KR100531434B1 - Device for supplying parts and flanging method using this - Google Patents

Device for supplying parts and flanging method using this Download PDF

Info

Publication number
KR100531434B1
KR100531434B1 KR10-2004-0009994A KR20040009994A KR100531434B1 KR 100531434 B1 KR100531434 B1 KR 100531434B1 KR 20040009994 A KR20040009994 A KR 20040009994A KR 100531434 B1 KR100531434 B1 KR 100531434B1
Authority
KR
South Korea
Prior art keywords
transfer table
blanking
rail
press
plate
Prior art date
Application number
KR10-2004-0009994A
Other languages
Korean (ko)
Other versions
KR20050081649A (en
Inventor
최윤옥
Original Assignee
대륙프랜지공업(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대륙프랜지공업(주) filed Critical 대륙프랜지공업(주)
Priority to KR10-2004-0009994A priority Critical patent/KR100531434B1/en
Publication of KR20050081649A publication Critical patent/KR20050081649A/en
Application granted granted Critical
Publication of KR100531434B1 publication Critical patent/KR100531434B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/04Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
    • B21D43/08Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by rollers
    • B21D43/09Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by rollers by one or more pairs of rollers for feeding sheet or strip material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D19/00Flanging or other edge treatment, e.g. of tubes
    • B21D19/02Flanging or other edge treatment, e.g. of tubes by continuously-acting tools moving along the edge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/003Positioning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/26Stops

Abstract

본 발명은 소재 공급 장치 및 이를 이용한 플랜지 성형 방법에 관한 것으로서, 더욱 상세하게는 프레스로 소재를 공급하여 플랜지를 성형하는 공정을 개선하여 소재를 절감하고 생산성을 향상함과 아울러 제조비용 및 인원을 최소화 할 수 있는 소재 공급 장치 및 이를 이용한 플랜지 성형 방법에 관한 것이다.The present invention relates to a material supply device and a flange forming method using the same, and more particularly, to improve the process of forming a flange by supplying the material by pressing, to reduce the material, improve productivity and minimize the manufacturing cost and personnel It relates to a material supply apparatus that can be and a flange forming method using the same.

이에 본 발명은 제품을 성형할 수 있도록 프레스(5)에 판상 소재(3)를 공급하는 소재 공급 장치에 있어서, 상기 소재(3)의 일측을 이송가능하게 지지하도록 상단에 다수의 롤러(11)가 설치된 롤러대(10); 상기 롤러대(10)로부터 이격되어 바닥에 설치되는 일정길이의 레일(20); 상기 레일(20)을 따라 전,후진 가능하게 설치되면서, 상단에 상기 소재(3)가 안착되고 하단에는 길이방향으로 래크(32)가 설치된 소재이송대(30); 상기 소재이송대(30)에 안착된 소재(3)를 정위치로 세팅하도록 설치되는 정위치세팅수단(40); 상기 래크(32)와 맞물려 결합되는 피니언(92)을 가지며 상기 소재이송대(30)를 일정 피치씩 이동시키도록 바닥에 설치되는 구동수단(90)을 포함하여 이루어지는 것을 특징으로 한다.Accordingly, the present invention, in the material supply device for supplying the plate-like material (3) to the press (5) to form a product, a plurality of rollers 11 at the top to support the one side of the material (3) to be transportable Roller stand 10 is installed; A rail 20 having a predetermined length spaced apart from the roller stand 10 and installed on the floor; A material transfer table 30 installed with the rail 20 in a forward and backward direction, wherein the material 3 is seated at an upper end thereof, and a rack 32 is installed at a lower end thereof in a longitudinal direction; Position setting means 40 is installed to set the material (3) seated on the material transporting table 30 to the correct position; It characterized in that it comprises a drive means 90 is installed on the floor to have a pinion 92 engaged with the rack 32 to move the material transfer table 30 by a predetermined pitch.

Description

소재 공급 장치 및 이를 이용한 플랜지 성형 방법{Device for supplying parts and flanging method using this}Device for supplying parts and flanging method using this}

본 발명은 소재 공급 장치 및 이를 이용한 플랜지 성형 방법에 관한 것으로서, 더욱 상세하게는 프레스로 소재를 공급하여 플랜지를 성형하는 공정을 개선하여 소재를 절감하고 생산성을 향상함과 아울러 제조비용 및 인원을 최소화 할 수 있는 소재 공급 장치 및 이를 이용한 플랜지 성형 방법에 관한 것이다.The present invention relates to a material supply device and a flange forming method using the same, and more particularly, to improve the process of forming a flange by supplying the material by pressing, to reduce the material, improve productivity and minimize the manufacturing cost and personnel It relates to a material supply apparatus that can be and a flange forming method using the same.

일반적으로 플랜지는 유체가 내부를 통하여 이동하는 파이프를 서로 연결하는 등 관이음을 하는데 사용되는 것으로서, 전체적으로는 원통상의 파이프 형상을 가지고 있다. In general, the flange is used to connect the pipe, such as connecting the pipes through which the fluid moves through the inside, as a whole has a cylindrical pipe shape.

이러한 플랜지를 성형하는 종래의 방법은, 먼저 플랜지의 크기에 맞게 두꺼운 철판을 필요한 치수로 가스절단을 한 후에 프레스로 블랭킹 가공하여 원판형태로 따내어 원판형 반제품을 성형한다.In the conventional method of forming such a flange, first, a thick iron sheet is cut into gas to the required size, and then blanked by a press to obtain a disc-shaped semifinished product.

그리고, 상기 원판형으로 따낸 원판형 반제품의 중앙부는 재차 프레스 가공하여 원형으로 따내어 링형 반제품을 형성한다.Then, the central portion of the disc-shaped semifinished product obtained in the disc shape is press-processed again to form a ring-shaped semifinished product.

이후 상기 링형 반제품을 정해진 치수대로 상면이나 또는 상하면과 내외주면 전둘레를 절삭가공하여 플랜지의 가공을 완료한다.Thereafter, the ring-shaped semi-finished product is cut to the upper or lower and inner and outer circumferential circumferences according to a predetermined dimension to complete machining of the flange.

상기와 같은 과정을 거쳐 링형태의 플랜지가 제작된 후에는 다수의 볼트체결공을 드릴과 리머작업을 실시하여 플랜지에 대한 가공이 완료되는 것이며, 이렇게 제작완료된 플랜지를 파이프의 단부에 용접하여 목적하는 바와 같은 관이음을 할 수 있게 되는 것이다.After the ring-shaped flange is manufactured through the above process, drilling and reaming of a plurality of bolt fastening holes is performed to complete the processing of the flange. It is possible to make a joint like this.

그러나, 상기와 같이, 플랜지를 성형하기 위해서는 두꺼운 철판을 플랜지의 크기에 맞게 가스절단한 후 프레스 작업으로 원판형 반제품을 성형하게 되는데, 이때 가스절단되는 철판은 가공공차를 위해 플랜지 크기 보다 더 크게 절단되기 때문에 소재의 낭비가 매우 많이 발생하였다.However, as described above, in order to form a flange, a thick iron plate is gas-cut to match the size of the flange, and then a disk-shaped semi-finished product is formed by press work, wherein the gas-cut iron plate is cut larger than the flange size for processing tolerance. As a result, waste of material was very much generated.

또한, 철판을 가스절단 할 때에도 대략 5mm 정도의 소재 낭비가 발생하는 문제가 있었다.In addition, there was a problem that the material waste of about 5mm occurs even when gas cutting the iron plate.

그리고, 철판을 가스절단 한 후에는 여러명의 작업자가 절단된 철판을 프레스로 공급하는 작업을 해야 하는 등 작업공정이 많고 복잡하여 생산성이 저하됨과 아울러 제조비용 및 인건비가 증가하는 문제도 있었다.In addition, after gas cutting of the iron plate, a number of workers have to work to supply the cut iron plate to the press.

상기한 문제점을 해결하기 위한 본 발명의 목적은 프레스로 소재를 공급하여 플랜지(원판형 반제품)를 성형하는 공정을 개선하여 소재를 절감하고 생산성을 향상함과 아울러 제조비용 및 인원을 최소화 할 수 있는 소재 공급 장치 및 이를 이용한 플랜지 성형 방법을 제공하는데 있다.An object of the present invention for solving the above problems is to improve the process of forming the flange (semi-finished product) by supplying the material to the press to reduce the material, improve productivity and minimize the manufacturing cost and personnel To provide a material supply device and a flange forming method using the same.

상기한 목적을 달성하기 위한 본 발명은 제품을 성형할 수 있도록 프레스에 판상 소재를 공급하는 소재 공급 장치에 있어서, 상기 소재의 일측을 이송가능하게 지지하도록 상단에 다수의 롤러가 설치된 롤러대; 상기 롤러대로부터 이격되어 바닥에 설치되는 일정길이의 레일; 상기 레일을 따라 전,후진 가능하게 설치되면서, 상단에 상기 소재가 안착되고 하단에는 길이방향으로 래크가 설치된 소재이송대; 상기 소재이송대에 안착된 소재를 정위치로 세팅하도록 설치되는 정위치세팅수단; 상기 래크와 맞물려 결합되는 피니언을 가지며 상기 소재이송대를 일정 피치씩 이동시키도록 바닥에 설치되는 구동수단을 포함하여 이루어지는 것을 특징으로 한다.The present invention for achieving the above object is a material supply device for supplying a plate-like material to the press so as to form a product, comprising: a roller stand provided with a plurality of rollers on the upper end so as to support one side of the material to be transported; A rail having a predetermined length spaced apart from the roller stand and installed on the floor; A material transport stand installed forward and backward along the rails, the material seated at an upper end thereof, and a rack installed in a longitudinal direction at a lower end thereof; Position setting means is installed to set the material seated on the material transport table to the correct position; It characterized in that it comprises a drive means installed on the floor having a pinion engaged with the rack coupled to move the material transfer table by a predetermined pitch.

또한, 레일을 따라 전,후진 가능하게 설치되는 소재이송대의 상단에 안착된 소재를 정위치시키는 1차 정위치세팅 단계; 상기 1차 정위치세팅 단계를 거친 상기 소재이송대를 일정 피치 만큼 단계적으로 이송하면서 소재를 프레스의 다이와 펀치 사이로 투입하여 플랜지 형상으로 따냄과 동시에 잔류하는 불필요한 소재를 절단하는 1차 블랭킹 단계; 상기 1차 블랭킹 단계를 거쳐 한줄 작업이 완료된 소재를 다음 작업을 위해 정위치시키되 선작업된 블랭킹면 사이사이에서 다음 블랭킹 작업이 이루어질수 있도록 세팅하는 2차 정위치세팅 단계; 상기 2차 정위치세팅 단계를 거친 상기 소재이송대를 일정 피치 만큼 단계적으로 이송하면서 소재를 프레스의 다이와 펀치 사이로 투입하여 선작업된 블랭킹면 사이사이에서 플랜지 형상을 따냄과 동시에 잔류하는 불필요한 소재를 절단하는 2차 블랭킹 단계;로 이루어지고, 상기 2차 정위치세팅 단계 및 2차 블랭킹 단계를 소재 하나의 작업 완료시까지 순차적으로 반복하여 소재에서 플랜지를 지그재그 형태로 따내는 것을 특징으로 한다.In addition, the first exact position setting step of positioning the material seated on the upper end of the material carrier to be installed forward, backward along the rail; A first blanking step of cutting the unnecessary material remaining while simultaneously feeding the material between the die and the punch of the press while transferring the material conveying table having passed the first exact position setting step by a predetermined pitch; A second exact position setting step of setting a material in which the one-line work is completed through the first blanking step for the next work but performing the next blanking work between the pre-worked blanking surfaces; While transferring the material transfer stage after the second in-situ setting step by a certain pitch step by inserting the material between the die and the punch of the press to obtain the flange shape between the blanking surface of the pre-work and at the same time to cut off the unnecessary material And a second blanking step, wherein the second in-position setting step and the second blanking step are sequentially repeated until the work of one material is completed to obtain a flange from the material in a zigzag form.

이하, 본 발명을 첨부된 도면을 참조하여 설명하면 다음과 같다.Hereinafter, the present invention will be described with reference to the accompanying drawings.

종래에 있어서와 동일한 부분에 대한 반복되는 설명은 생략한다.Repeated descriptions of the same parts as in the prior art are omitted.

도 1은 본 발명에 따른 소재 공급 장치를 나타내는 전체 사시도이고, 도 2는 도 1 에서의 A-A선 단면도이며, 도 3은 도 1 에서의 B-B선 단면도이고, 도 4a∼4e는 본 발명에 따른 소재 공급 장치의 작동과정을 나타내는 개략도이며, 도 5는 본 발명에 따른 소재 공급 장치를 이용하여 소재로부터 플랜지(원판형 반제품)를 성형하는 과정을 나타내는 도면이다.1 is an overall perspective view showing a material supply apparatus according to the present invention, Figure 2 is a cross-sectional view taken along the line AA in Figure 1, Figure 3 is a cross-sectional view taken along the line BB in Figure 1, Figures 4a to 4e is a raw material according to the present invention Fig. 5 is a schematic diagram showing an operation process of the supply device, and Fig. 5 is a view showing a process of forming a flange (semi-finished product) from a material using the material supply device according to the present invention.

도시된 바와 같이, 본 발명에 따른 소재 공급 장치(1)는 프레스(5)의 다이(5a)와 펀치(5b) 사이로 소재를 공급하는 장치이며, 상기 프레스(5)는 플랜지를 성형하기 위해 소재 공급 장치(1)로부터 공급되는 소재(3)를 원판형으로 따내어 원판형 반제품(4)을 성형하는 장치로서 공지된 것이므로 여기서 상세한 설명은 생략한다.As shown, the material supply apparatus 1 according to the present invention is a device for supplying a material between the die 5a and the punch 5b of the press 5, which press 5 is used to form a flange. Since the raw material 3 supplied from the supply apparatus 1 is disc shaped and it is known as an apparatus which shape | molds the disk-shaped semifinished product 4, detailed description is abbreviate | omitted here.

상기 소재 공급 장치(1)는 크게 롤러대(10), 레일(20), 소재이송대(30), 정위치세팅수단(40), 구동수단(90)으로 구성된다.The material supply apparatus 1 is largely composed of a roller stand 10, a rail 20, a material feed table 30, a position setting means 40, a drive means 90.

먼저, 상기 롤러대(10)는 다수의 프레임(12)으로 골격이 구성되고 상기 프레스(5)의 다이(5a) 및 펀치(5b)를 향하는 방향으로 일정한 길이 및 높이로 설치됨과 아울러 상단에는 다수의 롤러(11)가 일정간격으로 설치된다.First, the roller stand 10 is composed of a plurality of frames 12, the skeleton is installed in a predetermined length and height in the direction toward the die 5a and the punch (5b) of the press 5 and at the top Rollers 11 are installed at regular intervals.

상기 롤러(11)는 아래에서 설명될 소재이송대(30)에 소재(3)가 안착되어 이송시 소재이송대(30)로부터 돌출된 소재(3)의 일측을 이송가능하게 슬라이딩 지지하는 것이다.The roller 11 is to support the one side of the material (3) protruding from the material carrier (30) for transport so that the material (3) is seated on the material carrier 30 to be described below.

그리고, 상기 레일(20)은 상기 롤러대(10)로부터 이격되어 바닥에 일정길이로 설치된다.The rail 20 is spaced apart from the roller stand 10 and installed at a predetermined length on the floor.

여기서, 상기 레일(20)은 상기 롤러대(10)를 따라 설치되는 것이며, 상기 프레스(5)의 전방측에 위치하게 된다. Here, the rail 20 is to be installed along the roller stand 10, it is located on the front side of the press (5).

한편, 상기 롤러대(10)와 레일(20)은 바닥에 설치된 베이스 프레임(2) 상단에 설치되는 것이 바람직하다.On the other hand, the roller stand 10 and the rail 20 is preferably installed on the top of the base frame 2 installed on the bottom.

그리고, 상기 소재이송대(30)는 상기 레일(20)을 따라 전,후진 가능하게 설치되며, 다수의 프레임으로 이루어진 몸체(31)를 구비하고 상기 몸체(31)의 상단에는 소재(3)가 안착되고 하단에는 길이방향으로 래크(32)가 설치되어 구성된다.In addition, the material transfer table 30 is installed to be capable of moving forward and backward along the rail 20, and includes a body 31 formed of a plurality of frames, and the material 3 is seated on an upper end of the body 31. And the bottom 32 is provided with a rack 32 in the longitudinal direction.

여기서, 상기 몸체(31)의 하단에는 상기 레일(20)을 따라 슬라이딩함과 아울러 레일(20)로부터 이탈되지 않도록 양측에 지지턱(34a)을 갖는 바퀴(34)가 설치된다.Here, a wheel 34 having support jaws 34a on both sides is installed at the lower end of the body 31 so as to slide along the rail 20 and not to be separated from the rail 20.

따라서, 상기 소재이송대(30)는 상기 바퀴(34)에 의해 상기 롤러대(10)의 전방측에서 상기 레일(20)을 따라 전,후진 슬라이딩 될 수 있는 것이다.Therefore, the material transfer table 30 can be slid forward and backward along the rail 20 at the front side of the roller stand 10 by the wheel 34.

또한, 상기 소재이송대(30)의 몸체(31) 상단에는 상기 롤러대(10)를 향하는 횡방향으로 다수의 롤러(33)가 설치되어 상기 몸체(31)에 소재(3)가 안착된 후 아래에서 설명될 정위치세팅수단(40)에 의해 소재(3)가 상기 롤러대(10)측으로 원할하게 이동될 수 있도록 한다.In addition, a plurality of rollers 33 are installed at the upper end of the body 31 of the material carrier 30 in the lateral direction toward the roller stand 10, and then the material 3 is seated on the body 31. By the position setting means 40 to be described later to allow the material (3) can be smoothly moved to the roller stage (10) side.

즉, 상기 롤러(33)는 상기 정위치세팅수단(40)에 의한 소재(3)의 정위치 세팅 과정에서 소재(3)와 소재이송대(30)와의 마찰을 방지하여 소재(3)의 긁힘 및 소음을 방지하게 된다.That is, the roller 33 prevents the friction between the material 3 and the material carrier 30 in the process of setting the exact position of the material 3 by the exact position setting means 40, so that the scratches of the material 3 and It will prevent noise.

그리고, 상기 정위치세팅수단(40)은 상기 소재이송대(30)에 안착된 소재(3)를 정위치로 세팅하도록 설치되는 것이며, 상기 소재(3)가 프레스(5)로 공급될 시 정확한 위치에서 블랭킹 될 수 있도록 한다.In addition, the exact position setting means 40 is installed to set the material 3 seated on the material transport table 30 to the correct position, the correct position when the material 3 is supplied to the press 5 To be blanked in.

상기 정위치세팅수단(40)은 상기 롤러대(10)의 상단 일측에 일정간격 이격되어 설치되는 다수개의 제 1,2 스톱퍼(50a)(50b)와, 상기 소재(3)를 상기 제 1,2 스톱퍼(50a)(50b)로 밀착시키도록 상기 소재이송대(30)의 몸체(31) 상단에 설치되는 장입체(60)와, 상기 소재(3)의 양단을 고정하도록 상기 소재이송대(30)의 상단에 설치되는 클램프(70)로 구성된다.The exact position setting means 40 is a plurality of first and second stoppers (50a) (50b) and a plurality of first and second stoppers (50a) which are installed at regular intervals on one side of the upper end of the roller (10), the material (3) the first, 2 a stopper (50a) (50b) and the charging body 60 is installed on the upper end of the body 31 of the material transfer table 30 to be in close contact with the material transfer table 30 to fix both ends of the material (3) It consists of a clamp 70 is installed at the top of the.

먼저, 상기 제 1,2 스톱퍼(50a)(50b)는 상기 롤러대(10)의 상단 일측에 지지판(59)이 연장형성되어 상기 지지판(59)의 상단에 수직으로 지지프레임(51)이 설치되고, 상기 지지프레임(51)의 전방 양측에는 가이드(52)가 돌출 형성되며, 상기 지지프레임(51)의 상단에는 실린더(53)가 결합되는데 상기 실린더(53)의 실린더로드(53a)에는 실린더(53)의 작동시 상기 가이드(52)의 내측에서 승하강하는 승하강판(54)이 결합되어 있다.First, the first and second stoppers 50a and 50b are provided with a support plate 59 extending on one side of the upper end of the roller stand 10 so that the support frame 51 is installed vertically on the top of the support plate 59. Guides 52 are formed on both front sides of the support frame 51 to protrude, and a cylinder 53 is coupled to an upper end of the support frame 51, and the cylinder rod 53a of the cylinder 53 has a cylinder. When the operation of the 53, the elevating plate 54 which is raised and lowered on the inner side of the guide 52 is coupled.

상기 승하강판(54)에는 전방측으로 일정간격 이격된 상태로 스톱플레이트(55)가 결합되는데 상기 승하강판(54)과 스톱플레이트(55)는 탄성부재(56)를 매개로 상호 결합된다.The stop plate 55 is coupled to the elevating plate 54 in a state spaced apart at a predetermined interval toward the front side, and the elevating plate 54 and the stop plate 55 are coupled to each other via the elastic member 56.

한편, 상기 스톱플레이트(55)에는 전,후 이동가능하게 지지함과 아울러 상기 승하강판(54)에 슬라이딩 결합되는 슬라이딩핀(58)이 더 구비될 수 있다.On the other hand, the stop plate 55 may be further provided with a sliding pin (58) which is slidably coupled to the elevating plate (54) while supporting the front and rear movable.

여기서, 상기 탄성부재(56)는 스프링(56a)인 것이 바람직하며, 소재(3)의 정위치 세팅시에는 상기 승하강판(54)과 함께 상기 스톱플레이트(55)가 하강하여 소재(3)의 단부가 걸릴수 있도록 작동한다.Here, the elastic member 56 is preferably a spring (56a), when the set position of the raw material 3, the stop plate 55 with the lifting plate 54 is lowered to the Operate to catch the end.

또한, 상기 승하강판(54)에는 상기 장입체(60)를 제어하는 근접센서(57)가 설치된다.In addition, the elevating plate 54 is provided with a proximity sensor 57 for controlling the charging body (60).

즉, 상기 소재이송대(30)의 몸체(31) 상단에 안착된 소재(3)의 정위치 세팅을 위해 상기 장입체(60)가 소재(3)를 스톱플레이트(55)측으로 밀착시키게 되는데, 이때 상기 장입체(60)의 가압력에 의해 상기 스톱플레이트(55)가 후방측으로 일정거리 이동하게 되며 이때의 이동거리를 상기 근접센서(57)가 감지하여 상기 장입체(60)를 구동시키는 모터(61)를 정지시켜 소재(3)를 정위치 시키는 역할을 한다.That is, in order to set the exact position of the material 3 seated on the top of the body 31 of the material carrier 30, the charging body 60 is in close contact with the material 3 toward the stop plate 55, at this time The stop plate 55 is moved to the rear side by a pressing force of the charging body 60, and the proximity sensor 57 detects the movement distance at this time to drive the charging body 60. ) To stop the material (3) in place.

한편, 상기 제 1,2 스톱퍼(50a)(50b)는 동일한 구조로 이루어지지만, 각각의 전,후방 설치위치가 상이하고 개별 동작한다.Meanwhile, the first and second stoppers 50a and 50b have the same structure, but the front and rear installation positions are different and operate separately.

즉, 상기 소재(3)를 프레스(5)로 최초 블랭킹 작업시에는 상기 제 1 스톱퍼(50a)의 스톱플레이트(55)만 하강하여 소재(3)를 정위치시킨 상태에서 블랭킹 작업이 진행되고, 이렇게 소재(3)의 최초 한줄 블랭킹 작업이 완료되면, 그 다음 작업부터는 상기 제 2 스톱퍼(50b)의 스톱플레이트(55)만 하강하면서 소재(3)를 정위치시켜 블랭킹 작업을 진행 하게 된다.That is, during the initial blanking operation of the material 3 with the press 5, only the stop plate 55 of the first stopper 50a is lowered to perform the blanking operation in a state in which the material 3 is positioned. When the first one-line blanking operation of the material 3 is completed, the blanking operation is performed by positioning the material 3 while only descending the stop plate 55 of the second stopper 50b.

따라서, 상기 제 1 스톱퍼(50a)는 최초 공급된 소재(3)의 일단부부터 블랭킹 작업이 이루어질 부분의 중심까지의 거리를 맞추는 역할을 하는 것이고,Therefore, the first stopper 50a serves to adjust the distance from one end of the first supplied material 3 to the center of the blanking operation.

상기 제 2 스톱퍼(50b)는 상기 최초 한줄 블랭킹 작업과정에서 상기 소재(3)로부터 원판형 반제품(4)이 따내어질 때 잔류하고 있는 불필요한 부분의 소재는 프레스(5)의 커팅날(미도시)에 의해 동시에 절단이 이루어짐에 따라, 이때의 절단된 면부터 다음 블랭킹 작업이 이루어질 부분의 중심까지의 거리를 맞추는 역할을 하는 것이다.The second stopper (50b) is the raw material of the unnecessary portion remaining when the disc-shaped semi-finished product 4 is extracted from the material (3) during the first one-line blanking operation is the cutting edge of the press (not shown) As the cutting is made at the same time, it serves to match the distance from the cut surface at this time to the center of the portion where the next blanking operation is to be made.

한편, 상기에서는 상기 제 1,2 스톱퍼(50a)(50b)의 전,후방 설치위치가 상이하다고 설명하였으나, 제 1,2 스톱퍼(50a)(50b)가 동일 위치에 설치될 수도 있다. 이 경우에는, 상기 스톱플레이트(55)가 후방측으로 이동하는 거리를 감지하여 상기 장입체(60)의 모터(61)를 제어하는 근접센서(57)의 규격을 각각 상이한 제품을 사용하여 소재(3)를 정위치시키는 것이 바람직하다.Meanwhile, in the above description, the front and rear installation positions of the first and second stoppers 50a and 50b are different, but the first and second stoppers 50a and 50b may be installed at the same position. In this case, the stop plate 55 senses the distance to move to the rear side by controlling the motor 61 of the charging body 60, the specifications of the proximity sensor 57, each using a different product (3) It is preferable to position).

그리고, 상기 장입체(60)는 상기 소재이송대(30)의 몸체(31) 상단에 횡방향으로 설치된 모터(61)와, 상기 모터(61)의 스프로킷에 결합되어 회전하는 체인(62)과, 상기 체인(62)에 외측방향으로 돌출되도록 결합되어 소재(3)를 상기 제 1,2 스톱퍼(50a)(50b)측으로 밀착되게 이송시키는 돌출편(63)으로 구성된다.In addition, the charging body 60 is a motor 61 installed in the transverse direction on the upper end of the body 31 of the material transfer table 30, the chain 62 is coupled to the sprocket of the motor 61 and rotated, It is coupled to the chain 62 so as to protrude in the outward direction is composed of a projection piece 63 for conveying the material (3) in close contact with the first and second stoppers (50a, 50b) side.

이러한 상기 장입체(60)는 상기 소재이송대(30)에 적어도 2개 이상 설치되는 것이 바람직하고, 체인(62) 등의 보호를 위해 커버플레이트(64) 내측에 설치된다. 이때 상기 돌출편(63)은 커버플레이트(64)로부터 돌출되는 것은 당연할 것이다.It is preferable that at least two of the charging body 60 is installed on the material carrier 30, and is installed inside the cover plate 64 to protect the chain 62 or the like. At this time, it is natural that the protruding piece 63 protrudes from the cover plate 64.

그리고, 상기 클램프(70)는 상기 소재이송대(30)의 상단에 안착된 소재(3)의 일단부를 고정하는 고정클램프(81)와, 소재(3)의 타단부를 고정하되 이동가능하게 설치되는 이동클램프(71)로 이루어진다.In addition, the clamp 70 is a fixed clamp 81 for fixing one end of the material (3) seated on the upper end of the material carrier 30, and the other end of the material (3) is installed to be movable It consists of a moving clamp 71.

상기 고정클램프(81)는 상기 소재이송대(30)의 몸체(31) 상단에 고정되는 "ㄷ"자 형상의 고정몸체(83)를 구비하고, 상기 고정몸체(83)의 상단에는 실린더(84)가 설치되며, 상기 고정몸체(83)의 내측에는 상기 고정몸체(83)의 상단을 관통한 실린더로드의 단부에 결합되어 승하강하면서 소재(3)를 가압/고정하는 고정판(85)으로 구성된다.The fixing clamp 81 is provided with a "c" shaped fixing body 83 is fixed to the upper end of the body 31 of the material transfer table 30, the upper end of the fixed body 83 cylinder 84 Is installed, the inside of the fixed body 83 is coupled to the end of the cylinder rod penetrating the upper end of the fixed body 83 is composed of a fixed plate 85 for pressing / fixing the material (3) while lifting up and down. .

상기 이동클램프(71)는 상기 소재이송대(30)의 몸체(31) 상단에 슬라이딩판(73)을 결합하며, 상기 슬라이딩판(73)에는 이동실린더(75)에 전,후이동 가능하게 결합된 "ㄷ"자 형상의 고정몸체(74)를 구비하고, 상기 고정몸체(74)의 상단에는 실린더(76)가 설치되며, 상기 고정몸체(74)의 내측에는 상기 고정몸체(74)의 상단을 관통한 실린더로드의 단부에 결합되어 승하강하면서 소재(3)를 가압/고정하는 고정판(77)으로 구성된다.The movable clamp 71 couples the sliding plate 73 to the upper end of the body 31 of the material transfer table 30, and the sliding plate 73 is coupled to the moving cylinder 75 before and after the movement. A fixed body 74 having a "c" shape, and a cylinder 76 is installed at an upper end of the fixed body 74, and an upper end of the fixed body 74 is provided inside the fixed body 74. It is composed of a fixed plate 77 is coupled to the end of the cylinder rod penetrated to press / secure the raw material (3) while moving up and down.

여기서, 상기 고정클램프(81) 및 이동클램프(71)는 상기 소재이송대(30)의 몸체(31) 상단에 구비된 설치판(82)(72)에 설치되는 것이 바람직하다.Here, the fixed clamp 81 and the movable clamp 71 is preferably installed on the mounting plate 82, 72 provided on the upper end of the body 31 of the material transfer table (30).

따라서, 상기한 정위치세팅수단(40)은 상기 소재이송대(30)의 상단에 소재(3)가 안착되면, 상기 제 1,2 스톱퍼(50a)(50b)의 스톱플레이트(55) 중 어느 하나가 하강하고, 이때 상기 장입체(60)의 모터(61)가 작동하여 체인(62)이 회전하면서 상기 돌출편(63)을 이동시켜 소재(3)를 상기 스톱플레이트(55)측으로 밀착시키며, 계속해서 상기 이동클램프(71)가 작동하여 소재(3)를 상기 고정클램프(81)측으로 이동시킴과 동시에 소재(3)의 양단을 고정하게 된다.Therefore, the exact position setting means 40 is any one of the stop plate 55 of the first and second stoppers 50a and 50b when the material 3 is seated on the upper end of the material carrier 30. Is lowered, and at this time, the motor 61 of the charging body 60 is operated to move the protruding piece 63 while the chain 62 rotates to bring the material 3 into close contact with the stop plate 55, Subsequently, the movable clamp 71 is operated to move the raw material 3 toward the fixed clamp 81 and to fix both ends of the raw material 3.

이렇게 상기 소재(3)의 두 측면을 상기 제 1,2 스톱퍼(50a)(50b) 및 상기 고정클램프(81)측에 밀착시켜 정위치 시키게 되는 것이다.In this way, the two side surfaces of the material 3 are brought into close contact with the first and second stoppers 50a and 50b and the fixing clamp 81 side.

다음으로, 상기 구동수단(90)은 컨트롤러(미도시)를 갖는 서보모터(91)로 이루어진다.Next, the drive means 90 is composed of a servo motor 91 having a controller (not shown).

상기 서보모터(91)에는 상기 소재이송대(30)의 하단에 설치된 래크(32)와 맞물려 결합되는 피니언(92)이 구비되어 소재이송대(30)를 일정 피치씩 상기 레일(20)을 따라 이송시키게 된다.The servo motor 91 is provided with a pinion 92 engaged with the rack 32 installed at the lower end of the material carrier 30 to transfer the material carrier 30 along the rail 20 by a predetermined pitch. do.

한편, 상기 서보모터(91)의 컨트롤러에는 각각의 플랜지 크기별로 상기 소재이송대(30)를 이송시킬 피치값이 입력되어 있으며, 이처럼 서보모터(91)를 제어하는 방법은 공지된 사항이므로 여기서 상세한 설명은 생략한다.On the other hand, the controller of the servo motor 91 is input the pitch value for transferring the material transfer table 30 for each flange size, the method for controlling the servo motor 91 as described above is a detailed description here. Is omitted.

그리고, 상기 레일(20)을 따라 일정 위치에는 제 1,2 리미트스위치(95a)(95b)가 설치되는데, 제 1 리미트스위치(95a)는 상기 소재이송대(30)가 프레스(5)로 진입하기 전의 위치에 설치된다.In addition, the first and second limit switches 95a and 95b are installed at predetermined positions along the rail 20. The first limit switch 95a allows the material transfer table 30 to enter the press 5. It is installed in the previous position.

따라서, 소재(3)의 정위치 세팅이 완료된 상기 소재이송대(30)가 프레스(5)가 위치한 곳까지 신속히 이송하게 되고, 이때 상기 제 1 리미트스위치(95a)와 접촉하게 되면 일시정지한 후 상기 서보모터(91)의 컨트롤러에 입력된 일정피치 만큼 소재이송대의 이송이 이루어진다.Accordingly, the material transfer table 30 having completed the exact position setting of the material 3 is quickly transferred to the place where the press 5 is positioned. In this case, when the material transfer table 30 comes into contact with the first limit switch 95a, The material transfer table is transferred by a predetermined pitch input to the controller of the servomotor 91.

또한, 상기 제 2 리미트스위치(95b)는 상기 소재이송대(30)가 일정거리 이상 전진하여 상기 소재(3)에 대한 프레스(5)의 블랭킹 작업이 완료된 후 다시 소재이송대(30)가 원점 복귀할 수 있도록 블랭킹 작업이 완료되는 위치에 설치된다.In addition, the second limit switch (95b) is the material transfer table 30 advances a predetermined distance or more after the blanking operation of the press 5 for the material (3) is completed, the material transfer table 30 is returned to the origin again. So that the blanking work is completed.

따라서, 블랭킹 작업을 완료한 상기 소재이송대(30)가 일정거리 이상 전진하게 될 경우 상기 제 2 리미트스위치(95b)와 접촉하게 되면서 이때 신호를 받은 상기 서보모터(91)에 의해 소재이송대(30)가 신속히 후진하게 되는 것이다.Therefore, when the material transfer table 30 that has completed the blanking operation is advanced by a predetermined distance or more, the material transfer table 30 is brought into contact with the second limit switch 95b while receiving the signal at this time. Will quickly reverse.

이하, 본 발명에 따른 소재 공급 장치(1)의 작용을 설명하면 다음와 같다.Hereinafter, the operation of the material supply device 1 according to the present invention will be described.

먼저, 일정한 크기의 소재(철판)(3)를 상기 소재이송대(30)의 상단에 안착시키면, 상기 제 1 스톱퍼(50a)의 스톱플레이트(55)가 하강하게 되며, 스톱플레이트(55)의 하강이 완료되면 상기 장입체(60)의 모터(61)가 작동하면서 체인(62)에 결합된 돌출편(63)이 소재(3)를 상기 스톱플레이트(55)측으로 이동시킨다.First, when a predetermined size of the material (iron plate) 3 is seated on the upper end of the material transfer table 30, the stop plate 55 of the first stopper 50a is lowered, and the stop plate 55 is lowered. When the motor 61 of the charging body 60 is completed, the protruding piece 63 coupled to the chain 62 moves the material 3 toward the stop plate 55.

이때, 상기 소재(3)는 스톱플레이트(55)에 걸리면서 밀착 되지만, 밀착된 후에도 상기 모터(61)의 계속되는 작동으로 스톱플레이트(55)는 후방측으로 이동하기 시작하며, 일정거리 이상 이동하게 되면 상기 제 1 스톱퍼(50a)에 구비된 근접센서(57)를 작동시키게 되고 상기 근접센서(57)의 신호를 받은 상기 모터(61)는 정지하게 되면서 상기 소재(3)의 일측면이 정위치에 세팅된다.At this time, the material (3) is in close contact with the stop plate 55, the stop plate 55 starts to move to the rear side by the continuous operation of the motor 61 even after being in close contact, The proximity sensor 57 provided in the first stopper 50a is operated and the motor 61 receiving the signal of the proximity sensor 57 is stopped while one side of the material 3 is set in the correct position. do.

이후, 상기 이동클램프(71)의 이동실린더(75)가 작동하여 "ㄷ"자 형태의 고정몸체(74)를 이동시켜 소재(3)가 상기 고정클램프(81)에 밀착되도록 이동시킨다. 이동시킨 후에는 이동클램프(71) 및 고정클램프(81)의 고정몸체(74)(83) 상단에 설치된 각각의 실린더(76)(84)가 작동하여 고정판(77)(85)으로 소재(3)의 양단을 고정하면서 소재(3)의 또 다른 일측면이 정위치에 세팅된다.Thereafter, the movable cylinder 75 of the movable clamp 71 is operated to move the fixed body 74 of the "c" shape to move the material 3 in close contact with the fixed clamp 81. After the movement, the respective cylinders 76 and 84 installed on the top of the fixed body 74 and 83 of the movable clamp 71 and the fixed clamp 81 are operated to fix the material (3) to the fixed plates 77 and 85. Another side of the material 3 is set in place while fixing both ends of the substrate.

이렇게 소재(3)의 두 측면이 정위치에 세팅 완료되면, 상기 체인(62)이 역회전하여 돌출편(63)이 소재로부터 이격되고 상기 스톱플레이트(55)는 상승하게 된다. 이후 상기 서보모터(91)가 작동하여 상기 소재이송대(30)를 레일(20)을 따라 프레스(5)가 위치한 곳까지 신속히 전진시키게 된다.When the two side surfaces of the material 3 are set in the correct position, the chain 62 is rotated in reverse so that the protruding piece 63 is spaced apart from the material and the stop plate 55 is raised. The servo motor 91 is then operated to quickly advance the material transfer table 30 along the rail 20 to the place where the press 5 is located.

여기서, 상기 소재(3)의 일부는 상기 소재이송대(30)의 클램프(70)로 고정된 상태로 이송되지만, 상기 소재이송대(30)로부터 외측으로 돌출된 소재(3)의 일부는 상기 롤러대(10)의 롤러(11)를 슬라이딩하면서 프레스(5)의 다이(5a)와 펀치(5b) 사이로 공급된다.Here, a part of the material (3) is transported in a fixed state by the clamp 70 of the material carrier 30, but a part of the material (3) protruding outward from the material carrier 30 is the roller rod It is supplied between the die 5a of the press 5 and the punch 5b, sliding the roller 11 of (10).

한편, 상기 소재이송대(30)가 레일(20)을 따라 프레스(5)측으로 신속히 전진하는 과정에서 제 1 리미트스위치(95a)와 접촉하게 되면 프레스(5) 진입 직전에 일시정지하게 되며, 이후에는 서보모터(91)에 의해 일정 피치만큼 프레스(5)로 진입하게 된다.On the other hand, if the material transfer table 30 is in contact with the first limit switch (95a) in the process of rapidly advancing along the rail 20 toward the press (5) side, it is paused just before the press (5) entry, after The servo motor 91 enters the press 5 by a predetermined pitch.

상기 소재(3)가 상기 프레스(5)의 다이(5a)와 펀치(5b) 사이로 공급되기 시작하면, 상기 서보모터(91)는 컨트롤러에 입력된 일정 피치만큼 상기 소재이송대(30)를 단계적으로 이송시키게 되고, 이와 연동하여 상기 프레스(5)의 펀치(5b)는 하강하면서 소재(3)를 블랭킹 가공하게 된다.When the material 3 starts to be supplied between the die 5a of the press 5 and the punch 5b, the servo motor 91 gradually moves the material conveyance table 30 by a predetermined pitch input to the controller. In connection with this, the punch 5b of the press 5 is blanked while lowering the punch 5b of the press 5.

상기 프레스(5)의 블랭킹 작업시에는 소재(3)로부터 원판형 반제품(4)이 따지게 됨과 동시에 블랭킹 완료된 부분의 불필요한 소재(3)는 펀치(5b)와 함께 하강하는 커팅날에 의해 절단된다.In the blanking operation of the press 5, the disc-shaped semifinished product 4 is extracted from the raw material 3, and at the same time, the unnecessary raw material 3 of the blanking portion is cut by the cutting blade descending together with the punch 5b.

이렇게 상기 소재(3)로부터 한줄의 블랭킹 작업이 완료되면 상기 소재이송대(30)는 계속 전진하는 과정에서 상기 제 2 리미트스위치(95b)와 접촉하게 되고, 상기 제 2 리미트스위치(95b)로부터 신호를 받은 상기 서보모터(91)는 상기 소재이송대(30)를 다음 작업을 위해 원점으로 신속히 복귀시킨다.When the blanking operation of one line is completed from the material 3, the material transfer table 30 is brought into contact with the second limit switch 95b while continuing to move forward, and receives a signal from the second limit switch 95b. The received servo motor 91 quickly returns the material transfer table 30 to the origin for the next operation.

이후, 상기 소재(3)의 양단을 고정하고 있던 클램프(70)는 고정을 해제하게 되고, 다시 상기한 전과정을 반복수행하게 되는데, 이때부터는 상기 소재(3)의 정위치세팅을 위해 상기 제 2 스톱퍼(50b)를 사용하게 된다.Thereafter, the clamps 70, which are fixing both ends of the material 3, release the fixing and repeat the whole process again, from which time the second part is set for the exact position setting of the material 3. The stopper 50b is used.

즉, 상기 제 2 스톱퍼(50b)는 상기 소재(3)의 최초 한줄 블랭킹 작업으로 선작업된 반원형의 블랭킹 면(3a) 사이사이에 다음의 한줄 블랭킹 작업이 이루어질수 있도록 소재(3)를 정위치 세팅하게 되며, 이와 함께 상기 서보모터(91) 역시 상기 선작업된 반원형의 블랭킹 면(3a) 사이사이에서 프레스(5)의 펀칭이 이루어질 수 있도록 일정 피치만큼 상기 소재이송대(30)를 이송시키게 된다.That is, the second stopper 50b sets the workpiece 3 in position so that the next one-line blanking operation can be performed between the semicircular blanking surfaces 3a pre-worked by the first one-line blanking operation of the workpiece 3. In addition, the servo motor 91 also transfers the material transfer table 30 by a predetermined pitch so that punching of the press 5 can be performed between the lineworked semicircular blanking surfaces 3a.

따라서, 상기 선작업된 한줄 블랭킹 면(3a)과 다음에 작업될 한줄 블랭킹 면(3a)은 상호 겹치지 않는 범위 내에서 지그재그 형태로 작업이 반복된다.Accordingly, the line-worked blanking surface 3a and the line-working blanking surface 3a to be worked on next are repeated in a zigzag fashion within a range that does not overlap each other.

이와 같이, 상기 소재(3)를 정위치 세팅함과 동시에 소재이송대(30)를 서보모터(91)로 일정 피치씩 이송시켜 프레스(5)를 통해 한줄 한줄 블랭킹 가공되는 면(3a)이 인접한 블랭킹 면(3a)에 최대한 근접하면서 지그재그 형태로 원판형 반제품(4)이 따내어짐으로서, 소재(3)의 낭비를 최소화 할 수 있고, 생산성 향상과 제조비용 절감 및 인원을 최소화 할 수 있다.As such, while the material 3 is set in position, the material conveying table 30 is transferred to the servo motor 91 by a predetermined pitch so that the surface 3a, which is lined with one line blanking through the press 5, is adjacent. As the disc-shaped semi-finished product 4 is extracted in a zigzag form as close as possible to the surface 3a, waste of the material 3 can be minimized, productivity can be improved, manufacturing cost can be reduced, and personnel can be minimized.

다음으로 본 발명에 따른 소재 공급 장치를 이용한 플랜지 성형하는 방법은,Next, a method of forming a flange using a material supply device according to the present invention,

1차 정위치세팅 단계(가)와, 1차 블랭킹 단계(나)와, 2차 정위치세팅 단계(다)와, 2차 블랭킹 단계(라)로 이루어진다.The first exact position setting step (a), the first blanking step (b), the second exact position setting step (c), and the second blanking step (d).

가. 1차 정위치세팅 단계,end. 1st exact setting step,

서보모터(91)의 구동으로 레일(20)을 따라 전,후진 가능하게 설치되는 상기 소재이송대(30)의 상단에 소재(3)를 안착시킨 후 상기 정위치세팅수단(40)을 이용하여 소재(3)를 정위치시키는 단계이다.By driving the servo motor 91, the material 3 is seated on the upper end of the material carrier 30 which is installed to be able to move forward and backward along the rail 20, and then the material is set using the exact position setting means 40. (3) is the step of positioning.

이때, 상기 제 1,2 스톱퍼(50a)(50b) 중 제 1 스톱퍼(50a)만 작동하여 정위치 세팅이 진행된다.At this time, only the first stopper 50a of the first and second stoppers 50a and 50b is operated to set the home position.

나. 1차 블랭킹 단계,I. Primary blanking step,

상기 1차 정위치세팅 단계(가)를 거친 상기 소재이송대(30)를 서보모터(91)로 일정 피치 만큼 단계적으로 이송시키면서 소재(3)를 프레스(5)의 다이(5a)와 펀치(5b) 사이로 투입하여 플랜지(원판형 반제품)(4) 형상으로 따냄과 동시에 잔류하는 불필요한 소재(3)는 펀치(5b)와 함께 하강하는 커팅날로 절단하는 단계이다.The material 3 is transferred to the die 5a and the punch 5b of the press 5 while gradually transferring the material transfer table 30 that has undergone the first exact position setting step (a) to the servo motor 91 by a predetermined pitch. ) And the unnecessary raw material 3 remaining at the same time as the flange (semi-finished semi-finished product) 4 is inserted into the shape and cut with the punch 5b.

상기 1차 블랭킹 단계(나)는 최초 공급된 소재(3)에 대해 한줄 블랭킹 작업을 하게 되며, 작업 완료후에는 상기 소재이송대(30)가 다음 작업을 위해 원점 복귀된다.In the first blanking step (b), a blanking operation is performed on the first supplied material 3, and after completion of the work, the material transfer table 30 is returned to the origin for the next operation.

다. 2차 정위치세팅 단계,All. 2nd exact setting step,

상기 1차 블랭킹 단계(나)를 거쳐 한줄 작업이 완료된 소재(3)를 다음 작업을 위해 정위치시키되 선작업된 반원형의 블랭킹 면(3a) 사이사이에서 다음 블랭킹 작업이 이루어질수 있도록 상기 정위치세팅수단(40)을 이용하여 소재(3)를 정위치 시키는 단계이다.The first position blanking step (b) through the one-line work is completed for the next work is placed in place for the next work, but between the semi-circular blanking surface (3a) of the pre-working position setting means so as to be made Using 40 to position the material (3) in place.

이때, 상기 제 1,2 스톱퍼(50a)(50b) 중 제 2 스톱퍼(50b)만 작동하여 정위치 세팅이 진행된다.At this time, only the second stopper 50b of the first and second stoppers 50a and 50b is operated to set an exact position.

라. 2차 블랭킹 단계,la. Secondary blanking step,

상기 2차 정위치세팅 단계(다)를 거친 상기 소재이송대(30)를 서보모터(91)로 일정 피치 만큼 단계적으로 이송하면서 소재(3)를 프레스(5)의 다이(5a)와 펀치(5b) 사이로 투입하여 선작업된 블랭킹 면(3a) 사이사이에서 플랜지(원판형 반제품)(4) 형상을 따냄과 동시에 잔류하는 불필요한 소재(4)는 펀치(5b)와 함게 하강하는 커팅날로 절단하는 단계이다.The material 3 is transferred to the servo motor 91 stepwise by a predetermined pitch while the material transfer table 30 passed through the second exact position setting step (c) is die 5a and punch 5b of the press 5. And cutting the shape of the flange (semi-finished semi-finished product) 4 between the blanking surfaces 3a pre-injected and cutting the unnecessary material 4 remaining with the punch 5b with the cutting blade descending together with the punch 5b. to be.

이후, 소재(3) 하나의 작업 완료시까지 상기 2차 정위치세팅 단계(다) 및 2차 블랭킹 단계(라)는 순차적으로 반복 수행된다.Subsequently, the second exact position setting step (c) and the second blanking step (d) are repeatedly performed sequentially until the work of one material 3 is completed.

따라서, 하나의 소재(3)에서 원판형 반제품(4)을 연속적으로 한줄씩 지그재그 형태로 따내는 공정 개선을 통해 소재(3)를 더욱 절감할 수 있고 생산성이 향상되는 것이다.Therefore, the process of picking the disc-shaped semi-finished product 4 in a zigzag form from one material 3 in a row in a row can further reduce the material 3 and improve productivity.

상기한 본 발명에 따르면, 상기 프레스로 소재를 공급하여 한줄씩 지그재그 형태로 플랜지(원판형 반제품)를 성형하도록 공정을 개선함으로서, 소재가 절감되고 생산성이 향상됨과 아울러 제조비용 절감 및 인원을 최소화 할 수 있다. According to the present invention, by supplying the material to the press to improve the process to form a flange (semi-finished semi-finished product) in a zigzag form line by line, it is possible to reduce the material, improve productivity, and reduce the manufacturing cost and minimize the number of people Can be.

도 1은 본 발명에 따른 소재 공급 장치를 나타내는 전체 사시도,1 is an overall perspective view showing a material supply apparatus according to the present invention,

도 2는 도 1 에서의 A-A선 단면도,2 is a cross-sectional view taken along the line A-A in FIG.

도 3은 도 1 에서의 B-B선 단면도,3 is a cross-sectional view taken along the line B-B in FIG.

도 4a∼4e는 본 발명에 따른 소재 공급 장치의 작동과정을 나타내는 개략도,4a to 4e are schematic views showing the operation of the material supply apparatus according to the present invention,

도 5는 본 발명에 따른 소재 공급 장치를 이용하여 소재로부터 플랜지(원판형 반제품)를 성형하는 과정을 나타내는 도면이다.5 is a view showing a process of forming a flange (semi-finished semifinished product) from the material using the material supply device according to the present invention.

<도면의 주요부분에 대한 부호 설명><Description of Signs of Major Parts of Drawings>

1: 소재 공급 장치 2: 베이스 프레임1: material feeder 2: base frame

3: 소재(철판) 3a: 블랭킹 면3: material (iron plate) 3a: blanking surface

4: 원판형 반제품(플랜지) 5: 프레스4: disc shaped semifinished product (flange) 5: press

5a: 다이 5b: 펀치5a: die 5b: punch

10: 롤러대 11,33: 롤러10: roller stand 11,33: roller

12: 프레임12: frame

20: 레일 30: 소재이송대20: rail 30: material carrier

31: 몸체 32: 래크31: body 32: rack

34: 바퀴 34a: 지지턱34: wheel 34a: support jaw

40: 정위치세팅수단 50a: 제 1 스톱퍼40: exact position setting means 50a: first stopper

50b: 제 2 스톱퍼 51: 지지프레임50b: second stopper 51: support frame

52: 가이드 53,76,84: 실린더52: guide 53,76,84: cylinder

54: 승하강판 55: 스톱플레이트54: lifting plate 55: stop plate

56: 탄성부재 56a: 스프링56: elastic member 56a: spring

57: 근접센서 58: 슬라이딩핀57: proximity sensor 58: sliding pin

59: 지지판 60: 장입체59: support plate 60: holder

61: 모터 62: 체인61: motor 62: chain

63: 돌출편 64: 커버플레이트63: protrusion 64: cover plate

70: 클램프 71: 이동클램프70: clamp 71: moving clamp

72,82: 설치판 73: 슬리이딩판72,82: Mounting plate 73: Sliding plate

74,83: 고정몸체 75: 이동실린더74,83: fixed body 75: moving cylinder

77,85: 고정판 81: 고정클램프77,85: fixed plate 81: fixed clamp

90: 구동수단 91: 서보모터90: drive means 91: servo motor

92: 피니언 95a: 제 1 리미트스위치92: pinion 95a: first limit switch

95b: 제 2 리미트스위치95b: second limit switch

Claims (9)

제품을 성형할 수 있도록 프레스(5)에 판상 소재(3)를 공급하는 소재 공급 장치에 있어서,In the material supply apparatus for supplying the plate-like material (3) to the press (5) so that the product can be molded, 상기 소재(3)의 일측을 이송가능하게 지지하도록 상단에 다수의 롤러(11)가 설치된 롤러대(10);A roller stage 10 having a plurality of rollers 11 installed at an upper end thereof so as to support one side of the material 3 in a transportable manner; 상기 롤러대(10)로부터 이격되어 바닥에 설치되는 일정길이의 레일(20);A rail 20 having a predetermined length spaced apart from the roller stand 10 and installed on the floor; 상기 레일(20)을 따라 전,후진 가능하게 설치되면서, 상단에 상기 소재(3)가 안착되고 하단에는 길이방향으로 래크(32)가 설치된 소재이송대(30);A material transfer table 30 installed with the rail 20 in a forward and backward direction, wherein the material 3 is seated at an upper end thereof, and a rack 32 is installed at a lower end thereof in a longitudinal direction; 상기 소재이송대(30)에 안착된 소재(3)를 정위치로 세팅하도록 설치되는 정위치세팅수단(40);Position setting means 40 is installed to set the material (3) seated on the material transporting table 30 to the correct position; 상기 래크(32)와 맞물려 결합되는 피니언(92)을 가지며 상기 소재이송대(30)를 일정 피치씩 이동시키도록 바닥에 설치되는 구동수단(90)Drive means 90 having a pinion 92 engaged with the rack 32 and installed on the floor to move the material transfer table 30 by a predetermined pitch 을 포함하여 이루어지는 것을 특징으로 하는 소재 공급 장치.Material supply apparatus comprising a. 제 1 항에 있어서,The method of claim 1, 상기 정위치세팅수단(40)은 상기 롤러대(10)의 상단 일측에 일정간격 이격되어 설치되는 다수개의 제 1,2 스톱퍼(50a)(50b)와,The exact position setting means 40 is a plurality of first and second stoppers (50a) (50b) are installed at a predetermined interval spaced on one side of the upper end of the roller (10), 상기 소재(3)를 상기 제 1,2 스톱퍼(50a)(50b)로 밀착시키도록 상기 소재이송대(30)의 상단에 설치되는 장입체(60)와,A charging body 60 installed at an upper end of the material transfer table 30 to closely contact the material 3 with the first and second stoppers 50a and 50b; 상기 소재(3)의 양단을 고정하도록 상기 소재이송대(30)의 상단에 설치되는 클램프(70)로 이루어지는 것을 특징으로 하는 소재 공급 장치.Material supply apparatus, characterized in that consisting of a clamp (70) which is installed on the upper end of the material transfer table (30) to fix both ends of the material (3). 제 2 항에 있어서,The method of claim 2, 상기 제 1,2 스톱퍼(50a)(50b)는 상기 롤러대(10)의 상단 일측에 수직으로 설치되는 지지프레임(51)과, 상기 지지프레임(51)의 전방 양측에 형성되는 가이드(52)와, 상기 지지프레임(51)의 상단에 고정 설치되고 상기 가이드(52)의 내측에서 승하강하는 승하강판(54)을 갖는 실린더(53)와, 상기 승하강판(54)의 전방측으로 일정간격 이격된 상태에서 승하강판(54)과 탄성부재(56)를 매개로 결합되는 스톱플레이트(55)와, 상기 승하강판(54)에 설치되어 상기 스톱플레이트(55)의 후방측 이동거리를 감지하여 상기 장입체(60)를 제어하는 근접센서(57)로 각각 이루어지는 것을 특징으로 하는 소재 공급 장치.The first and second stoppers 50a and 50b may include a support frame 51 installed vertically on one side of the upper end of the roller stand 10, and guides 52 formed on both front sides of the support frame 51. And a cylinder 53 fixedly installed at an upper end of the support frame 51 and having a lifting plate 54 that moves up and down inside the guide 52, and spaced apart from the front of the lifting plate 54 by a predetermined distance. Stop plate 55 coupled to the elevating plate 54 and the elastic member 56 in the state and the elevating plate 54 is installed to detect the rear movement distance of the stop plate 55 Material supply apparatus, characterized in that each consisting of a proximity sensor (57) for controlling the charging body (60). 제 2 항에 있어서,The method of claim 2, 상기 장입체(60)는 상기 소재이송대(30)의 상단에 횡방향으로 설치된 모터(61)와, 상기 모터(61)에 결합되어 회전하는 체인(62)과, 상기 체인(62)에 외측방향으로 돌출되도록 결합되고 소재(3)를 상기 제 1,2 스톱퍼(50a)(50b)측으로 밀착시키는 돌출편(63)으로 이루어지는 것을 특징으로 하는 소재 공급 장치.The charging body 60 is a motor 61 installed in the transverse direction on the upper end of the material conveying table 30, the chain 62 is coupled to the motor 61 and rotated, and the chain 62 in the outward direction And a protruding piece (63) which is coupled so as to protrude from the material and closely adheres the material (3) to the first and second stoppers (50a) and (50b). 제 2 항에 있어서,The method of claim 2, 상기 클램프(70)는, "ㄷ"자 형상의 고정몸체(83)를 구비하고, 상기 고정몸체(83)의 상단에 설치되는 실린더(84) 및 상기 고정몸체(83)의 상단을 관통한 실린더로드의 단부에 결합되어 소재(3)의 일단을 가압/고정하는 고정판(85)으로 구성된 고정클램프(81)와,The clamp 70 has a “c” shaped fixing body 83, a cylinder 84 installed at the upper end of the fixing body 83, and a cylinder passing through the upper end of the fixing body 83. A fixed clamp 81 composed of a fixed plate 85 coupled to an end of the rod to press / fix one end of the material 3; 이동실린더(75)에 전,후이동 가능하게 결합된 "ㄷ"자 형상의 고정몸체(74)를 구비하고, 상기 고정몸체(74)의 상단에 설치되는 실린더(76) 및 상기 고정몸체(74)의 상단을 관통한 실린더로드의 단부에 결합되어 소재(3)의 타단을 가압/고정하는 고정판(77)으로 구성된 이동클램프(71)로 이루어진 것을 특징으로 하는 소재 공급 장치.The cylinder 76 and the fixed body 74 having a fixed body 74 having a "c" shape coupled to the moving cylinder 75 so as to be movable forward and backward, and installed at the upper end of the fixed body 74. The material supply device, characterized in that made of a moving clamp (71) consisting of a fixed plate (77) for pressing / fixing the other end of the material (3) is coupled to the end of the cylinder rod penetrating the upper end. 제 1 항 내지 제 5 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 5, 상기 구동수단(90)은 서보모터(91)인 것을 특징으로 하는 소재 공급 장치.The driving means (90) is a material supply apparatus, characterized in that the servo motor (91). 제 6 항에 있어서,The method of claim 6, 상기 레일(20)을 따라 일정 위치에는 소재(3)의 정위치 세팅후 레일(20)을 따라 신속히 이동하는 소재이송대(30)가 프레스(5) 진입 직전에 일시정지 할 수 있도록 서보모터(91)를 제어하는 제 1 리미트스위치(95a) 및 블랭킹 작업을 완료한 소재이송대(30)가 일정거리 이상 전진한 경우 다시 원점 복귀할 수 있도록 서보모터(91)를 제어하는 제 2 리미트스위치(95b)가 더 설치되는 것을 특징으로 하는 소재 공급 장치.After setting the exact position of the material (3) at a predetermined position along the rail (20), the servo motor (91) to temporarily stop immediately before the press (5) to move the material carrier 30 along the rail (20) Second limit switch 95a for controlling the servo motor 91 to return to the home position when the first limit switch 95a for controlling the control center and the material transfer table 30 having completed the blanking operation are moved more than a predetermined distance. Material supply apparatus characterized in that the installation is further. 제 1 항 내지 제 5 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 5, 상기 소재이송대(30)의 하단에는 상기 레일(20)을 따라 슬라이딩함과 아울러 레일(20)로부터 이탈되지 않도록 양측에 지지턱(34a)을 갖는 바퀴(34)가 설치되는 것을 특징으로 하는 소재 공급 장치.A material supply, characterized in that the wheel 34 having the support jaw 34a on both sides is installed at the lower end of the material transfer table 30 so as to slide along the rail 20 and not to be separated from the rail 20. Device. 레일(20)을 따라 전,후진 가능하게 설치되는 소재이송대(30)의 상단에 안착된 소재(3)를 정위치시키는 1차 정위치세팅 단계(가);(A) a first exact position setting step of precisely positioning the material 3 seated on the upper end of the material carrier 30 which is installed to be moved forward and backward along the rail 20; 상기 1차 정위치세팅 단계(가)를 거친 상기 소재이송대(30)를 일정 피치 만큼 단계적으로 이송하면서 소재(3)를 프레스(5)의 다이(5a)와 펀치(5b) 사이로 투입하여 플랜지 형상으로 따냄과 동시에 잔류하는 불필요한 소재(3)를 절단하는 1차 블랭킹 단계(나);Flange shape by feeding the material 3 between the die 5a of the press 5 and the punch 5b while transferring the material transfer table 30 which has undergone the first exact position setting step (a) stepwise by a predetermined pitch A first blanking step (b) of cutting off the unnecessary raw material 3 remaining at the same time as picking it up; 상기 1차 블랭킹 단계(나)를 거쳐 한줄 작업이 완료된 소재(3)를 다음 작업을 위해 정위치시키되 선작업된 블랭킹 면(3a) 사이사이에서 다음 블랭킹 작업이 이루어질수 있도록 세팅하는 2차 정위치세팅 단계(다);2nd exact position setting for setting the next blanking operation between the blanking surface 3a which has been lined up for the next work while the work 3 where the one-line work is completed through the first blanking step (b) is performed. Step (c); 상기 2차 정위치세팅 단계(다)를 거친 상기 소재이송대(30)를 일정 피치 만큼 단계적으로 이송하면서 소재(3)를 프레스(5)의 다이(5a)와 펀치(5b) 사이로 투입하여 선작업된 블랭킹 면(3a) 사이사이에서 플랜지 형상을 따냄과 동시에 잔류하는 불필요한 소재를 절단하는 2차 블랭킹 단계(라);Line work by feeding the material 3 between the die 5a of the press 5 and the punch 5b while gradually transferring the material transfer table 30 that has passed through the second exact position setting step (c) by a predetermined pitch. A secondary blanking step (d) which cuts out a flange shape between the blanking surfaces 3a and cuts unnecessary material remaining; 로 이루어지고, 상기 2차 정위치세팅 단계(다) 및 2차 블랭킹 단계(라)를 소재(3) 하나의 작업 완료시까지 순차적으로 반복하여 소재(3)에서 플랜지를 지그재그 형태로 따내는 것을 특징으로 하는 플랜지 성형 방법.It is made of, and the second in-position setting step (c) and the second blanking step (d) iteratively repeated until the completion of one work of the material (3) is characterized in that the flange from the material (3) in a zigzag form Flange forming method.
KR10-2004-0009994A 2004-02-16 2004-02-16 Device for supplying parts and flanging method using this KR100531434B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2004-0009994A KR100531434B1 (en) 2004-02-16 2004-02-16 Device for supplying parts and flanging method using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2004-0009994A KR100531434B1 (en) 2004-02-16 2004-02-16 Device for supplying parts and flanging method using this

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0003908U Division KR200349542Y1 (en) 2004-02-16 2004-02-16 Device for supplying parts

Publications (2)

Publication Number Publication Date
KR20050081649A KR20050081649A (en) 2005-08-19
KR100531434B1 true KR100531434B1 (en) 2005-11-30

Family

ID=37268216

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2004-0009994A KR100531434B1 (en) 2004-02-16 2004-02-16 Device for supplying parts and flanging method using this

Country Status (1)

Country Link
KR (1) KR100531434B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101214590B1 (en) 2011-01-21 2012-12-24 (주)삼텍엔지니어링 Piling stopper for steel plate impact absorption
KR101273161B1 (en) * 2007-08-13 2013-06-14 현대자동차주식회사 Moving device for blank sheet and operating method thereof

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100943802B1 (en) * 2007-12-21 2010-02-23 현대제철 주식회사 Shoe notch mold apparatus facilities
KR101314699B1 (en) * 2011-12-06 2013-10-07 대웅아이엔디 주식회사 Horizontality type automatic bumping machine
KR102076492B1 (en) * 2018-11-01 2020-02-12 박종갑 Automatic withdrawal and inversion device for workpiece
CN110000277A (en) * 2019-04-12 2019-07-12 苏州祥龙嘉业电子科技股份有限公司 A kind of stamping die convenient for being positioned to flitch
CN114713898B (en) * 2022-05-17 2024-01-26 浙江益凯机械有限公司 Cutting and discharging structure of roll forming machine
CN114769903B (en) * 2022-05-18 2023-10-17 赣州市超华科技有限公司 Automatic cutting device for air conditioner radiating fin

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01133625A (en) * 1987-11-20 1989-05-25 Amada Co Ltd Work carrier and sheet material working machine provided with its work carrier
JPH03118932A (en) * 1989-10-02 1991-05-21 Murata Mach Ltd Operation method for plate material working machine
JPH0550323A (en) * 1991-08-23 1993-03-02 Amada Metrecs Co Ltd Plate conveyor positioner in plate finishing machine
JP2002001464A (en) * 2000-06-15 2002-01-08 Murata Mach Ltd Punching press
KR100412667B1 (en) * 2001-07-09 2003-12-31 현대자동차주식회사 Setting device for panel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01133625A (en) * 1987-11-20 1989-05-25 Amada Co Ltd Work carrier and sheet material working machine provided with its work carrier
JPH03118932A (en) * 1989-10-02 1991-05-21 Murata Mach Ltd Operation method for plate material working machine
JPH0550323A (en) * 1991-08-23 1993-03-02 Amada Metrecs Co Ltd Plate conveyor positioner in plate finishing machine
JP2002001464A (en) * 2000-06-15 2002-01-08 Murata Mach Ltd Punching press
KR100412667B1 (en) * 2001-07-09 2003-12-31 현대자동차주식회사 Setting device for panel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101273161B1 (en) * 2007-08-13 2013-06-14 현대자동차주식회사 Moving device for blank sheet and operating method thereof
KR101214590B1 (en) 2011-01-21 2012-12-24 (주)삼텍엔지니어링 Piling stopper for steel plate impact absorption

Also Published As

Publication number Publication date
KR20050081649A (en) 2005-08-19

Similar Documents

Publication Publication Date Title
KR101537757B1 (en) Piercing system
CN108747413B (en) Full-automatic flange processing assembly line
KR101621065B1 (en) Automatic punching and noching apparatus of Profile
CN107204738B (en) Intelligent production line for short sides of frames of solar components
KR100531434B1 (en) Device for supplying parts and flanging method using this
CN111409251A (en) Double-liner parallel air-compression plastic suction forming machine and use method thereof
JP2866778B2 (en) Laser processing equipment
CN212494003U (en) Automatic press-in detection equipment for flange plate bearing
KR200349542Y1 (en) Device for supplying parts
JPH06142996A (en) Die change, forming method and its equipment in tandem press line
CN110788358A (en) Multi-spindle counter drilling machine
CN215697663U (en) Bearing ring production equipment using manipulator to move materials
CN112938482A (en) Full-automatic ring-shaped part outer ring shape correcting device
JP3620336B2 (en) Steel plate processing equipment
JPS6311961B2 (en)
JPH07314242A (en) Automatic transferring and working device for steel product
CN218875636U (en) Feeding processing device and circuit board processing equipment
CN215745993U (en) Feeding stamping device
CN220837585U (en) Automatic riveting machine for refrigerator sheet metal parts
CN218361728U (en) Sheet material stamping conveying platform
CN208357597U (en) A kind of intermetallic composite coating production line
JP3169394B2 (en) Plate joining device
CN115106798A (en) Aluminum alloy section processing technology and equipment thereof
CN115946177A (en) Feeding processing device, circuit board processing equipment and automatic feeding method
CN115805261A (en) Stamping equipment convenient to adjustment interval of punching a hole

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121120

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131121

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20181031

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20191031

Year of fee payment: 15