KR100952182B1 - 탄성 교좌장치의 설치방법 - Google Patents
탄성 교좌장치의 설치방법 Download PDFInfo
- Publication number
- KR100952182B1 KR100952182B1 KR1020090006079A KR20090006079A KR100952182B1 KR 100952182 B1 KR100952182 B1 KR 100952182B1 KR 1020090006079 A KR1020090006079 A KR 1020090006079A KR 20090006079 A KR20090006079 A KR 20090006079A KR 100952182 B1 KR100952182 B1 KR 100952182B1
- Authority
- KR
- South Korea
- Prior art keywords
- plate
- base plate
- elastic
- rubber pad
- knitting
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
- E01D19/041—Elastomeric bearings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
- 하부구조물의 상면에 편구배를 갖는 베이스플레이트를 고정하는 단계;상부구조물의 하면에 상부판, 하부판 및 상,하부판 사이에 설치되는 고무패드로 구성되며 하부판의 하면은 베이스플레이트 상면의 경사면에 대응되는 편구배를 갖는 경사면이 형성된 탄성 교좌장치를 고정한 다음 베이스플레이트의 상면에 거치하는 단계; 및상부 슬래브를 시공한 후 고무패드의 전단변형 및 편기를 보정한 다음 하부판을 베이스플레이트에 접합하는 단계를 포함하는 것을 특징으로 하는 탄성 교좌장치의 시공방법.
- 하부구조물의 상면에 편구배를 갖는 베이스플레이트를 고정하는 단계;상부구조물의 하면에 상부판, 하부판 및 상,하부판 사이에 설치되는 고무패드로 구성되며 하부판의 하면에는 베이스플레이트 상면의 경사면에 대응되는 편구배를 갖는 경사면이 형성된 중간연결판이 결합된 탄성 교좌장치를 고정한 다음 베이스플레이트의 상면에 거치하는 단계; 및상부 슬래브를 시공한 후 고무패드의 전단변형 및 편기를 보정한 다음 하부판을 베이스플레이트에 접합하는 단계를 포함하는 것을 특징으로 하는 탄성 교좌장치의 시공방법.
- 하부구조물의 상면에 일정한 곡률을 갖는 요부가 상면에 형성된 베이스플레이트를 고정하는 단계;상부구조물의 하면에 상부판, 하부판 및 상,하부판 사이에 설치되는 고무패드로 구성되며 하부판의 하면에는 베이스플레이트 상면의 요부에 대응되는 곡률을 갖는 철부가 형성된 중간연결판이 결합된 탄성 교좌장치를 고정한 다음 베이스플레이트의 상면에 거치하는 단계; 및상부 슬래브를 시공한 후 고무패드의 전단변형 및 편기를 보정한 다음 중간연결판을 베이스플레이트에 접합하는 단계를 포함하는 것을 특징으로 하는 탄성 교좌장치의 시공방법.
- 삭제
- 삭제
- 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090006079A KR100952182B1 (ko) | 2009-01-23 | 2009-01-23 | 탄성 교좌장치의 설치방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090006079A KR100952182B1 (ko) | 2009-01-23 | 2009-01-23 | 탄성 교좌장치의 설치방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100952182B1 true KR100952182B1 (ko) | 2010-04-09 |
Family
ID=42219751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090006079A KR100952182B1 (ko) | 2009-01-23 | 2009-01-23 | 탄성 교좌장치의 설치방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100952182B1 (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105156535A (zh) * | 2015-09-14 | 2015-12-16 | 江西洪都航空工业集团有限责任公司 | 一种大载荷贮运箱减震装置 |
CN114960460A (zh) * | 2022-07-13 | 2022-08-30 | 中国二十二冶集团有限公司 | 快速准确安装板式橡胶支座的方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62297555A (ja) * | 1986-06-16 | 1987-12-24 | Kazuo Suzuki | 免震装置 |
JPH03140506A (ja) * | 1989-10-26 | 1991-06-14 | Oiles Ind Co Ltd | 橋桁の支承方法 |
JP2006257741A (ja) * | 2005-03-17 | 2006-09-28 | Kawaguchi Metal Industries Co Ltd | ゴム支承載荷用治具 |
-
2009
- 2009-01-23 KR KR1020090006079A patent/KR100952182B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62297555A (ja) * | 1986-06-16 | 1987-12-24 | Kazuo Suzuki | 免震装置 |
JPH03140506A (ja) * | 1989-10-26 | 1991-06-14 | Oiles Ind Co Ltd | 橋桁の支承方法 |
JP2006257741A (ja) * | 2005-03-17 | 2006-09-28 | Kawaguchi Metal Industries Co Ltd | ゴム支承載荷用治具 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105156535A (zh) * | 2015-09-14 | 2015-12-16 | 江西洪都航空工业集团有限责任公司 | 一种大载荷贮运箱减震装置 |
CN114960460A (zh) * | 2022-07-13 | 2022-08-30 | 中国二十二冶集团有限公司 | 快速准确安装板式橡胶支座的方法 |
CN114960460B (zh) * | 2022-07-13 | 2023-12-15 | 中国二十二冶集团有限公司 | 快速准确安装板式橡胶支座的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100948359B1 (ko) | 교량받침 기능을 하는 교량 상부구조물 인상장치 및 이를 이용한 교량 상부구조물 인상방법 | |
KR101704971B1 (ko) | 시공 중 상부거더의 설치높이 조절 및 변위 수용과 전도방지가 가능하도록 한 받침장치 및 이를 이용한 라멘교 | |
KR101564721B1 (ko) | 하부구조물의 손상 없이 교량받침을 교체하는 공법 | |
JP5346523B2 (ja) | 載置工法及び接合構造 | |
KR20090102266A (ko) | 교각의 빔 인상 플레이트 | |
KR100952182B1 (ko) | 탄성 교좌장치의 설치방법 | |
KR101949248B1 (ko) | 프리셋팅 장치가 부착된 탄성받침 | |
JP3898509B2 (ja) | 既設弾性支承の機能変更補修工法 | |
KR101897099B1 (ko) | 무인상 교량받침 시공방법 | |
KR100548911B1 (ko) | 일체식 복합교대 교량 및 그 시공방법 | |
KR101133420B1 (ko) | 프리캐스트 콘크리트 연결보 및 이를 이용한 합성거더교의연속화 공법 | |
JP3946527B2 (ja) | 既設弾性支承の機能変更補修工法 | |
KR102490192B1 (ko) | 변위수용형 강가로보를 갖는 교량 상부 구조체 및 이를 이용한 교량 상부 시공 방법 | |
KR20040034368A (ko) | 교량의 상부구조물 상승용 잭 받침장치 | |
KR100313031B1 (ko) | 연속시공 교량의 납면진받침 이동제한방법 및 그 기구 | |
KR101492077B1 (ko) | 횡방향 프리스트레스트 거더부재를 이용한 케이블교의 시공방법 | |
KR100886818B1 (ko) | 프리셋팅이 용이한 교량용 탄성받침 및 그의 프리셋팅 방법 | |
JP6473426B2 (ja) | 落橋防止構造 | |
KR102619855B1 (ko) | 단일 받침을 이용한 psc 연속교 시공 방법 | |
JP6586305B2 (ja) | 既設橋梁の架替工法 | |
KR100883721B1 (ko) | 교좌장치 설치구조 및 설치방법 | |
CN109281252B (zh) | 边跨钢梁顶推反力装置及系统 | |
KR100405404B1 (ko) | 하중 균등분배 브릿지 베어링 교체방법 | |
JP2929922B2 (ja) | 免震支承のせん断変形修正方法 | |
JP2003227109A (ja) | 構造物の水平力緩衝装置の取付け方法および取付け構造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
J201 | Request for trial against refusal decision | ||
S901 | Examination by remand of revocation | ||
GRNO | Decision to grant (after opposition) | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130321 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140402 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160404 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170403 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180402 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190402 Year of fee payment: 10 |