KR100995857B1 KR1020100066165A KR20100066165A KR100995857B1 KR 100995857 B1 KR100995857 B1 KR 100995857B1 KR 1020100066165 A KR1020100066165 A KR 1020100066165A KR 20100066165 A KR20100066165 A KR 20100066165A KR 100995857 B1 KR100995857 B1 KR 100995857B1
Authority
KR
South Korea
Prior art keywords
bridge
support
supporting member
temporary
handrail
Prior art date
Application number
KR1020100066165A
Other languages
Korean (ko)
Inventor
이호건
허당
Original Assignee
동방엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동방엔지니어링 주식회사 filed Critical 동방엔지니어링 주식회사
Priority to KR1020100066165A priority Critical patent/KR100995857B1/en
Application granted granted Critical
Publication of KR100995857B1 publication Critical patent/KR100995857B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Abstract

PURPOSE: A support member of a temporary footway for a bridge is provided to reduce the time for construction of a temporary footway and to prevent the sagging of the temporary footway caused by bending stress. CONSTITUTION: A support member of a temporary footway for a bridge comprises a body with open bottom. The body includes a front face(12), a top face(13), and two side faces(14) which are narrowed backward. A plurality of support pieces(15) with support holes(15a) are arranged at regular intervals inside the body. Connection holes(12a) are formed on the front face of the body to be aligned with a center line passing through the support holes. Fastening steel bars(16) are inserted from handrail protrusions(2) of a bridge to pass through the connection holes and the support holes, and supporters and fastening nuts are coupled to the threaded ends of the fastening steel bars.

Description

교량용 가설인도의 받침부재{Support material of construction sidewalk for bridge}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001]

본 발명은 교량용 가설인도에 관한 것으로서, 좀더 상세하게는 차량만이 통행할 수 있도록 된 교량에 있어, 교량의 폭 방향 양측에 보행자가 지나다닐 수 있도록 구축되는 가설인도의 받침부재를 개선하여 보다 빠른 시공은 물론, 시공에 따른 가설인도의 휨응력에 의한 처짐발생을 방지하여 가설인도의 안전성을 높일 수 있도록 한 교량용 가설인도의 받침부재에 관한 것이다.
The present invention relates to a temporary construction guide for a bridge, and more particularly, in a bridge that only a vehicle can pass, by improving a supporting member of a temporary guide that is constructed to allow a pedestrian to pass on both sides of the bridge in a width direction. The present invention relates to a supporting member of a temporary construction guide for a bridge that can enhance the safety of the construction guide by preventing sagging caused by bending stress of the construction guide according to construction.

주지하는 바와 같이 교량(bridge)이라 함은 물이나 어떤 곳의 위로 건너다니도록 만든 시설물을 의미하는 것으로서, 설치하고자 하는 환경이나 특성 및 용도에 따라 다양한 공법에 의해 시공된다.As is known, a bridge refers to a facility made to cross over water or a place, and is constructed by various construction methods depending on the environment, characteristics, and uses to be installed.

현재, 건설되어 사용되고 있는 교량은 다수의 교각, 상판, 교좌 및 난간 등으로 구성되며, 상기 교량은 차량의 통행뿐만 아니라, 일반 보행자의 통행을 위한 인도가 함께 설치되기도 한다. 이러한 교량에 설치되는 인도는 별도의 방법에 의행 설치되는 것이 아니라, 단순히 차량통행을 위한 차도의 가장자리, 즉 교량상판의 가장자리를 난간 등으로 구획시켜 이를 인도로 사용하고 있다.Currently, a bridge that is being constructed and used is composed of a plurality of bridges, decks, bridges and railings, the bridge is not only the traffic of the vehicle, but also the sidewalk for the passage of general pedestrians are installed together. The sidewalks installed on these bridges are not installed by a separate method, but are simply used as sidewalks by dividing the edge of the roadway for vehicle traffic, that is, the edge of the bridge deck with a railing.

특히, 차량만이 통행 가능하도록 시공된 교량에는 보행을 위한 인도를 설치하여야 하는데, 별도로 보행자를 위한 교량을 설치하는 경우 별도로 보행을 위한 교량을 다시 설치해야 하나 이는 현실적이지 못하고, 설치에 따른 과다한 비용과 비효In particular, a bridge for pedestrians should be provided with pedestrian sidewalks. If a separate pedestrian bridge is installed, the pedestrian bridge must be reinstalled separately. And ineffective

율적인 문제로 인해 현재 시행되고 있지 않은 실정이다.Due to the problem of the law, it is not currently implemented.

그렇다고 하여, 인도설치를 위해 기존에 설치된 교량에서 차도 일부분을 인도로 확보한다면 기존에 설치된 교량에서는 인도가 차지하는 면적만큼의 차도 폭이 좁아지게 되므로 차량의 원활한 소통을 방해할 뿐만 아니라, 보행자 통로의 폭이 좁아 이는 더더욱 비현실적이라 하겠다. However, if a part of the roadway is secured as a sidewalk in the existing bridge for the sidewalk installation, the roadway will be narrowed by the area occupied by the sidewalk in the existing bridge, which not only prevents the smooth communication of vehicles but also the width of the pedestrian aisle. This narrowness is even more unrealistic.

따라서 이러한 문제점을 해결하기 위해서 기존의 교량에 인도를 가설하게 된다.Therefore, in order to solve this problem, the construction of the existing bridges is made.

이러한 교량용 가설인도는 한국등록특허 제 10-0597654 호(발명의 명칭 : 차량용 교량에 설치된 인도 및 그 설치방법) 및 한국등록실용신안 제 20-0397448 호 (고안의 명칭 : 인도가 없는 교량에 가설되는 인도)가 개시된바 있으며 이는 도 1과도 2에 개시되었다.Such construction of the temporary construction for bridges is Korean Registered Patent No. 10-0597654 (Invention name: India installed on a vehicle bridge and its installation method) and Korea Utility Model Model No. 20-0397448 (Proposed name: Hypothesis on a bridge without guidance) Is disclosed in FIGS. 1 and 2.

그러나 도 1에 개시된 한국등록특허 제 10-0597654 호의 경우에는 보행자의 보호의 목적은 달성했다고 볼 수 있으나, 가설인도(100)는 교각의 상단부 일부위를 감싸는 고정체(101), 상기 고정체(101)와 프레임(103)을 연결하는 연결체(104), 프레임(103), 브라켓(104)을 시공하는 등 그 시공이 복잡하고, 시공비용이 과다하고, 시공기간이 길어 이상의 문제점을 실질적으로 극복했다고 보기 어렵다. However, in the case of Korean Patent Registration No. 10-0597654 disclosed in FIG. 1, it can be seen that the purpose of protection of pedestrians has been achieved. The construction is complicated, such as constructing the connecting body 104, the frame 103, the bracket 104 connecting the 101 and the frame 103, the construction cost is excessive, and the construction period is long. It is hard to see that you have overcome it.

또한 도 2에 개시된 한국등록실용신안 제 20-0397448 호의 가설인도(200)의 설치구조를 살피면, 브라켓(201)의 구조가 I빔(Ibeam)브라켓 보다 안정성 및 경제성이 떨어지며, 보행자 보호 난간(202)이 끼움 형식으로 되어 있어 견고함이 부족하고, 보도용 발판의 경우 평행 플레이트(203)만으로 되어 있어 장기간 사용시 휨응력에 의한 처짐이 발생할 우려가 있다.In addition, if you look at the installation structure of the provisional guide 200 of the Korean Utility Model Registration No. 20-0397448 disclosed in Figure 2, the structure of the bracket 201 is less stable and economical than the I beam bracket, pedestrian protective railing (202) ), It is in the form of fitting, and lacks in firmness, and in the case of the sidewalk scaffolding, there is only a parallel plate 203, which may cause sagging due to bending stress when used for a long time.

따라서 보행자를 위한 인도의 설치에 있어, 시공자로서 경제적인 부담과, 교량의 안정성 및 시공의 어려움이 여전히 존재하고 있으며 또한 보행자 보호의 근본적인 문제점이 여전히 남아 있다.
Therefore, in the installation of sidewalks for pedestrians, the economic burden as a contractor, the stability of the bridge and the difficulty of construction still exist, and the fundamental problems of pedestrian protection remain.

본 발명은 상기와 같이 제반되는 종래의 문제점을 해결하기 위하여 발명한 것으로, 차량만이 통행할 수 있도록 된 교량에 있어, 교량의 폭 방향 양측에 보행자가 지나다닐 수 있도록 구축되는 가설인도를 개선하여 보다 빠른 시공은 물론, 시공에 따른 가설인도의 휨응력에 의한 처짐발생을 방지하여 가설인도의 안전성을 높일 수 있는 교량용 가설인도 받침부재를 제공하는데 그 목적이 있다.
The present invention was invented to solve the conventional problems as described above, in the bridge that only the vehicle can pass, by improving the hypothesis guidance that is built so that pedestrians can pass on both sides of the bridge in the width direction It is an object of the present invention to provide a temporary inductor supporting member for bridges that can increase the safety of the induction by preventing the occurrence of deflection due to the bending stress of the induction of construction.

상기 목적을 달성하기 위한 본 발명에 의하면, 교량의 폭방향 양측의 난간턱으로부터 보행자의 통행을 위해 받침보강대, 받침보강대 상부에 설치되는 발판, 난간을 포함하여 가설되는 교량용 가설인도의 받침부재에 있어서,According to the present invention for achieving the above object, a support reinforcement for the construction of the bridge, including a scaffold reinforcement, a scaffold installed on top of the reinforcement reinforcement for the passage of pedestrians from the handrails on both sides of the bridge in the width direction of the bridge, In

상기 받침부재는 몸체의 하부는 개방되고, 몸체의 직각되는 전면과 상면의 양 측면은 전방측에서 후방으로 갈수록 좁아지는 형태로 이루어지되, 상기 몸체의 내측에는 지지공이 복수개 형성된 지지편이 다수개 일정간격으로 배열되는 한편, 상기 몸체의 전면에는 지지공이 형성된 중심선상과 일치되는 연결공이 형성되고, 상기 각각의 지지편의 지지공 및 전면측 연결공과 함께 교량의 폭 방향 양측의 난간턱에 단부측에 나사산이 형성된 체결강봉이 관통되어 나사산의 단부로부터 지지구 및 체결너트로서 고정 설치되는 것을 특징으로 한다.The support member has a lower portion of the body is open, both sides of the front and the upper surface perpendicular to the body is made in the form of narrowing from the front side to the rear, the inner side of the body a plurality of support pieces formed a plurality of support holes at a predetermined interval A connecting hole is formed on the front surface of the body so as to be coincident with a center line formed with a supporting hole, and a thread is formed on the end side of the railing jaw on both sides in the width direction of the bridge together with the supporting hole and the front- And the formed fastening bar is passed through and fixedly installed from the end of the thread as a retaining nut and a retaining nut.

또한, 본 발명에 따른 상기 체결강봉이 관통되는 지지편 사이에는 몸체의 내구성과 몸체의 처짐방지를 위한 콘크리트제가 투입되어 경화처리되는 것을 특징으로 한다.In addition, between the support pieces through which the fastening steel bar according to the present invention is characterized in that the concrete is added to the hardening treatment to prevent the durability of the body and sagging of the body.

또한, 본 발명에 따른 상기 난간턱으로부터 지지구 및 체결너트의 고정된 부위는 경화제로서 경화/은폐처리되어 지지되는 것을 특징으로 한다.
In addition, the fixed portion of the support and the fastening nut from the balustrade according to the present invention is characterized in that it is supported by a curing / concealing treatment as a curing agent.

본 발명에 따른 교량용 가설인도는 교량의 난간턱에 형성한 각각의 결합공에 받침부재에 고정 설치한 체결강봉의 단부를 안내 관통시켜 받침부재를 난간턱에 밀착시킨 상태에서 난간턱의 반대측편에서는 돌출된 채결강봉의 단부로부터 지지구를 안내시킨 다음 체결너트를 조여 긴장상태로 받침부재를 간단히 결합시켜 줌으로써, 우선적으로 가설인도를 시공하기 위한 기초적인 받침부재의 공사기간이 매우 짧은 혜택이 부여되고, 교량의 도로측으로부터 차량이나 열차의 통행에 지장을 주지 않는 작업성이 매우 뛰어나며, 상기와 같이 설치된 받침부재의 전면은 난간턱으로부터 밀착됨과 동시에 내부에 콘크리트제로서 지지편에 의해 체결강봉을 지지하는 형태로서 받침부재의 내구성을 높임과 동시에, 난간턱으로부터 받침부재의 처짐을 방지할 수 있어 받침부재상으로부터 설치되는 받침보강대, 발판, 난간의 원활한 후 설치작업이 용이한 효과가 있다.
Bridge construction guide according to the present invention guides through the end of the fastening steel bar fixed to the support member in each coupling hole formed in the railing jaw of the bridge to guide the member in close contact with the handrail jaw in the state Guides the support from the end of the projected steel bar, and then tightens the fastening nut to simply combine the supporting member in tension, giving preferentially short construction period of the basic supporting member for constructing the temporary guide. It is excellent in workability that does not interfere with the traffic of the vehicle or train from the road side of the bridge, and the front surface of the supporting member installed as above is in close contact with the handrail jaw and the fastening steel bar is made of concrete inside the support piece. As a supporting form, it is possible to increase the durability of the supporting member and to prevent the supporting member from sagging from the handrail jaw. There is an effect that the installation work is easy after the support reinforcement, scaffolding, railings installed from the support member.

도 1은 종래기술의 가설인도의 설치상태를 보여주는 교량의 측면도,
도 2는 종래기술의 가설인도의 또 다른 설치 예를 보여주는 사시도,
도 3은 본 발명인 가설인도용 받침부재를 도시한 저면 사시도,
도 4 내지 7은 본 발명에 따른 가설인도용 받침부재의 제작상태를 단계적으로 도시한 단면도,
도 8는 도 7에서의 받침부재상에 받침보강대를 배치한 상태를 도시한 횡단면도,
도 9는 본 발명인 받침부재가 교량에 설치되어 가설인도를 구축한 상태를 도시한 단면도이다.
1 is a side view of a bridge showing a state of installation of a hypothetical delivery of the prior art,
Figure 2 is a perspective view showing another installation example of the hypothesis India of the prior art,
Figure 3 is a bottom perspective view of the present invention, the hypothesis guide member,
4 to 7 is a cross-sectional view showing a manufacturing state of the hypothesis guide member according to the invention step by step,
FIG. 8 is a cross-sectional view showing a state where a supporting reinforcing bar is disposed on the supporting member in FIG. 7; FIG.
9 is a cross-sectional view showing a state in which the base member is installed on the bridge to build a temporary delivery.

이하 본 발명을 첨부된 도면을 참조하여 더욱 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

본 발명은, 교량(1)의 폭방향 양측의 난간턱(2)으로부터 보행자의 통행을 위해 받침보강대(3), 받침보강대(3) 상부에 설치되는 발판(4), 난간(5)을 포함하여 가설되는 교량용 가설인도의 받침부재(10)에 있어서,The present invention includes a scaffold reinforcement (3), a footrest (4) provided on the support reinforcement (3), a handrail (5) for the passage of pedestrians from the handrail jaws (2) on both sides in the width direction of the bridge (1). In a supporting member (10) of a pantograph for a bridge,

상기 받침부재(10)는 몸체(11)의 하부는 개방되고, 몸체(11)의 직각되는 전면(12)과 상면(13)의 양 측면(14)은 전방측에서 후방으로 갈수록 좁아지는 형태로 이루어지되, 상기 몸체(11)의 내측에는 지지공(15a)이 복수개 형성된 지지편(15)이 다수개 일정간격으로 배열되는 한편, 상기 몸체(11)의 전면(12)에는 지지공(15a)이 형성된 중심선상과 일치되는 연결공(12a)이 형성되고, 상기 각각의 지지편(15)의 지지공(15a) 및 전면(12)측 연결공(12a)과 함께 교량(1)의 폭 방향 양측의 난간턱(2)으로부터는 단부측에 나사산(16a)이 형성된 체결강봉(16)이 관통되어 나사산(16a)의 단부로부터 지지구(17) 및 체결너트(18)로서 고정 설치된다.The supporting member 10 has a lower portion of the body 11 is opened, and both sides 14 of the front surface 12 and the upper surface 13 which are perpendicular to the body 11 are narrowed from the front side to the rear side. Although the support piece 15 having a plurality of support holes 15a is arranged inside the body 11, a plurality of support pieces 15 are arranged at regular intervals, while the support hole 15a is provided on the front surface 12 of the body 11. The connection hole 12a which is matched with the formed center line is formed, and the width direction of the bridge 1 together with the support hole 15a and the front surface 12 side connection hole 12a of each support piece 15. A fastening steel bar 16 having a threaded portion 16a formed thereon penetrates from the handrail jaw 2 on both sides, and is fixedly installed as a supporter 17 and a fastening nut 18 from an end portion of the threaded portion 16a.

상기 나사산(16a)이 형성된 체결강봉(16)의 또다른 단부측에는 육각머리부와 플랜지부가 형성되어 지지편(15) 중 마지막에 배치된 지지편측 지지공(15a)에 걸려 지지되도록 한 구조이다.The other end side of the fastening steel bar 16 is formed with a screw thread (16a) has a hexagonal head portion and a flange portion is formed so as to be supported by the support piece side support hole 15a disposed at the end of the support piece (15).

상기 체결강봉(16)이 관통되는 지지편(15) 사이에는 몸체(11)의 내구성과 몸체(11)의 처짐방지를 위한 콘크리트제(C)가 투입되어 경화처리된다. 상기 콘크리트제(C)는 받침부재(10)를 뒤집어 놓은 상태에서 작업되는 것으로, 이는 첨부된 도 6에서와 같이 각 지지편 사이에 채워지고, 각 배열된 지지편(15)의 단부 또한 콘크리트제(C)에 의해 은폐되는 형태로 채워져셔 경화처리된 것이다.Between the support pieces 15 through which the fastening steel bar 16 penetrates and hardens concrete material C for preventing durability of the body 11 and sagging of the body 11. The concrete (C) is to work in a state in which the support member 10 upside down, which is filled between each support piece as shown in Figure 6 attached, the end of each arranged support piece 15 is also made of concrete (C), and is hardened.

한편, 교량(1)을 이루는 양측의 난간턱(2)에는 결합공(2a)가 받침부재의 시공간격에 맞게 천공시켜 형성되는 것으로, 상기 결합공(2a) 내에는 받침부재(10)와의 결합 지지에 따른 보강을 위해 보강파이프(도면에서 생략함)를 더 설치하여 체결강봉이 보강파이프를 관통하는 타입으로 설치되어도 좋다.On the other hand, the coupling holes 2a are formed in the rail jaws 2 on both sides of the bridge 1 in such a manner as to fit the spacing of the receiving members. In the coupling holes 2a, A reinforcement pipe (not shown in the figure) may be further provided to reinforce the reinforcement according to the support so that the fastening steel bar penetrates through the reinforcement pipe.

한편, 상기 난간턱(2)으로부터 지지구(17) 및 체결너트(18)의 고정된 부위는 경화제(M)로서 경화/은폐처리되어 지지되도록 함이 바람직하다. 상기 경화제는 모르타르 혹은 우레탄 계열의 수지의 경화성 조성물로서 사용되며, 한정하지 않는 범위에서는 모두 가능할 것이다. 이와 같은 경화제의 시공처리는 체결너트(18)의 풀림방지와 외부로부터의 부식에 의한 손상을 고려한 것이다.On the other hand, the fixed portion of the support 17 and the fastening nut 18 from the handrail jaw (2) is preferably hardened / concealed as a curing agent (M) to be supported. The above-mentioned curing agent is used as a curable composition of mortar or urethane-based resin, and can be used in a range not limited thereto. The application of such a hardening agent takes into account the prevention of loosening of the fastening nut 18 and the damage caused by corrosion from the outside.

이와 같이 구성된 본 발명인 가설인도용 받침부재는 현장조립을 목적으로 생산지에서 체결강봉(16) 및 콘크리트제(C)가 각각의 지지편(15) 부위에 경화완료된 상태로 현장까지 운반되어 시공된다.The construction of the present invention is a temporary supporting member configured as described above is carried to the site in the production site for the purpose of on-site assembly, the fastening steel bar 16 and the concrete (C) is hardened to the respective support piece 15 site.

각각의 받침부재(10)는 현장에서 크레인 이용으로 교량(1)의 난간턱(2)으로부터 이동시키고, 난간턱(2)에 마련한 결합공(2a)에 일치시켜 받침부재(10)로부터 돌출된 체결강봉(16)의 나사산(16a)을 관통한 다음 난간턱(2)의 반대측으로 관통된 체결강봉(16)에 지지구(17)를 안내시킨 다음 나사산(16a)에 체결너트(18)로서 체결함으로써, 본 발명의 가설인도용 받침부재(10)는 교량(1)의 난간턱(2)으로부터 간단히 설치된다.Each supporting member 10 is moved from the railing jaw 2 of the bridge 1 by using a crane in the field and is brought into contact with the engaging hole 2a provided in the railing jaw 2, The supporter 17 is guided to the fastening steel bar 16 which penetrates the thread 16a of the fastening steel bar 16 and then penetrates to the opposite side of the handrail jaw 2, and then as the fastening nut 18 to the thread 16a. The forged support member 10 of the present invention is simply installed from the railing jaw 2 of the bridge 1. [

설치된 받침부재(10)의 고정은 몸체(11)를 이루는 전면(12)이 난간턱(2)의 외측면과 밀착된 상태이면서 몸체(11)의 내측 지지편에 채워져 경화된 콘크리트제(C)는 상기 난간턱(2)과 밀접된 받침부재(10)의 특히 전면(12)과 상면(13), 측면(14)을 고르게 보강하는 효과와 동시에 무게중심이 하부방향으로 향하면서 더욱더 난간턱(2)에 밀착된다.The fixing of the supporting member 10 installed is made of concrete (C) hardened by filling the inner support piece of the body 11 while the front surface 12 forming the body 11 is in close contact with the outer surface of the handrail jaw 2. In particular the front face 12 and the upper face 13 and the side face 14 of the receiving member 10 in close contact with the railing jaw 2 and at the same time the center of gravity is directed downward, Close to 2).

상기와 같은 시공 이후 난간턱(2)으로부터 고정된 지지구(17) 및 체결너트(18)는 경화제로서 은폐처리되어 체결너트(18)의 풀림 및 부식을 방지할 수 있게 된다.After the construction as described above, the fixed support 17 and the fastening nut 18 fixed from the handrail jaw 2 are hidden as a hardening agent to prevent the fastening nut 18 from being loosened and corroded.

상기와 같이 받침부재(10)의 고정설치에 따라 첨부된 도 9에서와 같이 향후 그 상부에 설치되는 받침보강대(3), 발판(4) 및 난간(5)을 설치함으로써, 가설인도를 구축하게 된다.According to the fixed installation of the supporting member 10 as described above, by installing the supporting reinforcing bar (3), the footrest (4) and the handrail (5) which will be installed in the upper portion in the future, to build a temporary guide do.

가설인도를 구성하는 받침부재(10)의 설치과정에서도 크게 교량으로부터 통행하는 차량(자동차, 열차)의 통행에 크게 영향을 주지 않고서도 작업할 수 있다.Even in the installation process of the supporting member 10 constituting the temporary delivery, it is possible to work without significantly affecting the traffic of vehicles (cars, trains) that pass from the bridge.

상기와 같이 받침부재(10)를 포함하는 주변 구성물의 시공으로서 교량으로부터 가설된 가설인도의 하중은 전반적으로 교량(1)의 난간턱(2)에 밀착된 부위에 분산되는 형태가 되므로 실질적으로 상기 체결강봉(16)을 고정하는 체결너트(18)에는 그 하중이 크게 작용하지 않는 범위에서 가설인도를 최적으로 구축할 수 있게 된다. As the construction of the peripheral component including the support member 10 as described above, the load of the hypothesis guided from the bridge is generally distributed to the portion in close contact with the handrail jaw 2 of the bridge (1). It is possible to optimally construct the fastening nut 18 for fastening the fastening steel bar 16 within a range in which the load does not act largely.

상기와 같은 받침부재(10)는 가설인도의 시공에 따른 공사기간을 줄이고, 가설인도의 안전성을 높일 수 있게 된다.
The supporting member 10 as described above can reduce the construction period according to the construction of the provisional delivery, it is possible to increase the safety of the provisional delivery.

10: 받침부재 11: 몸체
12: 전면 12a: 연결공
13: 상면 14: 측면
15: 지지편 15a: 지지공
16: 체결강봉 16a: 나사산
17: 지지구 18: 체결너트
C: 콘크리트제 M: 경화제
10: support member 11: body
12: front 12a: connector
13: top 14: side
15: support piece 15a: support hole
16: fastening bar 16a: thread
17: Supporting tool 18: Tightening nut
C: concrete M: hardener

Claims (3)

교량(1)의 폭방향 양측의 난간턱(2)으로부터 보행자의 통행을 위해 받침보강대(3), 받침보강대(3) 상부에 설치되는 발판(4), 난간(5)을 포함하여 가설되는 교량용 가설인도의 받침부재(10)에 있어서,
상기 받침부재(10)는 몸체(11)의 하부는 개방되고, 몸체(11)의 직각되는 전면(12)과 상면(13)의 양 측면(14)은 전방측에서 후방으로 갈수록 좁아지는 형태로 이루어지되, 상기 몸체(11)의 내측에는 지지공(15a)이 복수개 형성된 지지편(15)이 다수개 일정간격으로 배열되는 한편, 상기 몸체(11)의 전면(12)에는 지지공(15a)이 형성된 중심선상과 일치되는 연결공(12a)이 형성되고, 상기 각각의 지지편(15)의 지지공(15a) 및 전면(12)측 연결공(12a)과 함께 교량(1)의 폭 방향 양측의 난간턱(2)으로부터는 단부측에 나사산(16a)이 형성된 체결강봉(16)이 관통되어 나사산(16a)의 단부로부터 지지구(17) 및 체결너트(18)로서 고정 설치되는 것을 특징으로 하는 교량용 가설인도의 받침부재.
A bridge that is constructed including a footrest (3), a footrest (4) and a handrail (5) installed above the footrest (3), the footrest (3) for the passage of pedestrians from the handrail jaws (2) on both sides in the width direction of the bridge (1). In the supporting member 10 of the temporary construction guide,
The supporting member 10 has a lower portion of the body 11 is opened, and both sides 14 of the front surface 12 and the upper surface 13 which are perpendicular to the body 11 are narrowed from the front side to the rear side. Although the support piece 15 having a plurality of support holes 15a is arranged inside the body 11, a plurality of support pieces 15 are arranged at regular intervals, while the support hole 15a is provided on the front surface 12 of the body 11. The connection hole 12a which is matched with the formed center line is formed, and the width direction of the bridge 1 together with the support hole 15a and the front surface 12 side connection hole 12a of each support piece 15. From the handrail jaw 2 on both sides, a fastening steel bar 16 having a threaded portion 16a formed thereon penetrates and fixedly installed as a supporter 17 and a fastening nut 18 from an end portion of the threaded portion 16a. Supporting member of temporary construction for bridge.
제1항에 있어서, 상기 체결강봉(16)이 관통되는 지지편(15) 사이에는 몸체(11)의 내구성과 몸체(11)의 처짐방지를 위한 콘크리트제(C)가 투입되어 경화처리되는 것을 특징으로 하는 교량용 가설인도의 받침부재.The method of claim 1, wherein between the support piece 15 through which the fastening steel bar 16 is penetrated into the concrete (C) for the durability of the body 11 and the sagging of the body 11 is put into a curing process Supporting member of the temporary construction India for the bridge. 제1항에 있어서, 상기 난간턱(2)으로부터 지지구(17) 및 체결너트(18)의 고정된 부위는 경화제(M)로서 경화/은폐처리되어 지지되는 것을 특징으로 하는 교량용 가설인도의 받침부재.2. The bridge for a bridge according to claim 1, characterized in that the fixed portions of the support (17) and the clamping nut (18) from the railing jaw (2) are cured / Support member.
KR1020100066165A 2010-07-09 2010-07-09 Support material of construction sidewalk for bridge KR100995857B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100066165A KR100995857B1 (en) 2010-07-09 2010-07-09 Support material of construction sidewalk for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100066165A KR100995857B1 (en) 2010-07-09 2010-07-09 Support material of construction sidewalk for bridge

Publications (1)

Publication Number Publication Date
KR100995857B1 true KR100995857B1 (en) 2010-11-22

Family

ID=43409978

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100066165A KR100995857B1 (en) 2010-07-09 2010-07-09 Support material of construction sidewalk for bridge

Country Status (1)

Country Link
KR (1) KR100995857B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101101209B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for bridge using precast supporter and the method thereof
KR101101204B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for steel box bridge using steel supporter and the method thereof
KR101618746B1 (en) * 2015-03-23 2016-05-10 주식회사 태하 Prefabricated girder structure of a sidewalk enlargement installation
KR20190137496A (en) * 2018-06-01 2019-12-11 주식회사 우리이엔씨 Sidewalk structure for bridge with vibration damping assembly
CN111270606A (en) * 2020-02-11 2020-06-12 山东省交通规划设计院有限公司 Connecting structure of assembled steel bridge floor concrete anti-collision guardrail and complete construction method thereof
KR102250041B1 (en) * 2020-04-28 2021-05-10 주식회사 케이블브릿지 Cantilever type plank road system with filling type double tube and construction method thereof
KR102410461B1 (en) * 2022-03-07 2022-06-22 (주)한맥기술 Cantilever structure for bridge

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200397448Y1 (en) 2005-07-19 2005-10-04 김상희 To bridge for vehicles that there is no sidewalk construction done sidewalk
KR100918828B1 (en) 2009-04-20 2009-09-25 (주)신화금속 A constructed foodway for bridge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200397448Y1 (en) 2005-07-19 2005-10-04 김상희 To bridge for vehicles that there is no sidewalk construction done sidewalk
KR100918828B1 (en) 2009-04-20 2009-09-25 (주)신화금속 A constructed foodway for bridge

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101101209B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for bridge using precast supporter and the method thereof
KR101101204B1 (en) * 2011-06-03 2012-01-04 (주) 효성 Cantilever of slab for steel box bridge using steel supporter and the method thereof
KR101618746B1 (en) * 2015-03-23 2016-05-10 주식회사 태하 Prefabricated girder structure of a sidewalk enlargement installation
KR20190137496A (en) * 2018-06-01 2019-12-11 주식회사 우리이엔씨 Sidewalk structure for bridge with vibration damping assembly
KR102148034B1 (en) 2018-06-01 2020-08-26 (주)우리이엔씨 Sidewalk structure for bridge with vibration damping assembly
CN111270606A (en) * 2020-02-11 2020-06-12 山东省交通规划设计院有限公司 Connecting structure of assembled steel bridge floor concrete anti-collision guardrail and complete construction method thereof
CN111270606B (en) * 2020-02-11 2022-02-25 山东省交通规划设计院集团有限公司 Connecting structure of assembled steel bridge floor concrete anti-collision guardrail and complete construction method thereof
KR102250041B1 (en) * 2020-04-28 2021-05-10 주식회사 케이블브릿지 Cantilever type plank road system with filling type double tube and construction method thereof
KR102410461B1 (en) * 2022-03-07 2022-06-22 (주)한맥기술 Cantilever structure for bridge

Similar Documents

Publication Publication Date Title
KR100995857B1 (en) Support material of construction sidewalk for bridge
KR100998631B1 (en) Sidewalk for bridge
KR100987061B1 (en) Bridge upper part structure extended structure and method
KR101271450B1 (en) Safety fence for easy control angle
KR101633431B1 (en) Expandable bridge sidewalk and it's construction method
JP2015071907A (en) Mounting structure of concrete wall railing
KR101129698B1 (en) Hanger type temporary resources for cantilever and method for construction of cantilever part of bridge using the temporary resources
JP2013036206A (en) Structure for joining precast barrier curbs to each other
CN103758024B (en) The steel structure footbridge of quickly dismantled
KR100876098B1 (en) Wood guardrail assembling structure
KR100945041B1 (en) Pavement members for bridge expansion and the bridge expansion method of construction for which this was used
KR101092151B1 (en) A green arch bridge use of arch panel
KR20180028216A (en) Checking way of Bridge
JP3697235B2 (en) Railing construction method using precast concrete railings, precast concrete railings, and fixed structures for precast concrete railings
KR200167497Y1 (en) Checking way of bridge
KR102373890B1 (en) Lug Assembly for verticality shear force of Heavy Structure
KR101185431B1 (en) A constructed footway for bridge
KR101489965B1 (en) Safety fences with easy maintenance
KR20040092254A (en) Fixation device and apparatus for mounting checking plate in a bent
KR200206699Y1 (en) Fixation Device for Mounting Checking Plate in a Bent
KR200303255Y1 (en) Rail for checking pier and fixing apparatus thereof
KR200451716Y1 (en) Pedestrian Railings Fixed on Brackets of Bridge Bridges
KR200279221Y1 (en) Hand rail
KR200463386Y1 (en) Bonding Material for a reinforcing rod safety bar
JP2003056186A5 (en)

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131118

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141117

Year of fee payment: 5