KR100727638B1 - Repairing method of the load - Google Patents

Repairing method of the load Download PDF

Info

Publication number
KR100727638B1
KR100727638B1 KR1020060023752A KR20060023752A KR100727638B1 KR 100727638 B1 KR100727638 B1 KR 100727638B1 KR 1020060023752 A KR1020060023752 A KR 1020060023752A KR 20060023752 A KR20060023752 A KR 20060023752A KR 100727638 B1 KR100727638 B1 KR 100727638B1
Authority
KR
South Korea
Prior art keywords
road
damaged part
repairing
filling
concrete
Prior art date
Application number
KR1020060023752A
Other languages
Korean (ko)
Inventor
김성태
Original Assignee
김성태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김성태 filed Critical 김성태
Priority to KR1020060023752A priority Critical patent/KR100727638B1/en
Application granted granted Critical
Publication of KR100727638B1 publication Critical patent/KR100727638B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K3/00Materials not provided for elsewhere
    • C09K3/14Anti-slip materials; Abrasives
    • C09K3/149Antislip compositions
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/147Repairing concrete pavings, e.g. joining cracked road sections by dowels, applying a new concrete covering

Abstract

A road repair method is provided to keep a concrete road surface at the optimum state by repairing cracks in a concrete road, to maintain a concrete road with low repair expenses and to extend the service life of a concrete road. The invention relates to a road repair method for repairing the damaged parts of a road by washing and drying the damaged parts of a road(100), enhancing adhesive strength by installing set anchors or concrete nails on the damaged parts of the coarse road at regular intervals(150), filling up the damaged parts of the coarse road with an admixture(270), enhancing intermediate strength by placing gravel or wire meshes in the admixture(280), and spreading sand(300).

Description

도로 보수 방법{Repairing Method Of The Load}Repairing Method Of The Load

도 1은 제 1 차 파손을 보수하는 방법의 순서도.1 is a flow chart of a method of repairing a first breakage.

도 2는 제 2 차 파손을 보수하는 방법의 순서도.2 is a flow chart of a method for repairing secondary damage.

도 3은 제 3 차 파손을 보수하는 방법의 순서도.3 is a flow chart of a method of repairing a third breakage.

본 발명은 도로의 파손된 부분을 보수하는 방법에 관한 것이다. 더욱 상세하게는 콘크리트 포장 도로에 파손이 발생한 경우에 그 파손 정도에 맞는 적당한 보수 방법을 제공하는 도로 보수 방법에 관한 것이다.The present invention relates to a method of repairing a broken part of a roadway. More particularly, the present invention relates to a road repairing method that provides an appropriate repairing method suitable for the degree of damage in case of damage to the concrete pavement.

도로의 대표적인 포장방법은 콘크리트를 이용한 포장방법과 아스팔트를 이용한 포장방법이 있다. 상기 아스팔트를 이용한 포장방법에 의하여 포장된 도로는 여름철의 장기간 고온 현상과 중차량 및 교통량 증가에 따른 차량 정체 현상 등에 의해 소성변형이 발생한다.Typical pavement methods for roads include concrete pavement and asphalt pavement. The road paved by the paving method using the asphalt plastic deformation occurs due to long-term high-temperature phenomenon in the summer season and vehicle congestion due to the increase of heavy vehicles and traffic volume.

이러한 소성변형은 아스팔트 포장도로 파손의 절대적인 요인으로 작용하여 포장수명이 단축되고 도로의 유지 보수비용이 증가하는 등의 문제점이 나타나며, 이로 인하여 최근에는 내구성이 뛰어난 콘크리트 포장도로가 늘어나는 추세이다.Such plastic deformation acts as an absolute factor of damage to the asphalt pavement, resulting in shortening the pavement life and increasing maintenance cost of the road, resulting in an increase in the durability of concrete pavement in recent years.

그러나 종래의 콘크리트 포장도로는 크랙이나 파절 등과 같은 도로 파손이 발생한 경우에 적절한 보수 방법이 없다.However, in the conventional concrete pavement there is no appropriate repair method in the case of road damage such as cracks or fractures.

따라서 작은 크랙이나 파절을 방치하여 큰 웅덩이가 되었을 때 비로소 보수를 하였으나, 이 과정에서 큰 웅덩이가 될 때까지 도로를 계속 방치하여 상기 도로 파손 부분을 지나는 자동차에 손상을 초래함은 물론이고 교통사고의 위험도 증가하며, 콘크리트 도로의 수명도 단축되는 문제점이 있다.Therefore, it was repaired only when a large puddle was left by neglecting small cracks or fractures, but in this process, the road was left unattended until it became a large puddle. There is also a problem that increases the risk, shortening the life of the concrete road.

그리고 큰 웅덩이가 발생한 후에나 보수를 함에 있어서 파손 부분을 크게 절단하여 콘크리트를 채우거나 임시 방편으로 아스콘을 채우는 등의 방법을 사용하여 보수비용이 과다한 문제점이 있다.In addition, there is a problem in that the cost of repair is excessive by using a method such as filling the concrete by filling the damaged part by largely cutting the damaged part or repairing it after repairing a large puddle.

따라서 본 발명은 이러한 문제점을 해결하기 위해 발명된 것으로서, 도로의 파손부를 그 파손 정도에 따라 제 1 차 내지 제 3 차의 파손부로 나누고 각각의 파손부마다 가장 경제적이고 효과적으로 보수가 이루어지고 모든 보수 공정이 일괄적으로 시행될 수 있도록 하여 콘크리트 도로면이 최상의 상태로 유지되도록 하는 도로 보수 방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been invented to solve such a problem, and divided the damaged parts of the road into the first to third damaged parts according to the degree of damage, and the most economical and effective repair is made for each damaged part, and all repair processes The purpose of the present invention is to provide a road repairing method that can be implemented in a batch so that the concrete road surface is kept in the best condition.

이러한 목적을 달성하기 위하여 본 발명은 도로의 파손부를 보수하는 방법에 있어서, 파손부를 세척 및 건조하는 단계와 합성수지와 모래를 이용하여 상기 파손부를 충진하는 단계 및 상기 파손부의 표면에 미끄럼 방지재를 도포하는 단계를 포함하여 구성되는 도로 보수 방법을 제공한다. 그리고 상기 합성수지와 모래는 교번으로 적층되어 충진될 수 있고, 상기 합성수지가 경화되기 전에 모래를 도포할 수 있다. In order to achieve the above object, the present invention provides a method for repairing a damaged part of a road, washing and drying the damaged part, filling the damaged part using synthetic resin and sand, and applying an anti-slip material to the surface of the damaged part. It provides a road repair method comprising a step. The synthetic resin and sand may be alternately stacked and filled, and sand may be applied before the synthetic resin is cured.

상기 파손부의 크기가 소정 범위 이하인 경우 상기 합성수지와 모래를 이용하여 상기 파손부를 충진하는 단계를 합성수지만을 이용하여 상기 파손부를 충진하는 단계로 할 수 있다.When the size of the damaged portion is less than a predetermined range, filling the damaged portion by using the synthetic resin and sand may be a step of filling the damaged portion using only synthetic resin.

또한, 상기 파손부의 크기가 소정 범위 이상인 경우 상기 파손부에 소정 간격으로 세트 앙카 또는 콘크리트 못을 박는 단계와 합성수지와 모래 및 유리섬유의 혼합물을 충진하는 단계를 포함하여 구성되는 도로 보수 방법을 제공한다.In addition, when the size of the damaged portion is more than a predetermined range provides a road repair method comprising the step of nailing the set anchor or concrete nail at the predetermined interval and filling the mixture of synthetic resin and sand and glass fiber at a predetermined interval. .

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are used as much as possible even if displayed on different drawings. In addition, in describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted.

콘크리트 도로의 파손 유형을 크기별로 3가지로 분류하면 다음과 같다.The three types of breakage of concrete roads are as follows.

제 1 차 파손은 초기 파손 단계로 도로에 길이 및 깊이가 5㎜ 미만인 경미한 크랙이 발생한 경우이다. 그리고 제 2 차 파손은 상기 초기 파손 단계의 도로를 방 치하여 상기 도로에 길이 또는 깊이가 5㎜ 이상에서 100㎜ 미만인 크랙이 발생한 경우이다.The primary failure is an initial failure stage where minor cracks of less than 5 mm in length and depth occur on the roadway. The second breakage is when the road of the initial breakage stage is left, and a crack having a length or depth of 5 mm or more and less than 100 mm occurs in the road.

제 3 차 파손은 상기 제 2 차 파손의 도로 상태를 방치하여 길이 또는 깊이가 100㎜ 이상인 크랙이 여러 방향으로 발생하거나 상기 크랙에 의해 웅덩이가 생긴 경우이다.The third breakage is a case where a crack having a length or a depth of 100 mm or more occurs in various directions due to the road condition of the second breakage occurring, or a puddle is generated by the crack.

도 1은 상기 제 1 차 파손을 보수하는 방법의 순서도를 나타낸다.1 shows a flow chart of a method for repairing the first breakage.

상기 제 1 차 파손의 보수 방법은 도로의 파손부를 세척 및 건조하는 제 1 단계(100)와, 상기 제 1 단계(100)를 거친 도로의 파손부에 합성수지를 충진하는 제 2 단계(200) 및 상기 제 2 단계(200)를 거친 도로의 파손부에 모래를 도포하는 제 3 단계(300)를 포함한 과정을 통하여 보수가 이루어진다.The method for repairing the first breakage includes a first step (100) of washing and drying a damaged part of a road, a second step (200) of filling a synthetic resin in a damaged part of the road which has passed the first step (100); The repair is performed through a process including a third step 300 of applying sand to the damaged part of the road that has passed through the second step 200.

상기 제 1 단계(100)는 도로의 파손부를 워터건(WATER GUN)을 사용하여 제 1 차 세척하는 과정과, 에어건(AIR GUN)을 사용하여 제 2 차 세척을 함과 동시에 건조작업을 하는 과정을 포함하여 이루어진다.The first step 100 is a process of first washing the damaged part of the road using a water gun (WATER GUN) and a process of drying at the same time as the second wash using an air gun (AIR GUN) It is made, including.

그리고 상기 제 2 단계(200)는 도로의 파손부를 압축건을 사용하여 합성수지를 투입하는 과정을 포함하여 이루어지는데, 상기 합성수지는 도로표면의 높이까지 투입된다. 또한, 상기 제 3 단계(300)는 도로의 파손부가 넓은 경우에 상기 합성수지가 경화되기 전에 미끄럼 방지재로 모래를 도포하는 과정을 포함하여 이루어진다.In addition, the second step 200 includes a step of injecting the synthetic resin using a compression gun in the damaged part of the road, the synthetic resin is introduced to the height of the road surface. In addition, the third step 300 includes a step of applying sand with a non-slip material before the synthetic resin is cured in the case where the damaged portion of the road is wide.

상기와 같은 제 1 차 파손의 보수 방법의 각 단계의 작용을 설명하면 다음과 같다.Referring to the operation of each step of the first damage repair method as described above is as follows.

상기 제 1 단계(100)는 상기 워터건이 압축된 물을 뿜어내어 세척하는 작용을 하고, 상기 에어건이 압축된 공기를 뿜어내어 공기세척과 건조하는 작용을 하며, 이를 통하여 상기 제 1 단계(100)는 도로의 파손부 표면이 상기 제 2 단계(200)의 과정이 수행되는데 적합한 상태를 만들어 준다. 그리고 상기 제 2 단계(200)는 상기 합성수지가 파손부에 충진되어 파손부의 공간을 메워주는 역할을 한다.The first step 100 serves to flush and compress the water gun by compressing the water gun, and the air gun blows and compresses the compressed air to dry and wash the air. The surface of the damaged part of the road makes the state suitable for the process of the second step 200 is performed. In addition, the second step 200 fills the damaged part by filling the synthetic resin with the damaged part.

또한, 상기 제 3 단계(300)는 상기 모래가 보수된 파손부 표면의 미끄러짐을 방지하는 역할을 한다.In addition, the third step 300 serves to prevent sliding of the damaged surface of the repaired sand.

도 2는 상기 제 2 차 파손을 보수하는 방법의 순서도이다.2 is a flow chart of a method for repairing the secondary breakage.

상기 제 2 차 파손의 보수 방법은 도로의 파손부를 세척 및 건조하는 제 1 단계(100)와, 상기 제 1 단계(100)를 거친 도로의 파손부에 합성수지와 모래를 교번으로 적층되게 충진하는 제 2 단계(250)와, 상기 제 2 단계(250) 과정 중이나 과정 후 필요한 경우에 도로의 파손부에 혼합물을 충진하는 제 3 단계(270) 및 상기 제 3 단계(270)를 거친 후에 모래를 도포하는 제 4 단계(300)를 포함하여 이루어진다.The method for repairing the second breakage includes a first step (100) of washing and drying a broken part of a road, and a step of filling synthetic resin and sand alternately stacked on the damaged part of the road which has passed the first step (100). Sand is applied after the second step 250 and the third step 270 and the third step 270 of filling the mixture at the break of the road, if necessary during or after the second step 250 process. A fourth step 300 is performed.

상기 제 1 단계(100) 및 제 4 단계(300)는 상기 제 1 차 파손의 보수 방법 중 제 1 단계(100) 및 제 3 단계(300)의 내용과 각각 같다.The first step 100 and the fourth step 300 are the same as the contents of the first step 100 and the third step 300 of the repair method of the first damage, respectively.

상기 제 2 단계(250)는 도로의 파손부에 압축건 등을 사용하여 합성수지를 충진한 후에 그 위에 마른 모래를 충진하고, 다시 그 위에 합성수지와 마른 모래를 교번으로 적층하여 충진하는 방식을 포함하여 이루어진다. 그리고 상기 제 3 단계 (270)는 상기 제 2 단계(250)의 과정 중에 합성수지와 모래 및 유리섬유를 혼합하여 이루어진 혼합물을 충진하는 것을 포함하여 이루어진다.The second step 250 includes a method of filling a dry sand on the damaged part of the road by using a compression gun or the like, and then filling the dry sand and alternately stacking the synthetic resin and dry sand thereon. Is done. The third step 270 may include filling a mixture formed by mixing a synthetic resin, sand, and glass fibers during the second step 250.

상기 제 2 차 파손 보수 방법의 각 단계 작용을 설명하면 다음과 같다.The operation of each step of the second damage repair method is as follows.

상기 제 2 단계(250)는 합성수지와 마른 모래를 번갈아 충진하는 과정을 통하여 상기 파손부의 공간은 메우는 역할을 하는 것인데, 합성수지만 충진할 경우에 충진된 부분의 강도가 약하게 될 수 있어 마른 모래를 번갈아 충진하여 강도를 보강한다.The second step 250 is to fill the space of the damaged portion through the process of alternately filling the synthetic resin and dry sand, when filling the synthetic resin but the strength of the filled portion may be weakened alternately dry sand Fill to reinforce strength.

그리고 상기 제 3 단계(270)는 상기 파손부의 공간이 크기 때문에 제 2 단계(250) 과정만으로 파손부 공간을 채우는 것이 부적절하다고 판단될 경우에 제 2 단계(250) 과정과 함께 수행하여 파손부 공간을 쉽게 채우고 강도를 높일 수 있는 역할을 한다.In addition, when the third step 270 determines that it is inappropriate to fill the damaged part space only by the second step 250 process because the space of the damaged part is large, the third step 270 is performed together with the second step 250 process to make the damaged part space. It is easy to fill and increase the strength.

도 3은 상기 제 3 차 파손을 보수하는 방법의 순서도이다.3 is a flow chart of a method for repairing the third breakage.

상기 제 3 차 파손의 보수 방법은 도로의 파손부를 세척 및 건조하는 제 1 단계(100)와, 상기 제 1 단계(100)를 거친 도로의 파손부에 접착강도를 보강하는 제 2 단계(150)와, 상기 제 2 단계(150)를 거친 도로의 파손부에 혼합물을 충진하는 제 3 단계(270)와, 상기 제 3 단계(270)를 진행하면서 상기 혼합물들 사이에 중간강도를 보강하는 제 4 단계(280) 및 상기 제 3 단계(270)와 제 4 단계(280)를 거친 후에 모래를 도포하는 제 5 단계(300)를 포함하여 이루어진다.The third repair method of the damage is the first step (100) of washing and drying the damaged part of the road, and the second step 150 of reinforcing the adhesive strength to the damaged part of the road passed through the first step (100) And a third step 270 of filling the mixture at the break of the road through the second step 150, and a fourth step of reinforcing the intermediate strength between the mixtures while the third step 270 is performed. After the step 280 and the third step 270 and the fourth step 280 is included a fifth step 300 of applying sand.

상기 제 1 단계(100) 및 제 5 단계(300)는 상기 제 1 차 파손의 보수 방법 중 제 1 단계(100) 및 제 3 단계(300)의 내용과 각각 같다. 그리고 상기 제 3 단계 (270)의 혼합물을 충진하는 과정은 상기 제 2 차 파손의 보수 방법 중 제 3 단계(270)의 내용과 같다.The first step 100 and the fifth step 300 are the same as the contents of the first step 100 and the third step 300 of the first damage repair method. The filling of the mixture of the third step 270 is the same as that of the third step 270 of the repair method of the second breakage.

상기 제 2 단계(150)는 상기 파손부의 하부와 측부에 일정한 간격으로 세트 앙카 또는 콘크리트용 못을 박는 과정을 포함하여 이루어진다. 또한, 상기 제 4 단계(280)는 상기 혼합물 사이에 가는 자갈이나 와이어메쉬(WIRE MESH) 등을 타설하여 보수된 부분의 강도를 높이는 과정을 포함한다.The second step 150 includes a process of nailing set anchors or concrete nails at regular intervals on the lower part and the side of the damaged part. In addition, the fourth step 280 includes a process of increasing the strength of the repaired part by pouring fine gravel or wire mesh between the mixture.

상기 제 3 차 파손 보수 방법의 각 단계 작용을 설명하면 다음과 같다.The operation of each step of the third damage repair method is as follows.

상기 제 2 단계(150)는 도로 파손부의 보수에 필요한 접착력과 보수된 부분의 강도를 높이는 작용을 하고, 상기 제 4 단계(280)는 상기 제 3 단계(270)의 혼합물 충진 과정을 진행하면서 상기 혼합물만으로 파손부를 메울 경우에 보수된 부분의 강도가 약하게 되는 것을 방지하는 작용을 한다.The second step 150 acts to increase the adhesive strength and the strength of the repaired part necessary for repairing the road damaged part, and the fourth step 280 is performed while the mixture filling process of the third step 270 is performed. When filling the damaged part with only the mixture serves to prevent the strength of the repaired portion is weakened.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and changes without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

이상에서 설명한 바와 같이 본 발명에 의하면, 콘크리트 도로의 파손이 심한 부분은 물론 파손이 경미한 크랙의 경우도 보수하여 콘크리트 도로면을 최상의 상태로 유지시키고, 저렴한 보수비용으로 콘크리트 도로를 유지 관리하며, 콘크리트 도로의 수명을 획기적으로 연장하는 효과가 있다.As described above, according to the present invention, the concrete road surface is maintained in the best state by repairing not only the severe part of the concrete road but also the case of the minor crack, maintaining the concrete road at a low repair cost, and It has the effect of significantly extending the life of the road.

Claims (5)

삭제delete 도로의 파손부를 보수하는 방법에 있어서,In the method of repairing the damaged part of the road, 파손부를 세척 및 건조하는 단계;Washing and drying the damaged part; 합성수지와 모래를 이용하여 상기 파손부를 충진하는 단계;Filling the damaged part using synthetic resin and sand; 상기 파손부의 표면에 미끄럼 방지재를 도포하는 단계;Applying an anti-slip material to the surface of the breakage part; 를 포함하여 구성되어지되,Consists of including 상기 합성수지와 모래는 교번으로 적층되어 충진되는 것을 특징으로 하는 도로 보수 방법.The synthetic resin and sand is road repair method, characterized in that the alternatingly stacked. 도로의 파손부를 보수하는 방법에 있어서 상기 파손부의 크기가 소정 범위 이하인 경우에,In the method of repairing a damaged part of a road, when the size of the damaged part is equal to or less than a predetermined range, 파손부를 세척 및 건조하는 단계;Washing and drying the damaged part; 합성수지만을 이용하여 상기 파손부를 충진하는 단계;Filling the damaged part using only synthetic resin; 상기 파손부의 표면에 미끄럼 방지재를 도포하는 단계;Applying an anti-slip material to the surface of the breakage part; 를 포함하여 구성되는 것을 특징으로 하는 도로 보수 방법.Road repair method comprising a. 도로의 파손부를 보수하는 방법에 있어서 상기 파손부의 크기가 소정 범위 이상인 경우에,In the method of repairing the damaged part of the road, when the size of the damaged part is more than a predetermined range, 파손부를 세척 및 건조하는 단계;Washing and drying the damaged part; 상기 파손부에 소정 간격으로 세트 앙카 또는 콘크리트 못을 박는 단계;Nailing set anchors or concrete nails at predetermined intervals on the damaged portion; 합성수지와 모래 및 유리섬유의 혼합물을 충진하는 단계;Filling a mixture of synthetic resin with sand and fiberglass; 상기 파손부의 표면에 미끄럼 방지재를 도포하는 단계;Applying an anti-slip material to the surface of the breakage part; 를 포함하여 구성되는 것을 특징으로 하는 도로 보수 방법.Road repair method comprising a. 청구항 2 내지 청구항 4 중에 어느 하나의 청구항에 있어서,The method according to any one of claims 2 to 4, 상기 미끄럼 방지재는 모래인 것을 특징으로 하는 도로 보수 방법.The anti-skid material road repair method characterized in that the sand.
KR1020060023752A 2006-03-14 2006-03-14 Repairing method of the load KR100727638B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060023752A KR100727638B1 (en) 2006-03-14 2006-03-14 Repairing method of the load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060023752A KR100727638B1 (en) 2006-03-14 2006-03-14 Repairing method of the load

Publications (1)

Publication Number Publication Date
KR100727638B1 true KR100727638B1 (en) 2007-06-13

Family

ID=38359204

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060023752A KR100727638B1 (en) 2006-03-14 2006-03-14 Repairing method of the load

Country Status (1)

Country Link
KR (1) KR100727638B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101431680B1 (en) * 2014-01-02 2014-08-20 (주)메이드로드 Repairing method of pavement

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200227579Y1 (en) 2000-12-19 2001-06-15 주식회사한국 쇼본드 건설 Crack repair system of the concrete-pavement
KR200281719Y1 (en) 2002-04-16 2002-07-13 대한산자공업 주식회사 Mat for reinforcing asphalt road
KR100421255B1 (en) 2001-06-18 2004-03-09 금호석유화학 주식회사 a concrete or a mortar having synthetic rubber latex and Waterproof paving method using the concrete and the mortar

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200227579Y1 (en) 2000-12-19 2001-06-15 주식회사한국 쇼본드 건설 Crack repair system of the concrete-pavement
KR100421255B1 (en) 2001-06-18 2004-03-09 금호석유화학 주식회사 a concrete or a mortar having synthetic rubber latex and Waterproof paving method using the concrete and the mortar
KR200281719Y1 (en) 2002-04-16 2002-07-13 대한산자공업 주식회사 Mat for reinforcing asphalt road

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101431680B1 (en) * 2014-01-02 2014-08-20 (주)메이드로드 Repairing method of pavement

Similar Documents

Publication Publication Date Title
KR100959407B1 (en) Concrete structure repair work method
KR101323022B1 (en) Method of road repairing by using urethane sealant for repairing broken concrete near expansion joint
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
US20180313043A1 (en) System and method for roadway maintenance and repair
US20130121763A1 (en) Manhole, roadway and walkway repair
CN206512547U (en) A kind of repairing type bituminous paving
KR20060082832A (en) Precast concrete panel using height-controller and its road repairing method
US20140017004A1 (en) Pothole and utility cut repair overlay and method of installation
KR100727638B1 (en) Repairing method of the load
US2737092A (en) Rubber-coated plywood for roadbed on highways
KR101761165B1 (en) Road pavement method for prevention of pot hole
CA1122021A (en) Method of filling a hole in the ground
KR100869651B1 (en) Road surface repairing method using the rubafalt
KR100785311B1 (en) A load safety boundary stone and construction method thereof
KR101021475B1 (en) Construction method for prefabricated type concrete road using precasted concrete panel
KR101339202B1 (en) Repair method for concrete pavement using asphalt concrete
KR101650453B1 (en) a pothole repair method of a pavement
CN108342940B (en) Bus stop road surface structure
CN116536992A (en) Airport pavement broken board repairing method
KR101327873B1 (en) Flatness remaining unit fot repairing precast panel of concrete pavement, and repairing method
KR101250216B1 (en) Repairing crevis sheet of paved road and repairing method using it
KR101370641B1 (en) Repair material for asphalt road and repairing method for road using thereof
KR100831087B1 (en) Section repair material and section repair method using the mma resins for slab of concrete bridge
KR101096087B1 (en) Method of repair work on road and bridge deck flexible joints
RU2454502C1 (en) Method to repair road bed

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20120529

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee