JPS641826A - Lay-out method of wide-headed pile - Google Patents
Lay-out method of wide-headed pileInfo
- Publication number
- JPS641826A JPS641826A JP15529287A JP15529287A JPS641826A JP S641826 A JPS641826 A JP S641826A JP 15529287 A JP15529287 A JP 15529287A JP 15529287 A JP15529287 A JP 15529287A JP S641826 A JPS641826 A JP S641826A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- wide
- headed
- welding
- anchor bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
PURPOSE: To eliminate the manufacturing process of footing made of reinforced concrete on the upper part of a pile and to reduce the time and the cost of construction by welding a wide head section to a lower-pile.
CONSTITUTION: A hollow lower-pile 1 with an opening thereon is driven into the ground until a specific depth under the ground level. Then, a steel pipe pile 2 diametral enough to have a plane space necessary for laying out of anchor bolt, etc., so that the gap between the tip section could be filled up and the lower pile 1 is fitted to the upper end surface of the lower pile 1, and a contact surface with the lower pile 1 is connected by welding to form a wide-headed pile. Further, an arrangement of bars 3 and anchor bolt 4 are set to the wide- headed pile, and, concrete 7 placed, as necessary.
COPYRIGHT: (C)1989,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62-155292A JPH011826A (en) | 1987-06-24 | How to install expanded piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62-155292A JPH011826A (en) | 1987-06-24 | How to install expanded piles |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS641826A true JPS641826A (en) | 1989-01-06 |
JPH011826A JPH011826A (en) | 1989-01-06 |
Family
ID=
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003020657A (en) * | 2001-07-06 | 2003-01-24 | Taisei Corp | Structure of connection part between pile and pile head structural body |
JP2013174119A (en) * | 2012-01-23 | 2013-09-05 | Nippon Steel & Sumitomo Metal | Shape steel pile and construction method for the same |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003020657A (en) * | 2001-07-06 | 2003-01-24 | Taisei Corp | Structure of connection part between pile and pile head structural body |
JP4684479B2 (en) * | 2001-07-06 | 2011-05-18 | 大成建設株式会社 | Structure of the connection between the pile and the pile head structure |
JP2013174119A (en) * | 2012-01-23 | 2013-09-05 | Nippon Steel & Sumitomo Metal | Shape steel pile and construction method for the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS55114717A (en) | Combination method of support and foundation | |
JPS641826A (en) | Lay-out method of wide-headed pile | |
JPS55159024A (en) | Construction method for structure foundation | |
JPS6433315A (en) | Formation of hardened column using cloth cylinder under ground | |
JPS5789027A (en) | Multipillar type foundation construction method | |
JPS5513338A (en) | Caison sinking method | |
JPS5771923A (en) | Construction work of continuous underground wall | |
MY131012A (en) | Installing pre-founded columns | |
JPS55155830A (en) | Fixing method for leg part in building and the like | |
JPS6439417A (en) | Execution method of foundation pile | |
JPS55116923A (en) | Method for construction of pile foundation | |
JPS55161118A (en) | Pile driving method and pile | |
JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
JPS5693916A (en) | Construction for water-surface structure | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPS5685028A (en) | Driving method of pile into hard ground | |
JPS641823A (en) | Consolidation of foundation | |
JPS6421117A (en) | Upper pile reinforcing work for pc pile | |
JPS56105016A (en) | Executing method for reinforced foundation pile and reinforcing steel pipe | |
JPS56150222A (en) | Construction of marine structure | |
JPS57187417A (en) | Improvement work for soft ground | |
JPS6410819A (en) | Steel tubular pile for preventing liquefaction of ground | |
JPS5532812A (en) | Huge pole foundation practice | |
JPS6471917A (en) | Soil cement composite pile and its construction | |
JPS55161119A (en) | Pile driving method and pile |