KR100976912B1 - construction method for landscape architecture and revetment - Google Patents

construction method for landscape architecture and revetment Download PDF

Info

Publication number
KR100976912B1
KR100976912B1 KR1020080052859A KR20080052859A KR100976912B1 KR 100976912 B1 KR100976912 B1 KR 100976912B1 KR 1020080052859 A KR1020080052859 A KR 1020080052859A KR 20080052859 A KR20080052859 A KR 20080052859A KR 100976912 B1 KR100976912 B1 KR 100976912B1
Authority
KR
South Korea
Prior art keywords
soil
fixing
plate
hole
fixing member
Prior art date
Application number
KR1020080052859A
Other languages
Korean (ko)
Other versions
KR20080057212A (en
Inventor
윤위석
Original Assignee
윤위석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤위석 filed Critical 윤위석
Priority to KR1020080052859A priority Critical patent/KR100976912B1/en
Publication of KR20080057212A publication Critical patent/KR20080057212A/en
Application granted granted Critical
Publication of KR100976912B1 publication Critical patent/KR100976912B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

지반을 굴착시공한 후 또는 도로의 양측 경사면을 안정화시키도록 흙자루 및 뒷채움 흙을 안정적으로 쌓음과 동시에 마감판의 작업과 조경을 동시에 할 수 있도록 한 조경 및 흙막이 축조공법에 관한 것이다.The present invention relates to a landscaping and mudstone construction method that enables the pile and backfilling soils to be stably stacked to stabilize the slopes of both sides of the road after excavation, and to simultaneously work and landscaping the finishing plate.

이 축조공법은 지반(100)에 흙자루(11)들을 상호 밀착시켜서 수평으로 쌓는 제1단계와; 상하면에 각각 복수의 돌기(21a)들이 형성되고 자유단부 양측 가장자리에 연결공(21c)이 형성되고 자유단부의 반대측에 열쇠공(21b)이 형성된 수평판(21)과 이 수평판(21)으로부터 수직으로 연장되고 그 단부 양측 가장자리에 연결공(22b)이 형성되고 그 단부 중앙에 고정공(22a)이 형성되며 외측면에 식생을 위한 배양토가 수용되는 식생선반(22c)이 형성된 수직판(22)으로 이루어지는 고정부재(20)를 준비하여서, 상기 수평판(21)의 돌기(21a)들이 흙자루(11)에 진입되도록 하여 고정부재(20)를 상기 각 흙자루(11) 상면에 고정시키는 제2단계와; 상기 인접된 수평판(21)의 연결공(21c)을 통하여 연결핀(25)을 결합시키고, 상기 인접된 수직판(22)의 연결공(22b)을 통하여 연결핀(24)을 결합시켜서, 인접된 고정부재(20)들을 상호 결합시키는 제3단계와; 상기 흙자루(11)의 배면측에 뒷채움흙(15)을 흙자루(11)의 높이로 채우는 제4단계와; 상기 고정부재(20)의 돌기(21a)에 지오그리드시트(14)의 일단을 걸어 고정시키면서 뒷채움흙(15) 상면에 지오그리드시트(14)를 설치하는 제5단계와; 상기 식생선반(22c)에 배양토를 수용시키고 식물(100)을 심어 녹화시키는 제6단계와; 상기 수직판(22)의 고정공(22a)에 고정핀(23)이 상부로 향 하도록 결합고정시키는 제7단계와; 상기 각 수평판(21)의 돌기(21a)들에 쌓아지는 흙자루(11)들 속으로 진입되도록 하여 흙자루(11)들을 쌓는 제8단계와; 상기 제8단계에서 쌓아진 흙자루(11) 상면에 상기 고정부재(20)를 올려놓되, 상기 열쇠공(21b)의 큰 구멍을 통하여 상기 고정핀(23)을 결합시키고 아래층의 고정부재(20)의 수직판(22)과 일치되도록 열쇠공(21b)의 좁은 구멍으로 고정핀(23)이 위치되도록 고정부재(20)를 밀어서 상기 흙자루(11) 상면에 올려놓는 제9단계와; 이후 상기 제3단계로부터 제9단계를 소망하는 높이에 이르기까지 반복한다.This construction method is the first step of stacking the soil sack 11 in close contact with the ground (100) horizontally; A plurality of protrusions 21a are formed on the upper and lower surfaces, respectively, and a connection plate 21c is formed at both edges of the free end, and a horizontal plate 21 on which the key hole 21b is formed on the opposite side of the free end, and perpendicular to the horizontal plate 21. Vertical plate 22 having a vegetation shelf 22c which extends to the end and a connecting hole 22b is formed at both edges of the end thereof, and a fixing hole 22a is formed at the center of the end thereof, and the culture soil for vegetation is accommodated on the outer surface thereof. By preparing a fixing member 20 made of a, so that the projections (21a) of the horizontal plate 21 to enter the soil sack 11 to fix the fixing member 20 to the upper surface of each soil stool 11 Step 2; By coupling the connecting pin 25 through the connecting hole 21c of the adjacent horizontal plate 21, by coupling the connecting pin 24 through the connecting hole 22b of the adjacent vertical plate 22, A third step of coupling adjacent fixing members 20 to each other; A fourth step of filling the backfilling soil 15 with the height of the soil sack 11 on the rear side of the soil sack 11; A fifth step of installing the geogrid sheet 14 on the upper surface of the backfilling soil 15 while fixing one end of the geogrid sheet 14 to the protrusion 21a of the fixing member 20; A sixth step of accommodating the culture soil in the vegetation shelf (22c) and planting the plant (100) for greening; A seventh step of fixing the fixing pins 23 to the fixing holes 22a of the vertical plate 22 to face upwards; An eighth step of stacking the soil sackes 11 by entering the soil stalks 11 stacked on the protrusions 21a of the horizontal plates 21; The fixing member 20 is placed on an upper surface of the dirt bag 11 accumulated in the eighth step, and the fixing pin 23 is coupled through the large hole of the key hole 21b, and the fixing member 20 of the lower layer. A ninth step of pushing the fixing member 20 so that the fixing pin 23 is positioned in the narrow hole of the key hole 21b so as to match the vertical plate 22 of the key plate 21b; Thereafter, the third to the ninth steps are repeated to the desired height.

이와 같은 축조공법은 고정부재(20)를 돌기(21a)가 형성된 수평판(21)과 이 수평판(21)과 수직된 수직판(22)으로 형성하여 흙자루(11)를 축조함으로써, 수평판(21)에 의한 상/하흙자루(11) 상호 간 연결을 안정적으로 함과 동시에 수직판(22)에 의한 외부 마감작업을 동시에 하게 하므로 공사기간을 단축시킨다.In this construction method, the fixing member 20 is formed of a horizontal plate 21 having a projection 21a and a vertical plate 22 perpendicular to the horizontal plate 21 to build the soil sack 11, thereby making it possible Stability between the upper and lower soil sack 11 by the plate 21 and at the same time to the external finishing work by the vertical plate 22 to reduce the construction period.

또한, 식생선반(22c)의 채용으로 흙막이 축조와 동시에 수직판(22) 외측에 조경작업을 동시에 할 수 있으므로 조경작업을 간편하게 하고 환경보전을 가능하게 한다.In addition, by adopting the vegetation shelf (22c) it is possible to simultaneously perform the landscaping work on the outside of the vertical plate 22 at the same time as the earthen wall construction, thereby simplifying the landscaping work and enable the environmental conservation.

흙막이, 고정부재, 지오그리드시트, 식생선반 Earthshade, Retaining Member, Geogrid Sheet, Vegetation Shelf

Description

조경 및 흙막이 축조공법{construction method for landscape architecture and revetment}Construction method and landscape architecture and revetment

도 1은 종래 흙막이 축조공법에 의해 축조된 흙막이를 나타낸 단면도,1 is a cross-sectional view showing a soil barrier constructed by a conventional soil barrier construction method,

도 2는 도 1의 요부 발췌 단면도,2 is a cross-sectional view of the main portion of Figure 1,

도 3은 도 1의 흙막이 축조 후 마감작업상태를 나타낸 사시도,Figure 3 is a perspective view showing the finishing work state after the construction of the earthenware of Figure 1,

도 4는 본 발명 축조공법에 의한 조경 및 흙막이 축조상태를 나타낸 단면도,4 is a cross-sectional view showing a landscaping and earthenware construction state by the present invention construction method;

도 5는 도 4의 요부를 발췌하여 나타낸 사시도이다.5 is a perspective view showing the main portion of Figure 4 extracted.

*도면의 주요부분에 대한 부호의 설명DESCRIPTION OF THE REFERENCE NUMERALS

11...흙자루 14...지오그리드시트11 ... sack 14 ... Geogrid sheet

15...뒷채움 흙 20...고정부재15.Backfill soil 20 ... Fix member

23...고정핀 22c...식생선반23 ... pin 22c ... vegetable shelf

본 발명은 조경 및 흙막이 축조공법에 관한 것으로서, 특히 지반을 굴착 시공한 후 또는 도로의 양측 경사면을 안정화시키도록 흙자루 및 뒷채움 흙을 안정적으로 쌓음과 동시에 마감판의 작업과 조경을 동시에 할 수 있도록 한 조경 및 흙막 이 축조공법에 관한 것이다.The present invention relates to a landscaping and earthquake construction method, and in particular to ensure that the soil pile and backfilling soil to stably stack the soil after the excavation construction or to stabilize both sides of the road, and at the same time work and landscaping of the finish plate A landscaping and mudstone are related to the construction method.

일반적으로 산업이 발달하면서 신도시의 건설이나 단지의 조성 등으로 급경사지의 개간이 불가피한 것이 현실이다.In general, as the industry develops, it is inevitable that the steep slope is inevitable due to the construction of a new town or the construction of a complex.

따라서 토지의 이용효율을 높이고 주거단지의 안정성이나 쾌적성을 확보하는 것과 동시에 시공성, 경제성 및 환경보전성을 충족할 수 있는 사면(斜面) 안정대책 공법의 확립이 요구된다.Therefore, it is necessary to establish slope stabilization measures that can improve land use efficiency, secure the stability and comfort of residential complexes, and satisfy the constructability, economic feasibility and environmental preservation.

종래에는 도 1 내지 도 3에 도시된 바와 같이, 굴착된 경사면에 흙자루(1)를 순차적으로 쌓으면서 흙자루(1)의 뒷편에 뒷채움 흙(5)을 채우고 지오그리드(geogrid)시트(4)를 개재하여 뒷채움 흙(5)의 거동을 안정적으로 하는 공법에 의해 시공된 흙막이 축조상태를 나타낸다.In the related art, as shown in FIGS. 1 to 3, the backfill soil 5 is filled on the rear side of the soil sack 1 by sequentially stacking the soil sack 1 on the excavated inclined surface and the geogrid sheet 4. Represents the earthquake construction state constructed by a method of stabilizing the behavior of the backfilling soil (5) through the.

이 축조공법은 흙자루(1)들을 상호 밀착시켜 수평으로 배열시킨 후 흙자루(1)의 높이만큼 뒷채움흙(5)을 쌓는다.This construction method is to arrange the soil sack (1) in close contact with each other horizontally and then pile up the backfilling soil (5) by the height of the soil sack (1).

이어서, 흙자루(1)의 상면에 상하면에 돌기(3a)가 형성된 연결판(3)을 올려놓은 후 지오그리드시트(4)를 열결판(3)의 돌기(3a)에 걸어서 뒷채움흙(5)의 상면에 배열시킨다.Subsequently, the connecting plate 3 having the projections 3a formed on the upper and lower surfaces of the trowel 1 is placed, and the geogrid sheet 4 is hanged on the projections 3a of the heat-treating plate 3 to backfill the soil 5. Arrange on the upper surface of.

이어서 열결판(3)의 상면에 흙자루(1)들을 올려놓은 후 뒷채움흙(5)을 채우고 열결판(3)을 상면에 올려놓고 상기와 같이 지오그리드시트(4)를 설치하는 공정을 연속적으로 행하여 축조한다.Subsequently, after placing the soil sack (1) on the top surface of the heat plate (3), filling the back filling soil (5), the heat plate (3) is placed on the top surface and the geogrid sheet (4) as described above continuously To build.

상기 열결판(3)은 상하면에 돌기(3a)들이 형성되어 상하의 흙자루(1)들이 상호 열결판(3)에 의해서 연결되는 구조를 가짐으로써 흙자루(1)들의 거동이 함께 되 도록 하여 안정적으로 축조가 가능하게 한다.The thermal plate 3 is formed by the protrusions (3a) on the upper and lower surfaces having a structure in which the upper and lower soil stalks (1) are connected by the mutual thermal plate (3) to ensure the behavior of the soil sack (1) together Construction is possible.

상기와 같이 일정높이로 흙자루(1)들을 축조한 후에는 마감공정으로서 도 3에 도시된 바와 같이 고정핀(7)이 결합된 마감판(6)을 흙자루(1)들의 외측에 고정하여 마감을 한다.After constructing the soil sack (1) to a certain height as described above by fixing the finishing plate (6) to which the fixing pin (7) is coupled to the outside of the soil sack (1) as shown in FIG. Finish.

그러나 상기와 같은 흙막이 축조공법은 흙자루(1)들의 축조와 마감판(6)의 시공을 별도로 수행함으로써 공수가 증가하여 공사기간의 단축에 불리하다. 또한, 마감판(6)의 시공시 고정핀(7)이 흙자루(1)를 관통하여 고정되도록 시공함으로써 흙자루(1)의 손상이 발생되고, 각 마감판(6)을 흙자루(1)에 고정시킬 때 이미 고정된 마감판(6)과 상호 밀착되도록 고정시키기 위하여는 흙자루(1) 표면에 긴 고정핀(7)의 초기 고정위치를 정확히 잡아야 하는 숙련된 기술을 요한다.However, the earthquake construction method as described above is disadvantageous to shorten the construction period by increasing the number of maneuver by performing the construction of the soil yard (1) and the construction of the finishing plate (6) separately. In addition, the construction of the finishing plate (6) is fixed so that the fixing pin (7) penetrates through the soil yard (1) by the construction of damage to the soil yard (1) is generated, each finishing plate (6) In order to secure the close contact with the already fixed finishing plate (6) when fastening to)) requires a skilled technique to accurately hold the initial fixing position of the long fixing pin (7) on the surface of the soil (1).

따라서 비숙련자가 시공을 하게 되는 경우 마감판(6)과 마감판(6) 사이에 틈새가 발생되어 마감판에 의한 마감공정을 수행함에도 불구하고 외관이 미려하지 못하게 되는 문제점이 있다.Therefore, when a non-skilled person is constructing, a gap is generated between the finishing plate 6 and the finishing plate 6, but there is a problem in that the appearance is not beautiful even though the finishing process by the finishing plate is performed.

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로서, 흙자루의 축조와 동시에 마감공정을 동시에 수행할 수 있으며 마감면에 틈새 발생이 최소화될 수 있도록 한 조경 및 흙막이 축조공법을 제공하는 데 그 목적이 있다.The present invention has been made to solve the above problems, it is possible to perform the finishing process at the same time as the construction of the soil sack and to provide a landscaping and earthenware construction method to minimize the occurrence of gaps on the finish surface There is a purpose.

본 발명의 다른 목적은 마감시공과 함께 마감면의 녹화를 위한 조경을 할 수 있도록 한 조경 및 흙막이 축조공법을 제공하는 데 있다.It is another object of the present invention to provide a landscaping and earthenware construction method that allows the landscaping for the greening of the finishing surface with the finishing construction.

상기 목적을 달성하는 본 발명은 흙자루와 뒷채움흙을 쌓아서 경사면을 안정화시키는 흙막이 축조공법에 있어서,In the present invention to achieve the above object in the earthwork construction method for stabilizing the inclined surface by stacking the soil sack and backfilling soil,

지반에 흙자루들을 상호 밀착시켜서 수평으로 쌓는 제1단계와;A first step of horizontally stacking soil stalks on the ground;

상하면에 각각 복수의 돌기들이 형성되고 자유단부 양측 가장자리에 연결공이 형성되고 자유단부의 반대측에 열쇠공이 형성된 수평판과 이 수평판으로부터 수직으로 연장되고 그 단부 양측 가장자리에 연결공이 형성되고 그 단부 중앙에 고정공이 형성되며 외측면에 식생을 위한 배양토가 수용되는 식생선반이 형성된 수직판으로 이루어지는 고정부재를 준비하여서, 상기 수평판의 돌기들이 흙자루에 진입되도록 하여 고정부재를 상기 각 흙자루 상면에 고정시키는 제2단계와;A plurality of protrusions are formed on the upper and lower surfaces, respectively, and a connection hole is formed at both edges of the free end, and a key plate is formed on the opposite side of the free end, and is vertically extended from the horizontal plate, and a connection hole is formed at both edges of the end thereof, and at the center of the end thereof. A fixing member is formed and a fixing member including a vertical plate on which a vegetation shelf for accommodating culture soil is formed on an outer surface thereof is prepared, and the protrusions of the horizontal plate are allowed to enter the soil sack to fix the fixing member to the top of each soil sack. Making a second step;

상기 인접된 수평판의 연결공을 통하여 "ㄷ"형상의 연결핀을 결합시키고, 상기 인접된 수직판의 연결공을 통하여 "ㄷ"형상의 연결핀을 결합시켜서, 인접된 고정부재들을 상호 결합시키는 제3단계와;Couple the connection pins of the "C" shape through the connection hole of the adjacent horizontal plate, and couple the connection pins of the "C" shape through the connection hole of the adjacent vertical plate, thereby coupling adjacent fixing members A third step;

상기 흙자루의 배면측에 뒷채움흙을 흙자루의 높이로 채우는 제4단계와;A fourth step of filling the back side of the soil bag with the height of the soil bag;

상기 고정부재의 돌기에 지오그리드시트의 일단을 걸어 고정하면서 뒷채움흙 상면에 지오그리드시트를 설치하는 제5단계와;A fifth step of installing the geogrid sheet on the top surface of the backfilling soil while fixing one end of the geogrid sheet to the protrusion of the fixing member;

상기 식생선반에 배양토를 수용시키고 식물을 심어 녹화시키는 제6단계와;A sixth step of accommodating the culture soil in the vegetation shelf and planting plants;

상기 수직판의 고정공에 고정핀이 상부로 향하도록 결합고정시키는 제7단계와;A seventh step of fixing the fixing pins to the fixing holes of the vertical plate to face upwards;

상기 각 수평판의 상면에 돌기들이 흙자루들 속으로 진입되도록 하여 흙자루들을 쌓는 제8단계와;An eighth step of stacking the soil sackes by allowing the protrusions to enter the soil stalks on the upper surface of each horizontal plate;

상기 제8단계에서 쌓아진 흙자루 상면에 상기 고정부재를 올려놓되, 상기 열쇠공의 큰구멍을 통하여 상기 고정핀을 결합시키고 아래층의 고정부재의 수직판과 일치되도록 열쇠공의 좁은 구멍으로 고정핀이 위치되도록 고정부재를 밀어서 상기 흙자루 상면에 올려놓는 제9단계와;The fixing member is placed on an upper surface of the pile of dirt piled up in the eighth step, and the fixing pin is positioned in a narrow hole of the key hole so that the fixing pin is coupled through the large hole of the key hole and coincides with the vertical plate of the fixing member of the lower layer. A ninth step of pushing the fixing member to put it on the top of the soil bag;

이후 상기 제3단계로부터 제9단계를 소망하는 높이에 이르기까지 반복하는 것을 특징으로 한다.Thereafter, the third step is repeated until the ninth step to the desired height.

상기 본 발명의 특징에 의하면, 본 발명 축조공법은 흙자루의 축조와 동시에 흙자루의 외측면을 마감하며 동시에 녹화시공을 가능하게 함으로써 공기 단축을 가능하게 한다.According to the above feature of the present invention, the construction method of the present invention enables the shortening of the air by enabling the greening construction at the same time closing the outer surface of the soil yard at the same time as the construction of the soil yard.

이하 첨부된 도면을 참조하면서 본 발명에 따른 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명 실시예의 축조공법에 의해 시공된 흙막이 축조 상태를 나타낸 도 4 및 그 요부를 나타낸 도 5를 참조하면, 이 축조공법은 절취면, 경사 굴착면, 제방 등 공사면의 안정화를 위하여 흙자루의 축조를 행함과 동시에 마감공정 및 녹화공정을 동시에 수행하여 공기단축 및 주위 환경보전성을 향상시킨다.Referring to Fig. 4 and Fig. 5 showing the main part construction of the soil membrane construction by the construction method of the embodiment of the present invention, this construction method is a soil sack for stabilization of the construction surface, such as the cut surface, inclined excavation surface, embankment, etc. Simultaneously with construction, finishing process and greening process are performed to improve air shortening and environmental protection.

본 발명 실시예의 흙막이 축조공법은 다음과 같다.Earthquake construction method of the embodiment of the present invention is as follows.

지반(100)에 흙자루(11)들을 상호 밀착시켜서 수평으로 쌓는 제1단계와;A first step of stacking the soil stalks 11 on the ground 100 to be in close contact with each other;

상하면에 각각 복수의 돌기(21a)들이 형성되고 자유단부 양측 가장자리에 연결공(21c)이 형성되고 자유단부의 반대측에 열쇠공(21b)이 형성된 수평판(21)과 이 수평판(21)으로부터 수직으로 연장되고 그 단부 양측 가장자리에 연결공(22b)이 형 성되고 그 단부 중앙에 고정공(22a)이 형성되며 외측면에 식생을 위한 배양토가 수용되는 식생선반(22c)이 형성된 수직판(22)으로 이루어지는 고정부재(20)를 준비하여서, 상기 수평판(21)의 돌기(21a)들이 흙자루(11)에 진입되도록 하여 고정부재(20)를 상기 각 흙자루(11) 상면에 고정시키는 제2단계와;A plurality of protrusions 21a are formed on the upper and lower surfaces, respectively, and a connection plate 21c is formed at both edges of the free end, and a horizontal plate 21 on which the key hole 21b is formed on the opposite side of the free end, and perpendicular to the horizontal plate 21. Vertical plate 22 having a vegetation shelf 22c which extends to the side and a connecting hole 22b is formed at both ends of the end thereof, and a fixing hole 22a is formed at the center of the end thereof, and on which the culture soil for vegetation is accommodated on the outer surface thereof. By preparing a fixing member 20 made of a), so that the projections (21a) of the horizontal plate 21 to enter the soil sack 11 to fix the fixing member 20 to the upper surface of each soil sack (11) A second step;

상기 인접된 수평판(21)의 연결공(21c)을 통하여 "ㄷ"형상의 연결핀(25)을 결합시키고, 상기 인접된 수직판(22)의 연결공(22b)을 통하여 "ㄷ"형상의 연결핀(24)을 결합시켜서, 인접된 고정부재(20)들을 상호 결합시키는 제3단계와;The connection pin 25 of the "C" shape is coupled through the connection hole 21c of the adjacent horizontal plate 21, and the "C" shape through the connection hole 22b of the adjacent vertical plate 22. Coupling the connecting pins 24 of the third step to couple the adjacent fixing members 20 to each other;

상기 흙자루(11)의 배면측에 뒷채움흙(15)을 흙자루(11)의 높이로 채우는 제4단계와;A fourth step of filling the backfilling soil 15 with the height of the soil sack 11 on the rear side of the soil sack 11;

상기 고정부재(20)의 돌기(21a)에 지오그리드시트(14)의 일단을 걸어 고정시키면서 뒷채움흙(15) 상면에 지오그리드시트(14)를 설치하는 제5단계와:A fifth step of installing the geogrid sheet 14 on the top surface of the backfilling soil 15 while fixing one end of the geogrid sheet 14 to the protrusion 21a of the fixing member 20:

상기 식생선반(22c)에 배양토를 수용시키고 식물(100)을 심어 녹화시키는 제6단계와;A sixth step of accommodating the culture soil in the vegetation shelf (22c) and planting the plant (100) for greening;

상기 수직판(22)의 고정공(22a)에 고정핀(23)이 상부로 향하도록 결합고정시키는 제7단계와;A seventh step of fixing the fixing pins 23 to the fixing holes 22a of the vertical plate 22 to face upward;

상기 각 수평판(21)의 돌기(21a)들에 쌓아지는 흙자루(11)들 속으로 진입되도록 하여 흙자루(11)들을 쌓는 제8단계와;An eighth step of stacking the soil sackes 11 by entering the soil stalks 11 stacked on the protrusions 21a of the horizontal plates 21;

상기 제8단계에서 쌓아진 흙자루(11) 상면에 상기 고정부재(20)를 올려놓되, 상기 열쇠공(21b)의 큰구멍을 통하여 상기 고정핀(23)을 결합시키고 아래층의 고정부재(20)의 수직판(22)과 일치되도록 열쇠공(21b)의 좁은 구멍으로 고정핀(23)이 위치되도록 고정부재(20)를 밀어서 상기 흙자루(11) 상면에 올려놓는 제9단계와;The fixing member 20 is placed on an upper surface of the dirt bag 11 accumulated in the eighth step, and the fixing pin 23 is coupled through the large hole of the key hole 21b, and the fixing member 20 of the lower layer. A ninth step of pushing the fixing member 20 so that the fixing pin 23 is positioned in the narrow hole of the key hole 21b so as to match the vertical plate 22 of the key plate 21b;

이후 상기 제3단계로부터 제9단계를 소망하는 높이에 이르기까지 반복한다.Thereafter, the third to the ninth steps are repeated to the desired height.

상기 공법에 있어서, 고정공(22a)에 고정핀(23)이 나사결합되도록 하였으며, 연결핀(21c)(24)들은 인접하는 고정부재(20)들을 간편하게 연결시킬 수 있도록 "ㄷ"형으로 형성하였다.In the above method, the fixing pin 23 is screwed to the fixing hole 22a, and the connecting pins 21c and 24 are formed in a "c" shape so that the adjacent fixing members 20 can be easily connected. It was.

상기와 같은 공법으로 조성된 흙막이 축조공법은 지오그리드시트(14)에 의해서 뒷채움흙(15)의 거동을 안정화시키고 상/하흙자루(11)들이 돌기(21a)가 형성된 고정부재(20)에 의해서 상호 연결이 안정적으로 이루어짐과 동시에 수직판(22)에 의해서 흙자루(11)의 외부 마감작업이 동시에 이루어지게 되므로 공사기간을 단축시킨다.The earthquake construction method formed by the above-described method stabilizes the behavior of the backfilling soil 15 by the geogrid sheet 14 and the upper and lower soil sackes 11 are mutually formed by the fixing member 20 in which the protrusions 21a are formed. The connection is made stable and at the same time the external finishing work of the soil sack 11 by the vertical plate 22 is made at the same time, thereby shortening the construction period.

또한, 수직판(22)의 외측에 식생선반(22c)을 형성하여서 흙자루(11)의 축조와 함께 식물(100)을 심음으로써 조경작업을 하여 환경보전에도 유리하다. 또한, 고정핀(23)이 결합되는 것으로서 열쇠형상의 열쇠공(21b)을 형성시킴으로써, 고정핀(23)을 열쇠공(21b)의 넓은 구멍을 통하여 결합시킴으로써 결합작업을 간편하게 할 수 있게 한다.In addition, by forming the vegetation shelf (22c) on the outside of the vertical plate 22, planting the plant 100 together with the construction of the soil sack 11, it is advantageous to environmental conservation by the landscaping work. In addition, by forming the key hole 21b of the key shape as the fixing pin 23 is coupled, it is possible to simplify the coupling operation by coupling the fixing pin 23 through a wide hole of the key hole 21b.

또한, 고정핀(23)에 의해서 상하 고정부재(20)들의 수직판(22)들이 동일평면상에 위치될 수 있도록 하여 작업을 편리하게 한다.In addition, the vertical pins 22 of the upper and lower fixing members 20 may be positioned on the same plane by the fixing pins 23 to facilitate the operation.

상술한 바와 같은 본 발명은 다음과 같은 이점을 가진다.The present invention as described above has the following advantages.

첫째, 고정부재(20)를 돌기(21a)가 형성된 수평판(21)과 이 수평판(21)과 수 직된 수직판(22)으로 형성하여 흙자루(11)를 축조함으로써, 수평판(21)에 의한 상/하흙자루(11) 상호 간 연결을 안정적으로 함과 동시에 수직판(22)에 의한 외부 마감작업을 동시에 하게 하므로 공사기간을 단축시킨다.First, the fixing member 20 is formed of a horizontal plate 21 having a protrusion 21a and a vertical plate 22 perpendicular to the horizontal plate 21 to construct the soil sack 11, thereby forming the horizontal plate 21. The upper and lower soil sack (11) by the mutual stability and at the same time the external finishing work by the vertical plate 22 at the same time to shorten the construction period.

둘째, 연결핀(24)(25)에 의해서 인접하는 고정부재(20) 상호 간의 연결상태를 안정적으로 유지시킨다.Secondly, the connection pins 24 and 25 maintain a stable connection state between adjacent fixing members 20.

셋째, 고정핀(23)과 열쇠공(21b)에 의해서 상/하 고정부재(20)의 수직판(22)들을 동일 평면상에 간편하게 위치시킬 수 있으므로 비숙련자라도 수직판(22)에 의한 마감작업을 간편하게 한다.Third, since the vertical plate 22 of the upper and lower fixing member 20 can be easily positioned on the same plane by the fixing pin 23 and the key hole 21b, even the unskilled person finishes the finishing work by the vertical plate 22. Simplify

넷째, 식생선반(22c)의 채용으로 흙막이 축조와 동시에 수직판(22) 외측에 조경작업을 동시에 할 수 있으므로 조경작업을 간편하게 하고 환경보전을 가능하게 한다.Fourth, by adopting the vegetation shelf (22c) can be carried out at the same time the landscaping work on the outside of the vertical plate (22) at the same time as the earthen masonry to simplify the landscaping work and to enable environmental conservation.

Claims (1)

흙자루와 뒷채움흙을 쌓아서 경사면을 안정화시키는 흙막이 축조공법에 있어서,In the earthenware construction method to stabilize the slope by stacking the soil sack and backfilling soil, 지반(100)에 흙자루(11)들을 상호 밀착시켜서 수평으로 쌓는 제1단계와:The first step of stacking the soil sack (11) in close contact with the ground (100) horizontally and: 상하면에 각각 복수의 돌기(21a)들이 형성되고 자유단부 양측 가장자리에 연결공(21c)이 형성되고 자유단부의 반대측에 열쇠공(21b)이 형성된 수평판(21)과 이 수평판(21)으로부터 수직으로 연장되고 그 단부 양측 가장자리에 연결공(22b)이 형성되고 그 단부 중앙에 고정공(22a)이 형성되며 외측면에 식생을 위한 배양토가 수용되는 식생선반(22c)이 형성된 수직판(22)으로 이루어지는 고정부재(20)를 준비하여서, 상기 수평판(21)의 돌기(21a)들이 흙자루(11)에 진입되도록 하여 고정부재(20)를 상기 각 흙자루(11) 상면에 고정시키는 제2단계와;A plurality of protrusions 21a are formed on the upper and lower surfaces, respectively, and a connection plate 21c is formed at both edges of the free end, and a horizontal plate 21 on which the key hole 21b is formed on the opposite side of the free end, and perpendicular to the horizontal plate 21. Vertical plate 22 having a vegetation shelf 22c which extends to the end and a connecting hole 22b is formed at both edges of the end thereof, and a fixing hole 22a is formed at the center of the end thereof, and the culture soil for vegetation is accommodated on the outer surface thereof. By preparing a fixing member 20 made of a, so that the projections (21a) of the horizontal plate 21 to enter the soil sack 11 to fix the fixing member 20 to the upper surface of each soil stool 11 Step 2; 상기 인접된 수평판(21)의 연결공(21c)을 통하여 "ㄷ"형상의 연결핀(25)을 결합시키고, 상기 인접된 수직판(22)의 연결공(22b)을 통하여 "ㄷ"형상의 연결핀(24)을 결합시켜서, 인접된 고정부재(20)들을 상호 결합시키는 제3단계와:The connection pin 25 of the "C" shape is coupled through the connection hole 21c of the adjacent horizontal plate 21, and the "C" shape through the connection hole 22b of the adjacent vertical plate 22. By coupling the connecting pin 24 of the third step of coupling the adjacent fixing members 20 with each other: 상기 흙자루(11)의 배면측에 뒷채움흙(15)을 흙자루(11)의 높이로 채우는 제4단계와;A fourth step of filling the backfilling soil 15 with the height of the soil sack 11 on the rear side of the soil sack 11; 상기 고정부재(20)의 돌기(21a)에 지오그리드시트(14)의 일단을 걸어 고정시키면서 뒷채움흙(15) 상면에 지오그리드시트(14)를 설치하는 제5단계와;A fifth step of installing the geogrid sheet 14 on the upper surface of the backfilling soil 15 while fixing one end of the geogrid sheet 14 to the protrusion 21a of the fixing member 20; 상기 식생선반(22c)에 배양토를 수용시키고 식물(100)을 심어 녹화시키는 제 6단계와;A sixth step of accommodating the culture soil in the vegetation shelf (22c) and planting the plant (100) for greening; 상기 수직판(22)의 고정공(22a)에 고정핀(23)이 상부로 향하도록 결합고정시키는 제7단계와;A seventh step of fixing the fixing pins 23 to the fixing holes 22a of the vertical plate 22 to face upward; 상기 각 수평판(21)의 상면에 돌기(21a)들이 흙자루(11)들 속으로 진입되도록 하여 흙자루(11)들을 쌓는 제8단계와;An eighth step of stacking the soil sackes 11 by allowing the projections 21a to enter the soil stalks 11 on the upper surface of each horizontal plate 21; 상기 제8단계에서 쌓아진 흙자루(11) 상면에 상기 고정부재(20)를 올려놓되, 상기 열쇠공(21b)의 큰구멍을 통하여 상기 고정핀(23)을 결합시키고 아래층의 고정부재(20)의 수직판(22)과 일치되도록 열쇠공(21b)의 좁은 구멍으로 고정핀(23)이 위치되도록 고정부재(20)를 밀어서 상기 흙자루(11) 상면에 올려놓는 제9단계와;The fixing member 20 is placed on an upper surface of the dirt bag 11 accumulated in the eighth step, and the fixing pin 23 is coupled through the large hole of the key hole 21b, and the fixing member 20 of the lower layer. A ninth step of pushing the fixing member 20 so that the fixing pin 23 is positioned in the narrow hole of the key hole 21b so as to match the vertical plate 22 of the key plate 21b; 이후 상기 제3단계로부터 제9단계를 소망하는 높이에 이르기까지 반복하는 것을 특징으로 하는 조경 및 흙막이 축조공법.The landscaping and earthquake construction method, characterized in that to repeat the third step to the desired height after the third step.
KR1020080052859A 2008-06-03 2008-06-03 construction method for landscape architecture and revetment KR100976912B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080052859A KR100976912B1 (en) 2008-06-03 2008-06-03 construction method for landscape architecture and revetment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080052859A KR100976912B1 (en) 2008-06-03 2008-06-03 construction method for landscape architecture and revetment

Publications (2)

Publication Number Publication Date
KR20080057212A KR20080057212A (en) 2008-06-24
KR100976912B1 true KR100976912B1 (en) 2010-08-18

Family

ID=39803129

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080052859A KR100976912B1 (en) 2008-06-03 2008-06-03 construction method for landscape architecture and revetment

Country Status (1)

Country Link
KR (1) KR100976912B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101974552B1 (en) * 2017-02-02 2019-05-02 안학현 Slope supporting structures

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100350625B1 (en) 2000-01-17 2002-08-30 (주) 경화엔지니어링 Reinforced Earth Retaining-Wall for using Sand-Bag
KR20040052702A (en) * 2004-04-28 2004-06-23 합명회사 남부산업 Block for revetment construction
KR200407940Y1 (en) 2005-11-04 2006-02-07 김윤희 Vegetated retaining structures

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100350625B1 (en) 2000-01-17 2002-08-30 (주) 경화엔지니어링 Reinforced Earth Retaining-Wall for using Sand-Bag
KR20040052702A (en) * 2004-04-28 2004-06-23 합명회사 남부산업 Block for revetment construction
KR200407940Y1 (en) 2005-11-04 2006-02-07 김윤희 Vegetated retaining structures

Also Published As

Publication number Publication date
KR20080057212A (en) 2008-06-24

Similar Documents

Publication Publication Date Title
KR101162548B1 (en) Reinforcement gabion for afforestation environment and construction method
KR100976912B1 (en) construction method for landscape architecture and revetment
KR20100092836A (en) Plantable block and a plantable retaining wall construction method which uses the plantable block
KR100402843B1 (en) Afforestation Retaining-Wall laying Concrete-block
KR101088477B1 (en) Multi retaining wall block applicable various stiffener and retaining wall constructing method using this
KR20150095154A (en) the revetment of prefabricated panel
JP2005133402A (en) Construction method of foundation or retaining wall
KR20160109206A (en) A gabion
KR100393515B1 (en) Afforestation Retaining-Wall laying Concrete-block
KR100794221B1 (en) Retaining wall for planting
KR100536304B1 (en) Vegetation revetment structures and method constructing blocktype revetment using the same
KR100694874B1 (en) Revetment block
KR200405616Y1 (en) Ecology block
KR200235107Y1 (en) Afforestation Retaining-Wall laying Concrete-block
KR100601126B1 (en) Anchoring structure of afforestation Retaining-Wall
KR100680246B1 (en) Afforestation retaining-wall
KR200446445Y1 (en) Block for plants
KR100665600B1 (en) Block for reinforced earth retaining wall
KR200409796Y1 (en) Afforestation retaining-wall
JP3724306B2 (en) Legal block
KR200345934Y1 (en) Anchoring structure of afforestation Retaining-Wall
KR100940339B1 (en) Reinforced retainaing wall easily constructed and constructing method thereof
KR20060110913A (en) Method for manufacturing retaining wall and retaining wall manufactured thereof
JP2729911B2 (en) Retaining wall construction method and retaining wall block
JPH10252086A (en) Plantable retaining-wall block

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131112

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140807

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150812

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170512

Year of fee payment: 7

R401 Registration of restoration
LAPS Lapse due to unpaid annual fee