CN206753653U - A kind of tunnel solution cavity and Groundwater Comprehensive administer construction - Google Patents

A kind of tunnel solution cavity and Groundwater Comprehensive administer construction Download PDF

Info

Publication number
CN206753653U
CN206753653U CN201621475144.3U CN201621475144U CN206753653U CN 206753653 U CN206753653 U CN 206753653U CN 201621475144 U CN201621475144 U CN 201621475144U CN 206753653 U CN206753653 U CN 206753653U
Authority
CN
China
Prior art keywords
tunnel
solution cavity
hole
hydraulic pressure
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621475144.3U
Other languages
Chinese (zh)
Inventor
刘向远
付守洪
程永才
甘文
雷勇
胡朝程
周刚贵
曹师铭
郭麟
庞健民
谭勇
廖连烨
安荣�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201621475144.3U priority Critical patent/CN206753653U/en
Application granted granted Critical
Publication of CN206753653U publication Critical patent/CN206753653U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of tunnel solution cavity and Groundwater Comprehensive administer construction, so that tunnel structure and working security is effectively ensured, and do not influence environment.Draining shaft outside the hole being communicated in tunnel at water outlet is set outside tunnel scope from earth's surface, vertical shaft in hole is set below tunnel, and set draining shaft outside connection hole, in hole vertical shaft draining transverse passage-way, tunnel bottom sets the bottom girder across solution cavity, full envelope anti-hydraulic pressure is constructed in tunnel, the full anti-hydraulic pressure that seals extends certain length before and after solution cavity.

