KR200409796Y1 - Afforestation retaining-wall - Google Patents

Afforestation retaining-wall Download PDF

Info

Publication number
KR200409796Y1
KR200409796Y1 KR2020050033219U KR20050033219U KR200409796Y1 KR 200409796 Y1 KR200409796 Y1 KR 200409796Y1 KR 2020050033219 U KR2020050033219 U KR 2020050033219U KR 20050033219 U KR20050033219 U KR 20050033219U KR 200409796 Y1 KR200409796 Y1 KR 200409796Y1
Authority
KR
South Korea
Prior art keywords
shelf
anchor
fixing channel
retaining wall
blocks
Prior art date
Application number
KR2020050033219U
Other languages
Korean (ko)
Inventor
황용연
Original Assignee
(주)종합건축사 사무소 담
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)종합건축사 사무소 담 filed Critical (주)종합건축사 사무소 담
Priority to KR2020050033219U priority Critical patent/KR200409796Y1/en
Application granted granted Critical
Publication of KR200409796Y1 publication Critical patent/KR200409796Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

본 고안은 앵커타이와 연결된 H빔의 일정높이마다 선반블록들을 거치하여서, 구조적인 안정성을 확보하는 동시에 선반블록들의 층 사이로 노출되는 토사채움부를 통해 식물의 생육환경을 조성하여 주는 녹화 옹벽에 관한 것이다.The present invention relates to a greening retaining wall that mounts shelf blocks at a certain height of an H-beam connected to an anchor tie, and secures structural stability and creates a growing environment of plants through soil filling parts exposed between layers of shelf blocks. .

본 고안은 플랜지(11)가 전면을 향하면서 절토면(100)의 기초지반부(200)에 하부가 박혀 일정간격을 두고 세워지는 다수의 H빔(10)과; 상기 H빔(10)의 웨브(12)를 사이에 두고 양측으로 부착되는 1쌍이 상기 H빔(10)의 종방향을 따라 다수열 배치되는 브래킷(20)들과; 상호 마주보는 상기 브래킷(20)들에 양측단부가 얹혀져 지지되는 다수의 선반블록(30)과; 정착수단을 통해 일측단부가 상기 H빔(10)에 고정되면서 타측단부가 상기 절토면(100) 후부의 지반 깊숙이 근입되는 다수의 앵커타이(40)와; 상기 선반블록(30)들의 배면과 상부에 채워 넣은 토사채움부(60)로 구성되어서; H빔(10)과 연결된 앵커타이(40)를 통해 주동토압에 대응하고, 상하로 이웃하는 상기 선반블록(30)들의 층 사이로 노출되는 토사채움부(60)를 통해 식생이 이루어지도록 한 것을 특징으로 하는 H빔과 선반블록을 이용한 녹화 옹벽을 제공한다.The present invention has a plurality of H-beams (10) which are built at a predetermined interval by the lower portion is embedded in the base ground portion 200 of the cut surface 100 while the flange 11 faces the front; A pair of brackets 20 arranged in a plurality of rows along the longitudinal direction of the H beam 10 with one pair attached to both sides with the web 12 of the H beam 10 interposed therebetween; A plurality of shelf blocks 30 on which both ends are mounted on the brackets 20 facing each other; A plurality of anchor ties 40 having one side end fixed to the H beam 10 through a fixing unit, and the other end ending deep into the ground behind the cut surface 100; Consists of the soil filling portion (60) filled in the back and the top of the shelf block (30); Corresponding to the main earth pressure through the anchor tie 40 connected to the H-beam 10, characterized in that the vegetation is made through the soil filling portion 60 exposed between the layers of the shelf block 30 neighboring up and down It provides a greening retaining wall using an H beam and a shelf block.

비탈면, 절토면, 사면안정, 녹화 옹벽, 전면벽, 선반블록, 식재, 식생 Slope, cut surface, slope stability, green retaining wall, front wall, shelf block, planting, vegetation

Description

H빔과 선반블록을 이용한 녹화 옹벽{Afforestation retaining-wall}Greening retaining wall using H-beams and shelf blocks {Afforestation retaining-wall}

도1a는 선행기술에 따른 블록식 녹화 옹벽의 시공상태 측면도Figure 1a is a side view of the construction state of the block-type greening retaining wall according to the prior art

도1b는 선행기술에 따른 블록식 녹화 옹벽의 적층예를 보여주는 사시도1B is a perspective view showing an example of lamination of a block-type greening retaining wall according to the prior art;

도2는 본 고안에 의한 녹화 옹벽의 시공상태 측면도Figure 2 is a side view of the construction state of the greening retaining wall according to the present invention

도3은 본 고안에 의한 녹화 옹벽의 설치예를 보여주기 위한 분리 사시도Figure 3 is an exploded perspective view showing an installation example of the greening retaining wall according to the present invention

도4는 본 고안에 따른 앵커타이와 H빔의 결합상태 측단면도Figure 4 is a side cross-sectional view of the coupling state of the anchor tie and the H beam according to the present invention

도5a 및 도5b는 본 고안에 따른 H빔과 선반블록의 결합상태 측단면도 및 정면도5a and 5b is a side cross-sectional view and front view of the coupled state of the H-beam and the shelf block according to the present invention

도6은 본 고안에 따른 선반블록의 일 실시예를 보여주는 평면도Figure 6 is a plan view showing an embodiment of a shelf block according to the present invention

도7은 본 고안에 따른 선반블록의 다른 실시예를 보여주는 평면도7 is a plan view showing another embodiment of a shelf block according to the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10:H빔 11:플랜지 12:웨브10: H beam 11: flange 12: web

20:브래킷 30:선반블록 31:돌출부20: bracket 30: shelf block 31: protrusion

32:홈부 40:앵커타이 41:로드부32: groove portion 40: anchor tie 41: rod portion

42:정착체 43:정착너트 51:앵커정착용 채널42: fixing body 43: fixing nut 51: anchor fixing channel

51a:양측면판 51b:후면판 51c:체결구멍51a: Both sides plate 51b: Back plate 51c: Fastening hole

52d:요철부 52:H빔고정용 채널 52a:양측면판52d: Uneven portion 52: H beam fixing channel 52a: Both side plates

52b:전면판 52c:하면판 52d:체결구멍52b: Front plate 52c: Bottom plate 52d: Tightening hole

52f:요철부 53:부식방지제 54:덮개판52f: Uneven part 53: Corrosion inhibitor 54: Cover plate

55:쐐기판 60:토사채움부 70:측구55: wedge board 60: earth and sand filling part 70: side mouth

100:절토면 200:기초지반부 B:볼트100: cutting surface 200: foundation ground part B: bolt

N:너트N: Nut

본 고안은 절토부의 지반붕괴를 방지하기 위해 축조되는 옹벽에 관한 것으로, 특히 앵커타이에 의해 지지되는 H빔들을 절토부 전면에 배치하고 그 H빔의 일정높이마다 선반블록들을 거치하여서, 구조적인 안정성을 확보하는 동시에 상하로 이웃하는 선반블록들의 층 사이로 노출되는 토사채움부를 통해 식물의 생육환경을 조성하여 줌으로써, 환경친화적인 토목구조물을 구현하기 위한 H빔과 선반블록을 이용한 녹화 옹벽에 관한 것이다.The present invention relates to a retaining wall that is constructed to prevent ground collapse of the cut portion. In particular, the H beams supported by the anchor tie are disposed in front of the cut portion, and the shelf blocks are mounted at predetermined heights of the H beam to provide structural stability. The present invention relates to greening retaining walls using H-beams and shelf blocks to realize environmentally friendly civil structures by creating a growing environment of plants through soil filling parts exposed between layers of neighboring shelf blocks up and down at the same time.

우리나라의 경우 도로·철도의 사면, 공원지역의 비탈면이나 하천제방, 해안도로 등의 옹벽을 공사함에 있어서, 토양안정과 경사면보호라는 측면을 최우선으로 중요시하여 전면 전체를 철근콘크리트 구조물이나 콘크리트제 블록 또는 콘크리트제 패널로 마감한 옹벽이 주류를 이루고 있다.In Korea, when constructing retaining walls such as roads and rail slopes, slopes of park areas, river banks, and coastal roads, priority is placed on the stability of the soil and the protection of the slopes. Retaining walls made of concrete panels are the mainstream.

상기와 같이 콘크리트면으로 전면벽 전체를 마감하고 있는 옹벽은 주변 자연환경과 전혀 조화되지 않는 회색빛 외관을 제공하여 도회경관을 크게 해치고 있으며, 원래의 자연 생태계와는 이질적이어서 식물이나 미생물, 소동물 등의 자연 생태환경을 악화시키는 요인이 되고 있다.As mentioned above, the retaining wall, which finishes the entire front wall with a concrete surface, greatly damages the urban landscape by providing a grayish appearance that is not at all in harmony with the surrounding natural environment. It is a factor that worsens the natural ecological environment.

또한, 콘크리트면으로 된 전면벽 배수를 위해 배수구멍을 뚫어 놓고 자갈 등으로 뒤채움공사를 실시하고는 있으나, 배수가 원활히 이루어지지 못하여서 수압에 의해 붕괴될 위험성이 상존하는 등 구조적인 안정성을 확보하는데 큰 어려움이 있었다.In addition, although the drainage hole is drilled for the drainage of the front wall made of concrete and backfilled with gravel, the drainage is not made smoothly, and there is a risk of collapse due to water pressure. There was a great difficulty.

최근에 이르러 상기한 바와 같은 환경문제를 심각하게 인식하고, 환경친화적인 도회경관에 대한 사람들의 욕구가 높아지면서, 식생을 도입하여 자연생태환경을 조성시켜 주는 옹벽공사가 활발하게 시도되고 있다.In recent years, as the above-mentioned environmental problems are seriously recognized and people's desire for environment-friendly urban landscapes is increasing, retaining wall construction that introduces vegetation to create a natural ecological environment has been actively attempted.

최근 식생을 도입한 옹벽 중 하나로 국내 실용신안등록번호 20-235108호(원출원 특허 2001-0016446호)와 같은 블록식 녹화 옹벽이 개시된 바 있다.Recently, a block-type greening retaining wall, such as Korean Utility Model Registration No. 20-235108 (Original Application 2001-0016446), has been disclosed as one of the retaining walls into which vegetation is introduced.

이 선행기술에 의한 블록식 녹화 옹벽은 도1a 및 도1b의 도시와 같이, 기초 콘크리트부(1)의 상부에 가로방향으로 긴 선반블록(2)들과, 앞부분에 가로방향 접속홈(3)이 형성된 앵커블록(4)들을 단계적으로 쌓아 전면벽을 형성하면서 적층되는 블록들의 배면에 뒤채움 작업을 실시하여서 옹벽을 축조하며, 상기 앵커블록(4)이 상하로 적층되어지는 각 열마다의 후부에는 기초 지반에 하부가 박히면서 설계되어진 전면벽의 경사도를 따라 상부로 솟아오르는 강제 H빔(5)을 설치하고, 상기 앵커블록(4)들의 배면을 상기 H빔(5)의 전면에 맞댄 상태에서 상기 H빔(5)에 볼트(6)·너트(7)로 연결하여 지지시킨 것을 특징으로 하는 기술구성을 제공하고 있다.As shown in Figs. 1A and 1B, the block-type greening retaining wall according to the prior art has shelving blocks 2 extending in the horizontal direction on the upper part of the foundation concrete part 1, and the horizontal connecting grooves 3 in the front part. The retaining walls are constructed by backfilling the formed anchor blocks 4 stepwise to form the front wall and backfilling the stacked blocks, and the rear part of each row in which the anchor blocks 4 are stacked up and down. In the base is installed a forced H-beam (5) that rises to the top along the inclination of the front wall designed while the lower part is embedded in the base, and the back of the anchor block (4) to the front of the H-beam (5) The technical configuration is characterized in that the H beam 5 is connected to and supported by a bolt 6 and a nut 7.

이와 같은 블록식 녹화 옹벽은 뒤채움 토사가 상하층 선반블록(2)들의 사이로 노출되며, 이 뒤채움 토사의 노출부분을 통해 식물이 생육할 수 있는 환경을 제공함으로써, 환경 친화적인 토목구조물을 구현하고 있다.The block-type greening retaining wall is exposed to the backfill soil between the upper and lower shelf blocks, and provides an environment where plants can grow through the exposed portion of the backfill soil, thereby realizing environmentally friendly civil engineering structures. Doing.

그러나, 상기와 같은 선행기술에 의한 블록식 녹화 옹벽은 앵커블록의 형태가 복잡하여 제작이 까다롭고 제작비용이 높은 단점이 있다.However, the block-type greening retaining wall according to the prior art as described above has a disadvantage in that the shape of the anchor block is complicated and the manufacturing is difficult and the manufacturing cost is high.

그리고, 앵커블록과 H빔을 연결하여 고정시키는 작업이 번거롭고 난해하여 시공성이 떨어지고 공기가 길며, 공사비용이 과다하게 소요되는 문제점이 있었다.In addition, the work of fixing the anchor block and the H-beams is cumbersome and difficult, resulting in poor workability, long air, and excessive construction cost.

또한, H빔의 전면에 적층되는 앵커블록을 일정 층의 것마다 볼트와 너트로 H빔에 고정시키고는 있으나, 이것만에 의해서는 정착력이 부족해 구조적 안정성이 떨어지는 결함이 있었다.In addition, although anchor blocks stacked on the front of the H-beams are fixed to the H-beams with bolts and nuts for each layer, only this has a deficiency in fixing stability due to insufficient fixing ability.

또한, 앵커블록이 적층되는 열에는 뒤채움 토사가 노출되지 않기 때문에 식생 도입율에 있어서 불리한 단점이 있었다.In addition, there is a disadvantage in the vegetation introduction rate because the backfilling soil is not exposed to the heat stacking anchor block.

이에 따라, 본 고안은 상하로 이웃하는 선반블록들의 층 사이로 노출되는 토사채움부를 통해 식물의 생육환경을 조성하여 주는 녹화 옹벽을 구축하는데 있어서 상기한 선행기술이 가지는 제 문제점을 해결하기 위해 안출한 것으로, 구조가 복잡하고 시공이 까다로운 앵커블록의 사용을 배제한 구조로 개량한 것이다.Accordingly, the present invention has been devised to solve the problems of the above-described prior art in constructing the greening retaining wall for creating a growth environment of the plant through the soil filling part exposed between the layers of the neighboring shelf blocks up and down. In other words, the structure is improved by eliminating the use of anchor blocks that are complicated in structure and difficult to construct.

본 고안의 목적은 앵커타이에 의해 지지되는 H빔들을 절토부 전면에 배치하고 H빔의 일정높이마다 장착된 브래킷들에 선반블록들을 거치하여서, 시공성 및 구조적 안정성을 향상시키고 공사비용을 절감시켜 주는 H빔과 선반블록을 이용한 녹화 옹벽을 제공하는데 있다.The purpose of the present invention is to arrange the H-beams supported by the anchor tie in front of the cut portion and to mount the shelf blocks on the brackets mounted at every height of the H-beam, thereby improving workability and structural stability and reducing construction costs. To provide a greening retaining wall using the H-beams and shelf blocks.

본 고안의 다른 목적은 선반블록이 옹벽 전면 전체에 토사가 노출될 수 있도록 선반블록을 H빔의 전면까지 연장시킴으로써, 식생 도입율이 높은 녹화 옹벽을 제공하는데 있다.Another object of the present invention is to provide a green retaining wall with a high vegetation introduction rate by extending the shelf block to the front of the H-beam so that the shelf block is exposed to the entire soil wall.

상기 목적을 달성하기 위한 본 고안의 H빔과 선반블록을 이용한 녹화 옹벽은, 플랜지가 전면을 향하면서 절토면의 기초지반부에 하부가 박혀 일정간격을 두고 세워지는 다수의 H빔; 상기 H빔의 웨브를 사이에 두고 양측으로 부착되는 1쌍이 상기 H빔의 종방향을 따라 다수열 배치되는 브래킷; 평판형으로 성형되며 양측단부가 각각 상기 H빔의 전후면 플랜지 사이에 끼워져 상호 마주보는 상기 브래킷들에 양측단부가 얹혀져 지지되는 다수의 선반블록; 정착수단을 통해 일측단부가 상기 H빔에 고정되면서 타측단부가 상기 절토면 후부의 지반 깊숙이 근입되는 다수의 앵커타이; 상기 선반블록들의 배면과 상부에 채워 넣은 토사채움부;로 구성된 것을 기술구성상의 특징으로 한다.Greening retaining wall using the H-beam and the shelf block of the present invention for achieving the above object, a plurality of H-beams are built at a predetermined interval by the lower portion is embedded in the base ground of the cut surface while the flange toward the front; A bracket having a plurality of pairs arranged on both sides with the web of the H beam interposed therebetween in the longitudinal direction of the H beam; A plurality of shelf blocks formed in a plate shape and having both end portions respectively inserted between the front and rear flanges of the H beam such that both end portions are supported on the brackets facing each other; A plurality of anchor ties in which one end is fixed to the H beam through a fixing means and the other end is deeply grounded in the ground of the cut surface; Characterized in that the technical configuration consisting of; earth and sand filling portion filled in the back and the top of the shelf blocks.

위와 같은 특징적 구성으로 축조되는 본 고안에 의한 녹화옹벽은 H빔과 연결된 앵커타이를 통해 주동토압에 대응하며, 상하로 이웃하는 상기 선반블록들의 층 사이로 노출되는 토사채움부를 통해 식물의 생장이 이루어지게 한다.The greening retaining wall according to the present invention constructed with the above-mentioned characteristic configuration corresponds to the main earth pressure through the anchor tie connected with the H-beam, and the plant growth is made through the soil filling part exposed between the layers of the adjacent shelf blocks. do.

따라서, 본 고안에 의하면 선반블록이 옹벽 전면 전체에 토사가 노출될 수 있도록 선반블록을 H빔의 전면까지 연장시킴으로써, 넓은 식재공간부를 확보할 수 있어 식생 도입율이 높은 녹화 옹벽을 제공할 수 있게 되므로, 환경친화적이며 구조적으로 안정된 토목구조물을 구현하여 줄 뿐만 아니라, 공기가 적게 소요되고, 경제성이 높은 효과가 있다.Therefore, according to the present invention, the shelf block extends the shelf block to the front surface of the H beam so that the earth and sand can be exposed to the entire retaining wall front surface, thereby securing a wide planting space and providing a green retaining wall having a high vegetation introduction rate. Therefore, not only to realize environmentally friendly and structurally stable civil engineering structures, but also less air, there is a high economic effect.

이하, 본 고안의 기술구성을 본 고안의 실시예들에 의한 첨부도면을 참조하여 상세히 설명한다Hereinafter, the technical configuration of the present invention will be described in detail with reference to the accompanying drawings in accordance with embodiments of the present invention.

도1 내지 도7에는 본 고안에 따른 녹화 옹벽의 실시예를 보여주고 있으며, 이들 각 실시예에 의한 도면들에서 동일한 명칭이 부여되는 구성요소는 동일한 부호로 표시하였다.1 to 7 show an embodiment of the green retaining wall according to the present invention, in the drawings according to each of the embodiments are denoted by the same reference numerals denoted by the same reference numerals.

본 고안의 녹화옹벽은 플랜지(11)가 전면을 향하면서 절토면(100)의 기초지반부(200)에 하부가 박혀 일정간격을 두고 세워지는 다수의 H빔(10)과, 상기 H빔(10)의 웨브(12)를 사이에 두고 양측으로 부착되는 1쌍이 상기 H빔(10)의 종방향을 따라 다수열 배치되는 브래킷(20)과, 평판형으로 성형되며 양측단부가 각각 상기 H빔(10)의 전후면 플랜지(11) 사이에 끼워져 상호 마주보는 상기 브래킷(20)들에 양측단부가 얹혀져 지지되는 다수의 선반블록(30)과, 정착수단을 통해 일측단부가 상 기 H빔(10)에 고정되면서 타측단부가 상기 절토면(100) 후부의 지반 깊숙이 근입되는 다수의 앵커타이(40)와, 상기 선반블록(30)들의 배면과 상부에 채워 넣은 토사채움부(60);로 구성된다.The green retaining wall of the present invention has a plurality of H-beams 10 and the H-beams 10 which are set at regular intervals by being embedded in the base ground portion 200 of the cut surface 100 while the flange 11 faces the front surface. A pair of two pairs attached to both sides with the web 12 of the first through the web 12 is formed in a plurality of rows along the longitudinal direction of the H beam 10, and is formed in a flat plate shape, and both ends of the H beam ( A plurality of shelf blocks 30 are mounted between the front and rear flanges 11 and faced to the brackets 20 facing each other, and both side ends are supported, and one end of the H beam 10 is fixed through fixing means. A plurality of anchor ties 40 which are fixed to the other end and are deeply inserted into the ground of the cut surface 100, and the earth and sand filling portions 60 filled in the rear and upper portions of the shelf blocks 30. .

상기 H빔(10)은 흙이 무너져 내리는 것을 방지하기 위해 절토부의 전면에 일정간격으로 설치되는 구조재로서, 부식을 방지하기 위해 아연도금된 것을 사용함이 바람직하다.The H beam 10 is a structural member installed at a predetermined interval on the front of the cut portion to prevent the soil from falling down, it is preferable to use a galvanized to prevent corrosion.

상기 브래킷(20)은 삼각대 형상을 하고서 상기 H빔(10)의 전후면 플랜지(11)사이로 들어가 용착되며, 용착후 방청처리를 해서 부식을 방지한다. 이 브래킷(20)은 H빔(10)의 종방향을 따라 등간격으로 다수개 부착되는데, H빔(10)을 절토부 전면에 설치시 횡방향으로 이웃하는 것들이 동일 수평선상에 위치하도록 주의해서 설치한다.The bracket 20 has a tripod shape and enters and welds between the front and rear flanges 11 of the H beam 10, and prevents corrosion by performing rust prevention treatment after welding. A plurality of brackets 20 are attached at equal intervals along the longitudinal direction of the H beam 10. When the H beam 10 is installed at the front of the cut part, the neighbors in the transverse direction are carefully positioned on the same horizontal line. Install.

상기 선반블록(30)은 기본적으로 길이방향으로 긴 평판형태의 직육면체로 성형되며, 상호 마주하는 상기 브래킷(20)들에 양측단부가 얹혀져 지지된다.The shelf block 30 is basically formed into a rectangular parallelepiped having a long shape in the longitudinal direction, and both side ends are supported on the brackets 20 facing each other.

본 고안의 실시예에서 상기 선반블록(30)은 2가지 형태가 제시된다.In the embodiment of the present invention the shelf block 30 is presented in two forms.

그 중 하나는 도6의 도시와 같이, 양측단부에 각각 상기 H빔(10)의 전후면 플랜지(11) 사이에 알맞게 끼워지는 돌출부(31)가 형성된 것을 특징으로 한다.One of them is characterized in that, as shown in Figure 6, both side ends are formed with projections 31 are fitted between the front and rear flanges 11 of the H beam 10, respectively.

다른 하나는 도7의 도시와 같이, 양측단부에 각각 상기 H빔(10)의 전후면 플랜지(11)가 알맞게 끼워지는 홈부(32)가 형성된 것을 특징으로 한다. 이 다른 실시예에 의한 선반블록(30)은 H빔(10)의 전면까지 토사를 채울 수 있으면서 전면으로 노출되는 토사량이 증대됨으로써, 옹벽전면 전체에 걸쳐 식생을 도입시킬 수 있는 장점이 있다.The other is as shown in Fig. 7, characterized in that the grooves 32 are formed at both ends of each of the front and rear flanges 11 of the H beam 10 is fitted properly. Shelf block 30 according to this embodiment has the advantage that it is possible to fill the soil to the front of the H beam 10 while increasing the amount of soil exposed to the front, to introduce the vegetation over the entire retaining wall.

앵커타이(40)는 상기 H빔(10)을 지지하여서 주동토압에 대응하여 주는 구조재로서, 하나의 H빔(10)에 적어도 2개이상 설치함이 바람직하다. 이와 같은 앵커타이(40)는 록볼트 소일네일 등 여러 가지가 있을 수 있으나, 첨부된 도면에서의 앵커타이(40)는 강봉재로 제작된 로드부(41)와 로드부(41)의 말단부에 시멘트를 주입하여서 경화시킨 정착체(42)로 구성되며, H빔(10)과 정착수단을 통해 연결 고정된다.Anchor tie 40 is a structural member that supports the H beam 10 to correspond to the main earth pressure, it is preferable to install at least two in one H beam (10). Such anchor tie 40 may be various, such as rock bolt nail, but the anchor tie 40 in the accompanying drawings is cemented at the end of the rod portion 41 and the rod portion 41 made of steel rods It is composed of a fixing body 42 hardened by injecting, and is connected and fixed through the H beam 10 and the fixing means.

정착수단은 도3의 도시와 같이, 앵커정착용 채널(51)과 H빔고정용 채널(52)과 부식방지제(53)와 덮개판(54)으로 구성된다.As shown in Fig. 3, the fixing means is composed of an anchor fixing channel 51, an H beam fixing channel 52, a corrosion inhibitor 53 and a cover plate 54.

상기 앵커정착용 채널(51)은 양측면판(51a)과 후면판(51b)을 가지며, 상기 앵커타이(40)의 일측단부가 그 후면판(51b)을 관통하여 정착너트(43)에 의해 고정되어 후면판(51b)이 절토면(100)에 밀착·고정된다.The anchor fixing channel 51 has both side plates 51a and a back plate 51b, and one end of the anchor tie 40 is fixed by the fixing nut 43 through the back plate 51b. As a result, the back plate 51b is tightly fixed to the cut surface 100.

상기 H빔고정용 채널(52)은 양측면판(52a)과 전면판(52b) 및 하면판(52c)을 가지며 그 양측면판(52a)이 상기 앵커정착용 채널(51)의 양측면판(51a) 내측에 끼워져 볼트(B)·너트(N)로 결착되고 전면판(52b)이 상기 H빔(10)의 후면 플랜지(11)에 볼트(B)·너트(N)로 고정된다.The H-beam fixing channel 52 has both side plates 52a, a front plate 52b, and a bottom plate 52c, and both side plates 52a are both side plates 51a of the anchor fixing channel 51. It is fitted inside and is fastened by bolts B and nuts N, and the front plate 52b is fixed to the rear flange 11 of the H beam 10 by bolts B and N.

상기 앵커정착용 채널(51)의 양측면판(51a)과 H빔고정용 채널(52)의 양측면판(52a)에는 그것들을 상호 결착하는 상기 볼트(B)를 연통시키기 위한 체결구멍(51c)(52d)들이 각각 형성된다.Fastening holes 51c for communicating both side plates 51a of the anchoring channel 51 and both side plates 52a of the H-beam fixing channel 52 to communicate the bolts B that bind them to each other. 52d) are formed respectively.

본 고안의 실시예에 의한 도면에서, 상기 앵커정착용 채널(51)의 양측면판(51a)에 형성되는 체결구멍(51c)은 수평방향으로 긴 장공으로 형성하고 있으며, H빔고정용 채널(52)의 양측면판(52a)에 형성되는 체결구멍(52d)은 볼트(B)가 알맞게 끼워지는 원형으로 형성하고 있다.In the drawing according to the embodiment of the present invention, the fastening holes 51c formed in both side plates 51a of the anchor fixing channel 51 are formed in long holes in the horizontal direction, and the H beam fixing channel 52 The fastening hole 52d formed in the both side plates 52a of the () is formed in a circular shape in which the bolt B is appropriately fitted.

이와 같이 한쪽의 체결구멍(51c)을 길게 형성하는 이유는 절토면(100)이 불규칙하여 H빔(10)과 절토면(100)의 간격이 상하로 다를 경우 조절하기 위함이다.The reason for forming the one fastening hole 51c in this way is to adjust when the cut surface 100 is irregular and the gap between the H beam 10 and the cut surface 100 is vertically different.

그리고, 상기 앵커정착용 채널(51)의 양측면판(51a)의 내측면과 H빔고정용 채널(52)의 양측면판(52a)의 외측면에는 도3의 도시와 같이 상호 치합되는 요철부(51d)(52f)를 각각 형성하여서, 앵커정착용 채널(51)과 H빔고정용 채널(52)이 결합된 이후의 미끄러짐 현상을 방지한다.And, the inner surface of the both side plate 51a of the anchor fixing channel 51 and the outer surface of both side plate 52a of the H-beam fixing channel 52 as shown in FIG. 51d) and 52f are formed, respectively, to prevent the phenomenon of slipping after the anchoring channel 51 and the H beam fixing channel 52 are combined.

상기 부식방지제(53)는 앵커타이(40)의 정착부위가 부식됨을 방지하기 위한 겔상태로 된 일종의 오일로서, H빔(10)과 앵커타이(40)를 연결한 후 앵커정착용 채널(51)과 H빔고정용 채널(52)에 의해 형성되는 내측 공간부에 채워진다.The corrosion inhibitor 53 is a kind of oil in a gel state for preventing the anchoring portion of the anchor tie 40 from being corroded. The anchor fixing channel 51 connects the H beam 10 and the anchor tie 40. ) And the inner space formed by the H beam fixing channel 52.

상기 덮개판(54)은 앵커정착용 채널(51)과 H빔고정용 채널(52)의 공간부에 부식방지제(53)를 채운 후, 상기 앵커정착용 채널(51)과 H빔고정용 채널(52)의 상면에 용착하여 밀폐하는 부재이다.The cover plate 54 is filled with a corrosion inhibitor 53 in the space portion of the anchor fixing channel 51 and the H beam fixing channel 52, and then the anchor fixing channel 51 and the H beam fixing channel. It is a member which welds and seals on the upper surface of 52.

한편, 상기 H빔고정용 채널(52)의 전면판(52b)과 H빔(10)의 후면 플랜지(11)사이에는 간격조정용 쐐기판(55)이 소요두께로 여러 겹 게재될 수도 있다.On the other hand, between the front plate 52b of the H-beam fixing channel 52 and the rear flange 11 of the H-beam 10, the spacing adjustment wedge plate 55 may be placed several times as required thickness.

이 쐐기판(55)은 절토면(100)이 크게 불규칙하여 앞서 설명한 장공으로 형성된 앵커정착용 채널(51)의 체결구멍(51c)만으로 H빔(10)과 절토면(100)의 간격조절 이 불가능할 경우 유용하다.When the wedge plate 55 is largely irregular in the cut surface 100 and the distance between the H beam 10 and the cut surface 100 cannot be adjusted using only the fastening holes 51c of the anchor fixing channel 51 formed by the aforementioned long hole. useful.

토사채움부(60)는 식생기반을 제공하는 구조부로서 상기 선반블록(30)들의 배면과 상부에 채워진다.The soil filling part 60 is filled in the back and top of the shelf block 30 as a structure providing a vegetation base.

이상과 같이 구성되는 본 고안에 따른 녹화 옹벽의 시공방법을 설명하면 다음과 같다.Referring to the construction method of the greening retaining wall according to the present invention configured as described above are as follows.

a) 우선, 제작장에서 H빔(10)에 브래킷(20)들을 용접하여 부착하고, 용접부위를 방청처리하며, H빔(10)들의 후면 플랜지(11)에 앵커타이(40)가 설계된 높이에 맞춰 H빔고정용 채널(52)을 볼트(B)·너트(N)로 고정하여서 조립한다. 또한 선반블록(30)을 제작한다.a) First, at the fabrication site, the brackets 20 are attached to the H beam 10 by welding, and the welding part is rust prevented, and the anchor tie 40 is designed at the rear flange 11 of the H beams 10. In accordance with this, the H-beam fixing channel 52 is assembled by fixing with bolts B and nuts N. In addition, the shelf block 30 is manufactured.

b) 옹벽이 설치될 절토면(100)에서 H빔(10)이 설치될 열마다 앵커타이(40)를 지반 깊숙이 근입시키고, 절토면(100) 외측으로 노출된 앵커타이(40)의 말단에 앵커정착용 채널(51)을 고정하여 정착시킨다.b) Anchor tie 40 is deeply inserted into the ground at the cut surface 100 on which the retaining wall is to be installed, and the anchor tie 40 is anchored at the end of the anchor tie 40 exposed to the outside of the cut surface 100. The channel 51 is fixed and fixed.

c) 앵커타이(40)가 설치된 각 열마다에 상기 a)단계에서 조립된 H빔(10)을 소요깊이로 타입한다. 이때 H빔(10)들에 부착된 H빔고정용 채널(52)을 앵커타이(40)가 설치된 위치에 맞춘다.c) The H beam 10 assembled in the step a) is typed to the required depth for each row in which the anchor tie 40 is installed. At this time, the H beam fixing channel 52 attached to the H beams 10 is aligned to the position where the anchor tie 40 is installed.

d) 다음으로, 앵커타이(40)를 정착하고 있는 앵커정착용 채널(51)과 H빔고정용 채널(52)을 볼트(B)·너트(N)로 체결하여 고정한다. 이때, 절토면(100)이 크게 불규칙하여 장공으로 형성된 앵커정착용 채널(51)의 체결구멍(51c)을 만으로 H빔(10)과 절토면(100)의 간격조절이 불가능할 경우 H빔고정용 채널(52)의 전면판 (52b)과 H빔(10)의 후면 플랜지(11)사이에 간격조정용 쐐기판(55)을 소요두께로 여러 겹 게재한다.d) Next, the anchor fixing channel 51 in which the anchor tie 40 is fixed and the H beam fixing channel 52 are fastened by bolts B and nuts N to be fixed. At this time, when the cutting surface 100 is not very irregular and the gap between the H beam 10 and the cut surface 100 cannot be adjusted only by the fastening holes 51c of the anchor fixing channel 51 formed in the long hole, the H beam fixing channel ( Between the front plate 52b of 52) and the rear flange 11 of the H-beam 10, several intervals of the thickness adjustment wedge plate 55 are provided in the required thickness.

e) 이후, 선 제작된 선반블록(30)을 H빔(10)에 부착된 브래킷(20)들 위에 조립하면서, 선반블록(30)의 배면에 뒤채움 토사를 다져 넣으면서 선반블록(30)의 상부에 안식각을 유지하면서 토사를 쌓는다.e) Then, while assembling the prefabricated shelf block 30 on the brackets 20 attached to the H beam 10, while filling the backfilling soil on the back of the shelf block 30 of the shelf block 30 Pile up the soil while keeping the angle of repose at the top.

조립되는 선반블록(30)은 양측단부에 형성된 돌출부(31)가 H빔(10)의 전후면 플랜지(11) 사이에 끼워지거나, H빔(10)의 전후면 플랜지(11) 선반블록(30)의 홈부(32)에 끼워져 견고하게 고정된다.The shelf block 30 to be assembled is provided with protrusions 31 formed at both end portions between the front and rear flanges 11 of the H beam 10, or the front and rear flanges 11 of the H beam 10 shelf block 30. It fits in the groove part 32 of) and is firmly fixed.

이때, 선반블록(30)은 최하단층에 부착된 브래킷(20)들부터 시작하여 위로 차례차례 조립해 나가며, 1개층의 선반블록(30)을 조립한 후 뒤채움하는 작업을 설계된 옹벽 높이에 도달할 때까지 반복적으로 시행하고, 최상단층 블록들의 상부에 측구(70)를 설치하여 계획단면을 완성한다.At this time, the shelf block 30 is sequentially assembled starting from the brackets 20 attached to the lowermost layer, and after the assembly of the shelf block 30 of one layer to reach the designed retaining wall height Repeatedly until done, install the side opening 70 on top of the uppermost block blocks to complete the plan cross-section.

f) 최종적으로, 상하층 선반블록(30)들의 사이로 노출된 토사채움부(60)상에 식재작업을 시행하고 마무리하여서 옹벽의 구축을 완료한다.f) Finally, planting work is finished and finished on the soil filling part 60 exposed between the upper and lower shelf blocks 30 to complete the construction of the retaining wall.

본 고안은 이상과 같은 시공과정을 통하여 녹화 옹벽을 완성하며, 본 고안은 위에서 예시한 시공예 외에도 다양한 구조형태로 변형된 녹화 옹벽을 구현할 수 있다.The present invention completes the greening retaining wall through the construction process as described above, the present invention can implement the greening retaining wall modified in various structural forms in addition to the construction examples illustrated above.

상기와 같이 이루어지는 본 고안은, 구조가 복잡하고 시공이 까다로운 앵커 블록의 사용을 배제하고 H빔과 선반블록을 이용해 옹벽을 구축할 수 있게 됨으로써, 현장 작업이 대폭적으로 축소되므로 시공이 용이하고 신속하며 공사비용이 대폭적으로 절감되는 효과가 있다.The present invention made as described above, the construction of the retaining wall by using the H-beam and the shelf block without the use of complex and difficult construction of the anchor block, greatly reduced the field work, so the construction is easy and quick The construction cost is greatly reduced.

선반블록이 옹벽 전면 전체에 토사가 노출될 수 있도록 선반블록을 H빔의 전면까지 연장시킴으로써, 넓은 식재공간부를 확보할 수 있어 식생 도입율이 높은 녹화 옹벽을 제공할 수 있다.By extending the shelf block to the front surface of the H-beam so that the shelf block can expose the soil on the entire front surface of the retaining wall, a wide planting space can be secured, thereby providing a green retaining wall having a high vegetation introduction rate.

또한, H빔의 지지력이 지반 내부 깊숙이 정착되는 앵커타이에 의해 보강되어서, 주동토압에 강하게 대처할 수 있다.In addition, the bearing force of the H beam is reinforced by anchor tie which is settled deep inside the ground, and can cope strongly with the main earth pressure.

이상과 같이 본 고안은 환경친화적이며 구조적으로 안정된 토목구조물을 구현하여 줄 뿐만 아니라, 공기가 적게 소요되고, 경제성이 높은 매우 유용한 고안이다.As described above, the present invention not only realizes an environment-friendly and structurally stable civil structure, but also requires less air and is very useful.

Claims (3)

플랜지(11)가 전면을 향하면서 절토면(100)의 기초지반부(200)에 하부가 박혀 일정간격을 두고 세워지는 다수의 H빔(10);A plurality of H beams 10 which are fixed at regular intervals by being embedded in the base ground portion 200 of the cut surface 100 while the flange 11 faces the front; 상기 H빔(10)의 웨브(12)를 사이에 두고 양측으로 부착되는 1쌍이 상기 H빔(10)의 종방향을 따라 다수열 배치되는 브래킷(20);A bracket 20 in which a plurality of pairs of two pairs attached to both sides with the web 12 of the H beam 10 interposed therebetween are arranged along the longitudinal direction of the H beam 10; 평판형으로 성형되며 양측단부가 각각 상기 H빔(10)의 전후면 플랜지(11) 사이에 끼워져 상호 마주보는 상기 브래킷(20)들에 양측단부가 얹혀져 지지되는 다수의 선반블록(30);A plurality of shelf blocks 30 which are formed in a flat shape and whose both ends are sandwiched between the front and rear flanges 11 of the H beam 10 so that both ends of the brackets 20 face each other; 정착수단을 통해 일측단부가 상기 H빔(10)에 고정되면서 타측단부가 상기 절토면(100) 후부의 지반 깊숙이 근입되는 다수의 앵커타이(40);A plurality of anchor ties 40 having one side end fixed to the H beam 10 through a fixing means, and the other end ending deep into the ground behind the cut surface 100; 상기 선반블록(30)들의 배면과 상부에 채워 넣은 토사채움부(60);로 구성되어서, H빔(10)과 연결된 앵커타이(40)를 통해 주동토압에 대응하고, 상하로 이웃하는 상기 선반블록(30)들의 층 사이로 노출되는 토사채움부(60)를 통해 식생이 이루어지도록 한 것을 특징으로 하는 H빔과 선반블록을 이용한 녹화 옹벽.Soil filling portion 60 filled in the back and the top of the shelf blocks 30, consisting of, through the anchor tie 40 connected to the H-beam 10 corresponding to the main earth pressure, the shelf adjacent to the up and down Green retaining wall using H-beams and shelf blocks, characterized in that the vegetation is made through the soil filling portion 60 exposed between the layers of the blocks (30). 제1항에 있어서, 상기 정착수단은;According to claim 1, wherein the fixing means; 양측면판(51a)과 후면판(51b)을 가지며 상기 앵커타이(40)의 일측단부가 그 후면판(51b)을 관통하여 정착너트(43)에 의해 정착되는 앵커정착용 채널(51)과,An anchor fixing channel 51 having both side plates 51a and a back plate 51b, and one end of the anchor tie 40 penetrating the back plate 51b to be fixed by the fixing nut 43; 양측면판(52a)과 전면판(52b) 및 하면판(52c)을 가지며 그 양측면판(52a)이 상기 앵커정착용 채널(51)의 양측면판(51a) 내측에 끼워져 볼트(B)·너트(N)로 결착되고 전면판(52b)이 상기 H빔(10)의 후면 플랜지(11)에 볼트(B)·너트(N)로 고정되는 H빔고정용 채널(52)과,It has both side plates 52a, front plate 52b, and bottom plate 52c, and both side plates 52a are fitted inside both side plates 51a of the anchor fixing channel 51, so that the bolts B and nuts N) and an H-beam fixing channel 52, in which the front plate 52b is fixed to the rear flange 11 of the H-beam 10 by bolts B and nuts N, 상기 앵커정착용 채널(51)과 H빔고정용 채널(52)에 의해 형성되는 내측공간부에 채워지는 겔상태의 부식방지제(53)와,A gel corrosion inhibitor 53 filled in the inner space formed by the anchor fixing channel 51 and the H beam fixing channel 52; 상기 앵커정착용 채널(51)과 H빔고정용 채널(52)의 상면에 용착되어 밀폐하는 덮개판(54)과,A cover plate 54 which is welded to and sealed on the upper surface of the anchor fixing channel 51 and the H beam fixing channel 52; 상기 H빔고정용 채널(52)의 전면판(52b)과 H빔(10)의 후면 플랜지(11)사이에는 소요두께로 여러겹 게재되는 간격조정용 쐐기판(55)으로 구성됨을 특징으로 하는 H빔과 선반블록을 이용한 녹화 옹벽.Between the front plate (52b) of the H-beam fixing channel 52 and the rear flange (11) of the H-beam (10) is characterized in that it consists of a spacing adjustment wedge substrate (55) which is placed in multiple layers at a required thickness. Greening retaining wall using beams and shelf blocks. 제2항에 있어서, 상기 앵커정착용 채널(51)의 양측면판(51a)과 H빔고정용 채널(52)의 양측면판(52a)에는 그것들을 상호 결착하는 상기 볼트(B)를 연통시키기 위한 체결구멍(51c)(52d)들을 각각 형성하되, 그 체결구멍(51c)(51d)들 중 어느 하나는 수평방향으로 긴 장공으로 형성하고, 다른 하나는 볼트(B)가 알맞게 끼워지는 원형으로 형성한 것을 특징으로 하는 H빔과 선반블록을 이용한 녹화 옹벽.The side plate (51a) of the anchor fixing channel (51) and the side plate (52a) of the H-beam fixing channel (52) for communicating the bolt (B) for binding them mutually. Each of the fastening holes 51c and 52d is formed, one of the fastening holes 51c and 51d is formed in a long elongated hole in the horizontal direction, and the other is formed in a circular shape in which the bolt B is properly fitted. Greening retaining wall using an H-beam and a shelf block, characterized in that one.
KR2020050033219U 2005-11-24 2005-11-24 Afforestation retaining-wall KR200409796Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020050033219U KR200409796Y1 (en) 2005-11-24 2005-11-24 Afforestation retaining-wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020050033219U KR200409796Y1 (en) 2005-11-24 2005-11-24 Afforestation retaining-wall

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050112756A Division KR100680246B1 (en) 2005-11-24 2005-11-24 Afforestation retaining-wall

Publications (1)

Publication Number Publication Date
KR200409796Y1 true KR200409796Y1 (en) 2006-03-03

Family

ID=41760157

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020050033219U KR200409796Y1 (en) 2005-11-24 2005-11-24 Afforestation retaining-wall

Country Status (1)

Country Link
KR (1) KR200409796Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056760A (en) * 2018-10-10 2018-12-21 交通运输部科学研究院 A kind of slope protection and afforestation equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056760A (en) * 2018-10-10 2018-12-21 交通运输部科学研究院 A kind of slope protection and afforestation equipment

Similar Documents

Publication Publication Date Title
US6371699B1 (en) Anchored retaining wall system
US20080145153A1 (en) Barrier Wall Made of Sheet-Pile Components
US5505563A (en) Cellular structures for sustaining walls
IE55044B1 (en) Wall structure and method of construction
CN210104786U (en) Road shoulder retaining component capable of greening
US5356242A (en) System and method for adjustably connecting wall facing panels to the soldier beams of a tie-back or anchored wall
CN111622234B (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
KR100402843B1 (en) Afforestation Retaining-Wall laying Concrete-block
KR100393515B1 (en) Afforestation Retaining-Wall laying Concrete-block
KR200409796Y1 (en) Afforestation retaining-wall
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
KR100680246B1 (en) Afforestation retaining-wall
KR100750703B1 (en) A vegetation block and a method for constructing the cut ground using
KR100467234B1 (en) Retaining wall and its construction method of steel panel
CN210086289U (en) Reinforced embankment earth retaining member capable of greening
KR100601126B1 (en) Anchoring structure of afforestation Retaining-Wall
KR200235108Y1 (en) Afforestation Retaining-Wall laying Concrete-block
KR200345934Y1 (en) Anchoring structure of afforestation Retaining-Wall
KR100827783B1 (en) Retaining wall using blocks and constructing method thereof
RU176405U1 (en) SUPPORT WALL UNIT
KR100794221B1 (en) Retaining wall for planting
KR200235107Y1 (en) Afforestation Retaining-Wall laying Concrete-block
CN216739731U (en) Retaining wall structure
CN216075224U (en) High-drop assembled green retaining wall structure
RU2281997C2 (en) Injection pile and retaining wall built of pile foundation

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
EXTG Extinguishment