CN104792966B - A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum - Google Patents

A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum Download PDF

Info

Publication number
CN104792966B
CN104792966B CN201510163614.6A CN201510163614A CN104792966B CN 104792966 B CN104792966 B CN 104792966B CN 201510163614 A CN201510163614 A CN 201510163614A CN 104792966 B CN104792966 B CN 104792966B
Authority
CN
China
Prior art keywords
cavity
model
liquid capsule
conduit
urethane liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510163614.6A
Other languages
Chinese (zh)
Other versions
CN104792966A (en
Inventor
方勇
郭建宁
杨志浩
张雪金
刘书斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201510163614.6A priority Critical patent/CN104792966B/en
Publication of CN104792966A publication Critical patent/CN104792966A/en
Application granted granted Critical
Publication of CN104792966B publication Critical patent/CN104792966B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention discloses a kind of testing apparatus and the method for simulating subway shield tunnel construction initiation cavity, stratum, comprises cavity model, trial model case (8), heating control apparatus (7), the test soil body (9), LVDT displacement gauge (10), steel tunnel model (11) in band hole, opening-closing valve (13), graduated cylinder (14); Described cavity model is for simulating the cavity, stratum of irregular shape, cavity model comprises urethane liquid capsule (3), resistance wire (4), the first conduit (5) and the 2nd conduit (6), resistance wire (4) is connected to heating control apparatus (7) through the 2nd conduit (6) on urethane liquid capsule (3), by heating control apparatus (7), resistance wire is carried out computer heating control. The present invention simulates subway shield tunnel construction and causes the testing apparatus in cavity, stratum and method can solve cavity, stratum in existing model trial preferably and is difficult to simulation and the cavity uncontrollable problem of shape.

Description

A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum
Technical field
The invention belongs to underground works experimental technique field, it is possible to the cavity, stratum of the simulation different shapes that causes of subway shield tunnel construction and scale, collapse and the model trial of extension mechanism provides foundation for studying cavity.
Background technology
In metro construction, shielding method owing to its speed of application is fast, the features such as surrounding environment influence is little are obtained and apply more and more widely. Shield method tunnel construction technology was through the development of more than 100 years, although making great progress, but still cause surrounding formation disturbance unavoidably, cause stress relief and the stratum deformation of the periphery soil body, very easily bring a series of problem such as surface subsidence, existing building composition deformation, in the accident that shield tunneling causes, the surface subsidence accident that cavity, stratum that shielded construction brings out causes accounts for the 60% of total number of accident, and the ground that cavity, stratum the is brought out harm that uncertainty that accident occurs due to it, hysteresis quality, emergentness and causing cause after having an accident of subsiding is bigger. Therefore, for shielded construction brought out the differentiation in cavity, stratum and expansion mechanism and cause the ground settlement problem of subsiding carry out further investigation and be very important.
At present about shielded construction brought out the differentiation in cavity, stratum and expansion mechanism and cause the main method of institute's employing subsided of ground settlement have on-the-spot test method, numerical method and indoor model test method. Indoor model test is based on theory of similitude, utilize and carry out test to the similar model of prototype in geometry, material etc., have can manual control and change test conditions, replica test can be carried out, effect is intuitively clear, the features such as the cycle is short, are widely used in tunnels and underground engineering research field.
In existing simulator and method, there is a common shortcoming, it is exactly in the simulation for cavity, stratum, the uncertainty of cavity, stratum in shape and scale cannot be embodied, just cavity, stratum is reduced to a certain specific shape (as circular or oval) usually.But, in actual engineering, cavity, the stratum shape that shielded construction causes is irregular, and cavity scale also exists very big uncertainty, is approximately the research that specified shape carries out, and test-results is often bigger with practical situation deviation.
Summary of the invention
It is an object of the invention to provide the testing apparatus that shielded construction causes cavity, irregular shape stratum in the model trial of cavity, stratum. This testing apparatus can solve cavity, stratum in existing model trial preferably and be difficult to simulation and the cavity uncontrollable problem of shape.
In order to achieve the above object, present invention employs following technical scheme:
Simulate the testing apparatus that subway shield tunnel construction causes cavity, stratum, comprise cavity model, trial model case (8), heating control apparatus (7), the test soil body (9), LVDT displacement gauge (10), steel tunnel model (11) in band hole, opening-closing valve (13), graduated cylinder (14), described cavity model is for simulating the cavity, stratum of irregular shape, cavity model comprises urethane liquid capsule (3), resistance wire (4), first conduit (5) and the 2nd conduit (6), first conduit (5) and the 2nd conduit (6) are arranged on urethane liquid capsule (3) and go up and to be communicated to urethane liquid capsule (3) inner, it is inner that resistance wire (4) is arranged on urethane liquid capsule (3), described resistance wire (4) is connected to heating control apparatus (7) through the 2nd conduit (6) on urethane liquid capsule (3), by heating control apparatus (7), resistance wire is carried out computer heating control, the first conduit (5) on urethane liquid capsule (3) comprises the liquid medium of water for conveying in urethane liquid capsule (3), or this liquid medium is transported to the graduated cylinder (14) that urethane liquid capsule (3) is outside, the filling test soil body (9) in trial model case (8), arranges LVDT displacement gauge to measure surface displacement (10) on soil layer surface after being filled to desired height.
Described testing apparatus, the making method of described cavity model is: adopt igelite (1) to make required Internal periphery as required, woven wire (2) small pieces of cloth used for patches is inner at igelite (1), together with urethane liquid capsule (3) outside surface fits tightly with woven wire (2), resistance wire (4) is set in urethane liquid capsule (3) and by the 2nd conduit (6), resistance wire (4) is led to outside; After igelite (1) and woven wire (2) are set as a certain shape, in urethane liquid capsule (3), water is filled by the first conduit (5), then it is put in refrigerated tank (12), after water in urethane liquid capsule (3) is consolidated into ice, remove igelite (1) and woven wire (2) the empty model in cavity, stratum for simulating different shape.
Utilizing described experimental installation to carry out the empty method bringing out ground settlement model trial in stratum, concrete implementation step is:
A1, making cavity model: first resistance wire (4) is put into urethane liquid capsule (3) and is connected with outside by conduit (6), conduit (5) is connected with urethane liquid capsule (3) simultaneously; Urethane liquid capsule (3) outside under shrivelled state is surrounded woven wire (2) and igelite (1), the external model of woven wire (2) with igelite composition is set as required specified shape, by the first conduit (5) to water filling in urethane liquid capsule (3), until the Nang Bi of urethane liquid capsule (3) and woven wire (2) are close to; Device being put into refrigerated tank (12) freezing, in urethane liquid capsule (3), water takes out after being all consolidated into ice, removes woven wire (2) and igelite (1), obtains cavity, irregular shape stratum model;
A2, install cavity model: cavity model is placed in trial model case (8) carry out install fix, 2nd conduit (6) is connected with the external world by the aperture on steel tunnel model (11), and the resistance wire (4) in it connects heating control apparatus (7); First conduit (5) leads to graduated cylinder (14) by steel tunnel model (11) another aperture, and opening-closing valve (13) is set in the first conduit (5) end, experiment keeps the water yield in opening-closing valve (13) closedown and graduated cylinder (14) to be zero before starting; The filling test soil body (9) in mold box compacting, arrange LVDT displacement gauge (10) on soil layer surface;
A3, experimentation: open opening-closing valve (13), the thawing speed of ice cube in urethane liquid capsule (3) is controlled by heating control apparatus (7), after ice cube melts completely, cavity is formed, now record the volume of water in graduated cylinder (14), being scaled cavity volume by calculating, LVDT displacement gauge continues to monitor surface displacement.
Compared with prior art, the invention has the beneficial effects as follows:
1, the present invention utilizes the feature of liquid water shape malleable, the container filling liquid water is set shape in advance, be full of after water by its freezing be solid-state ice, shape invariance can be kept within a certain period of time, this method can effectively solve the problem that cavity, shape irregular stratum is difficult to simulate.
2, in conventional model trial, cavity, stratum generally can only disposable generate, the present invention controls the ice cube thawing time by the resistance wire arranged in liquid capsule, thus reaches the object of cavity, control stratum formation time, can be used for studying the impact of time speed for ground settlement of cavity, stratum formation.
3, water output duct and Resistant heating device are connected with the external world in duct by the present invention by arranging on tunnel model, effectively avoid the disturbance problem that conduit is embedded in the soil body to be caused by the soil body, make model trial closer to engineering practical situation.
Accompanying drawing explanation
Fig. 1 is of the present invention for simulating cavity, irregular shape stratum setting drawing;
Fig. 2 is the described mold box of invention and cavity, stratum analog system device front view;
Wherein, 1, igelite; 2, woven wire; 3, urethane liquid capsule; 4, resistance wire; 5, the first conduit; 6, the 2nd conduit; 7, heating control apparatus; 8, trial model case; 9, the soil body is tested; 10, LVDT displacement gauge; 11, steel tunnel model; 12, refrigerated tank; 13, opening-closing valve; 14, graduated cylinder.
Embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.
As depicted in figs. 1 and 2, simulation subway shield tunnel construction causes the testing apparatus in cavity, stratum, comprises cavity model, trial model case 8, heating control apparatus 7, the test soil body 9, LVDT displacement gauge 10, the steel tunnel model 11 in band hole, opening-closing valve 13, graduated cylinder 14; Described cavity model is for simulating the cavity, stratum of irregular shape, cavity model comprises urethane liquid capsule 3, resistance wire 4, first conduit 5 and the 2nd conduit 6, two conduit 6 of resistance wire 4 on urethane liquid capsule 3 is connected to heating control apparatus 7, by heating control apparatus 7, resistance wire is carried out computer heating control, the first conduit 5 on urethane liquid capsule 3 comprises the liquid medium of water for conveying in urethane liquid capsule 3, or is transported to by this liquid medium in the graduated cylinder 14 of urethane liquid capsule 3 outside.
The making method of cavity model is: adopt igelite 1 to make required Internal periphery as required, woven wire 2 small pieces of cloth used for patches is inner at igelite 1, urethane liquid capsule 3 outside surface arranges resistance wire 4 in urethane liquid capsule 3 and by the 2nd conduit 6, resistance wire 4 is led to outside together with fitting tightly with woven wire 2;After igelite 1 and woven wire 2 are set as a certain shape, in urethane liquid capsule 3, water is filled by the first conduit 5, then it is put in refrigerated tank 12, after for some time, water in urethane liquid capsule 3 is consolidated into ice, remove igelite 1 and woven wire 2 the empty model in cavity, stratum for simulating different shape.
The filling test soil body 9 in trial model case 8, arranges LVDT displacement gauge to measure surface displacement 10 on soil layer surface after being filled to desired height.
Test is needed the volume being measured cavity by graduated cylinder 14, under original state, in urethane liquid capsule 3, the state of water is the ice of solid, becoming liquid water after resistance wire 4 heating and melting enters in graduated cylinder 14, after water freezing, volume increases, can not simply with the volume of the volume of water in graduated cylinder 14 as cavity, the cubing formula in cavity can have analysis below to obtain.
ρWater=1g/cm3ρIce=0.9g/cm3
mWater=mIce
By v = m p
Can obtain
vEmptyThe volume in-------cavity;
vIceThe volume of ice cube in-----liquid capsule 3;
vWaterThe volume of water in------graduated cylinder 14;
Utilizing cavity, described irregular shape stratum simulator to carry out cavity, stratum and bring out ground settlement model trial, concrete implementation step is:
1, cavity model is made: first resistance wire 4 is put into urethane liquid capsule 3 and be connected with outside by conduit 6, be connected with urethane liquid capsule 3 by conduit 5 simultaneously; Urethane liquid capsule 3 outside under shrivelled state is surrounded woven wire 2 and igelite 1, the external model of woven wire 2 with igelite composition is set as required specified shape, by the first conduit 5 to water filling in urethane liquid capsule 3, until the Nang Bi of urethane liquid capsule 3 and woven wire 2 are close to; Device being put into refrigerated tank 12 freezing, in urethane liquid capsule 3, water takes out after being all consolidated into ice, removes woven wire 2 and igelite 1, obtains cavity, irregular shape stratum model.
2, cavity model is installed: cavity model being placed in trial model case 8 and carries out installing fixing, the 2nd conduit 6 is connected with extraneous by the aperture on steel tunnel model 11, and the resistance wire 4 in it connects heating control apparatus 7; First conduit 5 leads to graduated cylinder 14 by another aperture of steel tunnel model 11, and arranges opening-closing valve 13 in the first conduit 5 end, and experiment keeps opening-closing valve 13 to close and in graduated cylinder 14, the water yield is zero before starting; In mold box, the filling test soil body 9 also compacting, arranges LVDT displacement gauge 10 on soil layer surface.
3, experimentation: open opening-closing valve 13, the thawing speed of ice cube in urethane liquid capsule 3 is controlled by heating control apparatus 7, after ice cube melts completely, cavity is formed, now record the volume of water in graduated cylinder 14, being scaled cavity volume by above-mentioned formula, LVDT displacement gauge continues to monitor surface displacement.
Should be understood that, for those of ordinary skills, it is possible to improved according to the above description or convert, and all these improve and convert the protection domain that all should belong to claims of the present invention.

Claims (3)

1. simulate the testing apparatus that subway shield tunnel construction causes cavity, stratum for one kind, it is characterized in that, comprise cavity model, trial model case (8), heating control apparatus (7), the test soil body (9), LVDT displacement gauge (10), steel tunnel model (11) in band hole, opening-closing valve (13), graduated cylinder (14), described cavity model is for simulating the cavity, stratum of irregular shape, cavity model comprises urethane liquid capsule (3), resistance wire (4), first conduit (5) and the 2nd conduit (6), first conduit (5) and the 2nd conduit (6) are arranged on urethane liquid capsule (3) and go up and to be communicated to urethane liquid capsule (3) inner, it is inner that resistance wire (4) is arranged on urethane liquid capsule (3), described resistance wire (4) is connected to heating control apparatus (7) through the 2nd conduit (6) on urethane liquid capsule (3), by heating control apparatus (7), resistance wire is carried out computer heating control, the first conduit (5) on urethane liquid capsule (3) comprises the liquid medium of water for conveying in urethane liquid capsule (3), or this liquid medium is transported to the graduated cylinder (14) that urethane liquid capsule (3) is outside,The filling test soil body (9) in trial model case (8), arranges LVDT displacement gauge (10) to measure surface displacement on soil layer surface after being filled to desired height.
2. testing apparatus according to claim 1, it is characterized in that, the making method of described cavity model is: adopt igelite (1) to make required Internal periphery as required, woven wire (2) small pieces of cloth used for patches is inner at igelite (1), together with urethane liquid capsule (3) outside surface fits tightly with woven wire (2), resistance wire (4) is set in urethane liquid capsule (3) and by the 2nd conduit (6), resistance wire (4) is led to outside; After igelite (1) and woven wire (2) are set as a certain shape, in urethane liquid capsule (3), water is filled by the first conduit (5), then it is put in refrigerated tank (12), after water in urethane liquid capsule (3) is consolidated into ice, remove igelite (1) and woven wire (2) the empty model in cavity, stratum for simulating different shape.
3. utilize testing apparatus described in claim 1 or 2 to carry out the empty method bringing out ground settlement model trial in stratum, it is characterised in that, concrete implementation step is:
A1, making cavity model: first resistance wire (4) is put into urethane liquid capsule (3) and is connected with outside by the 2nd conduit (6), the first conduit (5) is connected with urethane liquid capsule (3) simultaneously; Urethane liquid capsule (3) outside under shrivelled state is surrounded woven wire (2) and igelite (1), the external model of woven wire (2) with igelite composition is set as required specified shape, by the first conduit (5) to water filling in urethane liquid capsule (3), until the Nang Bi of urethane liquid capsule (3) and woven wire (2) are close to; Device being put into refrigerated tank (12) freezing, in urethane liquid capsule (3), water takes out after being all consolidated into ice, removes woven wire (2) and igelite (1), obtains cavity, irregular shape stratum model;
A2, install cavity model: cavity model is placed in trial model case (8) carry out install fix, 2nd conduit (6) is connected with the external world by the aperture on steel tunnel model (11), and the resistance wire (4) in it connects heating control apparatus (7); First conduit (5) leads to graduated cylinder (14) by steel tunnel model (11) another aperture, and opening-closing valve (13) is set in the first conduit (5) end, experiment keeps the water yield in opening-closing valve (13) closedown and graduated cylinder (14) to be zero before starting; The filling test soil body (9) in mold box compacting, arrange LVDT displacement gauge (10) on soil layer surface;
A3, experimentation: open opening-closing valve (13), the thawing speed of ice cube in urethane liquid capsule (3) is controlled by heating control apparatus (7), after ice cube melts completely, cavity is formed, now record the volume of water in graduated cylinder (14), being scaled cavity volume by calculating, LVDT displacement gauge continues to monitor surface displacement.
CN201510163614.6A 2015-04-08 2015-04-08 A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum Expired - Fee Related CN104792966B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510163614.6A CN104792966B (en) 2015-04-08 2015-04-08 A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510163614.6A CN104792966B (en) 2015-04-08 2015-04-08 A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum

Publications (2)

Publication Number Publication Date
CN104792966A CN104792966A (en) 2015-07-22
CN104792966B true CN104792966B (en) 2016-06-15

Family

ID=53557944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510163614.6A Expired - Fee Related CN104792966B (en) 2015-04-08 2015-04-08 A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum

Country Status (1)

Country Link
CN (1) CN104792966B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109696541A (en) * 2019-01-10 2019-04-30 中国海洋大学 Simulate the threedimensional model tunnel test device that sedimentation is excavated containing empty formation tunnel

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223336B (en) * 2015-10-16 2018-06-01 西南交通大学 A kind of experimental rig and method simulated Shield-bored tunnels stratum cavity and trigger Stratum Loss
CN105628893B (en) * 2016-01-04 2017-05-24 同济大学 Model test device for simulating karst covering soil subsidence caused by subway vibration in karst region
CN107387098A (en) * 2017-08-04 2017-11-24 天津大学 A kind of destruction initiating device for simulating shield tunnel local failure accident
CN113376354A (en) * 2020-02-25 2021-09-10 中国石油化工股份有限公司 Method for simulating karst caves in different filling states and physical simulation test system
CN114280283B (en) * 2021-11-12 2023-08-11 山东大学 Visual road void simulation and bearing test platform and method
CN115184579B (en) * 2022-06-20 2023-03-24 北京科技大学 Device and method for testing disaster-causing evolution of cavity collapse hidden danger in whole process

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000214268A (en) * 1999-01-26 2000-08-04 Taisei Corp Elastic wave measuring device
CN101625289B (en) * 2009-08-05 2011-03-16 山东大学 Hidden water body or water filling karst pipe system in similar model test and embedding method thereof
CN101644632B (en) * 2009-08-05 2011-04-13 山东大学 Filler-free type karst cave or karst pipeline system in similar model test and embedding method thereof
CN101625352B (en) * 2009-08-05 2013-08-28 山东大学 Test method of karst water burst when tunneling and monitor device thereof
CN102003175A (en) * 2010-11-12 2011-04-06 中铁第四勘察设计院集团有限公司 Method for forecasting water inflow of railway karst tunnel water filling cavity through dewatering test method
CN103105310A (en) * 2013-01-22 2013-05-15 北京工业大学 Testing device and method of ground deformation caused by simulating metro shield tunnel construction
CN203148702U (en) * 2013-03-15 2013-08-21 西南交通大学 A tunnel model testing apparatus considering a goaf and a cave
CN203881760U (en) * 2014-06-06 2014-10-15 中国科学院武汉岩土力学研究所 Test device for simulating stratum loss caused by pipe-jacking construction
CN204101385U (en) * 2014-09-30 2015-01-14 西南交通大学 A kind of system having pressure solution chamber for simulation in tunnel excavation model test
CN104215517A (en) * 2014-09-30 2014-12-17 西南交通大学 System and method for simulating pressure cavity in tunnel excavating model test

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109696541A (en) * 2019-01-10 2019-04-30 中国海洋大学 Simulate the threedimensional model tunnel test device that sedimentation is excavated containing empty formation tunnel

Also Published As

Publication number Publication date
CN104792966A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104792966B (en) A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum
Tian et al. Similar simulation experiment of expressway tunnel in karst area
CN103954511B (en) A kind of Fracture Networks rock shearing-seepage flow coupling experiment method
Pan et al. Experimental and numerical study of the water inrush mechanisms of underground tunnels due to the proximity of a water-filled karst cavern
CN107831295B (en) For simulating the test method for adopting fault activation catastrophe
CN109297810A (en) A kind of simulation deep formation anchor rod drawing experimental rig and test method
CN108195723B (en) Permeation grouting test system and method for reinforcing loose gravel soil
CN108709534A (en) Shield tunnel construction stress deformation indoor model test device and its installation method
CN104330533A (en) Testing device and method for simulating collapse of tunnel surrounding rock under conditions of rainfall and underground water seepage
CN103105310A (en) Testing device and method of ground deformation caused by simulating metro shield tunnel construction
CN104807960A (en) Visual model testing device and method for simulating water gushing in tunnel
CN102426396B (en) Testing apparatus for simulating deep-displacement-initiated strata deformation coordination mechanism
CN105527404A (en) Test system and method for simulating ground loss extension in shield tunnel vertical section
CN108198504B (en) Centrifugal test device for simulating multi-line shield crossing existing structure and test method thereof
CN205317774U (en) Testing system of stratum loss extension in simulation shield tunnel vertical section
CN205280715U (en) Model of simulation excavation ground body
CN104931414B (en) A kind of swelled ground area slurry balance shield tunnel duct piece force analysis experimental rig
CN103938576B (en) Tailings Dam heap dam model testing and dynamics simulation study device
CN110836961A (en) Model test system and method for foundation pit construction stability research under influence of rainfall
CN103866736B (en) The shake of a kind of ore deposit is on the physical simulation experiment system and method for coal mine underground reservoir impact
CN110514806B (en) Similar simulation test device and method
CN204142710U (en) The test unit of tunnel surrounding landslide under simulated rainfall and seepage action of ground water
CN102393312A (en) Side slope tunnel coupling simulation test system and application method thereof
CN112435572A (en) Test device and method for influence of underpass tunnel on existing tunnel under grouting reinforcement
CN106504630A (en) Pass through the tunnel experiment system of karst strata

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20170408