Installing pre-founded columnsInfo
- Publication number
- MY131012A MY131012A MYPI9102210A MY131012A MY 131012 A MY131012 A MY 131012A MY PI9102210 A MYPI9102210 A MY PI9102210A MY 131012 A MY131012 A MY 131012A
- Authority
- MY
- Malaysia
- Prior art keywords
- pile
- column
- concrete
- construction
- sleeve
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
A METHOD OF INSTALLING A PRE-FOUNDED COLUMN, COMPRISING THE STEPS OF: CASTING A CONCRETE BORED PILE (3) IN A HOLE (2) IN THE GROUND, SO THAT THE TOP END OF THE PILE (3) IS BELOW GROUND LEVEL (GL); AND SECURING A COLUMN (4) TO THE TOP END OF THE PILE (3), AFTER THE CONCRETE OF THE PILE HAS SET.PREFERABLY, A HOLLOW SLEEVE (40) OF A DIAMETER LARGER THAN THE DIAMETER OF THE PILE (3) IS PROVIDED BETWEEN THE TOP OF THE PILE (3) AND THE SURFACE OF THE GROUND, THE CENTRELINE OF THE SLEEVE (40) BEING COINCIDENT WITH THE CENTRELINE OF THE PILE (3).THE PROVISION OF THIS LARGE DIAMETER SLEEVE (40) GIVES ACCESS TO THE TOP OF THE PILE SO THAT THE COLUMN (4) MAY BE SECURED TO THE TOP OF THE PILE (3) WHILST UNDER CONSTANT SUPERVISION BY WORKMEN SITUATED AT THE LEVEL AT THE TOP OF THE PILE (3).THE ABOVE METHOD OF INSTALLING A PREFOUNDED COLUMN (4) MAY BE INCORPORATED INTO A METHOD OF CONSTRUCTING A BASEMENT KNOWN AS THE "TOP-DOWN" METHOD OF CONSTRUCTION. IN THIS METHOD, CONCRETE PILES (3) ARE PLACED WELL BELOW GROUND LEVEL (GL) AND A COLUMN (4) IS SECURED TO EACH PILE (3) AFTER THE CONCRETE OF THE PILES (3) HAS SET. THE "TOP-DOWN" METHOD OF CONSTRUCTION HAS THE ADVANTAGE THAT ONCE THE PREFOUNDED COLUMNS (4) ARE INSTALLED, SIMULTANEOUS CONSTRUCTION OF THE BASEMENT SPACE AND THE UPPER FLOORS (14, 16, 18) OF THE BUILDING MAY TAKE PLACE.(FIG 3E)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MYPI9102210 MY131012A (en) | 1991-11-28 | 1991-11-28 | Installing pre-founded columns |
GB9208257A GB2261891A (en) | 1991-11-28 | 1992-04-14 | Installing columns e.g. below ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MYPI9102210 MY131012A (en) | 1991-11-28 | 1991-11-28 | Installing pre-founded columns |
Publications (1)
Publication Number | Publication Date |
---|---|
MY131012A true MY131012A (en) | 2007-07-31 |
Family
ID=19749653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MYPI9102210 MY131012A (en) | 1991-11-28 | 1991-11-28 | Installing pre-founded columns |
Country Status (2)
Country | Link |
---|---|
GB (1) | GB2261891A (en) |
MY (1) | MY131012A (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2356659B (en) * | 1999-11-18 | 2003-11-26 | Kvaerner Cementation Found Ltd | Pile forming |
CN101298773B (en) * | 2005-12-08 | 2010-06-02 | 王国奋 | Pile-formation sunken tube of pedestal pile |
CN105604081A (en) * | 2016-02-29 | 2016-05-25 | 福建省水利水电勘测设计研究院 | Offshore wind turbine rock-socketed foundation suitable for batholithic seabed and construction method of offshore wind turbine rock-socketed foundation |
CN107023029B (en) * | 2017-05-16 | 2022-10-21 | 潍坊学院 | Hollow circular truncated cone gravity type flexible fan foundation and construction method thereof |
CN109778872B (en) * | 2019-02-01 | 2024-09-06 | 百盛联合集团有限公司 | Deep foundation pit supporting structure of bored pile and construction method thereof |
CN110004902B (en) * | 2019-03-26 | 2024-02-02 | 中国石油大学(北京) | Skirt-type self-disposable puncture-resistant jack-up drilling platform pile shoe and drilling platform |
-
1991
- 1991-11-28 MY MYPI9102210 patent/MY131012A/en unknown
-
1992
- 1992-04-14 GB GB9208257A patent/GB2261891A/en not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
GB2261891A (en) | 1993-06-02 |
GB9208257D0 (en) | 1992-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101026731B1 (en) | Construction method of cellar for building completed | |
GB956134A (en) | Multi-storey building, and method of constructing the same | |
CN211898341U (en) | Structure for controlling upward floating of bored pile reinforcement cage | |
MY131012A (en) | Installing pre-founded columns | |
US3254466A (en) | Method of erecting a multi-story building structure | |
CN108412223B (en) | Deviation correcting structure and deviation correcting method for horizontal locking broken column | |
CN211341945U (en) | Assembled steel construction activity board house | |
JPS55122916A (en) | Method for building prestressed concrete-made pier foundation | |
KR20210053497A (en) | Fileless-up wall demolition method | |
JPS55114717A (en) | Combination method of support and foundation | |
JPS579925A (en) | Foundation structure for building | |
GB940500A (en) | Improvements relating to the construction of underground buildings | |
CN219992883U (en) | Novel steel structure column | |
JPS56111725A (en) | Constructing method for strip footing by using existing concrete pile | |
JPS56139307A (en) | Execution of foundation pile | |
JPS57219A (en) | Method and apparatus for construction of support central pillar | |
GB2048334A (en) | Stool for in situ cast beam | |
JPS62268423A (en) | Construction work of underground pile used in common for earth anchor | |
CN2457209Y (en) | Prestress anchor rod compensation gravity type building enclosure | |
JPS57178032A (en) | Constructing method for concrete wall | |
SU1092249A1 (en) | Method of constructing the bottom of sinkable well | |
JPS579916A (en) | Foundation structure for building | |
JPS56125528A (en) | Construction of in-situ driven pile | |
GB923776A (en) | Prefabricated house building | |
JPS57112523A (en) | Substructure of building |