가설 장비 등을 고려하여 단면내부 동일한 위치에 횡방향 쉬스관이 설치된 2개 이상의 바닥판 슬래브 겸 프리캐스트거더(30)를 제작하여 횡방향으로 맞대어 거치 후 맞대음부 공간에 콘크리트(C)를 타설 양생 후 횡방향 강선(36)을 긴장 정착하여 거더를 일체화한다.(도9a)When the piers or shifts are composed of a series of ready-made
횡방향 강선(36)을 긴장 정착하여 거더를 일체화하기위하여 1차강결블럭(20) 상부에 거치되는 바닥판 슬래브 겸 프리캐스트거더(30)는 2개 이상 횡방향으로 밀접되게 배치하는 것이 유리하다. 그러나 인도교나 자전거교량 등의 소규모 교량은 1개의 바닥판 슬래브 겸 프리캐스트거더(30)에 의해서도 가능하다. 어느 경우나 본 발명의 기술내용과 동일한 범주에 속한다.
In order to integrate the girder by tensioning the
또한 상단에 스터럽철근이 설치된 2개 이상의 바닥판 슬래브 겸 프리캐스트거더(30)를 횡방향으로 맞대어 거치 후 거더 상부에 설치된 스터럽철근과 결속하여 종. 횡방향 철근을 설치 후 소요 두께로 콘크리트(C)를 타설 양생하여 거더를 일체화할 수도 있다. (도9a)
In addition, two or more bottom plate slab and precast girder (30) installed on the top of the stub rebar is mounted in the transverse direction after binding to the stub reinforcing bar installed on the top of the girder. After installing transverse reinforcing bars, the girder may be integrated by pouring and curing concrete (C) to the required thickness. (Figure 9a)
이와 같이 본 발명은 하부구조(교대, 교각)는 기성파일(10)이, 상부구조는 바닥판 슬래브 겸 프리캐스트거더(30)가 적용되며, 기성파일(10)과 거더가 1차와 2차 강결블럭(20)(40)으로 강결되어 라멘구조체를 형성하는 라멘교량의 시공방법이다.
Thus, in the present invention, the lower structure (alternation, piers) is a ready pile (10), the upper structure is a slab and
10; 기성파일,
20; 1차강결블럭, 22; 파일두부보강철근, 24; 상부돌출철근, 26; 고강도 스티로폼,
30; 바닥판 슬래브 겸 프리캐스트거더, 32a; 상 단부 돌출보강철근, 32b; 하 단부 돌출보강철근, 34; 커플러, 36; 횡방향 강선,
40; 2차강결블럭,
G; 지지층,
C; 콘크리트
h; 파일두부매입깊이,
S; 강결공간, 10; Ready-made file,
20; Primary freezing block, 22; Pile head reinforcing bars, 24; Upper protrusion rebar, 26; High strength styrofoam,
30; Soleplate slab and precast girder, 32a; Upper end protruding reinforcing bars, 32b; Lower end protruding reinforcing bars, 34; Coupler, 36; Transverse liner,
40; 2nd steel block,
G; Support Layer,
C; concrete
h; Pile head depth,
S; Hardening Space,
Claims (4)
The primary pile block 20 is integrally formed on the upper end of the ready-made pile 10, but the pile head reinforcing bar 22 is embedded and is formed to have a thickness larger than the pile head embedding depth h. The upper protruding reinforcing bars 24 embedded in the steel-blocking block 20 protrude into the steel-setting space S, while the bottom plate slab and precast girder 30 is mounted on the primary steel-blocking block 20 to form steel. The space S is formed, but the hardening space S includes upper and lower end reinforcing bars 32a and 32b protruding horizontally from the bottom plate slab and precast girder 30, and the primary steel block 20 The upper protruding reinforcing bar 24 protruding from the) is installed, and the construction of the rigid space S connects the upper and lower end reinforcing bars 32a and 32b to each other by a connecting member such as a coupler 34. , Cast steel space (S) with concrete mortar to form secondary steel-blocking block 40, ready-made pile and slab slab and free-cast Method ganggyeol block of girders produced
⒝ 파일중공부에 파일두부보강철근(22)과, 그리고 상부돌출철근(24)을 포함한 철근을 배근하고, 이를 포함한 일련의 파일두부를 감싸는 거푸집을 설치하고, 콘크리트(C)를 타설 양생하며 파일상단에서 파일직경이상의 파일두부가 매입되도록 1차강결블럭(20)을 형성하는 단계;
⒞ 상ㆍ하 단부 돌출보강철근(32a)(32b)을 갖는 바닥판 슬래브 겸 프리캐스트거더(30)를 제작하는 단계;
⒟ ⒞단계에서 제작된 바닥판 슬래브 겸 프리캐스트거더(30)를 강결공간(S)이 형성되도록 1차강결블럭(20) 상부에 거치하되 강결공간(S)에는 상부돌출철근(24)과, 그리고 상ㆍ하 단부 보강철근(32a)(32b)이 위치되게 바닥판 슬래브 겸 프리캐스트거더(30)를 거치하는 단계;
⒠ 강결공간(S)내의 상ㆍ하 단부 보강철근(32a)(32b)을 커플러(34)로 서로 연결한 다음, 강결공간(S)에 콘크리트 몰탈을 타설하여 2차강결블럭(40)을 일체로 강결ㆍ제작하는 단계;를 포함함을 특징으로 하는 기성파일과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법
(B) arranging the pile head to a constant height after the pile is driven from the position of the required piling and alternating ground to support layer (G);
부 에 Install pile head reinforcing bars (22) and reinforcing bars including upper protrusions (24) in pile hollows, install formwork covering piles of pile heads including them, and pour and cure concrete (C). Forming a primary rigid block 20 so as to embed pile heads larger than the pile diameter at an upper end thereof;
(B) fabricating a bottom plate slab and precast girder 30 having upper and lower end protruding reinforcing bars 32a and 32b;
바닥 Mount the bottom slab slab and precast girder 30 produced in step 에 above the primary steel block 20 so that the steel space (S) is formed, but in the steel space (S), the upper protrusion reinforcement (24), And mounting the bottom plate slab and precast girder 30 so that the upper and lower end reinforcing bars 32a and 32b are positioned;
(2) The upper and lower end reinforcing bars (32a) and (32b) in the steelmaking space (S) are connected to each other by a coupler (34), and then concrete mortar is placed in the steelmaking space (S) to integrate the second steelmaking block (40). A method of constructing a ramen bridge using a ready-made pile and slab slab and precast girder
⒟단계에서 바닥판 슬래브 겸 프리캐스트거더(30)를 1차강결블럭(20) 상부에 거치하기 전에 1차 강결블럭(20) 상부에 고강도 스티로폼(26)을 설치한 다음 바닥판 슬래브 겸 프리캐스트거더(30)를 거치하는 단계;를 포함함을 특징으로 하는 기성파일(10)과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법
The method according to claim 2, wherein
Before the bottom plate slab and precast girder 30 is mounted on the first steel block 20 in the step 고강도, high-strength styrofoam 26 is installed on the first steel block 20 and then the bottom plate slab and precast girder 30 is installed. Mounting the girder (30); construction method of the ramen bridge using a ready-made pile 10 and the bottom plate slab and precast girder, characterized in that it comprises a
⒟단계에서 1차강결블럭(20) 상부에 횡방향 쉬스관이 설치된 2개 이상의 바닥판 슬래브 겸 프리캐스트거더(30)를 횡방향으로 맞대어 거치한 후, 횡방향 강선(36)을 긴장 정착하여 바닥판 슬래브 겸 프리캐스트거더(30)를 일체화하는 단계;를 포함함을 특징으로 하는 기성파일과 바닥판 슬래브 겸 프리캐스트거더를 이용한 라멘교의 시공방법The method according to claim 2 or 3
In step IX, two or more bottom plate slab and precast girders 30 having transverse sheath pipes installed on the first steel block 20 are mounted in the transverse direction, and then the transverse steel wires 36 are tensioned and fixed. Integrating the bottom plate slab and precast girder (30); Construction method of the ramen bridge using a ready-made pile and the bottom plate slab and precast girder
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120046788A KR101184719B1 (en) | 2012-05-03 | 2012-05-03 | Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120046788A KR101184719B1 (en) | 2012-05-03 | 2012-05-03 | Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101184719B1 true KR101184719B1 (en) | 2012-09-20 |
Family
ID=47113925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120046788A KR101184719B1 (en) | 2012-05-03 | 2012-05-03 | Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101184719B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140111476A (en) * | 2013-03-11 | 2014-09-19 | 주식회사 동성엔지니어링 | Bridge construction method for forming continuous point part of pier using copping for connecting girder |
KR101517889B1 (en) * | 2013-06-13 | 2015-06-12 | 박상현 | Rhamen bridge construction method using prestressed concrete girder of arch-shaped |
KR101751724B1 (en) * | 2016-08-31 | 2017-06-29 | (주)한맥기술 | Concrete structure constructed integral abutment bridge having shallow height psc i girder due to moment redistribution through control of member stiffness |
KR102206257B1 (en) | 2020-07-14 | 2021-01-22 | 에스오씨기술지주 주식회사 | File slab combination structure |
CN112726409A (en) * | 2020-12-29 | 2021-04-30 | 中铁一局集团有限公司 | Hoisting device for bridge water surface pile tie beam and construction method thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101027162B1 (en) | 2010-12-30 | 2011-04-05 | 콘비젼스 주식회사 | Bike bridge using pre-cast concrete panel in river and method for constructing thereof |
-
2012
- 2012-05-03 KR KR1020120046788A patent/KR101184719B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101027162B1 (en) | 2010-12-30 | 2011-04-05 | 콘비젼스 주식회사 | Bike bridge using pre-cast concrete panel in river and method for constructing thereof |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140111476A (en) * | 2013-03-11 | 2014-09-19 | 주식회사 동성엔지니어링 | Bridge construction method for forming continuous point part of pier using copping for connecting girder |
KR101582599B1 (en) * | 2013-03-11 | 2016-01-06 | 주식회사 동성엔지니어링 | Bridge construction method for forming continuous point part of pier using copping for connecting girder |
KR101517889B1 (en) * | 2013-06-13 | 2015-06-12 | 박상현 | Rhamen bridge construction method using prestressed concrete girder of arch-shaped |
KR101751724B1 (en) * | 2016-08-31 | 2017-06-29 | (주)한맥기술 | Concrete structure constructed integral abutment bridge having shallow height psc i girder due to moment redistribution through control of member stiffness |
KR102206257B1 (en) | 2020-07-14 | 2021-01-22 | 에스오씨기술지주 주식회사 | File slab combination structure |
CN112726409A (en) * | 2020-12-29 | 2021-04-30 | 中铁一局集团有限公司 | Hoisting device for bridge water surface pile tie beam and construction method thereof |
CN112726409B (en) * | 2020-12-29 | 2022-11-01 | 中铁一局集团有限公司 | Hoisting device for bridge water surface pile tie beam and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160340855A1 (en) | Modular construction mold apparatus and method for constructing concrete buildings and structures | |
US8448280B2 (en) | Method of providing a parapet wall on a bridge | |
WO2017045223A1 (en) | Prefabricated pier column member with steel-concrete composite structure | |
KR101178876B1 (en) | Prestressed composit rahmen bridge construdtion method | |
KR101184719B1 (en) | Method making rigid block with pile and slab/precast girder and method constructing the rahmen bridge thereof | |
KR100993777B1 (en) | Rahmen structure construction method using precast segment | |
CN104018518A (en) | Prefabricated underground diaphragm wall and method for constructing outer basement wall and floor slabs | |
CN108867310A (en) | The short rib T beam bridge of pretensioning prestressed concrete and its construction method | |
KR20090037419A (en) | Method for constructing precast coping by using multi-step tensioning | |
KR101263370B1 (en) | Precast end-block with girder connection member and bridge construction method using ths same | |
KR100483083B1 (en) | Composite Deck having Frame and Concrete | |
CN114892552A (en) | Box girder type bridge reconstruction construction method | |
CN208121795U (en) | Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line | |
CN206887745U (en) | A kind of section assembling FRP using SMA strengthens concrete pier of steel tube | |
CN203475289U (en) | Pile type continuous rigid frame bridge | |
CN110485258B (en) | Full-assembly type steel structure approach bridge and construction method thereof | |
CN112796198A (en) | Hollow arch bridge system connected by UHPC wet joints and construction method | |
KR20130090453A (en) | Reinforcement member and girder using the same | |
JP2008144459A (en) | Slab form and method of constructing composite floor slab | |
KR101232329B1 (en) | Integral bridge and construction method using arched and concrete-filled tube | |
CN111305066A (en) | Hybrid combination beam steel-concrete combination section and mounting method thereof | |
EA017909B1 (en) | Large diameter pillar construction method by layer-built and frame construction method adapting the same | |
KR101194866B1 (en) | Rahmen bridge construction method using longitudinal and lateral steel member | |
JP2008274567A (en) | Circular steel pipe prefabricated bridge and its construction method | |
KR102316098B1 (en) | An abutment structure using and reinforced concrete construction method precast concrete block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20150805 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160721 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170727 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180829 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190903 Year of fee payment: 8 |
|
R401 | Registration of restoration |