CN105804692B - A kind of new-type coal mine gas piezometry slip-casting hole-sealing method - Google Patents

A kind of new-type coal mine gas piezometry slip-casting hole-sealing method Download PDF

Info

Publication number
CN105804692B
CN105804692B CN201610188774.0A CN201610188774A CN105804692B CN 105804692 B CN105804692 B CN 105804692B CN 201610188774 A CN201610188774 A CN 201610188774A CN 105804692 B CN105804692 B CN 105804692B
Authority
CN
China
Prior art keywords
slip casting
capsule
pressure
hole
slip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610188774.0A
Other languages
Chinese (zh)
Other versions
CN105804692A (en
Inventor
杨小彬
韩心星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201610188774.0A priority Critical patent/CN105804692B/en
Publication of CN105804692A publication Critical patent/CN105804692A/en
Application granted granted Critical
Publication of CN105804692B publication Critical patent/CN105804692B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of new-type coal mine gas piezometry slip-casting hole-sealing method, including step:1) slip casting capsule is put into dilation by water injection in short sleeve, slip casting capsule is directly placed into petrosal foramen depths by slip casting drilling rod after the connection of slip casting capsule together with short sleeve to be seen in front of coal point;2) slip casting is carried out by slip casting drilling rod and slip casting capsule to block short sleeve and the hole seen between the petrosal foramen near coal point and surrounding crack;3) after cleaning bottom of hole, remove slip casting drilling rod and slip casting capsule, pressure measurement hole packer is directly placed into short sleeve, hole packer two capsules are expanded into after certain pressure with being in close contact on the inside of short sleeve, mucus is injected between pressure measurement hole packer two capsules, after mucus reaches certain pressure, a closed pressure measurement gas chamber just can be formed, excludes hydraulic pressure interference.Solve the problems, such as that existing method for sealing is difficult to exclude hydraulic pressure interference, quickly and accurately measures gas pressure.

Description

A kind of new-type coal mine gas piezometry slip-casting hole-sealing method
Technical field
The present invention relates to a kind of mine coal seam gas pressure measurement technology, more particularly to a kind of new-type coal mine gas pressure to survey Determine slip-casting hole-sealing method.
Background technology
In coal mining, Gas Disaster is always one of major casualty for threatening Safety of Coal Mine Production.With mining depth The increase of degree, Gas Disaster particularly coal and gas prominent disaster are on the rise, and coal-bed gas pressure is whether to predict coal seam An important indicator with outburst hazard, so accurate quick measure coal-bed gas pressure is for predicting coal and gas prominent It is dangerous and take corresponding control measure most important.
But in putting into practice at the scene, due to the influence of various factors, pressure measurement result can be caused to deviate the original gas pressure in coal seam Power or what is directly measured is hydraulic pressure, although can measure the gas pressure in coal seam sometimes, pressure measurement overlong time, seriously affects digging Progress.
The content of the invention
The object of the present invention is to provide a kind of new-type coal mine gas piezometry slip-casting hole-sealing method.
The purpose of the present invention is what is be achieved through the following technical solutions:
The new-type coal mine gas piezometry slip-casting hole-sealing method of the present invention, including step:
A, horizontal drilling or the uplink drilling of a diameter of a is opened in rock mass, drilling drilling is to being shown in that coal point stops;
B, according to seeing whether the neighbouring rock of coal point has the width in water-bearing layer and water-bearing layer, the short sleeve of appropriate length is selected, The a diameter of b of short sleeve, and b<Arc-shaped is processed into a, short sleeve rear end;
C, slip casting capsule is filled in into short sleeve, expands capsule using water pump pressurization, slip casting capsule is formed with short sleeve One entirety, is wrapped with a strata urethane on the outside of short sleeve rear end;
D, slip casting capsule and short sleeve are filled in drilling depths to see in front of coal point, slip casting capsule slip casting drilling rod phase successively Even, it is outer to extend to drilling, and slip casting drilling rod internal diameter is identical with slip casting capsule internal diameter, size c;
E, slip casting is carried out by slip casting drilling rod and slip casting capsule using slip casting machine, grouting pressure does not have to too big first, just rises Stop slip casting during pressure, solidify 48h after slip casting;
F, it is d (d using bit diameter<C) then drilling rod cleaning bottom of hole utilizes slip casting drilling rod and slip casting capsule to stopping when seeing coal Secondary grouting, secondary grouting pressure is larger, and the hydraulic pressure being greater than at this in rock, solidifies 48h after slip casting;
G, it is d (d using bit diameter<C) the secondary cleaning bottom of hole of drilling rod, 1-2m in cleaning bottom of hole to coal.Then removal slip casting capsule Hydraulic pressure, shrink capsule, exit slip casting drilling rod and slip casting capsule;
H, pressure measurement hole packer is filled in short sleeve, water filling expands pressure measurement capsule, and bulbs of pressure 3MPa, is then being sealed Mucus is filled between two pressure measurement capsule of hole device, mucus pressure is 2MPa;
I, above-mentioned steps end of operation, the gas pressure table with threeway is connected by pressure-measuring pipe, starts to observe gas pressure, And make a record.
As seen from the above technical solution provided by the invention, new-type coal mine gas pressure provided in an embodiment of the present invention Slip-casting hole-sealing method is measured, can rapidly and accurately measure the gas pressure in coal seam, and exclude the interference of rock stratum hydraulic pressure.
Brief description of the drawings
Fig. 1 is the slip casting structure diagram in the embodiment of the present invention;
Fig. 2 is the hole sealing structure schematic diagram in the embodiment of the present invention;
Fig. 3 is the short sleeve structure diagram in the embodiment of the present invention;
Fig. 4 is the slip casting structure A-A diagrammatic cross-sections in the embodiment of the present invention;
Fig. 5 is the slip casting structure B-B diagrammatic cross-sections in the embodiment of the present invention;
Fig. 6 is the slip casting structure C-C diagrammatic cross-sections in the embodiment of the present invention;
In figure:
1-coal seam, 2-rock mass, 3-slurries, 4-casing, 5-polyurethane, 6-slip casting, 7-slip casting of capsule drilling rod 8- Slip casting capsule water injecting pipeline 9-water pump, 10-slip casting machine, 11-pressure measurement capsule 12-pressure measurement capsule water injecting pipeline 13-glutinous 14-methane gas of liquid pipeline pipeline 15-four is in charge of 16-mucus pump 17-gas pressure table.
Embodiment
The embodiment of the present invention will be described in further detail below.
The new-type coal mine gas piezometry slip-casting hole-sealing method of the present invention, its preferable embodiment are:
Including step:
A, horizontal drilling or the uplink drilling of a diameter of a is opened in rock mass, drilling drilling is to being shown in that coal point stops;
B, according to seeing whether the neighbouring rock of coal point has the width in water-bearing layer and water-bearing layer, the short sleeve of appropriate length is selected, The a diameter of b of short sleeve, and b<Arc-shaped is processed into a, short sleeve rear end;
C, slip casting capsule is filled in into short sleeve, expands capsule using water pump pressurization, slip casting capsule is formed with short sleeve One entirety, is wrapped with a strata urethane on the outside of short sleeve rear end;
D, slip casting capsule and short sleeve are filled in drilling depths to see in front of coal point, slip casting capsule slip casting drilling rod phase successively Even, it is outer to extend to drilling, and slip casting drilling rod internal diameter is identical with slip casting capsule internal diameter, size c;
E, slip casting is carried out by slip casting drilling rod and slip casting capsule using slip casting machine, grouting pressure does not have to too big first, just rises Stop slip casting during pressure, solidify 48h after slip casting;
F, it is d (d using bit diameter<C) then drilling rod cleaning bottom of hole utilizes slip casting drilling rod and slip casting capsule to stopping when seeing coal Secondary grouting, secondary grouting pressure is larger, and the hydraulic pressure being greater than at this in rock, solidifies 48h after slip casting;
G, it is d (d using bit diameter<C) the secondary cleaning bottom of hole of drilling rod, 1-2m in cleaning bottom of hole to coal.Then removal slip casting capsule Hydraulic pressure, shrink capsule, exit slip casting drilling rod and slip casting capsule;
H, pressure measurement hole packer is filled in short sleeve, water filling expands pressure measurement capsule, and bulbs of pressure 3MPa, is then being sealed Mucus is filled between two pressure measurement capsule of hole device, mucus pressure is 2MPa;
I, above-mentioned steps end of operation, the gas pressure table with threeway is connected by pressure-measuring pipe, starts to observe gas pressure, And make a record.
The end of the slip casting drilling rod final section must burn-on ring flange, so that the grouting pipeline with slip casting machine is connected Complete slip casting work.
Arc-shaped is processed into the rear end of the short sleeve when being for sealing of hole, allows the smooth sleeve pipe of pressure measurement hole packer.
A strata urethane is wrapped with the outside of the rear end of the short sleeve, is in first slip casting, block slurries, prevent It is back in short sleeve, is brought inconvenience to follow-up work, while slurries is entered in the crack between short sleeve and petrosal foramen, envelope Stifled crack.
If the secondary grouting grouting pressure does not reach setting value, need to increase slip casting number, set until reaching Untill definite value, corresponding cleaning bottom of hole depth also will be increased accordingly.
The new-type coal mine gas piezometry slip-casting hole-sealing method of the present invention, can rapidly and accurately measure the gas in coal seam Pressure, and exclude the interference of rock stratum hydraulic pressure.
Specific embodiment, as shown in Figures 1 to 6, including step:
(1) horizontal drilling or the uplink drilling of a diameter of 193mm is opened in rock mass, drilling drilling is to being shown in that coal point stops;
(2) according to seeing whether the neighbouring rock of coal point has the width in water-bearing layer and water-bearing layer, the short sleeve of appropriate length is selected, Arc-shaped is processed into a diameter of 146mm of short sleeve, short sleeve rear end;
(3) slip casting capsule is filled in into short sleeve, expands capsule using water pump pressurization, slip casting capsule is formed with short sleeve One entirety, is wrapped with a strata urethane on the outside of short sleeve rear end;
(4) slip casting capsule and short sleeve are filled in drilling depths to see in front of coal point, slip casting capsule slip casting drilling rod phase successively Even, it is outer to extend to drilling, and slip casting drilling rod internal diameter is identical with slip casting capsule internal diameter, size 95mm;
(5) slip casting is carried out by slip casting drilling rod and slip casting capsule using slip casting machine, grouting pressure does not have to too big first, just rises Stop slip casting during pressure, solidify 48h after slip casting;
(6) slip casting drilling rod and slip casting capsule are then utilized to stopping when seeing coal using the drilling rod cleaning bottom of hole that bit diameter is 75mm Secondary grouting, secondary grouting pressure is larger, and the hydraulic pressure being greater than at this in rock, solidifies 48h after slip casting;
(7) using the secondary cleaning bottom of hole of drilling rod that bit diameter is 75mm, 1-2m in cleaning bottom of hole to coal.Then removal slip casting capsule Hydraulic pressure, shrinks capsule, exits slip casting drilling rod and slip casting capsule;
(8) pressure measurement hole packer is filled in short sleeve, water filling expands pressure measurement capsule, the bulbs of pressure 3MPa, Ran Hou Mucus is filled between two pressure measurement capsule of hole packer, mucus pressure is 2MPa;
(9) above-mentioned steps end of operation, the gas pressure table with threeway is connected by pressure-measuring pipe, starts to observe gas pressure Power, and make a record;
(10) step (6) if in secondary grouting grouting pressure do not reach setting value, need increase slip casting number, until Untill reaching setting value, corresponding cleaning bottom of hole depth also will be increased accordingly.Concrete numerical value in each step is referential data, Ke Yigen Adjusted accordingly according to actual conditions.
The innovation and advantage of the present apparatus are:
(1) creatively propose short sleeve being placed into and see in front of coal point, noted using slip casting drilling rod and slip casting capsule Slurry closure crack, eliminates the influence of hydraulic pressure for seeing water-bearing stratum in front of coal point;
(2) pressure measurement hole packer is directly put into sealing of hole in short sleeve by creative proposition, after capsule dilation by water injection with casing It is in close contact, plus the pressure-bearing mucus between two capsules, the preferable pressure measurement gas chamber of seal can be formed;
(3) slip casting and method for sealing combine horizontal or uphole perforate mode and had both overcome capsule and rock in conventional method Be difficult between hole be in close contact and mucus be difficult to pressure caused by gas leakage problem, also overcome two-stage casing water blockoff it is high into This problem.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art is in the technical scope of present disclosure, the change or replacement that can readily occur in, It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims Subject to enclosing.

Claims (5)

1. a kind of new-type coal mine gas piezometry slip-casting hole-sealing method, it is characterised in that including step:
A, horizontal drilling or the uplink drilling of a diameter of a is opened in rock mass, drilling drilling is to being shown in that coal point stops;
B, according to seeing whether the neighbouring rock of coal point has the width in water-bearing layer and water-bearing layer, the short sleeve of appropriate length, short set are selected Pipe diameter is b, and b<Arc-shaped is processed into a, short sleeve rear end;
C, slip casting capsule is filled in into short sleeve, expands capsule using water pump pressurization, slip casting capsule and short sleeve are formed one It is overall, a strata urethane is wrapped with the outside of short sleeve rear end;
D, slip casting capsule and short sleeve are filled in into drilling depths and sees in front of coal point that slip casting capsule slip casting drilling rod is connected, prolongs successively It is outer to extend drilling, and slip casting drilling rod internal diameter is identical with slip casting capsule internal diameter, size c;
E, slip casting is carried out by slip casting drilling rod and slip casting capsule using slip casting machine, grouting pressure does not have to too big first, when just having played pressure Stop slip casting, solidify 48h after slip casting;
F, it is d using bit diameter, and d<Then the drilling rod cleaning bottom of hole of c utilizes slip casting drilling rod and slip casting capsule two to stopping when seeing coal Secondary slip casting, secondary grouting pressure is larger, and the hydraulic pressure being greater than at this in rock, solidifies 48h after slip casting;
G, it is d using bit diameter, and d<The secondary cleaning bottom of hole of drilling rod of c, the water of 1-2m, then removal slip casting capsule in cleaning bottom of hole to coal Pressure, shrinks capsule, exits slip casting drilling rod and slip casting capsule;
H, pressure measurement hole packer is filled in short sleeve, water filling expands pressure measurement capsule, bulbs of pressure 3MPa, then in hole packer Mucus is filled between two pressure measurement capsules, mucus pressure is 2MPa;
I, above-mentioned steps end of operation, the gas pressure table with threeway is connected by pressure-measuring pipe, starts to observe gas pressure, and do Record easy to remember.
2. new-type coal mine gas piezometry slip-casting hole-sealing method according to claim 1, it is characterised in that the note The end of slurry drilling rod final section must burn-on ring flange, and slip casting work is completed so that the grouting pipeline with slip casting machine is connected.
3. new-type coal mine gas piezometry slip-casting hole-sealing method according to claim 1, it is characterised in that described is short Arc-shaped is processed into the rear end of casing when being for sealing of hole, allows the smooth sleeve pipe of pressure measurement hole packer.
4. new-type coal mine gas piezometry slip-casting hole-sealing method according to claim 2, it is characterised in that described is short A strata urethane is wrapped with the outside of the rear end of casing, is in first slip casting, block slurries, prevent it to be back to short sleeve It is interior, bring inconvenience to follow-up work, while slurries is entered in the crack between short sleeve and petrosal foramen, block crack.
5. new-type coal mine gas piezometry slip-casting hole-sealing method according to any one of claims 1 to 4, its feature exist In if the secondary grouting grouting pressure does not reach setting value, needing to increase slip casting number, until reaching setting value and being Only, corresponding cleaning bottom of hole depth also will be increased accordingly.
CN201610188774.0A 2016-03-29 2016-03-29 A kind of new-type coal mine gas piezometry slip-casting hole-sealing method Expired - Fee Related CN105804692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610188774.0A CN105804692B (en) 2016-03-29 2016-03-29 A kind of new-type coal mine gas piezometry slip-casting hole-sealing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610188774.0A CN105804692B (en) 2016-03-29 2016-03-29 A kind of new-type coal mine gas piezometry slip-casting hole-sealing method

Publications (2)

Publication Number Publication Date
CN105804692A CN105804692A (en) 2016-07-27
CN105804692B true CN105804692B (en) 2018-05-08

Family

ID=56454158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610188774.0A Expired - Fee Related CN105804692B (en) 2016-03-29 2016-03-29 A kind of new-type coal mine gas piezometry slip-casting hole-sealing method

Country Status (1)

Country Link
CN (1) CN105804692B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639962B (en) * 2016-10-17 2022-10-11 华北理工大学 Secondary hole sealing pressure measuring device based on expanding agent
CN106869855A (en) * 2017-04-25 2017-06-20 中煤科工集团重庆研究院有限公司 Full-automatic gas overrun prevention device
CN109162635A (en) * 2018-09-19 2019-01-08 淮北矿业股份有限公司 A kind of new pressure measuring drill hole construction technology
CN109341934B (en) * 2018-10-29 2024-03-22 山东科技大学 Dynamic monitoring equipment and monitoring method for water pressure of bottom plate aquifer
CN111561291B (en) * 2020-05-06 2022-04-08 太原理工大学 Double-layer extrusion type hole sealing device and method for gas extraction drill hole
CN117345226B (en) * 2023-10-26 2024-09-20 中国矿业大学 Coal seam double-sleeve stepped grouting, layer-penetrating and pressure measuring drilling construction method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1131463A (en) * 1980-08-01 1982-09-14 Susan A. De Korompay Method of fracturation detection
CN102071961B (en) * 2010-12-24 2012-09-05 陕西陕煤韩城矿业有限公司 Downward gas drainage drill hole and pressure testing drill hole sealing method
CN103015984A (en) * 2012-12-19 2013-04-03 河南焦煤能源有限公司科学技术研究所 Method for measuring gas pressure of coal seam by casing high-pressure hole sealing method
CN103015986B (en) * 2013-01-16 2015-09-16 河南理工大学 The method of the coal mine underground coal bed gas pressure of a kind of direct mensuration
CN103452525B (en) * 2013-09-06 2016-08-10 河南理工大学 Gas takes out fixed stopper and using method thereof
CN204200215U (en) * 2014-09-26 2015-03-11 宝钢集团新疆八一钢铁有限公司 Coal seam rapid hole sealing pressure measurement structure
CN104500042B (en) * 2014-10-16 2017-05-03 山东科技大学 Measuring method for water-containing coal and rock down drill hole gas pressure observation system

Also Published As

Publication number Publication date
CN105804692A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105804692B (en) A kind of new-type coal mine gas piezometry slip-casting hole-sealing method
CN105239965B (en) Halogen method is arranged in salt hole air reserved storeroom gas injection
CN105716747B (en) Mine formation downhole crustal stress quickly measures equipment and method
CN103742129B (en) The method of weak seam measuring gas pressure of coal bed by drilling hole
US9822632B2 (en) Method of pressure testing a plugged well
US11274543B2 (en) Method for accurately measuring reopening pressure of hydraulic fracturing induced fracture in deep borehole
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
JP5363824B2 (en) Hydraulic fracturing test method and measuring device
CN110748380A (en) Method for building salt cavern gas storage
CN113107469B (en) Device and method for measuring gas pressure through underground long drilling
CN109915070A (en) The down-hole coal bed test gas pressure hole sealing device of one kind and method
RU2171359C1 (en) Method of horizontal well completion
CN103147741B (en) Coal bed roadside pressure relief zone width measuring method based on drill hole gas leakage
CN103939143A (en) Method for measuring range of influence of crushed zones of coal bed roadway and device thereof
CN111335874B (en) Oil-gas well cementing cement packing capacity detection device and detection method thereof
CN109341934A (en) A kind of floor water-bearing rock hydraulic pressure dynamic monitoring equipment and monitoring method
CN103939075B (en) A kind of fracturing process improving coal mine gas drainage effect and device
CN208953189U (en) A kind of floor water-bearing rock hydraulic pressure dynamic monitoring equipment
CN105443071A (en) Process for blocking underwater channeling of roof
CN208456572U (en) Packaged type hydraulic fracturing and injection hole sealing integrated apparatus
JP6166666B2 (en) Water pressure measurement method, lid material and water pressure measurement structure
CN112443288B (en) Experimental device for evaluating sealing capacity of two interfaces of well cementation cement sheath
JP6411099B2 (en) Ground injection method
CN113236341B (en) Device for enhancing gas extraction in underground coal mine and using method
CN114278251B (en) Method for plugging and measuring pressure of surrounding rock fracture hole of coal mine tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508