CN107884246A - Solution cavity preparation method in a kind of geomechanical model test - Google Patents

Solution cavity preparation method in a kind of geomechanical model test Download PDF

Info

Publication number
CN107884246A
CN107884246A CN201711376228.0A CN201711376228A CN107884246A CN 107884246 A CN107884246 A CN 107884246A CN 201711376228 A CN201711376228 A CN 201711376228A CN 107884246 A CN107884246 A CN 107884246A
Authority
CN
China
Prior art keywords
solution cavity
mould
model test
geomechanical model
ice body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711376228.0A
Other languages
Chinese (zh)
Inventor
王旌
高成路
石少帅
侯福金
卜林
赵然
王升
陈雨雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Expressway Jilai Intercity Highway Co Ltd
Shandong University
Original Assignee
Shandong Expressway Jilai Intercity Highway Co Ltd
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Expressway Jilai Intercity Highway Co Ltd, Shandong University filed Critical Shandong Expressway Jilai Intercity Highway Co Ltd
Priority to CN201711376228.0A priority Critical patent/CN107884246A/en
Publication of CN107884246A publication Critical patent/CN107884246A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Instructional Devices (AREA)

Abstract

The present invention relates to solution cavity preparation method in a kind of geomechanical model test, this method mainly pre-buried realizes different shapes and sizes in geomechanical model test body, the automatic forming of position solution cavity by the way that ice body is prefabricated.Design is required according to required solution cavity geomery and make solution cavity mould first with mold materials;Clear water is then injected into, and is placed on carrying out freeze forming during freezing is set, after its freeze forming, form removal, which is taken out, can obtain solution cavity ice body model;Prefabricated ice body model surface is uniformly then smeared into vaseline;The ice body model made finally is embedded into test body specified location, the geomechanical model test body of built-in solution cavity is can obtain after its thawing.Solve the problem tested in geomechanical model test and put solution cavity in vivo, by prefabricated pre-buried ice body, the characteristic to be disappeared using its freeze forming, thawing, realize solution cavity built in fast simple making in geomechanical model test.

Description

Solution cavity preparation method in a kind of geomechanical model test
Technical field
The invention belongs to geomechanical model test field, refers specifically to pour using mould in Geo-Mechanical Model Test Process Ice body model is built and test body of nuzzling in advance, so as to realize the method for solution cavity automatic forming built in test body.
Background technology
Geomechanical model test is one of important research method in geotechnical study field, is referred to based on certain phase A kind of physical simulating method for carrying out reduced scale research is constructed to a certain engineering geology like principle.In China, Geotechnical Engineering is built at this stage If in, geomechanical model test can provide more intuitively physical phenomenon simulation, can not only disclose engineering construction to rock The affecting laws of soil body stability, it can more disclose affecting laws of the geological structure to engineering excavation.And recently as examination Test the raising of measurement technology, some research topics in geomechanical model test, enter quantitative point by the qualitative analysis stage The stage of analysis.Wherein, how the complicated geological structure of real simulation, the accuracy of geomechanical model test is proposed higher Requirement.
The content of the invention
The technical problem to be solved in the present invention is in geomechanical model test, and how rapidly and efficiently solution cavity built in test body Shaping.The present invention proposes solution cavity preparation method in a kind of geomechanical model test, and this method is mainly prefabricated pre- by ice body Bury and realize different shapes and sizes in geomechanical model test body, the automatic forming of position solution cavity.
To achieve the above object, technical solution of the present invention is as follows:
Solution cavity preparation method, comprises the following steps in a kind of geomechanical model test:
Step 1 makes ice body mould according to the shape of solution cavity;
Step 2 injects liquid in described ice body mould, and the ice body mould for injecting liquid is placed on into freezing equipment In;
Step 3 hard ice body model to be formed, form removal obtain prefabricated solution cavity model;
Step 4 smears protective layer outside obtained prefabricated solution cavity model;It is then placed within the specified location of test body;It is and fast Speed is in prefabricated solution cavity model overlying test body to fill compacting, and solution cavity caves in after melting to prevent ice body, after waiting ice body all to melt, Water penetrates test body under gravity, that is, obtains the geomechanical model test body of built-in solution cavity cavity.
Further, the ice body mould described in step 1 includes upper die and lower die, and described upper die and lower die pass through connection Part is connected, and sealing ring is provided with its connected position;Liquid injection pipe is provided with upper mould.
Further, the link position of described upper die and lower die is provided with otic placode, and the otic placode is one by bolt connection Rise and form mould cavity.
Protective layer described in the step 3 is damaged, and weaken in operation to smear vaseline with reducing ice body Contact of the ice body with air, so as to weaken the speed of its thawing.
The freezing equipment includes but is not limited to refrigerator, freezer.
Further, being in step 1 will according to solution cavity geomery using Metal mould material or nonmetal mould material Ask, design and make ice body and pour mould, the mould not only has good sealing, while also there is higher shaping to imitate Rate, and it is easy to operate, shell is firm, is not in deformation and failure at low temperature.
Further, described liquid can freeze below zero degrees celsius.
Beneficial effects of the present invention are as follows:
The present invention relates to solution cavity preparation method in a kind of geomechanical model test, this method are mainly prefabricated pre- by ice body Bury and realize different shapes and sizes in geomechanical model test body, the automatic forming of position solution cavity.First, mold materials are utilized Require to design and make solution cavity mould according to required solution cavity geomery;Clear water is then injected into, and is placed on freezing and sets Middle carry out freeze forming, after its freeze forming, form removal, which is taken out, can obtain solution cavity ice body model;Then by prefabricated ice body Model surface uniformly smears vaseline;The ice body model made finally is embedded into test body specified location, after its thawing It can obtain the geomechanical model test body of built-in solution cavity.The present invention have studied solution cavity in a kind of geomechanical model test Preparation method, solve the problem tested in geomechanical model test and put solution cavity in vivo, by prefabricated pre-buried ice body, utilize it Freeze forming, melt the characteristic to disappear, realize solution cavity built in fast simple making in geomechanical model test.Ground with forefathers Study carefully and compare, the invention is easy to operate, green, has preferable application prospect.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not form the improper restriction to the application.
Fig. 1 is solution cavity ice body mould schematic diagram provided by the invention.
Fig. 2 is solution cavity ice body model schematic provided by the invention.
Fig. 3 is the pre-buried shaping schematic diagram of solution cavity ice body model provided by the invention.
In figure:1- liquid injection pipes, 2- cope plates, 3- otic placodes, 4- lower templates, 5- sealing rings, 6- bolts, 7- mould cavities, 8- Solution cavity ice body model, 9- test body, solution cavity cavity built in 10- test body.
Embodiment
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, and recently as the raising of experiment measurement technology, geomechanics model examination Some research topics in testing, enter the stage of quantitative analysis by the qualitative analysis stage.Wherein, how real simulation is complicated Geological structure, higher requirement is proposed to the accuracy of geomechanical model test, in order to solve technical problem as above, because This, the present invention proposes solution cavity preparation method in a kind of geomechanical model test, and it is applied into geomechanical model test In, achieve preferable application effect.
In a kind of typical embodiment of the application, as shown in Figures 1 to 3, solution cavity in a kind of geomechanical model test Preparation method, comprise the following steps:
1) as shown in figure 1, using Metal mould material or nonmetal mould material according to the requirement of solution cavity geomery, design And make ice body and pour mould, the mould is mainly made up of cope plate 2 and lower template 3, and the otic placode 3 of bolster seam crossing leans on spiral shell Bolt 6 is connected, and seam crossing is sealed using rubber seal 5, to prevent leak-stopping water.The mould not only has good sealing, Also there is higher shaping efficiency simultaneously, and it is easy to operate, shell is firm, is not in deformation and failure at low temperature.
Cope plate and lower template are shaped as hemispherical in Fig. 1, and spherical structure is formed when combining;Cope plate and Lower template can also be designed to other shapes according to the actual needs.
2) as shown in figure 1, after the completion of Mold Making and assembling, using liquid injection pipe 1, by clear water, (clear water is optimal choosing Select) injection mould, it is careful not to fill, in order to avoid clear water solidification freezing process volume changes, causes mould stress excessive.With The mould of water filling is positioned in the freezing equipments such as refrigerator, freezer afterwards and carries out freeze forming, is formed after 48 hours more hard Ice body, form removal can obtain prefabricated spherical solution cavity ice body model.
3) as shown in Fig. 2 the prefabricated spherical surface of solution cavity ice body model 8 is uniformly smeared into vaseline, to reduce ice body It is damaged in operation, and weakens contact of the ice body with air, so as to weakens the speed of its thawing.
4) as shown in figure 3, the spherical solution cavity ice body model made is embedded into the specified location of test body 9, and rapidly by ice Body overlying test body fills compacting, and solution cavity caves in after melting to prevent ice body, and after waiting ice body all to melt, water oozes under gravity Test body is appeared, that is, obtains the geomechanical model test body of built-in solution cavity cavity 10.
The preferred embodiment of the application is the foregoing is only, is not limited to the application, for the skill of this area For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.

Claims (7)

1. solution cavity preparation method in a kind of geomechanical model test, it is characterised in that comprise the following steps:
Step 1 makes ice body mould according to the shape of solution cavity;
Step 2 injects liquid in described ice body mould, and the ice body mould for injecting liquid is placed in freezing equipment;
Step 3 hard ice body model to be formed, form removal obtain prefabricated solution cavity model;
Step 4 smears protective layer outside obtained prefabricated solution cavity model;It is then placed within the specified location of test body;And exist rapidly Prefabricated solution cavity model overlying test body is to fill compacting, and solution cavity caves in after melting to prevent ice body, and after waiting ice body all to melt, water exists Test body is penetrated under Action of Gravity Field, that is, obtains the geomechanical model test body of built-in solution cavity cavity.
2. solution cavity preparation method in geomechanical model test as claimed in claim 1, it is characterised in that be profit in step 1 With Metal mould material or nonmetal mould material according to the requirement of solution cavity geomery, design and make ice body and pour mould;Should Mold shell is firm, is not in deformation and failure at low temperature.
3. solution cavity preparation method in geomechanical model test as claimed in claim 2, it is characterised in that described in step 1 Ice body mould include upper die and lower die, described upper die and lower die are connected by connector, its connected position be provided with it is close Seal;Liquid injection pipe is provided with upper mould.
4. solution cavity preparation method in geomechanical model test as claimed in claim 3, it is characterised in that described upper mould and The link position of lower mould is provided with otic placode, and the otic placode is to form mould cavity together by bolt connection.
5. solution cavity preparation method in geomechanical model test as claimed in claim 1, it is characterised in that in the step 3 Described protective layer is smearing vaseline.
6. solution cavity preparation method in geomechanical model test as claimed in claim 1, it is characterised in that the freezing equipment Including but not limited to refrigerator, freezer.
7. solution cavity preparation method in geomechanical model test as claimed in claim 1, it is characterised in that described liquid exists It can be frozen below zero degrees celsius.
CN201711376228.0A 2017-12-19 2017-12-19 Solution cavity preparation method in a kind of geomechanical model test Pending CN107884246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711376228.0A CN107884246A (en) 2017-12-19 2017-12-19 Solution cavity preparation method in a kind of geomechanical model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711376228.0A CN107884246A (en) 2017-12-19 2017-12-19 Solution cavity preparation method in a kind of geomechanical model test

Publications (1)

Publication Number Publication Date
CN107884246A true CN107884246A (en) 2018-04-06

Family

ID=61771865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711376228.0A Pending CN107884246A (en) 2017-12-19 2017-12-19 Solution cavity preparation method in a kind of geomechanical model test

Country Status (1)

Country Link
CN (1) CN107884246A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357921A (en) * 2018-10-10 2019-02-19 成都理工大学 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable
CN110470522A (en) * 2019-09-19 2019-11-19 东北大学 A kind of method of prefabricated different water cut saturation degree rock mass of fracture network sample
CN111089766A (en) * 2019-12-11 2020-05-01 重庆大学 Random closed cavity manufacturing equipment and method based on soluble cavity salt block
CN111220444A (en) * 2020-01-17 2020-06-02 中国地质大学(武汉) Method for preparing concealed water-containing body
CN111739397A (en) * 2020-07-31 2020-10-02 湖北工业大学 Preparation method of multi-solution-cavity geological model
CN113376354A (en) * 2020-02-25 2021-09-10 中国石油化工股份有限公司 Method for simulating karst caves in different filling states and physical simulation test system
CN114544335A (en) * 2020-11-24 2022-05-27 中国石油化工股份有限公司 Method for evaluating circular seam hole-finding reconstruction experiment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455856A (en) * 2000-09-01 2003-11-12 素村胜三 Method and apparatus for producing stereoscopic ice of transparent sphere or the like
CN102866043A (en) * 2012-09-07 2013-01-09 中国石油天然气集团公司 Manufacturing method for fracture-cave rock core physical model
CN102886848A (en) * 2012-09-27 2013-01-23 常州华阳光伏检测技术有限公司 Improved ice hockey manufacturing mould and manufacturing method thereof
CN104677704A (en) * 2015-01-22 2015-06-03 山东大学 Large-diameter test block molding mould capable of prefabricating, and operating method of large-diameter test block molding mould
CN107084868A (en) * 2017-05-16 2017-08-22 山东大学 A kind of solution cavity preparation method and device based on 3D printing technique

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455856A (en) * 2000-09-01 2003-11-12 素村胜三 Method and apparatus for producing stereoscopic ice of transparent sphere or the like
CN102866043A (en) * 2012-09-07 2013-01-09 中国石油天然气集团公司 Manufacturing method for fracture-cave rock core physical model
CN102886848A (en) * 2012-09-27 2013-01-23 常州华阳光伏检测技术有限公司 Improved ice hockey manufacturing mould and manufacturing method thereof
CN104677704A (en) * 2015-01-22 2015-06-03 山东大学 Large-diameter test block molding mould capable of prefabricating, and operating method of large-diameter test block molding mould
CN107084868A (en) * 2017-05-16 2017-08-22 山东大学 A kind of solution cavity preparation method and device based on 3D printing technique

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐杰舜: "《汉族民间风俗》", 30 September 1998, 中央民族大学出版社 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357921A (en) * 2018-10-10 2019-02-19 成都理工大学 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable
CN110470522A (en) * 2019-09-19 2019-11-19 东北大学 A kind of method of prefabricated different water cut saturation degree rock mass of fracture network sample
CN110470522B (en) * 2019-09-19 2020-10-30 东北大学 Method for prefabricating fracture network rock mass samples with different water saturation degrees
CN111089766A (en) * 2019-12-11 2020-05-01 重庆大学 Random closed cavity manufacturing equipment and method based on soluble cavity salt block
CN111089766B (en) * 2019-12-11 2023-03-10 重庆大学 Random closed cavity manufacturing equipment and method based on soluble cavity salt block
CN111220444A (en) * 2020-01-17 2020-06-02 中国地质大学(武汉) Method for preparing concealed water-containing body
CN113376354A (en) * 2020-02-25 2021-09-10 中国石油化工股份有限公司 Method for simulating karst caves in different filling states and physical simulation test system
CN111739397A (en) * 2020-07-31 2020-10-02 湖北工业大学 Preparation method of multi-solution-cavity geological model
CN114544335A (en) * 2020-11-24 2022-05-27 中国石油化工股份有限公司 Method for evaluating circular seam hole-finding reconstruction experiment

Similar Documents

Publication Publication Date Title
CN107884246A (en) Solution cavity preparation method in a kind of geomechanical model test
CN107831295B (en) For simulating the test method for adopting fault activation catastrophe
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN105136641B (en) A kind of mould unit simulating osmotic grouting diffusion test under river channels
CN104963673B (en) Visual experimental device for simulating temporary hydraulic fracture plugging of fiber diverter
CN104314538B (en) Large scale acidizing wormhole analogue means
CN105021418B (en) Suitable for the shield tunneling surface model and analogy method of geotechnical centrifugal model test
CN109030137A (en) A kind of experimental provision and method of simulation frozen soil stratum cement sheath consolidation
CN105181730B (en) A kind of tunnel in cold area frost-heave force laboratory test model and its method of testing
CN110082218A (en) A kind of tunnel lining structural model test device and test method
CN106706697A (en) Model test device for simulating pre-cooling freezing method construction under flowing effect of underground water
CN105181927B (en) The hypotonic coal seam hydraulic fracture simulation experiment method of multi- scenarios method
CN104792966B (en) A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum
CN205317774U (en) Testing system of stratum loss extension in simulation shield tunnel vertical section
CN105842424B (en) Three-dimensional stress seepage flow coupling grouting pilot system and method
CN107884288A (en) Rock compressed shearing sample making containing Among Intermittent Joints and test method under high temperature
CN106703777A (en) Experimental facility for integrity of fractured horizontal shaft
CN115308022A (en) Subway connection channel freezes analogue test system
CN113532903B (en) Freezing and thawing cycle environment cold region tunnel simulation test platform
CN106324222A (en) Model testing device for simulating underground tunnel construction and use method of model testing device
CN206223758U (en) A kind of experimental provision for simulating rock grouting filling
CN110782362A (en) Large-scale three-dimensional simulation method for exploiting super-heavy oil reservoir by SAGD technology
CN112414853B (en) Water pressure testing method for water-containing fracture under blasting impact
CN201915970U (en) Draining type segment lining model test box
CN113376354A (en) Method for simulating karst caves in different filling states and physical simulation test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180406