JPS6314155B2 - - Google Patents
Info
- Publication number
- JPS6314155B2 JPS6314155B2 JP20595282A JP20595282A JPS6314155B2 JP S6314155 B2 JPS6314155 B2 JP S6314155B2 JP 20595282 A JP20595282 A JP 20595282A JP 20595282 A JP20595282 A JP 20595282A JP S6314155 B2 JPS6314155 B2 JP S6314155B2
- Authority
- JP
- Japan
- Prior art keywords
- steel frames
- steel
- pair
- jack
- frames
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 177
- 239000010959 steel Substances 0.000 claims description 177
- 238000000034 method Methods 0.000 claims description 20
- 238000007796 conventional method Methods 0.000 description 1
- 230000036461 convulsion Effects 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20595282A JPS5996359A (ja) | 1982-11-26 | 1982-11-26 | 鉄骨柱の建方方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20595282A JPS5996359A (ja) | 1982-11-26 | 1982-11-26 | 鉄骨柱の建方方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5996359A JPS5996359A (ja) | 1984-06-02 |
| JPS6314155B2 true JPS6314155B2 (enExample) | 1988-03-29 |
Family
ID=16515416
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20595282A Granted JPS5996359A (ja) | 1982-11-26 | 1982-11-26 | 鉄骨柱の建方方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5996359A (enExample) |
-
1982
- 1982-11-26 JP JP20595282A patent/JPS5996359A/ja active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5996359A (ja) | 1984-06-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5655243A (en) | Method for connecting precast concrete beams | |
| CN107858919A (zh) | 一种新型装配式桥梁伸缩装置 | |
| CN107931928A (zh) | 一种辅助横纵梁装焊的便携式夹具 | |
| JPS6314155B2 (enExample) | ||
| CN115142352A (zh) | 一种吊桥斜拉索施工平台 | |
| CN219326995U (zh) | 一种用于高立柱盖梁及系梁上的双抱箍装置 | |
| JP2001254315A (ja) | 沓座の補修方法 | |
| WO1983003373A1 (en) | Method of and apparatus for straightening a deformed frame element of a vehicle body | |
| JP3103294B2 (ja) | 柱用鉄骨、その連結に用いる治具および鉄骨の連結方法 | |
| JP2002349070A (ja) | 柱の建方調整治具およびこれを用いた柱建て込み方法 | |
| JP3103290B2 (ja) | 柱用鉄骨および鉄骨の連結方法 | |
| CN219451606U (zh) | 一种用于防止预应力梁卸载后发生反拱的装置 | |
| CN223576948U (zh) | T梁架设用安全防护装置 | |
| JP2688613B2 (ja) | 張弦梁床構造 | |
| CN222386977U (zh) | 抓手机构、抓臂装置及隧道工程台车 | |
| JPH0342381B2 (enExample) | ||
| JPH041128B2 (enExample) | ||
| JP3343242B2 (ja) | 鉄骨の連結に用いる治具 | |
| CN217080294U (zh) | 用于建立临时通道的组合式爬梯 | |
| CN220486219U (zh) | 一种钢栈桥 | |
| CN218951986U (zh) | 一种拼接桥梁梁板稳定装置 | |
| CN219824953U (zh) | 一种无塔扣索拆除拱桥的装置 | |
| JPS5817778Y2 (ja) | 支保工 | |
| JP2002349071A (ja) | 柱の建方調整治具および建て込み方法 | |
| SU607031A1 (ru) | Крепь сопр жени |