CN107328898A - Pass through tomography tunnel excavation analogue experiment installation - Google Patents

Pass through tomography tunnel excavation analogue experiment installation Download PDF

Info

Publication number
CN107328898A
CN107328898A CN201710584542.1A CN201710584542A CN107328898A CN 107328898 A CN107328898 A CN 107328898A CN 201710584542 A CN201710584542 A CN 201710584542A CN 107328898 A CN107328898 A CN 107328898A
Authority
CN
China
Prior art keywords
tunnel
tomography
pass
tunnel excavation
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710584542.1A
Other languages
Chinese (zh)
Other versions
CN107328898B (en
Inventor
李科
江星宏
丁浩
吴梦军
郭鸿雁
方林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201710584542.1A priority Critical patent/CN107328898B/en
Publication of CN107328898A publication Critical patent/CN107328898A/en
Application granted granted Critical
Publication of CN107328898B publication Critical patent/CN107328898B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

One kind that the present invention is provided passes through tomography tunnel excavation analogue experiment installation, and pressure from surrounding rock uneven caused by country rock bulk density difference XOR elevation difference is simulated using the short steel plate being hinged two-by-two.It is hinged short steel plate energy Transfer of Shear but does not transmit moment of flexure so that will not produces failure by shear because of abrupt pressure change again while simulating uneven pressure from surrounding rock and be possibly realized;Thickness and the inclination angle of tomography can be flexibly controlled by gauze, draws and more meets actual FAULT MODEL, is especially become apparent in soft tomography;The shape of a hoof soft rubber cushion at tunnel-liner model two ends can prevent country rock material from entering tunnel, can prevent again because tunnel structure and the concentrated stress that the safety glass of front and rear sides directly contacts generation under pressure cause the phenomenon that tunnel-liner model is destroyed or safety glass ruptures.This programme can accomplish the quantitative effect by with controlling unitary variant study of fault tunnel of verifying.

Description

Pass through tomography tunnel excavation analogue experiment installation
Technical field
The present invention relates to tunnel test technical field, and in particular to passes through tomography tunnel excavation analogue experiment installation.
Background technology
There are the engineering problems such as landslide, large deformation, the prominent mud of gushing water when passing through tomography, easily in tunnel, and this will be significantly greatly increased Engineering difficulty and expense, or even cause security incident.Carry out model test and construction mechanics, surrounding rock failure are carried out to fault belt Rule and adjoining rock stability Journal of Sex Research can effectively prevent or dispose such disaster.
In the prior art, Southwest Jiaotong University is in the simulation tunnel of the Application No. 201610004012.0 of application in 2016 The displacement synchronous control device and test method of active fault are passed through, the composition for disclosing its device is the model test box of uncovered It is made up of the left half chests and fixed right half chests of activity, left half chests is connected to reaction frame by load plate and horizontal loading apparatus On, the moving horizontally in pair of base is connected to by the vertical loading device of lower section, right half chests is directly fixed by high-strength bolt In on base, the hypotenuse of right half chests is parallel with the hypotenuse of left half chests, and is connected by prismatic pair.Use is provided with model test box In the model space runing rest of fixed tunnel model.The device can simulate multi-form(Walk sliding, tendency, it is oblique), it is different Locus(Tunnel and the tomography angle of cut, inclination angle relation)Tunnel is destroyed under the active fault stick-slip changing of the relative positions of displacement synchronous control loading The experiment of mechanism, reliable test data is provided for the design and construction in tunnel, to ensure the operation security in tunnel.
But, existing FAULT MODEL is passed through the simulated experiment of tomography tunnel excavation and inclined in edpth of tunnel, tomography thickness, tomography Angle and tomography with it is excessively single in terms of tunnel axis angle, it is impossible to accurately control variable, so study Tunnel Stability with it is each Quantitative relationship between factor, measured result often has the deviation for being difficult to adjust in actual applications, without representativeness, because This is difficult to the actual geological condition of the changeable engineering of flexible adaptation.
The content of the invention
For defect of the prior art, the present invention provides one kind and passes through tomography tunnel excavation analogue experiment installation, can spirit The variables such as control edpth of tunnel living, tomography thickness, co-hade, tomography and tunnel axis angle, adapt to various tomography environment Experimental rig.
One kind that the present invention is provided passes through tomography tunnel excavation analogue experiment installation, including experiment casing 1, fixed steelframe 2, It is U-shaped steel 3, angle steel 4, jack 5, power transmission steel plate 7, country rock simulation material 9, fault simulation material 10, tunnel-liner model 11, poor Dynamic formula digital display displacement meter 13, strain-type soil pressure cell 14, articulated mounting 16;
The fixed lower end of steelframe 2 is four groups through experiment casing 1, fixed steelframe 2, and four groups of fixation steelframes 2 are along axially in parallel point of tunnel Cloth;Lower end is connected by U-shaped steelframe 3 between fixed steelframe 2, and lower end is connected by angle steel 4;Top is fixed on jack 5 Determine the top of steelframe 2, the lower top of jack 5 is arranged on power transmission steel plate 7;Power transmission steel plate 7 is by four blocks of short steel plates by being hinged dress Put 16 to be spliced, often save and jack 5 is provided with short steel plate;Power transmission steel plate 7 and experiment casing 1 enclosed space filling country rock mould Intend material 9 and fault simulation material 10;Tunnel-liner model 1 is along the experiment length direction of casing 1 is through country rock simulation material 9 and breaks Layer simulation material 10;Differential type digital display displacement meter 13 and strain-type soil pressure cell 14 just serve as a contrast outside cloth along tunnel-liner model 11 If.
Further, it is separated by between country rock simulation material 9 and fault simulation material 10 with gauze 8, gauze 8 is consolidated with nailing 15 It is scheduled on experiment casing 1.
Further, the two ends of tunnel-liner model 11 are connected by shape of a hoof soft rubber cushion 12 with experiment casing 1.
Further, it is provided with anti-skidding cushion block 6 between 5 times tops of jack and power transmission steel plate 7.
Further, left and right, lower three faces of experiment casing 1 are the composite construction of inner side plank outside plate.
Further, experiment casing 1 front and rear sides are transparent toughened glass.
Further, country rock simulation material 9 is formulated by river sand, quartz sand, flyash, machine oil.
Further, fault simulation material 10 is formulated by fine sand, flyash and sawdust.
Further, the join of U-shaped steel 3 and angle steel 4 is fixed with trip bolt.
As shown from the above technical solution, beneficial effects of the present invention:
The present invention provides a kind of experimental provision for passing through the simulation of tomography tunnel excavation, is simulated using the short steel plate being hinged two-by-two by enclosing Uneven pressure from surrounding rock caused by rock bulk density difference XOR elevation difference.It is hinged short steel plate energy Transfer of Shear but does not transmit moment of flexure, Failure by shear will not be produced while to simulate uneven pressure from surrounding rock because of abrupt pressure change again;Pass through gauze energy Flexibly the thickness of control tomography and inclination angle, draw and more meet actual FAULT MODEL, especially become apparent in soft tomography;Tunnel The shape of a hoof soft rubber cushion at road lining model two ends can prevent country rock material from entering tunnel, can prevent again because tunnel structure with The concentrated stress that the safety glass of front and rear sides directly contacts generation under pressure causes tunnel-liner model to destroy or steel Change the phenomenon of glass rupture.This programme can accomplish the quantitative effect by with controlling unitary variant study of fault tunnel of verifying.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described.In all of the figs, similar element Or part is general by similar reference mark.In accompanying drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 passes through the schematic diagram of the experimental provision of tomography tunnel excavation simulation for the present invention.
Fig. 2 passes through the side schematic view of the experimental provision of tomography tunnel excavation simulation for the present invention.
Embodiment
The embodiment of technical solution of the present invention is described in detail below in conjunction with accompanying drawing.Following examples are only used for Clearly illustrate technical scheme, therefore be only used as example, and the protection model of the present invention can not be limited with this Enclose.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this hair The ordinary meaning that bright one of ordinary skill in the art are understood.
Refer to Fig. 1 to Fig. 2, a kind of experimental provision for passing through the simulation of tomography tunnel excavation that the present embodiment is provided, including Test casing 1, fixed steelframe 2, U-shaped steel 3, angle steel 4, jack 5, anti-skidding cushion block 6, power transmission steel plate 7, gauze 8, country rock simulation material Material 9, fault simulation material 10, tunnel-liner model 11, shape of a hoof soft rubber cushion 12, differential type digital display displacement meter 13, strain-type soil Pressure cell 14, nailing 15 and articulated mounting 16.Test the composite junction that left and right, lower three faces of casing 1 are inner side plank outside plate Structure.It is transparent toughened glass to test the front and rear sides of casing 1.The fixed lower end of steelframe 2 passes through model casing 1, four groups of edges of fixation steelframe 2 Connected, join is fixed with trip bolt, pushed up on jack 5 with U-shaped steel 3, angle steel 4 between the axially in parallel distribution in tunnel, steelframe The fixed top of steelframe 2, underlying anti-skidding cushion block 6, the anti-skidding underlying power transmission steel plate 7 of cushion block 6, power transmission steel plate is by four blocks of steel plates by being hinged Device 16 is spliced, and often saves and jack 5 is provided with short steel plate, and jack 5 is connected with Loading Control device.Power transmission steel plate 7 With the enclosed space of model casing 1 filling country rock simulation material 9 and fault simulation material 10, country rock simulation material 9 is by river sand, quartz Sand, flyash, machine oil are formulated, and experiment control cohesive strength, internal friction angle, unit weight, bullet are passed through according to specific engineering geology Property modulus and Poisson's ratio determine match ratio.Fault simulation material 10 is formulated by fine sand, flyash and sawdust, according to specific Engineering geology control cohesive strength, internal friction angle to determine match ratio by direct shearing test.Country rock simulation material 9 and fault simulation It is separated by the middle of material 10 with gauze 8, i.e., controls tomography thickness and inclination angle with gauze.Gauze 8 is fixed on model casing 1 with nailing 15 On, tunnel-liner model 11 passes through country rock simulation material 9 and fault simulation material 10, differential type along the length direction of model casing 1 Digital display displacement meter 13 is just laid in lining outside with strain-type soil pressure cell 14 along tunnel-liner model 11, differential type digital display displacement meter 13 It is connected with strain-type soil pressure cell 14 with PC ends.The two ends of tunnel-liner model 11 pass through shape of a hoof soft rubber cushion 12 and experiment casing 1 is connected.
Country rock pressure uneven caused by country rock bulk density difference XOR elevation difference is simulated using the short steel plate being hinged two-by-two Power.It is hinged short steel plate energy Transfer of Shear but does not transmit moment of flexure so that again will not be because of pressure while simulation uneven pressure from surrounding rock Cataclysm and produce failure by shear and be possibly realized;Thickness and the inclination angle of tomography can be flexibly controlled by gauze, draws and more meets reality FAULT MODEL, especially become apparent in soft tomography;The shape of a hoof soft rubber cushion at tunnel-liner model two ends can prevent from enclosing Rock material enters tunnel, can prevent again because tunnel structure is directly contacted under pressure with the safety glass of front and rear sides The concentrated stress of generation causes the phenomenon that tunnel-liner model is destroyed or safety glass ruptures.This programme can be accomplished single by controlling One variable study of fault tunnel of verifying quantitative effect.
When being tested using said apparatus, specific implementation step is:
1st, aggregation model size is drafted.According to 1:20 geometric similarity ratio determines that experiment box sizes are 5.5m(Laterally)× 10m(Longitudinal direction)×3.5m(It is high), tunnel span B=60cm, high H=45cm(Correspondence prototype B=12m, H=9m), lining thickness is 1.2m(Prototype is 24cm).
2nd, the configuration of country rock simulation material and fault simulation material.First pass through direct shear test, Axial compression tests, three axle pressures Contracting experiment and density test obtain cohesive strength, internal friction angle, unit weight, modulus of elasticity and the Poisson's ratio of country rock and the adhesive aggregation of tomography Power, internal friction angle, the material mixture ratio of model clay is adjusted according to test result, until obtaining desired physical parameter value.With analogy Method is:Using river sand as stock, quartz sand is used to adjusting strength and modulus of elasticity, and flyash is used to thin of country rock analog material Grain, cohesiveness and internal friction angle of the machine oil to adjust country rock analog material.
3rd, the installation of experimental rig.Experiment casing and fixed steelframe are first installed, set the inclination angle of two layers of parallel gauze with And to the angle of tunnel axis, good contour line is reserved on gauze, pass through preset value inclination angle with prefabricated tunnel-liner model Gauze, differential type digital display displacement meter and strain-type soil pressure cell are installed on the outside of tunnel-liner model.Respectively in gauze and case Fault simulation material and country rock simulation material are inserted between internal wall and in two layers of gauze.
4th, the setting of pressure from surrounding rock.The pressure parameter of each jack is set according to the specific geology of simulation and landform.
5th, pressed according to the parameter pre-set, observe tunnel-liner model and read differential type digital display displacement meter, The reading of strain-type soil pressure cell, record visual condition and data.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme, it all should cover among the claim of the present invention and the scope of specification.

Claims (9)

1. one kind passes through tomography tunnel excavation analogue experiment installation, it is characterised in that:Including experiment casing(1), fixed steelframe (2), U-shaped steel(3), angle steel(4), jack(5), power transmission steel plate(7), country rock simulation material(9), fault simulation material(10)、 Tunnel-liner model(11), differential type digital display displacement meter(13), strain-type soil pressure cell(14), articulated mounting(16);
The fixed steelframe(2)Lower end passes through experiment casing(1), the fixed steelframe(2)For four groups, four groups of fixation steelframes (2)Along the axially in parallel distribution in tunnel;The fixed steelframe(2)Between lower end pass through U-shaped steelframe(3)Connection, lower end passes through angle steel (4)It is connected;The jack(5)Fixed steelframe is fixed on upper top(2)Top, the jack(5)Lower top be arranged at Power transmission steel plate(7)On;The power transmission steel plate(7)Pass through articulated mounting by four blocks of short steel plates(16)Be spliced, it is described often save it is short Jack is provided with steel plate(5);The power transmission steel plate(7)With experiment casing(1)Enclosed space fills country rock simulation material(9) And fault simulation material(10);The tunnel-liner model(11)Along experiment casing(1)Length direction passes through country rock simulation material (9)With fault simulation material(10);The differential type digital display displacement meter(13)With strain-type soil pressure cell(14)Along tunnel-liner Model(11)Just lining outside is laid.
2. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The country rock mould Intend material(9)With fault simulation material(10)Between with gauze(8)It is separated by, the gauze(8)Use nailing(15)It is fixed on experiment Casing(1)On.
3. according to claim 2 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The tunnel-liner Model(11)Two ends pass through shape of a hoof soft rubber cushion(12)With experiment casing(1)It is connected.
4. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The jack (5)Lower top and power transmission steel plate(7)Between be provided with anti-skidding cushion block(6).
5. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The experiment casing (1)Left and right, lower three faces are the composite construction of inner side plank outside plate.
6. according to claim 5 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The experiment casing (1)Front and rear sides are transparent toughened glass.
7. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The country rock simulation Material(9)It is formulated by river sand, quartz sand, flyash, machine oil.
8. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The fault simulation Material(10)It is formulated by fine sand, flyash and sawdust.
9. according to claim 1 pass through tomography tunnel excavation analogue experiment installation, it is characterised in that:The U-shaped steel(3) And angle steel(4)Join fixed with trip bolt.
CN201710584542.1A 2017-07-18 2017-07-18 Crossing fault tunnel excavation simulation experiment device Active CN107328898B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710584542.1A CN107328898B (en) 2017-07-18 2017-07-18 Crossing fault tunnel excavation simulation experiment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710584542.1A CN107328898B (en) 2017-07-18 2017-07-18 Crossing fault tunnel excavation simulation experiment device

Publications (2)

Publication Number Publication Date
CN107328898A true CN107328898A (en) 2017-11-07
CN107328898B CN107328898B (en) 2023-02-21

Family

ID=60227738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710584542.1A Active CN107328898B (en) 2017-07-18 2017-07-18 Crossing fault tunnel excavation simulation experiment device

Country Status (1)

Country Link
CN (1) CN107328898B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007760A (en) * 2017-12-27 2018-05-08 西南交通大学 Tunnel lining structure longitudinal direction mechanics special type experimental rig
CN108181447A (en) * 2018-02-28 2018-06-19 招商局重庆交通科研设计院有限公司 Multispan diameter sand-pebble layer model test apparatus
CN108333332A (en) * 2018-03-06 2018-07-27 招商局重庆交通科研设计院有限公司 Large scale tunnel model test excavating device
CN108709534A (en) * 2018-06-27 2018-10-26 中国地质大学(武汉) Shield tunnel construction stress deformation indoor model test device and its installation method
CN108982219A (en) * 2018-08-01 2018-12-11 北方工业大学 Tunnel fault dislocation model test device and dislocation model test system
CN110780056A (en) * 2019-11-18 2020-02-11 四川农业大学 Test device for simulating movable fault to research on tunnel damage mechanism and using method
CN110865176A (en) * 2019-11-29 2020-03-06 湖北工程学院 Tunnel water burst and mud burst excavation simulation device and method for simulating water burst and mud burst disaster
CN111141186A (en) * 2020-01-21 2020-05-12 安徽理工大学 Blasting simulation experiment device
CN111175147A (en) * 2020-02-22 2020-05-19 中铁十九局集团轨道交通工程有限公司 Test method for measuring compressive shear performance and porosity change of lining filling material
CN112816332A (en) * 2020-12-28 2021-05-18 长安大学 Test method for simulating tunnel to penetrate through columnar jointed rock mass
CN113092148A (en) * 2021-01-17 2021-07-09 西南交通大学 Tunnel excavation model experiment box capable of simulating faults with different inclination angles and using method
CN113160684A (en) * 2021-02-10 2021-07-23 石家庄铁道大学 Device and method for simulating deformation and damage of tunnel fault fracture zone
CN113189304A (en) * 2021-04-29 2021-07-30 福州大学 Experimental device for simulating crossing of fault tunnel
CN114112655A (en) * 2021-10-13 2022-03-01 湖南工程学院 Advanced core soil reinforcement test device and method suitable for new idea method of tunnel
CN116341086A (en) * 2023-05-11 2023-06-27 西南交通大学 Method, system and storage medium for calculating internal force of tunnel structure crossing active fault

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3721304A (en) * 1971-05-04 1973-03-20 Gardner Denver Co Directional control for rock drill feed support
DE4014661A1 (en) * 1990-05-08 1991-11-14 Robert Prof Dr Ing Massen OPTICAL QUALITY CONTROL OF KNITTING NEEDLES ON KNITTING MACHINES
US5576485A (en) * 1995-04-03 1996-11-19 Serata; Shosei Single fracture method and apparatus for simultaneous measurement of in-situ earthen stress state and material properties
JP2002134633A (en) * 2000-10-25 2002-05-10 Matsushita Electric Ind Co Ltd Nonvolatile semiconductor memory device and its driving method
CN1928249A (en) * 2006-09-19 2007-03-14 孙景文 Method for sand prevention and binding and greening with coverlay
JP2009034542A (en) * 2008-10-20 2009-02-19 Hogi Medical:Kk Gauze counting holder
JP2010013913A (en) * 2008-07-02 2010-01-21 Kanazawa Seisakusho:Kk Water cutoff and protection device of tunnel penetrating through active fault or the like
JP2010230106A (en) * 2009-03-27 2010-10-14 Jfe Engineering Corp Pipeline for fault
US20110232239A1 (en) * 2010-03-24 2011-09-29 Multivac Sepp Haggenmuller Gmbh & Co. Kg Device for transporting objects
CN202433536U (en) * 2012-01-19 2012-09-12 长安大学 Physical model testing system for tunnel-penetrated ground crack zone
CN103015404A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 Partition strengthening method for tunnel passing weak stratum
CN103267835A (en) * 2013-04-19 2013-08-28 山东大学 Large-scale fluid-solid coupling model test bench being capable of prefabricating fault and test method
CN203275400U (en) * 2013-04-19 2013-11-06 山东大学 Large fluid-solid coupling model test bench with prefabricated fault
US20140291663A1 (en) * 2013-03-28 2014-10-02 Charles Kuo High stability spintronic memory
CN105352867A (en) * 2015-09-30 2016-02-24 四川大学 Simulation multi-gap assembled medium tunnel seepage test method
CN105699031A (en) * 2016-01-25 2016-06-22 大连理工大学 Tunnel shaking table test device for simulating fracture effect of blind fault
CN105756687A (en) * 2016-03-28 2016-07-13 北京住总集团有限责任公司 Through type large-section tunnel underground excavation lining trolley and tunnel underground excavation lining construction method
CN105785468A (en) * 2016-01-05 2016-07-20 西南交通大学 Destructive testing apparatus and method for simulating tunnel going through oblique displaced active fault
CN105973314A (en) * 2016-07-14 2016-09-28 河海大学 Porous medium saturation and non-saturation measurement system and method under surface water level change
CN106197944A (en) * 2016-07-13 2016-12-07 中国矿业大学 The testing system apparatus of simulation complex condition deep tunnel inrush through faults and method
CN106504630A (en) * 2016-10-28 2017-03-15 招商局重庆交通科研设计院有限公司 Pass through the tunnel experiment system of karst strata
CN106837333A (en) * 2017-01-17 2017-06-13 济宁矿业集团有限公司霄云煤矿 A kind of fully-mechanized mining working pre-tunnel laneway road formula passing fault method
CN106875804A (en) * 2017-03-15 2017-06-20 浙江大学 A kind of experimental rig and method for simulating the positive reverse fault movement of Rock And Soil
CN207248836U (en) * 2017-07-18 2018-04-17 招商局重庆交通科研设计院有限公司 Pass through tomography tunnel excavation analogue experiment installation

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3721304A (en) * 1971-05-04 1973-03-20 Gardner Denver Co Directional control for rock drill feed support
DE4014661A1 (en) * 1990-05-08 1991-11-14 Robert Prof Dr Ing Massen OPTICAL QUALITY CONTROL OF KNITTING NEEDLES ON KNITTING MACHINES
US5576485A (en) * 1995-04-03 1996-11-19 Serata; Shosei Single fracture method and apparatus for simultaneous measurement of in-situ earthen stress state and material properties
JP2002134633A (en) * 2000-10-25 2002-05-10 Matsushita Electric Ind Co Ltd Nonvolatile semiconductor memory device and its driving method
CN1928249A (en) * 2006-09-19 2007-03-14 孙景文 Method for sand prevention and binding and greening with coverlay
JP2010013913A (en) * 2008-07-02 2010-01-21 Kanazawa Seisakusho:Kk Water cutoff and protection device of tunnel penetrating through active fault or the like
JP2009034542A (en) * 2008-10-20 2009-02-19 Hogi Medical:Kk Gauze counting holder
JP2010230106A (en) * 2009-03-27 2010-10-14 Jfe Engineering Corp Pipeline for fault
US20110232239A1 (en) * 2010-03-24 2011-09-29 Multivac Sepp Haggenmuller Gmbh & Co. Kg Device for transporting objects
CN202433536U (en) * 2012-01-19 2012-09-12 长安大学 Physical model testing system for tunnel-penetrated ground crack zone
CN103015404A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 Partition strengthening method for tunnel passing weak stratum
US20140291663A1 (en) * 2013-03-28 2014-10-02 Charles Kuo High stability spintronic memory
CN203275400U (en) * 2013-04-19 2013-11-06 山东大学 Large fluid-solid coupling model test bench with prefabricated fault
CN103267835A (en) * 2013-04-19 2013-08-28 山东大学 Large-scale fluid-solid coupling model test bench being capable of prefabricating fault and test method
CN105352867A (en) * 2015-09-30 2016-02-24 四川大学 Simulation multi-gap assembled medium tunnel seepage test method
CN105785468A (en) * 2016-01-05 2016-07-20 西南交通大学 Destructive testing apparatus and method for simulating tunnel going through oblique displaced active fault
CN105699031A (en) * 2016-01-25 2016-06-22 大连理工大学 Tunnel shaking table test device for simulating fracture effect of blind fault
CN105756687A (en) * 2016-03-28 2016-07-13 北京住总集团有限责任公司 Through type large-section tunnel underground excavation lining trolley and tunnel underground excavation lining construction method
CN106197944A (en) * 2016-07-13 2016-12-07 中国矿业大学 The testing system apparatus of simulation complex condition deep tunnel inrush through faults and method
CN105973314A (en) * 2016-07-14 2016-09-28 河海大学 Porous medium saturation and non-saturation measurement system and method under surface water level change
CN106504630A (en) * 2016-10-28 2017-03-15 招商局重庆交通科研设计院有限公司 Pass through the tunnel experiment system of karst strata
CN106837333A (en) * 2017-01-17 2017-06-13 济宁矿业集团有限公司霄云煤矿 A kind of fully-mechanized mining working pre-tunnel laneway road formula passing fault method
CN106875804A (en) * 2017-03-15 2017-06-20 浙江大学 A kind of experimental rig and method for simulating the positive reverse fault movement of Rock And Soil
CN207248836U (en) * 2017-07-18 2018-04-17 招商局重庆交通科研设计院有限公司 Pass through tomography tunnel excavation analogue experiment installation

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
XUEZENG LIU ET AL: ""Experimental study on normal fault rupture propagation in loosem strata and its impact on mountain tunnels"", 《TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY》 *
曹海波: ""超大断层破碎带隧洞施工技术"", 《国土资源导刊》 *
王峥峥等: ""跨断层隧道振动台模型实验研究Ⅰ:试验方案设计"", 《现代隧道技术》 *
蔡琳祥: ""地铁动荷载作用下与地裂缝小角度斜交隧道围岩动力响应研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007760A (en) * 2017-12-27 2018-05-08 西南交通大学 Tunnel lining structure longitudinal direction mechanics special type experimental rig
CN108181447A (en) * 2018-02-28 2018-06-19 招商局重庆交通科研设计院有限公司 Multispan diameter sand-pebble layer model test apparatus
CN108181447B (en) * 2018-02-28 2023-07-18 招商局重庆交通科研设计院有限公司 Multi-span sandy pebble stratum model test device
CN108333332B (en) * 2018-03-06 2023-07-07 招商局重庆交通科研设计院有限公司 Large scale tunnel model test excavating device
CN108333332A (en) * 2018-03-06 2018-07-27 招商局重庆交通科研设计院有限公司 Large scale tunnel model test excavating device
CN108709534A (en) * 2018-06-27 2018-10-26 中国地质大学(武汉) Shield tunnel construction stress deformation indoor model test device and its installation method
CN108709534B (en) * 2018-06-27 2023-08-04 中国地质大学(武汉) Shield tunnel structure stress deformation indoor model test device and installation method thereof
CN108982219A (en) * 2018-08-01 2018-12-11 北方工业大学 Tunnel fault dislocation model test device and dislocation model test system
CN110780056A (en) * 2019-11-18 2020-02-11 四川农业大学 Test device for simulating movable fault to research on tunnel damage mechanism and using method
CN110865176A (en) * 2019-11-29 2020-03-06 湖北工程学院 Tunnel water burst and mud burst excavation simulation device and method for simulating water burst and mud burst disaster
CN111141186A (en) * 2020-01-21 2020-05-12 安徽理工大学 Blasting simulation experiment device
CN111175147A (en) * 2020-02-22 2020-05-19 中铁十九局集团轨道交通工程有限公司 Test method for measuring compressive shear performance and porosity change of lining filling material
CN112816332A (en) * 2020-12-28 2021-05-18 长安大学 Test method for simulating tunnel to penetrate through columnar jointed rock mass
CN113092148A (en) * 2021-01-17 2021-07-09 西南交通大学 Tunnel excavation model experiment box capable of simulating faults with different inclination angles and using method
CN113160684A (en) * 2021-02-10 2021-07-23 石家庄铁道大学 Device and method for simulating deformation and damage of tunnel fault fracture zone
CN113189304A (en) * 2021-04-29 2021-07-30 福州大学 Experimental device for simulating crossing of fault tunnel
CN114112655A (en) * 2021-10-13 2022-03-01 湖南工程学院 Advanced core soil reinforcement test device and method suitable for new idea method of tunnel
CN116341086A (en) * 2023-05-11 2023-06-27 西南交通大学 Method, system and storage medium for calculating internal force of tunnel structure crossing active fault
CN116341086B (en) * 2023-05-11 2023-08-08 西南交通大学 Method, system and storage medium for calculating internal force of tunnel structure crossing active fault

Also Published As

Publication number Publication date
CN107328898B (en) 2023-02-21

Similar Documents

Publication Publication Date Title
CN107328898A (en) Pass through tomography tunnel excavation analogue experiment installation
Jiang et al. Failure performance of 3DP physical twin-tunnel model and corresponding safety factor evaluation
Unal Development of design guidelines and roof-control standards for coal-mine roofs
Zhang et al. Influence of fault on the surrounding rock stability of a tunnel: Location and thickness
CN207248836U (en) Pass through tomography tunnel excavation analogue experiment installation
Yu et al. Macro and micro grouting process and the influence mechanism of cracks in soft coal seam
Zhang et al. Full-scale experimental study on failure characteristics of the key segment in shield tunnel with super-large cross-section
Wei et al. Experiment and numerical simulation of overburden and surface damage law in shallow coal seam mining under the gully
Liu et al. Effect of an incremental change in external water pressure on tunnel lining: a case study from the Tongxi karst tunnel
CN107478804A (en) Simulate the non-uniform loading method of different zones coal body stress under mining influence
Seki et al. Model experiments for examining heaving phenomenon in tunnels
Kunecki Field Test and Three-Dimensional Numerical Analysis of Soil–Steel Tunnel during Backfilling
Chen et al. The change of rock mass pressure of Lianchengshan tunnel
Qin et al. Safety evaluation with observational data and numerical analysis of Langyashan reinforced concrete face rockfill dam
Cui et al. Model Tests on the Antibreaking Countermeasures for Tunnel Lining Across Stick‐Slip Faults
Malai et al. Bridge approach settlement mitigation using expanded polystyrene foam as light backfill: Case study and 3D simulation
Xu et al. Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station
Li et al. Effect of bolting on roadway support in extremely weak rock
Yildiz Numerical analyses of embankments on PVD improved soft clays
Li et al. Refined model analysis of basement rock degradation mechanism of heavy-haul railway tunnel
Pathak et al. Wetting-drying behaviour of geogrid-reinforced clay under working load conditions
CN208537543U (en) Tunnel-liner model and the experimental rig for simulating tunnel longitudinal effect
Zhang et al. Investigation on the mechanical behavior of segment lining structure based on three-dimensional refined numerical model
CN114518292B (en) Model test device and test method for high-speed railway roadbed of inclined-span campaigns
Wang et al. Study on deformation failure mechanism and control technology of surrounding rock in soft rock roadway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant