KR101124704B1 - Guide for construction slurry wall and constructing method using the same - Google Patents

Guide for construction slurry wall and constructing method using the same Download PDF

Info

Publication number
KR101124704B1
KR101124704B1 KR1020080122367A KR20080122367A KR101124704B1 KR 101124704 B1 KR101124704 B1 KR 101124704B1 KR 1020080122367 A KR1020080122367 A KR 1020080122367A KR 20080122367 A KR20080122367 A KR 20080122367A KR 101124704 B1 KR101124704 B1 KR 101124704B1
Authority
KR
South Korea
Prior art keywords
continuous wall
guide
construction
parts
continuous
Prior art date
Application number
KR1020080122367A
Other languages
Korean (ko)
Other versions
KR20100063979A (en
Inventor
변웅호
Original Assignee
변웅호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 변웅호 filed Critical 변웅호
Priority to KR1020080122367A priority Critical patent/KR101124704B1/en
Publication of KR20100063979A publication Critical patent/KR20100063979A/en
Application granted granted Critical
Publication of KR101124704B1 publication Critical patent/KR101124704B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

본 발명은 건설, 토목분야에 관한 것으로서, 보다 상세하게는 흙막이 구조물인 연속벽의 시공을 가이드하기 위한 연속벽용 가이드 및 이를 이용한 연속벽 시공방법에 관한 것이다. 특히 본 발명은 복수의 파일들이 연속으로 연결된 연속벽을 굴토부에 시공하기 위한 것으로서, 적어도 연속벽의 둘레방향을 따라 서로 분리 가능하고, 서로 조합되어 상기 연속벽 형성공간을 이루는 복수의 가이드부들; 상기 복수의 가이드부들이 일체로 거동토록 상호 연결하는 결속부를 포함하는 것을 특징으로 하는 연속벽용 가이드 및 이를 이용한 연속벽 시공방법을 제시한다.The present invention relates to the field of construction and civil engineering, and more particularly, to a guide for a continuous wall for guiding the construction of a continuous wall which is an earthquake structure, and a continuous wall construction method using the same. Particularly, the present invention is for constructing a continuous wall in which a plurality of piles are continuously connected to the pit soil, and includes a plurality of guide parts that can be separated from each other along at least the circumferential direction of the continuous wall and are combined with each other to form the continuous wall forming space; Provides a guide for a continuous wall and a continuous wall construction method using the same, characterized in that the plurality of guides includes a binding unit interconnecting to behave integrally.

흙막이, 연속벽, 파일, 가이드, 가이드부, 결속부 Block, continuous wall, pile, guide, guide part, binding part

Description

연속벽용 가이드 및 이를 이용한 연속벽 시공방법{GUIDE FOR CONSTRUCTION SLURRY WALL AND CONSTRUCTING METHOD USING THE SAME}GUID FOR CONSTRUCTION SLURRY WALL AND CONSTRUCTING METHOD USING THE SAME}

본 발명은 건설, 토목분야에 관한 것으로서, 보다 상세하게는 흙막이 구조물인 연속벽의 시공을 가이드하기 위한 연속벽용 가이드 및 이를 이용한 연속벽 시공방법에 관한 것이다.The present invention relates to the field of construction and civil engineering, and more particularly, to a guide for a continuous wall for guiding the construction of a continuous wall which is an earthquake structure, and a continuous wall construction method using the same.

일반적으로 건설,토목현장의 지하공사에 있어서는 흙을 파낸 뒤 주위의 토사가 붕괴되는 것을 방지하기 위하여 임시적으로 흙막이 공사가 선행되는데, 흙막이 공사를 위해 설치되는 구조물을 흙막이 구조물이라 한다.In general, in the underground construction of construction and civil works site, temporary earthquake construction is preceded by digging soil to prevent collapse of surrounding soil. The structure installed for the earthquake construction is called an earthquake structure.

흙막이 구조물은 흙막이 공법에 따라 여러 방식이 있으며, 이중 하나가 복수의 파일(Pile)들이 연속적으로 연결되어 형성되는 연속벽이 있다.Dirt structure has various methods according to the dipping method, one of which has a continuous wall formed by connecting a plurality of piles (Pile) continuously.

즉, 도 1에 도시된 바와 같이, 굴토부(1)에 일정크기로 천공(2)을 형성한 후, 이 천공(2)에 콘크리트나 모르타르 등의 파일재를 주입하여 양생하여 하나의 파일(10)을 형성하며, 이러한 방식으로 복수의 파일들을 연속적으로 형성함으로써 연속벽(20)을 시공한다.That is, as shown in Figure 1, after forming the perforation (2) to a certain size in the gulchwibu 1, by injecting a pile material such as concrete or mortar into the perforation (2) to cure a single file ( 10) and the continuous wall 20 is constructed by continuously forming a plurality of piles in this manner.

이러한 연속벽(20)은 주변지반의 토압을 견딜 수 있는 흙막이 구조물임과 동 시에, 복수의 파일(10)들 사이에 틈이 없기 때문에 주변지반을 흐르는 물이 유입되지 않도록 차수역할도 겸할 수 있다.The continuous wall 20 is a structure that can withstand the earth pressure of the surrounding ground and at the same time, because there is no gap between the plurality of piles 10, it can also serve as the order so that water flowing through the surrounding ground does not flow. have.

그런데, 이와 같은 종래의 연속벽의 시공방법은 다음과 같은 점에서 문제로 지적되어 왔다.However, such a conventional method of constructing a continuous wall has been pointed out as a problem in the following points.

즉, 연속벽(20)을 한치의 오차없이 정확하게 시공하기 위해서는 무엇보다 복수의 파일(10)들을 형성하기 위한 천공작업이 정확하게 진행되어야 한다.That is, in order to accurately construct the continuous wall 20 without any error, a drilling operation for forming a plurality of piles 10 should be performed accurately.

그러나, 고심도의 천공(2)을 형성함에 따라 천공(2)을 정확하게 수직으로 형성하기 어렵다. 또한, 복수의 천공(2)을 순차적으로 형성함에 따라 누적 오차가 커진다. 따라서, 연속벽(20)에 틈이 생기고, 이로 인해 차수기능 및 구조적 안정성이 위협받는다.However, as the perforations 2 of high depth are formed, it is difficult to form the perforations 2 exactly vertically. In addition, as the plurality of perforations 2 are sequentially formed, the cumulative error increases. Thus, a gap occurs in the continuous wall 20, which threatens the ordering function and structural stability.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 연속벽의 정확한 시공을 위해, 연속벽의 시공을 가이드할 수 있는 연속벽용 가이드 및 이를 이용하는 연속벽 시공방법을 제공함을 그 목적으로 한다.The present invention has been made to solve the above problems, and to provide a continuous wall guide that can guide the construction of the continuous wall for continuous construction of the continuous wall, and a continuous wall construction method using the same.

상기한 과제를 해결하기 위해 본 발명은 복수의 파일들이 연속으로 연결된 연속벽을 굴토부에 시공하기 위한 것으로서, 적어도 연속벽의 둘레방향을 따라 서로 분리 가능하고, 서로 조합되어 상기 연속벽 형성공간을 이루는 복수의 가이드부들; 상기 복수의 가이드부들이 일체로 거동토록 상호 연결하는 결속부를 포함하는 것을 특징으로 하는 연속벽용 가이드를 제시한다.In order to solve the above problems, the present invention is for constructing a continuous wall in which a plurality of piles are continuously connected to the pit soil, and can be separated from each other along at least the circumferential direction of the continuous wall, and are combined with each other to form the continuous wall forming space. A plurality of guide parts; Provides a guide for a continuous wall, characterized in that the plurality of guide portion comprises a binding portion interconnecting to integrally behave.

상기 복수의 가이드부들은 상기 연속벽의 직선부 형성을 위한 직선부용 부재; 상기 연속벽의 코너부 형성을 위한 코너부용 부재들을 포함할 수 있다.The plurality of guide parts may include a straight part member for forming a straight part of the continuous wall; It may include corner members for forming the corner portion of the continuous wall.

상기 복수의 가이드부들은, 각각 상기 연속벽의 두께방향을 따라 이격하여 설치되는 내,외측 패널들을 포함할 수 있다. The plurality of guide parts may include inner and outer panels that are spaced apart from each other along the thickness direction of the continuous wall.

상기 내,외측 패널의 외측면은 각각, 평면으로 형성될 수 있다.The outer surface of the inner and outer panels may be formed in a plane, respectively.

상기 복수의 가이드부들은, 각각 상기 복수의 파일들과 일대일로 대응될 수 있도록 형성할 수 있다.The plurality of guide parts may be formed to correspond one-to-one with the plurality of files, respectively.

상기 복수의 가이드부들은, 상하방향으로 관통된 중공형으로 형성할 수 있다.The plurality of guide parts may be formed in a hollow shape penetrating in the vertical direction.

상기 복수의 가이드부들의 상면을 복개하는 적어도 하나의 상면 복개부재을 더 포함할 수 있다.It may further include at least one top cover member for covering the top surface of the plurality of guide parts.

상기 결속부는 상기 연속벽의 둘레방향을 따라 이웃한 가이드부들을 상호 연결하는 패널 연결부를 포함할 수 있다.The binding unit may include a panel connection unit interconnecting neighboring guide units along the circumferential direction of the continuous wall.

상기 패널 연결부는, 각각의 가이드부들의 일측에 구비되고, 이웃한 가이드부들에 끼워지는 적어도 하나의 고리를 갖는 고리부재; 상기 이웃한 가이드부들에 끼워진 고리부재의 고리에 끼워지는 키를 포함할 수 있다.The panel connection part includes a ring member provided at one side of each guide part and having at least one ring fitted to neighboring guide parts; It may include a key that is fitted to the ring of the ring member fitted to the adjacent guide portion.

또는 상기 패널 연결부는, 이웃한 가이드부들에 동시에 걸쳐지도록 상하방향으로 끼워질 수 있는 키; 상기 키가 끼워질 수 있도록 각각의 가이드부들에 형성된 키 홈을 포함할 수 있다. Or the panel connection portion, the key that can be fitted in the vertical direction so as to span the adjacent guide portion at the same time; It may include a key groove formed in each of the guide portion so that the key can be fitted.

또는 상기 패널 연결부는, 각각의 가이드부의 일측에 돌출 형성되어, 이웃한 가이드부에 형성된 키홈에 상하방향으로 끼워질 수 있는 키를 포함할 수 있다.Alternatively, the panel connection part may include a key protrudingly formed at one side of each guide part and fitted in a vertical direction to a key groove formed in a neighboring guide part.

상기 결속부는 상기 연속벽의 두께방향을 따라 상기 가이드부들의 내,외측패널 사이 간격을 유지시키는 간격유지부를 더 포함할 수 있다. 상기 간격 유지부는, 상기 연속벽의 두께방향을 따라 상기 가이드부들의 내,외측패널 사이에 위치되는 간격유지패널; 상기 간격유지패널과 상기 가이드부들의 내,외측패널이 일체로 거동토록 결합시키는 결합부재;를 포함할 수 있다. The binding part may further include a gap maintaining part for maintaining a gap between inner and outer panels of the guide parts along the thickness direction of the continuous wall. The gap maintaining part may include a gap maintaining panel positioned between inner and outer panels of the guide parts along a thickness direction of the continuous wall; And a coupling member configured to couple the gap maintaining panel and the inner and outer panels of the guide parts to be integrated with each other.

또한 상기한 과제를 해결하기 위해 본 발명은 상술한 연속벽용 가이드를 이용한 연속벽 시공방법으로서, 상기 굴토부에 상기 연속벽용 가이드를 설치하는 가이드 설치단계; 상기 설치된 연속벽용 가이드를 통해, 상기 연속벽 시공을 위한 천 공을 형성하는 천공단계; 상기 천공 후, 상기 연속벽용 가이드를 통해 연속벽을 시공하는 연속벽시공단계; 상기 연속벽 시공 후, 상기 연속벽용 가이드를 제거하는 가이드제거단계;를 포함할 수 있다.In addition, the present invention to solve the above problems is a continuous wall construction method using the above-described continuous wall guide, guide installation step of installing the guide for the continuous wall in the pit; A perforation step of forming perforations for the continuous wall construction through the installed continuous wall guide; A continuous wall construction step of constructing a continuous wall through the continuous wall guide after the drilling; After the continuous wall construction, the guide removal step of removing the guide for the continuous wall; may include.

상기 가이드설치단계는, 상기 연속벽의 일부를 시공할 수 있도록 상기 연속벽 가이드를 설치하는 설치과정; 상기 연속벽의 일부 시공 후, 상기 연속벽 가이드의 적어도 일부를 제거하는 가이드 제거과정; 상기 제거된 연속벽 가이드의 적어도 일부를 다음 연속벽 시공지점으로 옮겨 설치하는 연속설치과정;을 포함할 수 있다.The guide installation step, the installation process of installing the continuous wall guide to be able to construct a portion of the continuous wall; A guide removing process of removing at least a part of the continuous wall guide after the construction of the continuous wall; And a continuous installation process of moving at least a portion of the removed continuous wall guide to a next continuous wall construction point for installation.

상기 천공단계 및 연속벽 시공단계는, 복수의 파일들 중 일부씩 나눠서 순차적으로 형성할 수 있도록 교대로 반복 진행할 수 있다.The perforation step and the continuous wall construction step may be repeatedly performed alternately so as to be formed sequentially by dividing some of the plurality of files.

상기 천공단계는, 시공된 파일의 일부를 포함하여 천공할 수 있다.The drilling step may include drilling a portion of the pile.

또한 상기한 과제를 해결하기 위해 본 발명은 상술한 연속벽용 가이드를 이용한 연속벽 시공방법으로서, 상기 굴토부에 상기 복수의 가이드부들을 설치하여 상기 패널 연결부에 의해 상호 연결하고, 상기 복수의 가이드부들 중 일부 가이드부들에 상기 간격유지부를 설치하는 연속벽용 가이드 설치단계; 상기 복수의 가이드부들 중 상기 간격유지부가 설치되지 않은 가이드부들를 통해, 상기 연속벽 시공을 위한 1차 천공을 형성하는 1차천공단계; 상기 1차 천공에 1차 연속벽을 시공하는 1차연속벽시공단계; 상기 1차 연속벽 시공 후, 상기 간격유지부를 제거하고, 상기 간격유지부가 설치되었던 가이드부들를 통해 상기 연속벽 시공을 위한 2차 천공을 형성하는 2차천공단계; 상기 2차 천공에 2차 연속벽을 시공하는 2차연속벽시공단계; 상기 연속벽 시공 완료 후, 상기 연속벽용 가이드를 제거하는 가이드제거단 계;를 포함할 수 있다.In order to solve the above problems, the present invention provides a continuous wall construction method using the above-described continuous wall guide, the plurality of guides are installed in the pit to be connected to each other by the panel connection, the plurality of guides A guide wall installation step for installing the gap maintaining part in some of the guide parts; A primary drilling step of forming a primary drilling for the continuous wall construction through the guide portions of the plurality of guide portions in which the gap maintaining portion is not installed; A primary continuous wall construction step of constructing a primary continuous wall in the primary perforation; After the first continuous wall construction, removing the gap holding part and forming a second hole for the continuous wall construction through the guide parts in which the gap holding part is installed; A second continuous wall construction step of constructing a second continuous wall in the second perforation; After completion of the continuous wall construction, the guide removal step of removing the guide for the continuous wall; may include.

본 발명은 복수의 천공이 정확한 위치에 정확하게 수직으로 형성될 수 있게 함으로써, 연속벽이 정확하게 시공될 수 있도록 가이드할 수 있다.The present invention can guide the continuous wall to be accurately constructed by allowing a plurality of perforations to be formed exactly vertically at the correct position.

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2 내지 도 8에 도시된 바와 같이, 본 발명은 기본적으로 흙막이 구조물로서, 지반(100)의 터파기 작업에 의해 형성된 굴토부의 측면붕괴를 방지하기 위하여, 복수의 파일(102A)들이 연속적으로 연결된 연속벽(102)의 시공을 가이드하기 위한 연속벽용 가이드(110)에 관한 것이다.As shown in Figures 2 to 8, the present invention is basically a soil structure, in order to prevent the side collapse of the pit soil formed by the excavation of the ground 100, a plurality of pile (102A) is continuously It relates to a continuous wall guide 110 for guiding the construction of the connected continuous wall (102).

즉, 연속벽용 가이드(110)는 적어도 연속벽(102)의 둘레방향을 따라 서로 분리 가능하고 서로 조합되어 연속벽 형성공간(112)을 이루는 복수의 가이드부(120)들를 포함할 수 있다.That is, the continuous wall guide 110 may include a plurality of guide parts 120 that are separated from each other along at least the circumferential direction of the continuous wall 102 and are combined with each other to form the continuous wall forming space 112.

따라서, 연속벽용 가이드(110)에 의해, 연속벽(102)의 시공을 위한 천공을 정확한 위치에 정확하게 수직으로 형성함으로써, 연속벽(102)을 한치의 오차도 없이 정확하게 시공할 수 있어서, 연속벽(102)에 틈이 생기지 않게 방지할 수 있다는 효과를 얻을 수 있다.Therefore, by forming the perforations for the construction of the continuous wall 102 vertically and accurately at the correct position by the continuous wall guide 110, the continuous wall 102 can be accurately constructed without any error, and thus the continuous wall The effect that the gap is prevented from forming in 102 can be obtained.

또한, 연속벽용 가이드(110)에 의해, 연속벽(102)의 시공을 위한 천공 및 연속벽(102)의 타설작업을 용이하고 신속하게 진행할 수 있다는 효과를 얻을 수 있다.In addition, by the continuous wall guide 110, it is possible to obtain the effect that the drilling for the construction of the continuous wall 102 and the placing of the continuous wall 102 can be easily and quickly proceeded.

특히 복수의 가이드부(120)들은 연속벽(102)이 어떠한 형상을 취하든 용이하게 연속벽(102)의 시공을 가이드할 수 있도록, 연속벽(102)의 직선부 형성을 위한 직선부용 부재(122) 및 연속벽(102)의 코너부 형성을 위한 코너부용 부재(124)를 각각 포함하여 구성됨이 바람직하다.In particular, the plurality of guide parts 120 may be a member for the straight part for forming the straight part of the continuous wall 102 so that the continuous wall 102 can easily guide the construction of the continuous wall 102 in any shape. 122 and corner members 124 for forming corner portions of the continuous wall 102 are preferably configured.

직선부용 부재(122) 및 코너부용 부재(124)는 각각, 복수의 가이드부(120)들이 연속벽(102)의 둘레방향을 따라 서로 분리됨에 따라 연속벽(102)의 두께방향을 따라 이격하여 설치되는 내,외측 패널(122A,124A)(122B,124B)들로 구성될 수 있다.Each of the linear member 122 and the corner member 124 is spaced apart along the thickness direction of the continuous wall 102 as the plurality of guide portions 120 are separated from each other along the circumferential direction of the continuous wall 102. The inner and outer panels 122A and 124A (122B and 124B) may be installed.

상기 직선부용 부재(122) 및 코너부용 부재(124)의 내,외측 패널(122A,124A)(122B,124B)들은 각각, 필요에 따라 다양하게 형성할 수 있으며, 특히 그 외측면을 평면으로 형성함으로써 연속벽용 가이드(110)의 설치 후 육안으로도 쉽게 연속벽용 가이드(110)를 정확하게 설치하였는지를 확인 가능토록 할 수 있다는 이점을 취할 수 있다.The inner and outer panels 122A and 124A (122B and 124B) of the linear member 122 and the corner member 124 may be formed in various ways, respectively, and in particular, the outer surface thereof is formed in a plane. By doing so, even after the installation of the continuous wall guide 110, the naked eye can easily take advantage of being able to confirm whether or not the accurate installation of the continuous wall guide 110.

즉, 직선부용 부재(122) 및 코너부용 부재(124)들 사이가 단차지거나 틈이 생기지 않으면 연속벽용 가이드(110)를 정확하게 설치한 것이고, 그렇지 않다면 연속벽용 가이드(110)의 적어도 일부를 정확하지 않게 설치한 것이다.That is, if there is no step or gap between the straight member 122 and the corner member 124, the continuous wall guide 110 is installed correctly. Otherwise, at least a part of the continuous wall guide 110 is not accurate. It is not installed.

직선부용 부재(122)는 그 내,외측 패널(122A,124A)(122B,124B)이 필요에 따라 다양한 형상을 취할 수 있으며, 특히 도시된 바와 같이 복수의 직선부용 부재(122)를 혼돈없이 신속하게 용이하게 설치할 수 있도록 동일한 형상을 취함이 더욱 바람직하다.The linear member 122 may have various shapes as the inner and outer panels 122A, 124A, 122B, and 124B need, and in particular, the linear member 122 may be quickly and without confusion. It is more preferable to take the same shape so that it can be easily installed.

이러한 복수의 가이드부(120)들은 연속벽(102)의 둘레방향을 따라 다양한 방 식으로 분할될 수 있다. 특히 도시된 바와 같이 복수의 가이드부(120)들은 복수의 파일(102A)들과 일대일로 대응할 수 있도록 분할 형성할 수 있다. 물론, 이외에도 필요에 따라 복수의 가이드부(120)들은, 둘 이상의 가이드부(120)에 의해 하나의 연속벽 형성공간(112)을 형성하도록 분할될 수도 있고, 하나의 가이드부(120)에 의해 둘 이상의 연속벽 형성공간(112)을 형성하도록 분할될 수도 있다.The plurality of guide parts 120 may be divided in various ways along the circumferential direction of the continuous wall 102. In particular, as illustrated, the plurality of guide parts 120 may be formed to be divided so as to correspond one-to-one with the plurality of piles 102A. Of course, in addition to this, the plurality of guide parts 120 may be divided to form one continuous wall forming space 112 by two or more guide parts 120, or by one guide part 120. It may be divided to form two or more continuous wall forming spaces 112.

또한, 각각의 가이드부(120), 즉 각 패널(122A,124A)(122B,124B)은 내부가 빈 구조로 형성됨으로써 제조비 및 중량을 줄일 수 있으며, 특히 상하방향으로 관통된 중공형을 취함으로써 후술하는 바와 패널 연결부(140)의 키 삽입이 가능하여 패널 연결부(140)를 간소하게 구성할 수 있다는 이점을 더 취할 수 있다.In addition, each guide portion 120, that is, each panel (122A, 124A) (122B, 124B) is formed in a hollow structure to reduce the manufacturing cost and weight, in particular by taking a hollow penetrating in the vertical direction As described later, a key insertion of the panel connection unit 140 may be performed, and thus, the panel connection unit 140 may be simply configured.

이때, 연속벽(102)을 시공하는 동안, 각각의 가이드부(120)의 빈 내부공간(120B)으로 토사나 연속벽(102)의 시공재료(예를 들어, 콘크리트) 등의 유입 방지를 위해, 복수의 가이드부(120)들의 상면은 적어도 하나의 상면 복개부재(160)에 의해 복개되는 것이 더욱 바람직하다 할 수 있다. At this time, during the construction of the continuous wall 102, to prevent the inflow of construction materials (for example, concrete), such as earth and sand into the empty interior space (120B) of each guide portion 120. The upper surface of the plurality of guide parts 120 may be more preferably covered by at least one upper surface covering member 160.

상면 복개부재(160)은 복수의 가이드부(120)들의 상면에 탈착 가능하게 설치되어 복개할 수 있다면 어떠한 구성이든 무방하다.The upper surface covering member 160 may have any configuration as long as it can be detachably installed on the upper surfaces of the plurality of guide parts 120.

나아가, 복수의 가이드부(120)들이 일체로 거동될 수 있도록, 복수의 가이드부(120)들를 상호 연결하는 결속부(130)를 더 포함할 수 있다.Furthermore, the plurality of guide parts 120 may further include a binding part 130 that interconnects the plurality of guide parts 120 so that the plurality of guide parts 120 may be integrated.

따라서, 결속부(130)에 의해, 복수의 가이드부(120)들이 서로를 구속함으로써, 복수의 가이드부(120)들 간 시공오차가 생기는 것을 방지할 수 있어서, 복수의 가이드부(120)들을 정확하게 시공할 수 있고, 따라서 연속벽(102)의 시공성이 월등 히 우수하다는 효과를 얻을 수 있다.Accordingly, by the binding unit 130, the plurality of guide units 120 may restrict each other, thereby preventing a construction error between the plurality of guide units 120, thereby preventing the plurality of guide units 120. The construction can be accurately performed, and therefore, the effect that the workability of the continuous wall 102 is excellent can be obtained.

또한, 복수의 가이드부(120)들이 서로의 버팀목이 되어 줌으로써, 복수의 가이드부(120)들을 설치하여 고정하기 위한 별도의 작업이나 부재를 생략할 수 있어서, 신속하게 연속벽용 가이드(110)를 설치할 수 있고, 비용을 줄일 수 있다는 효과를 얻을 수 있다.In addition, since the plurality of guide parts 120 serve as mutual support, separate work or members for installing and fixing the plurality of guide parts 120 may be omitted, thereby rapidly providing the continuous wall guide 110. It can be installed and the cost can be reduced.

이를 위해, 결속부(130)는 복수의 가이드부(120)들을 서로 탈착 가능하게 연결할 수 있다면 어떠한 구성이든 무방하며, 특히 연속벽(102)의 둘레방향을 따라 이웃한 가이드부(120)들을 상호 연결하는 패널 연결부(140)를 포함할 수 있다.To this end, the binding unit 130 may have any configuration as long as the plurality of guide units 120 can be detachably connected to each other, and in particular, the adjacent guide units 120 may be adjacent to each other along the circumferential direction of the continuous wall 102. It may include a panel connector 140 for connecting.

패널 연결부(140)는 도시된 바와 같이, 각각의 가이드부(120)들의 일측에 구비되고 이웃한 가이드부(120)들에 끼워지는 적어도 하나의 고리(142A)를 갖는 고리부재(142)와, 이웃한 가이드부(120)들에 형성된 고리 홀(120A)에 끼워진 고리부재(142)의 고리(142A)에 끼워지는 키(144)를 포함할 수 있다.As shown in the drawing, the panel connection part 140 includes a ring member 142 provided on one side of each guide part 120 and having at least one ring 142A fitted to neighboring guide parts 120. The key 144 may be inserted into the ring 142A of the ring member 142 fitted into the ring hole 120A formed in the neighboring guide parts 120.

이때, 도시된 바와 같이 하나의 가이드부(120)의 일측에는 고리부재(142)가 형성되고 그 반대쪽에는 고리 홀(120A)이 형성될 수 있으며, 필요에 따라 하나의 가이드부(120)의 양측에 모두 고리부재(142) 또는 고리 홀(120A)이 형성될 수도 있다.At this time, as shown, one side of the one guide portion 120, the ring member 142 is formed and the other side of the ring hole 120A may be formed, if necessary, both sides of the one guide portion 120 Both ring members 142 or ring holes 120A may be formed.

고리부재(142)는 도시된 바와 같이 가이드부(120)와 일체로 형성될 수 있으며, 이외에도 필요에 따라 가이드부(120)와는 별도의 부재로 형성되어 가이드부(120)와 결합될 수도 있다. The ring member 142 may be formed integrally with the guide portion 120 as shown, in addition, may be formed as a separate member from the guide portion 120, if necessary, may be combined with the guide portion 120.

고리부재(142)는 이웃한 두 가이드부(120)들을 견고하게 연결하기 위해서, 상하방향을 따라 복수 형성되는 것이 더욱 바람직하다.The ring member 142 is more preferably formed in a plurality in the vertical direction, in order to firmly connect the two adjacent guide portion 120.

고리부재(142)는 도시된 바와 같이 폐쇄형 고리로 형성될 수 있으며, 이외에도 필요에 따라 갈고리 등과 같이 일부가 개구된 형상을 취할 수도 있다.The ring member 142 may be formed as a closed ring as shown, and may have a shape in which a part is opened, such as a hook, as necessary.

키(144)는 도시된 바와 같이 핀 구조를 취할 수 있으며, 이외에도 필요에 따라 이웃한 고리부재(142)에 탈착 가능하게 끼워질 수 있다면 어떠한 구성이든 무방하다.The key 144 may have a pin structure as shown, and any configuration may be provided as long as it can be detachably fitted to a neighboring ring member 142 as necessary.

이와 같이 고리부재(142)와 키 구조의 패널 연결부(140)는, 상술한 바와 같이 각각의 가이드부(120)가 상하방향으로 관통된 중공형으로 형성됨으로써 용이하게 구성될 수 있다.As described above, the loop member 142 and the panel connection portion 140 having the key structure may be easily configured by forming the guide member 120 in a hollow shape vertically penetrating as described above.

그리고, 이러한 패널 연결부(140)는, 볼트, 용접 방법 등을 이용하여 이웃한 두 가이드부(120)들을 연결하는 경우와 비교해볼 때, 키를 고리부재(142)에 끼워넣는 한번의 작업으로 간단하게 끝낼 수 있고, 연속벽용 가이드(110)의 제거시 용이하게 이웃한 두 가이드부(120)들이 분리될 수 있기 때문에, 보다 효과적이다.In addition, the panel connection unit 140 is simple in one operation by inserting a key into the ring member 142 as compared with the case of connecting two adjacent guide units 120 using a bolt, a welding method, or the like. It can be finished, and since the two adjacent guide portion 120 can be easily separated when removing the guide 110 for the continuous wall, it is more effective.

그리고, 결속부(130)는 상술한 바와 같이 각각의 가이드부(120)가 내,외측패널로 분리된 구성인 바, 연속벽(102)의 두께방향을 따라 가이드부(120)들의 내,외측패널 사이 간격을 유지시키는 간격유지부(150)를 더 포함할 수 있다.And, as described above, the binding unit 130 has a structure in which each guide unit 120 is separated into inner and outer panels, and the inner and outer sides of the guide units 120 along the thickness direction of the continuous wall 102. The apparatus may further include a gap maintaining part 150 to maintain a gap between the panels.

간격유지부(150)는 도시된 바와 같이, 연속벽(102)의 두께방향을 따라 가이드부(120)들의 내,외측패널(122A,124A)(122B,124B) 사이에 위치되는 적어도 하나의 간격유지패널(152)과, 간격유지패널(152)과 가이드부(120)들의 내,외측패널(122A,124A)(122B,124B)이 일체로 거동토록 결합시키는 결합부재(154)를 포함하 여 구성될 수 있다.At least one gap disposed between the inner and outer panels 122A, 124A, 122B, and 124B of the guide parts 120 along the thickness direction of the continuous wall 102, as shown in FIG. It includes a holding panel 152, the coupling member 154 for coupling the inner and outer panels 122A, 124A (122B, 124B) of the gap maintaining panel 152 and the guide portion 120 integrally. Can be configured.

간격유지패널(152)은 각각의 가이드부(120)의 내,외측패널 간 간격을 유지시키기만 하면 되므로, 연속벽 형성공간(112)을 메우도록 형성되는 것보다는 도시된 바와 같이 패널처럼 형성되는 것이 보다 바람직하다 할 수 있다.Since the gap maintaining panel 152 only needs to maintain a gap between the inner and outer panels of each guide part 120, the gap maintaining panel 152 is formed like a panel as shown, rather than being formed to fill the continuous wall forming space 112. It may be more preferable.

간격유지패널(152)은 도시된 바와 같이 상하방향으로 복수의 가이드부(120)들의 길이와 동일한 길이를 갖도록 형성될 수 있으며, 필요에 따라 복수의 가이드부(120)들의 길이보다 짧게 형성되거나, 더 길게 형성되어도 무방하다.The gap maintaining panel 152 may be formed to have the same length as the length of the plurality of guide parts 120 in the up and down direction as shown, and may be formed shorter than the length of the plurality of guide parts 120 as necessary. It may be formed longer.

간격유지패널(152)은 도시된 바와 같이 각각의 가이드부(120)의 내,외측패널 사이에 하나만 설치될 수 있으며, 필요에 따라 상하방향으로 복수 설치되거나 연속벽(102)의 둘레방향을 따라 복수 설치되어도 무방하다.As shown in the drawing, only one space keeping panel 152 may be installed between the inner and outer panels of each guide unit 120. If necessary, a plurality of interval maintaining panels 152 may be installed in the vertical direction or along the circumferential direction of the continuous wall 102. It may be provided in plurality.

간격유지패널(152) 또한, 어느 정도 두께를 갖는다면, 제조비 및 중량을 줄이기 위해 상술한 각각의 가이드부(120)처럼 내부가 빈 구조를 취할 수 있다.The gap maintaining panel 152 may also have a hollow structure, such as the respective guide parts 120 described above, in order to reduce the manufacturing cost and weight, if the thickness of the gap maintaining panel 152 is reduced.

결합부재(154)는 상술한 패널 연결부(140)와 같이, 고리(154A)와 키(154B)로 구성될 수 있다.The coupling member 154 may be composed of a ring 154A and a key 154B, like the panel connection unit 140 described above.

이때, 결합부재(154)의 고리(154A)는 도시된 바와 같이 간격유지패널(152)과 일체로 형성되고, 각각의 가이드부(120)의 내측면에 결합부재(154)의 고리(154A)가 끼워질 수 있는 고리 홀(이하, 설명의 편의를 위해 '내측면 고리 홀(120C)'이라한다)이 형성될 수 있다. 이 경우, 연속벽(102)의 시공시 내측면 고리 홀(120C)을 통해 연속벽(102)의 시공재료가 각각의 가이드부(120)의 내부공간으로 유출될 수 있으므로, 연속벽(102)의 시공시에는 각각의 가이드부(120)의 내측면 고리 홀(120C) 을 복개할 수 있다.At this time, the ring 154A of the coupling member 154 is integrally formed with the spacer panel 152 as shown, and the ring 154A of the coupling member 154 on the inner side of each guide portion 120. Ring hole (hereinafter, referred to as 'inner ring hole 120C' for convenience of description) may be formed. In this case, since the construction material of the continuous wall 102 may flow into the inner space of each guide unit 120 through the inner side ring hole 120C during the construction of the continuous wall 102, the continuous wall 102. At the time of construction, the inner ring hole 120C of each guide unit 120 may be covered.

또는 도 10에 도시된 바와 같이, 결합부재(154)의 고리(154A)가 각각의 가이드부(120)에 형성되고, 간격유지패널(152)에 고리 홀(152A)이 형성될 수도 있다. Alternatively, as illustrated in FIG. 10, a ring 154A of the coupling member 154 may be formed in each guide unit 120, and a ring hole 152A may be formed in the spacer panel 152.

이때, 결합부재(154)의 고리(154A)는 각각의 가이드부(120)와 일체로 형성될 수도 있지만, 이 경우, 연속벽(102)의 시공시 연속벽(102)에 파묻혀버려서 가이드부(120)의 제거가 불가능해질 수 있다. 따라서, 도 10에 도시된 바와 같이 결합부재(154)의 고리(154A)는 별도의 고리부재로서 각각의 가이드부(120)와 분리 가능토록 구성되는 것이 바람직하다. 즉, 각각의 가이드부(120)의 내측면에는 결합부재(154)의 고리(142A)의 탈부착을 위해 고리 탈부착 홀(120D)이 형성될 수 있다.At this time, the ring 154A of the coupling member 154 may be formed integrally with each of the guide portions 120, in this case, buried in the continuous wall 102 during the construction of the continuous wall 102, the guide portion ( 120 may be impossible to remove. Therefore, as shown in Figure 10, the ring 154A of the coupling member 154 is preferably configured to be separated from each guide portion 120 as a separate ring member. That is, a ring detachable hole 120D may be formed on the inner surface of each guide unit 120 for detachment of the ring 142A of the coupling member 154.

나아가, 상술한 바와 같이 연속벽(102)의 시공시 결합부재(154)의 고리(154A)를 뺄 경우, 각각의 가이드부(120)의 고리 탈부착 홀(120D)을 복개하기 위해, 각각의 가이드부(120)에 탈착 가능하게 설치될 수 있는 내측면 복개부재(162)를 더 포함할 수 있다.Furthermore, as described above, when the ring 154A of the coupling member 154 is pulled out during the construction of the continuous wall 102, the respective guides to cover the ring detachable holes 120D of the respective guide parts 120 are covered. It may further include an inner side cover member 162 that can be detachably installed in the portion 120.

한편, 도 11에 도시된 바와 같이, 패널 연결부(140)는, 이웃한 가이드부(120)들에 동시에 걸쳐지도록 각각의 가이드부(120)들에 형성된 키 홈(120E)에 상하방향으로 끼워질 수 있는 키(이하, 설명의 편의를 위해 '제2키(146)'라 한다)를 포함할 수 있다.On the other hand, as shown in FIG. 11, the panel connection part 140 may be fitted in the vertical direction to the key groove 120E formed in each of the guide parts 120 so as to span the neighboring guide parts 120 at the same time. It may include a key (hereinafter referred to as 'second key 146' for convenience of description).

이때, 제2키(146)는 이웃한 두 가이드부(120)들 간 벌어짐 방지를 위해, 도시된 나비모양 등과 같이 키 홈(120E)에 상하방향으로만 끼워질 수 있도록 형성됨이 바람직하다.At this time, the second key 146 is preferably formed to be fitted only in the vertical direction to the key groove 120E, such as a butterfly shape to prevent the gap between the two adjacent guide portion 120.

물론, 간격유지부(150)의 결합부재(154) 또한 도 11에 도시된 패널 연결부(140)처럼 구성될 수 있다.Of course, the coupling member 154 of the gap maintaining unit 150 may also be configured like the panel connection unit 140 shown in FIG.

또는 도 12에 도시된 바와 같이, 패널 연결부(140)는, 각각의 가이드부(120)의 일측에 돌출 형성되어, 이웃한 가이드부(120)에 형성된 키홈(120F)에 상하방향으로 끼워질 수 있는 키(이하, 설명의 편의를 위해 '제3키(148)'라 한다)를 포함하여 구성될 수 있다.Alternatively, as shown in FIG. 12, the panel connection part 140 may protrude on one side of each guide part 120 to be fitted in the vertical direction to the key groove 120F formed in the neighboring guide part 120. Key (hereinafter, referred to as 'third key 148' for convenience of description).

물론, 제3키(148)는 상하방향으로만 끼워질 수 있도록, 도시된 삼각단면 등의 형상을 취함이 바람직하다. Of course, it is preferable that the third key 148 has a shape such as a triangular cross section as shown so that the third key 148 can be fitted only in the vertical direction.

또한, 간격유지부(150)의 결합부재(154)도 마찬가지로 구성될 수 있다.In addition, the coupling member 154 of the spacer 150 may be configured in the same manner.

도 11 및 도 12에 도시된 바와 같이 패널 연결부(140)가 구성되는 경우, 도 13에 도시된 바와 같이 이웃한 두 가이드부(120)들 간 상하방향 상대 움직임이 가능하기 때문에, 지반(100)이 평평하지 않는 곳에도 연속벽용 가이드(110)를 용이하게 설치할 수 있는 이점을 더 취할 수 있다.When the panel connection unit 140 is configured as shown in FIGS. 11 and 12, as shown in FIG. 13, since up and down relative movement between two neighboring guide units 120 is possible, the ground 100 Even in this non-flat place, it is possible to further take advantage of the easy installation of the guide 110 for the continuous wall.

이와 같이 구성된 연속벽용 가이드(110)를 이용한 연속벽(102) 시공과정을 설명하면, 다음과 같다.The construction process of the continuous wall 102 using the continuous wall guide 110 configured as described above is as follows.

먼저, 도 9a에 도시된 바와 같이, 굴토부에 연속벽용 가이드(110)를 설치한다. 이때, 복수의 가이드부(120)들 중 연속벽(102)의 파일(102A)이 후 시공되는 일부 가이드부(120)들에만 간격유지부(150)를 설치한다. First, as shown in FIG. 9A, the continuous wall guide 110 is installed in the pit part. At this time, the spacing maintaining part 150 is installed only in some of the guide parts 120 where the pile 102A of the continuous wall 102 is constructed after the plurality of guide parts 120.

즉, 도시된 바와 같이 연속벽(102)의 복수의 파일(102A)들이 1차, 2차로 나뉘어 시공되는 경우, 2차 연속벽(102)이 시공되는 일부 가이드부(120)들에만 간격 유지부(150)를 설치할 수 있다.That is, as shown, when the plurality of piles 102A of the continuous wall 102 are constructed by dividing the primary and the secondary, the space maintaining part is provided only to some guide parts 120 on which the secondary continuous wall 102 is constructed. 150 can be installed.

도 9b에 도시된 바와 같이 복수의 가이드부(120)들 중 간격유지부(150)가 설치되지 않은 가이드부(120)들를 통해서 1차 연속벽(102) 시공을 위한 1차 천공을 형성한 후, 1차 천공을 콘크리트 등의 연속벽(102)의 시공재료로 메움으로써 1차 연속벽(102)을 시공한다.As shown in FIG. 9B, after forming the first perforation for the construction of the first continuous wall 102 through the guide parts 120 of the plurality of guide parts 120 in which the gap maintaining part 150 is not installed, The primary continuous wall 102 is constructed by filling primary drilling with construction materials for the continuous wall 102 such as concrete.

그리고, 도 9c에 도시된 바와 같이, 간격유지부(150)를 제거하고, 간격유지부(150)가 설치되었던 가이드부(120)들를 통해 2차 연속벽(102) 시공을 위한 2차 천공을 형성한다.And, as shown in Figure 9c, to remove the gap maintaining portion 150, through the guide portion 120 in which the gap maintaining portion 150 is installed secondary drilling for the construction of the second continuous wall (102) Form.

이때, 연속벽(102)의 복수의 파일(102A)들이 서로 연속될 수 있도록, 2차 천공은 시공된 파일(102A)의 일부를 포함하여 천공하는 것이 바람직하다.At this time, it is preferable that the secondary drilling includes a portion of the piled pile 102A so that the plurality of piles 102A of the continuous wall 102 can be continuous with each other.

2차 천공 후, 2차 연속벽(102)을 시공하고, 연속벽용 가이드(110)를 제거하면, 도 9d에 도시된 바와 같이, 연속벽(102)이 시공 완료될 수 있다.After the secondary drilling, when the secondary continuous wall 102 is constructed and the continuous wall guide 110 is removed, the continuous wall 102 may be completed as shown in FIG. 9D.

한편, 1차 연속벽(102) 시공 및 2차 연속벽(102) 시공은, 각각 복수의 파일(102A)들이 한번에 시공될 수도 있지만, 복수의 파일(102A)들이 일부씩 나눠서 순차적으로 형성될 수도 있다. On the other hand, the first continuous wall 102 construction and the second continuous wall 102 construction, although a plurality of pile (102A) may be constructed at a time, respectively, a plurality of pile (102A) may be formed in part by sequentially have.

1차 천공 및 1차 연속벽(102) 시공이 교대로 반복 진행될 수 있다. 또한 2차 천공 및 2차 연속벽(102) 시공이 교대로 반복 진행될 수 있다.Primary drilling and primary continuous wall 102 construction may be repeated alternately. In addition, the secondary perforation and the secondary continuous wall 102 construction may be repeated alternately.

또한, 상술한 바와 같이 복수의 파일(102A)들이 일부씩 나눠서 순차적으로 형성되는 경우, 연속벽용 가이드(110)는 연속벽(102)의 전 부분에 대응하여 설치될 수도 있고, 연속벽(102)의 일부분에만 대응하여 설치될 수도 있다.In addition, as described above, when the plurality of piles 102A are sequentially formed by dividing one by one, the continuous wall guide 110 may be installed corresponding to the entire portion of the continuous wall 102, or the continuous wall 102. It may be installed corresponding to only a part of the.

후자의 경우는 즉, 연속벽(102)의 일부를 시공할 수 있도록 연속벽(102) 가이드를 설치하여 연속벽(102)의 일부를 시공한 후, 연속벽(102) 가이드의 적어도 일부를 제거하고, 그 제거된 연속벽(102) 가이드의 적어도 일부를 다음 연속벽(102) 시공지점으로 옮겨 설치하여 연속벽(102)의 시공을 계속 진행할 수 있다.In the latter case, that is, a part of the continuous wall 102 is installed by installing the guide of the continuous wall 102 so that a part of the continuous wall 102 can be constructed, and then at least a part of the guide of the continuous wall 102 is removed. Then, at least a part of the removed continuous wall 102 guide can be moved to the next continuous wall 102 construction point and installed to continue the construction of the continuous wall 102.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다. Since the above has been described only with respect to some of the preferred embodiments that can be implemented by the present invention, the scope of the present invention, as is well known, should not be construed as limited to the above embodiments, the present invention described above It will be said that both the technical idea and the technical idea which together with the base are included in the scope of the present invention.

도 1은 종래의 연속벽 시공을 보여주는 평면도.1 is a plan view showing a conventional continuous wall construction.

도 2 내지 도 9d은 본 발명의 일 실시 예에 따른 연속벽용 가이드 및 이를 이용하는 연속벽 시공방법에 관한 것으로서,2 to 9d are directed to a continuous wall guide and a continuous wall construction method using the same, according to an embodiment of the present invention.

도 2는 연속벽용 가이드의 시공상태 구성도.Figure 2 is a construction state configuration of the guide for the continuous wall.

도 3은 연속벽용 가이드의 시공상태 주요부 평단면도.3 is a plan sectional view of a main portion of a construction state of the guide for the continuous wall.

도 4는 연속벽용 가이드의 패널 연결부를 보여주는 분해 사시도.Figure 4 is an exploded perspective view showing a panel connection of the guide for the continuous wall.

도 5는 연속벽용 가이드의 패널 연결부를 보여주는 분해 사시도.5 is an exploded perspective view showing a panel connection of the guide for the continuous wall.

도 6은 도 3의 A-A선에 따른 단면도.6 is a cross-sectional view taken along the line A-A of FIG.

도 7은 도 3의 B-B선에 따른 단면도.7 is a cross-sectional view taken along the line B-B in FIG.

도 8은 도 3의 C-C선에 따른 단면도.8 is a cross-sectional view taken along the line C-C in FIG.

도 9는 연속벽 시공순서를 보여주는 구성도.9 is a configuration diagram showing a continuous wall construction sequence.

도 10은 연속벽용 가이드의 간격유지부의 다른 실시 예를 보여주는 분해 사시도.10 is an exploded perspective view showing another embodiment of the interval maintaining part of the guide for the continuous wall.

도 11은 연속벽용 가이드의 패널결속부의 다른 실시 예를 보여주는 평단면도.11 is a plan sectional view showing another embodiment of the panel binding unit of the guide for the continuous wall.

도 12는 연속벽용 가이드의 패널결속부의 또 다른 실시 예를 보여주는 평단면도.12 is a cross-sectional view showing another embodiment of the panel binding unit of the guide for the continuous wall.

도 13은 도 11, 도12의 연속벽용 가이드의 시공상태를 보여주는 측면도.Figure 13 is a side view showing the construction of the continuous wall guide of Figure 11, Figure 12;

<도면의 주요 부분에 관한 부호의 설명><Explanation of symbols on main parts of the drawings>

100; 지반 102; 연속벽100; Ground 102; Continuous wall

110; 연속벽용 가이드 112; 연속벽 형성공간110; Guide 112 for continuous wall; Continuous wall formation space

120; 가이드부 122; 직선부용 부재120; Guide portion 122; Straight part member

124; 코너부용 부재 130; 결속부124; Corner member 130; Binding

140; 패널 연결부 142; 고리부재140; Panel connection 142; Ring member

144; 키 150; 간격유지부144; Key 150; Spacing

152; 간격유지패널 154; 결합부재152; Gap maintenance panel 154; Joining member

Claims (18)

복수의 파일들이 연속으로 연결된 연속벽을 굴토부에 시공하기 위한 것으로서, In order to construct a continuous wall in which a plurality of piles are connected in series, 서로 조합되어 상기 연속으로 연결된 복수의 파일들에 대응되는 연속벽 형성공간을 형성하며, 적어도 상기 연속벽의 둘레방향을 따라 서로 분리 가능한 복수의 가이드부들;A plurality of guide parts combined with each other to form a continuous wall forming space corresponding to the plurality of piles connected to each other, and separated from each other along at least the circumferential direction of the continuous wall; 상기 복수의 가이드부들이 일체로 거동토록 상호 연결하는 결속부를 포함하는 것을 특징으로 하는 연속벽용 가이드.And a binding portion for interconnecting the plurality of guide portions integrally with each other. 청구항 1에 있어서,The method according to claim 1, 상기 복수의 가이드부들은 The plurality of guide parts 상기 연속벽의 직선부 형성을 위한 직선부용 부재;A straight part member for forming a straight part of the continuous wall; 상기 연속벽의 코너부 형성을 위한 코너부용 부재들을 포함하는 것을 특징으로 하는 연속벽용 가이드.And a corner member for forming corner portions of the continuous wall. 청구항 1에 있어서,The method according to claim 1, 상기 복수의 가이드부들은, 각각 상기 연속벽의 두께방향을 따라 이격하여 설치되는 내,외측 패널들을 포함하는 것을 특징으로 하는 연속벽용 가이드.The plurality of guide parts, the guide for the continuous wall, characterized in that it comprises inner and outer panels which are spaced apart along the thickness direction of the continuous wall, respectively. 청구항 3에 있어서,The method of claim 3, 상기 내,외측 패널의 외측면은 각각, 평면으로 형성되는 것을 특징으로 하는 연속벽용 가이드.The outer surface of the inner and outer panel, each guide for the continuous wall, characterized in that formed in a plane. 청구항 1에 있어서,The method according to claim 1, 상기 복수의 가이드부들은, 각각 상기 복수의 파일들과 일대일로 대응될 수 있도록 형성되는 것을 특징으로 하는 연속벽용 가이드.The plurality of guide parts, the guide for the continuous wall, characterized in that each formed so as to correspond to the plurality of files one-to-one. 청구항 1에 있어서,The method according to claim 1, 상기 복수의 가이드부들은,The plurality of guide parts, 상하방향으로 관통된 중공형으로 형성되는 것을 특징으로 하는 연속벽용 가이드.Guide for continuous wall, characterized in that formed in the hollow penetrated in the vertical direction. 청구항 6에 있어서,The method of claim 6, 상기 복수의 가이드부들의 상면을 복개하는 적어도 하나의 상면 복개부재을 더 포함하는 것을 특징으로 하는 연속벽용 가이드.And at least one top surface covering member covering the top surfaces of the plurality of guide portions. 청구항 1 내지 청구항 7 중 어느 한 항에 있어서,The method according to any one of claims 1 to 7, 상기 결속부는 상기 연속벽의 둘레방향을 따라 이웃한 가이드부들을 상호 연결하는 패널 연결부를 포함하는 것을 특징으로 하는 연속벽용 가이드.The binding unit is a guide for a continuous wall, characterized in that it comprises a panel connection portion for interconnecting the adjacent guide portion in the circumferential direction of the continuous wall. 청구항 8에 있어서,The method according to claim 8, 상기 패널 연결부는, The panel connection portion, 각각의 가이드부들의 일측에 구비되고, 이웃한 가이드부들에 끼워지는 적어도 하나의 고리를 갖는 고리부재;A ring member provided on one side of each of the guide parts and having at least one ring fitted to neighboring guide parts; 상기 이웃한 가이드부들에 끼워진 고리부재의 고리에 끼워지는 키를 포함하는 것을 특징으로 하는 연속벽용 가이드.And a key fitted to a ring of a ring member fitted to the neighboring guide parts. 청구항 8에 있어서,The method according to claim 8, 상기 패널 연결부는, The panel connection portion, 이웃한 가이드부들에 동시에 걸쳐지도록 상하방향으로 끼워질 수 있는 키;A key that can be fitted in the up and down direction so as to span simultaneously the adjacent guide parts; 상기 키가 끼워질 수 있도록 각각의 가이드부들에 형성된 키 홈을 포함하는 것을 특징으로 하는 연속벽용 가이드.And a key groove formed in each of the guide parts so that the key can be inserted therein. 청구항 8에 있어서,The method according to claim 8, 상기 패널 연결부는, The panel connection portion, 각각의 가이드부의 일측에 돌출 형성되어, 이웃한 가이드부에 형성된 키홈에 상하방향으로 끼워질 수 있는 키를 포함하는 것을 특징으로 하는 연속벽용 가이드.Protrudingly formed on one side of each guide portion, the guide for the continuous wall, characterized in that it comprises a key that can be fitted in the vertical direction in the key groove formed in the adjacent guide portion. 청구항 8에 있어서,The method according to claim 8, 상기 결속부는 상기 연속벽의 두께방향을 따라 상기 가이드부들의 내,외측패 널 사이 간격을 유지시키는 간격유지부를 더 포함하는 것을 특징으로 하는 연속벽용 가이드.The binding unit further comprises a spacer for maintaining a gap between the inner and outer panels of the guide portion along the thickness direction of the continuous wall guide for continuous wall. 청구항 12에 있어서,The method according to claim 12, 상기 간격 유지부는, The gap maintaining unit, 상기 연속벽의 두께방향을 따라 상기 가이드부들의 내,외측패널 사이에 위치되는 간격유지패널;A gap maintaining panel positioned between inner and outer panels of the guide parts along a thickness direction of the continuous wall; 상기 간격유지패널과 상기 가이드부들의 내,외측패널이 일체로 거동토록 결합시키는 결합부재;A coupling member for coupling the gap maintaining panel and the inner and outer panels of the guide parts to be integrated with each other; 를 포함하는 것을 특징으로 하는 연속벽용 가이드.Guide for continuous wall comprising a. 청구항 1 내지 청구항 7 중 어느 한 항의 연속벽용 가이드를 이용한 연속벽 시공방법으로서, A continuous wall construction method using the continuous wall guide according to any one of claims 1 to 7, 상기 굴토부에 상기 연속벽용 가이드를 설치하는 가이드 설치단계;A guide installation step of installing the guide for the continuous wall on the pit; 상기 설치된 연속벽용 가이드를 통해, 상기 연속벽 시공을 위한 천공을 형성하는 천공단계;A perforating step of forming perforations for the continuous wall construction through the installed continuous wall guide; 상기 천공 후, 상기 연속벽용 가이드를 통해 연속벽을 시공하는 연속벽시공단계;A continuous wall construction step of constructing a continuous wall through the continuous wall guide after the drilling; 상기 연속벽 시공 후, 상기 연속벽용 가이드를 제거하는 가이드제거단계;A guide removing step of removing the continuous wall guide after the continuous wall construction; 를 포함하는 것을 특징으로 하는 연속벽용 가이드를 이용한 연속벽 시공방 법.Continuous wall construction method using a guide for the continuous wall comprising a. 청구항 14에 있어서,The method according to claim 14, 상기 가이드설치단계는, The guide installation step, 상기 연속벽의 일부를 시공할 수 있도록 상기 연속벽 가이드를 설치하는 설치과정;An installation process of installing the continuous wall guide to construct a part of the continuous wall; 상기 연속벽의 일부 시공 후, 상기 연속벽 가이드의 적어도 일부를 제거하는 가이드 제거과정;A guide removing process of removing at least a part of the continuous wall guide after the construction of the continuous wall; 상기 제거된 연속벽 가이드의 적어도 일부를 다음 연속벽 시공지점으로 옮겨 설치하는 연속설치과정;A continuous installation process of moving at least a portion of the removed continuous wall guide to a next continuous wall construction point for installation; 을 포함하는 것을 특징으로 하는 연속벽용 가이드를 이용한 연속벽 시공방법.Continuous wall construction method using a guide for the continuous wall comprising a. 청구항 14에 있어서,The method according to claim 14, 상기 천공단계 및 연속벽 시공단계는, 복수의 파일들 중 일부씩 나눠서 순차적으로 형성할 수 있도록 교대로 반복 진행하는 것을 특징으로 하는 연속벽 가이드를 이용한 연속벽 시공방법.The drilling step and the continuous wall construction step, the continuous wall construction method using a continuous wall guide, characterized in that it is repeated repeatedly so as to sequentially form a portion of a plurality of files. 청구항 16에 있어서,18. The method of claim 16, 상기 천공단계는, The drilling step, 시공된 파일의 일부를 포함하여 천공하는 것을 특징으로 하는 연속벽 가이드를 이용한 연속벽 시공방법.Continuous wall construction method using a continuous wall guide, characterized in that the perforated including a part of the construction pile. 청구항 12의 연속벽용 가이드를 이용한 연속벽 시공방법으로서, A continuous wall construction method using the continuous wall guide of claim 12, 상기 굴토부에 상기 복수의 가이드부들을 설치하여 상기 패널 연결부에 의해 상호 연결하고, 상기 복수의 가이드부들 중 일부 가이드부들에 상기 간격유지부를 설치하는 연속벽용 가이드 설치단계;A guide wall installation step of installing the plurality of guide parts in the pit soil and interconnecting by the panel connection part, and installing the gap maintaining part in some of the guide parts of the plurality of guide parts; 상기 복수의 가이드부들 중 상기 간격유지부가 설치되지 않은 가이드부들를 통해, 상기 연속벽 시공을 위한 1차 천공을 형성하는 1차천공단계;A primary drilling step of forming a primary drilling for the continuous wall construction through the guide portions of the plurality of guide portions in which the gap maintaining portion is not installed; 상기 1차 천공에 1차 연속벽을 시공하는 1차연속벽시공단계;A primary continuous wall construction step of constructing a primary continuous wall in the primary perforation; 상기 1차 연속벽 시공 후, 상기 간격유지부를 제거하고, 상기 간격유지부가 설치되었던 가이드부들를 통해 상기 연속벽 시공을 위한 2차 천공을 형성하는 2차천공단계;After the first continuous wall construction, removing the gap holding part and forming a second hole for the continuous wall construction through the guide parts in which the gap holding part is installed; 상기 2차 천공에 2차 연속벽을 시공하는 2차연속벽시공단계;A second continuous wall construction step of constructing a second continuous wall in the second perforation; 상기 연속벽 시공 완료 후, 상기 연속벽용 가이드를 제거하는 가이드제거단계;Guide removal step of removing the guide for the continuous wall after completion of the continuous wall construction; 를 포함하는 것을 특징으로 하는 연속벽용 가이드를 이용한 연속벽 시공방법.Continuous wall construction method using a guide for the continuous wall comprising a.
KR1020080122367A 2008-12-04 2008-12-04 Guide for construction slurry wall and constructing method using the same KR101124704B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080122367A KR101124704B1 (en) 2008-12-04 2008-12-04 Guide for construction slurry wall and constructing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080122367A KR101124704B1 (en) 2008-12-04 2008-12-04 Guide for construction slurry wall and constructing method using the same

Publications (2)

Publication Number Publication Date
KR20100063979A KR20100063979A (en) 2010-06-14
KR101124704B1 true KR101124704B1 (en) 2012-03-20

Family

ID=42363733

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080122367A KR101124704B1 (en) 2008-12-04 2008-12-04 Guide for construction slurry wall and constructing method using the same

Country Status (1)

Country Link
KR (1) KR101124704B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102366824B1 (en) 2021-06-03 2022-02-25 주식회사 창대이엔지 Overlap drilling guide for CIP
KR102389950B1 (en) 2021-06-03 2022-04-26 주식회사 창대이엔지 Sheet Pile Advance Drilling Guide

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102065959B1 (en) * 2019-06-07 2020-02-11 권준환 Retaining Wall
KR102083822B1 (en) * 2019-06-27 2020-03-03 강문기 APPARATUS FOR FORMING A CIP RETAINING WALL USING All-IN-ONE TYPE CONNECTING PARTS AND CONSTRUCTION METHOD USING THEREOF
KR102118098B1 (en) * 2019-11-14 2020-06-02 강문기 Construction method of retaining wall and apparatus thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100495878B1 (en) * 2002-09-28 2005-06-16 윤은중 Method for underground watertight wall

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100495878B1 (en) * 2002-09-28 2005-06-16 윤은중 Method for underground watertight wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102366824B1 (en) 2021-06-03 2022-02-25 주식회사 창대이엔지 Overlap drilling guide for CIP
KR102389950B1 (en) 2021-06-03 2022-04-26 주식회사 창대이엔지 Sheet Pile Advance Drilling Guide

Also Published As

Publication number Publication date
KR20100063979A (en) 2010-06-14

Similar Documents

Publication Publication Date Title
KR100939535B1 (en) Guide for execution of underground diaphragm wall
KR100782007B1 (en) Construction method of a earth-protection walls
KR100884289B1 (en) Composite type steel temporary construction and construction method thereof
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR101655077B1 (en) Construction method of block for prefabricated retaining wall
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR101124704B1 (en) Guide for construction slurry wall and constructing method using the same
KR101041274B1 (en) Retaining wall grouting structure and method for constructing thereof
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR20100043600A (en) Underground excuvation pile construction method using percussion rotary drill
EP2708658A1 (en) Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same
KR20070081633A (en) Construction method for underground watertight wall and subsidiary casing used in the same
KR101840226B1 (en) The guide holes of the form for soil auger dredges
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR100849226B1 (en) C.i.p temporary wall and method for constructing thereof
KR102019908B1 (en) Guide for construction slurry wall
KR102239089B1 (en) Underaround continued wall structure using casing and pile continuous connection and method therefor
KR101974826B1 (en) The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It&#39;s Continuous Pile
KR101567422B1 (en) Vertical structure construction method for vertical and horizontal regid connection
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
KR102292762B1 (en) Continuous Steel Material constituting Wall Connected to Plurality of Units and Underground Structure Construction Method Using the Same
KR20210146507A (en) Apparatus of guide casing for a ground excavator
KR102459282B1 (en) Drilling guide for excavation in the second or first row
KR102578571B1 (en) Guide apparatus for cast-in-placed-pile and earth wall construction method thereof
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee