KR101029629B1 - Steel skeleton work method of Hatch type escaping apparatus - Google Patents
Steel skeleton work method of Hatch type escaping apparatus Download PDFInfo
- Publication number
- KR101029629B1 KR101029629B1 KR1020090025434A KR20090025434A KR101029629B1 KR 101029629 B1 KR101029629 B1 KR 101029629B1 KR 1020090025434 A KR1020090025434 A KR 1020090025434A KR 20090025434 A KR20090025434 A KR 20090025434A KR 101029629 B1 KR101029629 B1 KR 101029629B1
- Authority
- KR
- South Korea
- Prior art keywords
- hatch
- evacuation device
- deck plate
- type evacuation
- type
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62B—DEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
- A62B5/00—Other devices for rescuing from fire
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62B—DEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
- A62B3/00—Devices or single parts for facilitating escape from buildings or the like, e.g. protection shields, protection screens; Portable devices for preventing smoke penetrating into distinct parts of buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/08—Built-in cupboards; Masks of niches; Covers of holes enabling access to installations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C9/00—Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes
- E06C9/06—Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes movably mounted
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
본 발명에 따르면, 기둥의 상단에 형강을 수평 연결시키는 형강 배치 단계; 연속된 굴곡 형상의 데크플레이트를 상기 형강 상측에 고정시키는 데크플레이트 배치 단계; 상기 데크플레이트 상에 해치형 피난장치의 폭만큼 해치를 형성시키는 데크플레이트 천공 단계; 상기 해치형 피난장치를 해치에 배치시켜 상기 해치형 피난장치의 외측면과 상기 데크플레이트를 결합시키는 위치 고정 단계; 및 상기 해치형 피난장치 주변의 데크플레이트 상면에 콘크리트를 타설한 후 양생시키는 발코니 형성 단계를 포함하는 해치형 피난장치의 철골조 시공법이 제공된다.According to the invention, the step of arranging the section steel horizontally connecting the section steel to the top of the column; A deck plate arrangement step of fixing a deck plate having a continuous curved shape to the upper side of the section steel; A deck plate drilling step of forming a hatch on the deck plate by a width of a hatch type evacuation device; A position fixing step of disposing the hatch evacuation device on the hatch to couple the outer surface of the hatch evacuation device to the deck plate; And steel frame construction method of the hatch-type evacuation apparatus comprising a step of forming a balcony after pouring concrete on the upper surface of the deck plate around the hatch-type evacuation device.
이에 의하면, 철골조 시공시 해치형 피난장치가 데크플레이트의 해치에 견고히 고정배치된 후, 발코니 형성됨으로써 해치형 피난장치에 대한 정밀 시공이 가능하게 되는 장점이 있다. According to this, the hatch-type evacuation device is firmly arranged on the hatch of the deck plate when the steel frame construction, there is an advantage that can be precise construction for the hatch-type evacuation device is formed by the balcony.
해치형 피난장치, 발코니, 거푸집, 철근, 배근, 용접, 콘크리트, 모르타르, 타설, 양생, 시공법, 받침대, 이음부재, 철골 Hatch type evacuation device, balcony, formwork, rebar, reinforcement, welding, concrete, mortar, casting, curing, construction method, pedestal, joint member, steel frame
Description
본 발명은 해치형 피난장치의 철골조 시공법에 관한 것으로서, 더욱 상세하게는 철골조 시공시 해치형 피난장치를 발코니에 매립 시공되도록 한 해치형 피난장치의 철골조 시공법에 관한 것이다. The present invention relates to a steel frame construction method of the hatch-type evacuation device, and more particularly to a steel frame construction method of the hatch-type evacuation device to be buried construction on the balcony when the steel frame construction.
일반적으로 화재가 발생했을 때 불길과 유독가스는 주로 위쪽으로 향하기 때문에 가능한 화재발생지역보다 아래쪽으로 도피하는 것이 바람직하고, 이를 위해 발코니 바닥에 매립 설치되어 상층으로부터 하층으로의 피난경로를 제공하는 사다리가 내부에 접철 구비된 해치형 피난장치(도 1 참조)가 안출된 바 있다. In general, when a fire breaks out, since flames and toxic gases are mainly directed upwards, it is preferable to evacuate below the fire area where possible. For this purpose, a ladder is provided on the floor of the balcony to provide an evacuation route from the upper floor to the lower floor. The hatch-type evacuation device (see FIG. 1) provided with a folding inside has been conceived.
이러한 종래의 해치형 피난장치의 경우, 화원으로부터 신속 및 효과적으로 대피할 수 있으며, 평상시 발코니 공간을 자유롭게 사용할 수 있다는 점에서 그 활용성이 점차 증대되고 있다. In the case of such a conventional hatch type evacuation device, it is possible to evacuate quickly and effectively from the fire garden, and its utilization is gradually increasing in that it is possible to freely use the balcony space normally.
이와 같은 종래의 해치형 피난장치를 고층건물의 철골조 시공현장에서 발코니 바닥에 시공하고자 할 경우, 매립될 소정 위치에 해치형 피난장치를 정확히 고정배치시키는 것이 중요하다. When a conventional hatch type evacuation device is to be installed on a balcony floor in a steel frame construction site of a high-rise building, it is important to accurately fix the hatch type evacuation device at a predetermined position to be buried.
그러나, 종래의 해치형 피난장치의 철골조 시공법에 의하면, 상, 하층 발코니 바닥의 특정 지점에 해치형 피난장치를 배치시킴에 있어 그 시공과정이 정례화되어 있지 않아 해치형 피난장치의 정밀시공이 곤란하게 되는 문제가 있다.However, according to the conventional steel frame construction method of the hatch-type evacuation device, in order to arrange the hatch-type evacuation device at a specific point of the upper and lower balcony floors, the construction process is not regularized, making it difficult to precisely install the hatch-type evacuation device. There is a problem.
본 발명은 상기한 문제점을 해결하기 위하여 창출된 것으로서, 철골조 시공시 해치형 피난장치를 발코니에 정밀하게 매립시공할 수 있는 해치형 피난장치의 철골조 시공법을 제공하는데 그 목적이 있다. The present invention has been made in order to solve the above problems, an object of the present invention is to provide a steel frame construction method of the hatch type evacuation device that can be accurately embedded in the balcony hatch-type evacuation device during construction.
상기한 목적을 달성하기 위해 본 발명의 일 측면에 따른 해치형 피난장치의 철골조 시공법은, 기둥의 상단에 형강을 수평 연결시키는 형강 배치 단계; 연속된 굴곡 형상의 데크플레이트를 상기 형강 상측에 고정시키는 데크플레이트 배치 단계; 상기 데크플레이트 상에 해치형 피난장치의 폭만큼 해치를 형성시키는 데크플레이트 천공 단계; 상기 해치형 피난장치를 해치에 배치시켜 상기 해치형 피난장치의 외측면과 상기 데크플레이트를 결합시키는 위치 고정 단계; 및 상기 해치형 피난장치 주변의 데크플레이트 상면에 콘크리트를 타설한 후 양생시키는 발코니 형성 단계를 포함하여 구성된다.Steel frame construction method of the hatch-type evacuation device according to an aspect of the present invention to achieve the above object, the beam forming step of connecting the section steel to the upper end of the column; A deck plate arrangement step of fixing a deck plate having a continuous curved shape to the upper side of the section steel; A deck plate drilling step of forming a hatch on the deck plate by a width of a hatch type evacuation device; A position fixing step of disposing the hatch evacuation device on the hatch to couple the outer surface of the hatch evacuation device to the deck plate; And forming a balcony after pouring concrete on the upper surface of the deck plate around the hatch type evacuation device.
여기서, 본 발명은, 콘크리트 양생이 완료되면 콘크리트 위에 모르타르를 바른후 발코니 바닥을 마감시키는 미장 단계를 더 포함하는 것을 특징으로 한다.Here, the present invention is characterized in that it further comprises a plastering step of finishing the balcony floor after applying the mortar on the concrete when the curing of the concrete is completed.
또한, 본 발명은, 상기 미장 단계에서 상기 해치형 피난장치 주변으로 오목홈이 둘러싸듯 형성되며, 이 오목홈에 실리콘을 코킹 형성시키는 방수 단계를 더 포함하는 것을 특징으로 한다.In addition, the present invention is characterized in that the concave groove is formed around the hatch-type evacuation device in the plastering step, and further comprises a waterproof step of caulking silicon in the concave groove.
또한, 본 발명은, 판면 이음용의 "L"형 이음부재를 다수 준비시키는 이음부 재 준비 단계를 더 포함하는 것을 특징으로 한다.In addition, the present invention is characterized in that it further comprises a joint re-preparation step of preparing a plurality of "L" type joint members for the plate joint.
또한, 상기 위치 고정 단계에서는, 상기 이음부재의 양측과 각각 대응되는 상기 데크플레이트의 일측면과 해치형 피난장치의 외측면이 용접 이음되는 것을 특징으로 한다.In addition, the position fixing step, characterized in that the one side surface of the deck plate and the outer surface of the hatch-type evacuation device respectively corresponding to both sides of the joint member is welded.
전술한 바와 같이 본 발명에 따른 해치형 피난장치의 철골조 시공법에 의하면, 철골조 시공시 해치형 피난장치가 데크플레이트의 해치에 견고히 고정배치된 후, 발코니 형성됨으로써 해치형 피난장치에 대한 정밀 시공이 가능하게 되는 장점이 있다. As described above, according to the steel frame construction method of the hatch type evacuation device according to the present invention, when the steel frame construction is fixedly placed on the hatch of the deck plate, the balcony is formed, so that precise construction of the hatch type evacuation device is possible. There is an advantage to doing that.
이하, 첨부된 도면을 참조로 본 발명의 일 실시예에 따른 해치형 피난장치의 철골조 시공법에 대해 상세하게 살펴본다.Hereinafter, with reference to the accompanying drawings looks at in detail with respect to the steel frame construction method of the hatch-type evacuation apparatus according to an embodiment of the present invention.
이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Prior to this, terms or words used in the present specification and claims should not be construed as being limited to the common or dictionary meanings, and the inventors should properly explain the concept of terms in order to best explain their own invention. Based on the principle that can be defined, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.
따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only the most preferred embodiments of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It should be understood that various equivalents and modifications may be present.
도 1은 본 발명의 일 실시예에 따른 해치형 피난장치의 상부도어 개방상태를 보인 사시도, 및 도 2는 도 1의 동작 상태도이다.1 is a perspective view showing an upper door open state of a hatch type evacuation device according to an embodiment of the present invention, and FIG. 2 is an operation state diagram of FIG. 1.
도 1 및 도 2에 도시된 바와 같이, 본 발명의 해치형 피난장치는, 사각진 관형상의 프레임(111)과, 상기 프레임(111)의 상단에 결합된 상부도어(112)와, 상기 프레임(111)과 상기 상부도어(112)사이에 개재된 회동링크부(120)와, 상기 프레임(111)의 내부에 접철 수용된 피난사다리(113)와, 상기 피난사다리(113)의 하중을 지지하도록 상기 프레임(111)의 하단에 결합된 하부도어(114)로 구성된다.As shown in Fig. 1 and 2, the hatch-type evacuation device of the present invention, the rectangular
여기서, 상기 프레임(111)은 상부개구가 상층공간으로 노출되고, 하부개구가 하층공간으로 노출되도록 발코니의 바닥(B)에 매립 설치되며, 상, 하부 도어(112)(114)가 회동되어 개방시 일측 지지시키도록 상하단에 단차진 걸림면(111a)이 각각 구비된다.Here, the
또한, 상기 상부도어(112)는 프레임(111)의 상부개구를 폐쇄하는 폐쇄위치와 프레임(111)의 상부개구를 개방하는 개방위치 사이를 회동할 수 있도록 프레임(111)의 상단에 힌지 결합되며, 그 저면 중앙영역에 손잡이(112a)가 형성된다.In addition, the
또한, 상기 회동링크부(120)는 하단이 프레임(111)에 회동가능하게 결합된 프레임레버(121)와, 상단이 상부도어(112)에 회동가능하게 결합된 도어레버(122)로 이루어진다.In addition, the
상기한 프레임레버(121)의 상단에는 요홈부(121a)가 형성되며, 그 하단을 통해 프레임(111)에 회동 결합된다. 그리고 상기 도어레버(122)는 직선상의 단일체로 형성되되 하단에 회동제한절곡부(122a)가 구비되어, 상기 상부도어(112)가 개방될 때 회동제한절곡부(122a)가 프레임레버(121)의 요홈부(121a)에 접촉하게 된다.A
또한, 상기 피난사다리(113)는 각 수평발판(113a)을 잇는 한 쌍의 수평바(113b) 형태가 다수 접철된 것으로서, 최상부 수평바(113b)의 양측이 프레임(111) 내측면의 두 지점에 회동 지지되며, 하부측 수평바(113b)의 양측이 프레임(111)에 지지된 가압레버(117)에 결합되는바, 상기 가압레버(117)는 프레임(111) 상에 설치 고정된 롤러(115)의 견인선(116)에 의해 승하강 가능하게 연결된다.In addition, the
즉, 상기 가압레버(117)가 하방향으로 가압되면 상기 하부도어(114)가 개방됨과 아울러, 상기 롤러(115)가 회전 및 견인선(116)이 풀리면서 상기 피난사다리(113)는 하층 바닥을 향해 전개될 수 있게 되며, 전개된 피난사다리(113)는 별도의 감김수단(도시 생략)을 통해 상기 롤러(115)를 역회전시켜 견인선(116)을 감아올림으로써 프레임(111)의 내부로 복귀시킬 수 있게 된다.That is, when the
또한, 상기 하부도어(114)는 프레임(111)의 하부개구를 폐쇄하는 폐쇄위치와 프레임(111)의 하부개구를 개방하는 개방위치 사이를 회동할 수 있도록 프레임(111)의 하단에 힌지 결합된다. 개방상태의 하부도어(114)는 대략 개방상태의 상부도어(112)와 동일한 평면(도 2 참조)을 이루도록 프레임(111)에 결합됨이 바람직하다.In addition, the
이러한 구성을 갖는 하부도어(114)는 프레임(111)에 억지끼움 형태로 폐쇄상태를 유지하다가, 가압레버(117)가 가압되어 피난사다리(113)가 펼쳐질 때 개방되도록 구성할 수 있다.The
이하, 도 2를 참조하여 본 발명 해치형 피난장치의 작동법에 대해 살펴본다.Hereinafter, with reference to Figure 2 looks at the operation of the present invention hatch type evacuation device.
화재 발생에 따라 피난자가 상부도어(112)를 상측으로 잡아당기게 되면, 프레임레버(121)와 도어레버(122)는 프레임레버(121)의 상측영역과 도어레버(122)가 직선을 이루도록 각각 프레임(111)과 상부도어(112)에 대하여 회동하게 된다. When the evacuator pulls the
이때 프레임레버(121)와 도어레버(122)의 회동동작은 요홈부(121a)와 회동제한절곡부(122a)가 접촉할 때까지 계속되는바, 프레임레버(121)의 요홈부(121a)와 도어레버(122)의 회동제한절곡부(122a)가 접촉할 때 상부도어(112)는 개방위치에 도달하게 된다.At this time, the rotation operation of the
다음으로 피난자가 가압레버(117)를 하방향으로 가압하게 되면 하부도어(114)가 하측으로 개방됨과 동시에 피난사다리(113)가 하층 바닥을 향해 펼쳐지게 된다.Next, when the evacuator presses the
따라서, 피난자는 손잡이(112a)를 잡은 상태로 상,하층에 연통 형성된 개구부를 따라 피난사다리(113)의 수평발판(113a)을 통해 하층으로 피난할 수 있게 되는 것이다.Therefore, the evacuator will be able to evacuate to the lower floor through the
한편, 상술된 본 발명의 해치형 피난장치를 철골조 시공과 동시에 설치하기 위한 시공법에 대해 도 3 내지 도 7를 참조하여 살펴보면 다음과 같다. On the other hand, with reference to Figures 3 to 7 with respect to the construction method for installing the hatch-type evacuation device of the present invention described above and at the same time as the steel frame construction.
도 3은 도 1의 해치형 피난장치의 철골조 시공법를 나타내 보인 순서도, 도 4는 도 3의 데크플레이트 천공 단계에서 데크플레이트에 해치가 형성된 상태를 보인 사시도, 도 5는 도 3의 위치 고정 단계에서 해치형 피난장치와 데크플레이트가 결합된 상태를 보인 사시도, 도 6은 도 3의 방수 단계까지 완료된 상태의 부분 파단 사시도, 및 도 7은 도 6의 측단면도이다.Figure 3 is a flow chart showing the steel frame construction method of the hatch-type evacuation device of Figure 1, Figure 4 is a perspective view showing the hatch formed on the deck plate in the deck plate drilling step of Figure 3, Figure 5 hatch in the position fixing step of Figure 3 Figure 6 is a perspective view showing a state where the type evacuation device and the deck plate is coupled, Figure 6 is a partially broken perspective view of the state completed until the waterproof step of Figure 3, and Figure 7 is a side cross-sectional view of FIG.
도 3에 도시된 바와 같이 해치형 피난장치의 철골조 시공법은 프레임 설치 단계(S100)와, 마감 처리 단계(S200), 및 피난사다리 설치 단계(S300)를 포함한다. As shown in FIG. 3, the steel frame construction method of the hatch type evacuation apparatus includes a frame installation step S100, a finishing treatment step S200, and an evacuation ladder installation step S300.
상기한 프레임 설치 단계(S100)는 기둥의 상단에 형강(I)을 수평 연결시켜 발코니 하중을 지탱시키는 형강 배치 단계(S110)와, 연속된 굴곡 형상의 데크플레이트(D)를 상기 형강(I) 상측에 피스로 고정시키는 데크플레이트 배치 단계(S120)와, 상기 데크플레이트(D) 상에 해치형 피난장치의 프레임(111) 폭만큼 해치(H)를 형성시키는 데크플레이트 천공 단계(S130)와, 상기 해치형 피난장치를 해치(H)에 배치시켜 상기 해치형 피난장치의 외측면과 상기 데크플레이트(D)를 결합시키는 위치 고정 단계(S140), 및 상기 해치형 피난장치 주변의 데크플레이트(D) 상면에 콘크리트를 타설한 후 양생시키는 발코니 형성 단계(S150)를 차례로 거친다. The frame installation step (S100) is a steel beam arrangement step (S110) for supporting the balcony load by horizontally connecting the section steel (I) to the top of the column, and the continuous bending deck plate (D) of the section steel (I) Deck plate arrangement step (S120) of fixing the piece to the upper side, deck plate drilling step (S130) to form a hatch (H) by the width of the
여기서 상기 형상 배치 단계(S110)에서 사용되는 형강(I)은 각종 단면 형상을 가진 봉(棒) 모양의 압연재를 총칭하는 것으로, 그 단면 형상에 따라 ㄱ형강, H형강, I형강, ㄷ형강, Z형강, T형강 등의 여러 종류가 사용될 수 있다.Here, the section steel (I) used in the shape arrangement step (S110) refers to a rod-shaped rolled material having various cross-sectional shapes, and a-shaped steel, H-shaped steel, I-shaped steel, c-shaped steel according to the cross-sectional shape , Z-shaped steel, T-shaped steel and the like can be used.
또한, 상기 데크플레이트 배치 단계(S120)에서는 골함석(아연도금강판) 또는 철판 재질의 데크플레이트(D)를 이용해 상기 형강(I) 상측에 물결 모양의 지지판면을 형성시키게 된다. In addition, the deck plate arrangement step (S120) is to form a corrugated support plate surface on the upper side of the section steel (I) using a corrugated iron (galvanized steel sheet) or iron plate deck plate (D).
또한, 상기 데크플레이트 천공 단계(S130)에서는 도 4에 도시된 바와 같이 상기 데크플레이트(D) 상에 프레임(111)의 저부측이 관통될 수 있는 폭으로 해치(H)를 형성시키게 되며, 아울러, 이 해치(H)는 상기 해치형 피난장치가 설치완료 후 상부도어(112) 개방 작동시 인접하게 배치된 벽면(W)에 의해 회동이 제한되어 개방 불량이 되지 않도록 상부도어(112)의 일단이 벽면으로부터 60mm 내지 100 mm 정도 이격되게 상기 데크플레이트(D)의 적정 위치에 천공 형성됨이 바람직하다. In addition, in the deck plate drilling step (S130), as shown in FIG. 4, the hatch (H) is formed to a width through which the bottom side of the
그리고, 본 발명은 위치 고정 단계(S140)에 앞서, 판면 이음용의 "L"형 이음부재(A)를 다수 준비시키는 이음부재 준비 단계(S135)가 선행됨이 바람직하다. And, in the present invention, prior to the position fixing step (S140), it is preferable that the joint member preparation step (S135) for preparing a plurality of "L" type joint member (A) for the plate joint is preceded.
따라서, 도 5 및 도 6에 도시된 바와 같이 상기 위치 고정 단계(S140)에서는 프레임(111)의 하단이 데크플레이트(D)의 하단과 나란한 가상선(D')에 맞춰지도록 해치(H) 내부로 관통 배치되며, 준비된 이음부재(A)의 양측과 각각 대응되는 상기 데크플레이트(D)의 일측면과 프레임(111) 외측면이 용접 이음됨으로써 상기 데크플레이트(D) 상에 해치형 피난장치를 견고히 위치 고정시킬 수 있게 된다.Therefore, as shown in FIGS. 5 and 6, in the position fixing step S140, the lower end of the
이처럼 해치형 피난장치의 프레임(111)이 데크플레이트(D)에 견고히 고정된 상태로 상기 프레임(111)의 주변으로 콘크리트를 타설 및 양생시키는 발코니 형성 단계(S150)가 실시됨으로써 프레임 설치 단계(S100)가 완료된다. Thus, the
이와 같은 프레임 설치 단계(100)는 상기 프레임(111)이 단독으로 설치되는 것에 한정되지 않는바, 상기 프레임(111)에 상, 하부 도어(112)(114)를 선택적으로 결합하여 도 7에 도시된 바와 같이 함께 설치될 수 있음은 물론이다. Such a frame installation step 100 is not limited to the
그리고, 상기 마감 처리 단계(S200)는 발코니에 대한 콘크리트 양생이 완료되면 콘크리트 위에 모르타르(M)를 바른후, 발코니를 마감시키는 미장 단계(S260)와, 상기 미장 단계(S260)에서 상기 해치형 피난장치 주변으로 둘러싸듯 형성되는 오목홈(O)에 실리콘(S)을 코킹 형성시키는 방수 단계(S270)를 거치게 된다. In addition, the finishing treatment step (S200) is a plastering step (S260) for finishing the balcony after applying the mortar (M) on the concrete when the concrete curing for the balcony, and the plastering step (S260) in the hatch-type evacuation Through the waterproofing step (S270) for caulking the silicon (S) in the concave groove (O) formed to surround the device.
아울러, 본 마감 처리 단계(S200)에서는 미장 단계(S260)에 앞서 프레 임(111)의 파손을 방지하며, 경첩 부분에 모르타르가 인입되는 것을 방지하기 위해 프레임(111) 상면에 비닐커버 또는 종이 재질의 보호덮개(P)를 덮어 보양조치 취함이 바람직하다.In addition, in the finishing treatment step (S200) in order to prevent the damage of the
끝으로, 상기 피난사다리 설치 단계(S300)는 마감 처리 단계(S200) 이후 프레임(111)의 벽면 방향 내측면에 피난 사다리(113)를 최상부 수평바(113b)의 양측이 회동 지지되게 접철 수용된 상태로 내삽시킴으로써 해치형 피난장치의 시공이 완료된다.Finally, the evacuation ladder installation step (S300) is a state that is folded and received so that both sides of the uppermost horizontal bar (113b) of the
이상과 같이, 본 발명은 비록 한정된 실시예와 도면에 의해 설명되었으나 이에 한정되지 않으며, 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술 사상과 아래에 기재될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형 가능함은 물론이다. As described above, although the present invention has been described by way of limited embodiments and drawings, the present invention is not limited thereto, and it should be understood by those of ordinary skill in the art to which the present invention relates, Of course, various modifications and variations can be made within the equivalent range.
도 1은 본 발명의 일 실시예에 따른 해치형 피난장치의 상부도어 개방상태를 보인 사시도, 1 is a perspective view showing the upper door open state of the hatch-type evacuation device according to an embodiment of the present invention,
도 2는 도 1의 동작 상태도, 2 is an operating state diagram of FIG. 1;
도 3은 도 1의 해치형 피난장치의 철골조 시공법를 나타내 보인 순서도, 3 is a flow chart showing the steel frame construction method of the hatch-type evacuation device of FIG.
도 4는 도 3의 데크플레이트 천공 단계에서 데크플레이트에 해치가 형성된 상태를 보인 사시도, 4 is a perspective view showing a hatch formed on the deck plate in the deck plate drilling step of FIG.
도 5는 도 3의 위치 고정 단계에서 해치형 피난장치와 데크플레이트가 결합된 상태를 보인 사시도, 5 is a perspective view showing a state in which the hatch type evacuation device and the deck plate are coupled in the position fixing step of FIG.
도 6은 도 3의 방수 단계까지 완료된 상태의 부분 파단 사시도, 및 6 is a partially broken perspective view of the state completed by the waterproof step of Figure 3, and
도 7은 도 6의 측단면도이다.7 is a side cross-sectional view of FIG. 6.
** 도면의 주요부분에 대한 부호의 설명 **DESCRIPTION OF REFERENCE NUMERALS
111: 프레임 111a: 걸림면111:
112: 상부도어 113: 피난사다리112: upper door 113: evacuation ladder
114: 하부도어 115: 롤러114: lower door 115: roller
116: 견인선 117: 가압레버116: traction ship 117: pressure lever
120 : 회동링크부 121: 프레임레버120: rotating link unit 121: frame lever
122: 도어레버 S100: 프레임 설치 단계122: door lever S100: frame installation step
S110: 형강 배치 단계 S120: 데크플레이트 배치 단계S110: section steel placement step S120: deck plate placement step
S130: 데크플레이트 천공 단계 S135: 이음부재 설치 단계S130: Deck plate drilling step S135: Fitting member installation step
S140: 위치 고정 단계 S150: 발코니 형성 단계S140: Position fixing step S150: Balcony formation step
S200: 마감 처리 단계 S260: 미장 단계S200: Finishing Step S260: Plastering Step
S270: 방수 단계 S280: 해체 단계S270: waterproof stage S280: dismantling stage
S290: 견출 작업 단계 S300: 피난사다리 설치 단계S290: Evacuation work step S300: Evacuation ladder installation step
A: 이음부재 B: 발코니 바닥A: joint member B: balcony floor
D: 데크플레이트 D': 가상선D: Deck Plate D ': Virtual Line
H: 해치 I: 형강H: Hatch I: Shape Steel
M: 모르타르 O: 오목홈M: mortar O: concave groove
S: 실리콘 W: 벽면S: Silicone W: Wall Panel
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090025434A KR101029629B1 (en) | 2009-03-25 | 2009-03-25 | Steel skeleton work method of Hatch type escaping apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090025434A KR101029629B1 (en) | 2009-03-25 | 2009-03-25 | Steel skeleton work method of Hatch type escaping apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100107243A KR20100107243A (en) | 2010-10-05 |
KR101029629B1 true KR101029629B1 (en) | 2011-04-15 |
Family
ID=43129081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090025434A KR101029629B1 (en) | 2009-03-25 | 2009-03-25 | Steel skeleton work method of Hatch type escaping apparatus |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101029629B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101281997B1 (en) | 2011-07-08 | 2013-07-04 | (주)반초기업 | Assembly type refuge tool and installation method therefor |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101118163B1 (en) * | 2011-10-12 | 2012-03-16 | 주식회사 세이프테크코리아 | Water stop equipped container structure of floor installing style fire escape apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02285190A (en) * | 1989-04-27 | 1990-11-22 | Naka Tech Lab | Installation construction of escape device |
JPH02296987A (en) * | 1989-05-10 | 1990-12-07 | Naka Tech Lab | Mounting structure for refuge device |
JPH10331250A (en) | 1997-05-29 | 1998-12-15 | Sekisui House Ltd | Structure of balcony and corridor, and floor board therefor |
JP2000160753A (en) | 1998-11-25 | 2000-06-13 | Marunishi Kensetsu Kk | Floor construction of steel building, steel building therewith, floor construction of building with wall type structure, and building with wall type structure therewith |
-
2009
- 2009-03-25 KR KR1020090025434A patent/KR101029629B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02285190A (en) * | 1989-04-27 | 1990-11-22 | Naka Tech Lab | Installation construction of escape device |
JPH02296987A (en) * | 1989-05-10 | 1990-12-07 | Naka Tech Lab | Mounting structure for refuge device |
JPH10331250A (en) | 1997-05-29 | 1998-12-15 | Sekisui House Ltd | Structure of balcony and corridor, and floor board therefor |
JP2000160753A (en) | 1998-11-25 | 2000-06-13 | Marunishi Kensetsu Kk | Floor construction of steel building, steel building therewith, floor construction of building with wall type structure, and building with wall type structure therewith |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101281997B1 (en) | 2011-07-08 | 2013-07-04 | (주)반초기업 | Assembly type refuge tool and installation method therefor |
Also Published As
Publication number | Publication date |
---|---|
KR20100107243A (en) | 2010-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR870000727B1 (en) | Transportable fabric building structure | |
EP1944430B1 (en) | Peripheral slab formwork system | |
KR101086075B1 (en) | Hatch type escaping apparatus having subframe and construction method using the subframe | |
KR101042838B1 (en) | Concrete fonudation work method of Hatch type escaping apparatus | |
KR101029629B1 (en) | Steel skeleton work method of Hatch type escaping apparatus | |
CN106284427A (en) | A kind of basement post-pouring zone temporary leaking water gear soil construction method | |
CN110173102A (en) | The more work surface synchronous construction foot hand systems of super high-rise building and construction method | |
CN109972849A (en) | Inside and outside self-stabilising in sliding type electric stair shaft safety device construction method | |
KR101107358B1 (en) | Construction method of an drop type emergency ladder | |
KR20100105139A (en) | Concrete fonudation work method of hatch type escaping apparatus | |
KR100882320B1 (en) | Draining plate | |
KR20210028361A (en) | Formwork frame for forming floor openings for installation of top-down evacuation ladder | |
KR101281997B1 (en) | Assembly type refuge tool and installation method therefor | |
KR101035860B1 (en) | An apparatus for opening and shutting the manhole for escaping the fire place in the high building | |
CN106223367B (en) | A kind of exterior wall pouring after settlement enclosure method and device | |
CN211691556U (en) | Concrete curing means of high-rise building | |
JPH11343729A (en) | Slide rising type suspended scaffold | |
KR101714591B1 (en) | Exterior insulation system intergrated insulatin material using the gangform | |
CN106320588A (en) | Roof assembling method | |
RU2059053C1 (en) | Method for story-by-story erection of a building of monolithic reinforced concrete and concreting form for implementing the same | |
RU2401924C2 (en) | Form for floor forming | |
CN217782979U (en) | Opening pay-off device convenient for construction site | |
CN219316028U (en) | Connecting node of outer protection system and main body structure of assembled steel structure building | |
ITUD20080132A1 (en) | DEVICE, FORMWORK, EQUIPMENT AND PROCEDURE FOR THE REALIZATION OF HORIZONTAL FLAT STRUCTURES, WHICH ARE FLOORS, FLOORS OR SIMILAR | |
CN220469358U (en) | Foldable daylighting well operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |