CN106050211A - Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing - Google Patents

Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing Download PDF

Info

Publication number
CN106050211A
CN106050211A CN201610589072.3A CN201610589072A CN106050211A CN 106050211 A CN106050211 A CN 106050211A CN 201610589072 A CN201610589072 A CN 201610589072A CN 106050211 A CN106050211 A CN 106050211A
Authority
CN
China
Prior art keywords
gypsum fibrosum
fracture
gypsum
seam hole
ice making
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610589072.3A
Other languages
Chinese (zh)
Inventor
张广清
周再乐
范宗洋
王元元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201610589072.3A priority Critical patent/CN106050211A/en
Publication of CN106050211A publication Critical patent/CN106050211A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements

Abstract

The invention discloses a method for manufacturing a test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing. The method includes the following steps: a) manufacturing an ice ball: assembling an ice making die, filling the ice making die with water and then placing the ice making die inside a refrigerator for refrigeration; b) manufacturing a gypsum fracture-cavity single/connector: rolling the ice ball on gypsum powder, and sprinkling a small quantity of water, such that the gypsum powder is bonded to the surface of the ice ball to a certain thickness, then placing the ice ball inside the refrigerator for refrigeration; c) manufacturing the test piece: assembling a prefabricated die, installing a simulation shaft, injecting the well-mixed cement mortar to the prefabricated die, during the injection, placing the gypsum fracture-cavity single/connector at a preset position, and when the cement mortar reaches the top of the fabricated die, floating the cement mortar with a claying plate; d) maintaining: after the solidification of the test piece for 1-2 days, dismounting the die, maintaining the test piece. According to the invention, the method has simple steps, is easy to realize, can prefabricate a plurality of test pieces with facture-cavities as required by the test, and can provide technical guidance for actual production in oil field with the obtained research result.

Description

A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method
Technical field
The invention belongs to fracturing modelling technique field, particularly relate to a kind of fracture-cavity type carbonate oil-gas reservoir The preparation method containing seam hole body test specimen during volume fracturing physical simulation experiment.
Background technology
Carbonate rock hydrocarbon reservoir is one of most important oil-gas exploration and development field, the whole world, accounts for the whole world storage of verified oil The 52% of amount, accounts for the 60% of global Oil Gas total output.Marine Facies Carbonate Reservoir can be divided into pore type, pore pattern carbonate rock reservoir, Seam hole type these three type.China's carbonate rock hydrocarbon reservoir accounts for more than the 30% of total resources, is distributed widely in the tower of China Tub ground, the Sichuan Basin and Ordos Basin, wherein the carbonate oil-gas reservoir of 80% is difficult to be developed by conventional means. Owing to the general buried depth of carbonate rock hydrocarbon reservoir is big, reservoir temperature is high, have extremely low porosity and permeability, high elastic modulus and Tensile strength, the most natural seam hole is widely distributed, there is abnormal pressure in the body of seam hole, and these factors make conventional pressure break be difficult to reality Existing oilfield stimulation.
Volume fracturing technology is to be internally formed many cracks by fracturing fluid, proppant at reservoir, and then realizes reservoir and exist " three-dimensional transformation " on three directions of length, thus increase the contacting volume in crack and reservoir, expand oil to greatest extent The discharge capacity of gas, thus increase substantially yield.Volume fracturing technology is as an important group in fracturing yield increasing technology Become part, be current international advanced technology, represent oil recovery, the developing direction of gas producing technology technology.Current domestic employing volume Fracturing technique transformation carbonate reservoir, has been achieved for certain achievement.
But, many problems of volume fracturing technological layer have not been solved yet, and need in theoretical and application aspect exhibition Open substantial amounts of research work.Factor owing to relating to is extremely complex, the crack initiation in crack, extension, spatial distribution characteristic, governing factor There is the biggest difference with conventional hydraulic pressure break Deng all, need in mechanical model, lab simulation theory and method, actual influence factor Etc. aspect launch further investigation.Additionally, due to fracture-cavity type carbonate oil-gas reservoir internal fissure grows complexity, with substantial amounts of sky So seam hole body, and in the seam hole body having, fluid pressure is contained in portion, the research carrying out volume fracturing problem on this basis just becomes Increasingly complex.Therefore, understand the impact on hydraulic fracture expansion process of multiple natural seam holes body, seam is applied to for volume fracturing The exploitation of hole type carbonate rock hydrocarbon reservoir is particularly important.
The present invention relates to a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, it is possible to prepare A series of imitation specimens containing seam hole body, coordinate the high-temperature and high-stress waterpower of Chinese Petroleum Univ.'s rock mechanics laboratory Fracture simulation platform, it is possible to the seam hole body in research fracture-cavity type carbonate oil-gas reservoir for hydraulic fracture crack initiation, extend, extend Impact, obtained achievement in research can be oil field actual production provide technological guidance.
Summary of the invention
It is an object of the invention to provide a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, The test specimen containing multiple seam holes body can be precast, coordinate high-temperature and high-stress fracturing analog platform, can study containing pressure (no Containing pressure) stitch the impact that hole body extends for hydraulic fracture.
The present invention relates to a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, the method includes Following steps: a) ice making ball: by good for ice making mould assembly, internally fill water from the consent at its top, subsequently by ice making mould Put into refrigerator freezing, until the water in ice making mould is completely solidified into as ice hockey;B) Gypsum Fibrosum seam hole list/connector is prepared: will The ice hockey prepared is placed on gypsum powder rolling, spoons a small amount of water to ice hockey surface simultaneously, makes gypsum powder be bonded to ice hockey Surface also reaches certain thickness, is refrigerated to Gypsum Fibrosum and solidifies completely in being subsequently placed at refrigerator;C) test specimen is prepared: assembled prefabricated molds Tool, installs simulation wellbore hole, pours in prefabricated mould by the cement mortar being stirred, during pouring cement mortar into, and Gypsum Fibrosum Seam hole list/connector is put into according to setting position, when cement mortar reaches prefabricated mould top, floating with claying board;D) maintenance: After test specimen solidifies 1~2 day, dismantle mould, test specimen is placed in maintenance at shady and cool ventilation.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid a, the typical material of described ice making mould is silica gel, can produce certain deformation when water setting expansion.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid a, ice making mould is made up of upper shell, lower house, short stopper, long stopper, and the circumference of upper shell and lower house has four The top of consent, upper shell and lower house respectively has a consent.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid a, when needs prefabricated gypsum seam hole monomer, upper shell and lower house are bolted together, with short stopper by each consent Clog, after ice making mould fills water, freezing in putting it into refrigerator;When needs prefabricated gypsum seam hole connector, first will Upper shell and lower house are bolted together, and are clogged by the consent needing reserved connector position with long stopper, the plug of remaining position Hole clogs with short stopper, after filling water in ice making mould, freezing in putting it into refrigerator.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid b, the thickness of described Gypsum Fibrosum shell is the thinnest, and typical thickness is 1~3mm.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid b, described Gypsum Fibrosum seam hole monomer is made up of the ice hockey of internal layer and the Gypsum Fibrosum shell of outer layer, if in dry room temperature environment Placing a period of time, volatilization is only remained Gypsum Fibrosum shell by the water in the monomer of Gypsum Fibrosum seam hole.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid b, described Gypsum Fibrosum seam hole connector is stitched hole monomer by connecting tube and Gypsum Fibrosum and constitutes.The manufacture method of Gypsum Fibrosum seam hole connector For: the prepared ice hockey containing connector is linked together, by step b to ice hockey according to the compound mode set with connecting tube Add last layer Gypsum Fibrosum shell, in then putting it into refrigerator, be refrigerated to gypsum sets.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid c, described prefabricated mould is made up of base plate, floor, side plate, and floor has perforate, and simulation wellbore hole can be bolted On floor.When the test specimen needing preparation containing Gypsum Fibrosum seam hole connector, the external connecting tube of Gypsum Fibrosum seam hole connector can be by floor On perforate reach outside prefabricated mould.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid c, the preparation of described cement mortar is the cement of use ratio 1: 1, quartz sand, and adding water stirs forms.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid c, the test specimen containing multiple Gypsum Fibrosum seam hole monomer is made up of Gypsum Fibrosum seam hole monomer, test specimen, simulation wellbore hole, and the Gypsum Fibrosum in test specimen Seam hole monomer is the most aqueous to be adjusted by test requirements document.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid c, the test specimen containing Gypsum Fibrosum seam hole connector is made up of connecting tube, Gypsum Fibrosum seam hole monomer, test specimen, simulation wellbore hole, Gypsum Fibrosum seam hole Connector is concatenated by connecting tube, and Gypsum Fibrosum seam hole connector has a connecting tube to stretch out outside test specimen, when being used for testing Pressure is provided for Gypsum Fibrosum seam hole connector by extraneous liquid injection system.
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as above, wherein, in step In rapid d, test specimen needs maintenance 28 days at shady and cool ventilation, and period needs constantly to water, so that test specimen reaches design strength.
The beneficial effects of the present invention is, the examination containing seam hole body of number of different types can be prepared in laboratory conditions Part, coordinates high-temperature and high-stress fracturing analog platform can study the body containing pressure (or without pressure) seam hole for hydraulic fracture The impact of extension.Step of the present invention is simple, it is achieved convenient, it is possible to needs to precast various different containing according to test and stitches hole body Test specimen.And overall procedure is with low cost, it is simple to promote, can be actual raw for oil field by volume fracturing simulation test gained achievement Produce and technological guidance is provided, optimize effect of increasing production.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the present invention and explain, not delimit the scope of the invention.Wherein,
Fig. 1 is that the ice making mould of a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention is signed an undertaking Structure schematic diagram;
Fig. 2 is that the Gypsum Fibrosum seam hole of a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention is single Body generalized section;
Fig. 3 is that the Gypsum Fibrosum seam hole of a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention connects Junctor generalized section;
Fig. 4 be a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention containing Gypsum Fibrosum stitch hole The test specimen generalized section of monomer;
Fig. 5 be a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention containing Gypsum Fibrosum stitch hole The test specimen generalized section of connector;
Fig. 6 be a kind of fracture-cavity type carbonate oil-gas reservoir imitation specimen preparation method according to the present invention prefabricated mould with Simulation wellbore hole combination schematic diagram.
Drawing reference numeral illustrates:
1, upper shell;2, lower house;3, short stopper;4, long stopper;5, ice hockey;6, Gypsum Fibrosum shell;7, connecting tube;8, seam hole Monomer;9, test specimen;10, simulation wellbore hole;11, base plate;12, floor;13, side plate.
Detailed description of the invention
In order to be more clearly understood from the technical characteristic of the present invention, purpose and effect, now comparison accompanying drawing illustrates this Bright detailed description of the invention.
The present invention relates to a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, the method includes Following steps: a) ice making ball: by good for ice making mould assembly, internally fill water from the consent at its top, subsequently by ice making mould Put into refrigerator freezing, until the water in ice making mould is completely solidified into as ice hockey;B) Gypsum Fibrosum seam hole list/connector is prepared: will The ice hockey prepared is placed on gypsum powder rolling, spoons a small amount of water to ice hockey surface simultaneously, makes gypsum powder be bonded to ice hockey Surface also reaches certain thickness, is refrigerated to Gypsum Fibrosum and solidifies completely in being subsequently placed at refrigerator;C) test specimen is prepared: assembled prefabricated molds Tool, installs simulation wellbore hole, pours in prefabricated mould by the cement mortar being stirred, during pouring cement mortar into, and Gypsum Fibrosum Seam hole list/connector is put into according to setting position, when cement mortar reaches prefabricated mould top, floating with claying board;D) maintenance: After test specimen solidifies 1~2 day, dismantle mould, test specimen is placed in maintenance at shady and cool ventilation.
Further, in step a, as it is shown in figure 1, described ice making mould is by upper shell 1, lower house 2, short stopper 3, length Stopper 4 is constituted.Wherein, the circumference of upper shell 1 and lower house 2 has four consents, and the top of upper shell 1 and lower house 2 is each Have a consent.When needs prefabricated gypsum seam hole monomer, upper shell 1 and lower house 2 are bolted together, with short stopper 3 Each consent is clogged, after ice making mould fills water, freezing in putting it into refrigerator;When needs prefabricated gypsum seam hole connects During body, first upper shell 1 and lower house 2 are bolted together, with long stopper 4, the consent needing reserved connector position are clogged, The consent of remaining position clogs with short stopper 3, after filling water in ice making mould, freezing in putting it into refrigerator.
Further, as in figure 2 it is shown, described Gypsum Fibrosum stitches the hole monomer ice hockey 5 by internal layer and Gypsum Fibrosum shell 6 structure of outer layer Becoming, if placing a period of time in dry room temperature environment, volatilization is only remained Gypsum Fibrosum shell 6 by the water in the monomer of Gypsum Fibrosum seam hole.
Further, as it is shown on figure 3, Gypsum Fibrosum seam hole connector is stitched hole monomer 8 by connecting tube 7 and Gypsum Fibrosum and constitutes.Gypsum Fibrosum stitches The manufacture method of hole connector is: be connected to according to the compound mode set with connecting tube 7 by the prepared ice hockey 5 containing connector Together, add last layer Gypsum Fibrosum shell by step b to ice hockey, in then putting it into refrigerator, be refrigerated to gypsum sets.
Further, as shown in Figure 4, Figure 5, the test specimen containing multiple Gypsum Fibrosum seam hole monomer by Gypsum Fibrosum seam hole monomer 8, test specimen 9, Simulation wellbore hole 10 forms, and the Gypsum Fibrosum in test specimen stitches, and hole monomer is the most aqueous to be adjusted by test requirements document;And stitch hole containing Gypsum Fibrosum The test specimen of connector is made up of connecting tube 7, Gypsum Fibrosum seam hole monomer 8, test specimen 9, simulation wellbore hole 10, and Gypsum Fibrosum seam hole connector is by even Adapter concatenates, and Gypsum Fibrosum seam hole connector has a connecting tube to stretch out outside test specimen, by extraneous fluid injection system when being used for testing Unite and provide pressure for Gypsum Fibrosum seam hole connector.
Further, as shown in Figure 6, described prefabricated mould is made up of base plate 11, floor 12, side plate 13, and floor has Perforate, simulation wellbore hole 10 can be bolted on floor 12, and when needs preparation is containing Gypsum Fibrosum seam hole connector test specimen, Gypsum Fibrosum stitches The external connecting tube 7 of hole connector can be reached outside prefabricated mould by the perforate on floor 12.
Embodiment 1
1. prepare Gypsum Fibrosum seam hole monomer
Assembled ice making mould, is bolted together upper shell 1 and lower house 2, with short stopper 3 by the consent on ice making mould Clog, ice making mould will fill water afterwards, put in refrigerator freezing, until the water in ice making mould is completely solidified into as ice hockey 5, prepare multiple ice hockey 5 in this way.
Take a certain amount of gypsum powder to be placed in an etui, prefabricated ice hockey is put into rollback on gypsum powder Dynamic, during rolling, need suitable on ice hockey, to spoon a small amount of water, make gypsum powder be bonded to the surface of ice hockey, The Gypsum Fibrosum shell 6 being repeated up on ice hockey reaches certain thickness, puts it into afterwards and is frozen up to Gypsum Fibrosum in refrigerator and solidifies completely. Repeat the method and make multiple Gypsum Fibrosum seam hole monomer 8.
2. preparation is containing the test specimen of Gypsum Fibrosum seam hole monomer
Assembled good prefabricated mould, at the inner brush last layer oils and fats of prefabricated mould, is installed to floor by simulation wellbore hole subsequently On 12.Cement is mixed according to the ratio of 1: 1 with quartz sand, adds water and after stirring, pour into the inside of prefabricated mould.Pouring During cement, according to the position of EXPERIMENTAL DESIGN, Gypsum Fibrosum is stitched hole monomer 8 and put into inside prefabricated mould, while put into Gypsum Fibrosum seam hole Monomer 8 limit pours into cement, until cement mortar reaches the top of prefabricated mould, then with claying board by the water at prefabricated mould top Cement mortar is floating.Subsequently test specimen being stood 1~2 day, dismantle prefabricated mould, be positioned over by test specimen at shady and cool ventilation, test specimen stands Period needs constantly to water and carries out maintenance.
Embodiment 2
1. prepare Gypsum Fibrosum seam hole connector
Assembled ice making mould, is bolted together upper shell 1 and lower house 2, will need pre-lingering on long stopper 4 on ice hockey The position connecing hole clogs, and the consent of remaining position clogs with short stopper 3, afterwards by filling water in ice making mould, puts in refrigerator Freezing, until the water in ice making mould is completely solidified into as ice hockey 5, prepares multiple ice hockey 5 in this way.
Take a certain amount of gypsum powder to be placed in an etui, prepared ice hockey 5 linked together with connecting tube 7, Subsequently the coalition of ice hockey 5 with connecting tube 7 is positioned on gypsum powder pouring gypsum powder, needs during drenching gypsum powder Want suitable on ice hockey, spoon a small amount of water, make gypsum powder be bonded to the surface of ice hockey, the Gypsum Fibrosum being repeated up on ice hockey Shell 6 reaches certain thickness, puts it into afterwards and is frozen up to Gypsum Fibrosum in refrigerator and solidifies completely.
2. preparation is containing the test specimen of Gypsum Fibrosum seam hole connector
Assembled good prefabricated mould, at the inner brush last layer oils and fats of prefabricated mould, is installed to floor by simulation wellbore hole subsequently On 12, Gypsum Fibrosum is stitched hole connector and is contained in the opposite side of prefabricated mould in advance, for external connecting tube by the perforate on floor 12 Stretch out outside prefabricated mould.Cement is mixed according to the ratio of 1: 1 with quartz sand, adds water and after stirring, pour into prefabricated mould Inside, when cement mortar reaches prefabricated mould top, with claying board by floating for the cement mortar at prefabricated mould top.Subsequently will Test specimen stands 1~2 day, dismantles prefabricated mould, is positioned over by test specimen at shady and cool ventilation, test specimen need constantly to water during standing into Row maintenance.
Embodiment 3
A kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, with embodiment 1, difference exists In, the Gypsum Fibrosum seam hole monomer 8 prepared in described step 1 needs to place one week in the environment of dry room temperature, makes Gypsum Fibrosum seam hole single Water within body 8 volatilizees completely, the most remaining Gypsum Fibrosum shell 6.
The foregoing is only the schematic detailed description of the invention of the present invention, be not limited to the scope of the present invention.Any Those skilled in the art, equivalent variations done on the premise of without departing from the design of the present invention and principle and amendment, all The scope of protection of the invention should be belonged to.

Claims (5)

1. the present invention relates to a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method, the method include with Lower step: a) ice making ball: by good for ice making mould assembly, internally fill water from the consent at its top, subsequently ice making mould is put Enter freezing in refrigerator, until the water in ice making mould is completely solidified into as ice hockey;B) Gypsum Fibrosum seam hole list/connector is prepared: will system The ice hockey got ready is placed on gypsum powder rolling, spoons a small amount of water to ice hockey surface simultaneously, makes gypsum powder be bonded to ice hockey table Face also reaches certain thickness, is refrigerated to Gypsum Fibrosum and solidifies completely in being subsequently placed at refrigerator;C) test specimen is prepared: assembled prefabricated molds Tool, installs simulation wellbore hole, pours in prefabricated mould by the cement mortar being stirred, during pouring cement mortar into, and Gypsum Fibrosum Seam hole list/connector is put into according to setting position, when cement mortar reaches prefabricated mould top, floating with claying board;D) maintenance: After test specimen solidifies 1~2 day, dismantle mould, test specimen is placed in maintenance at shady and cool ventilation.
2. a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as claimed in claim 1, it is special Levying and be, described ice making mould is made up of upper shell, lower house, long stopper, short stopper, and uses silica gel material as ice making Mould, can produce certain deformation when water setting expansion.
3. a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as claimed in claim 1, it is special Levying and be, the thickness of described Gypsum Fibrosum shell is the thinnest, and typical thickness is 1~3mm.
4. a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as claimed in claim 1, it is special Levying and be, described Gypsum Fibrosum seam hole monomer is made up of with internal ice hockey Gypsum Fibrosum shell, places longer in the environment of drying at room temperature Time, the water within the monomer of Gypsum Fibrosum seam hole can volatilize completely, and remaining Gypsum Fibrosum shell.
5. a kind of fracture-cavity type carbonate oil-gas reservoir volume fracturing imitation specimen preparation method as claimed in claim 1, it is special Levying and be, described Gypsum Fibrosum seam hole connector is made up of with connecting tube Gypsum Fibrosum seam hole monomer, passes through between the monomer of each Gypsum Fibrosum seam hole Connecting tube is linked up and connects, and connecting tube external during test provides fluid pressure for whole seam hole connector.
CN201610589072.3A 2016-07-19 2016-07-19 Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing Pending CN106050211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610589072.3A CN106050211A (en) 2016-07-19 2016-07-19 Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610589072.3A CN106050211A (en) 2016-07-19 2016-07-19 Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing

Publications (1)

Publication Number Publication Date
CN106050211A true CN106050211A (en) 2016-10-26

Family

ID=57418331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610589072.3A Pending CN106050211A (en) 2016-07-19 2016-07-19 Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing

Country Status (1)

Country Link
CN (1) CN106050211A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725042A (en) * 2017-09-13 2018-02-23 中国石油大学(北京) A kind of large-scale fracture and vug carbonate reservoir physical simulation experiment device of HTHP and method
WO2021082130A1 (en) * 2019-11-01 2021-05-06 成都北方石油勘探开发技术有限公司 Acid fracturing simulation method considering variable-viscosity acid dynamic process
CN114508333A (en) * 2020-11-17 2022-05-17 中国石油化工股份有限公司 Vertical well seam temporary plugging steering circular seam hole-finding fracturing physical simulation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2202869C (en) * 1994-10-21 2004-11-23 Per Just Andersen Foamed starch compositions, articles and methods
CN104034563A (en) * 2014-06-12 2014-09-10 中国石油大学(北京) Preparation method of artificial rock core of jointing shale
CN104290179A (en) * 2014-10-16 2015-01-21 福建省诺希新材料科技有限公司 Suction filtration slip casting plaster mold
CN104792961A (en) * 2015-05-20 2015-07-22 中国矿业大学(北京) Large-size coal and mashgas outburst simulation test device
CN105332682A (en) * 2015-10-21 2016-02-17 中国石油大学(北京) Method of experimenting on impact of high-pressure fracture-cave bodies in carbonate rock reservoirs upon hydraulic fracture extension
CN105443121A (en) * 2015-11-18 2016-03-30 中国科学院武汉岩土力学研究所 Carbonate acidizing and fracturing simulation sample, preparation method, simulation device and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2202869C (en) * 1994-10-21 2004-11-23 Per Just Andersen Foamed starch compositions, articles and methods
CN104034563A (en) * 2014-06-12 2014-09-10 中国石油大学(北京) Preparation method of artificial rock core of jointing shale
CN104290179A (en) * 2014-10-16 2015-01-21 福建省诺希新材料科技有限公司 Suction filtration slip casting plaster mold
CN104792961A (en) * 2015-05-20 2015-07-22 中国矿业大学(北京) Large-size coal and mashgas outburst simulation test device
CN105332682A (en) * 2015-10-21 2016-02-17 中国石油大学(北京) Method of experimenting on impact of high-pressure fracture-cave bodies in carbonate rock reservoirs upon hydraulic fracture extension
CN105443121A (en) * 2015-11-18 2016-03-30 中国科学院武汉岩土力学研究所 Carbonate acidizing and fracturing simulation sample, preparation method, simulation device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725042A (en) * 2017-09-13 2018-02-23 中国石油大学(北京) A kind of large-scale fracture and vug carbonate reservoir physical simulation experiment device of HTHP and method
CN107725042B (en) * 2017-09-13 2020-06-19 中国石油大学(北京) Physical simulation experiment device and method for high-temperature and high-pressure large-scale carbonate fracture-cave type oil reservoir
WO2021082130A1 (en) * 2019-11-01 2021-05-06 成都北方石油勘探开发技术有限公司 Acid fracturing simulation method considering variable-viscosity acid dynamic process
CN114508333A (en) * 2020-11-17 2022-05-17 中国石油化工股份有限公司 Vertical well seam temporary plugging steering circular seam hole-finding fracturing physical simulation method

Similar Documents

Publication Publication Date Title
CN104832169B (en) Indoor experimental shaft device and method for horizontal well two-well synchronous or asynchronous multi-section clustering fracturing
CN105890998B (en) Have crannied rock fracture simulation sample and preparation method, the simulation test device and method
CN106499385B (en) Device and method for evaluating fracture environment setting of casing integrality
CN203685173U (en) Seam cave type carbonate reservoir three-dimensional macro simulation and physical simulation experiment device
CN102053026B (en) Material and method for manufacturing carbonate cave oil reservoir physical model
CN106124325B (en) Rock fracture simulates sample and preparation method, the simulation test device and method
CN108333050B (en) Coal rock secondary hydraulic fracturing test method in true triaxial state
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN108386176B (en) Physical model test method for natural crack and artificial crack extension rule
CN106761721B (en) Experimental device and experimental method for improving thermal reservoir in consideration of thermal stress fracturing natural fracture development for enhanced geothermal system
CN105181927B (en) The hypotonic coal seam hydraulic fracture simulation experiment method of multi- scenarios method
CN105626027A (en) Coal and rock directional well sand fracturing physical simulation method
CN104100252A (en) Horizontal well multistage hydraulic fracturing physical simulation method
CN110924933A (en) Visual experiment method for dynamically simulating shale fracturing fracture network
CN203614095U (en) Cement sheath cementing strength evaluation device
CN109357921A (en) A kind of fracture hole oil reservoir Artificial Core Making method that parameter is controllable
CN107966340B (en) Preparation method of test piece containing geometric damage rock-like material
CN106050211A (en) Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing
CN110344826B (en) Method for evaluating compressibility of unconventional reservoir based on fracture morphology characterization
CN110005400A (en) Hot dry rock stratum high-temperature hyperbaric environment wellbore casing-cement sheath cement plane test device
CN106198181B (en) A kind of fractured horizontal well physical analogy sample and preparation method thereof
CN107884246A (en) Solution cavity preparation method in a kind of geomechanical model test
CN110593811B (en) Cement sheath initial stress state monitoring experiment method
CN111946318A (en) Multi-cluster synchronous fracturing visual simulation device, system and manufacturing method
CN205743861U (en) For simulating core model and the physics facility of actual fracture-pore reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026

WD01 Invention patent application deemed withdrawn after publication