EP2708658A1 - Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same - Google Patents
Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same Download PDFInfo
- Publication number
- EP2708658A1 EP2708658A1 EP11865671.9A EP11865671A EP2708658A1 EP 2708658 A1 EP2708658 A1 EP 2708658A1 EP 11865671 A EP11865671 A EP 11865671A EP 2708658 A1 EP2708658 A1 EP 2708658A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steel pipes
- piles
- installation
- caliber
- sheet piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/002—Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/18—Foundations formed by making use of caissons
Definitions
- the present invention relates to a large-caliber casing construction for preventing a collapse or an inflow of an earth layer during excavation of the ground for laying a foundation in the process of building a underwater structure, such as a dam, a bridge, and an offshore wind structure under water, such as sea and river, and more particularly, to a temporary structure of a large-caliber casing type and a method of constructing the same, which enables batch installation after prefabrication to thereby reduce field work and can flexibly cope with irregular underwater ground.
- a stable foundation work on the underwater ground must be preceded.
- the foundation work of the underwater ground is carried out through a method of constructing mono piles after excavating the underwater ground.
- a temporary structure of a large-caliber casing type Before excavation of the underwater ground, it is necessary to install a temporary structure of a large-caliber casing type in the foundation work area in order to prevent an inflow of weak soil or water into the foundation work area or a collapse of the underwater ground.
- a method of embedding large-caliber casing steel pipes (large-caliber steel pipe pile type) is a representative method of constructing temporary structures.
- the large-caliber steel pipe pile type is a method of manufacturing integrally large-caliber casing steel pipes with steel materials around a factory or a construction field, carrying the manufactured steel pipes into the construction field and constructing them while sinking them in water.
- Such a method can reduce field work but has several problems in that it needs large-scale equipment for carrying and lifting the large-sized casing steel pipes and in that stabilization work of the underwater ground must be previously carried out in order to stably settle and install the casing steel pipes in the underwater ground.
- the method cannot prevent a collapse or an inflow of an earth layer while the casing steel pipes excavate the underwater ground.
- the present invention has been made in an effort to solve the above-mentioned problems occurring in the prior arts, and it is an object of the present invention to provide a temporary structure of a large-caliber casing type and a method of constructing the same, which enables batch installation after prefabrication to thereby reduce field work and can flexibly cope with irregular underwater ground.
- the present invention provides a underwater large-caliber casing structure which is completed by installing sheet piles between steel pipes through a claw connection method and a construction method of a large-caliber casing including the steps of prefabricating steel pipes and sheet piles, installing them in a lump, and embedding and installing center piles and the sheet piles in the ground under water.
- the temporary structure of the large-caliber casing type and the method of constructing the same according to the present invention have the following effects.
- the large-caliber casing work can be carried out in the minimized field work because sheet piles are installed after being prefabricated. Accordingly, the present invention can reduce the construction period of time and construction expenses in relation with foundation work of the underwater structure.
- the underwater large-caliber casing is constructed in such a manner that the sheet piles and the steel pipes are first installed in an assembled state and H-piles are installed inside the steel pipes of the assembled body, there is little possibility to cause a construction error, and as a result, the present invention can enhance the construction quality due to a schemeful construction.
- the present invention can install sheet piles while coping with an irregular underwater ground even though the surface of a hard layer (or a rock layer) on the seabed or a riverbed is in a very irregular state, it can prevent a collapse of soil during excavation of the underwater ground inside the casing for laying the foundation.
- the present invention provides a temporary batch-installation-type underwater large-caliber casing structure using sheet piles including: steel pipes having a plurality of claw connectors disposed on the outer peripheral surface thereof, the steel pipes being spaced apart from each other at predetermined intervals and installed in the ground under water in such a manner that the claw connectors are opposed to each other; sheet piles having a plurality of claw connectors disposed at end portions thereof, the sheet piles being installed in such a way as to close spaces between the steel pipes and being embedded in the ground under water while engaging with the steel pipes through the claw connectors; a horizontal strut fixed inside or outside the casing to horizontally connect the steel pipes; and center piles respectively inserted into the steel pipes and fixed to the steel pipes while being embedded into the ground under water.
- the present invention provides a construction method of a temporary batch-installation-type underwater large-caliber casing structure including the steps of: (S11) assembling steel pipes, sheet piles and a horizontal strut in such a manner that the sheet piles are not located lower than the steel pipes; (S12) carrying the assembled body of the step (S11) into a construction field and seating the steel pipes on the ground under water; (S13) inserting and driving center piles into the steel pipes so as to embed them into the ground under water; (S14) fixing the center piles to the steel pipes; and (S15) driving the sheet piles so as to embed them into the ground under water.
- FIGS. 1 and 2 are a plan view and a perspective view of a temporary underwater large-caliber casing structure according to the present invention.
- the underwater large-caliber casing is a temporary structure for preventing a collapse or an inflow of an earth layer during excavation of the ground for laying a foundation in the process of building an underwater structure, such as a dam, a bridge, and an offshore wind structure under water, such as sea and river.
- the underwater large-caliber casing assembling structure includes steel pipes 10, sheet piles 20, a horizontal strut 30, and center piles 50.
- the steel pipe 10 is an empty hollow member and has a claw connector 13 disposed on the outer peripheral surface thereof.
- a plurality of the steel pipes 10 are arranged at predetermined intervals and are seated on the bottom under water in such a manner that the claw connectors 13 are opposed to each other.
- Such steel pipes 10 serve as a guide pipe of the center piles 50 respectively inserted and mounted inside the steel pipes.
- the sheet piles 20 are sheet type pile members which respectively have claw connectors 23 disposed at ends thereof so as to be joined to each other through a claw connection, and are generally the same as typical sheet piles used for retaining walls or cofferdams.
- the sheet piles 20 are arranged in mutual claw connection one by one and are installed under the ground while being driven into the ground.
- the sheet piles 20 are embedded and installed to the underwater ground while being engaged and connected with the steel pipes 10 through the claw connectors 13 and 23 between the steel pipes 10 so as to form a casing of a closed structure together with the steel pipes 10.
- the sheet piles 20 are joined one another in engagement with one another and with the steel pipes 10 so as to close spaces between the steel pipes 10 by the sheet piles 20.
- the horizontal strut 30 is fixedly mounted while horizontally connecting the steel pipes 10 inside or outside the casing.
- a plurality of the steel pipes 10 are restricted and reinforced into one body by the horizontal strut 30.
- the horizontal strut 30 includes an outer strut 31 which is continuously mounted from the outside of the casing.
- the horizontal strut 30 is fixed only to the steel pipes 10 and simply gets in contact with the sheet piles 20, such that the sheet piles 20 can be embedded and installed in the underwater ground while being driven even in a state where the steel pipes 10, the horizontal strut 30 and the sheet piles 20 are assembled together.
- the horizontal strut 30 may be disposed parallel to each other in multistage, and in this instance, vertical strut 40 may be additionally disposed for vertically connecting the multistage horizontal strut 30.
- the horizontal strut 30 and the vertical strut 40 may be adopted from general steel members having a proper cross section, such as H-shaped steels, ⁇ -shaped channels, angles, and others, according to structural designs, and FIG. 1 illustrates the outer strut 31 having the H-shaped steel and the vertical strut 40 having the ⁇ -shaped channel.
- the center pile 50 is inserted into the steel pipe 10 and fixed to the steel pipe 10 while being embedded to the underwater ground.
- the center piles 50 are embedded and mounted in the underwater ground together with the sheet piles 20 and serve to stably settle the temporary casing structure to the underwater ground. It is possible that the center piles 50 are embedded deeper than the sheet piles 20 if possible because the center piles 50 are H beams.
- the center piles 50 are properly adopted from general steel members, such as H-shaped steels, and FIG. 1 illustrates the center piles 50 having the H-shaped steels. Meanwhile, the center piles 50 are fixed to the steel pipes 10, and for this, couplers may be used properly.
- the underwater large-caliber casing according to the present invention is the temporary structure which will be demolished before long, it is preferable that the couplers are mounted by a wedge type fixing method or a bolt fastening method so as to be easily attached and detached rather than the welding method.
- the temporary underwater large-caliber casing structure is finished.
- the casing of the closed structure is completed through the claw connection of the steel pipes 10 and the sheet piles 20, and the temporary structure can keep a stable construction state through settlement of the center piles 50 and the sheet piles 20 in the underwater ground.
- the temporary underwater large-caliber casing structure according to the present invention may have a circular closed structure or a polygonal closed structure.
- FIGS. 1 and 2 show a temporary casing structure of the polygonal closed structure.
- the steel pipes 10 are arranged in such a way as to be located at edges of a polygon and the sheet piles 20 are arranged in such a way as to be located as sides of the polygon to thereby complete the polygonal closed structure.
- the polygonal closed structure can be easily completed when general straight steel members are applied as the horizontal struts 30 as they are.
- the horizontal strut 30 has inner and outer struts 31 and 32 which are spaced apart from each other and respectively mounted in parallel with each other inside and outside the casing, and the sheet piles 20 are contactingly mounted between the inner and outer struts 31 and 32.
- Such an installation structure of the horizontal strut 30 is favorable in securing a stable reinforcing structure by the inner and outer struts 31 and 32 and keeping perpendicularity of the sheet piles 20 during the process of embedding and installing the sheet piles 20.
- FIG. 3 is a detailed diagram showing a connected state of a steel pipe and a sheet pile of the temporary underwater large-caliber casing structure according to the present invention.
- the steel pipes 10 are formed by properly transforming conventional steel pipes.
- the steel pipe 10 includes: a steel pipe body 11; a wing sheet 12 welded on the outer peripheral surface of the steel pipe body 11; and a claw connector 13 formed by an end portion of the wing sheet 12 curved.
- the sheet pile 20 is divided in half and joined to both sides of the steel pipe body 11, such that the steel pipe 10 having the claw connector 13 is completed.
- the steel pipe 10 is simply joined during the claw connection of the sheet pile 20.
- FIGS. 4 to 7 are flow charts showing a construction method of the temporary underwater large-caliber casing structure according to the present invention, and illustrate the method of constructing the temporary underwater large-caliber casing structure of FIGS. 1 and 2 . Now, the construction method of the temporary underwater large-caliber casing structure according to the present invention will be described.
- the steel pipes 10, the sheet piles 20 and the horizontal strut 30 are assembled, and the vertical struts 40 may be further assembled in the case that the vertical struts 40 are installed (S11, See FIG. 4 ).
- the sheet piles 20 are equal to or longer than the steel pipes 10, and preferably, are not located lower than the steel pipes 10. The reason is not to be interfered by the sheet piles 20 and to stably install the steel pipes 10 in the ground under water.
- the assembled body assembled in the step S11 is carried into a construction field, and the steel pipes 10 are seated and installed in the ground under water (S12, See FIG. 5 ).
- the steel pipes 10 are installed while being lifted by a crane, and the assembled body is held not to be moved after the installation.
- the center piles 50 of the H-shaped steels are inserted and driven into the steel pipes 10 so as to be embedded in the ground under water (S13, See FIG. 6 ).
- the center piles 50 are fixed in the steel pipes 10 (S14), and the sheet piles 20 are driven to be embedded and installed in the ground under water (S15, See FIG. 7 ).
- a crane, a hammer, or others may be used properly.
- the temporary large-caliber casing structure is completely constructed. Because arrangement of the previously assembled body, insertion and driving of the center piles 50, and driving of the sheet piles 20 are just carried out in the construction field, the present invention can reduce a work amount in the construction field and allow rapid construction work.
- FIGS. 8 to 10 are flow charts showing a process of constructing an underwater structure while applying the construction method of the temporary underwater large-caliber casing structure according to FIGS. 4 to 7 , wherein the flow charts respectively show construction sequences of a mono-pile for offshore wind and a pier for a bridge.
- FIGS. 8 and 9 illustrate a construction sequence of the mono-pile (MP).
- the temporary underwater large-caliber casing structure is constructed in a construction position (See FIG> 8), and the construction method is the same as FIGS. 4 to 7 .
- a drilling rig is inserted into the temporary casing structure and fixed to the top of a jackup barge, and then, a drilling base machine and the drilling rig are connected with each other so as to drill the inside of the temporary casing structure (See FIG. 9(a) ).
- drilling water is supplied to the inside of the temporary casing structure in a reverse cycle, and then, drilling water and rock fragments are discharged out through a drill pipe.
- the mono-pile (MP) is inserted and installed inside an excavation hole ( FIG.
- FIG. 9(b) various grouting materials, such as concrete, mortar, or other filling materials, fill between the mono-pile and the excavation hole ( FIG. 9(c) ), and then, the temporary casing structure is removed ( FIG. 9(d) ).
- the removal work is carried out in reverse. In other words, first, the sheet piles 20 are drawn out from the ground under water, the fixed state of the center piles 50 is released to draw out the center piles 50 from the ground under water and remove the center piles 50 from the steel pipes 10, and then, the assembled body of the steel pipes 10, the sheet piles 20 and the horizontal strut 30 is lifted and carried. Through the above process, the underwater structure like the mono-pile can be constructed completely.
- FIG. 10 illustrates a construction sequence of a pier under water.
- the temporary underwater large-caliber casing structure is constructed at the construction position.
- water is supplied to the inside of the temporary casing structure by a water lift pump ( FIG.10(a) ), and then, when the underwater ground is exposed inside the temporary casing structure, a foundation of the pier (P1) and a pier body (P2) are constructed in the ground under water (FIGS. 19(b) and (c)).
- the temporary casing structure is removed ( FIG. 10(e) ). In this instance, the removal of the temporary structure is the same as the construction process of the mono-pile described above. Through the above process, the underwater structure such as the pier of the bridge is constructed completely.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Foundations (AREA)
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention relates to a large-caliber casing installation construction for preventing a collapse or an inflow of an earth layer during excavation of the ground for laying a foundation in the process of building a underwater structure, such as a dam, a bridge, an offshore wind structure under water, such as sea and river. The present invention completes a casing structure by installing a sheet pile between steel pipes and insertingly installing a center piles inside the steel pipes, and as a result, enables batch installation after first assembling the casing structure, and thus, can reduce field work and flexibly respond to irregular grounds underwater during construction.
Description
- The present invention relates to a large-caliber casing construction for preventing a collapse or an inflow of an earth layer during excavation of the ground for laying a foundation in the process of building a underwater structure, such as a dam, a bridge, and an offshore wind structure under water, such as sea and river, and more particularly, to a temporary structure of a large-caliber casing type and a method of constructing the same, which enables batch installation after prefabrication to thereby reduce field work and can flexibly cope with irregular underwater ground.
- In order to stably construct an underwater structure, such as a dam, a bridge, and an offshore wind structure under water, such as sea and river, a stable foundation work on the underwater ground must be preceded. The foundation work of the underwater ground is carried out through a method of constructing mono piles after excavating the underwater ground. Before excavation of the underwater ground, it is necessary to install a temporary structure of a large-caliber casing type in the foundation work area in order to prevent an inflow of weak soil or water into the foundation work area or a collapse of the underwater ground. A method of embedding large-caliber casing steel pipes (large-caliber steel pipe pile type) is a representative method of constructing temporary structures.
- The large-caliber steel pipe pile type is a method of manufacturing integrally large-caliber casing steel pipes with steel materials around a factory or a construction field, carrying the manufactured steel pipes into the construction field and constructing them while sinking them in water. Such a method can reduce field work but has several problems in that it needs large-scale equipment for carrying and lifting the large-sized casing steel pipes and in that stabilization work of the underwater ground must be previously carried out in order to stably settle and install the casing steel pipes in the underwater ground. Moreover, in the case that the underwater ground is developed irregularly, for instance, the bedrock is exposed or the earth layer is distributed very thinly, because the casing steel pipes cannot flexibly cope with the underwater ground, the method cannot prevent a collapse or an inflow of an earth layer while the casing steel pipes excavate the underwater ground.
- Accordingly, the present invention has been made in an effort to solve the above-mentioned problems occurring in the prior arts, and it is an object of the present invention to provide a temporary structure of a large-caliber casing type and a method of constructing the same, which enables batch installation after prefabrication to thereby reduce field work and can flexibly cope with irregular underwater ground.
- To achieve the above objects, the present invention provides a underwater large-caliber casing structure which is completed by installing sheet piles between steel pipes through a claw connection method and a construction method of a large-caliber casing including the steps of prefabricating steel pipes and sheet piles, installing them in a lump, and embedding and installing center piles and the sheet piles in the ground under water.
- The temporary structure of the large-caliber casing type and the method of constructing the same according to the present invention have the following effects.
- First, the large-caliber casing work can be carried out in the minimized field work because sheet piles are installed after being prefabricated. Accordingly, the present invention can reduce the construction period of time and construction expenses in relation with foundation work of the underwater structure.
- Second, because the underwater large-caliber casing is constructed in such a manner that the sheet piles and the steel pipes are first installed in an assembled state and H-piles are installed inside the steel pipes of the assembled body, there is little possibility to cause a construction error, and as a result, the present invention can enhance the construction quality due to a schemeful construction.
- Third, because the present invention can install sheet piles while coping with an irregular underwater ground even though the surface of a hard layer (or a rock layer) on the seabed or a riverbed is in a very irregular state, it can prevent a collapse of soil during excavation of the underwater ground inside the casing for laying the foundation.
-
-
FIGS. 1 and2 are a plan view and a perspective view of a temporary underwater large-caliber casing structure according to the present invention. -
FIG. 3 is a detailed diagram showing a connected state of a steel pipe and a sheet pile of the temporary underwater large-caliber casing structure according to the present invention. -
FIGS. 4 to 7 are flow charts showing a construction method of the temporary underwater large-caliber casing structure according to the present invention. -
FIGS. 8 to 10 are flow charts showing a process of constructing an underwater structure while applying the construction method of the temporary underwater large-caliber casing structure according toFIGS. 4 to 7 , wherein the flow charts respectively show construction sequences of a mono-pile for offshore wind and a pier for a bridge. - The present invention provides a temporary batch-installation-type underwater large-caliber casing structure using sheet piles including: steel pipes having a plurality of claw connectors disposed on the outer peripheral surface thereof, the steel pipes being spaced apart from each other at predetermined intervals and installed in the ground under water in such a manner that the claw connectors are opposed to each other; sheet piles having a plurality of claw connectors disposed at end portions thereof, the sheet piles being installed in such a way as to close spaces between the steel pipes and being embedded in the ground under water while engaging with the steel pipes through the claw connectors; a horizontal strut fixed inside or outside the casing to horizontally connect the steel pipes; and center piles respectively inserted into the steel pipes and fixed to the steel pipes while being embedded into the ground under water.
- The present invention provides a construction method of a temporary batch-installation-type underwater large-caliber casing structure including the steps of: (S11) assembling steel pipes, sheet piles and a horizontal strut in such a manner that the sheet piles are not located lower than the steel pipes; (S12) carrying the assembled body of the step (S11) into a construction field and seating the steel pipes on the ground under water; (S13) inserting and driving center piles into the steel pipes so as to embed them into the ground under water; (S14) fixing the center piles to the steel pipes; and (S15) driving the sheet piles so as to embed them into the ground under water.
- Reference will be now made in detail to the preferred embodiment of the present invention with reference to the attached drawings.
-
FIGS. 1 and2 are a plan view and a perspective view of a temporary underwater large-caliber casing structure according to the present invention. The underwater large-caliber casing is a temporary structure for preventing a collapse or an inflow of an earth layer during excavation of the ground for laying a foundation in the process of building an underwater structure, such as a dam, a bridge, and an offshore wind structure under water, such as sea and river. The underwater large-caliber casing assembling structure includessteel pipes 10,sheet piles 20, ahorizontal strut 30, andcenter piles 50. - The
steel pipe 10 is an empty hollow member and has aclaw connector 13 disposed on the outer peripheral surface thereof. A plurality of thesteel pipes 10 are arranged at predetermined intervals and are seated on the bottom under water in such a manner that theclaw connectors 13 are opposed to each other.Such steel pipes 10 serve as a guide pipe of thecenter piles 50 respectively inserted and mounted inside the steel pipes. - The
sheet piles 20 are sheet type pile members which respectively haveclaw connectors 23 disposed at ends thereof so as to be joined to each other through a claw connection, and are generally the same as typical sheet piles used for retaining walls or cofferdams. In other words, thesheet piles 20 are arranged in mutual claw connection one by one and are installed under the ground while being driven into the ground. Thesheet piles 20 are embedded and installed to the underwater ground while being engaged and connected with thesteel pipes 10 through theclaw connectors steel pipes 10 so as to form a casing of a closed structure together with thesteel pipes 10. - The
sheet piles 20 are joined one another in engagement with one another and with thesteel pipes 10 so as to close spaces between thesteel pipes 10 by thesheet piles 20. - The
horizontal strut 30 is fixedly mounted while horizontally connecting thesteel pipes 10 inside or outside the casing. A plurality of thesteel pipes 10 are restricted and reinforced into one body by thehorizontal strut 30. For a stable reinforcing structure, it is preferable that thehorizontal strut 30 includes anouter strut 31 which is continuously mounted from the outside of the casing. Thehorizontal strut 30 is fixed only to thesteel pipes 10 and simply gets in contact with thesheet piles 20, such that thesheet piles 20 can be embedded and installed in the underwater ground while being driven even in a state where thesteel pipes 10, thehorizontal strut 30 and thesheet piles 20 are assembled together. In the meantime, thehorizontal strut 30 may be disposed parallel to each other in multistage, and in this instance,vertical strut 40 may be additionally disposed for vertically connecting the multistagehorizontal strut 30. Thehorizontal strut 30 and thevertical strut 40 may be adopted from general steel members having a proper cross section, such as H-shaped steels, □-shaped channels, angles, and others, according to structural designs, andFIG. 1 illustrates theouter strut 31 having the H-shaped steel and thevertical strut 40 having the □-shaped channel. - The
center pile 50 is inserted into thesteel pipe 10 and fixed to thesteel pipe 10 while being embedded to the underwater ground. Thecenter piles 50 are embedded and mounted in the underwater ground together with thesheet piles 20 and serve to stably settle the temporary casing structure to the underwater ground. It is possible that thecenter piles 50 are embedded deeper than thesheet piles 20 if possible because thecenter piles 50 are H beams. Preferably, thecenter piles 50 are properly adopted from general steel members, such as H-shaped steels, andFIG. 1 illustrates thecenter piles 50 having the H-shaped steels. Meanwhile, thecenter piles 50 are fixed to thesteel pipes 10, and for this, couplers may be used properly. Considering that the underwater large-caliber casing according to the present invention is the temporary structure which will be demolished before long, it is preferable that the couplers are mounted by a wedge type fixing method or a bolt fastening method so as to be easily attached and detached rather than the welding method. - Through the above structure, the temporary underwater large-caliber casing structure is finished. The casing of the closed structure is completed through the claw connection of the
steel pipes 10 and thesheet piles 20, and the temporary structure can keep a stable construction state through settlement of thecenter piles 50 and thesheet piles 20 in the underwater ground. The temporary underwater large-caliber casing structure according to the present invention may have a circular closed structure or a polygonal closed structure. -
FIGS. 1 and2 show a temporary casing structure of the polygonal closed structure. As shown in the drawings, thesteel pipes 10 are arranged in such a way as to be located at edges of a polygon and thesheet piles 20 are arranged in such a way as to be located as sides of the polygon to thereby complete the polygonal closed structure. The polygonal closed structure can be easily completed when general straight steel members are applied as thehorizontal struts 30 as they are. - Furthermore, in
FIGS. 1 and2 , thehorizontal strut 30 has inner andouter struts sheet piles 20 are contactingly mounted between the inner andouter struts horizontal strut 30 is favorable in securing a stable reinforcing structure by the inner andouter struts sheet piles 20 during the process of embedding and installing thesheet piles 20. -
FIG. 3 is a detailed diagram showing a connected state of a steel pipe and a sheet pile of the temporary underwater large-caliber casing structure according to the present invention. InFIG. 3 , thesteel pipes 10 are formed by properly transforming conventional steel pipes. Concretely, thesteel pipe 10 includes: asteel pipe body 11; awing sheet 12 welded on the outer peripheral surface of thesteel pipe body 11; and aclaw connector 13 formed by an end portion of thewing sheet 12 curved. In other words, thesheet pile 20 is divided in half and joined to both sides of thesteel pipe body 11, such that thesteel pipe 10 having theclaw connector 13 is completed. Thesteel pipe 10 is simply joined during the claw connection of thesheet pile 20. -
FIGS. 4 to 7 are flow charts showing a construction method of the temporary underwater large-caliber casing structure according to the present invention, and illustrate the method of constructing the temporary underwater large-caliber casing structure ofFIGS. 1 and2 . Now, the construction method of the temporary underwater large-caliber casing structure according to the present invention will be described. - First, the
steel pipes 10, the sheet piles 20 and thehorizontal strut 30 are assembled, and thevertical struts 40 may be further assembled in the case that thevertical struts 40 are installed (S11, SeeFIG. 4 ). The sheet piles 20 are equal to or longer than thesteel pipes 10, and preferably, are not located lower than thesteel pipes 10. The reason is not to be interfered by the sheet piles 20 and to stably install thesteel pipes 10 in the ground under water. - Next, the assembled body assembled in the step S11 is carried into a construction field, and the
steel pipes 10 are seated and installed in the ground under water (S12, SeeFIG. 5 ). Thesteel pipes 10 are installed while being lifted by a crane, and the assembled body is held not to be moved after the installation. - Next, the center piles 50 of the H-shaped steels are inserted and driven into the
steel pipes 10 so as to be embedded in the ground under water (S13, SeeFIG. 6 ). After that, the center piles 50 are fixed in the steel pipes 10 (S14), and the sheet piles 20 are driven to be embedded and installed in the ground under water (S15, SeeFIG. 7 ). In this instance, a crane, a hammer, or others may be used properly. - Through the above steps, the temporary large-caliber casing structure is completely constructed. Because arrangement of the previously assembled body, insertion and driving of the center piles 50, and driving of the sheet piles 20 are just carried out in the construction field, the present invention can reduce a work amount in the construction field and allow rapid construction work.
-
FIGS. 8 to 10 are flow charts showing a process of constructing an underwater structure while applying the construction method of the temporary underwater large-caliber casing structure according toFIGS. 4 to 7 , wherein the flow charts respectively show construction sequences of a mono-pile for offshore wind and a pier for a bridge. -
FIGS. 8 and9 illustrate a construction sequence of the mono-pile (MP). First, the temporary underwater large-caliber casing structure is constructed in a construction position (See FIG> 8), and the construction method is the same asFIGS. 4 to 7 . A drilling rig is inserted into the temporary casing structure and fixed to the top of a jackup barge, and then, a drilling base machine and the drilling rig are connected with each other so as to drill the inside of the temporary casing structure (SeeFIG. 9(a) ). In this instance, drilling water is supplied to the inside of the temporary casing structure in a reverse cycle, and then, drilling water and rock fragments are discharged out through a drill pipe. Next, the mono-pile (MP) is inserted and installed inside an excavation hole (FIG. 9(b) ), various grouting materials, such as concrete, mortar, or other filling materials, fill between the mono-pile and the excavation hole (FIG. 9(c) ), and then, the temporary casing structure is removed (FIG. 9(d) ). The removal work is carried out in reverse. In other words, first, the sheet piles 20 are drawn out from the ground under water, the fixed state of the center piles 50 is released to draw out the center piles 50 from the ground under water and remove the center piles 50 from thesteel pipes 10, and then, the assembled body of thesteel pipes 10, the sheet piles 20 and thehorizontal strut 30 is lifted and carried. Through the above process, the underwater structure like the mono-pile can be constructed completely. -
FIG. 10 illustrates a construction sequence of a pier under water. In order to construct the underwater pier, as shown inFIG. 8 , first, the temporary underwater large-caliber casing structure is constructed at the construction position. Next, water is supplied to the inside of the temporary casing structure by a water lift pump (FIG.10(a) ), and then, when the underwater ground is exposed inside the temporary casing structure, a foundation of the pier (P1) and a pier body (P2) are constructed in the ground under water (FIGS. 19(b) and (c)). Next, after water is supplied to the inside the temporary casing structure (FIG. 10(d) ), the temporary casing structure is removed (FIG. 10(e) ). In this instance, the removal of the temporary structure is the same as the construction process of the mono-pile described above. Through the above process, the underwater structure such as the pier of the bridge is constructed completely. - As described above, while the present invention has been particularly shown and described with reference to the example embodiments thereof, it will be understood by those of ordinary skill in the art that the above embodiments of the present invention are all exemplified and various changes, modifications and equivalents may be made therein without departing from the scope of the present invention. Therefore, it would be understood that the technical and protective scope of the present invention shall be defined by the technical idea as defined by the following claims.
Claims (6)
- A temporary batch-installation-type underwater large-caliber casing structure using sheet piles comprising:steel pipes (10) having a plurality of claw connectors (13) disposed on the outer peripheral surface thereof, the steel pipes (10) being spaced apart from each other at predetermined intervals and installed in the ground under water in such a manner that the claw connectors (13) are opposed to each other;sheet piles (20) having a plurality of claw connectors (23) disposed at end portions thereof, the sheet piles (20) being installed in such a way as to close spaces between the steel pipes (10) and being embedded in the ground under water while engaging with the steel pipes (10) through the claw connectors (13, 23);a horizontal strut (30) fixed inside or outside the casing to horizontally connect the steel pipes (10); andcenter piles (50) respectively inserted into the steel pipes (10) and fixed to the steel pipes (10) while being embedded into the ground under water.
- The temporary batch-installation-type underwater large-caliber casing structure according to claim 1, wherein the horizontal strut (30) comprises: an outer strut (31) located outside the casing; and an inner strut (32) located inside the casing, and the inner and outer struts (31, 32) are spaced apart from each other and arranged in parallel with each other, and
wherein the sheet piles (20) get in contact with the inner and outer struts (31, 32). - The temporary batch-installation-type underwater large-caliber casing structure according to claim 1 or 2, wherein the steel pipe (10) comprises: a steel pipe body (11); a wing sheet (12) welded on the outer peripheral surface of the steel pipe body (11); and a claw connector (13) formed by an end portion of the wing sheet 12 curved.
- The temporary batch-installation-type underwater large-caliber casing structure according to claim 1 or 2, wherein the steel pipes (10) are arranged at edges of a polygonal composition,
the sheet piles (20) are arranged on sides of the polygonal composition while connecting the steel pipes (10) with each other, and
the horizontal strut (30) comprises an outer strut (31) mounted in a polygonal composition while surrounding the outer periphery of the steel pipes (10). - The temporary batch-installation-type underwater large-caliber casing structure according to claim 1 or 2, wherein the center piles (50) are H-shaped steels.
- A construction method of the temporary batch-installation-type underwater large-caliber casing structure according to claim 1 or 2, comprising the steps of:(S11) assembling steel pipes (10), sheet piles (20) and a horizontal strut (30) in such a manner that the sheet piles (20) are not located lower than the steel pipes (10);(S12) carrying the assembled body of the step (S11) into a construction field and seating the steel pipes (10) on the ground under water;(S13) inserting and driving center piles (50) into the steel pipes (10) so as to embed them into the ground under water;(S14) fixing the center piles (50) to the steel pipes (20); and(S15) driving the sheet piles (20) so as to embed them into the ground under water.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110045103A KR101106219B1 (en) | 2011-05-13 | 2011-05-13 | Sheetpile type large-diameter casing for underwater structure and construction method thereof |
PCT/KR2011/009993 WO2012157829A1 (en) | 2011-05-13 | 2011-12-22 | Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2708658A1 true EP2708658A1 (en) | 2014-03-19 |
Family
ID=45614347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11865671.9A Withdrawn EP2708658A1 (en) | 2011-05-13 | 2011-12-22 | Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2708658A1 (en) |
KR (1) | KR101106219B1 (en) |
AU (1) | AU2011368478B2 (en) |
WO (1) | WO2012157829A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102016972B1 (en) * | 2017-01-13 | 2019-09-03 | 권혁빈 | Construction Method of Underwater Civil Engineering Structure Foundation |
CN109356166B (en) * | 2018-11-06 | 2023-12-29 | 福建卓越建设工程开发有限公司 | Steel pipe pile-Larson steel sheet pile bending direct combined driving combined supporting system and construction method |
KR102205948B1 (en) | 2018-11-16 | 2021-01-21 | 한국건설기술연구원 | Method for connecting very large diameter mono-pile into rock using small and middle diameter pin pile |
KR20200134761A (en) | 2019-05-23 | 2020-12-02 | 양필규 | The workstation mounted on top of file form |
CN110485305A (en) * | 2019-08-27 | 2019-11-22 | 中铁大桥局集团有限公司 | Steel pile casting Anti-fall platform and its construction method for water Bridge foundation construction |
CN113431071B (en) * | 2021-05-24 | 2022-05-13 | 徐州中矿岩土技术股份有限公司 | Rescue pipe and emergency rescue pipe fitting for dam piping accident and using method thereof |
CN114960890B (en) * | 2022-04-15 | 2024-09-03 | 中国港湾工程有限责任公司 | Construction method of offshore water outlet |
CN115369858B (en) * | 2022-07-29 | 2023-12-12 | 中国化学工程第六建设有限公司 | Construction process of concrete filled steel tubular column |
CN117166462B (en) * | 2023-09-08 | 2024-05-07 | 湖北省工业建筑集团有限公司 | Rotary drilling pile foundation construction device and method for hard rock combined stratum |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4231194B2 (en) | 2000-09-06 | 2009-02-25 | 新日本製鐵株式会社 | Revetment structure |
KR100652454B1 (en) * | 2005-03-25 | 2006-12-01 | 재현토건(주) | Cofferdam construction method using the large caliber steel pipe for the structures constructed over the water |
KR100923078B1 (en) * | 2007-10-11 | 2009-11-02 | 현대건설주식회사 | Cofferdam Construction Method using Sheet File and Wale and Construction Method For Underwater Structure using the Cofferdam |
KR100929141B1 (en) * | 2007-10-26 | 2009-12-01 | 삼성물산 주식회사 | Temporary structure for detachable temporary membrane and temporary membrane construction method using the same |
KR100884289B1 (en) | 2008-06-23 | 2009-02-17 | 가원이엔씨 주식회사 | Composite type steel temporary construction and construction method thereof |
KR100936161B1 (en) * | 2009-07-31 | 2010-01-12 | 현대엔지니어링 주식회사 | Nature friendly polygon cell type coffering method for harbor, river and dam construction |
-
2011
- 2011-05-13 KR KR1020110045103A patent/KR101106219B1/en not_active IP Right Cessation
- 2011-12-22 WO PCT/KR2011/009993 patent/WO2012157829A1/en active Application Filing
- 2011-12-22 AU AU2011368478A patent/AU2011368478B2/en not_active Ceased
- 2011-12-22 EP EP11865671.9A patent/EP2708658A1/en not_active Withdrawn
Non-Patent Citations (1)
Title |
---|
See references of WO2012157829A1 * |
Also Published As
Publication number | Publication date |
---|---|
KR101106219B1 (en) | 2012-01-19 |
WO2012157829A1 (en) | 2012-11-22 |
AU2011368478A1 (en) | 2013-03-28 |
AU2011368478B2 (en) | 2014-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2011368478B2 (en) | Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same | |
US9567720B2 (en) | Offshore platform for a marine environment | |
JP5057223B2 (en) | Temporary wall construction method using steel segments | |
JP6762800B2 (en) | Reinforcement method and structure of existing pile foundation | |
KR102011321B1 (en) | Construction method of foundation using rectangular pipe and its foundation | |
KR100927186B1 (en) | Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water | |
CN110359476B (en) | Construction method of construction platform for mounting steel sheet pile cofferdam inner support and bored pile steel casing | |
JP5257407B2 (en) | Installation method and installation structure of angry material | |
JP5986429B2 (en) | Caisson and manufacturing method thereof | |
JP2012117209A (en) | Caisson method and equipment for caisson method | |
CN212200387U (en) | Diaphragm wall foundation steel guide wall structure in deep water soft silt area | |
JP6760529B1 (en) | How to build a waterproof wall and a waterproof wall | |
JP2023140927A (en) | Construction method of underground structure and underground structure | |
CN211873023U (en) | Foundation pit supporting device | |
JP2007107233A (en) | Construction method for earth retaining structure | |
JP7275844B2 (en) | WALL-LIKE STRUCTURE AND METHOD OF CONSTRUCTING WALL-LIKE STRUCTURE | |
JP2017197910A (en) | Construction method of earth retaining wall structure, and earth retaining wall structure | |
CN111119159A (en) | Diaphragm wall foundation steel guide wall structure in deep water soft silt area | |
JP4475116B2 (en) | Vertical shaft structure and its construction method | |
CN111119200A (en) | Foundation pit supporting device | |
CN111206594A (en) | Foundation pit supporting construction method | |
KR20210015135A (en) | Pile reinforcement guide device and its construction method | |
JP6800365B1 (en) | How to reinforce the existing caisson foundation | |
CN215669530U (en) | Foundation pit supporting system capable of being turned over | |
CN115324087B (en) | Deep water rock-socketed combined light cofferdam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130307 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20150701 |