Constructing method and structure of foundation pile with expansion tip using ready-made pile

Info

Publication number
JPS5873618A
JPS5873618A JP17133581A JP17133581A JPS5873618A JP S5873618 A JPS5873618 A JP S5873618A JP 17133581 A JP17133581 A JP 17133581A JP 17133581 A JP17133581 A JP 17133581A JP S5873618 A JPS5873618 A JP S5873618A
Authority
JP
Japan
Prior art keywords
pile
antibody
hole
expanded
ready
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17133581A
Other languages
Japanese (ja)
Inventor
Hiroshi Yoneda
弘 米田
Hideo Takano
高野 秀男
Futoshi Kaneda
金田 太
Keisuke Matsuda
松田 啓資
Yoshihiro Ogawa
小川 好広
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Construction Co Ltd
Original Assignee
Mitsubishi Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Construction Co Ltd filed Critical Mitsubishi Construction Co Ltd
Priority to JP17133581A priority Critical patent/JPS5873618A/en
Publication of JPS5873618A publication Critical patent/JPS5873618A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Abstract

PURPOSE:To easily construct a foundation pile with an expansion tip by a method in which precast piles including an expansion tip pile are connected with one another and they are hung down into a pit. CONSTITUTION:A combination of an expansion tip pile 21 and a pile 31 is hung down into a pit 10 filled with mud water. In case where the depth of the pit 10 is deep, they are hung down into the pit 10 while connecting the pile 21 with the pile 31, and cou0led in such a way that the upper end of the pile 20 is left in a proper length on the ground surface. In this way, piles are orderly connected as needed and hung down into the pit 10. After the expansion tip pile 31 lands on the pit bottom 13, cement mortar is poured into the aperture between the pile 20 and the pit 10 by means of a mortar pump MP to fill up the aperture and thereby fix the plle 20. Thus, a foundation pile with an expansion tip can be constructed.

Description

【発明の詳細な説明】 本発明は既製の抗体の複数個を組合せ接続することによ
る基礎杭の構築方法及びその基礎杭構造体に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a foundation pile by combining and connecting a plurality of ready-made antibodies, and a foundation pile structure thereof.

近時建築物の基礎杭とし拡底型の杭が段々使用されるよ
うになって来ている。昭和56年6月建築基準法の一部
が改訂されたことにより、上部構造物からの荷重の増加
が当然生じて来ることになる。そうすると構造物の基礎
杭は荷重保持の必要からして大きな直径が必要とされる
ことになるであろう。ところで。
Recently, expanded-bottomed piles have been increasingly used as foundation piles for buildings. Due to the partial revision of the Building Standards Act in June 1981, an increase in the load from the superstructure naturally occurred. In this case, the foundation piles of the structure will need to have a large diameter due to the need to hold the load. by the way.

理想的な抗体を考えてみると単純な直往型の杭よりも抗
体の強度と地盤の強度とを同一と成し得るような拡底型
状の杭の方が経済的に好適であることは確である。従っ
て「拡底型」の杭への移行は今後顕著になると思われる
Considering the ideal antibody, it is economically more suitable to use an expanded-bottom type pile that can achieve the same strength of the antibody and the strength of the ground than a simple straight-through type pile. It is certain. Therefore, the shift to "expanded-bottom" piles is expected to become more pronounced in the future.

実用化された拡底杭工法に関しては、今までのところ6
種類の工法が存在する。これらの工法によると抗体とし
ての機能の点では在来型の直往製杭に比較しては勝って
はいるが。
Regarding the expanded bottom pile construction method that has been put into practical use, so far, 6
There are various construction methods. These construction methods are superior to conventional direct-produced piles in terms of antibody function.

建造の実施の面から9.、、・予、建造の費用の面から
9. From the aspect of construction implementation. ,・・From the aspect of construction cost.

モして又建造後の杭採の現実の作用の点から見て、何れ
の工法を採ってみても満足の行くものではなかった。
Furthermore, from the point of view of the actual function of pile excavation after construction, no matter which construction method was adopted, it was not satisfactory.

たとえば現在性われている拡底場所打ち杭では、孔の最
下部を拡がりを有するように掘削し、この孔に対しコン
クリートを打つ。しかしこの場合には掘削した拡底部の
形状の確認が困難であったし、又孔の底部のスライムの
探知方法、拡底部への配筋方法、及びスライ・ムの除去
方法にも問題があった。
For example, in the currently available cast-in-place piles, the lowest part of the hole is excavated so as to widen, and concrete is poured into the hole. However, in this case, it was difficult to confirm the shape of the excavated expanded bottom, and there were also problems with the method of detecting slime at the bottom of the hole, the method of arranging reinforcement in the expanded bottom, and the method of removing slime. Ta.

さらに、他の拡底基礎杭工法としては本出願人による先
行発明として昭和49年1月18日に特許出願(特願昭
49−8312)され昭和54年11月29日に出願公
告(昭54−39.551 )された発明がある。しか
しこの場合にはコンクリート打設に際しケーシングの内
側に型枠を建込み、そしてコンクリートを打設しながら
該型枠を引き抜く操作を要するのでこの点に問題があっ
た。さらに両者の方法とも杭一般費用の点で充分に経済
的で1:1、 はなかった。  ゛ 本発明の目的はこのような在来の工法の欠点を消去した
新規の拡底杭構築工法を提供することであり、同時にこ
の新規の工法は本出願人による前記先行発明の工法の改
良に該当する。
Furthermore, as a prior invention by the present applicant, a patent application was filed on January 18, 1972 (Japanese Patent Application No. 8312, 1972) for other expanded-bottom foundation pile construction methods, and the application was published on November 29, 1971 (Showa 54-8312). 39.551) There is an invention that was made. However, in this case, when pouring concrete, it is necessary to erect a formwork inside the casing and then pull out the formwork while pouring concrete, which poses a problem. Furthermore, both methods were sufficiently economical in terms of general pile costs, and the ratio was not 1:1.゛The purpose of the present invention is to provide a new method for constructing expanded-bottomed piles that eliminates the drawbacks of such conventional methods, and at the same time, this new method corresponds to an improvement of the method of the prior invention by the present applicant. do.

本発明の他の目的は在来の工法の欠点を消去するために
既製の抗体であって直往型のものと拡底型のものとを組
合せ結合して実施する基礎杭構築工法を提供することで
ある。
Another object of the present invention is to provide a foundation pile construction method that is implemented by combining and combining ready-made antibodies, a direct type type and an expanded type type, in order to eliminate the drawbacks of conventional construction methods. It is.

本発明の別の目的は、既製の抗体であって直往型のもの
と拡底型のものとを組合せ結合することにより出来上る
基礎杭の構造体そのものを提供することである。
Another object of the present invention is to provide a foundation pile structure itself, which is made by combining and bonding ready-made antibodies of a straight-through type and an expanded-bottom type.

本発明の上記の目的を達成するために次のような手順で
杭の構築を行う。先ず、掘削工具を用いて地面に孔を穿
ち、この孔の直径を使用する拡底杭の下端の拡がった底
部の直径よりすこし大なるようにし、前記の孔の上方に
杭建込み櫓を設置し、そして、下端部分に近接して末広
がりの形状に、又その上方部分に関しては普通型の所定
長の円柱型の抗体の直径に等しく形成された既製の拡底
杭体を前記孔の附近の地上にもたらし1次で既製の円柱
型の所定長の普通型の抗体を前記拡底杭体の上方にもた
らし、該拡底杭体の上端と前記普通型の抗体の下端とを
接続しこれを前記杭建込み櫓を利用して前記の孔の中に
吊りおろし、若しこのようにして接続した杭の長さが掘
削した孔の深さより短く、従って拡底杭体の下端が孔の
底に達しないならば杭の上端が地上にすこし出るように
して止め、そして前記既製の普通型の別の抗体の下端を
先の普通型の抗体の上端に接続して前記孔の中に1−1
3りおろす。このようにして孔の深さに応じて順次に既
製の普通型の抗体を接続しつ\、そのものを孔の中に帛
りおろし、最後に既製の抗体の末広がりの下端部分が孔
の底に達するようにする。かくして接続した複数個の既
製抗体によって出来上った一連の長さの基礎杭を孔の中
に構築することが達成される。
In order to achieve the above-mentioned object of the present invention, a pile is constructed according to the following procedure. First, use a drilling tool to drill a hole in the ground, make the diameter of this hole slightly larger than the diameter of the expanded bottom of the bottom end of the expanded-bottom pile that will be used, and install a pile turret above the hole. Then, a ready-made expanded-bottom pile body, which has a shape that widens toward the bottom near the lower end and whose upper part is equal to the diameter of a regular cylindrical body with a predetermined length, is placed on the ground near the hole. In the first step, a ready-made cylindrical normal type antibody of a predetermined length is brought above the expanded bottom pile body, the upper end of the expanded bottom pile body and the lower end of the normal type antibody are connected, and this is used to erect the pile. If the length of the pile connected in this way is shorter than the depth of the drilled hole, and therefore the lower end of the expanded pile does not reach the bottom of the hole, Fix the pile so that the top end is slightly above the ground, connect the bottom end of another ready-made normal type antibody to the top end of the previous normal type antibody, and insert 1-1 into the hole.
3 Grate. In this way, connect the ready-made ordinary antibodies one after another according to the depth of the hole, and then drop them into the hole, and finally, the bottom end of the ready-made antibody with its flared ends will be at the bottom of the hole. reach it. It is thus accomplished to construct a series of lengths of foundation piles in the hole, made up of a plurality of prefabricated antibodies connected.

そして又一方に於て、この杭構築工法により、下端部分
に末広がりの拡底端部を有する既製の拡底杭体を有しそ
の上方には普通型の円柱型の所定長の抗体を1個又は複
数個接続した既製抗体接続型基礎杭構造体が提供される
ことになる。
On the other hand, with this pile construction method, a ready-made expanded-bottomed pile body having a widened-bottomed end portion at the lower end portion is provided, and one or more ordinary cylindrical antibodies of a predetermined length are mounted above the pile body. A ready-made antibody-connected foundation pile structure will be provided.

本発明をさらに明瞭にするために9本発明の基礎杭の構
築方法及びその基礎杭の構造体を、以下に実施例とその
図面によって説明する。
In order to further clarify the present invention, the method for constructing a foundation pile and the structure of the foundation pile according to the present invention will be described below with reference to Examples and drawings.

第1図はリバース工法を用いて掘削した孔である。孔の
掘削はリバース工法に依らなくても可能であるが、簡便
であること、又能率の良いことからこの工法を利用した
。この場合に掘削孔の直径りは後に述べる杭の拡底され
た下端部の直径dwよりすこし大きく1例えば10乃至
20cf/L大とする。第1図でG、L。
Figure 1 shows the hole drilled using the reverse method. Although it is possible to excavate the hole without relying on the reverse method, this method was used because it is simple and efficient. In this case, the diameter of the excavated hole is set to be slightly larger than the diameter dw of the enlarged bottom end of the pile, which will be described later, for example, 10 to 20 cf/L. G and L in Figure 1.

は地表面、12は孔の中の泥水である。次にトレミー管
を用いてスライムの処理をする。
is the ground surface, and 12 is the muddy water inside the hole. Next, process the slime using a tremie tube.

次で杭建込み櫓(図示なり、を孔の上にセットシ、さら
に孔の底部に捨コンクリート16を少量打設する。
Next, a pile erected turret (not shown) is set over the hole, and a small amount of concrete 16 is placed at the bottom of the hole.

、:ころで本発明の特徴とするところは拡底抗体を含ん
で既製の抗体を接続し組合せして。
However, the feature of the present invention is to connect and combine ready-made antibodies, including a widened antibody.

且つこれらを孔の中に吊り下して基礎杭を構築すること
である。
In addition, these are suspended into holes to construct foundation piles.

それで先ず、杭の底端部となる可き拡底杭体について説
明する。第2図は本発明の基礎杭の構築の途中を示す図
であるがこの抗体の下端部の21に示すものが拡底杭体
である。
Therefore, first, the expandable bottom pile body that becomes the bottom end of the pile will be explained. FIG. 2 is a diagram showing the construction of the foundation pile of the present invention in progress, and what is shown at 21 at the lower end of this antibody is an expanded bottom pile body.

この拡底杭体は長さより直径の方が大きいずんぐりした
形態をしていて、それの下端部26は孔の直径りよりや
\小なる直径dWを有する。該下端部26より上方は末
広がり又は円錐の一部分の形状を画定する部分22とな
っている。そしてさらにその上方は円柱型の杭体31と
同一の直径doを有する部分24として形成されている
。このような拡底杭体21は枠組した鉄筋を含んで製造
され得る。又このものは′2′5で示すように底部を塞
11・ ′11 いだ形状に製造されることが出来る。この場合には抗体
を、泥水12で充満された孔10に帛りおろす際に中空
の抗体であれば生ずるてあろう浮力を打ち消すために底
部25に通気孔26を設けても良い。
This expanded-bottomed pile has a stocky form with a diameter greater than its length, and its lower end 26 has a diameter dW smaller than the diameter of the hole. Above the lower end 26 is a portion 22 which flares out or defines the shape of a portion of a cone. Further above, a portion 24 having the same diameter do as the cylindrical pile body 31 is formed. Such an expanded bottom pile body 21 may be manufactured including framed reinforcing bars. Also, this product can be manufactured in a shape in which the bottom is closed, as shown by '2'5. In this case, a ventilation hole 26 may be provided in the bottom portion 25 in order to cancel out the buoyancy that would occur if the antibody was hollow when the antibody was lowered into the hole 10 filled with muddy water 12.

本発明の場合にはこのような拡底杭体21は、コンクリ
ート抗体でありそして工場で製造されるものである。そ
してこのような既製の拡底杭体が建設現場に搬入され使
用されるのである。
In the case of the present invention, such an expanded pile body 21 is made of concrete and is manufactured in a factory. These ready-made expanded-bottomed pile bodies are then transported to construction sites and used.

又第2図でろ1,52.33.34で示すものは工場生
産の既製の円柱型(直径d。)の市販の、規格品の所定
長のコンクリート抗体である。
Also, what is shown by 1, 52, 33, and 34 in FIG. 2 is a factory-produced ready-made cylindrical (diameter d.) commercially available, standardized concrete antibody of a predetermined length.

抗体(全体として20で示す)の孔1oへの建込みに際
しては先ず拡底杭体21を孔の附近の地上にもたらす。
When installing antibodies (indicated by 20) into the hole 1o, first, the expanded-bottomed pile body 21 is brought to the ground near the hole.

次で既製の円柱型の所定長の単位の杭体61を拡底杭体
21の上方にもたらし、杭体21の上端部22と杭体6
1の下端部とを溶接又はpc鋼線の緊張のいずれかの方
法によって接続する。次でこの拡底杭体21と円柱型の
所定長の杭体61との結合体を前記の建込み櫓を利用し
て孔1゜の中に帛りおろす。この時に該櫓に杭の降下を
係止し得る適宜の装置を設けて良く、この係止装置を利
用して、杭体61の上端が地上にすこし出る。くらいに
してこれを停止させる。
Next, a ready-made cylindrical pile body 61 of a predetermined length is brought above the expanded bottom pile body 21, and the upper end 22 of the pile body 21 and the pile body 6
1 by either welding or tensioning of PC steel wire. Next, the combined body of the expanded bottom pile body 21 and the cylindrical pile body 61 of a predetermined length is lowered into the 1° hole using the above-mentioned construction tower. At this time, the turret may be provided with an appropriate device that can lock the descent of the pile, and by using this locking device, the upper end of the pile body 61 slightly protrudes above the ground. I'll stop this at some point.

もつとも孔の深さが深く拡底杭体21の下端が孔の底に
達していないときに上記が必要とされるもので、孔の深
さが浅ければ拡底杭体の下端部は直に孔の底に達するよ
うになるわけである。そして孔が深く杭が未だ短いとき
は次に円柱型の所定長の第2の単位の杭体62を杭体3
1の上方にもたらし、杭体61の上端と杭体62の下端
とを溶接又はpc鋼線の緊張によって強固に接続する。
The above is necessary when the depth of the hole is deep and the lower end of the expanded pile body 21 does not reach the bottom of the hole. In other words, it reaches the bottom. If the hole is deep and the pile is still short, then a second unit pile body 62 of a cylindrical shape with a predetermined length is inserted into the pile body 3.
1, and the upper end of the pile body 61 and the lower end of the pile body 62 are firmly connected by welding or tensioning of PC steel wire.

さらに次にこのようにして出来た既製の抗体30,31
゜52の結合体を前記のように建込み櫓を利用して孔1
0の中に帛りおろし杭体62の上端が孔の上の地上に適
宜の長さ残るようにして。
Furthermore, ready-made antibodies made in this way30,31
The combined body of
0 so that the upper end of the pile body 62 remains on the ground above the hole for an appropriate length.

これを停止し係止する。Stop and lock this.

このようにして孔10の深さに応じた所要の長さの抗体
20が出来上るように既製の個個の抗体53,34.等
を必要に応じて」1記と同様の方法によって順次側々の
杭体の上下端を接続し、孔の中に吊りおろして行く。
In this way, individual antibodies 53, 34, . If necessary, connect the upper and lower ends of the pile bodies on the sides one by one using the same method as described in 1 above, and lower them into the hole.

第3図は基礎杭体20の孔10内への建て込みが終了し
たところを示す。この場合には拡底杭体21に対して円
柱型抗体31〜64の4本が接続されて1本の基礎杭体
2oが完成していることがわかるであろう。
FIG. 3 shows a state where the foundation pile body 20 has been erected into the hole 10. In this case, it will be seen that four cylindrical antibodies 31 to 64 are connected to the expanded bottom pile body 21 to complete one foundation pile body 2o.

次で杭体20と孔10との隙間に対してモルタル又はそ
の他の同等品を注入し埋めもどしをし、(第6図に見え
るMP(モルタルポンプ)を用いる)杭体20を固定し
、これによって基礎杭1本の構築が終了したことになる
Next, the gap between the pile body 20 and the hole 10 is filled with mortar or other equivalent material, and the pile body 20 is fixed (using an MP (mortar pump) as shown in FIG. 6). This means that construction of one foundation pile has been completed.

又上述のような既製の抗体の複数個の接続による1個の
基礎杭の構築方法の順次の工程、)よ、ヵ、ら、!11
カ、なようン・、、オ、□、於7.よヶ11の見方から
すれば、杭の拡底端部となる可き末広がりの杭下端部を
有して形成された既製の拡底杭体21を最下端部としそ
の上方に既製の円柱型の所定長の1個ゲ1体31又は複
数個の他の個々の抗体32.33等を接続して形成した
既製抗体接続型のシ′、礎杭構造体を提供している。こ
の場合に各々の既製抗体の接続は先に基礎杭構築方法に
17’−(述べたように各個の”既製抗体の上端とT慣
゛、I 、9溶接又はPC鋼線の緊張によって打1 !
・る。
Also, the sequential steps of the method for constructing one foundation pile by connecting multiple pieces of ready-made antibodies as described above, ), ka, ra,! 11
Ka, nayoun...,, o, □, 7. From the viewpoint of Yoga 11, the ready-made expanded-bottom pile body 21, which is formed with a pile bottom end that is widened as far as possible and becomes the bottom-expanded end of the pile, is the lowest end, and above it is a pre-made cylindrical predetermined column. A ready-made antibody-connected base pile structure is provided, which is formed by connecting one length 31 or a plurality of other individual antibodies 32, 33, etc. In this case, the connection of each prefabricated antibody is made by first applying the foundation pile construction method to the upper end of each "prefabricated antibody and T", I, 9 by welding or by tensioning the PC steel wire (as mentioned above). !
・Ru.

又接続する既製抗体の個81・i′−”(出来上った基
礎杭の全長は孔の深さに1 じて定まることは当然であ
る。さらに、ζ(、既製抗体接続型の基礎杭構造体に於
ては1戸11要の長さを有する杭を、地上に於て全+1
− ti’ I、て構築したものを使用することも可能
である。
In addition, the number of prefabricated antibodies to be connected is In the structure, piles with a length of 11 times per house are installed on the ground with a total of +1
It is also possible to use one constructed by - ti' I.

さらに本発明の基礎杭構築工法及基礎杭構造体に於ては
構製の単位の抗体に前もってネ□ ガティブフリクション防止のための表面処理1111+
・ 材(図示せず)′を塗布して置き、この単位の抗体を接
続して基礎杭を構築rる。従って表面処理は容易に且良
好に実施されることが出来、又このように表面処理をほ
どこされた杭体は置き杭の形で設置されるので一植込み
杭とちがい一ネガティブフリクション防止に関し確実に
効果を発揮することが出来る。
Furthermore, in the foundation pile construction method and foundation pile structure of the present invention, the antibodies of the structural units are applied in advance to surface treatment for preventing negative friction 1111+
・Apply and place the material (not shown) and connect the antibodies of this unit to construct the foundation pile. Therefore, the surface treatment can be carried out easily and effectively, and since the surface-treated pile body is installed in the form of a pile, unlike a planted pile, it is possible to reliably prevent negative friction. It can be effective.

本発明は上に述べたような基礎杭の構築方法及び基礎杭
構造体に関するものであるが次のような効果を有する。
The present invention relates to a method of constructing a foundation pile and a foundation pile structure as described above, and has the following effects.

すなわち、杭材は工場生産の既製のものであるから高強
度で均質のものが得られる。さらに既製杭材は、製造方
法の改良などにより。
That is, since the pile material is ready-made from a factory, high strength and homogeneity can be obtained. Furthermore, ready-made pile materials have improved due to improved manufacturing methods.

強度のより大なるものが市場に供給される状況にあるの
でこの点に於て既製杭材の利用は有利性が考えられる。
Since piles with higher strength are being supplied to the market, the use of ready-made piles may be advantageous in this respect.

このことは比較的外径の細い杭材の使用が可能であるこ
とを意味し。
This means that it is possible to use pile materials with a relatively small outer diameter.

又これは基礎杭の構築に於ける工費を低減させる方向に
作用するであろう。
This will also work towards reducing the cost of construction of foundation piles.

又本基礎杭に於゛Cは最下部の拡底杭材として配筋した
ものを使用することができ、そして又その形態の確定し
たものを使用することが出来る。場所打ちコンクリート
杭でないたy)杭材中への泥水の混入がなく、従って杭
材の品質に対する信頼性が増大する。杭材に表面処理を
したときはネガティブフリクションを効果的に防止する
ことができる。孔内に杭材を建て込む際に、杭建込み櫓
に関連して調整機構を設けることが出来これを用いて杭
の垂直性を容易に保持することが可能である。
In addition, in this foundation pile, a reinforcement can be used as the lowest bottom expansion pile material, and a type with a fixed form can also be used. Since it is not a cast-in-place concrete pile, there is no mixing of muddy water into the pile material, thus increasing reliability in the quality of the pile material. Negative friction can be effectively prevented when the pile material is surface treated. When erecting pile materials into a hole, an adjustment mechanism can be provided in conjunction with the pile erecting turret, and by using this, it is possible to easily maintain the verticality of the pile.

本発明の基礎杭に於ては抗体の強度を地盤の強度と同一
にするように拡底端部の形状寸法を定めることが可能で
あるから他の工法に比較し経済的に安上りで有利である
In the foundation pile of the present invention, it is possible to determine the shape and dimensions of the expanded bottom end so that the strength of the antibody is the same as the strength of the ground, so it is economically cheaper and more advantageous than other construction methods. be.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は基礎杭を建てこむ可く地面に掘削した孔の縦断
面図であり、第2図は前記の孔の中1こ本発明の基礎杭
を建てこんでいる途中を示す縦断面図であり、第6図は
前記の孔の中に本発明の基礎杭を、孔の底に到るまでお
ろしそして杭の周辺部をモルタル又は類似品を注入し埋
め戻しを行っているところを示す縦断面図である。 〔主要部分の符号の説明〕 r) 、L 、−・・・ 地表面 10・・・ ・・孔 21 ・・・  既製の拡底杭体 61〜64  ・  ・・・ 既製の円柱形の所定長の
杭体20・・・・・・・・基礎杭 出願人 : 三菱建設株式会社 第 11コ 第 2gi 第3困
Figure 1 is a vertical cross-sectional view of a hole drilled in the ground into which a foundation pile can be installed, and Figure 2 is a vertical cross-sectional view showing the middle of the hole in which the foundation pile of the present invention is being installed. FIG. 6 shows the foundation pile of the present invention being lowered into the hole described above until it reaches the bottom of the hole, and the surrounding area of the pile is backfilled with mortar or a similar product. FIG. [Explanation of symbols of main parts] r), L, -... Ground surface 10... Hole 21... Ready-made expanded bottom pile bodies 61 to 64... Ready-made cylindrical piles of a predetermined length Pile body 20...Foundation pile Applicant: Mitsubishi Construction Co., Ltd. No. 11, No. 2gi, No. 3

Claims (1)

【特許請求の範囲】 1 掘削工具を用・いて地面に孔を掘削し、この孔の直
径を杭下端部の直径よりわずかに犬なるようにし、前記
掘削孔の上方に杭建込み櫓を設置し、杭の拡底した先端
部となる可き末広がりの杭下端部を有して形成された既
製の拡底杭体を前記掘削した孔の附近の地上にもたらし
9次で既製の円柱型の所定長の第1の抗体を前記拡底杭
体の上方にもたらし、前記拡底杭体の上端と前記第1の
抗体の下端とを接続し9次で上記の接続された抗体を孔
の中に吊りおろし拡底杭体の拡底端部が孔の底に達して
いないならば上記接続された抗体の吊りおろしを適宜中
止し、前記第1の抗体の上方に既製の円柱型、の所定長
の第2の抗体をもたらし前記第1の抗体の上端と該第2
の抗体の下端とを接続するようにし、追って同様にして
孔の深さに応じて抗体の長さを延長しつ\。 前記槽によって、接続した抗体を前記掘削した孔の中に
早りおろし、拡底杭体の拡底先端部を孔の底に達するよ
うにさせることを特徴とする既製抗体を利用し拡底先端
部を有する基礎杭の構築方法。 2、 杭の拡底先端部となる可き末広がりの杭下端部を
有して形成された既製の拡底杭体を最下端部としその上
方に既製の円柱型の所定長の抗体を1個又は複数個接続
して出来ていることを特徴とする既製抗体接続型の基礎
杭構造体。
[Claims] 1. A hole is excavated in the ground using a drilling tool, the diameter of this hole is slightly larger than the diameter of the lower end of the pile, and a pile turret is installed above the excavated hole. Then, a ready-made expanded-bottom pile body formed with a bottom end of the pile that is widened as far as possible, which will become the bottom-expanded tip of the pile, is brought to the ground near the excavated hole, and a ready-made cylindrical shape with a predetermined length of 9 degrees is brought to the ground near the excavated hole. Bring the first antibody above the expanded bottom pile body, connect the upper end of the expanded bottom pile body and the lower end of the first antibody, and suspend the connected antibody into the hole in the ninth step to expand the bottom. If the enlarged bottom end of the pile body has not reached the bottom of the hole, suspending the connected antibody is appropriately stopped, and a ready-made cylindrical second antibody of a predetermined length is placed above the first antibody. bringing about the upper end of said first antibody and said second antibody.
and the lower end of the antibody, and then extend the length of the antibody according to the depth of the hole in the same way. The connected antibody is quickly lowered into the excavated hole by the tank, and the expanded bottom end of the expanded bottom pile body is made to reach the bottom of the hole. How to construct foundation piles. 2. A ready-made expanded-bottom pile body formed with a bottom end of the pile that can be expanded toward the end, which becomes the expanded-bottom tip of the pile, is the lowest end, and one or more ready-made cylindrical antibodies of a predetermined length are placed above it. A ready-made antibody-connected foundation pile structure characterized by being made by individually connecting each other.
JP17133581A 1981-10-28 1981-10-28 Constructing method and structure of foundation pile with expansion tip using ready-made pile Pending JPS5873618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17133581A JPS5873618A (en) 1981-10-28 1981-10-28 Constructing method and structure of foundation pile with expansion tip using ready-made pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17133581A JPS5873618A (en) 1981-10-28 1981-10-28 Constructing method and structure of foundation pile with expansion tip using ready-made pile

Publications (1)

Publication Number Publication Date
JPS5873618A true JPS5873618A (en) 1983-05-02

Family

ID=15921313

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17133581A Pending JPS5873618A (en) 1981-10-28 1981-10-28 Constructing method and structure of foundation pile with expansion tip using ready-made pile

Country Status (1)

Country Link
JP (1) JPS5873618A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01315523A (en) * 1988-06-15 1989-12-20 Kazuo Murazaki Burying method for concrete pile and device thereof
CN107675706A (en) * 2017-11-17 2018-02-09 万保金 Prefabricated bamboo joint pile and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01315523A (en) * 1988-06-15 1989-12-20 Kazuo Murazaki Burying method for concrete pile and device thereof
CN107675706A (en) * 2017-11-17 2018-02-09 万保金 Prefabricated bamboo joint pile and its construction method

Similar Documents

Publication Publication Date Title
JP2007239200A (en) Erecting construction method of reinforcing cage or steel pipe, float device used for this construction method and removal method of this device
JP4984308B2 (en) Ready-made pile
KR101187170B1 (en) Application of under pinning method in remodeling
JPH11280067A (en) Method for embedding existing concrete pile and structure of foundation pile and existing concrete pile
JP4724879B2 (en) Foundation pile structure
JP4115095B2 (en) Reverse strike method
US3299644A (en) Underpinning system and method of constructing same
JPS5873618A (en) Constructing method and structure of foundation pile with expansion tip using ready-made pile
JPS59126821A (en) Erection work of foundation pile
JP4724878B2 (en) Foundation pile structure
JP4724873B2 (en) Ready-made pile
RU2089706C1 (en) Pile frozen into permafrost and method of erection of pile frozen into permafrost
US5234288A (en) Integrated column and pile
JP3586839B2 (en) In-situ formed concrete pile and its forming method
JP4054903B2 (en) Method of burying ready-made piles, foundation pile structure and ready-made piles
EP0911449A1 (en) A cast-in-place pile and the process for manufacturing of the same
JPS62268423A (en) Construction work of underground pile used in common for earth anchor
JPS6250516A (en) Formation work of composite pile
JPH02272113A (en) Method of creating concrete pile body
JP2004238818A (en) Work execution method for soil cement column-row wall with tip foot protection pile structure
JP2996113B2 (en) How to build a shaft
JPH11247203A (en) Reinforcing method of existing building foundation by inclined shaft
JPS58204218A (en) Burying work of pile
JPH0442493B2 (en)
JPS59145822A (en) Construction work of underground continuous wall