KR101840226B1 - The guide holes of the form for soil auger dredges - Google Patents
The guide holes of the form for soil auger dredges Download PDFInfo
- Publication number
- KR101840226B1 KR101840226B1 KR1020160141787A KR20160141787A KR101840226B1 KR 101840226 B1 KR101840226 B1 KR 101840226B1 KR 1020160141787 A KR1020160141787 A KR 1020160141787A KR 20160141787 A KR20160141787 A KR 20160141787A KR 101840226 B1 KR101840226 B1 KR 101840226B1
- Authority
- KR
- South Korea
- Prior art keywords
- main body
- auger
- guide hole
- pipe members
- present
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0038—Production methods using an auger, i.e. continuous flight type
Abstract
Description
본 발명은 각종 건축 및 토목 현장에서 지하 터파기 공사를 할 시에 조성하는 옹벽 시공에 사용되는 오거 및 오거와 함께 지반에 삽입되는 케이싱을 안내하여 오거의 수직 천공도를 향상시킴과 아울러 시공성을 높일 수 있도록 하는 지반굴착기의 오거용 가이드홀 거푸집에 관한 것으로서, 보다 구체적으로는 타설되는 콘크리트구조물의 가이드홀에서 쉽게 분리할 수 있는 일체형 구성으로 제공함으로 해서 시공성과 취급성을 향상시킬 수 있도록 한 지반굴착기의 오거용 가이드홀 거푸집을 제공코자 하는 것이다.The present invention relates to an auger and an auger used for constructing a retaining wall to be constructed in a subterranean digging construction at various construction and civil engineering sites, guides a casing inserted in the ground to improve the vertical perforation of the auger, The present invention relates to a guide hole for an auger of a ground excavator which can be easily separated from a guide hole of a concrete structure to be laid, To provide a guide hole mold for auger.
통상 지하 터파기 공사를 행할 시 주위에 옹벽 등을 축조하기 위하여 사용하고 있는 차수벽 흙막이 공법은 다음과 같은 다수의 공법들이 사용되어 오고 있다.In general, the following methods have been used for the anchorage wall construction method that is used to construct the retaining wall around the underground construction site.
즉, 일반 H-비임과 토류판을 이용한 흙막이 공법, 현장타설 CIP 공법, MIP 공법, PIP 공법, SCW 주열식 공법 등 수 많은 지하 터파기를 위한 차수 및 흙막이 공법을 현재까지 건설 현장에서 사용하고 있으나, 이는 아래와 같은 장단점을 가지고 있었던 것이다.In other words, a number of construction methods such as retention method using general H-beam and soil plate, field installation CIP method, MIP method, PIP method, SCW main type and so on have been used in construction sites until now. I had the following advantages and disadvantages.
기존 CIP 공법의 경우는 기존 터파기 구조물과의 근접시공이 가능하고, 터파기 폭을 최소화 할 수 있으며, 토류판 시공이 불필요하므로 사고 위험이 적다는 장점을 가지고 있지만, 이는 기둥간의 연결성이 좋지 못하며, 차수성이 나쁘고 토사 유실의 가능성이 크다는 단점이 있었고, 구멍(孔)과 구멍 사이에 누수에 대한 별도의 보조방법이 필요하다는 문제점을 안고 있었던 것이다.The existing CIP method has the advantage that it can be installed close to the existing structure, minimizes the width of the trench, and reduces the risk of accidents because it is unnecessary to construct the soil plate. However, the connection between the columns is not good, There is a disadvantage in that the water pollution is bad and the possibility of soil loss is large and a separate auxiliary method for leakage between the hole and the hole is needed.
그리고 SCW 공법의 경우는 차수성이 좋으며, 토사유실의 가능성은 적다. 또한 벽체와 강도가 널말뚝보다 크고, 함수비가 높은 연약지반에 시공이 가능하고, 시공 후 잔토가 소량이고 수질 오염의 우려가 적다는 장점은 가지고 있으나, 토사지역에서만 시공이 가능하고, 자갈지반이나 전석층, 풍화암 이상인 지층에서는 시공이 불가능하며, 대형장비가 필요하므로 작업공간이 넓어야 하며, 비교적 공사비가 비싸다는 단점과 함께 타 공법에 비하여 내구성이 떨어지는 등의 문제점을 안고 있었다.In the case of the SCW method, water repellency is good, and the possibility of soil loss is small. In addition, it has the advantage that the wall and the strength are larger than the sheet pile, it can be applied to the soft ground with high water content, there is a small amount of residual soil after construction, and there is little concern about water pollution, but construction is possible only in the soil region, It is impossible to construct in the stratum which is more than the weathered rock, and the large space is required because the large equipment is required. Also, the construction cost is relatively high and the durability is lower than other construction methods.
상기한 문제점을 해결하기 위한 수단으로 대한민국 등록특허공보(B1)10-0406693호(2003.11.21.)의 차수벽 흙막이 공법이 제안되고 있으며, 이의 구성은 지하 터파기 공사를 위하여 옹벽을 축조하는 차수벽 흙막이 공법에 있어서; 기 측량된 시공라인(L)을 따라 1번 구멍을 오거머신을 사용하여 천공한 후 오거머신 인발과 동시에 시멘트 모르타르를 1번 구멍 내부에 충진하고, 상기 1번 구멍 내부에 요입부를 가진 반월형 케이싱을 시공라인(L)을 따라 이웃하여 연속 천공하는 2번 구멍에 요입부가 위치되도록 타삽하며, 순차적으로 응력재와 자갈을 2번 구멍 내부에 충진된 시멘트 모르타르상으로 타삽하며, 상기 2번 구멍을 오거머신으로 1번 구멍과 동일하게 요입부에 겹쳐서 천공 후 시멘트 모르타르 충진과 반월형 케이싱을 전기한 1번 구멍과 동일하게 수행하며, 3번 구멍을 오거머신으로 상기 1,2번 구멍과 동일하게 요입부에 겹쳐서 천공한 후 1번 구멍 상에 결합된 반월형 케이싱을 인발하는 제 과정을 연속적으로 시공라인(L)을 따라 행하여 옹벽을 축조할 수 있도록 한 것이다.As a means for solving the above-mentioned problems, a watertight cladding method of Korean Patent Registration No. B1-01066669 (November 21, 2003) has been proposed. The construction of the cladding cladding method is as follows. The watertight cladding In the construction method; The mortar is poured into the
상기와 같은 공법의 경우 기존 터파기 구조물과의 근접시공이 가능하며, 터파기 폭을 최소화할 수 있고, 토류판 시공이 불필요하므로 사고 위험이 적고, 구멍과 구멍 사이에 누수에 따른 보조공법이 필요 없으며, 모든 지반에 굴착이 가능하며, 연속 시공이 가능하고 따라서 차수가 완벽하고 강도를 높일 수 있는 효과를 제공할 수 있다.In the case of the above-mentioned method, it is possible to construct the structure close to the existing structure, minimize the width of the trencher, minimize the risk of accident due to the construction of the soil plate, , It is possible to excavate all the ground, and it is possible to provide continuous effect, and thus it is possible to provide a perfect order and increase the strength.
그러나 오거머신을 이용하여 천공하는 과정에서 케이싱 및 오거를 가이드할 수 있는 수단이 미비하여 오거 및 케이싱의 수직도가 저하되는 등의 문제점이 있었다.However, there is a problem in that the means for guiding the casing and the auger in the process of perforating using the auger machine is insufficient and the verticality of the auger and the casing is lowered.
근자에는 상기한 문제점을 개선할 목적으로 케이싱 및 오거를 가이드할 수 있는 수단들이 제공되고 있다.In recent years, there have been provided means for guiding a casing and auger for the purpose of improving the above-mentioned problems.
대표적인 예로는 대한민국 등록특허공보(B1)10-0864110호(2008.10.16.)의 케이싱 설치공법 및 그를 이용한 연속벽 시공방법이 제공되고 있으며, 이의 구성은 지반에 연속해서 배치된 다수개의 케이싱(casing) 내부로 파일형성물질이 주입되어 성형된 파일이 연속체를 이루며 형성되는 연속벽을 시공하기 위하여, 다수개의 케이싱을 지반에 삽입하기 위한 케이싱 설치공법에 있어서, 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면형상을 가진 정해진 개수의 분할모형을 성형하는 분할모형 성형단계와; 상기 다수개의 케이싱이 배치될 영역을 따라 지반을 상기 케이싱의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하면서 굴착물을 제거하여 안내공간을 형성시키는 안내공간 형성단계와; 상기 안내공간에 상기 분할모형을 위치시키고, 상기 안내공간으로 유동성이 있는 결합경화제를 주입하여 고화시키는 결합경화제 주입단계와; 상기 안내공간에 주입되어 고화된 상기 결합경화제로부터 상기 분할모형을 인발하여 제거시켜 상기 안내공간에 홀형상의 안내라인을 형성시키는 안내라인 형성단계를 포함하여, 상기 다수개의 케이싱이 상기 안내라인에 의해 정위치되어 지반으로 삽입되도록 하는 것이다.As a representative example, a casing installation method and a continuous wall construction method using the same disclosed in Korean Patent Publication (B1) 10-0864110 (Oct. 16, 2008) are provided, and the construction thereof includes a plurality of casings A method of installing a casing for inserting a plurality of casings into a ground for constructing a continuous wall in which a pile of the pile forming material is injected into the pile, A divided model forming step of forming a predetermined number of divided models having the same sectional shape as a divided sectional shape obtained by dividing a shape into a predetermined number; A guide space forming step of excavating the ground along a region where the plurality of casings are to be arranged to a predetermined depth with a width larger than the width of the casing to remove excavated material to form a guide space; A binding curing agent injecting step of placing the partitioning model in the guide space and solidifying the injection curing agent by injecting a fluidity binding curing agent into the guide space; And a guide line forming step of forming a hole-shaped guide line in the guide space by drawing and removing the split model from the binder hardener injected into the guide space and solidified, So that it is inserted into the ground.
상기한 구성은 주형틀을 이영하여 분할모형을 제작 후 분할모형을 안내공간에 수평으로 배열한 상태에서 안내공간 내에 콘크리트를 타설한 후 분할모형을 제거하는 과정을 순차적으로 형해야 하는 것으로 작업성이 저하되는 등의 문제점이 있고, 콘크리트가 경화된 상태에서 분할모형을 제거할 때 대부분의 분할모형이 파손되어 재사용할 수 없는 문제점이 있었다.The above-mentioned construction is to sequentially mold the concrete after placing the concrete in the guide space in a state where the split model is horizontally arranged in the guide space after the flask is moved and the split model is manufactured. There is a problem in that most of the split models are broken and can not be reused when the split model is removed in a state where the concrete is hardened.
이에 본 발명자는 상기한 종래 문제점을 일소코자 거푸집을 모듈화 제작하여 거푸집을 재사용 할 수 있도록 본 발명을 연구 개발한 것이다.Therefore, the present inventor has researched the present invention so as to reuse the mold by modularly manufacturing the mold of the present invention.
즉, 본 발명에서는 반월형 케이싱 타입으로 구성한 파이프부재를 연속으로 이어 붙인 구성의 본체 양측으로 이웃하는 거푸집과 연결하는 연결대판을 결합하는 구성을 통하여 터파기한 구덩이에 거푸집을 내입한 후 거푸집 외부에 콘크리트를 타설하는 방법에 의해 콘크리트구조물의 가이드홀이 연속적으로 형성될 수 있도록 함으로 해서, 시공성과 취급성을 향상시킬 수 있도록 한 지반굴착기의 오거용 가이드홀 거푸집을 제공함에 발명의 기술적 과제를 두고 본 발명을 완성한 것이다.That is, according to the present invention, a structure in which a pipe member constituting a meniscus-type casing type is continuously connected and a connection plate which connects to a neighboring workpiece on both sides of the body are coupled to each other through the structure, the concrete is inserted into the trough- The present invention provides a guide hole form for auger of a ground excavator capable of improving the workability and handling property by allowing guide holes of the concrete structure to be formed continuously by a method of pouring the concrete. It is finished.
과제 해결 수단으로 본 발명에서는 첫째 1~2m 내외의 파이프부재에 길이방향으로 절개부를 형성하고 이웃하는 파이프부재의 일부가 내입되도록 복수의 파이프부재를 병렬로 결합하여 본체를 형성하고, 본체를 구성하는 양쪽 파이프부재의 바깥쪽에 길이방향으로 절개부를 형성하여 연결대판을 형성하며, 이웃하는 거푸집과 상호 연결토록 하며, 상기 본체에는 인양브래킷을 상향 돌출되게 형성하고, 본체와 연결대판에 외부면에는 콘크리트구조물과 분리가능한 이형제를 결합한 것을 특징으로 한다.In the present invention, first, a main body is formed by cutting a pipe member in a length of 1 to 2m in the longitudinal direction and connecting a plurality of pipe members in parallel so that a part of a neighboring pipe member is inserted therein, A connecting plate is formed on the outer side of the pipe members in the longitudinal direction to interconnect with neighboring formworks, a lifting bracket is formed to protrude upward from the main body, and a concrete structure And a releasing agent capable of being separated.
둘째 상기 본체를 구성하는 파이프부재의 내부 상하측에는 보강대를 십자형상으로 결합하며, 연결대판에는 조립구멍을 형성하여 이웃하는 연결대판과 볼트와 너트로 구성되는 고정수단이 조립될 수 있도록 한 것을 특징으로 한다.Second, the reinforcing bars are cross-shaped on the upper and lower sides of the pipe member constituting the main body, and a fixing hole is formed in the connecting plate so that the connecting plate, the neighboring connecting plate, and the bolt and nut can be assembled. do.
셋째 상기 본체와 연결대판에 외부면에는 콘크리트구조물과 분리가능한 이형제는 부직포 또는 합성수지 필름지, 비닐지 중 어느 하나인 것을 특징으로 한다.Third, the releasing agent separable from the concrete structure on the outer surface of the main body and the connection plate is any one of a nonwoven fabric, a synthetic resin film, and a vinyl paper.
본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집에 의하면, 파이프부재를 이어 붙인 구성으로 모듈화되어 있어 취급이 용이하며, 외부면에 이형제가 결합되어 있는 구성이므로 콘크리트에서 간편하게 분리할 수 있게 되는 것이다.According to the guide hole formwork for auger of the ground excavator of the present invention, since the pipe member is modularized in a structure in which the pipe member is connected, it is easy to handle and the release agent is bonded to the outer surface, so that it can be easily separated from the concrete .
따라서 터파기한 구덩이에 거푸집을 수평 상태로 내입 후 콘크리트를 타설하면 되므로 가이드홀을 연속적으로 신속하게 형성할 수 있으며, 거푸집을 재사용할 수 있으므로 거푸집 제작에 따른 경제적 손실을 최소화할 수 있는 등의 효과를 기대할 수 있는 것이다.Therefore, it is possible to form the guide hole continuously and quickly, since the concrete can be inserted after horizontally inserting the form into the trough period pit, and the economic loss due to the molding can be minimized because the form can be reused It can be expected.
도 1은 본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집 구성을 보인 외형 사시도
도 2는 본 발명의 분해사시도
도 3은 본 발명의 측면도
도 4는 본 발명의 평면도
도 5는 본 발명의 사용 상태로 이웃하는 거푸집과 연결한 상태를 보인 정단면도 및 평면도
도 6은 본 발명의 사용 상태로 가이드홀을 형성하는 시공 상태도BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is an external perspective view showing a guide hole mold construction for auger of a ground excavator provided in the present invention;
2 is an exploded perspective view of the present invention
3 is a side view of the present invention
Fig. 4 is a plan view
FIG. 5 is a front sectional view and a plan view showing a state connected to a neighboring mold in the use state of the present invention;
Fig. 6 is a view showing a construction state diagram for forming guide holes in the use state of the present invention
이하 본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집의 바람직한 일실시례를 첨부 도면에 의거하여 설명한다.BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, a preferred embodiment of a guide hole mold for auger of a ground excavator provided in the present invention will be described with reference to the accompanying drawings.
도 1은 본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집 구성을 보인 외형 사시도를 도시한 것이고, 도 2는 본 발명의 분해사시도, 도 3은 본 발명의 측면도, 도 4는 본 발명의 평면도, 도 5는 본 발명의 사용 상태로 이웃하는 거푸집과 연결한 상태를 보인 정단면도 및 평면도를 각각 도시한 것이다.1 is an exploded perspective view showing an auger guide hole formwork construction of a ground excavator according to the present invention. FIG. 2 is an exploded perspective view of the present invention, FIG. 3 is a side view of the present invention, And FIG. 5 is a front sectional view and a plan view showing a state connected to a neighboring mold in the use state of the present invention, respectively.
본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집(1)은 CIP 공법을 적용하기 위해 지면에 구멍을 천공할 때 케이싱 및 오거를 가이드하여 구멍의 수직도를 높일 수 있도록 하고, 아울러 정위치에 신속한 천공작업이 이루어질 수 있도록 지면에 가이드홀(310)이 형성된 콘크리트구조물(300)에 제공하기 위한 것이다.In order to apply the CIP method, the auger
본 발명에서 제공하는 지반굴착기의 오거용 가이드홀 거푸집(1)은 파이프부재(21)를 축방향으로 배열하여 병렬로 이어 붙여 구성한 본체(2)와, 본체(2)의 양측에 결합한 연결대판(3), 그리고 본체(2)와 연결대판(3)의 외부에 구비되는 이형제(5)를 포함하는 구성으로 이루어진다.The auger
상기 본체(2)는 지반굴착기에 장착되는 케이싱의 외경과 부합하는 직경의 파이프부재(21)를 1~2m 길이로 절단하고, 길이방향으로 절개부(22)를 형성하여 이웃하는 파이프부재(21)의 일부가 절개부(22)로 내입시킨 상태로 용접하여 일체로 구성하는 구조로 2~10개의 파이프부재(21)를 병렬로 이어 붙이는 구성으로 제공된다.The
파이프부재(21)를 1m 이하로 짧게 형성하면, 콘크리트구조물(300)에 형성되는 가이드홀(310)의 높이가 낮아 가이드의 효율성이 저하되며, 2m 이상으로 길게 형성하는 경우 가이드 효과는 향상되나, 과도한 레미콘을 사용해야 하는 경제적 부담이 있다.When the
또한 본체(2)를 구성함에 있어 10개 이상의 파이프부재(21)를 이어 붙여 구성하는 경우 취급성이 떨어지게 된다.Further, in constituting the
본체(2)를 구성하고 있는 파이프부재(21)의 내부 상하측으로는 콘크리트 타설시 압력에 의해 파이프부재(21)의 형상이 변형되는 것을 방지할 수 있도록 보강대(23)가 구비되어 있으며, 보강대(23)는 도시된 바와 같이 열십자 방향으로 환봉등을 가설토록 하며, 또한 본체(2)의 상측으로는 구멍(25)이 천공된 인양브래킷(24)을 한 쌍 마련하여 와이어(200) 등을 걸어 거푸집(1) 전체를 크레인 등으로 들어 올릴 수 있도록 한다.A reinforcing
연결대판(3)은 철판을 직사각형으로 절단하여 구성한 것으로, 본체(2)를 구성하고 있는 파이프부재(21) 중 가장자리측 파이프부재(21)에 형성된 절개부(22)의 양측으로 일부가 돌출되게 밀착하고 용접하여 본체(2)와 일체로 구성한다.The connecting
연결대판(3)에는 상단에 복수의 조립구멍(31)을 형성하여 볼트와 너트와 같은 고정수단(4)이 조립되도록 함으로 해서 이웃하는 거푸집(1)의 연결대판(3)과 상호 조립될 수 있도록 한다.The
이때 조립구멍(31)은 파이프부재(21)를 벗어난 부분과 절개부(22)에 위치되도록 형성한다. 상기 조립구멍(31)은 연결대판(3) 하단의 절개부(22)에도 형성할 수 있으나, 이러한 구성은 분해 조립성이 저하되므로 주의토록 한다.At this time, the assembling
본체(2)와 연결대판(3)의 외부에 구비되는 이형제(5)는 본 발명에서 제공하는 거푸집(1)을 콘크리트구조물(300)에서 쉽게 분리할 수 있도록 하는 부재이며, 부직포 또는 합성수지 필름지, 비닐지 등이 선택적으로 적용될 수 있다.The
이상과 같이 구성되는 본 발명의 지반굴착기의 오거용 가이드홀(310) 거푸집(1)을 사용하고자 할 시에는 도 6에 도시된 바와 같이 CIP 공법을 적용코자 하는 경우 먼저 지반에 터파기를 행하여 구덩이(100)을 형성한다. 이때 구덩이(100)는 본 발명의 거푸집(1)이 내입된 상태에서 거푸집(1)의 측방으로 콘크리트를 타설할 수 있는 충분한 공간이 형성될 수 있게 형성하며, 거푸집(1)의 높이보다 낮게 한다.6, when the CIP method is to be applied to the
상기와 같이 터파기한 구덩이(100)에 본 발명의 거푸집(1)을 수평 상태로 안치한다.The
상기와 같이 거푸집(1)을 안치할 때 본체(2) 및 연결대판(3)의 외부를 이형제(5)로 감싸는 것은 당연하다. 이형제(1)는 본체(2) 및 연결대판(3)의 측면과 위, 아래를 함께 감쌀 수 있도록 함이 바람직하다.It is a matter of course to wrap the outside of the
상기와 같이 이형제(5)로 거푸집(1)을 감싼 상태에서 터파기한 구덩이(100) 내의 거푸집(1) 바깥 공간으로 콘크리트를 타설하고 양생이 이루어지도록 한다.As the
콘크리트를 타설하여 양생이 이루어진 상태에서 본체(2)에 구비되어 있는 인양브래킷(24)에 와이어(200)를 결합한 상태에서 크레인에 와이어(200)를 걸어 거푸집(1)을 들어 올리면 콘크리트구조물(300)에 지반굴착기에 장착되는 케이싱의 외경과 부합하는 직경의 가이드홀(310)이 형성되므로 이 가이드홀(310)을 이용하여 지반굴착기에 장착되는 케이싱 및 오거를 내입시켜 지반에 천공작업을 행하면 되는 것이다.When the
본 발명의 상세한 설명에서는 구체적인 실시례에 관해 설명하고 있으나, 본 발명의 범주에서 벗어나지 않는 한도 내에서 다양한 변형이 가능함은 물론이다. 그러므로 본 발명의 보호 범위는 설명된 실시례에 국한되어 정해져서는 안 되며, 후술하는 청구범위 뿐만 아니라 균등한 것들에 의해 정해져야 한다.While the present invention has been described in connection with what is presently considered to be practical exemplary embodiments, it is to be understood that the invention is not limited to the disclosed embodiments. Therefore, the scope of protection of the present invention should not be limited to the described embodiment, but should be determined by the equivalents as well as the claims that follow.
1:(지반굴착기의 오거용 가이드홀) 거푸집
2:본체 21:파이프부재
22:절개부 23:보강대
24:인양브래킷 25:구멍
3:연결대판 31:조립구멍
4:고정수단 5:이형제
100:구덩이 200:와이어
300:콘크리트구조물 310:가이드홀1: (guide hole for auger of ground excavator) Formwork
2: main body 21: pipe member
22: incision section 23:
24: lifting bracket 25: hole
3: Connection plate 31: Assembly hole
4: fixing means 5: release agent
100: pit 200: wire
300: Concrete structure 310: Guide hole
Claims (3)
본체(2)를 구성하는 양쪽 파이프부재(21)의 바깥쪽에 길이방향으로 절개부(22)를 형성하여 연결대판(3)을 형성하며, 이웃하는 거푸집(1)과 상호 연결토록 하며,
상기 본체(2)에는 인양브래킷(24)을 상향 돌출되게 형성하고, 본체(2)와 연결대판(3)에 외부면에는 콘크리트구조물(300)과 분리가능한 이형제(5)를 결합한 것을 특징으로 하는 지반굴착기의 오거용 가이드홀 거푸집.
A cutout 22 is formed in the pipe member 21 of about 1 to 2 m in the longitudinal direction and a plurality of pipe members 21 are connected in parallel so that a part of the adjacent pipe member 21 is inserted, Lt; / RTI >
A cutout portion 22 is formed in the longitudinal direction outside the both pipe members 21 constituting the main body 2 to form a connection board 3 to interconnect with the neighboring formwork 1,
A lifting bracket 24 is formed on the main body 2 so as to protrude upward and a concrete structure 300 and a releasable separating agent 5 are coupled to the outer surface of the main body 2 and the connection base plate 3 Guide hole formwork for auger of ground excavator.
상기 본체(2)를 구성하는 파이프부재(21)의 내부 상하측에는 보강대(23)를 십자형상으로 결합하며,
연결대판(3)에는 조립구멍(31)을 형성하여 이웃하는 연결대판(3)과 볼트와 너트로 구성되는 고정수단(4)이 조립될 수 있도록 한 것을 특징으로 하는 지반굴착기의 오거용 가이드홀 거푸집.
The method of claim 1,
In the upper and lower sides of the pipe member 21 constituting the main body 2, a reinforcing bar 23 is cross-
Wherein the connecting base plate (3) is provided with an assembling hole (31) so that a fixing means (4) composed of a neighboring connecting base plate (3) and a bolt and a nut can be assembled. Form.
상기 본체(2)와 연결대판(3)에 외부면에는 콘크리트구조물(300)과 분리가능한 이형제(5)는 부직포 또는 합성수지 필름지, 비닐지 중 어느 하나인 것을 특징으로 하는 지반굴착기의 오거용 가이드홀 거푸집.The method of claim 1,
Wherein the concrete structure (300) and the releasable agent (5) detachable from the outer surface of the main body (2) and the connection plate (3) are one of a nonwoven fabric, a synthetic resin film, and a vinyl paper. Form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160141787A KR101840226B1 (en) | 2016-10-28 | 2016-10-28 | The guide holes of the form for soil auger dredges |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160141787A KR101840226B1 (en) | 2016-10-28 | 2016-10-28 | The guide holes of the form for soil auger dredges |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101840226B1 true KR101840226B1 (en) | 2018-03-20 |
Family
ID=61910730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160141787A KR101840226B1 (en) | 2016-10-28 | 2016-10-28 | The guide holes of the form for soil auger dredges |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101840226B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200108557A (en) * | 2019-03-11 | 2020-09-21 | 주식회사 브리오 | Magnetic type embeded anchor and manufacturing method thereof |
KR102228553B1 (en) * | 2020-07-13 | 2021-03-16 | (주)서아건설 | Ground hole guide member for retaining wall |
KR102300727B1 (en) * | 2020-09-25 | 2021-09-10 | 허재봉 | The block assembly jig of the block form for the placing concrete and block form |
KR20230077836A (en) | 2021-11-26 | 2023-06-02 | 오피건설 주식회사 | A mold for making concrete guides for casing installation and column-type diaghragm wall construction method using the same |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004211368A (en) * | 2002-12-27 | 2004-07-29 | Sekisui Plastics Co Ltd | Concrete curing rust prevention mold releasing agent and curing method making use thereof |
KR100864110B1 (en) * | 2008-06-11 | 2008-10-16 | 국진토건(주) | Inserting method for casing and construction method for continuous wall thereof |
KR101344096B1 (en) * | 2013-05-09 | 2013-12-20 | 삼보토건 주식회사 | Apparatus of guide casing for a ground excavator |
-
2016
- 2016-10-28 KR KR1020160141787A patent/KR101840226B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004211368A (en) * | 2002-12-27 | 2004-07-29 | Sekisui Plastics Co Ltd | Concrete curing rust prevention mold releasing agent and curing method making use thereof |
KR100864110B1 (en) * | 2008-06-11 | 2008-10-16 | 국진토건(주) | Inserting method for casing and construction method for continuous wall thereof |
KR101344096B1 (en) * | 2013-05-09 | 2013-12-20 | 삼보토건 주식회사 | Apparatus of guide casing for a ground excavator |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200108557A (en) * | 2019-03-11 | 2020-09-21 | 주식회사 브리오 | Magnetic type embeded anchor and manufacturing method thereof |
KR102184769B1 (en) * | 2019-03-11 | 2020-11-30 | 주식회사 브리오 | Magnetic type embeded anchor and manufacturing method thereof |
KR102228553B1 (en) * | 2020-07-13 | 2021-03-16 | (주)서아건설 | Ground hole guide member for retaining wall |
KR102300727B1 (en) * | 2020-09-25 | 2021-09-10 | 허재봉 | The block assembly jig of the block form for the placing concrete and block form |
KR20230077836A (en) | 2021-11-26 | 2023-06-02 | 오피건설 주식회사 | A mold for making concrete guides for casing installation and column-type diaghragm wall construction method using the same |
KR102544641B1 (en) * | 2021-11-26 | 2023-06-16 | 오피건설 주식회사 | A mold for making concrete guides for casing installation and column-type diaghragm wall construction method using the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101840226B1 (en) | The guide holes of the form for soil auger dredges | |
KR101655077B1 (en) | Construction method of block for prefabricated retaining wall | |
JP5584542B2 (en) | Ground deformation prevention method and underground structure construction method using the same | |
CN111719565A (en) | Deep foundation pit support structure and construction method thereof | |
KR102009077B1 (en) | Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type | |
KR20140055639A (en) | A execution method of architecture beam | |
KR20180124795A (en) | An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same | |
KR102217329B1 (en) | Guide device for continuous excavation of casing | |
KR100712593B1 (en) | Construction method of pipe roof structures | |
KR20070081633A (en) | Construction method for underground watertight wall and subsidiary casing used in the same | |
JP4881555B2 (en) | Construction method of underground structure | |
KR101793037B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
KR20090007826A (en) | Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut | |
JP5229913B2 (en) | Slope reinforcement method | |
KR101324231B1 (en) | Soil cement wall structure and method for constructing thereof | |
JP5351125B2 (en) | Open shield machine start method of open shield method | |
CN110344439B (en) | Construction method of rear retaining wall drain hole | |
KR101181619B1 (en) | Building method of high wall block for large scale underground structure using earth anchor represtressing | |
KR101871446B1 (en) | Underground structure with high accuracy press and longitudinal guide drain | |
KR102021496B1 (en) | Retaining wall construction method and retaining wall structure by the method | |
JP5367452B2 (en) | Underground wall construction method and underground wall body | |
KR101545713B1 (en) | Composite type cutoff wall of steel temporary facility and construction method of the same | |
KR101069706B1 (en) | Method for constructing structure for forming underground tunnel on boundary of rock bed | |
JP5830068B2 (en) | Slope reinforcement method | |
KR101219451B1 (en) | Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant |