KR101020066B1 - Expansion joint and this construction technique - Google Patents

Expansion joint and this construction technique Download PDF

Info

Publication number
KR101020066B1
KR101020066B1 KR1020090078185A KR20090078185A KR101020066B1 KR 101020066 B1 KR101020066 B1 KR 101020066B1 KR 1020090078185 A KR1020090078185 A KR 1020090078185A KR 20090078185 A KR20090078185 A KR 20090078185A KR 101020066 B1 KR101020066 B1 KR 101020066B1
Authority
KR
South Korea
Prior art keywords
base
same time
expansion joint
anchor bolt
lower plate
Prior art date
Application number
KR1020090078185A
Other languages
Korean (ko)
Other versions
KR20110020526A (en
Inventor
이두성
서성우
홍선영
강현종
Original Assignee
주식회사 일원테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 일원테크 filed Critical 주식회사 일원테크
Priority to KR1020090078185A priority Critical patent/KR101020066B1/en
Publication of KR20110020526A publication Critical patent/KR20110020526A/en
Application granted granted Critical
Publication of KR101020066B1 publication Critical patent/KR101020066B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/40Plastics

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE: An expandable connecting device and a construction method thereof are provided to prevent a foreign material from entering and to minimize frictional force. CONSTITUTION: An expandable connecting device is as follows. A hole of a given diameter and a given depth is formed on a slab surface(F). Resin(R) is injected into the hole and an anchor bolt(B) is inserted into the hole. A rubber pad(P) is installed on the anchor bolt and a second lower plate(210) is supported on the rubber pad. A waterproof material(W) is installed on the second lower plate. The waterproof material is covered with a second upper plate(220) and a second cover plate(230). The second upper and cover plates are fastened with a nut(N) and the anchor bolt is caulked.

Description

신축이음장치 및 이의 시공방법{expansion joint and this construction technique}Expansion joint and this construction technique

본 발명은 신축이음장치 및 이의 시공방법에 관한 것이다.The present invention relates to an expansion joint device and a construction method thereof.

일반적으로 철도 교량은 소음과 하중에 의한 대응력을 가지도록 지면에 설치되는 선로와 같이 많은 양의 자갈이 포설되고, 그에 따라 교량과 교량 사이에 설치되는 상부슬래브의 이음 부분에는 상기 자갈이 상부슬래브의 이음 부분으로 삽입되어 신축작용에 지장을 초래하는 것을 방지하기 위해 신축이음장치가 설치된다.In general, a railway bridge has a large amount of gravel, such as a track installed on the ground so as to have a corresponding force due to noise and load, and accordingly the gravel of the upper slab at the joint portion of the upper slab installed between the bridge and the bridge Expansion joints are installed to prevent them from interfering with the expansion of the joints.

또한, 상기 신축이음장치는 포설된 자갈이 무거운 중량을 갖는 열차의 통행시 충격과 진동에 의해 서로 마찰되면서 입자상태로 파쇄되어 상기 상부슬래브 사이의 이음 부분에 설치된 신축이음장치로 끼지 않도록 한 구조로 제작된다.In addition, the expansion joint has a structure in which the installed gravel is crushed to each other by the impact and vibration during the passage of a train having a heavy weight so as to be crushed into a particle state so as not to be caught by the expansion joint installed in the joint portion between the upper slab. Is produced.

이와 같이 철도교량에 설치되는 종래의 신축이음장치(100)는 도 1에 도시된 바와 같이, 교량 사이에 설치되는 상부슬래브(A, B) 사이의 이음 부분에 덮이도록 차단시트(110)를 형성하고, 일측 상기 상부슬래브(B)에는 차단시트의 일단과 같이 스크루에 의해 지지플레이트(120)가 고정되며, 타측 상기 상부슬래브(A)에는 상기 차단시트(110)의 타단과 같이 상기 지지플레이트(120)의 상부가 덮이도록 덮개플레 이트(130)가 고정되어 상기 상부슬래브(A) 사이의 이음 부분으로 자갈 등이 삽입되어 끼지 않도록 설치된다.As shown in FIG. 1, the conventional expansion joint device 100 installed on the railway bridge forms the blocking sheet 110 so as to cover the joint portion between the upper slabs A and B installed between the bridges. And, one side of the upper slab (B) is fixed to the support plate 120 by means of a screw as one end of the blocking sheet, the other side of the upper slab (A) to the other end of the blocking sheet 110 as the support plate ( Cover plate 130 is fixed so that the upper portion of the cover 120 is installed so that the gravel is inserted into the joint between the upper slab (A) is inserted.

또한, 상기 지지플레이트(120)와 덮개플레이트(130) 사이에는 자갈로부터 파손된 입자상태의 각종 이물질 등이 유입되지 않도록 고무판(140)이 지지플레이트(120)로 접착제에 의해 부착되거나 또는 스크류에 의해 고정된다.In addition, between the support plate 120 and the cover plate 130, the rubber plate 140 is attached to the support plate 120 by an adhesive or by a screw so as not to introduce various foreign matters such as particles broken from gravel. It is fixed.

이에 따라 종래의 신축이음장치(100)는 교량 사이에 설치되는 상부슬래브(A, B) 사이의 이음 부분으로 자갈이 삽입되어 끼는 것을 방지함과 아울러 상기 덮개플레이트(130)와 지지플레이트(120) 사이로 입자상태의 이물질 등이 유입되는 것을 차단하고 있다.Accordingly, the conventional expansion joint device 100 prevents the gravel from being inserted into the joint portion between the upper slabs A and B installed between the bridges, and the cover plate 130 and the support plate 120. It prevents the inflow of foreign particles in the form of particles.

그러나 상기한 바와 같은 종래의 신축이음장치(100)에 있어서는 상기 덮개플레이트(130)와 지지플레이트(120)가 상부슬래브(A, B) 사이의 각 단부에 설치되는 관계로 상기 상부슬래브(A, B)의 중간으로 무거운 중량을 가지는 열차의 통행시 그 중량으로 인해 상기 덮개플레이트(130)와 지지플레이트(120)에 회전변위가 발생하면서 이격되는 문제가 발생하고, 이로 인해 이격된 틈을 통하여 각종 이물질 등이 삽입되어 신축작용에 악영향을 미치는 원인이 될 뿐만 아니라 신축이음장치의 볼트부에 집중 응력을 발생시키는 원인이 된다.However, in the conventional expansion joint device 100 as described above, the upper slab A, the cover plate 130 and the support plate 120 is installed at each end between the upper slab (A, B) B) when the train having a heavy weight in the middle of the traffic due to the rotational displacement occurs in the cover plate 130 and the support plate 120 is generated a problem, which is caused by the various spaced apart Foreign matters are inserted to not only cause a bad influence on the elastic action, but also cause a concentrated stress in the bolt portion of the expansion joint.

또한, 상기 일측부의 부동의 단차로 인하여 특히 지지플레이트(120)가 설치된 부분의 단차 발생시 상기 덮개플레이트(130)와 지지플레이트(120) 사이는 더 큰 폭으로 틈이 발생하는 문제점이 있다.In addition, there is a problem in that a gap is generated between the cover plate 130 and the support plate 120 in a larger width, particularly when a step occurs in a portion where the support plate 120 is installed due to the floating step.

그리고 상기 지지플레이트(120)와 덮개플레이트(130) 사이에 설치되는 고무 판(110)은 무거운 중량을 가지는 열차의 통행으로 인해 단기간 내에 쉽게 변형이 발생되고, 또한 고무판(110)을 사용함으로써, 열차가 통행시 고무판(110)이 압축되었다가 열차가 통과한 후 고무판(110)이 팽창하여 팽창력으로 볼트부와 너트에 반복적인 충격을 가함으로써, 피로가 누적되어 볼트 두부가 파괴되는 현상이 발생되고, 즉, 하중과 진동에 의해 일정 사용기간 후에는 압착되거나 일부가 파손됨에 따라 변형된 틈새를 통하여 우수가 유입되어 신축작용이 원활하게 이루어지지 않아 신축이음장치가 제 역할을 못하는 원인이 되고 있다.In addition, the rubber plate 110 installed between the support plate 120 and the cover plate 130 is easily deformed in a short time due to the passage of a train having a heavy weight, and also by using the rubber plate 110, When the rubber plate 110 is compressed during the passage, the rubber plate 110 expands after the train passes, and repeatedly exerts an impact on the bolt part and the nut with the expansion force, causing fatigue to accumulate and breaking the head of the bolt. That is, after a certain period of time due to the load and vibration, the rainwater flows through the deformed gap as the part is squeezed or damaged, causing the expansion joint to not function properly because the expansion and contraction is not performed smoothly.

또한, 종래의 신축이음장치는 볼트가 풀릴 경우에 덮개플레이트(130)가 해체되어 대형 사고로 이어지는 원인이 되고 있다. In addition, in the conventional expansion joint device, when the bolt is loosened, the cover plate 130 is disassembled, which causes a large accident.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 철도 교량에 설치되는 신축이음장치에 온도에 따른 변위를 수용하고, 이물질의 유입을 방지할 뿐만 아니라 열차의 진행방향에 대한 유동시 마찰력을 최소화시킬 수 있도록 한 신축이음장치 및 이의 시공방법을 제공하는데 그 목적이 있다. Accordingly, the present invention has been made to solve the above problems, to accommodate the displacement according to the temperature in the expansion joint installed in the railway bridge, and to prevent the inflow of foreign substances, as well as to the direction of the train It is an object of the present invention to provide an expansion joint device and a construction method thereof that minimize frictional forces during flow.

상기한 목적을 달성하기 위한 본 발명에 따른 신축이음장치는 구조물의 신축이음장치의 설치 대상인 슬래브면에 일정한 직경 및 깊이로 구멍을 천공하고, 상기 구멍에 수지를 주입하며, 상기 구멍 내에 고정용 앵커볼트를 삽입하며, 상기 고정용 앵커볼트 상에 2mm이하의 얇은 고무패드를 설치하고, 상기 고무패드 상에 제1하판을 거치하며, 상기 제1하판에 고무방수재를 설치하고, 상기 고무방수재를 제1상판으로 덮고, 상기 제1상판을 너트로 체결하며, 상기 고정용 앵커볼트에 코킹 처리한 것을 특징으로 한다.Expansion joint according to the present invention for achieving the above object punctures a hole with a predetermined diameter and depth to the slab surface that is the installation target of the expansion joint of the structure, injecting resin into the hole, fixing anchors in the hole Insert a bolt, install a thin rubber pad of 2mm or less on the fixing anchor bolt, mount the first lower plate on the rubber pad, install a rubber waterproofing material on the first lower plate, and the rubber waterproofing material Covered with a first top plate, the first top plate is fastened with a nut, characterized in that the caulking treatment to the fixing anchor bolt.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 신축이음장치 시공방법은 구조물의 신축이음장치의 설치 대상인 슬래브면 및 유간을 정리하는 단계; 상기 설치 대상인 슬래브면에 일정한 직경 및 깊이로 구멍을 천공하고, 상기 구멍에 수지를 주입하는 단계; 상기 구멍 내에 고정용 앵커볼트를 삽입하는 단계; 상기 고정용 앵커볼트 상에 2mm이하의 얇은 고무패드를 설치하고, 상기 고무패드 상에 제1하판을 거치하는 단계; 상기 제1하판에 고무방수재를 설치하고, 상기 고무방수재를 제1상판으로 덮고, 상기 제1상판을 너트로 체결하는 단계; 상기 고정용 앵커볼트에 코킹을 실시하는 단계로 이루어짐을 특징으로 한다.In addition, the expansion joint construction method according to the present invention for achieving the above object comprises the steps of arranging the slab surface and the gap between the installation target of the expansion joint of the structure; Drilling holes in a predetermined diameter and depth on the surface of the slab to be installed, and injecting resin into the holes; Inserting a fixing anchor bolt into the hole; Installing a thin rubber pad of 2 mm or less on the fixing anchor bolt, and mounting a first lower plate on the rubber pad; Installing a rubber waterproof material on the first lower plate, covering the rubber waterproof material with a first upper plate, and fastening the first upper plate with a nut; Characterized in that it comprises the step of caulking the fixing anchor bolt.

이상에서 설명한 바와 같이, 본 발명에 따른 신축이음장치 및 이의 시공방법은 철도 열차 통행 및 침하에 따른 이상 변위에도 이물질 등이 유입되는 것을 차단하여 더욱 원활한 신축작용이 이루어짐과 동시에 간단한 구조로 설치가 편리할 뿐만 아니라 유지보수가 간편한 효과가 있다.As described above, the expansion joint according to the present invention and the construction method thereof is convenient to install in a simple structure and at the same time more smooth stretching operation by blocking the inflow of foreign matters in the abnormal displacement caused by the railroad train passage and settlement. In addition, it is easy to maintain.

이하, 본 발명을 첨부한 예시도면과 다양한 실시예를 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings and various embodiments of the present invention will be described in detail.

[제1실시예][First Embodiment]

도 2는 본 발명에 따른 신축이음장치의 제1실시예를 도시한 평면도이고, 도 3은 본 발명에 따른 신축이음장치의 제1실시예를 도시한 단면도이며, 도 4는 도 3의 "B" 부분을 확대 도시한 상세도이며, 도 5는 본 발명에 따른 신축이음장치의 제1실시예의 제2하판, 제2상판 및 제2덮개판을 도시한 단면도이다.2 is a plan view showing a first embodiment of the expansion joint according to the present invention, Figure 3 is a cross-sectional view showing a first embodiment of the expansion joint according to the present invention, Figure 4 is a "B" of FIG. 3 is an enlarged detail view, and FIG. 5 is a cross-sectional view showing a second lower plate, a second upper plate and a second cover plate of the first embodiment of the expansion joint device according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치는 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제2하판(210)을 거치하며, 상기 제2하판(210)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제2상판(220)과 제2덮개판(230)으로 덮고, 상기 제2상판(220) 및 제2덮개판(230)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것이다.As shown in these drawings, the expansion joint according to the present invention drills the hole (H) at a constant diameter and depth on the slab surface (F) that is the installation target of the expansion joint (A) of the structure (S), Resin (R) is injected into the hole (H), the fixing anchor bolt (B) is inserted into the hole (H), the rubber pad (P) is installed on the fixing anchor bolt (B), and The second lower plate 210 is mounted on the rubber pad P, a rubber waterproof material W is installed on the second lower plate 210, and the rubber waterproof material W is disposed on the second upper plate 220 and the second. Covered with a cover plate 230, the second upper plate 220 and the second cover plate 230 is fastened with a nut (N), and the fixing anchor bolt (B) is caulking (C) process.

여기서, 상기 제2하판(210)은 전체적으로 평활면으로 이루어지는 베이스(212)와; 상기 베이스(212)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(214)와, 상기 베이스(212)의 타측은 수직으로 연장됨과 동 시에 내측으로 요입 형성되는 끼움부(216)와; 상기 끼움부로부터 일정한 각도로 하향으로 연장되는 연장부(218)로 구성된다.Here, the second lower plate 210 includes a base 212 formed of a smooth surface as a whole; One side of the base 212 is a groove portion 214 is formed in the shape of an arrowhead to be inserted into the inside, and the other side of the base 212 is vertically extended and at the same time the fitting portion formed in the inner ( 216); It is composed of an extension portion 218 extending downward from the fitting portion at a predetermined angle.

또한, 상기 제2상판(220)은 전체적으로 평활면으로 이루어지는 베이스(222)와; 상기 베이스(222)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(224)와; 상기 베이스(222)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(226)로 구성된다.In addition, the second top plate 220 is a base 222 made of a smooth surface as a whole; One side of the base 222 and the protrusion 224 is formed to extend horizontally at the same time inclined at a predetermined angle; The other side of the base 222 is composed of a concave inlet portion 226 extending vertically and at the same time formed a predetermined concave inward.

그리고 상기 제2덮개판(230)은 전체적으로 평활면으로 이루어지는 베이스(232)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(234)와; 상기 베이스(232)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(236)로 구성된다. The second cover plate 230 includes a base 232 formed of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and extends horizontally at the same time, the cover portion 234 formed to be thinner; The other side of the base 232 is composed of a concave inlet 236 extending vertically and at the same time a predetermined portion concave inward.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 신축이음장치의 시공에 대해 설명한다.Hereinafter, the construction of the expansion joint according to the present invention having the configuration as described above.

도 6(a) 내지 6(f)은 본 발명에 따른 신축이음장치의 제1실시예의 설치 순서를 도시한 공정도이다.6 (a) to 6 (f) are process charts showing the installation procedure of the first embodiment of the expansion joint according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치 시공방법은 구조물(S)의 신축이음장치(A) 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계; 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계; 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계; 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 전체적으로 평활면으로 이루어지는 베이스(212)와; 상기 베이스(212)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(214)와, 상기 베이스(212)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(216)와; 상기 끼움부(216)로부터 일정한 각도로 하향으로 연장되는 연장부(218)로 구성된 제2하판(210)을 거치하는 단계; 상기 제2하판(210)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 전체적으로 평활면으로 이루어지는 베이스(222)와; 상기 베이스(222)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(224)와; 상기 베이스(222)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(226)로 구성된 제2상판(220)과 전체적으로 평활면으로 이루어지는 베이스(232)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(234)와; 상기 베이스(232)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(236)로 구성된 제2덮개판(230)을 덮고, 상기 제2상판(220) 및 제2덮개판(230)을 너트(N)로 체결하는 단계; 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어진다.As shown in these drawings, the expansion joint construction method according to the present invention comprises the steps of arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S); Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); Inserting a fixing anchor bolt (B) into the hole (H); A base 212 having a rubber pad P installed on the fixing anchor bolt B, and having a smooth surface as a whole on the rubber pad P; One side of the base 212 is a groove portion 214 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 212 is vertically extended and the fitting portion 216 is formed inwardly at the same time Wow; Mounting a second lower plate (210) consisting of an extension (218) extending downward from the fitting portion (216) at a predetermined angle; A base 222 having a rubber waterproofing material (W) installed on the second lower plate (210) and having the rubber waterproofing material (W) as a whole; One side of the base 222 and the protrusion 224 is formed to extend horizontally at the same time inclined at a predetermined angle; The other side of the base 222 extends vertically and at the same time a second upper plate 220 consisting of a concave inlet portion 226 formed in a predetermined portion inwardly and the base 232 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and extends horizontally at the same time, the cover portion 234 formed to be thinner; The other side of the base 232 extends vertically and at the same time covers the second cover plate 230 consisting of a concave inlet 236 formed in a predetermined portion inwardly, the second upper plate 220 and the second cover plate ( 230 fastening with a nut (N); Comprising the step of performing the caulking (C) to the fixing anchor bolt (B).

이하, 상기한 바와 같은 단계로 이루어진 본 발명에 따른 신축이음장치 시공방법을 각 단계별로 나누어 상세히 설명한다.Hereinafter, the expansion joint construction method according to the invention consisting of the steps as described above will be described in detail by dividing each step.

먼저, 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계는 도 6a에 도시된 바와 같이, 교량 구조물(S)에 신축이음장치(A)를 설치할 대상 부분인 각 부 슬래브면(F)을 면처리하고, 신축이음장치(A)의 설치유간 을 정리하는 단계이다.First, the step of arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S), as shown in Figure 6a, to install the expansion joint (A) to the bridge structure (S). Surface treatment of each side slab surface (F) which is a target part, and the installation clearance of the expansion joint (A) is arrange | positioned.

이어서, 상기 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계는 도 6b에 도시된 바와 같이, 신축이음장치(A)를 설치할 대상인 슬래브면(F)에 일정한 직경 및 깊이를 갖도록 구멍(H)을 천공하고, 상기 구멍(H)에 고정용 앵커볼트(B)의 견고한 고정을 위해 구멍(H) 내에 수지(R)를 주입하여 충전하는 단계이다.Subsequently, the hole H is drilled into the slab surface F, which is the installation target of the expansion joint device A, with a predetermined diameter and depth, and the resin R is injected into the hole H as shown in FIG. 6B. As shown in the drawings, the hole H is drilled to have a predetermined diameter and depth on the slab surface F on which the expansion joint device A is to be installed, and the anchor bolt B is firmly fixed to the hole H. In order to fill the hole (H) by injecting a resin (R).

이어서, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계는 도 6c에 도시된 바와 같이, 슬래브면(F)에 천공된 구멍(H)에 충전된 수지(R) 내로 고정용 앵커볼트(B)를 삽입하여, 접착수지(R)에 의해서 고정용 앵커볼트(B)를 구멍(H) 내에 견고히 고정하는 단계이다.Subsequently, inserting the fixing anchor bolt B into the hole H is fixed to the resin R filled in the hole H punched in the slab surface F, as shown in FIG. 6C. By inserting the anchor bolt (B), the fixing anchor bolt (B) by the adhesive resin (R) is firmly fixed in the hole (H).

이어서, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제2하판(210)을 거치하는 단계는 도 6d에 도시된 바와 같이, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 포설하고, 상기 고무패드(P)를 전체적으로 평활면으로 이루어지는 베이스(212)와; 상기 베이스(212)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(214)와, 상기 베이스(212)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(216)와; 상기 끼움부(216)로부터 일정한 각도로 하향으로 연장되는 연장부(218)로 구성된 제2하판(210)으로 고정하는 단계이다. Subsequently, installing the rubber pad (P) on the fixing anchor bolt (B), and mounting the second lower plate 210 on the rubber pad (P) is shown in Figure 6d, the fixing A base 212 formed with a rubber pad P on the anchor bolt B, and the rubber pad P having a smooth surface as a whole; One side of the base 212 is a groove portion 214 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 212 is vertically extended and the fitting portion 216 is formed inwardly at the same time Wow; It is a step of fixing with a second lower plate 210 composed of an extension portion 218 extending downward from the fitting portion 216 at a predetermined angle.

이어서, 상기 제2하판(210)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제2상판(220)과 제2덮개판(230)을 덮고, 상기 제2상판(220) 및 제2덮개 판(230)을 너트(N)로 체결하는 단계는 도 6e에 도시된 바와 같이, 상기 고무패드(P)에 제2하판(210)이 고정 설치된 상태에서 상기 제2하판(210)의 요홈부(214)에 고무방수재(W)를 삽입한 후, 상기 고무방수재(W)를 전체적으로 평활면으로 이루어지는 베이스(222)와; 상기 베이스(222)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(224)와; 상기 베이스(222)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(226)로 구성된 제2상판(220)의 일측에 형성된 돌출부(224)로 누르고, 제2상판(220)의 타측에 형성된 요입부(226)로 제2하판(210)의 끼움부(216)에 끼워서 고정한 후, 상기 제2상판(220)의 위에 전체적으로 평활면으로 이루어지는 베이스(232)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(234)와; 상기 베이스(232)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(236)로 구성된 제2덮개판(230)을 제2하판(210)과 제2상판(220)을 덮고, 상기 제2상판(220)의 가운데로 솟아오른 고정용 앵커볼트(B)에 너트(N)로 고정 체결하는 단계이다.Subsequently, a rubber waterproof material (W) is installed on the second lower plate (210), the rubber waterproof material (W) covers the second upper plate (220) and the second cover plate (230), and the second upper plate (220). And fastening the second cover plate 230 with a nut (N), as shown in Figure 6e, the second lower plate 210 in a state in which the second lower plate 210 is fixed to the rubber pad (P). After inserting the rubber waterproof material (W) in the groove portion 214 of the), the rubber waterproof material (W) and the base 222 made of a smooth surface as a whole; One side of the base 222 and the protrusion 224 is formed to extend horizontally at the same time inclined at a predetermined angle; The other side of the base 222 extends vertically and presses the protrusion 224 formed on one side of the second upper plate 220 including the concave inlet 226 formed at a predetermined portion inwardly, and the second upper plate 220. A base 232 formed of a smooth surface as a whole on the second upper plate 220 after being fixed to the fitting portion 216 of the second lower plate 210 by the concave inlet 226 formed on the other side of the second upper plate 220; One side of the base 232 is inclined at a predetermined angle and extends horizontally at the same time, the cover portion 234 formed to be thinner; The other side of the base 232 extends vertically and at the same time covers the second lower plate 210 and the second upper plate 220, the second cover plate 230 consisting of a concave inlet portion 236 is formed in a predetermined portion inwardly In this case, the fixing anchor bolt B rises to the center of the second upper plate 220 and is fixed and fastened with a nut (N).

이어서, 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계는 도 6f에 도시된 바와 같이, 상기 고정용 앵커볼트(B)와 너트(N)에 의해 체결된 부분을 수밀성을 강화하기 위해 코킹(C)을 실시한다.Subsequently, performing the caulking (C) to the fixing anchor bolt (B) is, as shown in Figure 6f, to enhance the watertightness of the portion fastened by the fixing anchor bolt (B) and the nut (N). Caulking (C) is carried out in order to do this.

[제2실시예][Second Embodiment]

도 7은 본 발명에 따른 신축이음장치의 제2실시예를 도시한 평면도이고, 도 8은 본 발명에 따른 신축이음장치의 제2실시예를 도시한 단면도이며, 도 9는 도 8의 "C" 부분을 확대 도시한 상세도이며, 도 10은 본 발명에 따른 신축이음장치의 제2실시예의 제3하판, 제3상판 및 제3덮개판을 도시한 단면도이다.7 is a plan view showing a second embodiment of the expansion joint according to the present invention, Figure 8 is a cross-sectional view showing a second embodiment of the expansion joint according to the present invention, Figure 9 is a "C" of FIG. "Is an enlarged detail view of a portion, and FIG. 10 is a cross-sectional view showing a third lower plate, a third upper plate and a third cover plate of the second embodiment of the expansion joint according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치는 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제3하판(310)을 거치하며, 상기 제3하판(310)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제3상판(320)과 제3덮개판(330)으로 덮고, 상기 제3상판(320) 및 제3덮개판(330)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것이다.As shown in these drawings, the expansion joint according to the present invention drills the hole (H) at a constant diameter and depth on the slab surface (F) that is the installation target of the expansion joint (A) of the structure (S), Resin (R) is injected into the hole (H), the fixing anchor bolt (B) is inserted into the hole (H), the rubber pad (P) is installed on the fixing anchor bolt (B), and The third lower plate 310 is mounted on the rubber pad P, a rubber waterproof material W is installed on the third lower plate 310, and the rubber waterproof material W is attached to the third upper plate 320 and the third. Covered with a cover plate 330, the third upper plate 320 and the third cover plate 330 is fastened with a nut (N), and the fixing anchor bolt (B) is caulking (C).

여기서, 상기 제3하판(310)은 전체적으로 평활면으로 이루어지는 베이스(312)와; 상기 베이스(312)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(314)와, 상기 베이스(312)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(316)와; 상기 끼움부(316)로부터 일정한 각도로 하향으로 연장되는 연장부(318)로 구성된다.Here, the third lower plate 310 and the base is formed of a smooth surface as a whole (312); One side of the base 312 is a groove portion 314 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 312 is vertically extended and at the same time the fitting portion 316 is formed in the inner side Wow; It is composed of an extension 318 extending downward from the fitting portion 316 at a predetermined angle.

또한, 상기 제3상판(320)은 전체적으로 평활면으로 이루어지는 베이스(322)와; 상기 베이스(322)의 일측은 양 갈래로 갈라짐과 동시에 그 내측에 일정한 공간이 형성되는 끼움홈(324)과; 상기 베이스(322)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(326)로 구성된다.In addition, the third upper plate 320 is a base 322 consisting of a smooth surface as a whole; One side of the base 322 is divided into two parts and at the same time the fitting groove 324 is formed a predetermined space therein; The other side of the base 322 is composed of a concave inlet 326 extending vertically and at the same time a predetermined portion concave inward.

그리고 상기 제3덮개판(330)은 전체적으로 평활면으로 이루어지는 베이스(332)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(334)와; 상기 베이스(332)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(336)로 구성된다.And the third cover plate 330 is a base 332 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and at the same time extends horizontally, the cover portion 334 formed to be thinner; The other side of the base 332 is composed of a concave portion 336 extending vertically and at the same time formed a predetermined concave inward.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 신축이음장치의 시공에 대해 설명한다.Hereinafter, the construction of the expansion joint according to the present invention having the configuration as described above.

도 11(a) 내지 11(f)은 본 발명에 따른 신축이음장치의 제2실시예의 설치 순서를 도시한 공정도이다.11 (a) to 11 (f) are process charts showing the installation procedure of the second embodiment of the expansion joint according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치 시공방법은 구조물(S)의 신축이음장치(A) 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계; 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계; 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계; 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 전체적으로 평활면으로 이루어지는 베이스(312)와; 상기 베이스(312)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(314)와, 상기 베이스(312)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(316)와; 상기 끼움부(316)로부터 일정한 각도로 하향으로 연장되는 연장부(318)로 구성된 제3하판(310)을 거치하는 단계; 상기 제3하판(310)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 전체적으로 평활면으로 이루어지는 베이스(322)와; 상기 베이스(322)의 일측은 양 갈래로 갈라짐과 동시에 그 내측에 일정한 공간이 형성되는 끼움홈(324)과; 상기 베이스(322)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(326)로 구성된 제3상판(320)과 전체적으로 평활면으로 이루어지는 베이스(332)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(334)와; 상기 베이스(332)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(336)로 구성된 제3덮개판(330)을 덮고, 상기 제3상판(320)과 제3덮개판(330)을 너트(N)로 체결하는 단계; 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어진다.As shown in these drawings, the expansion joint construction method according to the present invention comprises the steps of arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S); Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); Inserting a fixing anchor bolt (B) into the hole (H); A rubber pad (P) installed on the fixing anchor bolt (B), and a base (312) formed of a smooth surface on the rubber pad (P) as a whole; One side of the base 312 is a groove portion 314 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 312 is vertically extended and at the same time the fitting portion 316 is formed in the inner side Wow; Mounting the third lower plate 310 consisting of an extension portion 318 extending downward from the fitting portion 316 at a predetermined angle; A base 322 having a rubber waterproofing material (W) installed on the third lower plate (310), the rubber waterproofing material (W) being made of a smooth surface as a whole; One side of the base 322 is divided into two parts and at the same time the fitting groove 324 is formed a predetermined space therein; The other side of the base 322 extends vertically and at the same time a third top plate 320 consisting of a concave inlet portion 326 formed in a predetermined portion inwardly and the base 332 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and at the same time extends horizontally, the cover portion 334 formed to be thinner; The other side of the base 332 extends vertically and at the same time covers the third cover plate 330 composed of a concave inlet 336 formed in a predetermined portion inwardly, the third upper plate 320 and the third cover plate ( Fastening 330 to the nut N; Comprising the step of performing the caulking (C) to the fixing anchor bolt (B).

이하, 상기한 바와 같은 단계로 이루어진 본 발명에 따른 신축이음장치 시공방법을 각 단계별로 나누어 상세히 설명한다.Hereinafter, the expansion joint construction method according to the invention consisting of the steps as described above will be described in detail by dividing each step.

먼저, 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계는 도 11a에 도시된 바와 같이, 교량 구조물(S)에 신축이음장치(A)를 설치할 대상 부분인 각 부 슬래브면(F)을 면처리하고, 신축이음장치(A)의 설치유간을 정리하는 단계이다.First, the step of arranging the slab surface (F) and the clearance between the installation and expansion of the expansion joint (A) of the structure (S), as shown in Figure 11a, to install the expansion joint (A) in the bridge structure (S). Surface treatment of each part slab surface F which is a target part is arrange | positioned, and the installation flow path of the expansion joint A is arranged.

이어서, 상기 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계는 도 11b에 도시된 바와 같이, 신축이음장치(A)를 설치할 대상인 슬래브면(F)에 일정한 직경 및 깊이를 갖도록 구멍(H)을 천공하고, 상기 구멍(H)에 고정용 앵커볼트(B)의 견고 한 고정을 위해 구멍(H) 내에 수지(R)를 주입하여 충전하는 단계이다.Subsequently, the hole H is drilled into the slab surface F, which is the installation target of the expansion joint device A, with a predetermined diameter and depth, and the resin R is injected into the hole H as shown in FIG. 11B. As described above, the hole (H) is drilled to have a certain diameter and depth on the slab surface (F) to which the expansion joint (A) is to be installed, and the fixing bolt (B) is firmly fixed to the hole (H). In order to fill the hole (H) by injecting a resin (R).

이어서, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계는 도 11c에 도시된 바와 같이, 슬래브면(F)에 천공된 구멍(H)에 충전된 수지(R) 내로 고정용 앵커볼트(B)를 삽입하여, 접착수지(R)에 의해서 고정용 앵커볼트(B)를 구멍(H) 내에 견고히 고정하는 단계이다.Subsequently, inserting the fixing anchor bolt B into the hole H is fixed to the resin R filled in the hole H perforated in the slab surface F, as shown in FIG. 11C. By inserting the anchor bolt (B), the fixing anchor bolt (B) by the adhesive resin (R) is firmly fixed in the hole (H).

이어서, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제3하판(110)을 거치하는 단계는 도 16d에 도시된 바와 같이, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 포설하고, 상기 고무패드(P)를 전체적으로 평활면으로 이루어지는 베이스(312)와; 상기 베이스(312)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(314)와, 상기 베이스(312)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(316)와; 상기 끼움부(316)로부터 일정한 각도로 하향으로 연장되는 연장부(318)로 구성된 제3하판(310)으로 고정하는 단계이다.Subsequently, installing the rubber pad (P) on the fixing anchor bolt (B), and mounting the third lower plate 110 on the rubber pad (P) is shown in Figure 16d, the fixing A base 312 having rubber pads P disposed on the anchor bolts B, the rubber pads P having a smooth surface as a whole; One side of the base 312 is a groove portion 314 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 312 is vertically extended and at the same time the fitting portion 316 is formed in the inner side Wow; Fixing with a third lower plate 310 composed of an extension part 318 extending downward from the fitting part 316 at a predetermined angle.

이어서, 상기 제3하판(310)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제3상판(320)과 제3덮개판(330)으로 덮고, 상기 제3상판(320)과 제3덮개판(330)을 너트(N)로 체결하는 단계는 도 11e에 도시된 바와 같이, 상기 고무패드(P)에 제3하판(310)이 고정 설치된 상태에서 상기 제3하판(310)의 요홈부(314)에 고무방수재(W)를 삽입한 후, 상기 고무방수재(W)를 전체적으로 평활면으로 이루어지는 베이스(322)와; 상기 베이스(322)의 일측은 양 갈래로 갈라짐과 동시에 그 내측에 일정한 공간이 형성되는 끼움홈(324)과; 상기 베이스(322)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(326)로 구성된 제3상판(320)의 일측에 형성된 돌출부(324)로 누르고, 제3상판(320)의 타측에 형성된 요입부(326)로 제3하판(310)의 끼움부(316)에 끼워서 고정한 후, 상기 제3상판(220)의 양 갈래로 갈라진 공간에 전체적으로 평활면으로 이루어지는 베이스(332)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(334)와; 상기 베이스(332)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(336)로 구성된 제3덮개판(330)의 덮개부(334)를 삽입하고, 상기 제3상판(320)의 가운데로 솟아오른 고정용 앵커볼트(B)에 너트(N)로 고정 체결하는 단계이다.Subsequently, a rubber waterproof material (W) is installed on the third lower plate (310), the rubber waterproof material (W) is covered with a third upper plate (320) and a third cover plate (330), and the third upper plate (320). Fastening the third cover plate 330 with a nut (N) is the third lower plate 310 in a state in which the third lower plate 310 is fixed to the rubber pad (P) as shown in FIG. After inserting the rubber waterproofing material (W) in the groove portion 314 of the), the rubber waterproofing material (W) and the base (322) consisting of a smooth surface as a whole; One side of the base 322 is divided into two parts and at the same time the fitting groove 324 is formed a predetermined space therein; The other side of the base 322 extends vertically and presses the protrusion 324 formed on one side of the third upper plate 320, which is formed of a concave indentation part 326 formed at a predetermined portion inwardly, and the third upper plate 320. The base 332 is formed of a smooth surface as a whole in the space divided by the bifurcated part of the third upper plate 220 after being fixed to the fitting portion 316 of the third lower plate 310 by the recess 326 formed at the other side of the third lower plate 310. Wow; One side of the base 232 is inclined at a predetermined angle and at the same time extends horizontally, the cover portion 334 formed to be thinner; The other side of the base 332 extends vertically and at the same time inserts a cover portion 334 of the third cover plate 330 composed of a concave portion 336 formed in a predetermined portion inwardly, and the third upper plate 320 The fixing anchor bolt (B) bulge to the center of the step of fastening with a nut (N).

이어서, 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계는 도 11f에 도시된 바와 같이, 상기 고정용 앵커볼트(B)와 너트(N)에 의해 체결된 부분을 수밀성을 강화하기 위해 코킹(C)을 실시한다. Then, the step of performing the caulking (C) to the fixing anchor bolt (B) is, as shown in Figure 11f, to strengthen the watertightness of the portion fastened by the fixing anchor bolt (B) and the nut (N). Caulking (C) is carried out in order to do this.

[제3실시예][Third Embodiment]

도 12는 본 발명에 따른 신축이음장치의 제3실시예를 도시한 평면도이고, 도 13은 본 발명에 따른 신축이음장치의 제3실시예를 도시한 단면도이며, 도 14는 도 13의 "A" 부분을 확대 도시한 상세도이며, 도 15는 본 발명에 따른 신축이음장치의 제3실시예의 제1하판 및 제1상판을 도시한 단면도이다.12 is a plan view showing a third embodiment of the expansion joint according to the present invention, Figure 13 is a cross-sectional view showing a third embodiment of the expansion joint according to the present invention, Figure 14 "A of FIG. Is an enlarged view of a portion, and FIG. 15 is a cross-sectional view showing a first lower plate and a first upper plate of a third embodiment of the expansion joint device according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치는 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제1하판(110)을 거치하며, 상기 제1하판(110)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제1상판(120)으로 덮고, 상기 제1상판(120)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것이다.As shown in these drawings, the expansion joint according to the present invention drills the hole (H) at a constant diameter and depth on the slab surface (F) that is the installation target of the expansion joint (A) of the structure (S), Resin (R) is injected into the hole (H), the fixing anchor bolt (B) is inserted into the hole (H), the rubber pad (P) is installed on the fixing anchor bolt (B), and Mounting the first lower plate 110 on the rubber pad (P), installing a rubber waterproofing material (W) on the first lower plate 110, covering the rubber waterproofing material (W) with the first upper plate 120, The first upper plate 120 is fastened with a nut (N), and the caulking (C) treatment to the fixing anchor bolt (B).

여기서, 상기 제1하판(110)은 전체적으로 평활면으로 이루어지는 베이스(112)와; 상기 베이스(112)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(114)와, 상기 베이스(112)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(116)로 구성된다.Here, the first lower plate 110 and the base 112 is formed of a smooth surface as a whole; One side of the base 112 is a groove portion 114 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 112 is vertically extended and at the same time the fitting portion 116 is formed in the inner side It consists of.

또한, 상기 제1상판(120)은 전체적으로 평활면으로 이루어지는 베이스(122)와; 상기 베이스(122)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(124)와; 상기 베이스(122)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(126)로 구성된다.In addition, the first top plate 120 and the base 122 is made of a smooth surface as a whole; One side of the base 122 is a protrusion 124 is formed to be inclined at a predetermined angle and extend horizontally; The other side of the base 122 includes a concave inlet 126 extending vertically and at the same time concave inwardly.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 신축이음장치의 시공에 대해 설명한다.Hereinafter, the construction of the expansion joint according to the present invention having the configuration as described above.

도 16(a) 내지 16(f)은 본 발명에 따른 신축이음장치의 제3실시예의 설치 순서를 도시한 공정도이다.16 (a) to 16 (f) are process charts showing the installation procedure of the third embodiment of the expansion joint according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 신축이음장치 시공방법은 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계; 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계; 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계; 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 전체적으로 평활면으로 이루어지는 베이스(112)와; 상기 베이스(112)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(114)와, 상기 베이스(112)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(116)로 구성된 제1하판(110)을 거치하는 단계; 상기 제1하판(110)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 전체적으로 평활면으로 이루어지는 베이스(122)와; 상기 베이스(122)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(124)와; 상기 베이스(122)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(126)로 구성된 제1상판(120)으로 덮고, 상기 제1상판(120)을 너트(N)로 체결하는 단계; 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어진다.As shown in these drawings, the expansion joint construction method according to the present invention comprises the steps of arranging the slab surface (F) and the clearance between the installation target of the expansion joint (A) of the structure (S); Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); Inserting a fixing anchor bolt (B) into the hole (H); A base (112) having a rubber pad (P) installed on the fixing anchor bolt (B), and having a smooth surface as a whole on the rubber pad (P); One side of the base 112 is a groove portion 114 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 112 is vertically extended and at the same time the fitting portion 116 is formed in the inner side Mounting the first lower plate 110 consisting of; A base 122 having a rubber waterproofing material W installed on the first lower plate 110 and the rubber waterproofing material W being made of a smooth surface as a whole; One side of the base 122 is a protrusion 124 is formed to be inclined at a predetermined angle and extend horizontally; The other side of the base 122 is covered with a first upper plate 120 composed of a concave inlet 126 that extends vertically and is formed with a predetermined recess inwardly, and fastens the first upper plate 120 with a nut N. Making; Comprising the step of performing the caulking (C) to the fixing anchor bolt (B).

이하, 상기한 바와 같은 단계로 이루어진 본 발명에 따른 신축이음장치 시공방법을 각 단계별로 나누어 상세히 설명한다.Hereinafter, the expansion joint construction method according to the invention consisting of the steps as described above will be described in detail by dividing each step.

먼저, 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계는 도 16a에 도시된 바와 같이, 교량 구조물(S)에 신축이음장치(A)를 설치할 대상 부분인 각 부 슬래브면(F)을 면처리하고, 신축이음장치(A)의 설치유간을 정리하는 단계이다.First, the step of arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S), as shown in Figure 16a, to install the expansion joint (A) in the bridge structure (S). Surface treatment of each part slab surface F which is a target part is arrange | positioned, and the installation flow path of the expansion joint A is arranged.

이어서, 상기 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계는 도 16b에 도시된 바와 같이, 신축이음장치(A)를 설치할 대상인 슬래브면(F)에 일정한 직경 및 깊이를 갖도록 구멍(H)을 천공하고, 상기 구멍(H)에 고정용 앵커볼트(B)의 견고한 고정을 위해 구멍(H) 내에 수지(R)를 주입하여 충전하는 단계이다.Subsequently, the hole H is drilled in the slab surface F, which is the installation target of the expansion joint device A, with a predetermined diameter and depth, and the resin R is injected into the hole H as shown in FIG. 16B. As shown in the drawings, the hole H is drilled to have a predetermined diameter and depth on the slab surface F on which the expansion joint device A is to be installed, and the anchor bolt B is firmly fixed to the hole H. In order to fill the hole (H) by injecting a resin (R).

이어서, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계는 도 16c에 도시된 바와 같이, 슬래브면(F)에 천공된 구멍(H)에 충전된 수지(R) 내로 고정용 앵커볼트(B)를 삽입하여, 접착수지(R)에 의해서 고정용 앵커볼트(B)를 구멍(H) 내에 견고히 고정하는 단계이다.Subsequently, inserting the fixing anchor bolt B into the hole H is fixed to the resin R filled in the hole H punched in the slab surface F, as shown in FIG. 16C. By inserting the anchor bolt (B), the fixing anchor bolt (B) by the adhesive resin (R) is firmly fixed in the hole (H).

이어서, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제1하판(110)을 거치하는 단계는 도 16d에 도시된 바와 같이, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 포설하고, 상기 고무패드(P)를 전체적으로 평활면으로 이루어지는 베이스(112)와; 상기 베이스(112)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(114)와, 상기 베이스(112)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(116)로 구성된 제1하판(110)으로 고정하는 단계이다. Subsequently, installing the rubber pad (P) on the fixing anchor bolt (B), and mounting the first lower plate 110 on the rubber pad (P) is shown in Figure 16d, the fixing A base 112 formed with a rubber pad P on the anchor bolt B, and the rubber pad P having a smooth surface as a whole; One side of the base 112 is a groove portion 114 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 112 is vertically extended and at the same time the fitting portion 116 is formed in the inner side Fixing with the first lower plate 110 consisting of.

이어서, 상기 제1하판(110)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제1상판(120)으로 덮고, 상기 제1상판(120)을 너트(N)로 체결하는 단계는 도 16e에 도시된 바와 같이, 고무패드(P)에 제1하판(110)이 고정 설치된 상태에서 상기 제1하판(110)의 요홈부(114)에 고무방수재(W)를 삽입한 후, 상기 고무방수 재(W)를 전체적으로 평활면으로 이루어지는 베이스(122)와; 상기 베이스(122)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(124)와; 상기 베이스(122)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(126)로 구성된 제1상판(120)의 일측에 형성된 돌출부(124)로 누르고, 제1상판(120)의 타측에 형성된 요입부(126)로 제1하판(110)의 끼움부(116)에 끼워서 고정한 후, 상기 제1상판(120)의 가운데에 솟아오른 고정용 앵커볼트(B)에 너트(N)로 고정 체결하는 단계이다.Subsequently, a rubber waterproofing material (W) is installed on the first lower plate (110), the rubber waterproofing material (W) is covered with the first upper plate (120), and the first upper plate (120) is fastened with a nut (N). As shown in FIG. 16e, after the first lower plate 110 is fixed to the rubber pad P, the rubber waterproof member W is inserted into the recess 114 of the first lower plate 110. And the base 122 made of a rubber smooth surface (W) as a whole; One side of the base 122 is a protrusion 124 is formed to be inclined at a predetermined angle and extend horizontally; The other side of the base 122 extends vertically and presses the protrusion 124 formed on one side of the first upper plate 120 including the concave inlet 126 formed in a predetermined portion inwardly, and the first upper plate 120. After fixing to the fitting portion 116 of the first lower plate 110 by the concave inlet 126 formed on the other side of the nut, the nut (N) to the fixing anchor bolt (B) emanating from the center of the first upper plate 120 The step of fastening with).

이어서, 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계는 도 16f에 도시된 바와 같이, 상기 고정용 앵커볼트(B)와 너트(N)에 의해 체결된 부분을 수밀성을 강화하기 위해 코킹(C)을 실시한다.Next, performing the caulking (C) to the fixing anchor bolt (B) is, as shown in Figure 16f, to enhance the watertightness of the portion fastened by the fixing anchor bolt (B) and the nut (N). Caulking (C) is carried out in order to do this.

도 1은 종래의 신축이음장치를 도시한 예시도,1 is an exemplary view showing a conventional expansion joint device,

도 2는 본 발명에 따른 신축이음장치의 제1실시예를 도시한 평면도,Figure 2 is a plan view showing a first embodiment of the expansion joint according to the present invention,

도 3은 본 발명에 따른 신축이음장치의 제1실시예를 도시한 단면도,3 is a cross-sectional view showing a first embodiment of the expansion joint according to the present invention;

도 4는 도 3의 "B" 부분을 확대 도시한 상세도,4 is an enlarged detailed view of a portion “B” of FIG. 3;

도 5는 본 발명에 따른 신축이음장치의 제1실시예의 제2하판, 제2상판 및 제2덮개판을 도시한 단면도,5 is a cross-sectional view showing a second lower plate, a second upper plate and a second cover plate of the first embodiment of the expansion joint according to the present invention;

도 6(a) 내지 6(f)은 본 발명에 따른 신축이음장치의 제1실시예의 설치 순서를 도시한 공정도,6 (a) to 6 (f) are process drawings showing the installation procedure of the first embodiment of the expansion joint according to the present invention;

도 7은 본 발명에 따른 신축이음장치의 제2실시예를 도시한 평면도,7 is a plan view showing a second embodiment of the expansion joint according to the present invention;

도 8은 본 발명에 따른 신축이음장치의 제2실시예를 도시한 단면도,8 is a cross-sectional view showing a second embodiment of the expansion joint according to the present invention;

도 9는 도 8의 "C" 부분을 확대 도시한 상세도,9 is an enlarged detailed view of a portion “C” of FIG. 8;

도 10은 본 발명에 따른 신축이음장치의 제2실시예의 제3하판, 제3상판 및 제3덮개판을 도시한 단면도,10 is a cross-sectional view showing a third lower plate, a third upper plate and a third cover plate of the second embodiment of the expansion joint according to the present invention;

도 11(a) 내지 11(f)은 본 발명에 따른 신축이음장치의 제2실시예의 설치 순서를 도시한 공정도,11 (a) to 11 (f) are process drawings showing the installation procedure of the second embodiment of the expansion joint according to the present invention;

도 12는 본 발명에 따른 신축이음장치의 제3실시예를 도시한 평면도,12 is a plan view showing a third embodiment of the expansion joint according to the present invention;

도 13은 본 발명에 따른 신축이음장치의 제3실시예를 도시한 단면도,13 is a sectional view showing a third embodiment of the expansion joint according to the present invention;

도 14는 도 13의 "A" 부분을 확대 도시한 상세도,FIG. 14 is an enlarged detailed view of a portion “A” of FIG. 13;

도 15는 본 발명에 따른 신축이음장치의 제3실시예의 제1하판 및 제1상판을 도시한 단면도,15 is a cross-sectional view showing a first lower plate and a first upper plate of the third embodiment of the expansion joint according to the present invention;

도 16(a) 내지 16(f)은 본 발명에 따른 신축이음장치의 제1실시예의 설치 순서를 도시한 공정도,16 (a) to 16 (f) are process charts showing the installation procedure of the first embodiment of the expansion joint according to the present invention;

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

110: 제1하판 112: 베이스110: first lower plate 112: base

114: 요홈부 116: 끼움부114: groove 116: fitting

120: 제1상판 122: 베이스120: first top plate 122: base

124: 돌출부 126: 요입부124: protrusion 126: recessed portion

210: 제2하판 212: 베이스210: second lower plate 212: base

214: 요홈부 216: 끼움부214: groove 216: fitting

218: 연장부 220: 제2상판218: extension 220: second top plate

222: 베이스 224: 돌출부222: base 224: protrusion

226: 요입부 230: 제2덮개판226: recessed portion 230: second cover plate

232: 베이스 234: 덮개부232: base 234: cover

236: 요입부 310: 제3하판236: recessed part 310: the third lower plate

312: 베이스 314: 요홈부312: base 314: groove

316: 끼움부 318: 연장부316: fitting portion 318: extension portion

320: 제3상판 322: 베이스320: third top plate 322: base

324: 끼움홈 326: 요입부324: fitting groove 326: recessed part

330: 제3덮개판 332: 베이스330: third cover plate 332: base

334: 덮개부 336: 요입부334: cover portion 336: recessed portion

A: 신축이음장치 B: 앵커볼트A: Expansion joint B: Anchor bolt

C: 코킹 F: 슬래브면C: Caulking F: Slab Surface

H: 구멍 N: 너트H: hole N: nut

P: 고무패드 R: 수지P: Rubber pad R: Resin

S: 구조물 W: 고무방수재S: Structure W: Rubber Waterproofing Material

Claims (12)

구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제1하판(110)을 거치하며, 상기 제1하판(110)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제1상판(120)으로 덮고, 상기 제1상판(120)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것을 특징으로 하는 신축이음장치.The hole (H) is drilled to the slab surface (F), which is the installation target of the expansion joint (A) of the structure (S), with a constant diameter and depth, the resin (R) is injected into the hole (H), and the hole ( Inserting a fixing anchor bolt (B) in the H), install a rubber pad (P) on the fixing anchor bolt (B), and mount the first lower plate 110 on the rubber pad (P) Installing a rubber waterproof material (W) on the first lower plate 110, covering the rubber waterproof material (W) with the first upper plate 120, and fastening the first upper plate 120 with a nut (N), Expansion joint device characterized in that the caulking (C) treatment to the fixing anchor bolt (B). 제 1항에 있어서,The method of claim 1, 상기 제1하판(110)은 전체적으로 평활면으로 이루어지는 베이스(112)와; 상기 베이스(112)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(114)와, 상기 베이스(112)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(116)로 구성되고,The first lower plate 110 and the base 112 is formed of a smooth surface as a whole; One side of the base 112 is a groove portion 114 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 112 is vertically extended and at the same time the fitting portion 116 is formed in the inner side Consisting of, 상기 제1상판(120)은 전체적으로 평활면으로 이루어지는 베이스(122)와; 상기 베이스(122)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(124)와; 상기 베이스(122)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(126)로 구성됨을 특징으로 하는 신축이음장치.The first top plate 120 is a base 122 made of a smooth surface as a whole; One side of the base 122 is a protrusion 124 is formed to be inclined at a predetermined angle and extend horizontally; The other side of the base 122 is an expansion joint device, characterized in that consisting of a concave inlet portion 126 that extends vertically and at the same time formed a predetermined part of the concave inward. 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제2하판(210)을 거치하며, 상기 제2하판(210)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제2상판(220)과 제2덮개판(230)으로 덮고, 상기 제2상판(220) 및 제2덮개판(230)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것을 특징으로 하는 신축이음장치.The hole (H) is drilled to the slab surface (F), which is the installation target of the expansion joint (A) of the structure (S), with a constant diameter and depth, the resin (R) is injected into the hole (H), and the hole ( Inserting a fixing anchor bolt (B) in the H), install a rubber pad (P) on the fixing anchor bolt (B), and mount the second lower plate 210 on the rubber pad (P) The rubber waterproofing material (W) is installed on the second lower plate (210), and the rubber waterproofing material (W) is covered with the second upper plate (220) and the second cover plate (230), and the second upper plate (220) and Fastening the second cover plate 230 with a nut (N), expansion joint device characterized in that the caulking (C) treatment to the fixing anchor bolt (B). 제 3항에 있어서,The method of claim 3, wherein 상기 제2하판(210)은 전체적으로 평활면으로 이루어지는 베이스(212)와; 상기 베이스(212)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(214)와, 상기 베이스(212)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(216)와; 상기 끼움부(216)로부터 일정한 각도로 하향으로 연장되는 연장부(218)로 구성되고, The second lower plate 210 includes a base 212 formed of a smooth surface as a whole; One side of the base 212 is a groove portion 214 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 212 is vertically extended and the fitting portion 216 is formed inwardly at the same time Wow; Consists of an extension 218 extending downward from the fitting portion 216 at a predetermined angle, 상기 제2상판(220)은 전체적으로 평활면으로 이루어지는 베이스(222)와; 상기 베이스(222)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(224)와; 상기 베이스(222)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(226)로 구성되며,The second top plate 220 is a base 222 made of a smooth surface as a whole; One side of the base 222 and the protrusion 224 is formed to extend horizontally at the same time inclined at a predetermined angle; The other side of the base 222 is composed of a concave inlet 226 extending vertically and at the same time a predetermined portion of the concave inward, 상기 제2덮개판(230)은 전체적으로 평활면으로 이루어지는 베이스(232)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(234)와; 상기 베이스(232)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(236)로 구성됨을 특징으로 하는 신축이음장치. The second cover plate 230 is a base 232 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and extends horizontally at the same time, the cover portion 234 formed to be thinner; The other side of the base 232 is an expansion joint device, characterized in that it consists of a concave inlet portion 236 extending vertically and at the same time a certain portion concave inward. 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하며, 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하며, 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제3하판(310)을 거치하며, 상기 제3하판(310)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제3상판(320)과 제3덮개판(330)으로 덮고, 상기 제3상판(320) 및 제3덮개판(330)을 너트(N)로 체결하며, 상기 고정용 앵커볼트(B)에 코킹(C) 처리한 것을 특징으로 하는 신축이음장치.The hole (H) is drilled to the slab surface (F), which is the installation target of the expansion joint (A) of the structure (S), with a constant diameter and depth, the resin (R) is injected into the hole (H), and the hole ( Inserting a fixing anchor bolt (B) in the H), install a rubber pad (P) on the fixing anchor bolt (B), and mount the third lower plate 310 on the rubber pad (P) The rubber waterproofing material (W) is installed on the third lower plate (310), and the rubber waterproofing material (W) is covered with the third upper plate (320) and the third cover plate (330), and the third upper plate (320) and The third cover plate 330 is fastened with a nut (N), expansion joint device characterized in that the caulking (C) treatment to the fixing anchor bolt (B). 제 5항에 있어서,The method of claim 5, 상기 제3하판(310)은 전체적으로 평활면으로 이루어지는 베이스(312)와; 상기 베이스(312)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(314)와, 상기 베이스(312)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(316)와; 상기 끼움부(316)로부터 일정한 각도로 하향으로 연장되는 연장부(318)로 구성되고,The third lower plate 310 includes a base 312 formed of a smooth surface as a whole; One side of the base 312 is a groove portion 314 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 312 is vertically extended and at the same time the fitting portion 316 is formed in the inner side Wow; Consists of the extension portion 318 extending downward from the fitting portion 316 at a predetermined angle, 상기 제3상판(320)은 전체적으로 평활면으로 이루어지는 베이스(322)와; 상기 베이스(322)의 일측은 양 갈래로 갈라짐과 동시에 그 내측에 일정한 공간이 형성되는 끼움홈(324)과; 상기 베이스(322)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(326)로 구성되며,The third upper plate 320 is a base 322 consisting of a smooth surface as a whole; One side of the base 322 is divided into two parts and at the same time the fitting groove 324 is formed a predetermined space therein; The other side of the base 322 is composed of a concave inlet 326 extending vertically and at the same time a predetermined portion of the concave inward, 상기 제3덮개판(330)은 전체적으로 평활면으로 이루어지는 베이스(332)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(334)와; 상기 베이스(332)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(336)로 구성됨을 특징으로 하는 신축이음장치.The third cover plate 330 is a base 332 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and at the same time extends horizontally, the cover portion 334 formed to be thinner; The other side of the base 332 is an expansion joint device, characterized in that it consists of a concave inlet portion 336 extending vertically and at the same time indented in a predetermined portion. 구조물(S)의 신축이음장치(A)의 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계;Arranging the slab surface F and the clearance between the expansion joints A of the structure S; 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계;Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계;Inserting a fixing anchor bolt (B) into the hole (H); 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제1하판(110)을 거치하는 단계;Installing a rubber pad (P) on the fixing anchor bolt (B), and mounting a first lower plate (110) on the rubber pad (P); 상기 제1하판(110)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제1상판(120)으로 덮고, 상기 제1상판(120)을 너트(N)로 체결하는 단계;Installing a rubber waterproof material (W) on the first lower plate (110), covering the rubber waterproof material (W) with a first upper plate (120), and fastening the first upper plate (120) with a nut (N); 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어짐을 특징으로 하는 신축이음장치 시공방법. Construction method of the expansion joint device characterized in that consisting of the step of performing a caulking (C) to the fixing anchor bolt (B). 제 7항에 있어서,The method of claim 7, wherein 상기 제1하판(110)은 전체적으로 평활면으로 이루어지는 베이스(112)와; 상기 베이스(112)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(114)와, 상기 베이스(112)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(116)로 구성되고,The first lower plate 110 and the base 112 is formed of a smooth surface as a whole; One side of the base 112 is a groove portion 114 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 112 is vertically extended and at the same time the fitting portion 116 is formed in the inner side Consisting of, 상기 제1상판(120)은 전체적으로 평활면으로 이루어지는 베이스(122)와; 상기 베이스(122)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(124)와; 상기 베이스(122)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(126)로 구성됨을 특징으로 하는 신축이음장치 시공방법. The first top plate 120 is a base 122 made of a smooth surface as a whole; One side of the base 122 is a protrusion 124 is formed to be inclined at a predetermined angle and extend horizontally; The other side of the base 122, the vertical expansion and at the same time the expansion joint device construction method characterized in that it consists of a concave inlet portion 126 is formed in a certain portion inward. 구조물(S)의 신축이음장치(A) 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계;Arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S); 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계;Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계;Inserting a fixing anchor bolt (B) into the hole (H); 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제2하판(210)을 거치하는 단계;Installing a rubber pad (P) on the fixing anchor bolt (B), and mounting a second lower plate (210) on the rubber pad (P); 상기 제2하판(210)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제2상판(220)과 제2덮개판(230)을 덮고, 상기 제2상판(220) 및 제2덮개판(230)을 너트(N)로 체결하는 단계;The rubber waterproofing material (W) is installed on the second lower plate (210), and the rubber waterproofing material (W) covers the second upper plate (220) and the second cover plate (230), and the second upper plate (220) and the first Fastening the cover plate 230 with a nut (N); 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어짐을 특징으로 하는 신축이음장치 시공방법.Construction method of the expansion joint device characterized in that consisting of the step of performing a caulking (C) to the fixing anchor bolt (B). 제 9항에 있어서,The method of claim 9, 상기 제2하판(210)은 전체적으로 평활면으로 이루어지는 베이스(212)와; 상기 베이스(212)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(214)와, 상기 베이스(212)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(216)와; 상기 끼움부(216)로부터 일정한 각도로 하향으로 연장되는 연장부(218)로 구성되고,The second lower plate 210 includes a base 212 formed of a smooth surface as a whole; One side of the base 212 is a groove portion 214 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 212 is vertically extended and the fitting portion 216 is formed inwardly at the same time Wow; Consists of an extension 218 extending downward from the fitting portion 216 at a predetermined angle, 상기 제2상판(220)은 전체적으로 평활면으로 이루어지는 베이스(222)와; 상기 베이스(222)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장 형성되는 돌출부(224)와; 상기 베이스(222)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(226)로 구성되며,The second top plate 220 is a base 222 made of a smooth surface as a whole; One side of the base 222 and the protrusion 224 is formed to extend horizontally at the same time inclined at a predetermined angle; The other side of the base 222 is composed of a concave inlet 226 extending vertically and at the same time a predetermined portion of the concave inward, 상기 제2덮개판(230)은 전체적으로 평활면으로 이루어지는 베이스(232)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(234)와; 상기 베이스(232)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(236)로 구성됨을 특징으로 하는 신축이음장치. The second cover plate 230 is a base 232 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and extends horizontally at the same time, the cover portion 234 formed to be thinner; The other side of the base 232 is an expansion joint device, characterized in that it consists of a concave inlet portion 236 extending vertically and at the same time a certain portion concave inward. 구조물(S)의 신축이음장치(A) 설치 대상인 슬래브면(F) 및 유간을 정리하는 단계;Arranging the slab surface (F) and the clearance between the expansion joint (A) installation target of the structure (S); 상기 설치 대상인 슬래브면(F)에 일정한 직경 및 깊이로 구멍(H)을 천공하고, 상기 구멍(H)에 수지(R)를 주입하는 단계;Drilling holes (H) in a predetermined diameter and depth on the slab surface (F) to be installed, and injecting resin (R) into the holes (H); 상기 구멍(H) 내에 고정용 앵커볼트(B)를 삽입하는 단계;Inserting a fixing anchor bolt (B) into the hole (H); 상기 고정용 앵커볼트(B) 상에 고무패드(P)를 설치하고, 상기 고무패드(P) 상에 제3하판(310)을 거치하는 단계;Installing a rubber pad (P) on the fixing anchor bolt (B), and mounting a third lower plate 310 on the rubber pad (P); 상기 제3하판(310)에 고무방수재(W)를 설치하고, 상기 고무방수재(W)를 제3상판(320)과 제3덮개판(330)을 덮고, 상기 제3상판(320)과 제3덮개판(330)을 너트(N)로 체결하는 단계;A rubber waterproof material (W) is installed on the third lower plate (310), and the rubber waterproof material (W) covers the third upper plate (320) and the third cover plate (330), and the third upper plate (320) and the third 3 fastening the cover plate 330 with a nut (N); 상기 고정용 앵커볼트(B)에 코킹(C)을 실시하는 단계로 이루어짐을 특징으로 하는 신축이음장치 시공방법.Construction method of the expansion joint device characterized in that consisting of the step of performing a caulking (C) to the fixing anchor bolt (B). 제 11항에 있어서,The method of claim 11, 상기 제3하판(310)은 전체적으로 평활면으로 이루어지는 베이스(312)와; 상기 베이스(312)의 일측은 그 내부로 삽입이 이루어지도록 화살촉 형상으로 형성되는 요홈부(314)와, 상기 베이스(312)의 타측은 수직으로 연장됨과 동시에 내측으로 요입 형성되는 끼움부(316)와; 상기 끼움부(316)로부터 일정한 각도로 하향으로 연장되는 연장부(318)로 구성되고,The third lower plate 310 includes a base 312 formed of a smooth surface as a whole; One side of the base 312 is a groove portion 314 formed in an arrowhead shape to be inserted into the inside, and the other side of the base 312 is vertically extended and at the same time the fitting portion 316 is formed in the inner side Wow; Consists of the extension portion 318 extending downward from the fitting portion 316 at a predetermined angle, 상기 제3상판(320)은 전체적으로 평활면으로 이루어지는 베이스(322)와; 상기 베이스(322)의 일측은 양 갈래로 갈라짐과 동시에 그 내측에 일정한 공간이 형성되는 끼움홈(324)과; 상기 베이스(322)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(326)로 구성되며,The third upper plate 320 is a base 322 consisting of a smooth surface as a whole; One side of the base 322 is divided into two parts and at the same time the fitting groove 324 is formed a predetermined space therein; The other side of the base 322 is composed of a concave inlet 326 extending vertically and at the same time a predetermined portion of the concave inward, 상기 제3덮개판(330)은 전체적으로 평활면으로 이루어지는 베이스(332)와; 상기 베이스(232)의 일측은 소정의 각도로 경사짐과 동시에 수평하게 연장되며, 두께가 얇아지도록 형성된 덮개부(334)와; 상기 베이스(332)의 타측은 수직으로 연장됨과 동시에 내측으로 일정부분 요입 형성되는 요입부(336)로 구성됨을 특징으로 하는 신축이음장치 시공방법.The third cover plate 330 is a base 332 made of a smooth surface as a whole; One side of the base 232 is inclined at a predetermined angle and at the same time extends horizontally, the cover portion 334 formed to be thinner; The other side of the base 332 extends vertically and at the same time the expansion joint device construction method characterized in that the concave inlet portion 336 is formed in a predetermined portion inwardly formed.
KR1020090078185A 2009-08-24 2009-08-24 Expansion joint and this construction technique KR101020066B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090078185A KR101020066B1 (en) 2009-08-24 2009-08-24 Expansion joint and this construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090078185A KR101020066B1 (en) 2009-08-24 2009-08-24 Expansion joint and this construction technique

Publications (2)

Publication Number Publication Date
KR20110020526A KR20110020526A (en) 2011-03-03
KR101020066B1 true KR101020066B1 (en) 2011-03-08

Family

ID=43938519

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090078185A KR101020066B1 (en) 2009-08-24 2009-08-24 Expansion joint and this construction technique

Country Status (1)

Country Link
KR (1) KR101020066B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101164449B1 (en) 2012-04-04 2012-07-18 (주) 태평양지질 Non - slip expansion joint structure for bridge
KR101486487B1 (en) 2013-07-16 2015-01-23 (주)에스알디코리아 The bridge that prevevtion of corrosion of the supporting beam is possible

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317004B (en) * 2015-11-27 2017-08-11 齐一鸣 Detachable attaching type caulking gum band bridge extension joint
CN106968170B (en) * 2017-05-20 2018-10-09 衡水中铁建工程橡胶有限责任公司 A kind of rubber waterproof band quick change method of bridge expanssion joint
CN108360374A (en) * 2018-03-05 2018-08-03 尚德建设集团有限公司 A kind of water-tight device being suitable for repairing Existing Railway Line bridge expanssion joint
CN111827105A (en) * 2020-07-29 2020-10-27 中国铁路设计集团有限公司 Combined type bridge expansion joint device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020000281A (en) * 2000-06-22 2002-01-05 박중길 Bridge expansion joint and repairing method for using the same
KR20020000943A (en) * 2000-06-22 2002-01-09 박중길 Bridge expansion joint and repairing method for using the same
KR200435657Y1 (en) 2005-08-29 2007-02-06 박민철 Railway expansion joint with leak stop
JP2009019369A (en) 2007-07-10 2009-01-29 Eko Japan Kk Expansion gap water leakage prevention device in railway viaduct

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020000281A (en) * 2000-06-22 2002-01-05 박중길 Bridge expansion joint and repairing method for using the same
KR20020000943A (en) * 2000-06-22 2002-01-09 박중길 Bridge expansion joint and repairing method for using the same
KR200435657Y1 (en) 2005-08-29 2007-02-06 박민철 Railway expansion joint with leak stop
JP2009019369A (en) 2007-07-10 2009-01-29 Eko Japan Kk Expansion gap water leakage prevention device in railway viaduct

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101164449B1 (en) 2012-04-04 2012-07-18 (주) 태평양지질 Non - slip expansion joint structure for bridge
KR101486487B1 (en) 2013-07-16 2015-01-23 (주)에스알디코리아 The bridge that prevevtion of corrosion of the supporting beam is possible

Also Published As

Publication number Publication date
KR20110020526A (en) 2011-03-03

Similar Documents

Publication Publication Date Title
KR101020066B1 (en) Expansion joint and this construction technique
CN101611198A (en) The cap assemblies that is used for structural element
KR101236191B1 (en) Expansion joint for connecting slabs of a bridge structure and repairing method for using the same
KR102039092B1 (en) Expansion joint for reinforcing post-placing concrete and method therefor
KR101184606B1 (en) Concrete ballast rail accepting dusproof pad having improved structure
KR102253508B1 (en) Expansion joint apparatus
KR102356049B1 (en) Expansion joints for bridge
KR100736858B1 (en) Expansion jointing apparatus with drainpipe for a bridge and construction method thereof
JP5274940B2 (en) Reinforcing method for embankment and embankment on its back
KR100657172B1 (en) Soundproofing tunnel for bridge
KR200184750Y1 (en) A expansion joint apparatus of bridge
CN109554960A (en) A kind of road bed board elastic limit device and its installation method
KR102167032B1 (en) Bridge support for easy replacement
KR200442631Y1 (en) Rail connecting device for concrete ballast track capable of tight installation of prop member
KR20050011830A (en) Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge and old bridge and construction method thereof
KR100718297B1 (en) A pillar support apparatus for guardrail
EP3612677B1 (en) System for fastening a rail, methods for producing a fastening and a support system for a rail and use of a rail fastening system
KR20020005251A (en) Anchor bolt
KR100808444B1 (en) Expansion jointing apparatus for a bridge and it's construction method thereof
KR102000437B1 (en) Bridge support with easily maintenance and installation
RU196901U1 (en) Rail fastener
KR200418599Y1 (en) Elastomeric bearing
KR200398418Y1 (en) Expansion jointing apparatus with drainpipe for a bridge
KR101323239B1 (en) Girder and construction method for bridge using the same
JP6364210B2 (en) Bridge pier reinforcement structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140303

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150303

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170203

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180220

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20200302

Year of fee payment: 10