KR101761165B1 - Road pavement method for prevention of pot hole - Google Patents
Road pavement method for prevention of pot hole Download PDFInfo
- Publication number
- KR101761165B1 KR101761165B1 KR1020160172528A KR20160172528A KR101761165B1 KR 101761165 B1 KR101761165 B1 KR 101761165B1 KR 1020160172528 A KR1020160172528 A KR 1020160172528A KR 20160172528 A KR20160172528 A KR 20160172528A KR 101761165 B1 KR101761165 B1 KR 101761165B1
- Authority
- KR
- South Korea
- Prior art keywords
- elastic
- concrete layer
- asphalt concrete
- stiffener
- layer
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
- E01C7/34—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ made of several courses which are not bound to each other ; Separating means therefor, e.g. sliding layers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/16—Reinforcements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/10—Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
본 발명은 포트 홀 방지용 도로포장공법에 관한 것으로서, 보다 상세하게는 도로가 형성될 지반을 평편하게 평탄화하는 평탄화단계와, 상기 평탄화가 진행된 지반에 콘크리트를 포설하여 콘크리트층을 형성시키는 콘크리트층 형성단계와, 상기 콘크리트층을 타공하여 체결홈을 형성한 후 상기 체결홈에 너트를 안착시키는 너트부재 고정단계와, 상기 콘크리트층의 상면에 폴리머를 도포하여 폴리머층을 형성시키는 폴리머층 형성단계와, 상기 폴리머층의 상부에 탄성보강재를 배치한 후 상기 탄성보강재의 사방모서리 부분을 늘린 후 볼트로 상기 너트에 고정시켜 상기 탄성보강재를 인장시키는 탄성보강재 고정단계와, 상기 탄성보강재의 내측을 충진시킴과 아울러 외부를 덮으면서 상기 폴리머층의 상부에 아스팔트 콘크리트를 포설하여 아스팔트 콘크리트층을 형성시키는 아스팔트 콘크리트층 형성단계와, 상기 볼트를 상기 너트 및 상기 아스팔트 콘크리트층에서 분리하여 상기 탄성보강재에 충진된 아스팔트 콘크리트가 가압되도록 하고, 상기 볼트가 상기 아스팔트 콘크리트층에서 분리되면서 형성되는 분리홀에 아스팔트 콘크리트를 채워 마감처리하는 마감단계를 포함하여 이루어진 것을 특징으로 하는 포트홀 방지용 도로포장공법을 제공한다.
본 발명에 따르면, 포장된 도로에서 포트 홀이 발생되는 것을 방지하여 차량의 사고를 방지하고 포트 홀의 보수를 위한 유지보수비용이 절감되며, 내구성, 강도 및 지지력을 향상시켜 포장된 도로의 수명을 연장시킬 수 있는 효과가 있다.The present invention relates to a pavement method for preventing port holes, and more particularly, to a pavement method for preventing port holes, which comprises a planarizing step of flattening a ground to be formed with roads, a step of forming a concrete layer by laying concrete on the ground, A nut member fixing step of punching the concrete layer to form a fastening groove and then fixing the nut to the fastening groove, a polymer layer forming step of forming a polymer layer by applying a polymer to the upper surface of the concrete layer, An elastic stiffener fixing step of disposing an elastic stiffener on an upper portion of the polymer layer, extending the four corners of the elastic stiffener, and fixing the elastic stiffener to the nut with bolts to tension the elastic stiffener; filling the inner side of the elastic stiffener Asphalt concrete is placed on the polymer layer while covering the outside, The asphalt concrete layer is formed by separating the bolt from the nut and the asphalt concrete layer to press the asphalt concrete filled in the elastic reinforcement, and the bolt is separated from the asphalt concrete layer And a finishing step of finishing asphalt concrete in the separation hole to finish the porthole pavement method.
According to the present invention, it is possible to prevent a port hole from being generated on a packed road, to prevent a vehicle accident, to reduce the maintenance cost for repairing the port hole, to improve the durability, strength and supportability, There is an effect that can be made.
Description
본 발명은 포트 홀 방지용 도로포장공법에 관한 것으로서, 보다 상세하게는 포장된 도로에서 포트 홀이 발생되는 것을 방지하여 차량의 사고를 방지하고 포트 홀의 보수를 위한 유지보수비용이 절감되며, 내구성, 강도 및 지지력을 향상시켜 포장된 도로의 수명을 연장시킬 수 있는 포트 홀 방지용 도로포장공법에 관한 것이다.The present invention relates to a pavement method for preventing a port hole, and more particularly, to a pavement method for preventing a port hole from being generated on a packed road by preventing a vehicle accident, reducing maintenance cost for repairing a port hole, And a pavement method for preventing port holes that can extend the service life of a packed road by improving the supporting force.
일반적으로, 도로포장으로는 아스팔트 포장 및 콘크리트 포장이 있으며, 현재는 아스팔트 포장이 대부분이기는 하지만 콘크리트 포장도 증가하고 있는 추세이다.이전에는 포장층의 침하 또는 파손이 아스팔트 포장의 문제점이었지만, 최근에는 기상이변에 따른 집중호우, 폭설 또는 중차량의 급격한 증가 및 교통량이 급격한 증가로 인해 아스팔트 포장의 변형이 주요 문제점으로 부각되고 있다. 또한 아스팔트 포장은 교통개방 후 하자보수 기간이 2년 정도이며 소성변형, 파손이 발생되면 파손의 원인분석 파악이 어렵고 그로 인해 유지보수 비용이 증가하는 문제점이 부각되는 추세이다Asphalt pavement and concrete pavement are generally used as road pavement, and concrete pavement is also increasing, although asphalt pavement is present at present. The settlement or breakage of pavement layer was a problem of asphalt pavement before, Deformation due to asphalt pavement is becoming a major problem due to heavy rainfall, heavy snowfall or heavy traffic, and rapid increase in traffic volume. In addition, asphalt pavement has a repair service period of about 2 years after opening the traffic, and when plastic deformation or breakage occurs, it is difficult to understand the cause of the breakage and the problem of increasing the maintenance cost is emphasized
이러한 아스팔트는 시공시 포장 표면에 생기는 국부적인 작은구멍을 포트 홀(pot hole)이라고 한다. 발생 원인은 시공시의 전압(轉壓)부족, 혼합물의 품질 불량 외에 배수 구조불량 등에 의해 발생된다. 보수 방법으로서 불량 개소의 패칭(patching), 국부 재포장, 배수 불량인 경우는 배수 구조의 개량이 필요하다.Such asphalt is called a pot hole, which is a small hole formed on the surface of the pavement during construction. The cause of the occurrence is caused by insufficient voltage at the time of construction, poor quality of the mixture, poor drainage structure, and the like. As a repair method, it is necessary to improve the drainage structure in case of patching of defective parts, local repacking, and poor drainage.
또한, 아스팔트의 시공 이외에 상기한 포트 홀은 시공 후 아스팔트로 스며든 물기가 기온에 따라 얼고 녹기를 반복에 의해 형성되거나 염화칼슘에 의해 부식되어 형성되고, 그 위로 차량이 다니면서 아스팔트가 부서지고 떨어져 나가면서 결국 커다란 구멍이 생겨나게 되고, 주행하는 차량의 바퀴가 빠져 타이어가 펑크나거나 주행방향이 틀어져 사고를 유발하는 심각한 문제점이 발생하고 있다.In addition to the construction of the asphalt, the above-mentioned port hole is formed by repeating the freezing and melting of the asphalt-permeated water after the construction according to the temperature or by the corrosion by the calcium chloride, and the asphalt breaks and falls As a result, a large hole is created, and the wheels of the traveling vehicle are lost, causing a serious problem that the tire is punctured or the traveling direction is changed to cause an accident.
최근에는 대한민국 출원번호 제10-2013-0141544호에서와 같이 도로의 아스팔트에 형성되는 파손된 포트 홀이나 파손된 부분을 보수하도록 덧씌우기 포장공법이 개시되어 있다. 그러나, 포트 홀을 형성된 이후에 보수가 이루어지게 되므로 근본적으로 포트 홀의 형성을 방지하게 못하게 되고, 포트 홀이 생긴 후 차량의 주행에 따른 사고가 발생되는 것을 방지할 수 없게 되는 문제점이 상존하게 된다.Recently, as disclosed in Korean Patent Application No. 10-2013-0141544, a paving method for repairing a broken port hole or a damaged portion formed on an asphalt of a road is disclosed. However, since the repair is performed after the port hole is formed, the formation of the port hole can not be fundamentally prevented, and an accident caused by the running of the vehicle after the port hole is formed can not be prevented.
전술한 발명은 본 발명이 속하는 기술분야의 배경기술을 의미하며, 종래 기술을 의미하는 것은 아니다.The above-mentioned invention means the background art of the technical field to which the present invention belongs, and does not mean the prior art.
본 발명은 상기한 종래의 문제점을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 포장된 도로에서 포트 홀이 발생되는 것을 방지하여 차량의 사고를 방지하고 포트 홀의 보수를 위한 유지보수비용이 절감되며, 내구성, 강도 및 지지력을 향상시켜 포장된 도로의 수명을 효과적으로 연장시킬 수 있는 도로포장공법을 제공하는데 그 목적이 있다.SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to prevent a port hole from being generated on a packed road, to prevent a vehicle accident, The present invention provides a road paving method capable of effectively extending the service life of a packed road by improving durability, strength and supportability.
