JPS6125020A - Inserting method of measuring instrument - Google Patents

Inserting method of measuring instrument

Info

Publication number
JPS6125020A
JPS6125020A JP14723784A JP14723784A JPS6125020A JP S6125020 A JPS6125020 A JP S6125020A JP 14723784 A JP14723784 A JP 14723784A JP 14723784 A JP14723784 A JP 14723784A JP S6125020 A JPS6125020 A JP S6125020A
Authority
JP
Japan
Prior art keywords
instrument
packer
meter
rod
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14723784A
Other languages
Japanese (ja)
Inventor
Mitsuru Tsujita
辻田 満
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Hazama Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazama Gumi Ltd filed Critical Hazama Gumi Ltd
Priority to JP14723784A priority Critical patent/JPS6125020A/en
Publication of JPS6125020A publication Critical patent/JPS6125020A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

PURPOSE:To enhance the reliability of observed data, by providing a leading wheel when a measuring instrument is inserted in an inserting hole for the measuring instrument, sealing the hole by a packer, filling a filler, and accurately inserting the device in the ground. CONSTITUTION:A measuring instrument 1 is inserted in an inserting hole for the measuring instrument. An inserting rod 15 is pushed to a guide pin 8 of the rear end of a linking rod 7. Then the measuring instrument 1 is inserted to a specified position. Thereafter, compressed air is fed through an air pipe 14 and a packer 6 is expanded. The packer 6 is sealed and engaged with the measuring- instrument inserting hole. Then the inside of the measuring-instrument inserting hole 2 in the vicinity of the measuring instrument 1 is filled with a filler through an injecting pipe 11 from a main injecting pipe 18. Before the filler is hardened, the main injecting pipe 18 is taken out of the injecting pipe 11. After the filler is hardened, the packer 6 is contracted, and the inserting rod 15 and the main injecting pipe 18 are taken out of the measuring-instrument inserting hole. The secondary injection is further carried out in the entire measuring-instrument inserting hole.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、地下空洞などの水平または上方向の任意の方
向の計器挿入孔へ計器を挿入する方法に関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a method for inserting a meter into a meter insertion hole in any horizontal or upward direction, such as in an underground cavity.

〔従来技術とその問題点〕[Prior art and its problems]

従来、被シが大きい地下空洞などの周辺に、水平方向か
ら上方向の計器挿入孔内へ計器を埋設するには、計器を
挿入してから一度に充填材を注入して計器挿入孔を塞ぐ
という方法がとられてきた。しかしこの方法では充填材
注入口から注入した充填材が逸脱流出し、計器挿入孔先
端部に装置した計器と周辺地盤との間に大きな隙間が生
じ、更に計器挿入のためのロッドが埋め殺しであるため
に、測定上好ましくない影響をうける恐れがあシ、観測
データの信頼性に疑問がもたれていた。また計器を挿入
する際に孔壁が削られ、切削土が計器の周辺に溜り、従
って計器と周辺地盤との一体性にも問題があった。
Conventionally, in order to bury a meter from the horizontal direction upward into the meter insertion hole around a large underground cavity, etc., it was necessary to insert the meter and then inject filler material all at once to block the meter insertion hole. This method has been adopted. However, with this method, the filler injected from the filler injection port deviates and flows out, creating a large gap between the instrument installed at the tip of the instrument insertion hole and the surrounding ground, and furthermore, the rod for inserting the instrument is buried. Because of this, there was a risk of unfavorable effects on measurements, and there were doubts about the reliability of the observation data. In addition, when inserting the instrument, the hole wall is scraped, and the cut soil accumulates around the instrument, resulting in problems with the integrity of the instrument and the surrounding ground.

〔発明の目的〕[Purpose of the invention]

本発明は従来の方法の欠点を解消し、計器を計器挿入孔
内の中央に正しく設置して周辺地盤と一体化することに
より観測データの信頼性を向上する計器の挿入方法を提
供する。
The present invention overcomes the drawbacks of conventional methods and provides an instrument insertion method that improves the reliability of observation data by properly centering the instrument within the instrument insertion hole and integrating it with the surrounding ground.

〔発明の構成〕[Structure of the invention]

本発明は、計器の先端部に先導車輪を備えた鋼棒を取付
け、後部に案内車輪を備えかつ流体圧により伸縮するパ
ッカーを貫着した連結ロンドを取付け、連結pラドの後
端部にガイドピンにより挿入ロッドを連結すると共にパ
ッカーには先端部が前記鋼棒の先端に達する空気抜き管
と先端に逆止弁を取付けた注入管と計器用導入ケーブル
とを挿通保持したのち挿入ロッドを連結ロッド後端部の
ガイドピンに押当て計器を所定位置に挿入し、ついでパ
ッカーに流体圧を加え膨張させてパッカーを計器挿入孔
に密封係止し、注入本管に接続した注入管より充填材を
計器周辺に充填し、この充填材が固化しないうちに注入
本管を注入管より抜出し、充填材が同化した後にパッカ
ーを収縮し挿入ロッドを抜出し計器挿入孔に再び前記充
填材を充填して計器を計器挿入孔に設置することを特徴
とする計器の挿入方法である。
In the present invention, a steel rod with a guide wheel is attached to the tip of the instrument, a connecting rod is attached to the rear end of the connecting rod, which is equipped with a guide wheel and penetrates a packer that expands and contracts by fluid pressure, and the guide is attached to the rear end of the connecting p-rad. The insertion rod is connected by a pin, and an air vent pipe whose tip reaches the tip of the steel rod, an injection tube with a check valve attached to the tip, and an instrument lead-in cable are inserted and held in the packer, and then the insertion rod is connected to the connecting rod. Insert the pusher into the guide pin at the rear end into a predetermined position, then apply fluid pressure to the packer to inflate it, sealingly lock the packer in the meter insertion hole, and pour the filling material through the injection pipe connected to the main injection pipe. The filling material is filled around the instrument, the main injection pipe is pulled out from the injection pipe before the filling material solidifies, and after the filling material is assimilated, the packer is contracted, the insertion rod is pulled out, the instrument insertion hole is filled with the filling material again, and the instrument is installed. This is a method for inserting a meter, which is characterized in that the meter is installed in the meter insertion hole.

〔実施例〕〔Example〕

本発明の実施例を図面により説明する。第1図(ト)は
計器1を計器挿入孔2に挿入した状態を示す側断面図で
あり、第1図CB)は第1図囚のイーイより見た正面図
である。
Embodiments of the present invention will be described with reference to the drawings. FIG. 1(G) is a side cross-sectional view showing the meter 1 inserted into the meter insertion hole 2, and FIG. 1 CB) is a front view of the device in FIG.

挿入する計器1は先端に所定長さを有する鋼棒4を取付
け、鋼棒4には第1図色)に示すように放射状に3個の
先導車輪5を備えている。先導車輪5は計器3を計器挿
入孔2内にて正しく中央に維持すると共に挿入時の土砂
の崩れを防ぎ、また鋼棒4は計器挿入孔2内における計
器8のストッパを兼ねている。計器1の後部には連結ロ
ッド7を取付け、連結ロッド7には前記先導車輪5と同
一構造の3個の案内車輪9を備え、かつパッカー6を貫
着する。パッカー6は弾性材で作られ、空気管14より
送給する空気圧により伸縮する。また連結ロッド7の後
端部にガイドピン8を取付は挿入ロッド15を連結する
。パッカー6は更に前記鋼棒4の先端部に達する空気抜
き管10と、先端に逆止弁12を取付けた充填材の注入
管11と、計器1月の導入ケーブル13を夫々挿通保持
している。この注入管11には、後端部に注入本管18
を取外し容易なるように挿入接続する。計器1の押圧用
挿入ロッド15は先端部に押切りビン16を取付は連結
ロッド7の後端部にて着脱自在に接続する。また連結ロ
ッド7と注入管11に夫々ガイドワイヤ17..17b
を取付ける。
The instrument 1 to be inserted has a steel rod 4 having a predetermined length attached to its tip, and the steel rod 4 is provided with three radial leading wheels 5 as shown in FIG. 1 (color). The guide wheel 5 maintains the meter 3 in the center of the meter insertion hole 2 and prevents the earth from collapsing during insertion, and the steel rod 4 also serves as a stopper for the meter 8 in the meter insertion hole 2. A connecting rod 7 is attached to the rear of the meter 1, and the connecting rod 7 is provided with three guide wheels 9 having the same structure as the leading wheels 5, and is penetrated by a packer 6. The packer 6 is made of an elastic material and is expanded and contracted by air pressure supplied from the air pipe 14. Further, a guide pin 8 is attached to the rear end of the connecting rod 7 to connect the insertion rod 15. The packer 6 further holds an air vent pipe 10 reaching the tip of the steel rod 4, a filler injection tube 11 with a check valve 12 attached to the tip, and an introduction cable 13 for the meter, respectively. This injection pipe 11 has an injection main 18 at the rear end.
Insert and connect so that it can be easily removed. The pushing insertion rod 15 of the meter 1 has a push-off pin 16 attached to its tip and is detachably connected to the connecting rod 7 at its rear end. Also, guide wires 17 are connected to the connecting rod 7 and the injection tube 11, respectively. .. 17b
Install.

次に計器工の挿入方法について説明する。第2図は計器
挿入孔2に計器1を挿入した全体図であり、第3図ない
し第5図は第2図のa部の拡大図にして挿入方法の工程
図である。
Next, the method of inserting the instrument will be explained. FIG. 2 is an overall view of the meter 1 inserted into the meter insertion hole 2, and FIGS. 3 to 5 are enlarged views of section a in FIG. 2 and are step charts of the insertion method.

先ず第2図において計器1を計器挿入孔2に導入し挿入
ロッド15を連結ロッド7の後端部のガイドピン8に押
当て計器1を所定の位置まで挿入する。
First, as shown in FIG. 2, the meter 1 is introduced into the meter insertion hole 2, and the insertion rod 15 is pressed against the guide pin 8 at the rear end of the connecting rod 7 to insert the meter 1 to a predetermined position.

l Fl ) ついで第3図の如く空気管14より圧縮空気を送給して
パッカー6を膨張させてパッカー6を計器挿入孔2に密
封係止する。
l Fl ) Then, as shown in FIG. 3, compressed air is supplied from the air pipe 14 to expand the packer 6 and seal the packer 6 into the instrument insertion hole 2.

引続き第4図の如く注入本管18より注入管11にて充
填材19を計器1周辺の計器挿入孔2内に充填する。こ
の場合計器1周辺の空気は空気抜き管10よυ排出され
、また、−成性入管11の先端には逆止弁12を取付け
ているので注入した充填材19は注入管11に逆流する
ことはなく、計器1周辺の計器挿入孔2内の隅部まで充
分に充填される。充填材19の充填が完了すれに空気抜
き管10より充填材19が横溢するので充填したことが
確認できる。
Subsequently, as shown in FIG. 4, the filling material 19 is filled into the instrument insertion hole 2 around the instrument 1 using the injection pipe 11 from the injection main pipe 18. In this case, the air around the instrument 1 is discharged through the air vent pipe 10, and since a check valve 12 is attached to the tip of the inlet pipe 11, the injected filler 19 will not flow back into the injection pipe 11. The instrument insertion hole 2 around the instrument 1 is fully filled up to the corners. When filling with the filler 19 is completed, the filler 19 overflows from the air vent pipe 10, so that it can be confirmed that the filler 19 has been filled.

この充填材19が固化しないうちに、第5図の如く先づ
注入本管18を注入管11より抜出し、更に充填材19
が固化すればパッカー6内の空気を空気管14より排除
してパッカー6を収縮させ、挿入ロッド15を連結ロッ
ド7より切離して、注入本管18と挿入ロッド15を計
器挿入孔2より取出し、ついで計器挿入孔2全体に二次
注入を行って計器1の挿入が完了する。
Before the filling material 19 solidifies, first pull out the injection main pipe 18 from the injection tube 11 as shown in FIG.
Once solidified, the air inside the packer 6 is expelled from the air pipe 14 to contract the packer 6, the insertion rod 15 is separated from the connecting rod 7, and the injection main pipe 18 and insertion rod 15 are taken out from the instrument insertion hole 2. Next, secondary injection is performed into the entire meter insertion hole 2, and the insertion of the meter 1 is completed.

第6図および第7図(A)Q3)は横方向に穿設した計
器挿入孔2′に計器1を挿入する状態を示した図面であ
り、第7図囚は第6図のb部の拡大図、また第7図(B
)は第7図(4)のロー口より見た正面図である。第7
図(4)(B)にて先導車輪5、案内車輪9は夫々逆V
字形に取付けた2個の先導車輪5および案内車輪9を有
し、また第6図の如く計器1を押圧する挿入ロッド15
にも夫々逆■字形に案内車輪9を取付ける。とのように
して横方向の計器挿入孔2′についても計器1を計器挿
入孔2′内の所定の位置に挿入することができる。
Figures 6 and 7 (A) Q3) are drawings showing the state in which the meter 1 is inserted into the meter insertion hole 2' drilled in the horizontal direction. Enlarged view and Figure 7 (B
) is a front view seen from the row opening in FIG. 7(4). 7th
In Figures (4) and (B), the leading wheels 5 and guide wheels 9 are each inverted V.
It has two leading wheels 5 and a guide wheel 9 mounted in a shape, and an insertion rod 15 for pressing the instrument 1 as shown in FIG.
A guide wheel 9 is attached to each in an inverted ■ shape. In this manner, the meter 1 can also be inserted into the horizontal meter insertion hole 2' at a predetermined position within the meter insertion hole 2'.

〔発明の効果〕〔Effect of the invention〕

本発明は、計器挿入孔に計器を挿入する際に先導車輪を
設けているので孔壁を崩すととなく正確に所定位置に挿
入することができ、またパッカーにより密封して充填材
を充填するので計器は周辺地盤と完全に一体化し、更に
は計器設置後には不用な注入管や挿入ロッドなどを除去
するので地盤中に正確に挿入設置され、観測データの信
頼性が向上する。
The present invention is equipped with a guide wheel when inserting the instrument into the instrument insertion hole, so it can be inserted into the predetermined position accurately without breaking the hole wall, and it is sealed with a packer and filled with filler material. Therefore, the instrument is completely integrated with the surrounding ground, and furthermore, unnecessary injection pipes and insertion rods are removed after the instrument is installed, so it can be inserted and installed accurately into the ground, improving the reliability of observation data.

【図面の簡単な説明】[Brief explanation of drawings]

第1図(4)は計器の挿入状態を示す側断面図、第1図
の)は第1図(ト)のイーイより見た正面図、第2図は
計器挿入孔に計器を挿入した全体図、第3図ないし第5
図は第2図a部の拡大図にして挿入方法の工程図、第6
図は横方向に穿設した計器挿入孔に計器を挿入した全体
図、第7図囚は第6図す部の拡大図、第7図ω)は第7
図(4)のロー口より見た正面図である。 1・・・計器  2,2・・・計器挿入孔4・・・鋼棒
  5,5・・・先導車輪  6・・・パッカー   
7・・・連結ロッド  9,9゜9・・・案内車輪  
10・・・空気抜き管11・・・注入管  12・・・
逆止弁  13・・・計器用の導入ケーブル  14・
・・空気管15・・・挿入ロッド   18・・・注入
本管19・・・充填材 M1図(A) 第2図      第3図 ム 第4図 第5図 手続補正書(自発) 昭和59年 9月 5日 特許庁長官 志賀 学 殿     逼1、事件の表示 昭和59年 特 許 願第14723753、 補正を
する者 事件との関係 特許出願人
Figure 1 (4) is a side sectional view showing the inserted state of the instrument, () in Figure 1 is a front view seen from E in Figure 1 (G), and Figure 2 is the overall view with the instrument inserted into the instrument insertion hole. Figures 3 to 5
The figure is an enlarged view of part a in Figure 2 and is a process diagram of the insertion method.
The figure is an overall view of the instrument inserted into the instrument insertion hole drilled in the horizontal direction.
It is a front view seen from the row opening of FIG. (4). 1... Instrument 2, 2... Instrument insertion hole 4... Steel rod 5, 5... Leading wheel 6... Packer
7...Connecting rod 9,9゜9...Guide wheel
10...Air vent pipe 11...Injection pipe 12...
Check valve 13... Instrument introduction cable 14.
...Air pipe 15...Insertion rod 18...Injection main 19...Filling material M1 diagram (A) Figure 2 Figure 3 Figure 4 Figure 5 Procedural amendment (voluntary) 1981 September 5th, Commissioner of the Japan Patent Office Manabu Shiga 1, Indication of the case 1982 Patent Application No. 14723753, Person making the amendment Relationship to the case Patent applicant

Claims (1)

【特許請求の範囲】[Claims] 計器の先端部に先導車輪を備えた鋼棒を取付け、後部に
案内車輪を備えかつ流体圧により伸縮するパッカーを貫
着した連結ロッドを取付け、連結ロッドの後端部にガイ
ドピンにより挿入ロッドを連結すると共にパッカーには
先端部が前記鋼棒の先端に達する空気抜き管と先端に逆
止弁を取付けた注入管と計器用導入ケーブルとを挿通保
持したのち挿入ロッドを連結ロッド後端部のガイドピン
に押当て計器を所定位置に挿入し、ついでパッカーに流
体圧を加え膨張させてパッカーを計器挿入孔に密封係止
し、注入本管に接続した注入管より充填材を計器周辺に
充填し、この充填材が固化しないうちに注入本管を注入
管より抜出し、充填材が固化した後にパッカーを収縮し
挿入ロッドを抜出し計器挿入孔に再び前記充填材を充填
して計器を計器挿入孔に設置することを特徴とする計器
の挿入方法。
Attach a steel rod with a guide wheel to the tip of the instrument, attach a connecting rod with a guide wheel to the rear and penetrate a packer that expands and contracts with fluid pressure, and insert an insertion rod with a guide pin at the rear end of the connecting rod. At the same time, an air vent pipe whose tip reaches the tip of the steel rod, an injection pipe with a check valve attached to its tip, and an instrument lead-in cable are inserted and held in the packer, and then the insertion rod is inserted into the guide at the rear end of the connecting rod. Insert the meter into the specified position by pressing it against the pin, then apply fluid pressure to the packer to inflate it, sealingly lock the packer in the meter insertion hole, and fill the area around the meter with filler material from the injection pipe connected to the injection main pipe. , the injection main pipe is pulled out from the injection pipe before the filling material solidifies, and after the filling material solidifies, the packer is contracted, the insertion rod is pulled out, the meter insertion hole is filled with the filling material again, and the meter is inserted into the meter insertion hole. A method of inserting an instrument characterized by installing it.
JP14723784A 1984-07-16 1984-07-16 Inserting method of measuring instrument Pending JPS6125020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14723784A JPS6125020A (en) 1984-07-16 1984-07-16 Inserting method of measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14723784A JPS6125020A (en) 1984-07-16 1984-07-16 Inserting method of measuring instrument

Publications (1)

Publication Number Publication Date
JPS6125020A true JPS6125020A (en) 1986-02-03

Family

ID=15425673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14723784A Pending JPS6125020A (en) 1984-07-16 1984-07-16 Inserting method of measuring instrument

Country Status (1)

Country Link
JP (1) JPS6125020A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009109394A (en) * 2007-10-31 2009-05-21 Shimizu Corp Method of installing monitoring instrument into rock bed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009109394A (en) * 2007-10-31 2009-05-21 Shimizu Corp Method of installing monitoring instrument into rock bed

Similar Documents

Publication Publication Date Title
CN105716747B (en) Mine formation downhole crustal stress quickly measures equipment and method
US4253781A (en) Method and an apparatus for providing a grouted anchorage against hydrostatic pressure
KR100877580B1 (en) Eexperiment of grout stability for shield method
KR20220053956A (en) Constructing method of grouting steel pipe having cocking packer module and grouting steel pipe having cocking packer module
CN102721634A (en) Method and device for in-situ penetration test by means of water injection under drilling pressure
CN107060814B (en) A kind of prefabricated shield duct piece earth pressure gauge method for embedding
CN105804692B (en) A kind of new-type coal mine gas piezometry slip-casting hole-sealing method
US6280675B1 (en) Grouting method for rigidly connecting two elements using a binder, and in particular for anchoring one element in another
CN107884246A (en) Solution cavity preparation method in a kind of geomechanical model test
CN109827717A (en) A kind of shallow cementing cement test device for air tightness and method
CN211949636U (en) Device for realizing integrated operation of grouting and sealing
JPS6125020A (en) Inserting method of measuring instrument
CN108242604B (en) A kind of electric power line pole tower horizontal grounding resistance-reducing device and construction method
CN206753653U (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction
CN212272177U (en) Coal seam gas pressure measuring device
CN105926568B (en) A kind of supporting bracing means and method of the embedded inclinometer pipe that drills
KR101709737B1 (en) Direct injection grouting method for reinforcing buried steel pipe
JP3507606B2 (en) Construction method of sewer
JP3849440B2 (en) Confirmation of filling of tunnel backfill injection material
CN205839724U (en) The supporting bracing means of inclinometer pipe is buried in a kind of boring underground
CN108918023A (en) A kind of soil under vacuum preloading vacuum degree monitoring device and method
CN109853506A (en) A kind of pore pressure meter embedded device and its method suitable for mud soil property
JPH09222369A (en) Method for measuring slack displacement of rock ground
CN109357935A (en) Broken soft rock tunnel relaxation zone test method based on glass anchor pole microstrain analysis
JP2002097628A (en) Supply return type hole filling packer and boring hole filling blocking construction method