Description

A kind of tunnel solution cavity and Groundwater Comprehensive administer construction
Technical field
Tunnel is the utility model is related to, more particularly to a kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction party Method.
Background technology
In tunnel excavation and liner structure work progress, solution cavity and ground are typically punished using close measure and ejectment measure Lower water.Close measure objectively has that so the karst water such as disclosed is ground water discharge passage, in draining end End, water is big, and blindly closure hidden danger is very big, and blocks difficulty, and construction risk is big;Even if temporary transient water blockoff success, then certainly will Level of ground water is caused to rise, simultaneously as the erratic behavior of karsts developing area, original lithic drainage is destroyed in addition, new water Grease head highness is difficult to determine, karst water is also difficult to determine to tunnel longitudinal direction coverage, and it is also difficult that anti-hydraulic pressure applies length, thickness To determine, blindly processing may make tunnel hide under water under high pressure effect, and its abutment wall, inverted arch easily burst, and exist and jeopardize The traffic safety even hidden danger of passenger's casualty accident.Ejectment measure is to set drain cavern ejectment karst water, and its advantage is draining road Footpath is clear and definite, solves blindly potential safety hazard caused by closure, but because draining causes new environmental problem unexpected, and it is applied The work cycle is long, investment is big, big to environment, duration and Investment Influence.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of tunnel solution cavity and Groundwater Comprehensive administers construction, with Tunnel structure and working security is effectively ensured, and does not influence environment.
Technical scheme is as follows used by the utility model solves its technical problem:
A kind of tunnel solution cavity of the present utility model and Groundwater Comprehensive administer construction, it is characterized in that:Outside tunnel scope from Earth's surface is set and is communicated in tunnel draining shaft outside the hole at water outlet, and vertical shaft in hole is set below tunnel, and sets connection hole The draining transverse passage-way of vertical shaft in outer draining shaft, hole, tunnel bottom set the bottom girder across solution cavity, and full envelope water resistant is constructed in tunnel Lining cutting is pressed, the full anti-hydraulic pressure that seals extends certain length before and after solution cavity.
The beneficial effects of the utility model are, arrange the comprehensive control measures combined using envelope, and it is controllable that tunnel bears hydraulic pressure, can Implementation is relatively strong;Head height can be effectively controlled, does not change original underground water path, ensures tunnel structure and construction safety Property, and environment is not influenceed, quick construction is convenient, and investment is smaller.
Brief description of the drawings
This specification includes the following width accompanying drawing of width two:
Fig. 1 is the schematic diagram that the utility model tunnel solution cavity and Groundwater Comprehensive administer construction;
Fig. 2 is the sectional drawing that the utility model tunnel solution cavity and Groundwater Comprehensive administer full envelope anti-hydraulic pressure in construction.
Component and corresponding mark are shown in figure:It is country rock 10, preliminary bracing structure 11, waterproof system 12, first resistant to pressure Lining cutting 13, waterproof layer 14, secondary anti-hydraulic pressure 15, bottom girder 16, anchor pole 17, draining shaft 20 outside hole, vertical shaft 21, draining in hole Transverse passage-way 22, fill concrete 30.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Reference picture 1, tunnel solution cavity of the present utility model and Groundwater Comprehensive administer construction, including in the digging process of country rock 10 The disclosed solution cavity 30 being positioned above.Set outside the country rock 10 and be communicated to draining shaft 20 outside the hole on ground, in country rock 10 lower sections set vertical shaft 21 in hole, and set draining shaft 20 outside connection hole, in hole vertical shaft 21 draining transverse passage-way 22, country rock 10 Full envelope anti-hydraulic pressure is constructed in outside, and the full anti-hydraulic pressure that seals is in the front and rear extension certain length of solution cavity 30.
For the utility model using envelope row's combination technology measure, the external near exit in hole sets draining shaft, is set in hole horizontal Passage introduces the water into draining shaft, by the full envelope anti-hydraulic pressure of section use before and after solution cavity, underground water is discharged from earth's surface, connects Enter major groove.Head height can be effectively controlled, does not change original underground water path, structure is feasible, and environment influences small, construction quality Height, investment are relatively small.Using envelope row to closing, tunnel bears that hydraulic pressure is controllable, and exploitativeness is relatively strong.
Reference picture 2, it is described build tunnel anti-hydraulic pressure include outwards set gradually by country rock 10 preliminary bracing structure 11, Waterproof and water drainage system 12, first anti-hydraulic pressure 13, waterproof layer 14 and secondary anti-hydraulic pressure 15, the first bottom of anti-hydraulic pressure 13 Connected as one with bottom girder 16, the lower end of waterproof and water drainage system 12 is connected to vertical shaft 21 in hole.
(head is no more than 50m) under normal circumstances, tunnel anti-hydraulic pressure extension 40-50m before and after solution cavity 30, just The secondary thickness of anti-hydraulic pressure 13 is 50cm, and the secondary thickness of anti-hydraulic pressure 15 is 40cm, and the waterproof layer 14 preferably uses propylene Hydrochlorate sprays film, substitutes traditional polymer membranes waterproof layer, ensures waterproof effect after just propping up, prevents crossfire before and after underground water
The preliminary bracing structure 11 of reference picture 2 includes the shotcrete layer of covering country rock 10, is embedded in shotcrete layer Steelframe etc..Also include carrying out grouting and reinforcing to country rock 10 using diameter 42mm slip castings steel floral tube around country rock 10, formed certain thick The sealing country rock of degree, underground water is avoided to be ganged up along tunnel perimeter hole, karst row gap toward front and rear.
Reference picture 1, a kind of tunnel solution cavity of the utility model and Groundwater Comprehensive are administered construction and constructed as follows:
1. apply draining shaft 20 outside hole;
2. use concrete backfill tunnel top solution cavity 30;
3. apply preliminary bracing structure 11 to construct;
4. apply vertical shaft 21 and draining transverse passage-way 22 in hole;
5. apply waterproof and water drainage system 12, first anti-hydraulic pressure 13 and bottom girder 16;
6. pressing water to examine, the first effect of anti-hydraulic pressure 13 is examined, percolating water such as be present, first handled, reached nothing and ooze After leakage, then carry out next step;
7. apply waterproof layer 14 and secondary anti-hydraulic pressure 15.
When bottom girder 16 is constructed, underground water introduces draining shaft 20 outside hole by draining transverse passage-way 22 and carries out interim pump drainage, makes Level of ground water is reduced to bottom girder below 16.
A kind of tunnel solution cavity of the utility model and the Groundwater Comprehensive described above of simply explaining through diagrams administers the one of construction A little principles, it is not intended to the utility model being confined in shown and described concrete structure and the scope of application, thus it is every all The corresponding modification that may be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (4)

1. a kind of tunnel solution cavity and Groundwater Comprehensive administer construction, it is characterized in that:Set and be communicated to from earth's surface outside tunnel scope Draining shaft (20) outside hole in tunnel at water outlet, vertical shaft (21) in hole is set below tunnel, and draining outside connection hole is set The draining transverse passage-way (22) of vertical shaft (21) in vertical shaft (20), hole, tunnel bottom set the bottom girder (16) across solution cavity, structure in tunnel Full envelope anti-hydraulic pressure is built, the full anti-hydraulic pressure that seals extends certain length before and after solution cavity.
2. a kind of tunnel solution cavity as claimed in claim 1 and Groundwater Comprehensive administer construction, it is characterized in that:It is described seal entirely it is resistant to pressure Lining cutting includes preliminary bracing structure (11), for the first time waterproof and water drainage system (12), the lining resistant to pressure outwards set gradually by country rock (10) (13), waterproof layer (14) and secondary anti-hydraulic pressure (15), first anti-hydraulic pressure (13) bottom is built to be connected as with bottom girder (16) One, waterproof and water drainage system (12) lower end is connected to vertical shaft in hole (21).
3. a kind of tunnel solution cavity as claimed in claim 2 and Groundwater Comprehensive administer construction, it is characterized in that:The waterproof layer (14) Film is sprayed for acrylates.
4. a kind of tunnel solution cavity as claimed in claim 1 and Groundwater Comprehensive administer construction, it is characterized in that:The tunnel is resistant to pressure Lining cutting extends 40-50m before and after solution cavity.
CN201621475144.3U 2016-12-30 2016-12-30 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction Withdrawn - After Issue CN206753653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621475144.3U CN206753653U (en) 2016-12-30 2016-12-30 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621475144.3U CN206753653U (en) 2016-12-30 2016-12-30 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction

Publications (1)

Publication Number Publication Date
CN206753653U true CN206753653U (en) 2017-12-15

Family

ID=60607851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621475144.3U Withdrawn - After Issue CN206753653U (en) 2016-12-30 2016-12-30 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction

Country Status (1)

Country Link
CN (1) CN206753653U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761918A (en) * 2016-12-30 2017-05-31 中铁二院工程集团有限责任公司 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN109763506A (en) * 2018-12-28 2019-05-17 中国水利水电第四工程局有限公司 A kind of diversion tunnel karst method for treating water
CN111610094A (en) * 2020-05-29 2020-09-01 西南交通大学 Model test device and test method for high-speed railway roadbed passing karez

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761918A (en) * 2016-12-30 2017-05-31 中铁二院工程集团有限责任公司 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN106761918B (en) * 2016-12-30 2019-07-05 中铁二院工程集团有限责任公司 A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN109763506A (en) * 2018-12-28 2019-05-17 中国水利水电第四工程局有限公司 A kind of diversion tunnel karst method for treating water
CN111610094A (en) * 2020-05-29 2020-09-01 西南交通大学 Model test device and test method for high-speed railway roadbed passing karez

Similar Documents

Publication Publication Date Title
CN106761918B (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN101424189B (en) Water stopping device and method for process for getting out of starting well and entering receiving well for digging implement and method
CN106640120A (en) Ground-surface fixed-point deep hole layered grouting construction method
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN104895098A (en) Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN206753653U (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN206592136U (en) A kind of plain wall closing water sealing consolidation structure of shield launching
CN103670448B (en) A kind of underground utilities protective device and apply the supporting method of this device
CN113153308A (en) Construction method for double arch tunnel collapse section
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN109680675A (en) A kind of Stabilizing Grout method that can dynamically control grouting amount and harden opportunity
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN113153379B (en) Tunnel waterproof and drainage system and construction process
CN105220700B (en) Foundation pit waterproof curtain reinforcement
CN207143920U (en) Water-stopping system between novel pile under a kind of complicated circumstance of flowing water
CN104453915A (en) Large-section vertical shaft pre-grouting reinforcement quick excavation method
CN108798718B (en) Tunnel front-bearing subsequent grouting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171215

Effective date of abandoning: 20190705