상기 과제를 달성하기 위하여 본 발명은In order to achieve the above object,
도로에 포트 홀이 형성되는 것을 방지하는 도로포장공법으로서, 도로가 형성될 지반을 평편하게 평탄화하는 평탄화단계와, 상기 평탄화가 진행된 지반에 콘크리트를 포설하여 콘크리트층을 형성시키는 콘크리트층 형성단계와, 상기 콘크리트층을 타공하여 체결홈을 형성한 후 상기 체결홈에 너트를 안착시키는 너트부재 고정단계와, 상기 콘크리트층의 상면에 폴리머를 도포하여 폴리머층을 형성시키는 폴리머층 형성단계와, 상기 폴리머층의 상부에 탄성보강재를 배치한 후 상기 탄성보강재의 사방모서리 부분을 늘린 후 볼트로 상기 너트에 고정시켜 상기 탄성보강재를 인장시키는 탄성보강재 고정단계와, 상기 탄성보강재의 내측을 충진시킴과 아울러 외부를 덮으면서 상기 폴리머층의 상부에 아스팔트 콘크리트를 포설하여 아스팔트 콘크리트층을 형성시키는 아스팔트 콘크리트층 형성단계와, 상기 볼트를 상기 너트 및 상기 아스팔트 콘크리트층에서 분리하여 상기 탄성보강재에 충진된 아스팔트 콘크리트가 가압되도록 하고, 상기 볼트가 상기 아스팔트 콘크리트층에서 분리되면서 형성되는 분리홀에 아스팔트 콘크리트를 채워 마감처리하는 마감단계로 이루어진 것을 특징으로 하는 포트 홀 방지용 도로포장공법을 제공한다.A road pavement method for preventing a port hole from being formed on a road, comprising: a planarizing step of flattening a ground on which a road is to be formed; a concrete layer forming step of forming a concrete layer by laying concrete on the ground, A nut member fixing step of fixing the concrete layer to form a fastening groove and then mounting a nut on the fastening groove; a polymer layer forming step of forming a polymer layer by applying a polymer to the upper surface of the concrete layer; An elastic stiffener fixing step of disposing an elastic stiffener on an upper portion of the elastic stiffener and fixing the elastic stiffener to the nut by bolts at four corners of the elastic stiffener and then tensioning the elastic stiffener; And the asphalt concrete is laid on the polymer layer to cover the asphalt concrete layer The asphalt concrete layer is separated from the nut and the asphalt concrete layer to press the asphalt concrete filled in the elastic reinforcement, and the bolt is separated from the asphalt concrete layer, And a finishing step of finishing the asphalt concrete to fill the port hole.
본 발명의 일 실시예에 있어서, 상기 폴리머는 시멘트, 폴리머분말, 물, 소포제, 지연제 및 증점재를 혼합하여 형성한 것을 특징으로 한다.In an embodiment of the present invention, the polymer is formed by mixing cement, a polymer powder, water, a defoamer, a retarder and a thickener.
또한, 본 발명의 일 실시예에 있어서, 상기 콘크리트층 형성단계 이후에 상기 콘크리트층의 상부에 지지망을 배치하는 지지망 배치단계를 더 포함함으로써 상기 지지망을 덮으면서 상기 폴리머층이 형성되도록 하는 것을 특징으로 한다.In one embodiment of the present invention, the polymer layer is formed while covering the support network, further comprising a support network arrangement step of disposing a support network on the concrete layer after the concrete layer formation step. do.
또한, 본 발명의 일 실시예에 있어서, 상기 탄성보강재는 육각의 충진홀이 다수 형성된 허니콤탄성망과, 상기 허니콤탄성망의 사방모서리 부분에 형성되는 목부와 상기 목부의 일단에 형성되는 관통홀이 형성된 고정패드로 이루어진 인장고정부로 이루어진 것을 특징으로 한다.According to an embodiment of the present invention, the elastic stiffener may include a honeycomb elastic net having a plurality of hexagonal filling holes, a neck formed at a corner of the honeycomb elastic net and a through-hole formed at one end of the neck, And a tension fixing portion formed of a fixing pad having a hole formed thereon.
또한, 본 발명의 일 실시예에 있어서, 상기 허니콤탄성망의 충진홀에는 내측면에 걸림돌부가 형성되며, 상기 걸림돌부는 상기 충진홀의 내측면 중간부분을 따라 돌출되게 형성되고, 상측과 하측이 외측으로 갈수록 경사지게 경사면이 더 형성되는 것을 특징으로 한다.In addition, in one embodiment of the present invention, the filling hole of the honeycomb elastic net is provided with a locking protrusion on the inner side, the locking protrusion is formed to protrude along the middle portion of the inner side of the filling hole, The inclined surface is further formed to be inclined toward the lower side.
본 발명인 포트 홀 방지용 도로포장공법은 평탄화단계와, 콘크리트층 형성단계와, 너트부재 고정단계와, 폴리머층 형성단계와, 탄성보강재 고정단계와, 아스팔트 콘크리트층 형성단계와, 마감단계를 거치면서 도로를 포장함으로써, 포장된 도로에서 포트 홀이 발생되는 것을 방지하여 차량의 사고를 방지하고 포트 홀의 보수를 위한 유지보수비용이 절감되며, 내구성, 강도 및 지지력을 향상시켜 포장된 도로의 수명을 연장시킬 수 있는 효과가 있다.The port pavement road pavement method of the present invention is a road pavement pavement method for preventing port holes, which comprises the steps of: a planarization step; a concrete layer formation step; a nut member fixing step; a polymer layer formation step; an elastic stiffener fixing step; an asphalt concrete layer formation step; Thereby preventing the occurrence of port holes on packed roads, thereby preventing vehicle accidents, reducing the maintenance cost for repairing the port holes, and enhancing durability, strength and supportability to prolong the life of the packaged roads There is an effect that can be.
도 1은 본 발명에 따른 포트 홀 방지용 도로포장공법을 나타낸 순서도이다.
도 2는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 도로포장공법에 의해 포장된 도로를 나타낸 단면도이다.
도 3은 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 탄성보강재를 나타낸 도면이다.
도 4는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 도로를 포장하는 과정에서 탄성보강제가 체결된 상태를 나타낸 도면이다.
도 5는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 마감처리과정을 나타낸 도면이다.
도 6은 본 발명에 따른 포트 홀 방지용 도로포장공법의 다른 실시예에 의해 도로가 포장된 상태를 나타낸 단면도이다.
도 7은 본 발명에 사용되는 허니콤탄성망의 세부 확대도이다. 1 is a flowchart showing a pavement method for preventing port holes according to the present invention.
2 is a cross-sectional view showing a road packed by a road pavement method in the pavement method for port hole prevention according to the present invention.
3 is a view showing an elastic stiffener in the pavement method for preventing port holes according to the present invention.
4 is a view showing a state in which an elastic reinforcing agent is fastened in the process of paving the road in the pavement method for port hole prevention according to the present invention.
FIG. 5 is a view showing a finishing process in the pavement method for preventing port holes according to the present invention.
6 is a cross-sectional view showing a state in which a road is packed according to another embodiment of the pavement method for preventing port holes according to the present invention.
7 is a detail enlarged view of a honeycomb elastic net used in the present invention.
이하, 첨부된 도면들을 참조하여 본 발명에 따른 포트 홀 방지용 도로포장공법의 바람직한 실시예를 첨부된 도면을 참조하여 설명한다. 이 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다. 또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다. 그러므로, 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a porthole pavement method according to the present invention will be described with reference to the accompanying drawings. In this process, the thicknesses of the lines and the sizes of the components shown in the drawings may be exaggerated for clarity and convenience of explanation. In addition, the terms described below are defined in consideration of the functions of the present invention, which may vary depending on the intention or custom of the user, the operator. Therefore, definitions of these terms should be made based on the contents throughout this specification.
또한, 하기 실시예는 본 발명의 권리범위를 한정하는 것이 아니라 단지 예시로 제시하는 것이며, 본 기술 사상을 통해 구현되는 다양한 실시예가 있을 수 있다.In addition, the following embodiments are not intended to limit the scope of the present invention, but merely as an example, and various embodiments may be implemented through the present invention.
도 1은 본 발명에 따른 포트 홀 방지용 도로포장공법을 나타낸 순서도이고, 도 2는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 도로포장공법에 의해 포장된 도로를 나타낸 단면도이며, 도 3은 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 탄성보강재를 나타낸 도면이고, 도 4는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 도로를 포장하는 과정에서 탄성보강제가 체결된 상태를 나타낸 도면이며, 도 5는 본 발명에 따른 포트 홀 방지용 도로포장공법에 있어, 마감처리과정을 나타낸 도면이고, 도 6은 본 발명에 따른 포트 홀 방지용 도로포장공법의 다른 실시예에 의해 도로가 포장된 상태를 나타낸 단면도이며, 도 7은 본 발명에 사용되는 허니콤탄성망의 세부 확대도이다. 2 is a cross-sectional view of a road paved by a road pavement method in the pavement method for preventing port holes according to the present invention, and Fig. 3 is a cross- FIG. 4 is a view showing a state in which an elastic reinforcing agent is fastened in the process of paving roads in a pavement method for preventing port holes according to the present invention. FIG. 5 is a view showing a finishing process in the pavement method for preventing port holes according to the present invention, and FIG. 6 is a view illustrating a pavement pavement method according to another embodiment of the present invention. 7 is a detail enlarged view of a honeycomb elastic net used in the present invention.
도면에 도시된 바와 같이 본 발명인 포트 홀 방지용 도로포장공법(이하에서는 설명의 편의상 '도로포장공법'이라 명명함)는 포장된 도로에 침하나 지진 및 투수에 따른 포트 홀이 형성되어, 운행되는 차량이 포트 홀에 빠져 사고가 유발되는 것을 방지하도록 된 도로포장공법으로서, 이에 이와 같은 도로포장공법은 평탄화단계(S1)와 콘크리트층 형성단계(S2)와 너트부재 고정단계(S3)와 폴리머층(20) 형성단계(S4)와 탄성보강재 고정단계(S5)와 아스팔트 콘크리트층 형성단계(S6)와 마감단계(S7)를 포함하여 이루어진다.As shown in the drawings, the port pavement road pavement method of the present invention (hereinafter referred to as 'road pavement method' for the sake of convenience in the following description) is characterized in that port holes are formed on packed roads, The road pavement method is a road pavement method in which the road pavement method is constructed so as to prevent the occurrence of accidents by falling into the port holes. The road pavement method includes a planarization step S1, a concrete layer forming step S2, a nut member fixing step S3, 20) forming step S4, an elastic stiffener fixing step S5, an asphalt concrete layer forming step S6, and a finishing step S7.
상기 평탄화단계(S1)는 도로가 형성될 지면에 평평하게 평탄화하는 단계이다.The planarizing step S1 is a step of planarizing the surface of the road on which the road is to be formed.
상기 평탄화단계(S1)는 지반(100)인 성토층을 평평하게 형성시키도록 롤러나 평탄화장비를 이용하는 것이 바람직하다.Preferably, the planarization step S1 uses a roller or planarization equipment to flatten the embankment layer which is the
상기 콘크리트층 형성단계(S2)는 상기 평탄화가 진행된 지면에 콘크리트를 포설하여 콘크리트층(10)을 형성시키는 단계이다.The concrete layer forming step (S2) is a step of forming a concrete layer (10) by laying concrete on the ground surface where the planarization proceeds.
상기 콘크리트층 형성단계(S2)는 평탄화단계(S1)를 거친 지반(100)에 거푸집을 형성하고 그 거푸집에 콘크리트를 포설하여 경화시켜 상기한 콘크리트층(10)을 형성시킨다. 본 발명에서 상기 콘크리트층은 시공 기간 단축을 위하여 초고속 경화형 콘크리트를 사용하는 것이 바람직하다. In the concrete layer forming step S2, a concrete form is formed in the
상기 너트부재 고정단계(S3)는 상기 콘크리트층(10)을 타공하여 체결홈을 형성한 후 상기 체결홈에 너트(50)를 안착시키는 단계이다.In the step (S3) of fixing the nut member, the
상기 너트부재 고정단계(S3)는 도 4에 도시된 바와 같이 상기 콘크리트층(10)의 상면에 상기 너트(50)를 안착시켜 고정시키는 단계로서, 상기 너트(50)는 상기 콘크리트가 포설되는 과정에서 상면이 노출되어 인서트되도록 하는 것이 바람직하며, 다르게는 경화된 콘크리트층(10)의 상면에 결합홈을 형성한 후 상기 결합홈에 상기 너트(50)를 삽입하여 접착고정시키는 것도 가능하다.As shown in FIG. 4, the
상기 폴리머층(20) 형성단계(S4)는 상기 콘크리트층(10)의 상면에 폴리머를 도포하여 폴리머층(20)을 형성시키는 단계이다.The step of forming the polymer layer 20 (S4) is a step of forming a
상기 폴리머는 시멘트, 폴리머분말, 물, 소포제, 지연제, 증점재 등을 혼합하여 형성한다.The polymer is formed by mixing cement, a polymer powder, water, a defoaming agent, a retarder, a thickener, and the like.
상기한 폴리머는 예를 들어, 시멘트 50~60 중량부, 폴리머분말 10~20 중량부, 물 30~40 중량부, 소포제 0.1~2.0 중량부, 지연제 0.1~2.0 중량부 및 증점재 0.1~2.0 중량부를 혼합하여 형성시킬 수 있다.The above polymer may be used, for example, in an amount of 50 to 60 parts by weight of cement, 10 to 20 parts by weight of polymer powder, 30 to 40 parts by weight of water, 0.1 to 2.0 parts by weight of defoamer, 0.1 to 2.0 parts by weight of retarder, By weight.
상기 폴리머는 내구성, 수밀성, 강도가 향상되도록 상기 콘크리트층(10)에 도포되어 경화된다.The polymer is applied to the
상기한 폴리머는 내구성, 수밀성, 강도를 향상시키는 것으면, 어느 성분비를 적용하여도 무방하며, 다른 성분을 사용하는 것도 가능하다.Any of the above-mentioned polymers may be used as long as they improve durability, water tightness and strength, and other components may be used.
상기 폴리머층(20)은 상기 너트(50)가 외부로 노출되도록 경화된 후 관통공을 형성시키는 것이 바람직하다.The
상기 탄성보강재 고정단계(S5)는 상기 폴리머층(20)의 상부에 탄성보강재(30)를 배치한 후 상기 탄성보강재(30)의 사방모서리 부분을 늘린 후 볼트(60)로 상기 너트(50)에 고정시켜 상기 탄성보강재(30)를 인장시키는 단계이다.The elastic stiffener fixing step S5 may be performed by disposing an
상기 탄성보강재(30)는 육각의 충진홀(310)이 다수 형성된 허니콤탄성망(31)과, 상기 허니콤탄성망(31)의 사방모서리 부분에 형성되는 목부(32)와 상기 목부(32)의 일단에 형성되는 관통홀(311)이 형성된 고정패드(33)로 이루어진 인장고정부로 이루어진다.The
즉, 상기 폴리머층(20)을 형성시킨 상태에서 작업자들이 상기 탄성보강재(30)를 사방으로 늘린 후 볼트(60)를 상기 고정패드(33)에 끼워 상기 너트(50)에 체결함으로써, 상기 탄성보강재(30)를 늘려진 상태로 고정시킬 수 있다.That is, when the operator stretches the
상기 목부(32)와 상기 고정패드(33)는 도 3에 도시된 사방모서리 이외에 상기 허니콤탄성망(31)의 외면에 다수를 형성시키는 것도 가능하다. The
상기 탄성보강재(30)는 탄성을 갖는 합성수지재로 형성시키게 된다.The
상기 아스팔트 콘크리트층 형성단계(S6)는 상기 탄성보강재(30)의 내측을 충진시킴과 아울러 외부를 덮으면서 상기 폴리머층의 상부에 아스팔트 콘크리트를 포설하여 아스팔트 콘크리트층(40)을 형성시키는 단계이다.The asphalt concrete layer forming step (S6) is a step of filling the inside of the elastic stiffener (30) and forming an asphalt concrete layer (40) by covering the outside with the asphalt concrete on the polymer layer.
구체적으로, 상기 아스팔트 콘크리트층(40)은 상기 허니콤탄성망(31)의 내부에 충진됨과 아울러 상기 탄성보강재(30)를 덮으면서 포설된 후 경화된다.Specifically, the
상기 마감단계(S7)는 상기 볼트(60)를 상기 너트(50) 및 상기 아스팔트 콘크리트층(40)에서 분리하여 상기 탄성보강재(30)에 충진된 아스팔트 콘크리트가 가압되도록 하고, 상기 볼트(60)가 상기 아스팔트 콘크리트층(40)에서 분리되면서 형성되는 분리홀에 아스팔트 콘크리트를 채워 마감처리하는 단계이다.The finishing step S7 separates the
즉, 경화된 상기 아스팔트 콘크리트층(40)에서 상기 볼트(60)를 분리한 후 상기 분리홀(41)에 아스팔트 콘크리트를 채운 후 경화시킴으로써, 일련의 과정을 마치게 된다.That is, after the
상기한 바와 같이 마감단계(S7)를 볼트(60)를 너트(50)에서 분리함으로써, 인장된 탄성보강재(30)가 원상태로 복귀하도록 탄성이 작용하여 허니콤탄성망(31)에 충진된 아스팔트 콘크리트를 가압하게 되므로 외력이나 지진 및 우천에 의해 아스팔트 콘크리트층(40)이 침하가 되는 것을 지연시키게 됨과 아울러 방지하게 되고 지지력을 향상시키게 됨으로써, 포트 홀이 형성되는 것을 방지할 수 있게 된다.As described above, by separating the
도 6을 참조하면, 상기 콘크리트층 형성단계(S2)에 이후에 상기 콘크리트의 상부에 지지망(70)을 배치하는 지지망(70) 배치단계(S2-1)를 거친 후 상기 지지망(70)을 덮으면서 상기 폴리머층(20)이 형성되도록 함으로써, 상기 지지망(70)에 의해 아스팔트 콘크리트층(40)이 침하되어 포트 홀이 형성되는 것을 재차 방지할 수 있게 된다.Referring to FIG. 6, after the concrete layer forming step S2, the
상기 지지망(70)은 금속재 또는 합성수지재로 형성시키게 된다.The
도 7을 참조하면, 상기 허니콤탄성망(31)의 충진홀(310)에는 내측면에 걸림돌부(312)가 형성되며, 상기 걸림돌부(312)는 상기 충진홀(310)의 내측면 중간부분을 따라 돌출되게 형성되고, 상측과 하측이 외측으로 갈수록 경사지게 경사면(313)이 더 형성되어, 상기 허니콤탄성망(31)의 충진홀(310)에 충진된 아스팔트 콘크리트가 가압하는 상기 걸림돌부(312)에 걸림되어 침하되거나 융기되는 되는 것을 방지할 수 있게 된다.7, the filling
이상 설명한 본 발명에 따른 포트 홀 방지용 도로포장공법은, 포장된 도로에서 포트 홀이 발생되어 주행중 차량에 포트 홀에 빠져 사고가 발생되는 것을 방지하게 되므로 종래의 기술에서 발생하는 문제점을 해소할 수 있게 되고, 내구성, 강도 및 지지력을 향상시켜 포장된 도로의 수명을 늘릴 수 있게 됨과 아울러 포트 홀의 발생을 방지하여 안전하게 도로를 주행할 수 있게 된다.The above-described pavement method for preventing port holes according to the present invention prevents port holes from being generated on a packed road and causing accidents to be caused by falling into the port holes of the vehicle while the vehicle is running. Therefore, The durability, the strength and the supporting force can be improved, the life of the packed road can be increased, the port hole can be prevented from occurring, and the road can be safely traveled.
본 발명에 따른 포트 홀 방지용 도로포장공법은 도로의 일반 구간 전체에 걸쳐 적용할 수도 있으나, 시공 비용 절감을 위해서는 포트 홀 발생이 예상되는 곳, 예를 들어 차량의 중량이 많이 미치는 횡단보도 이전 구간이나 도로의 커브 외측, 또는 비나 눈이 많이 내리는 지역 등에만 제한적으로 적용될 수도 있다. The port pavement pavement method according to the present invention can be applied to the entire general road section. However, in order to reduce the construction cost, the pavement pavement method can be applied to a place where a port hole is expected, for example, It may be applied only to the outside of the curve of the road, or to rain or snowy areas.
이상에서 설명된 본 발명의 일 실시 예는 예시적인 것에 불과하며, 본 발명이 속한 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시 예가 가능하다는 점을 잘 알 수 있을 것이다. 그러므로 본 발명은 상기의 상세한 설명에서 언급되는 형태로만 한정되는 것은 아님을 잘 이해할 수 있을 것이다. 따라서 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다. 또한, 본 발명은 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 그 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.It will be apparent to those skilled in the art that various modifications and equivalent arrangements may be made therein without departing from the scope of the present invention as defined by the appended claims and their equivalents. . Therefore, it is to be understood that the present invention is not limited to the above-described embodiments. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims. It is also to be understood that the invention includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.
10 : 콘크리트층 20 : 폴리머층
30 : 탄성보강재 40 : 아스팔트 콘크리트층
50 : 너트 60 : 볼트
70 : 지지망
11 : 분리홀
31 : 허니콤탄성망 310 : 충진홀
312 : 걸림돌부 313 : 경사면
32 : 목부 33 : 고정패드
310 : 충진홀 311 : 관통홀
41 : 분리홀
100 : 지반
S1 : 평탄화단계 S2 : 콘크리트층 형성단계
S2-1 : 지지망 배치단계
S3 : 너트부재 고정단계 S4 : 폴리머층 형성단계
S5 : 탄성보강재 고정단계 S6 : 아스팔트 콘크리트층 형성단계
S7 : 마감단계 10: concrete layer 20: polymer layer
30: elastic stiffener 40: asphalt concrete layer
50: Nut 60: Bolt
70: Support network
11: Separation hole
31: Honeycomb elastic net 310: Filling hole
312: stumbling block 313: inclined surface
32: neck 33: fastening pad
310: Filling hole 311: Through hole
41: separation hole
100: ground
S1: planarization step S2: concrete layer formation step
S2-1: Layout of the support network
S3: Nut member fixing step S4: Polymer layer forming step
S5: Securing the elastic stiffener S6: Asphalt concrete layer forming step
S7: Finishing step
Claims (5)
도로가 형성될 지반을 평편하게 평탄화하는 평탄화단계와,
상기 평탄화가 진행된 지반에 콘크리트를 포설하여 콘크리트층을 형성시키는 콘크리트층 형성단계와,
상기 콘크리트층을 타공하여 체결홈을 형성한 후 상기 체결홈에 너트를 안착시키는 너트부재 고정단계와,
상기 콘크리트층의 상면에 폴리머를 도포하여 폴리머층을 형성시키는 폴리머층 형성단계와,
상기 폴리머층의 상부에 탄성보강재를 배치한 후 상기 탄성보강재의 사방모서리 부분을 사방으로 늘린 후 볼트를 상기 탄성보강재의 사방모서리 부분에 형성된 고정패드에 끼워 상기 너트에 체결함으로써 상기 탄성보강재를 늘려진 상태로 고정시키는 탄성보강재 고정단계와,
상기 탄성보강재의 내측을 충진시킴과 아울러 외부를 덮으면서 상기 폴리머층의 상부에 아스팔트 콘크리트를 포설하여 아스팔트 콘크리트층을 형성시키는 아스팔트 콘크리트층 형성단계와,
상기 볼트를 상기 너트 및 상기 아스팔트 콘크리트층에서 분리하여 인장된 탄성보강재가 원상태로 복귀하면서 탄성이 작용하여 탄성보강재에 충진된 아스팔트 콘크리트가 가압되도록 하고, 상기 볼트가 상기 아스팔트 콘크리트층에서 분리되면서 형성되는 분리홀에 아스팔트 콘크리트를 채워 마감처리하는 마감단계로 이루어진 것을 특징으로 하며,
상기 탄성보강재는 육각의 충진홀이 다수 형성된 허니콤탄성망과, 상기 허니콤탄성망의 사방모서리 부분에 형성되는 목부와, 상기 목부의 일단에 형성되는 관통홀이 형성된 고정패드로 이루어진 인장고정부로 이루어지고,
상기 허니콤탄성망의 충진홀에는 내측면에 걸림돌부가 형성되며, 상기 걸림돌부는 상기 충진홀의 내측면 중간부분을 따라 돌출되게 형성되고, 상측과 하측이 외측으로 갈수록 경사지게 경사면이 형성되어 상기 허니콤탄성망의 충진홀에 충진된 아스팔트 콘크리트가 가압하는 상기 걸림돌부에 걸림되어 침하되거나 융기되는 것을 방지하는 것을 특징으로 하는 포트 홀 방지용 도로포장공법.
A road paving method for preventing a port hole from being formed on a road,
A planarizing step of flattening the ground on which the road is to be formed,
A concrete layer forming step of forming a concrete layer by placing concrete on the ground where the planarization proceeds,
A nut member securing step for securing the nut to the securing groove after the concrete layer is pierced to form a securing groove;
Forming a polymer layer on the upper surface of the concrete layer to form a polymer layer;
The elastic stiffener is disposed on the upper portion of the polymer layer, the four sides of the elastic stiffener are extended in all directions, and the bolts are fitted to the fixing pads formed on the four corners of the elastic stiffener to tighten the elastic stiffener An elastic stiffener fixing step of fixing the elastic stiffener in a state of being fixed,
An asphalt concrete layer forming step of filling the inside of the elastic stiffener with an asphalt concrete layer on the polymer layer while covering the outside to form an asphalt concrete layer;
The bolts are separated from the nuts and the asphalt concrete layer and the tensile elastic reinforcement is restored to its original state so that the elasticity acts to press the asphalt concrete filled in the elastic stiffener and the bolts are separated from the asphalt concrete layer And a finishing step of finishing asphalt concrete in the separation hole,
Wherein the elastic reinforcement comprises: a honeycomb elastic net having a plurality of hexagonal filling holes; a neck formed at each corner of the honeycomb elastic net; and a fixing pad having a through hole formed at one end of the neck, Lt; / RTI >
The honeycomb elastic net has a filling hole formed in an inner side surface thereof and a protruding portion formed along the middle portion of the inner surface of the filling hole. The upper and lower sides of the filling hole are inclined to be inclined, Wherein the asphalt concrete filled in the filling hole of the net is prevented from being pinched and bulged by being caught by the protruding stones to be pressed.
상기 폴리머는 시멘트, 폴리머분말, 물, 소포제, 지연제 및 증점재를 혼합하여 형성한 것을 특징으로 하는 포트 홀 방지용 도로포장공법.
The method according to claim 1,
Wherein the polymer is formed by mixing cement, polymer powder, water, defoamer, retarder, and thickening material.
상기 콘크리트층 형성단계 이후에 상기 콘크리트의 상부에 지지망을 배치하는 지지망배치단계를 더 포함함으로써 상기 지지망을 덮으면서 상기 폴리머층이 형성되도록 하는 것을 특징으로 하는 포트 홀 방지용 도로포장공법.
The method according to claim 1,
Further comprising the step of disposing a supporting network on the concrete after the concrete layer forming step, so that the polymer layer is formed while covering the supporting network.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160172528A KR101761165B1 (en) | 2016-12-16 | 2016-12-16 | Road pavement method for prevention of pot hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160172528A KR101761165B1 (en) | 2016-12-16 | 2016-12-16 | Road pavement method for prevention of pot hole |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101761165B1 true KR101761165B1 (en) | 2017-07-25 |
Family
ID=59422613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160172528A KR101761165B1 (en) | 2016-12-16 | 2016-12-16 | Road pavement method for prevention of pot hole |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101761165B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102115835B1 (en) * | 2019-06-17 | 2020-05-27 | 윤수환 | Flexible joint structure of road structure using geoell filled with elastic sealant and method of construction |
KR102209832B1 (en) | 2020-06-15 | 2021-01-29 | 임창준 | Road pavement structure |
EP3812750A1 (en) | 2019-10-21 | 2021-04-28 | Korea Expressway Corp. | System and method for detecting pothole sign of road pavement using electromagnetic wave, and recording medium having computer readable program for executing the method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100918109B1 (en) * | 2009-04-17 | 2009-09-22 | 주식회사 일승에스티 | Elastic pavement and it's operation method |
JP2014114593A (en) * | 2012-12-10 | 2014-06-26 | Masashige Inaba | Road structure at boundary between structure on road and banking |
-
2016
- 2016-12-16 KR KR1020160172528A patent/KR101761165B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100918109B1 (en) * | 2009-04-17 | 2009-09-22 | 주식회사 일승에스티 | Elastic pavement and it's operation method |
JP2014114593A (en) * | 2012-12-10 | 2014-06-26 | Masashige Inaba | Road structure at boundary between structure on road and banking |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102115835B1 (en) * | 2019-06-17 | 2020-05-27 | 윤수환 | Flexible joint structure of road structure using geoell filled with elastic sealant and method of construction |
EP3812750A1 (en) | 2019-10-21 | 2021-04-28 | Korea Expressway Corp. | System and method for detecting pothole sign of road pavement using electromagnetic wave, and recording medium having computer readable program for executing the method |
KR102209832B1 (en) | 2020-06-15 | 2021-01-29 | 임창준 | Road pavement structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101761165B1 (en) | Road pavement method for prevention of pot hole | |
KR101355399B1 (en) | Flexible jointing structure of road installation and constructing method thereof | |
KR100959407B1 (en) | Concrete structure repair work method | |
JP2007138467A (en) | Load bearing type expansion device of elevated road and its construction method | |
CN107268432B (en) | Shock-absorbing impact-resistant bridge expansion joint mechanism and construction method thereof | |
KR101794070B1 (en) | Elastic joint structure for vertical crack prevention of bridge slab | |
JP2015224478A (en) | Abutted-type expansion/contraction device for road bridge, and construction and repair methods therefor | |
KR20060071384A (en) | Precast concrete panel using height-controller and its precast pavement method | |
JP2016199916A (en) | Pavement structure, pavement method, road water permeable block and manufacturing of the same | |
KR101097995B1 (en) | Concrete modular panels for rigid paving and fast construction method | |
KR100659768B1 (en) | Drain apparatus of elastic pavement mixed | |
US2737092A (en) | Rubber-coated plywood for roadbed on highways | |
KR100879160B1 (en) | Expansion joint for underground driveways | |
KR101370641B1 (en) | Repair material for asphalt road and repairing method for road using thereof | |
JP2018080484A (en) | Gas station pavement structure and pavement structure construction method | |
KR200375633Y1 (en) | asphalt reinforcement | |
KR101339202B1 (en) | Repair method for concrete pavement using asphalt concrete | |
JP4506316B2 (en) | Road leveling structure | |
KR101560189B1 (en) | Flexible jointing structure of concrete road installation using key shape and constructing method thereof | |
CN209482074U (en) | A kind of new and old seam-line removal structure | |
KR200245123Y1 (en) | expansion joints to prevent leaking water | |
KR100983633B1 (en) | A head reinforcement PHC pile | |
KR100727638B1 (en) | Repairing method of the load | |
KR200324380Y1 (en) | Environment water-permeable block | |
CN212025808U (en) | Recycled asphalt pavement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |