CN108709534A - Shield tunnel construction stress deformation indoor model test device and its installation method - Google Patents

Shield tunnel construction stress deformation indoor model test device and its installation method Download PDF

Info

Publication number
CN108709534A
CN108709534A CN201810681642.0A CN201810681642A CN108709534A CN 108709534 A CN108709534 A CN 108709534A CN 201810681642 A CN201810681642 A CN 201810681642A CN 108709534 A CN108709534 A CN 108709534A
Authority
CN
China
Prior art keywords
model
tunnel
jurisdiction
section
foil gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810681642.0A
Other languages
Chinese (zh)
Other versions
CN108709534B (en
Inventor
梁荣柱
吴文兵
蒋学鹏
张莉
康成
方宇翔
霍利朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201810681642.0A priority Critical patent/CN108709534B/en
Publication of CN108709534A publication Critical patent/CN108709534A/en
Application granted granted Critical
Publication of CN108709534B publication Critical patent/CN108709534B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid

Abstract

The embodiment of the invention discloses shield tunnel construction stress deformation indoor model test device and its installation methods, tunnel model is located in model slot, displacement meter and foil gauge are set on tunnel model, displacement meter, foil gauge and data collecting instrument connect, and can monitor the vertical and horizontal deformation evolution situation after tunnel model stress in real time comprehensively;Soil layer is located at around the tunnel model, restores true tunnel surrounding soil property;Pressure apparatus is located on soil layer, for simulating the interim Loading of earth's surface;Model test apparatus is pressed to be designed with the geometric similarity ratio of actual tunnel, the unit weight likelihood ratio, ensure that the consistency with prototype tunnel;By studying in the case where simulating earth's surface preloading, tunnel segment structure opening, faulting of slab ends, bolt internal force, section of jurisdiction stress, convergent deformation situation obtain shield tunnel construction Deformation evolution;On this basis, degree of injury of the evaluation section of jurisdiction under surface load, offers reference for Practical Project.

Description

Shield tunnel construction stress deformation indoor model test device and its installation method
Technical field
The present invention relates to tunnel traffic modelling technique field, particularly relate under a kind of earth's surface temporary load(ing) effect Shield tunnel construction stress deformation indoor model test device.
Background technology
Under the interim preloading of earth's surface, the model investigation of duct pieces of shield tunnel vertical and horizontal deformation evolution mechanism is typically It is carried out with native box-shaped formula, model is placed in experiment soil medium.Because of the influence of the factors such as water content in Rock And Soil, model test mistake The acquisition difficulty of the data such as ess-strain is larger in journey;Shield tunnel construction Deformation evolution and section of jurisdiction are unable to get in earth's surface Degree of injury under load.
Invention content
In view of this, the embodiment provides one kind being used to simulate the lower shield tunnel of temporary load(ing) effect indoors The model test apparatus of road structure stress deformation.
In order to solve the above technical problems, technical solution used in the embodiment of the present invention is, shield tunnel construction stress deformation Indoor model test device, including model slot, tunnel model, soil layer, pressure apparatus;The tunnel model is located at the model slot It is interior, displacement meter and foil gauge are set on the tunnel model, and the displacement meter, foil gauge and data collecting instrument connect;The soil Layer is located at around the tunnel model;The pressure apparatus is located at tunnel model soil layer surface.
Preferably, the tunnel model further includes bolt, section of jurisdiction, the displacement meter and foil gauge, and the tunnel passes through pipe Piece and bolt are spliced, the symmetrical circumferential laying foil gauge in periphery medial and lateral of the section of jurisdiction, the cloth up and down of the section of jurisdiction If the displacement meter.
Preferably, the pressure apparatus includes pressure gauge, jack, pressure plate, and the pressure plate is located at the tunnel mould On soil layer above type, the pressure gauge is located on the pressure plate, and the jack is located on the pressure gauge, and top is set Reaction frame is set, the reaction frame is connect with the top of the steelframe.
Preferably, the babinet for the top end opening that the model slot connects into for steel plate, one week setting rib steel of the steel plate, two Steelframe is arranged in side, and the steelframe is connect with the rib steel.
The embodiment of the present invention additionally provides a kind of installation method of model test apparatus, includes the following steps:
(1) section of jurisdiction modelling;A certain proportion of mortar is prepared, pours into a mould to form section of jurisdiction by segment die;
(2) model slot is installed;The steel plate of pre-set dimension is connected into the babinet of upper end opening, rib is set around surface of steel plate Steelframe is arranged in two sides in steel, and the steelframe is connect with the rib steel, and filling sand is in model slot;
(3) tunnel model is installed;Tunnel model is placed in model slot, tunnel model section of jurisdiction inside with 90 ° of circle Heart angle is distributed displacement meter, with the symmetrical setting foil gauge in edge in 45 ° of central angle outside in section of jurisdiction;It is vertical in tunnel model The foil gauge is set on the connection bolt of connector and on the connection bolt of girth joint;The foil gauge, displacement meter with it is outer Portion's data collecting instrument connection;
(4) it is laid with soil layer;It is laid with soil layer above the tunnel model;
(5) pressure apparatus is installed;Pressure plate is set in the middle part of the surface of the tunnel model, is arranged on the pressure plate Jack is arranged on the pressure gauge in pressure gauge, and reaction frame, the reaction frame and the steelframe is arranged in the top of jack Top connection.
Compared with the relevant technologies, the advantageous effect of technical solution used in the embodiment of the present invention is, the embodiment of the present invention Shield tunnel construction stress deformation indoor model test device, including model slot, tunnel model, soil layer, pressure apparatus, foil gauge And displacement meter;The tunnel model is located in the model slot, and displacement meter and foil gauge, institute's rheme are arranged on the tunnel model Meter, foil gauge and data collecting instrument is moved to connect;The soil layer is located above the tunnel model;The pressure apparatus is located at soil layer Surface;Apparatus structure is simple, and model test apparatus is pressed to be designed with the geometric similarity ratio of actual tunnel, the unit weight likelihood ratio, ensure that With the consistency of prototype tunnel;Displacement meter, foil gauge are set in tunnel model, tunnel model stress can be monitored in real time comprehensively Vertical and horizontal deformation evolution situation afterwards;Pressure apparatus contributes to the application to tunnel model power in the top of tunnel model, More can accurate simulation go out the interim Loading of earth's surface.
Description of the drawings
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the section of jurisdiction circumferential direction measuring point situation schematic diagram of the embodiment of the present invention;
Fig. 3 is the connection bolt measuring point schematic diagram of the embodiment of the present invention.
Wherein, model slot 1, tunnel model 2, section of jurisdiction 3, soil layer 4, steelframe 5, reaction frame 6, pressure gauge 7, jack 8, pressurization Plate 9, data collecting instrument 10, rib steel 11, girth joint 12, landing edge 13, displacement meter 14, foil gauge 15, connection bolt 16.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is further described.
Referring to FIG. 1, the embodiment provides shield tunnel construction stress deformation indoor model test device, packet Include model slot 1, tunnel model 2, soil layer 4, pressure apparatus;The tunnel model 2 is located in the model slot 1, the tunnel mould Displacement meter 14 and foil gauge 15 are set in type 2, and the displacement meter 14, foil gauge 15 are connect with data collecting instrument 10, in real time comprehensively The stress data changing value of ground monitoring acquisition tunnel model 2;The soil layer 4 is located at the top of the tunnel model 2;The pressure Device is located on the soil layer 4, and pressure apparatus simulates the interim preloading of earth's surface to tunnel model applied force.The embodiment of the present invention Model test apparatus is 1 with the geometric similarity ratio of actual tunnel prototype, intensity, stress, cohesiveness, the elasticity modulus likelihood ratio: 10, and the unit weight likelihood ratio, Poisson's ratio, strain, the angle of friction likelihood ratio are 1:1.Can preferably simulation under the interim preloading of earth's surface, Vertical and horizontal deformation evolution situation after 2 stress of tunnel model provides reliable data for actual tunnel engineering and supports.
Further, the tunnel model 2 includes bolt, multiple sections of jurisdiction 3, and the section of jurisdiction 3 is spliced to form more by bolt 16 The tunnel model 2 of ring, the periphery medial and lateral of the section of jurisdiction 3 it is symmetrical it is circumferential lay the foil gauge 15, the section of jurisdiction 3 up and down Lay the displacement meter 14.
Further, pass through girth joint 12, longitudinal direction between circumferential adjacent section of jurisdiction 3 and the adjacent section of jurisdiction 3 of longitudinal direction respectively Connector 13 connects, and the girth joint 12, landing edge 13 are connected by connecting bolt 16.
The inside of tunnel model 2 is distributed displacement meter 14 with 90 ° of central angle, with 45 ° of central angle in the interior outside in section of jurisdiction 3 The symmetrical setting foil gauge 15 in edge, wherein displacement meter 4 totally 4, totally 8 pairs of foil gauge 15, in the interface that section of jurisdiction 3 is obtained with this Power;
Further, the pressure apparatus includes pressure gauge 7, jack 8, pressure plate 9, and the pressure plate is located at the tunnel On the soil layer 4 of 2 top of road model, the pressure gauge 7 is located on the pressure plate 9, and the jack 8 is located at the pressure gauge 7 On, reaction frame 6 is arranged in top, and the reaction frame 6 is connect with the top of the steelframe 5.The size of the pressure plate 9 is 80cm ×60cm。
Further, the model slot 1 is the babinet for the top end opening that steel plate connects into, one week setting rib steel of the steel plate 11, steelframe 5 is arranged in two sides, and the steelframe 5 is connect with the rib steel 11.The size of the model slot 1 be 2.4m × 1.5m × 1.8m。
The embodiment of the present invention additionally provides the installation method of shield tunnel construction stress deformation indoor model test device, packet Include following steps:
(1) 3 modelling of section of jurisdiction;A certain proportion of mortar is prepared, section of jurisdiction 3 is formed by 3 die casting of section of jurisdiction;
(2) installation model slot 1;The steel plate of pre-set dimension is connected into the babinet of 2.4m × 1.5m × 1.8m upper end openings, Rib steel 11 is set around surface of steel plate, steelframe 5 is set in two sides, the steelframe 5 is connect with the rib steel 11, and filling sand exists In model slot 1;The filling thickness of sand is 50cm, by the real density for sieving rain method calibration control sand;
(3) tunnel model 2 is installed;The section of jurisdiction 3 is spliced to form polycyclic tunnel model 2 by bolt;
Specifically, displacement meter 14 is distributed with 90 ° of central angle in the inside of the section of jurisdiction of tunnel model 23, with 45 ° of the center of circle The symmetrical setting foil gauge 15 in edge in angle outside in section of jurisdiction 3, wherein displacement meter 4 totally 4, totally 8 pairs of foil gauge 15, with this Obtain the interface internal force of section of jurisdiction 3;The foil gauge 15, displacement meter 14 are connect with external data Acquisition Instrument 10;Monitoring acquisition in real time Vertical and horizontal deformation evolution situation after 2 stress of tunnel model;
(4) it is laid with soil layer 4;Soil layer 4 is laid with above the tunnel model 2;The thickness of soil layer 4 is the fine sand of 50cm, is led to The real density of rain method of being sieved calibration control sand;
(5) pressure apparatus is installed;Pressure plate 9, the size of pressure plate 9 are set in the middle part of the surface of the tunnel model 2 For 80cm × 60cm, pressure gauge 7 is set on the pressure plate 9, jack 8 is set on the pressure gauge 7, in jack 8 Reaction frame 6 is arranged in top, and the reaction frame 6 is connect with the top of the steelframe 5.The setting of reaction frame 6 contributes to the application of power, More can accurate simulation go out under the interim preloading of earth's surface, 3 vertical and horizontal deformation evolution situation of duct pieces of shield tunnel.
Indoor model test device through the embodiment of the present invention is studied under earth's surface preloading, and 3 structure of section of jurisdiction opens, is wrong Platform, bolt internal force, 3 stress of section of jurisdiction, convergent deformation, obtain shield tunnel construction Deformation evolution.On this basis, evaluation pipe Degree of injury of the piece 3 under surface load, offers reference for Practical Project.
Herein, the nouns of locality such as involved front, rear, top, and bottom are to be located in figure with parts in attached drawing and zero Part mutual position defines, only for the purpose of expressing the technical solution clearly and conveniently.It should be appreciated that the noun of locality Use should not limit the claimed range of the application.
In the absence of conflict, the feature in embodiment and embodiment herein-above set forth can be combined with each other.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (8)

1. shield tunnel construction stress deformation indoor model test device, characterized in that including model slot, tunnel model, soil layer, Pressure apparatus, displacement meter and foil gauge;The tunnel model is located in the model slot, and displacement meter is arranged on the tunnel model With foil gauge, the displacement meter, foil gauge and data collecting instrument connect;The soil layer is located at around the tunnel model;It is described Pressure apparatus is located on the soil layer.
2. shield tunnel construction stress deformation indoor model test device according to claim 1, characterized in that the tunnel Road model includes multiple sections of jurisdiction, and the section of jurisdiction is bolted, and assembly forms polycyclic tunnel model;The periphery of the section of jurisdiction The symmetrical circumferential laying foil gauge in medial and lateral, the surrounding of the section of jurisdiction lay the displacement meter.
3. shield tunnel construction stress deformation indoor model test device according to claim 2, characterized in that the tunnel Road model is made of polycyclic section of jurisdiction, and section of jurisdiction quantity is determined according to realistic simulation length of tunnel.The inside of section of jurisdiction is with 90 ° of central angle It is distributed displacement meter, with the symmetrical setting foil gauge in edge in 45 ° of central angle outside in section of jurisdiction, wherein per endless tube piece arrangement Displacement meter totally 4, totally 8 pairs of foil gauge;On the connection bolt of tunnel model landing edge and on the connection bolt of girth joint The foil gauge is set.
4. shield tunnel construction stress deformation indoor model test device according to claim 1, characterized in that the mould Type groove is the babinet for the top end opening that steel plate connects into, and one week setting rib steel of the steel plate, steelframe, the steelframe is arranged in two sides It is connect with the rib steel.
5. shield tunnel construction stress deformation indoor model test device according to claim 1 or 4, characterized in that institute The size for stating model slot is 2.4m × 1.5m × 1.8m.
6. shield tunnel construction stress deformation indoor model test device according to claim 4, characterized in that the pressure Power apparatus includes pressure gauge, jack, pressure plate, and the pressure plate is located on the soil layer above the tunnel model, the pressure Power meter is located on the pressure plate, and the jack is located on the pressure gauge, top be arranged reaction frame, the reaction frame with The top of the steelframe connects.
7. shield tunnel construction stress deformation indoor model test device installation method, includes the following steps:
(1) section of jurisdiction modelling;A certain proportion of mortar is prepared, steel reinforcement cage is made using iron wire, shape is poured into a mould by segment die At section of jurisdiction;
(2) model slot is installed;The steel plate of pre-set dimension is connected into the babinet of upper end opening, rib steel is set around surface of steel plate, Steelframe is set in two sides, the steelframe is connect with the rib steel, and filling sand is in model slot;
(3) tunnel model is installed;Tunnel model is formed using pipe sheet assembling, the tunnel model is placed in the model slot;
(4) it is laid with soil layer;It is laid with sand around the tunnel model;
(5) pressure apparatus is installed;Pressure plate is set in the middle part of the surface of the tunnel model, pressure is set on the pressure plate Meter, is arranged jack on the pressure gauge, and reaction frame, the top of the reaction frame and the steelframe is arranged in the top of jack End connection.
8. shield tunnel construction stress deformation indoor model test device installation method according to claim 7, feature It is that in the step (3), tunnel model is multiring structure, displacement is distributed with 90 ° of central angle in the inside of tunnel model section of jurisdiction Meter, with the symmetrical setting foil gauge in edge in 45 ° of central angle outside in section of jurisdiction;In the connection of tunnel model landing edge The foil gauge is set on bolt and on the connection bolt of girth joint;The foil gauge, displacement meter and external data Acquisition Instrument Connection.
CN201810681642.0A 2018-06-27 2018-06-27 Shield tunnel structure stress deformation indoor model test device and installation method thereof Active CN108709534B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810681642.0A CN108709534B (en) 2018-06-27 2018-06-27 Shield tunnel structure stress deformation indoor model test device and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810681642.0A CN108709534B (en) 2018-06-27 2018-06-27 Shield tunnel structure stress deformation indoor model test device and installation method thereof

Publications (2)

Publication Number Publication Date
CN108709534A true CN108709534A (en) 2018-10-26
CN108709534B CN108709534B (en) 2023-08-04

Family

ID=63872038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810681642.0A Active CN108709534B (en) 2018-06-27 2018-06-27 Shield tunnel structure stress deformation indoor model test device and installation method thereof

Country Status (1)

Country Link
CN (1) CN108709534B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357939A (en) * 2018-12-12 2019-02-19 中铁十八局集团有限公司 Shield sky pushes away field testing procedure
CN109374865A (en) * 2018-12-07 2019-02-22 华侨大学 A kind of shield tunnel scaled model considering curved bolt clipping forcee and production method
CN109520851A (en) * 2018-12-12 2019-03-26 中铁十八局集团有限公司 Section of jurisdiction faulting of slab ends testing method
CN109556903A (en) * 2019-01-25 2019-04-02 济南大学 Shield tunnel vertical structure character model test apparatus and its application method
CN109556964A (en) * 2018-11-06 2019-04-02 宁波大学 A kind of monitor control system of the tunnel model test platform based on threedimensional model
CN109826633A (en) * 2019-03-06 2019-05-31 青岛理工大学 Existing shield tunnel simulator and analogy method are worn under a kind of shield machine
CN110284530A (en) * 2019-05-17 2019-09-27 同济大学 In conjunction with the Multifunctional assembled model test case apparatus and application in foundation pit and tunnel
CN110348117A (en) * 2019-07-10 2019-10-18 宁波六希格码建筑科技有限公司 A kind of negative ring structure of steel pipe sheet and its optimization design
CN110529127A (en) * 2019-09-10 2019-12-03 西南石油大学 A kind of the shield driving experimental rig and method of simulated formation protuberance
CN112050724A (en) * 2020-08-05 2020-12-08 南通职业大学 Deformation detection device and deformation detection method for building structure
CN112903459A (en) * 2021-02-02 2021-06-04 中国电建集团华东勘测设计研究院有限公司 Visual test device and method for simulating influence of earth surface overload on existing shield tunnel structure
CN113504122A (en) * 2021-06-30 2021-10-15 中铁十四局集团大盾构工程有限公司 Tunnel segment upper soil body load deformation experimental device and method
CN114199187A (en) * 2021-11-29 2022-03-18 宁波市轨道交通集团有限公司 Shield tunnel model test device and method
CN114198107A (en) * 2021-12-13 2022-03-18 西安交通大学 Multifunctional reduced-scale shield model free of shield machine model and test method thereof
CN114260847A (en) * 2021-12-16 2022-04-01 中铁隧道局集团有限公司 Assembling system and assembling method of horizontal vacuum tunnel detection model
CN114441313A (en) * 2022-01-23 2022-05-06 中国地质大学(武汉) Mine method tunnel excavation underpinning bridge pile foundation experiment model and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2097729C1 (en) * 1992-12-30 1997-11-27 Виктор Александрович Болотин Method designed to determine aerodynamic characteristics of model and aerodynamic installation intended for its realization
JP2005258569A (en) * 2004-03-09 2005-09-22 Tokyo Electric Power Co Inc:The Strength evaluation method for rc made underground hollow structure
CN101435746A (en) * 2008-12-15 2009-05-20 西南交通大学 Comprehensive test system of shield tunnel construction model
WO2012077941A2 (en) * 2010-12-07 2012-06-14 한국건설기술연구원 Drain system of shield tunnel lining and method for constructing shield tunnel using same
CN204128887U (en) * 2014-09-25 2015-01-28 浙江科技学院 A kind of tunnel excavation dimensional model experiment charger
CN105863734A (en) * 2016-05-20 2016-08-17 天津大学 Device for simulating and monitoring existing tunnel during excavation of double-track tunnel
CN107328898A (en) * 2017-07-18 2017-11-07 招商局重庆交通科研设计院有限公司 Pass through tomography tunnel excavation analogue experiment installation
JP2018035553A (en) * 2016-08-31 2018-03-08 大成建設株式会社 Design method of contractible timbering
CN207194905U (en) * 2017-04-21 2018-04-06 天津大学 A kind of tunnel model for shield model test

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2097729C1 (en) * 1992-12-30 1997-11-27 Виктор Александрович Болотин Method designed to determine aerodynamic characteristics of model and aerodynamic installation intended for its realization
JP2005258569A (en) * 2004-03-09 2005-09-22 Tokyo Electric Power Co Inc:The Strength evaluation method for rc made underground hollow structure
CN101435746A (en) * 2008-12-15 2009-05-20 西南交通大学 Comprehensive test system of shield tunnel construction model
WO2012077941A2 (en) * 2010-12-07 2012-06-14 한국건설기술연구원 Drain system of shield tunnel lining and method for constructing shield tunnel using same
CN204128887U (en) * 2014-09-25 2015-01-28 浙江科技学院 A kind of tunnel excavation dimensional model experiment charger
CN105863734A (en) * 2016-05-20 2016-08-17 天津大学 Device for simulating and monitoring existing tunnel during excavation of double-track tunnel
JP2018035553A (en) * 2016-08-31 2018-03-08 大成建設株式会社 Design method of contractible timbering
CN207194905U (en) * 2017-04-21 2018-04-06 天津大学 A kind of tunnel model for shield model test
CN107328898A (en) * 2017-07-18 2017-11-07 招商局重庆交通科研设计院有限公司 Pass through tomography tunnel excavation analogue experiment installation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡志平;彭建兵;黄强兵;王启耀;: "地铁盾构隧道30°斜穿地裂缝的物理模拟试验", 长安大学学报(自然科学版), no. 04 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109556964A (en) * 2018-11-06 2019-04-02 宁波大学 A kind of monitor control system of the tunnel model test platform based on threedimensional model
CN109556964B (en) * 2018-11-06 2021-12-14 宁波大学 Monitoring control system of tunnel model test platform based on three-dimensional model
CN109374865A (en) * 2018-12-07 2019-02-22 华侨大学 A kind of shield tunnel scaled model considering curved bolt clipping forcee and production method
CN109357939A (en) * 2018-12-12 2019-02-19 中铁十八局集团有限公司 Shield sky pushes away field testing procedure
CN109520851A (en) * 2018-12-12 2019-03-26 中铁十八局集团有限公司 Section of jurisdiction faulting of slab ends testing method
CN109357939B (en) * 2018-12-12 2023-11-21 中铁十八局集团有限公司 Shield air-pushing field test method
CN109520851B (en) * 2018-12-12 2024-03-26 中铁十八局集团有限公司 Segment staggering test method
CN109556903A (en) * 2019-01-25 2019-04-02 济南大学 Shield tunnel vertical structure character model test apparatus and its application method
CN109826633A (en) * 2019-03-06 2019-05-31 青岛理工大学 Existing shield tunnel simulator and analogy method are worn under a kind of shield machine
CN110284530A (en) * 2019-05-17 2019-09-27 同济大学 In conjunction with the Multifunctional assembled model test case apparatus and application in foundation pit and tunnel
CN110348117A (en) * 2019-07-10 2019-10-18 宁波六希格码建筑科技有限公司 A kind of negative ring structure of steel pipe sheet and its optimization design
CN110348117B (en) * 2019-07-10 2023-10-31 宁波六希格码建筑科技有限公司 Steel pipe sheet negative ring structure and optimal design method thereof
CN110529127A (en) * 2019-09-10 2019-12-03 西南石油大学 A kind of the shield driving experimental rig and method of simulated formation protuberance
CN112050724A (en) * 2020-08-05 2020-12-08 南通职业大学 Deformation detection device and deformation detection method for building structure
CN112903459A (en) * 2021-02-02 2021-06-04 中国电建集团华东勘测设计研究院有限公司 Visual test device and method for simulating influence of earth surface overload on existing shield tunnel structure
CN113504122A (en) * 2021-06-30 2021-10-15 中铁十四局集团大盾构工程有限公司 Tunnel segment upper soil body load deformation experimental device and method
CN114199187A (en) * 2021-11-29 2022-03-18 宁波市轨道交通集团有限公司 Shield tunnel model test device and method
CN114199187B (en) * 2021-11-29 2024-01-16 宁波市轨道交通集团有限公司 Shield tunnel model test device and method
CN114198107A (en) * 2021-12-13 2022-03-18 西安交通大学 Multifunctional reduced-scale shield model free of shield machine model and test method thereof
CN114260847A (en) * 2021-12-16 2022-04-01 中铁隧道局集团有限公司 Assembling system and assembling method of horizontal vacuum tunnel detection model
CN114441313A (en) * 2022-01-23 2022-05-06 中国地质大学(武汉) Mine method tunnel excavation underpinning bridge pile foundation experiment model and method

Also Published As

Publication number Publication date
CN108709534B (en) 2023-08-04

Similar Documents

Publication Publication Date Title
CN108709534A (en) Shield tunnel construction stress deformation indoor model test device and its installation method
CN107179396A (en) Multifunctional built-up formula Geotechnical Engineering physics similar test system
CN110954676A (en) Visual test device for simulating shield tunneling existing tunnel construction
CN208398855U (en) Shield tunnel construction stress deformation indoor model test device
CN108198504B (en) Centrifugal test device for simulating multi-line shield crossing existing structure and test method thereof
CN112595533B (en) Shield tunnel stratum action simulation test device and test method thereof
CN104569347B (en) The simulation of Rock And Soil catastrophe and pick-up unit
CN104792966B (en) A kind of testing apparatus and method simulating subway shield tunnel construction initiation cavity, stratum
CN106501014A (en) Vertical load testing machine for domain tunnel structure
CN112435572A (en) Test device and method for influence of underpass tunnel on existing tunnel under grouting reinforcement
CN112964563A (en) Simulation box for simulating long-term tunnel settlement under subway operation load and test method
CN211505504U (en) Test device for simulating tunnel crossing water-rich fault gushing water
CN109026106A (en) The working condition simulation method and Work condition analogue testing stand of Bolt System
CN102426396A (en) Testing apparatus for simulating deep-displacement-initiated strata deformation coordination mechanism
CN109682416A (en) Measure the experimental provision and method of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
CN209280028U (en) Measure the experimental provision of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
CN110967252A (en) Device for simulating influence of shield tunnel construction on existing tunnel and using method thereof
CN106546483A (en) Two-dimentional mechanical models for soil and rock assay device and method
CN108086995A (en) A kind of shield(TBM)Tunnel pipe sheet built seam tests loading method
CN106504630A (en) Pass through the tunnel experiment system of karst strata
CN206095660U (en) Indoor testing system of quiet dynamic response characteristic of multi -functional reduced scale tunnel structure
CN213986020U (en) Load performance test system for assembled reinforced retaining wall
CN107942038A (en) Slope retaining model assay systems and test method
CN104849081B (en) Reproduce emergency management and rescue passage analog simulation testing stand in a kind of colliery
CN108051304A (en) A kind of experimental provision and experimental method at multifunction three-dimensional visual structure interface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant