CN107675706A - Prefabricated bamboo joint pile and its construction method - Google Patents
Prefabricated bamboo joint pile and its construction method Download PDFInfo
- Publication number
- CN107675706A CN107675706A CN201711146678.0A CN201711146678A CN107675706A CN 107675706 A CN107675706 A CN 107675706A CN 201711146678 A CN201711146678 A CN 201711146678A CN 107675706 A CN107675706 A CN 107675706A
- Authority
- CN
- China
- Prior art keywords
- pile
- circular
- enlarging
- splicing
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 title claims abstract description 12
- 235000017491 Bambusa tulda Nutrition 0.000 title claims abstract description 12
- 241001330002 Bambuseae Species 0.000 title claims abstract description 12
- 235000015334 Phyllostachys viridis Nutrition 0.000 title claims abstract description 12
- 239000011425 bamboo Substances 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 title claims abstract description 8
- 239000002689 soil Substances 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 7
- 239000010959 steel Substances 0.000 claims abstract description 7
- 238000005266 casting Methods 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims 1
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000010412 perfusion Effects 0.000 description 2
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of prefabricated bamboo joint pile and its construction method, belong to technical field of building construction.Enlarging stake is divided into termination by splice sections and cuts native enlarging pile cutoff and middle part splicing pile cutoff;Cut native enlarging pile cutoff and be made up of circular pile body part and circular flared part in termination;Circular pile body part and circular flared part surface are all uniformly provided with circular opening, and the concrete rib of circular ring type, and the stitching portion of prefabricated pile element is provided with splicing bayonet socket and splicing enlarging, and the bottom of circular flared part is provided with the steel sheath of circle;Middle part splicing pile cutoff two ends are equipped with splicing bayonet socket and splicing enlarging, and in-between section is circular pile body part, and circular pile body part surface is uniformly provided with circular opening, and the concrete rib of circular ring type.The present invention can effectively improve speed of fulfiling hole, the frictional force of increase stake and soil and economize on resources and the purpose of cost of labor.
Description
Technical field
The present invention relates to a kind of prefabricated bamboo joint pile and its construction method, belong to technical field of building construction.
Background technology
It is slow borehole speed to be present in the conventional stake of Building Trade in China at present, if supporting course can cause pile body very long more deeply.Mesh
Preceding bored concrete pile system refers to form stake in foundation soil by means such as machine drilling, steel pipe soil compaction or manpower excavations in engineering site
Hole, and steel reinforcement cage, concrete perfusion and the stake made are placed in it, different according to forming hole method, it is heavy that bored concrete pile can be divided into again
Several classes such as pipe perfusion pile, cast-in-situ bored pile and digging hole filling pile.
The content of the invention
It is an object of the invention to provide a kind of prefabricated bamboo joint pile and its construction method, can effectively improve pore-forming speed
Degree, the frictional force of increase stake and soil and economizes on resources and the purpose of cost of labor.
The present invention to achieve these goals, adopts the following technical scheme that:
A kind of prefabricated bamboo joint pile, enlarging stake are divided into termination by splice sections and cut native enlarging pile cutoff and middle part splicing pile cutoff;
Cut native enlarging pile cutoff and be made up of circular pile body part and circular flared part in termination;
Circular pile body part and circular flared part surface are all uniformly provided with circular opening, and the concrete rib of circular ring type, in advance
The stitching portion of pile element processed is provided with splicing bayonet socket and splicing enlarging, and the bottom of circular flared part is provided with the steel sheath of circle;
Middle part splicing pile cutoff two ends are equipped with splicing bayonet socket and splicing enlarging, and in-between section is circular pile body part, circular stake
Body part surface is uniformly provided with circular opening, and the concrete rib of circular ring type.
A kind of construction method of prefabricated bamboo joint pile is as follows the step of this method:
A, first spoil, dig to the depth of one section of prefabricated pile cutoff;
B, the termination of prefabricated enlarging stake is cut into native pile cutoff lifting to be put into the soil body excavated, when guarantee is installed in place, pile body is protected
Hold vertical;
C, the following soil body is drilled loose by rotary digging drilling hole technology, taken out, at the same time, termination cut native pile cutoff can because deadweight and
Sink;
When D, specifying absolute altitude when sinking to the stage, the splice sections lifting of prefabricated enlarging stake is buried, carried out with termination enlarging stake
Splicing;
E, and then C, D steps are repeated, until stake bottom reaches designed elevation;
F, the casting concrete in stake, pile body structure is formed.
The equally distributed circular opening, it is in casting process, make the concrete in pile body be overflow from hole
Go out, increase with the contact surface of the soil body to reach the effect of increase frictional force.
The pile body flared part, it is in order to increase the floor space of pile body, to improve bearing capacity of pile tip.
The steel sheath, first, in order to protect end concrete wall not by soil fail, second, making pile crown part form phase
To the sharp smooth sinking cut native face, facilitate pile body.
Flared part in the middle part enlarging splice sections, it is to increase the frictional force of pile lining and soil.
Beneficial effects of the present invention:
1st, the present invention may be such that the frictional force of stake and bottom bearing get a promotion;
2nd, the present invention greatly improves the efficiency for excavating pore-forming;
3rd, the present invention can reduce manual work, reduce Contraction in Site;
4th, the invention enables job site noise is small, pollution is small;
5th, the present invention realizes factorial praluction, convenient and swift.
Brief description of the drawings
Fig. 1 is that the structural representation of native enlarging pile cutoff is cut in the termination of the present invention;
Fig. 2 is the middle part spliced pile segment structure schematic diagram of the present invention;
Fig. 3 is the main view angle structural representation of the present invention;
Fig. 4 is the cross-sectional view of the present invention;
Fig. 5 is overall structure diagram after present invention splicing.
Embodiment
The present invention will be described in detail below in conjunction with the accompanying drawings:
A kind of prefabricated bamboo joint pile, enlarging stake are divided into termination by splice sections and cut native enlarging pile cutoff and middle part splicing pile cutoff;
Cut native enlarging pile cutoff and be made up of circular pile body part 1 and circular flared part 4 in termination;
Circular pile body part 1 and the surface of circular flared part 4 are all uniformly provided with circular opening 3, and the concrete rib of circular ring type
2, the stitching portion of prefabricated pile element is provided with splicing bayonet socket 6 and splicing enlarging 7, and the bottom of circular flared part 4 is provided with circle
Steel sheath 5;
Middle part splicing pile cutoff two ends are equipped with splicing bayonet socket 6 and splicing enlarging 7, and in-between section is circular pile body part 1, circular
The surface of pile body part 1 is uniformly provided with circular opening 3, and the concrete rib 2 of circular ring type.
A kind of construction method of prefabricated bamboo joint pile is as follows the step of this method:
A, first spoil, dig to the depth of one section of prefabricated pile cutoff;
B, the termination of prefabricated enlarging stake is cut into native pile cutoff lifting to be put into the soil body excavated, when guarantee is installed in place, pile body is protected
Hold vertical;
C, the following soil body is drilled loose by rotary digging drilling hole technology, taken out, at the same time, termination cut native pile cutoff can because deadweight and
Sink;
When D, specifying absolute altitude when sinking to the stage, the splice sections lifting of prefabricated enlarging stake is buried, carried out with termination enlarging stake
Splicing;
E, and then C, D steps are repeated, until stake bottom reaches designed elevation;
F, the casting concrete in stake, pile body structure is formed.
Claims (2)
- A kind of 1. prefabricated bamboo joint pile, it is characterised in that:Bamboo joint pile is divided into termination by splice sections and cuts native enlarging pile cutoff with Splice pile cutoff in portion;Native enlarging pile cutoff is cut by circular pile body part in termination(1)With circular flared part(4)Composition;Circular pile body part(1)With circular flared part(4)Surface is all uniformly provided with circular opening(3), and circular ring type is mixed Coagulate native rib(2), the stitching portion of prefabricated pile element is provided with splicing bayonet socket(6)With splicing enlarging(7), circular flared part(4)Bottom Portion is provided with the steel sheath of circle(5);Middle part splicing pile cutoff two ends are equipped with splicing bayonet socket(6)With splicing enlarging(7), in-between section is circular pile body part (1), circular pile body part(1)Surface is uniformly provided with circular opening(3), and the concrete rib of circular ring type(2).
- A kind of 2. construction method of prefabricated bamboo joint pile as claimed in claim 1, it is characterized in that the step of this method is such as Under:A, first spoil, dig to the depth of one section of prefabricated pile cutoff;B, the termination of prefabricated enlarging stake is cut into native pile cutoff lifting to be put into the soil body excavated, when guarantee is installed in place, pile body is protected Hold vertical;C, the following soil body is drilled loose by rotary digging drilling hole technology, taken out, at the same time, termination cut native pile cutoff can because deadweight and Sink;When D, specifying absolute altitude when sinking to the stage, the splice sections lifting of prefabricated enlarging stake is buried, carried out with termination enlarging stake Splicing;E, and then C, D steps are repeated, until stake bottom reaches designed elevation;F, the casting concrete in stake, pile body structure is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711146678.0A CN107675706A (en) | 2017-11-17 | 2017-11-17 | Prefabricated bamboo joint pile and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711146678.0A CN107675706A (en) | 2017-11-17 | 2017-11-17 | Prefabricated bamboo joint pile and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107675706A true CN107675706A (en) | 2018-02-09 |
Family
ID=61149919
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711146678.0A Pending CN107675706A (en) | 2017-11-17 | 2017-11-17 | Prefabricated bamboo joint pile and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107675706A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5873618A (en) * | 1981-10-28 | 1983-05-02 | Mitsubishi Kensetsu Kk | Constructing method and structure of foundation pile with expansion tip using ready-made pile |
CN101775804A (en) * | 2010-01-13 | 2010-07-14 | 浙江大东吴集团建设有限公司 | Tube pile structure |
CN203924045U (en) * | 2013-12-23 | 2014-11-05 | 中淳高科桩业股份有限公司 | Compound pile |
CN106759296A (en) * | 2017-01-17 | 2017-05-31 | 浙江工业大学 | Drainable irregular-section bamboo joint pipe pile and root planting type construction method thereof |
CN106948338A (en) * | 2017-03-21 | 2017-07-14 | 林清辉 | A kind of bamboo joint pile and its construction method |
-
2017
- 2017-11-17 CN CN201711146678.0A patent/CN107675706A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5873618A (en) * | 1981-10-28 | 1983-05-02 | Mitsubishi Kensetsu Kk | Constructing method and structure of foundation pile with expansion tip using ready-made pile |
CN101775804A (en) * | 2010-01-13 | 2010-07-14 | 浙江大东吴集团建设有限公司 | Tube pile structure |
CN203924045U (en) * | 2013-12-23 | 2014-11-05 | 中淳高科桩业股份有限公司 | Compound pile |
CN106759296A (en) * | 2017-01-17 | 2017-05-31 | 浙江工业大学 | Drainable irregular-section bamboo joint pipe pile and root planting type construction method thereof |
CN106948338A (en) * | 2017-03-21 | 2017-07-14 | 林清辉 | A kind of bamboo joint pile and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758123B (en) | The construction method of manually digging hole filling pile retaining wall lining | |
CN104988907A (en) | Construction method of concrete pile | |
CN102286984A (en) | Water-stop curtain and construction method thereof | |
CN105780763A (en) | Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile | |
CN101838988B (en) | Comprehensive construction method for extracting anchor cable | |
JPWO2004035942A1 (en) | Pile digging method, foundation pile structure | |
CN108662281B (en) | Pipe jacking device and pipe jacking construction method | |
CN202194149U (en) | Water-proof curtain | |
CN207362838U (en) | A kind of tool-type soft soil foundation irrigates pile wall | |
CN110374091A (en) | A kind of rectangle friction pile mechanical hole building construction method | |
CN104480929A (en) | Pile and wall integrated construction method for applying occlusive pile into permanent basement external wall | |
CN104988914A (en) | Cast-in-situ bored pile breakage processing method under water area environment | |
CN104099946A (en) | Novel jacking pipe intersegment overhaul well | |
CN207469238U (en) | Prefabricated flaring stake | |
CN204311456U (en) | Foundation ditch strengthening structure | |
KR20200013275A (en) | A device that can be separated after entering a PHC pile using a steel pipe | |
CN102619521A (en) | Construction method for vertical shaft bedrock section wall structure | |
CN207469237U (en) | Prefabricated bamboo joint pile | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN107675706A (en) | Prefabricated bamboo joint pile and its construction method | |
CN107675705A (en) | Prefabricated enlarging stake and its construction method | |
CN206233232U (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
KR101049514B1 (en) | Ready-made reinforced concrete pile with detachable upper pile | |
JPH11166231A (en) | Bottom widening existing pile and embedding machine | |
JP4074198B2 (en) | How to remove existing piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180209 |
|
RJ01 | Rejection of invention patent application after publication |