KR100801266B1 - Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith - Google Patents

Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith Download PDF

Info

Publication number
KR100801266B1
KR100801266B1 KR1020070000234A KR20070000234A KR100801266B1 KR 100801266 B1 KR100801266 B1 KR 100801266B1 KR 1020070000234 A KR1020070000234 A KR 1020070000234A KR 20070000234 A KR20070000234 A KR 20070000234A KR 100801266 B1 KR100801266 B1 KR 100801266B1
Authority
KR
South Korea
Prior art keywords
casing
pile
ground
pile hole
concrete
Prior art date
Application number
KR1020070000234A
Other languages
Korean (ko)
Inventor
이동정
Original Assignee
이동정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이동정 filed Critical 이동정
Priority to KR1020070000234A priority Critical patent/KR100801266B1/en
Application granted granted Critical
Publication of KR100801266B1 publication Critical patent/KR100801266B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/006Accessories for drilling pipes, e.g. cleaners
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A casing for a ground excavator having a guide member and a construction method of a cut-off wall using a casing are provided to reduce the time and cost required for construction of a cut-off wall. A casing(1) for a ground excavator having a guide member includes an insertion guide portion(1a) fixed to an outer side of the casing in a longitudinal direction to guide the insertion direction of the casing, and a guide insertion groove portion(1b) fixed to the other outer side of the casing in a longitudinal direction to insert an insertion guide portion installed to another casing in a vertical direction. A construction method of a cut-off wall using a casing for a ground excavator comprises the steps of: preparing a ground excavator provided with an auger drive device for setting up a vertical vibration to the top of a casing inserted to a pile hole perforated by an auger screw and press-fitting the casing, and plural casings for a ground excavator fixed with an insertion guide portion and a guide insertion groove portion at two sides; fixing a first casing to the ground excavator and perforating a first pile hole on the soft ground where a cut-off wall is to be constructed, and press-fitting the first casing into the first pile hole; installing a second casing to the ground excavator and perforating a second pile hole adjacently to the first pile hole, and press-fitting the second casing into the second pile hole; perforating plural pile holes continuously on the soft ground; placing concrete to the pile holes in order and drawing out the casing press-fitted to each pile hole, and then moving a cut-off wall to be constructed in a longitudinal direction and adjoining to the final pile hole; and hardening the concrete placed in the pile holes to make concrete piles formed in each pile hole connected to each other.

Description

가이드부재가 구비된 지반굴착기용 케이싱 및 이를 이용한 차수벽 시공방법{Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith}Casing for guiding parts for a ground excavator and the method for constructing a cut-off wall therewith}

도 1은 종래의 오가구동장치가 구비된 지반굴착기를 나타내는 설명도.1 is an explanatory diagram showing a ground excavator equipped with a conventional oga driving device.

도 2는 종래의 콘크리트파일 시공상태를 나타내는 단면도.Figure 2 is a cross-sectional view showing a conventional concrete pile construction state.

도 3의 (가)(나)(다)는 종래의 콘크리트파일을 이용한 차수벽 시공과정을 나타내는 설명도.Figure 3 (a) (b) (c) is an explanatory diagram showing the process of construction of the order wall using a conventional concrete pile.

도 4는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 나타내는 사시도.Figure 4 is a perspective view showing a casing for a ground excavator equipped with a guide member according to the present invention.

도 5는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱의 시공과정을 나타내는 설명도.5 is an explanatory view showing a construction process of a ground excavator casing provided with a guide member according to the present invention.

도 6은 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽의 시공과정을 나타내는 공정도.Figure 6 is a process chart showing the construction process of the order wall using the ground excavator casing provided with a guide member according to the present invention.

도 7의 (가)(나)(다)(라)는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽의 시공과정을 나타내는 설명도.Figure 7 (a) (b) (c) (d) is an explanatory diagram showing the construction process of the order wall using the ground excavator casing provided with a guide member according to the present invention.

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

1, 2, 3 : 케이싱 1a, 2a, 3a : 삽입가이드부1, 2, 3: Casing 1a, 2a, 3a: Insertion guide part

1b, 2b, 3b : 가이드삽입홈부 4, 4a, 5, 5a, 6, 6a : 파일공1b, 2b, 3b: guide insertion groove 4, 4a, 5, 5a, 6, 6a: pile hole

7, 8, 9 : 콘크리트파일 10 : 연약지반7, 8, 9: Concrete pile 10: Soft ground

11 : 작업준비단계 12 : 제 1천공단계11: work preparation stage 12: first drilling stage

13 : 제 2천공단계 14 : 연속천공단계13: second drilling step 14: continuous drilling step

15 : 콘크리트타설 및 반복시공단계 16 : 차수벽 완성단계15: concrete placing and repetitive construction stage 16: order wall completion stage

본 발명은 가이드부재가 구비된 지반굴착기용 케이싱 및 이를 이용한 차수벽 시공방법에 관한 것으로, 보다 상세하게는 연약지반에 콘크리트파일이 타설될 파일공을 천공하는 데 사용되는 원형관형상으로 된 지반굴착기용 케이싱의 외부양측면에 케이싱의 삽입방향을 안내하는 삽입가이드부와 가이드삽입홈부가 길이방향으로 각각 고정설치되도록 구성하므로써, 다수의 콘크리트 파일공이 서로 평행을 유지하면서 인접하게 연속적으로 시공될 수 있게 하여 작업성을 대폭 향상시킬 수 있도록 하며, 또 이러한 가이드부재가 구비된 지반굴착기용 케이싱을 이용하여 차수벽을 시공하도록 하므로써 연약지반에 천공되는 콘크리트 파일공을 서로 평행을 유지하면서 인접하게 연속적으로 천공할 수 있게 되는 동시에 각 파일공에 타설되는 콘크리트에 의해 형성되는 콘크리트파일간의 틈새가 전혀 생기지 않게 시공할 수 있게 되므로 차수벽의 시공작업에 소요되는 시간과 비용을 대폭 절감할 수 있도록 한 것이다.The present invention relates to a ground excavator casing equipped with a guide member and a method for constructing a water barrier using the same, and more particularly, for ground excavators having a circular tubular shape used to drill pile holes in which concrete piles are to be placed on soft ground. The insert guide portion and guide insertion groove portion for guiding the insertion direction of the casing are fixedly installed in the longitudinal direction on both outer sides of the casing, so that a plurality of concrete pile holes can be continuously and adjacently constructed while maintaining parallel to each other. It is possible to greatly improve the properties, and by using the ground excavator casing equipped with such a guide member to construct the wall, so that the concrete pile holes drilled on the soft ground can be continuously and adjacently drilled in parallel with each other. Of concrete being poured onto each pile at the same time Since the construction can be done without any gaps between concrete piles formed, it is possible to drastically reduce the time and cost required for the construction of the order walls.

일반적으로 아파트나 빌딩 또는 교량과 같은 각종 구조물을 시공하기 위해서는 구조물의 시공토대가 되는 지반을 일정 심도만큼 굴삭하는 기초 터파기 공사를 실시하게 되는데, 이러한 기초 터파기 공사시 굴삭된 지반을 통하여 지하수나 침투수가 기초터의 내부로 용출될 경우 작업이 곤란하게 될 뿐만 아니라 시공하고자 하는 구조물의 강도와 그 안전성에 치명적인 악영향을 미치게 될 우려가 있기 때문에 기초 터파기 공사를 실시하기 전에는 반드시 개량지반의 둘레에 걸쳐 기초터의 내부로 지하수나 침투수가 용출되는 것을 차단하기 위한 차수벽(遮水壁)을 시공하게 된다.In general, in order to construct various structures such as apartments, buildings, or bridges, foundation excavation works are carried out to excavate the ground, which is the foundation of the structure, to a certain depth. If the infiltration water is eluted into the foundation site, it will not only be difficult to work, but also it may adversely affect the strength and safety of the structure to be constructed. In order to prevent the groundwater or the infiltration water from being eluted to the inside of the foundation, the order wall is constructed.

이와 같은 차수벽을 시공하는 데 통상적으로 사용되고 있는 공법 중의 하나로서는 지반굴착장비에 구비된 오거머신을 이용하여 소정의 직경을 가지는 파일공을 주열식으로 지반에 천공한 후 천공된 파일공에 콘크리트를 타설하여 벽체를 형성하도록 하는 공법이 널리 알려져 있다.One of the commonly used methods for constructing such a water barrier wall is to use auger machine provided on the ground excavation equipment to drill a pile ball having a predetermined diameter on the ground in a row, and then cast concrete on the drilled pile ball. The method for forming a wall is widely known.

상기와 같은 공법에 사용되는 지반굴착기는 도 1에 도시되어 있는 바와 같이 크레인(20)의 전단부에 지지암(21)과 백스테이(22)에 의해 지지되는 리더(23)가 수직으로 설치되고, 상기 리더(23)의 전방에는 리더(23)의 상단에 설치된 한 쌍의 활차(24)에 권취되는 권양케이블(25)에 의해 현수되는 오가구동장치(26)와 오가스크류홀더(27)가 리더(23)를 따라 승하강되도록 각각 설치되고, 상기 오가구동장치(26)의 하단부에는 원형관형상으로 된 케이싱(28)이 장착되고, 상기 오가스크류홀더(27)의 하단부에 굴착비트(29)가 구비된 오가스크류(30)가 장착되도록 구성되어 있다. As shown in FIG. 1, the ground excavator used in the above-described method is provided with a leader 23 supported by the support arm 21 and the backstay 22 vertically at the front end of the crane 20. In front of the leader 23, an organo driving device 26 and an organo screw holder 27 suspended by a hoisting cable 25 wound on a pair of pulleys 24 installed on the top of the leader 23 are provided. It is installed so as to move up and down along the leader 23, the lower end of the organ driving device 26 is mounted with a casing 28 of a circular tubular shape, the drilling bit 29 at the lower end of the orga screw holder 27 ) Is configured to be equipped with an orgas screw (30).

본 출원인은 상기와 같이 구성되어 있는 지반굴착기에 장착되는 오가구동장치를 선출원하여 특허등록번호 제10-0447143호로 등록받은 바 있었다.The present applicant has been filed with a patent registration No. 10-0447143 for the filing of the Oga driving device mounted on the ground excavator is configured as described above.

본 출원인에 의해 선출원되어 등록된 지반굴착기용 오가구동장치는 오가구동장치의 하단에 장착되는 원형관형상으로 된 케이싱(28)을 회전시키지 않고 편심축에 의한 진동을 상하방향으로 가하여 그 진동에 의해 케이싱(28)이 오가스크류(30)에 의해 천공되는 파일공의 내부로 압입될 수 있도록 한 것이다.The OGA driving device for ground excavators registered and filed by the present applicant is applied by the eccentric shaft in the vertical direction without rotating the casing 28 having a circular tubular shape mounted on the lower end of the OGA driving device. The casing 28 is to be press-fitted into the pile hole to be drilled by the orgas screw 30.

그러나, 이와 같은 지반굴착기용 오가구동장치를 이용하여 콘크리트파일이 타설된 파일공을 연약지반에 천공하고자 할 경우에는 다음과 같은 문제점이 있었다.However, there was the following problem when attempting to drill a pile hole in a concrete ground using a pile-driving device for ground excavators.

즉, 상기와 같은 지반굴착기용 오가구동장치를 이용하여 콘크리트파일이 타설될 파일공을 연약지반에 천공하고자 할 경우에는, 도 1에 도시되어 있는 바와 같이 지상구간에서는 케이싱(28)을 연약지반에 압입시키는 오가구동장치(26)가 크레인(20)의 전방에 수직으로 설치된 리더(23)를 따라 하강하게 되어 오가구동장치(26)의 하단에 장착된 케이싱(28)이 정확한 수직도를 유지하면서 연약지반내로 압입될 수 있게 되므로 케이싱(28)의 내부에서 회전하는 오가스크류(30)에 의해 천공되는 파일공이 거의 정확한 수직도를 유지할 수 있게 되지만, 연약지반내부로 더욱 더 깊이 들어갈수록 연약지반의 내부로 압입되는 케이싱(28)의 하단부가 토질상태 등으로 인하여 정확한 수직도를 유지하지 못하게 되어 케이싱(28)의 내부에서 회전하는 오가스크류(30)에 의해 천공되는 파일공의 하단부가 비스듬하게 형성되는 일이 빈번하게 발생되곤 하였다.That is, when using the above-mentioned ground excavator driving apparatus for drilling the pile to the concrete pile to be drilled in the soft ground, as shown in Figure 1 in the ground section the casing 28 in the soft ground The indentation pendulum driver 26 descends along the leader 23 installed vertically in front of the crane 20 so that the casing 28 mounted on the lower part of the pendulum driver 26 maintains the correct verticality. Since the pile can be press-fitted into the soft ground, the pile hole drilled by the orgas screw 30 rotating inside the casing 28 can maintain almost accurate verticality, but the more deeply into the soft ground, the more soft ground The lower end of the casing 28, which is press-fitted into the inside, cannot maintain the correct verticality due to the soil state, etc., and thus is caused by the orgas screw 30 rotating inside the casing 28. Two days, the lower end of file space that ball is obliquely formed was often occurs frequently.

따라서, 연약지반내에 천공되는 파일공의 하단부가 정확한 수직도를 유지하지 못하고 비스듬하게 형성되면, 도 2에 도시되어 있는 바와 같이 천공된 파일공의 내부에 콘크리트를 타설하여 콘크리트파일을 형성할 경우 서로 인접한 콘크리트파일(40)(41)의 하단부사이에서 틈새(G)가 생기게 되어 지하수나 침투수가 용출되는 것을 차단하는 차수벽의 기능을 수행하지 못하게 되므로 그 벌어진 틈새(G)를 막는 공사를 별도로 시공해야 하는 번거로운 문제점이 있었다.Therefore, when the lower ends of the pile holes to be drilled in the soft ground are formed obliquely without maintaining the correct verticality, as shown in FIG. 2, when the concrete is formed by placing concrete in the perforated pile holes, Since the gap (G) is formed between the lower ends of the adjacent concrete piles (40) and (41) to prevent the groundwater or the infiltration water from being eluted, the construction of blocking the gap (G) must be performed separately. There was a troublesome problem.

또한, 종래의 지반굴착기용 오가구동장치를 이용하여 연약지반내에 차수벽을 시공하기 위해서는 다음과 같은 과정을 거치게 된다.In addition, in order to construct the order wall in the soft ground by using the conventional ground excavator driving apparatus for the ground excavator is subjected to the following process.

우선, 도 3의 (가)에 도시되어 있는 바와 같이 차수벽을 시공하고자 하는 연약지반에 콘크리트파일이 타설될 1차 파일공(50)을 파일공의 직경만큼의 간격을 두고 천공한 후 천공된 1차 파일공(50)에 각각 콘크리트를 타설하게 된다. 이때 상기 1차 파일공(50)을 파일공의 직경만큼의 간격을 두고 천공하는 이유는 먼저 천공해놓은 파일공에 인접하여 파일공을 천공할 경우 먼저 천공한 파일공이 붕괴될 우려가 있기 때문이다.First, as shown in (a) of FIG. 3, after drilling the primary pile hole 50 in which the concrete pile is to be placed on the soft ground to be constructed, the gap is equal to the diameter of the pile hole. Concrete is poured into each of the car pile holes 50. In this case, the reason for drilling the primary pile hole 50 at intervals equal to the diameter of the pile hole is that the first drilled pile hole may collapse when the pile hole is drilled adjacent to the drilled pile hole.

이어서, 2~ 3일 경과 후 천공된 1차 파일공(50)에 각각 타설된 콘크리트가 양생되어 견고한 1차 콘크리트파일(51)이 형성되면, 도 3의 (나)에 도시되어 있는 바와 같이 1차 파일공(50)사이의 공간마다 2차 파일공(52)을 각각 천공한 후 천공된 2차 파일공(52)에 각각 콘크리트를 타설하게 된다.Subsequently, after two to three days have elapsed, the concrete placed in each of the drilled primary pile holes 50 is cured to form a solid primary concrete pile 51, as shown in FIG. Secondary pile holes 52 are drilled for each space between the secondary pile holes 50, and concrete is then poured into the drilled secondary pile holes 52.

이어서, 2~ 3일 경과 후 천공된 2차 파일공(52)에 각각 타설된 콘크리트가 양생되어 견고한 2차 콘크리트파일(53)이 형성되면, 도 3의 (다)에 도시되어 있는 바와 같이 1차 콘크리트파일(51)과 2차 콘크리트파일(53)사이에 파일틈새막이용 구조물(54)를 시공하여 콘크리트파일간에 생기는 틈새를 밀폐시키게 됨으므로써 차수벽의 시공을 완료하게 된다.Subsequently, after two or three days have elapsed, the concrete placed in each of the drilled secondary pile holes 52 is cured to form a solid secondary concrete pile 53, as shown in FIG. Construction of the pile gap gasket structure 54 between the primary concrete pile 51 and the secondary concrete pile 53 is to seal the gap generated between the concrete pile to complete the construction of the order wall.

그러나, 상기와 같은 종래의 차수벽 시공방법은 1차 파일공(50)에 타설된 1차 콘크리트파일(51)의 양생이 완료된 후 2차 파일공(52)을 천공한 후 2차 콘크리트파일(53)을 타설해야 하므로 시공기간이 길어지게 될 뿐만 아니라, 1차 콘크리트파일(51)과 2차 콘크리트파일(53)의 시공 후에도 1차 콘크리트파일(51)과 2차 콘크리트파일(53)사이에 생기는 틈새를 막기 위한 파일틈새막이용 구조물(54)을 시공하는 공사를 별도로 실시해야 하므로 많은 시간과 비용이 소요되는 문제점이 있었다.However, in the conventional order wall construction method as described above, after the curing of the primary concrete pile 51 placed in the primary pile hole 50 is completed, the secondary concrete pile 53 after drilling the secondary pile hole 52. ), Because the construction period is not only long, but also between the primary concrete pile 51 and the secondary concrete pile 53 even after the construction of the primary concrete pile 51 and the secondary concrete pile 53 There was a problem that it takes a lot of time and money because the construction of the pile gap structure 54 to prevent the gap must be carried out separately.

본 발명은 상기의 문제점을 해결하기 위하여 안출된 것으로서, 연약지반에 콘크리트파일이 타설될 파일공을 천공하는 데 사용되는 원형관형상으로 된 지반굴착기용 케이싱의 외부양측면에 케이싱의 삽입방향을 안내하는 삽입가이드부와 가이드삽입홈부가 길이방향으로 각각 고정설치되도록 구성하므로써, 다수의 콘크리트 파일공이 서로 평행을 유지하면서 인접하게 연속적으로 시공될 수 있게 하여 작업성을 대폭 향상시킬 수 있도록 하며, 또 이러한 가이드부재가 구비된 지반굴착기용 케이싱을 이용하여 차수벽을 시공하도록 하므로써 연약지반에 천공되는 콘크리트 파일공을 서로 평행을 유지하면서 인접하게 연속적으로 천공할 수 있게 되는 동시에 각 파일공에 타설되는 콘크리트에 의해 형성되는 콘크리트파일간의 틈새가 전혀 생기지 않게 시공할 수 있게 되므로 차수벽의 시공작업에 소요되는 시간과 비용을 대폭 절감할 수 있도록 하는 것을 기술적 과제로 한다.The present invention has been made in order to solve the above problems, to guide the insertion direction of the casing on the outer both sides of the casing for the ground excavator in the form of a circular tube used to drill the pile hole in which the concrete pile is to be placed on the soft ground The insertion guide part and the guide insertion groove part are fixedly installed in the longitudinal direction, so that a plurality of concrete pile holes can be continuously and adjacently constructed while maintaining parallel to each other, thereby greatly improving workability. By constructing the order wall using the ground excavator casing equipped with the member, concrete pile holes drilled in the soft ground can be continuously drilled adjacent to each other while maintaining parallel to each other, and are formed by concrete poured in each pile hole. There is no gap between the concrete piles Since the construction is possible, it is a technical task to significantly reduce the time and cost required for the construction of the wall.

상기의 기술적 과제를 해결하기 위하여 본 발명은 오가스크류에 의해 지반에 천공되는 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키게 되는 오가구동장치가 구비된 지반굴착기에 장착되어 사용되는 원형관형상으로 된 지반굴착기용 케이싱에 있어서, 상기 케이싱의 외부일측면에는 케이싱의 삽입방향을 안내하는 삽입가이드부가 길이방향으로 고정설치되고 외부타측면에는 다른 케이싱의 외부일측면에 설치된 삽입가이드부가 수직방향으로 삽입되어 결합되는 가이드삽입홈부가 길이방향으로 고정설치되도록 구성된 것을 특징으로 한다.In order to solve the above technical problem, the present invention is provided with an organo-driving device for pressurizing the casing by applying a vibration in the vertical direction by an eccentric shaft to the upper end of the casing is inserted into the pile hole drilled into the ground by the orga screw. In the ground tubular casing is used to be mounted to the ground excavator used, the outer side of the casing, the insertion guide for guiding the insertion direction of the casing is fixed in the longitudinal direction and the other side of the other casing The guide insertion groove is inserted in the vertical direction is installed in the outer one side is characterized in that the guide insertion groove is configured to be fixed in the longitudinal direction.

또한, 본 발명에 의한 차수벽 시공방법은 오가스크류에 의해 천공된 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키게 되는 오가구동장치가 구비된 지반굴착기와 외부양측면에 각각 삽입가이드부와 가이드삽입홈부가 길이방향으로 고정설치된 복수개의 지반굴착기용 케이싱을 구비하게 되는 작업준비단계와, 상기 작업준비단계에서 구비된 지반굴착기에 복수개의 케이싱 중 하나를 장착하여 차수벽을 시공하고자 하는 연약지반에 파일공을 천공하면서 그 내부로 케이싱을 압입시키게 되는 제 1천공단계와, 상기 지반굴착기에 복수개의 케이싱 중 다른 하나를 장착하여 상기 제 1천공단계에서 천공된 파일공에 인접하도록 파일공을 천공하면서 그 내부로 케이싱을 압입시키되, 압입되는 케이싱의 삽입가이드부가 제 1천공단계에서 천공된 파일공의 내부에 압입되어 있는 케이싱의 가이드삽입홈부에 삽입되어 안내되도록 하는 제 2천공단계와, 상기 제 1천공단계와 제 2천공단계를 작업준비단계에서 구비된 복수개의 케이싱 수만큼 반복하므로써 차수벽을 시공하고자 하는 연약지반에 케이싱이 각각 압입되어 있는 복수개의 파일공을 서로 인접하도록 연속적으로 천공하게 되는 연속천공단계와, 상기 연속천공단계를 거쳐 서로 인접하게 연속적으로 천공된 복수개의 파일공에 차례대로 콘크리트를 타설하는 동시에 그 파일공에 압입되어 있던 케이싱을 인출한 후 시공하고자 하는 차수벽을 길이방향으로 이동시켜 복수개의 파일공 중 최측단에 위치한 파일공에 인접하도록 시공하는 작업을 차수벽의 길이만큼 반복하게 되는 콘크리트타설 및 반복시공단계와, 상기 콘크리트타설 및 반복시공단계를 반복하여 서로 인접하게 연속 천공된 파일공의 내부에 각각 타설된 콘크리트가 각 파일공의 양측에 케이싱의 삽입가이드부와 가이드삽입홈부에 의해 형성된 공간으로 유입되어 각 파일공에 형성되는 콘크리트파일간의 틈새가 서로 연결되게 경화되도록 하므로써 하나의 차수벽을 완성하게 되는 차수벽 완성단계로 이루어지는 것을 특징으로 한다.In addition, the order wall construction method according to the present invention is a ground excavator equipped with an oscillating device for pressing the casing by applying the vibration in the vertical direction by the eccentric shaft to the upper end of the casing is inserted into the pile hole drilled by the orgas screw And a work preparation step comprising a plurality of ground excavator casings each of which has an insertion guide part and a guide insertion groove part fixed in a longitudinal direction, and one of the plurality of casings in the ground excavator provided in the work preparation step. A first drilling step of pressing a casing into the ground while drilling a pile hole in the soft ground to be constructed with the order wall, and a pile drilled in the first drilling step by attaching another one of a plurality of casings to the ground excavator. Press the casing into the hole while drilling the pile ball adjacent to the ball, A second drilling step for inserting and guiding the guide insertion groove of the casing being pressed into the inside of the pile hole drilled in the first drilling step, and the first drilling step and the second drilling step for preparing the work The continuous drilling step of successively drilling a plurality of pile holes, each of which the casing is press-fitted into the soft ground to be constructed by repeating the number of casing provided in the adjacent to each other, and adjacent to each other through the continuous drilling step In order to pour concrete into a plurality of continuous pile holes, the casings pressed into the pile holes are taken out, and the order wall to be constructed is moved in the longitudinal direction, and the pile holes located at the far end of the pile holes Concrete placing to repeat the construction work adjacent to the length of the order wall and A space formed by the insert guide portion and the guide insertion groove of the casing on both sides of each pile hole are concrete placed in each of the pile holes continuously drilled adjacent to each other by repeating the repeated construction step and the concrete pouring and repeated construction step. The gap between the concrete piles introduced into each pile hole is hardened so as to be connected to each other.

이하, 상기의 목적을 달성하기 위하여 본 발명을 도 4 내지 도 7을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to FIGS. 4 to 7 to achieve the above object.

도 4는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 나타내는 사시도이며, 도 5는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱의 시공과정을 나타내는 설명도이고, 도 6은 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽의 시공과정을 나타내는 공정도이며, 도 7의 (가)(나)(다)(라)는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽의 시공과정을 나타내는 설명도이다.Figure 4 is a perspective view showing a ground excavator casing with a guide member according to the present invention, Figure 5 is an explanatory view showing the construction process of the ground excavator casing with a guide member according to the present invention, Figure 6 Figure 7 is a process diagram showing the construction process of the order wall using a ground excavator casing provided with a guide member according to the invention, Figure 7 (a) (b) (c) (d) is a ground excavator equipped with a guide member according to the present invention It is explanatory drawing which shows the construction process of the order wall using the dragon casing.

본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱은 본 출원인에 의해 선출원되어 특허등록번호 제10-0447143호로 등록된 바 있는 오가스크류에 의해 지반에 천공되는 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키도록 구성된 오가구동장치가 구비된 지반굴착기에 장착되어 사용되는 것이다.The ground excavator casing is provided with a guide member according to the present invention is the upper end of the casing is inserted into the inside of the pile hole drilled on the ground by the Oga screw that has been filed by the applicant and registered in the Patent Registration No. 10-0447143 It is used to be mounted on a ground excavator equipped with an oscillating drive device configured to press the casing by applying vibration in the vertical direction by the eccentric shaft.

본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱은 도 4와 도 5에 도시되어 있는 바와 같이 원형관형상으로 된 지반굴착기용 케이싱(1)의 외부일측면에 케이싱(1)의 삽입방향을 안내하는 삽입가이드부(1a)가 길이방향으로 고정설치되고, 외부타측면에 다른 케이싱(2)의 외부일측면에 설치된 삽입가이드부(2a)가 수직방향으로 삽입되어 결합되는 가이드삽입홈부(1b)가 길이방향으로 고정설치되도록 구성되는 것을 특징으로 한다.The ground excavator casing is provided with a guide member according to the present invention, the insertion direction of the casing (1) to the outer one side of the ground excavator casing (1) in a circular tube shape as shown in Figs. A guide insertion groove 1b in which the guide guide portion 1a for guiding is fixedly installed in the longitudinal direction and the insertion guide portion 2a installed on the outer one side of the other casing 2 is inserted in the vertical direction and coupled to the outer other side. ) Is configured to be fixed in the longitudinal direction.

이 때, 상기 케이싱(1)의 외부양측면에 각각 길이방향으로 고정설치되는 삽입가이드부(1a)와 가이드삽입홈부(1b)는 상기 케이싱(1)이 본 출원인에 의해 특허등록받은 지반굴착기용 오가구동장치에 용이하게 클램핑될 수 있도록 하는 동시에 상기 케이싱(1)의 하단부가 오가스크류에 의해 지반에 천공되는 파일공의 입구로 용이하게 삽입될 수 있도록 하기 위하여 케이싱(1)의 상부외주면과 하부외주면을 제외한 외부양측면에 형성되도록 하는 것이 바람직하다.At this time, the insertion guide portion (1a) and the guide insertion groove (1b) is fixed to the outer both sides of the casing (1) in the longitudinal direction respectively, the casing (1) for the ground excavator excavator patented by the applicant The upper and lower outer peripheral surfaces of the casing 1 to be easily clamped to the drive device and to allow the lower end of the casing 1 to be easily inserted into the inlet of the pile hole drilled into the ground by the Oga screw. It is preferable to be formed on both outer sides except.

이와 같이 구성되는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이 싱을 사용하게 되면, 도 5에 도시되어 있는 바와 같이 연약지반(10)에 최초 파일공을 천공하면서 그 파일공의 내부로 첫 번째 케이싱(1)을 압입시킨 후, 첫 번째 케이싱(1)의 외부일측면에 길이방향으로 고정설치된 가이드삽입홈부(1b)에 두 번째 케이싱(2)의 외부일측면에 길이방향으로 고정설치된 삽입가이드부(2a)가 삽입되도록 한 상태에서 두 번째 케이싱(2)을 압입시키면서 두 번째 파일공을 첫 번째 파일공과 인접하게 천공할 수 있게 되므로써, 연약지반에 다수의 콘크리트 파일공을 서로 평행을 유지하면서 인접하게 연속적으로 시공할 수 있게 되므로 작업성을 대폭 향상시킬 수 있게 된다.When the casing for the ground excavator equipped with the guide member according to the present invention configured as described above is used, the first pile hole is drilled into the soft ground 10 as shown in FIG. After press-fitting the first casing (1), the insert is fixedly installed in the longitudinal direction on the outer one side of the second casing (2) to the guide insertion groove (1b) fixed in the longitudinal direction on the outer one side of the first casing (1) The second pile hole can be drilled adjacent to the first pile hole while pressing the second casing 2 while the guide portion 2a is inserted, thereby maintaining a plurality of concrete pile holes parallel to each other on the soft ground. While being able to construct consecutively adjacent to each other, workability can be greatly improved.

상기와 같이 구성되는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용하여 차수벽을 시공하는 과정을 설명하면 다음과 같다.Referring to the process of constructing the order wall using the casing for the ground excavator equipped with a guide member according to the present invention configured as described above are as follows.

본 발명에 의한 차수벽 시공과정은 도 6에 도시되어 있는 바와 같이 작업준비단계(11), 제 1천공단계(12), 제 2천공단계(13), 연속천공단계(14), 콘크리트타설 및 반복시공단계(15), 차수벽 완성단계(16)로 이루어진다.The order wall construction process according to the present invention is a work preparation step 11, the first drilling step 12, the second drilling step 13, the continuous drilling step 14, concrete pouring and repetition as shown in FIG. Construction step (15), the order wall is completed step (16).

상기 작업준비단계(11)에서는 오가스크류에 의해 천공된 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키도록 구성된 오가구동장치가 구비된 지반굴착기와 외부양측면에 각각 삽입가이드부와 가이드삽입홈부가 길이방향으로 고정설치된 복수개의 지반굴착기용 케이싱 등을 구비하게 된다.In the work preparation step (11) is a ground excavator equipped with an organo drive device configured to press the casing by applying the vibration in the vertical direction by the eccentric shaft to the upper end of the casing is inserted into the pile hole drilled by the Oga screw Each of the outer side surface is provided with a plurality of ground excavator casing and the like is inserted into the guide guide portion and the guide insertion groove portion in the longitudinal direction.

이 때, 상기 지반굴착기로는 본 출원인에 의해 선출원되어 특허등록번호 제10-0447143호로 등록된 바 있는 지반굴착기용 오가구동장치가 장착된 것을 사용하 는 것이 바람직하다. At this time, it is preferable to use the ground excavator as a ground excavator driving apparatus for which the ground excavator is previously filed by the present applicant and registered under Patent Registration No. 10-0447143.

그리고, 외부양측면에 각각 삽입가이드부(1a)와 가이드삽입홈부(1b)가 길이방향으로 고정설치된 지반굴착기용 케이싱(1)을 구비하게 되는데, 이러한 가이드부재가 구비된 지반굴착기용 케이싱(1)의 수량은 시공하고자 하는 차수벽의 길이를 케이싱의 직경으로 나눈 개수만큼 준비해야 하지만, 이렇게 할 경우 그 수량이 너무 많아지게 되어 케이싱을 운반하거나 적치하는 데 많은 시간과 비용이 소요되므로 3 ~ 5개 정도를 한 세트로 구비한 후 시공작업시 이를 교대로 이동시키면서 작업하는 것이 바람직하다. 본 실시예에서는 3개를 한 세트로 하여 구비한 케이싱을 교대로 이동시키면서 시공하는 방법을 예로 들어 설명하기로 한다.Then, the ground guide excavator (1a) and the guide insertion groove (1b) is provided with a ground excavator casing (1) fixed in the longitudinal direction, respectively, the ground excavator casing (1) provided with such a guide member The quantity of should be prepared by dividing the length of the order wall to be divided by the diameter of the casing. However, if this is done, the quantity becomes too large, so it takes a lot of time and money to transport or load the casing. After having provided as a set it is preferable to work while moving it alternately during construction work. In this embodiment, a description will be given by taking an example of a method of constructing three casings while moving alternately.

상기 제 1천공단계(12)에서는 작업준비단계(11)에서 구비된 지반굴착기에 복수개의 케이싱 중 하나인 제 1케이싱(1)을 장착하여 차수벽을 시공하고자 하는 연약지반에 제 1파일공(4)을 천공하면서 그 내부로 제 1케이싱(1)을 압입시키게 된다.In the first drilling step 12, the first pile hole 4 is installed in the soft ground to which the order wall is to be installed by attaching the first casing 1, which is one of a plurality of casings, to the ground excavator provided in the work preparation step 11. ) And press the first casing 1 into it.

상기 제 2천공단계(13)에서는 상기 지반굴착기에 복수개의 케이싱 중 다른 하나인 제 2케이싱(2)를 장착하여 상기 제 1천공단계(12)에서 천공된 제 1파일공(4)에 인접하도록 제 2파일공(5)을 천공하면서 그 내부로 제 2케이싱(2)을 압입시키되, 압입되는 제 2케이싱(2)의 삽입가이드부(2a)가 제 2천공단계(12)에서 천공된 제 1파일공(4)의 내부에 압입되어 있는 제 1케이싱(1)의 가이드삽입홈부(1b)에 삽입되어 안내되도록 한다.In the second drilling step 13, a second casing 2, which is another one of a plurality of casings, is mounted on the ground excavator so as to be adjacent to the first pile hole 4 drilled in the first drilling step 12. The second casing 2 is press-fitted into the second pile hole 5 while the insertion guide portion 2a of the second casing 2 is press-drilled in the second drilling step 12. It is inserted into the guide insertion groove 1b of the first casing 1 press-fitted into the first pile hole 4 so as to be guided.

상기 연속천공단계(14)에서는 제 1천공단계(12)와 제 2천공단계(13)를 작업 준비단계(11)에서 구비된 복수개의 케이싱 수만큼 반복하므로써 차수벽을 시공하고자 하는 연약지반에 케이싱이 각각 압입되어 있는 복수개의 파일공을 서로 인접하도록 연속적으로 천공하게 된다. 본 실시예에서는 케이싱 3개를 한 세트로 구비하였으므로 도 7의 (가)에 도시되어 있는 바와 같이 제 1케이싱(1), 제 2케이싱(2), 제 3케이싱(3)을 이용하여 제 1파일공(4), 제 2파일공(5), 제 3파일공(6)을 서로 인접하게 연속적으로 천공하게 된다.In the continuous drilling step 14, the casing is applied to the soft ground to construct the order wall by repeating the first drilling step 12 and the second drilling step 13 by the number of casings provided in the work preparation step 11. A plurality of pile holes each press-fitted are successively drilled to be adjacent to each other. In this embodiment, three casings are provided in one set, so that the first casing 1, the second casing 2, and the third casing 3 are used as shown in Fig. 7A. The pile hole 4, the second pile hole 5, and the third pile hole 6 are successively drilled adjacent to each other.

상기 콘크리트타설 및 반복시공단계(15)에서는 도 7의 (나)에 도시되어 있는 바와 같이 상기 연속천공단계(14)를 거쳐 서로 인접하게 연속적으로 천공된 파일공 중 제 1파일공(4)에 콘크리트를 타설하여 제 1콘크리트파일(7)을 형성하는 동시에 제 1파일공(4)에 압입되어 있던 제 1케이싱(1)을 인출한 후 시공하고자 하는 차수벽을 길이방향으로 이동시켜 제 3파일공(6)에 인접하도록 제 4파일공(4a)을 시공하고, 이어서 도 7의 (다)에 도시되어 있는 바와 같이 제 2파일공(5)에 콘크리트를 타설하여 제 2콘크리트파일(8)을 형성하는 동시에 제 2파일공(5)에 압입되어 있던 제 2케이싱(2)을 인출한 후 시공하고자 하는 차수벽을 길이방향으로 이동시켜 제 4파일공(4a)에 인접하도록 제 5파일공(5a)을 시공하고, 이어서 도 7의 (라)에 도시되어 있는 바와 같이 제 3파일공(6)에 콘크리트를 타설하여 제 3콘크리트파일(9)을 형성하는 동시에 제 3파일공(6)에 압입되어 있던 제 3케이싱(3)을 인출한 후 시공하고자 하는 차수벽을 길이방향으로 이동시켜 제 5파일공(5a)에 인접하도록 제 6파일공(6a)을 시공하는 작업을 시공하고자 하는 차수벽의 길이만큼 반복하게 된다.In the concrete placing and repetitive construction step (15) as shown in (b) of Figure 7 through the continuous drilling step (14) to the first pile hole (4) of the pile holes continuously drilled adjacent to each other After pouring concrete to form the first concrete pile 7, the first casing 1, which has been press-fitted into the first pile hole 4, is pulled out, and the third wall is moved by moving the order wall to be constructed in the longitudinal direction. The fourth pile hole 4a is constructed so as to be adjacent to (6), and then concrete is poured into the second pile hole 5 as shown in FIG. 7 (c) to form the second concrete pile 8. At the same time, after drawing out the second casing 2 press-fitted into the second pile hole 5, the order wall to be constructed is moved in the longitudinal direction to be adjacent to the fourth pile hole 4a so as to be adjacent to the fourth pile hole 4a. ) And then to the third pile hole 6 as shown in (d) of FIG. Concrete is poured to form the third concrete pile 9, and the third casing 3, which is press-fitted into the third pile hole 6, is pulled out. The work for constructing the sixth pile hole 6a to be adjacent to (5a) is repeated by the length of the order wall to be constructed.

상기 차수벽 완성단계(16)에서는 콘크리트타설 및 반복시공단계(15)를 반복 하여 서로 인접하게 연속 천공된 파일공의 내부에 각각 타설된 콘크리트가 각 파일공의 양측에 케이싱의 삽입가이드부와 가이드삽입홈부에 의해 형성된 공간으로 유입되어 각 파일공에 형성되는 콘크리트파일간의 틈새가 서로 연결된 상태로 경화되도록 하므로써 하나의 차수벽을 완성하게 된다.In the order wall completion step 16, the concrete placing and the repeated construction step 15 are repeated, and the concrete placed in each of the continuously drilled pile holes adjacent to each other is inserted into the guide portion and guide insertion of the casing on both sides of each pile hole. By entering the space formed by the groove portion, the gap between the concrete piles formed in each pile hole is hardened in a state connected to each other to complete one order wall.

상기한 바와 같은 단계로 이루어지는 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽 시공방법에 의하면, 차수벽을 시공하고자 하는 연약지반에 콘크리트파일이 형성될 다수의 파일공을 서로 평행을 유지하면서 인접하게 연속적으로 천공할 수 있게 될 뿐만 아니라, 각 파일공에 타설되는 콘크리트가 각 파일공의 양측에 케이싱의 삽입가이드부와 가이드삽입홈부에 의해 형성된 공간으로 유입되어 각 파일공에 형성되는 콘크리트파일간에 틈새가 전혀 생기지 않게 되므로 틈새막이공사를 별도로 실시할 필요가 전혀 없게 되어 차수벽의 시공작업에 소요되는 시간과 비용을 대폭 절감할 수 있게 된다.According to the order wall construction method using a ground excavator casing provided with a guide member according to the present invention comprising the steps as described above, a plurality of pile holes in which concrete piles are to be formed on the soft ground to be constructed in the order wall to maintain parallel to each other In addition to being able to continuously drill adjacent to each other, the concrete placed in each pile hole is introduced into the space formed by the insertion guide portion and the guide insertion groove of the casing on both sides of each pile hole to be formed in each pile hole. Since there is no gap between the piles, there is no need to perform a separate gap construction, which can greatly reduce the time and cost required for the construction of the order wall.

상기와 같이 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱은 외부양측면에 케이싱의 삽입방향을 안내하는 삽입가이드부와 가이드삽입홈부가 길이방향으로 각각 고정설치되도록 구성되므로써 다수의 콘크리트 파일공이 서로 평행을 유지하면서 인접하게 연속적으로 시공될 수 있게 되어 작업성을 대폭 향상시킬 수 있게 되는 효과가 있는 것이다.As described above, the ground excavator casing provided with the guide member according to the present invention has a plurality of concrete pile holes formed so that the insertion guide portion and the guide insertion groove portion for guiding the insertion direction of the casing on both sides are fixed to each other in the longitudinal direction. Since it can be constructed continuously adjacent to maintain parallel, there is an effect that can greatly improve the workability.

또한, 본 발명에 의한 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽 시공방법은 차수벽을 시공하고자 하는 연약지반에 콘크리트파일이 형성될 다수의 파일공을 서로 평행을 유지하면서 인접하게 연속적으로 천공할 수 있게 될 뿐만 아니라, 각 파일공에 타설되는 콘크리트가 각 파일공의 양측에 케이싱의 삽입가이드부와 가이드삽입홈부에 의해 형성된 공간으로 유입되어 각 파일공에 형성되는 콘크리트파일간에 틈새가 전혀 생기지 않게 시공할 수 있게 되므로 콘크리트파일간의 틈새를 막는 공사를 별도로 실시할 필요가 전혀 없게 되어 차수벽의 시공작업에 소요되는 시간과 비용을 대폭 절감할 수 있게 되는 효과가 있다.In addition, the order wall construction method using a casing for ground excavator equipped with a guide member according to the present invention can be drilled continuously adjacent to each other while maintaining the parallel piles of pile piles to be formed in the soft ground to be constructed In addition, the concrete placed in each pile hole is introduced into the space formed by the insertion guide portion and the guide insertion groove portion of the casing on both sides of each pile hole so that there is no gap between the concrete piles formed in each pile hole. Since the construction can be done, there is no need to perform a separate construction to prevent the gap between the concrete piles, which can significantly reduce the time and cost required for the construction of the order walls.

Claims (2)

연약지반에 파일공을 천공한 후 천공된 파일공에 콘크리트를 타설하여 콘크리트파일을 시공하는 데 사용되는 것으로, 오가스크류에 의해 지반에 천공되는 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키게 되는 오가구동장치가 구비된 지반굴착기에 장착되어 사용되는 원형관형상으로 된 지반굴착기용 케이싱(1)에 있어서,It is used to construct concrete pile by drilling concrete in perforated pile after drilling pile in soft ground, and on the eccentric shaft at the top of the casing inserted into the pile of perforated drilled on the ground by Oga screw. In the ground pipe casing (1) having a circular tubular shape that is used in a ground excavator equipped with an oscillating device that presses the casing by applying vibration in the vertical direction. 상기 케이싱(1)의 외부일측면에는 케이싱(1)의 삽입방향을 안내하는 삽입가이드부(1a)가 길이방향으로 고정설치되고 외부타측면에는 다른 케이싱의 외부일측면에 설치된 삽입가이드부가 수직방향으로 삽입되어 결합되는 가이드삽입홈부(1b)가 길이방향으로 고정설치되도록 구성된 것을 특징으로 하는 가이드부재가 구비된 지반굴착기용 케이싱.An insertion guide part 1a for guiding the insertion direction of the casing 1 is fixedly installed on one outer side of the casing 1 in the longitudinal direction, and an insertion guide part installed on the outer one side of the other casing on the other side of the casing 1 in the vertical direction. Casing for the ground excavator provided with a guide member, characterized in that the guide insertion groove (1b) is inserted and coupled to be fixed to be installed in the longitudinal direction. 오가스크류에 의해 천공된 파일공의 내부로 삽입되는 케이싱의 상단에 편심축에 의한 상하방향의 진동을 가하여 케이싱을 압입시키게 되는 오가구동장치가 구비된 지반굴착기와 외부양측면에 각각 삽입가이드부와 가이드삽입홈부가 길이방향으로 고정설치된 복수개의 지반굴착기용 케이싱을 구비하게 되는 작업준비단계(11)와,A ground excavator equipped with an oscillating device that presses the casing by applying an oscillation in the up and down direction by an eccentric shaft to the upper end of the casing inserted into the pile hole drilled by the orgas screw, and the insertion guide portion and the guide on the outer both sides, respectively. A work preparation step (11) having a plurality of ground excavator casings having an insertion groove fixed in a longitudinal direction; 상기 작업준비단계(11)에서 구비된 지반굴착기에 복수개의 케이싱 중 하나를 장착하여 차수벽을 시공하고자 하는 연약지반에 파일공을 천공하면서 그 내부로 케 이싱을 압입시키게 되는 제 1천공단계(12)와,The first drilling step (12) presses the casing into the inside while drilling a pile hole in the soft ground to be installed by mounting one of the plurality of casing to the ground excavator provided in the work preparation step (11) Wow, 상기 지반굴착기에 복수개의 케이싱 중 다른 하나를 장착하여 상기 제 1천공단계(12)에서 천공된 파일공에 인접하도록 파일공을 천공하면서 그 내부로 케이싱을 압입시키되, 압입되는 케이싱의 삽입가이드부가 제 1천공단계(12)에서 천공된 파일공의 내부에 압입되어 있는 케이싱의 가이드삽입홈부에 삽입되어 안내되도록 하는 제 2천공단계(13)와,While mounting the other one of the plurality of casing to the ground excavator to drill the pile hole to be adjacent to the pile hole drilled in the first drilling step 12 while pressing the casing into the inside, the insertion guide portion of the pressurized casing A second drilling step 13 for inserting and guiding the guide insertion groove of the casing press-fitted into the drilled hole in the first drilling step 12; 상기 제 1천공단계(12)와 제 2천공단계(13)를 작업준비단계(11)에서 구비된 복수개의 케이싱 수만큼 반복하므로써 차수벽을 시공하고자 하는 연약지반에 케이싱이 각각 압입되어 있는 복수개의 파일공을 서로 인접하도록 연속적으로 천공하게 되는 연속천공단계(14)와,By repeating the first drilling step 12 and the second drilling step 13 by the number of casings provided in the work preparation step 11, a plurality of files each of which casings are press-fitted into the soft ground to construct the order wall Continuous drilling step 14 to continuously drill the ball adjacent to each other, 상기 연속천공단계(14)를 거쳐 서로 인접하게 연속적으로 천공된 복수개의 파일공에 차례대로 콘크리트를 타설하는 동시에 그 파일공에 압입되어 있던 케이싱을 인출한 후 시공하고자 하는 차수벽을 길이방향으로 이동시켜 복수개의 파일공 중 최측단에 위치한 파일공에 인접하도록 시공하는 작업을 차수벽의 길이만큼 반복하게 되는 콘크리트타설 및 반복시공단계(15)와,Through the continuous drilling step (14), the concrete is sequentially cast in a plurality of pile holes continuously drilled adjacent to each other, and at the same time, the casing that is press-fitted to the pile hole is taken out, and the order wall to be constructed is moved in the longitudinal direction. Concrete placing and repetitive construction step (15) to repeat the construction work to be adjacent to the pile hole located at the far end of the plurality of pile holes by the length of the order wall, 상기 콘크리트타설 및 반복시공단계(15)를 반복하여 서로 인접하게 연속 천공된 파일공의 내부에 각각 타설된 콘크리트가 각 파일공의 양측에 케이싱의 삽입가이드부와 가이드삽입홈부에 의해 형성된 공간으로 유입되어 각 파일공에 형성되는 콘크리트파일간의 틈새가 서로 연결되게 경화되도록 하므로써 하나의 차수벽을 완성하게 되는 차수벽 완성단계(16)로 이루어지는 것을 특징으로 하는 가이드부재 가 구비된 지반굴착기용 케이싱을 이용한 차수벽 시공방법.Repeating the concrete placing and repetitive construction step 15, the concrete placed in each of the pile holes continuously drilled adjacent to each other flows into the space formed by the insertion guide portion and the guide insertion groove of the casing on both sides of each pile hole. The construction of the order wall using the casing for the ground excavator provided with a guide member, characterized in that the gap between the concrete piles formed in each pile hole is hardened to be connected to each other to complete one order wall Way.
KR1020070000234A 2007-01-02 2007-01-02 Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith KR100801266B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070000234A KR100801266B1 (en) 2007-01-02 2007-01-02 Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070000234A KR100801266B1 (en) 2007-01-02 2007-01-02 Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith

Publications (1)

Publication Number Publication Date
KR100801266B1 true KR100801266B1 (en) 2008-02-04

Family

ID=39342454

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070000234A KR100801266B1 (en) 2007-01-02 2007-01-02 Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith

Country Status (1)

Country Link
KR (1) KR100801266B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009125927A1 (en) * 2008-04-11 2009-10-15 Back Nam Jin Out casing and drilling rig using same
KR100984762B1 (en) 2008-07-10 2010-10-01 최종배 Pressing apparatus of casing of retaining well construction and the constructing method thereof
KR101858623B1 (en) * 2016-12-05 2018-05-24 강릉건설(주) Drilling machine with link drill unit and collumn wall contructing method by the same

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR940002434A (en) * 1992-07-13 1994-02-17 박형국 PIPE ANGLE WALL construction method
KR100447143B1 (en) * 2001-11-19 2004-09-04 이동정 Apparatus for operating auger installed in a ground excavator

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR940002434A (en) * 1992-07-13 1994-02-17 박형국 PIPE ANGLE WALL construction method
KR100447143B1 (en) * 2001-11-19 2004-09-04 이동정 Apparatus for operating auger installed in a ground excavator

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
국내공개특허공보 제2000-0006650호
국내공개특허공보 제94-0002434호
국내등록특허공보 제10-0447143호

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009125927A1 (en) * 2008-04-11 2009-10-15 Back Nam Jin Out casing and drilling rig using same
KR100984762B1 (en) 2008-07-10 2010-10-01 최종배 Pressing apparatus of casing of retaining well construction and the constructing method thereof
KR101858623B1 (en) * 2016-12-05 2018-05-24 강릉건설(주) Drilling machine with link drill unit and collumn wall contructing method by the same

Similar Documents

Publication Publication Date Title
KR100782007B1 (en) Construction method of a earth-protection walls
KR101492858B1 (en) apparatus of guide casing for a ground excavator
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR101655077B1 (en) Construction method of block for prefabricated retaining wall
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
JP6634219B2 (en) Ground anchor installation method
KR101793037B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
JP5202708B2 (en) Steel pipe pile and pile foundation method using the steel pipe pile
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR20100043600A (en) Underground excuvation pile construction method using percussion rotary drill
KR100801266B1 (en) Casing with guiding parts for a ground excavator and the method for constructing a cut-off wall therewith
KR101840226B1 (en) The guide holes of the form for soil auger dredges
KR102325623B1 (en) Construction method of retaining wall
KR101045625B1 (en) Construction method of retaining wall using cast-in-place pile
CN111827280B (en) Ex-situ pouring, jacking and in-place hole digging pile retaining wall device and construction method thereof
KR102233572B1 (en) Inverse casing for perforating ground bore and inverse casing manufacturing method thereof
KR101124704B1 (en) Guide for construction slurry wall and constructing method using the same
JP5075094B2 (en) Construction method and foundation structure of foundation structure in structure
KR101345457B1 (en) Driving piles pressure device and using the device driving pile method
JP5288356B2 (en) How to connect existing piping and new piping in the manhole
JP2005220573A (en) Pile driving method
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls
JP4196273B2 (en) How to form a retaining wall at the bottom of an existing building
JP3413166B2 (en) Construction method of underground continuous wall and underground continuous wall

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130220

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131121

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141127

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160418

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170710

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20181023

Year of fee payment: 11

R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20191029

Year of fee payment: 12

R401 Registration of restoration