CN109357921A - A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable - Google Patents

A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable Download PDF

Info

Publication number
CN109357921A
CN109357921A CN201811175904.2A CN201811175904A CN109357921A CN 109357921 A CN109357921 A CN 109357921A CN 201811175904 A CN201811175904 A CN 201811175904A CN 109357921 A CN109357921 A CN 109357921A
Authority
CN
China
Prior art keywords
paraffin
core
model
fracture hole
rock core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811175904.2A
Other languages
Chinese (zh)
Inventor
郑军
龚丁
刘鸿博
王可可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201811175904.2A priority Critical patent/CN109357921A/en
Publication of CN109357921A publication Critical patent/CN109357921A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Mounting, Exchange, And Manufacturing Of Dies (AREA)

Abstract

A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable, specifically includes: by paraffin carve or be heated to plastic state, the solution cavity model and fractured model of certain shapes is made, and connect end heating after link together after be placed on rock core mold center;Cement mortar is poured into the gap between rock core mold and fracture hole model;It consolidates to form rock core matrix to cement mortar, by artificial core grinding two end surfaces;Rock core is placed in baking oven or core holding unit, makes paraffin melting for that liquid and can flow out by crack, then progress nitrogen, kerosene alternating displacement to be higher than under paraffin melting point, until paraffin is completely exhausted out in fracture hole, completion Artificial Core Making.Corestone manufacture method of the present invention is simple, crack and solution cavity shape, connected relation are controllable, fracture hole wall roughness and wetability are closer to true reservoir, fracture hole wall surface wetability is in slightly oil-wet state after Treating Cuttings with Paraffin Wax, rock core is able to bear high pressure, carries out high temperature and pressure experiment suitable for being put into core holding unit.

Description

A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable
Technical field
The invention belongs to oil gas experimental technique fields, are related to a kind of production of fracture hole oil reservoir artificial core, especially a kind of Fracture hole parameter is controllable, the fracture hole oil reservoir Artificial Core Making method suitable for high temperature and pressure displacement test.
Background technique
It is real that fracture-pore reservoir carries out indoor simulation as conventional oil reservoir development, using representative reservoir core It tests, is to obtain oil reservoir key parameter, understanding oil reservoir development rule, and then formulate the essential link of scientific development scheme.It splits Seam and solution cavity are the main memory space of fracture hole oil reservoir and seepage channel, because of such oil reservoir fracture hole size, shape, connected relation Etc. sufficiently complex, reservoir properties non-homogeneous degree is very high, leads to either underground coring or outcrop coring, is all difficult Obtain representative reservoir core.Therefore it needs to represent fracture cave reservoir with artificial core, carries out corresponding laboratory experiment.Mesh Forefathers' seam hole rock core there are two main classes method: first is that performing etching production visualization fracture hole model using organic glass, but should Class fracture hole model cannot bear high pressure, cannot be tested under strata pressure;Second is that being passed through using true carbonate rock rock core Rock core rive in internal production fracture hole, is then adhesively-bonded together to form simulation core.Both the above method is hard due to material used Spend it is larger, it is relatively difficult to the state modulators such as solution cavity and fracture shape, mode of communicating, typically with approximate pipe passageway come generation There is very big difference in table crack with practical fracture pattern, in addition, the fracture hole wall surface smoother of above method production, rock core profit Moist generally strong water-wet, this with hydraulically rough surface and partially oily wet actual reservoir there are larger gaps.
Summary of the invention
The purpose of the present invention is to provide a kind of production simply, and the shape of fracture hole, mode of communicating are controllable, and fracture hole wall surface is thick Rough, wetability is closer to true core, the production method of the fracture hole oil reservoir artificial core suitable for high temperature and pressure experiment.It solves Current fracture hole shape, mode of communicating control are difficult, and wall surface property and actual reservoir difference are big, part artificial core cannot be born The drawbacks of high pressure.
In order to solve the above-mentioned technical problem, the present invention is accomplished by the following way:
A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable, specifically includes the following steps:
1) paraffin is carved or is heated to Plastic Forming state, the solution cavity model and fractured model of certain shapes is made, and It will link together after the heating of the connecting pin of solution cavity model and fractured model according to required;
2) paraffin in step 1) is shaped to and is connected with solution cavity model and fractured model is placed on rock core mold center;
3) cement mortar is configured, cement mortar is poured and is filled between rock core mold and fractured model, solution cavity model Among gap;
4) it is stored at room temperature and consolidates within 48 hours to form rock core matrix to cement mortar, and by artificial core grinding two end surfaces;
5) rock core of step 4) is placed in an oven or is placed in the core holding unit that can be heated, to melt higher than paraffin Make paraffin melting to be that liquid can simultaneously be flowed out by crack at a temperature of point, nitrogen, kerosene alternating displacement is then carried out, until crack It is completely exhausted out with the paraffin melted in solution cavity, completes Artificial Core Making.
Further, a certain size In Carbonate Rock can be mixed into the step 1) when production solution cavity model in paraffin Block etc. fills substance, and substance is filled after paraffin melting discharge and is trapped in solution cavity model, realizes half filling state of solution cavity.
Further, the fractured model in the step 1) can be replaced using certain thickness plastic plate, to cement bonded sand The rock core matrix that slurry pours extracts plastic plate out when not yet fully consolidated, to achieve the purpose that accurate control critical eigenvalue width.
Further, in the cement mortar in the step 3), the mass ratio of preferred cement, sand and water is 1:3:0.6, It is required that having stronger hardness after cement mortar consolidation, the artificial core being eventually fabricated can support core holding unit high confining pressure to make With.
Compared with prior art, the invention has the benefit that
Artificial core production method of the present invention is simple, and crack and solution cavity shape, connected relation are controllable, fracture hole wall roughness With wetability closer to true reservoir, fracture hole wall surface wetability is in slightly oil-wet state after Treating Cuttings with Paraffin Wax, with most of fracture hole Reservoir wettability state is close;Rock core matrix is that cement mortar consolidates simultaneously, and rock core is able to bear high pressure, suitable for being put into Core holding unit carries out high temperature and pressure experiment.
Detailed description of the invention
Fig. 1 is the fracture hole rock core overlooking structure diagram of the embodiment of the present invention;
Fig. 2 is the fracture hole rock core schematic view of the front view of the embodiment of the present invention;
Each label is respectively as follows: 1, rock core mold, 2, rock core matrix, 3, fractured model, 4, solution cavity model in figure.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.
A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable, specifically includes the following steps:
1) paraffin is carved or is heated to Plastic Forming state, the solution cavity model and fractured model of certain shapes is made, and It will link together after the heating of the connecting pin of solution cavity model and fractured model according to required;
2) paraffin in step 1) is shaped to and is connected with solution cavity model and fractured model is placed on rock core mold center;
3) cement mortar is configured, cement mortar is poured and is filled between rock core mold and fractured model, solution cavity model Among gap;
4) it is stored at room temperature and consolidates within 48 hours to form rock core matrix to cement mortar, and by artificial core grinding two end surfaces;
5) rock core of step 4) is placed in an oven or is placed in the core holding unit that can be heated, to melt higher than paraffin Make paraffin melting to be that liquid can simultaneously be flowed out by crack at a temperature of point, nitrogen, kerosene alternating displacement is then carried out, until crack It is completely exhausted out with the paraffin melted in solution cavity, completes Artificial Core Making.
Further, filling substance can be mixed into paraffin in the solution cavity model that step 1) makes of paraffin, it is such as certain The carbonate rock stone of size, filling substance after paraffin melting discharge can be trapped in solution cavity, realize half filling shape of solution cavity State.
Further, fractured model can be replaced with certain thickness plastic plate, and the rock core matrix poured to cement is not yet Plastic plate can be extracted when fully consolidated out, to achieve the purpose that accurate control critical eigenvalue width.
Further, cement mortar is mixed using a certain proportion of cement, gravel and water, it is desirable that cement mortar consolidation There is stronger hardness afterwards, the artificial core being eventually fabricated can support core holding unit high confining pressure to act on.
As shown in Fig. 1~2, a kind of artificial core of the fracture hole oil reservoir Artificial Core Making method that parameter is controllable production, packet Include: rock core mold 1, rock core matrix 2, fractured model 3 and solution cavity model 4, wherein rock core mold 1 is the blank pipe of plastic material, rock Depending on the length and diameter of heart mold makes the size of rock core as needed, rock core matrix 2 is poured for cement mortar and is consolidated And be filled in rock core mold, fractured model 3 is all made of paraffin material with solution cavity model 4 and is made.
Fracture hole body wall face made by the method for the present invention is coarse, and after tested, fracture hole wall surface wetability is in weak after Treating Cuttings with Paraffin Wax Oleophylic state, it is close with most of fracture hole reservoir wettability state.
The above is only embodiments of the present invention, is stated again, and those skilled in the art are come It says, without departing from the principle of the present invention, several improvement can also be carried out to the present invention, these improvement are also included in the present invention In scope of protection of the claims.

Claims (4)

1. a kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable, it is characterised in that: specifically includes the following steps:
1) paraffin is carved or is heated to Plastic Forming state, the solution cavity model and fractured model of certain shapes is made, and will be molten It links together after the heating of the connecting pin of hole model and fractured model according to required;
2) paraffin in step 1) is shaped to and is connected with solution cavity model and fractured model is placed on rock core mold center;
3) cement mortar is configured, cement mortar is poured to the gap being filled between rock core mold and fractured model, solution cavity model Among;
4) it is stored at room temperature and consolidates within 48 hours to form rock core matrix to cement mortar, and by artificial core grinding two end surfaces;
5) rock core of step 4) is placed in an oven or is placed in the core holding unit that can be heated, to be higher than paraffin melting point temperature Degree is lower so that paraffin melting can flow out for liquid and by crack, then progress nitrogen, kerosene alternating displacement, until crack and molten The paraffin melted in hole is completely exhausted out, and completes Artificial Core Making.
2. a kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable as described in claim 1, it is characterised in that: described It can be mixed into filling substance in paraffin when production solution cavity model in step 1), filling substance is trapped in molten after paraffin melting discharge In the model of hole, half filling state of solution cavity is realized.
3. a kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable as described in claim 1, it is characterised in that: described Fractured model in step 1) can be replaced using certain thickness plastic plate, and the rock core matrix poured to cement mortar is not yet complete Plastic plate is extracted out when full consolidation, to achieve the purpose that accurate control critical eigenvalue width.
4. a kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable as described in claim 1, it is characterised in that: described Cement mortar in step 3) uses mass ratio to be mixed for the cement of 1:3:0.6, sand and water, it is desirable that after cement mortar consolidation With stronger hardness, manufactured artificial core can support core holding unit high confining pressure to act on.
CN201811175904.2A 2018-10-10 2018-10-10 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable Pending CN109357921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811175904.2A CN109357921A (en) 2018-10-10 2018-10-10 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811175904.2A CN109357921A (en) 2018-10-10 2018-10-10 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable

Publications (1)

Publication Number Publication Date
CN109357921A true CN109357921A (en) 2019-02-19

Family

ID=65348863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811175904.2A Pending CN109357921A (en) 2018-10-10 2018-10-10 A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable

Country Status (1)

Country Link
CN (1) CN109357921A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110987557A (en) * 2019-11-20 2020-04-10 四川大学 Method for manufacturing rock-like body built-in open type fracture sample based on polyhydroxyalkanoate
CN111060366A (en) * 2019-12-13 2020-04-24 中国海洋石油集团有限公司 Artificial core manufacturing method for simulating borehole drilling
CN112146960A (en) * 2020-10-14 2020-12-29 中国矿业大学(北京) Method for manufacturing cement mortar test piece with built-in open crack
CN113049321A (en) * 2019-12-26 2021-06-29 中国石油天然气股份有限公司 Preparation method of reservoir model and reservoir model
CN113484116A (en) * 2021-07-16 2021-10-08 中国石油大学(华东) Method for nondestructively preparing artificial core with fracture-cavity/fracture structure and artificial core
CN113702147A (en) * 2020-05-20 2021-11-26 中国石油天然气股份有限公司 Core manufacturing method
CN113916627A (en) * 2021-09-30 2022-01-11 中南大学 Device and method for preparing simulated rock sample containing complex-form weak layer
CN116297618A (en) * 2023-03-14 2023-06-23 西南石油大学 Nuclear magnetic online monitoring experimental method for saturation of saturated living oil shale

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102053026A (en) * 2009-10-30 2011-05-11 中国石油化工股份有限公司 Material and method for manufacturing carbonate cave oil reservoir physical model
CN102866043A (en) * 2012-09-07 2013-01-09 中国石油天然气集团公司 Manufacturing method for fracture-cave rock core physical model
CN105277405A (en) * 2015-10-13 2016-01-27 中国地质大学(武汉) Manufacture method for cement sample used for simulating parent-rock porosity character
CN105628463A (en) * 2015-03-09 2016-06-01 绍兴文理学院 Sample preparation mold for fractured rock mass model sample
CN105738179A (en) * 2016-04-18 2016-07-06 西南石油大学 Manufacturing method of low-cost sandstone artificial rock core for experimental teaching
CN106706392A (en) * 2017-02-06 2017-05-24 西南石油大学 Manufacturing method of large-model low-permeability micro-crack rock core
CN106872229A (en) * 2017-01-19 2017-06-20 中国地质大学(武汉) A kind of fracture-cavity type carbonate artificial rock core and preparation method thereof
CN107084868A (en) * 2017-05-16 2017-08-22 山东大学 A kind of solution cavity preparation method and device based on 3D printing technique
CN107884246A (en) * 2017-12-19 2018-04-06 山东大学 Solution cavity preparation method in a kind of geomechanical model test
CN207637392U (en) * 2017-09-18 2018-07-20 西南石油大学 A kind of fracture hole type artificial core

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102053026A (en) * 2009-10-30 2011-05-11 中国石油化工股份有限公司 Material and method for manufacturing carbonate cave oil reservoir physical model
CN102866043A (en) * 2012-09-07 2013-01-09 中国石油天然气集团公司 Manufacturing method for fracture-cave rock core physical model
CN105628463A (en) * 2015-03-09 2016-06-01 绍兴文理学院 Sample preparation mold for fractured rock mass model sample
CN105277405A (en) * 2015-10-13 2016-01-27 中国地质大学(武汉) Manufacture method for cement sample used for simulating parent-rock porosity character
CN105738179A (en) * 2016-04-18 2016-07-06 西南石油大学 Manufacturing method of low-cost sandstone artificial rock core for experimental teaching
CN106872229A (en) * 2017-01-19 2017-06-20 中国地质大学(武汉) A kind of fracture-cavity type carbonate artificial rock core and preparation method thereof
CN106706392A (en) * 2017-02-06 2017-05-24 西南石油大学 Manufacturing method of large-model low-permeability micro-crack rock core
CN107084868A (en) * 2017-05-16 2017-08-22 山东大学 A kind of solution cavity preparation method and device based on 3D printing technique
CN207637392U (en) * 2017-09-18 2018-07-20 西南石油大学 A kind of fracture hole type artificial core
CN107884246A (en) * 2017-12-19 2018-04-06 山东大学 Solution cavity preparation method in a kind of geomechanical model test

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110987557A (en) * 2019-11-20 2020-04-10 四川大学 Method for manufacturing rock-like body built-in open type fracture sample based on polyhydroxyalkanoate
CN111060366A (en) * 2019-12-13 2020-04-24 中国海洋石油集团有限公司 Artificial core manufacturing method for simulating borehole drilling
CN113049321A (en) * 2019-12-26 2021-06-29 中国石油天然气股份有限公司 Preparation method of reservoir model and reservoir model
CN113049321B (en) * 2019-12-26 2023-01-10 中国石油天然气股份有限公司 Preparation method of reservoir model and reservoir model
CN113702147A (en) * 2020-05-20 2021-11-26 中国石油天然气股份有限公司 Core manufacturing method
CN112146960A (en) * 2020-10-14 2020-12-29 中国矿业大学(北京) Method for manufacturing cement mortar test piece with built-in open crack
CN113484116A (en) * 2021-07-16 2021-10-08 中国石油大学(华东) Method for nondestructively preparing artificial core with fracture-cavity/fracture structure and artificial core
CN113484116B (en) * 2021-07-16 2023-07-14 中国石油大学(华东) Method for preparing artificial rock core with fracture-cavity/fracture structure in nondestructive mode and artificial rock core
CN113916627A (en) * 2021-09-30 2022-01-11 中南大学 Device and method for preparing simulated rock sample containing complex-form weak layer
CN116297618A (en) * 2023-03-14 2023-06-23 西南石油大学 Nuclear magnetic online monitoring experimental method for saturation of saturated living oil shale
CN116297618B (en) * 2023-03-14 2023-11-14 西南石油大学 Nuclear magnetic online monitoring experimental method for saturation of saturated living oil shale

Similar Documents

Publication Publication Date Title
CN109357921A (en) A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable
CN106706392B (en) A kind of production method of large-sized model low permeability and micro-fracture rock core
CN102053026B (en) Material and method for manufacturing carbonate cave oil reservoir physical model
CN107084868B (en) A kind of solution cavity preparation method and device based on 3D printing technique
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN109594959B (en) Fracturing oil displacement method for improving recovery economic efficiency of thin and poor reservoir of old oil field
CN103234791B (en) A kind of production method of stratified model for hydraulic fracturing physical simulation experiment
CN109060470B (en) Hydraulic fracturing experiment test piece for prefabricating natural fracture and manufacturing method thereof
CN107572975B (en) Plugging agent, preparation method and application thereof
CN109931045A (en) A kind of self-supporting acid fracturing method of double slit system
CN107101854A (en) A kind of shale loose sand Corestone manufacture method
CN106198181B (en) A kind of fractured horizontal well physical analogy sample and preparation method thereof
CN106568637B (en) It is a kind of for determining the preparation method of face perforation rock sample
CN105545263B (en) Visual sand blasting model used for oil displacement experiment and manufacturing method thereof
CN108518209B (en) Design method for coal-series production layer combined well hole track azimuth angle considering transition zone
CN107991188A (en) A kind of method based on rock core residual stress level prediction hydraulic fracture complexity
CN108414304A (en) A kind of mold and method made for coupled shear-flow test joint samples
CN112943233B (en) Method for simulating proppant transport under reservoir conditions
CN114414326A (en) Rock sample making and experiment method for interference of natural fracture network on hydraulic fracture
CN109540617B (en) Preparation method of fractured core
CN106050211A (en) Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing
CN108121844A (en) Waterpower involves the preparation method of radius
CN111060366A (en) Artificial core manufacturing method for simulating borehole drilling
CN109138953B (en) Seam making method for multi-scale cracks
CN115392150A (en) Weak cementation reservoir fracturing feasibility evaluation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219

RJ01 Rejection of invention patent application after publication