A kind of rectangle friction pile mechanical hole building construction method Download PDFInfo
- Publication number
- CN110374091A CN110374091A CN201910615879.3A CN201910615879A CN110374091A CN 110374091 A CN110374091 A CN 110374091A CN 201910615879 A CN201910615879 A CN 201910615879A CN 110374091 A CN110374091 A CN 110374091A
- Authority
- CN
- China
- Prior art keywords
- rectangle
- pile
- stake holes
- contour line
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000009435 building construction Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 37
- 238000005266 casting Methods 0.000 claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 238000005553 drilling Methods 0.000 claims abstract description 20
- 239000004567 concrete Substances 0.000 claims abstract description 18
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000011435 rock Substances 0.000 abstract description 2
- 238000009412 basement excavation Methods 0.000 abstract 1
- 238000005422 blasting Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 238000004880 explosion Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/36—Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of rectangle friction pile mechanical hole building construction methods, belong to slope supporting structure construction technology field, this method comprises the following steps: the positioning of A. rectangle stake holes unwrapping wire;B. rectangle steel pile casting is made;C. rotary pile-digging machine borehole;D. rectangle steel pile casting is transferred in rectangle stake holes using manipulator, removes the extra earthwork of side wall;E. it backbreaks on the outside of steel pile casting region casting concrete;F. manipulator proposes steel pile casting;G. decentralization rectangle steel reinforcement cage and casting concrete formation friction pile.Construction method of the present invention solves artificial digging pile and is crushed into rock inefficiency, and do not allow Blasting Excavation in the case where environment is complicated, the very big problem of drilling construction difficulty, it only need to be using conventional rotary drilling machinery equipment, do not increase construction cost, and has the advantages that speed of fulfiling hole is fast, construction efficiency is high, easy to operate, security risk is low etc..
Description
Technical field
The present invention relates to a kind of friction pile drilling construction methods, more particularly to a kind of applying for rectangle friction pile mechanical hole building
Work method belongs to slope supporting structure construction technology field.
Background technique
Manual digging pile construction operating procedure is simple, easy for construction, bearing capacity of single pile is high, construction quality is easily guaranteed that.But
Caisson underground work condition is poor, the security risk of bad environments, large labor intensity, single pile speed of application slowly, in construction
It is very prominent, it is necessary to take underground work, human safety issues are extremely severe, and there are many unsafe factors and hidden danger, apply
Work safety management difficulty is larger;And stake well digging process weakens slip mass drag itself, especially digs to below slider bed
When hard and steady stratum, it usually needs explosion is big to the disturbance on stratum;Especially those are in the cunning in development of deformation stage
Slope, explosion more exacerbate its unstability and construction risk, and the safety of construction personnel and periphery construction of structures is even more to be difficult to ensure.
Mechanical hole perfusion post construction efficiency is high, operator is few, risk is small, is influenced less by weather, but in square pile
There is also some technical problems when construction, and such as most rotary digging stakes use circular bite currently on the market, in addition market
The problems such as rectangular friction pile mechanical piling technique of upper appearance is immature, applicability is not strong or construction cost is excessively high exists.
Economic and Efficiency Analysis shows that (reason is to collapse although mechanical hole building increases compared with the concrete that artificial digging pile needs
Hole and fullness coefficient increase), but the steel reinforced concrete dado of artificial digging pile can be reduced simultaneously, increased costs are less, are substantially at and hold
Level state.
Construction risk can be greatly lowered with respect to manually digging hole in rectangle friction pile mechanical hole building, as collapsed during manually digging hole
The emergency situations such as hole, electric shock, gas explosion improve construction efficiency, accelerate construction progress, solve manual digging pile construction progress
Slowly, the big problem of risk has preferable market application prospect.
Summary of the invention
In order to overcome the shortage of prior art, the present invention provides a kind of rectangle friction pile mechanical hole building construction method, this method
Using conventional rotary drilling machinery equipment, do not increase construction cost, with easy to operate, construction safety, speed it is fast, high-efficient excellent
Point.
The present invention realizes that the technical solution of above-mentioned purpose is as follows:
A kind of rectangle friction pile mechanical hole building construction method, comprising the following steps:
A. rectangle stake holes unwrapping wire positions
A.1 rectangle stake holes contour line is determined;
A.2 rotary pile-digging machine bit diameter is determined according to rectangle stake holes contour line bond length;
A.3 lower brill stake core position for the first time is determined along rectangle stake holes contour line longitudinal direction;
A.4 it is determined according to rectangle stake holes contour line long side length and bores number under rotary pile-digging machine;
A.5 according to boring under rotary pile-digging machine, the positioning of number unwrapping wire is lower every time to bore stake core position;
B. rectangle steel pile casting is made;
C. rotary pile-digging machine borehole
C.1 the lower drilled as holes of rotary pile-digging machine gradation;
C.2 boring number as follows is more than twice, using jump digging method sequence of construction;
D. rectangle steel pile casting is transferred in rectangle stake holes using manipulator, removes the extra earthwork of side wall;
E. it backbreaks on the outside of steel pile casting region casting concrete;
F. manipulator proposes steel pile casting;
G. decentralization rectangle steel reinforcement cage and casting concrete formation friction pile.
Further, step A.2 in, the rotary pile-digging machine bit diameter need to be more than or equal to rectangle stake holes contour line short side
Length is finally determined for compliance with the rotary pile-digging machine drill bit of requirement in conjunction with market common drill bit specification.
Further, step A.3 in, determine that stake core position of boring lower for the first time uses along rectangle stake holes contour line longitudinal direction
The method of two point of contact Radius, the specific steps of this method are as follows: be with two endpoints of a short side of rectangle stake holes contour line
Two point of contacts are justified with rotary pile-digging machine drill bit radius size work, so that the center of circle is fallen in rectangle stake holes contour line short side and be located at rectangle stake holes
On elongated central line in contour line, which is lower brill stake core position;
Further, step A.4 in, under rotary pile-digging machine bore number determination method are as follows:
A.4.1 select two endpoints of the other side short side of rectangle stake holes contour line for two point of contacts, using two point of contacts one
The method of radius determines brill stake core position under second;
A.4.2 if the lower drilling profile bored and rectangle stake holes contour line can surround Delta Region twice, and when three
Number is bored when angular zone height is not more than a quarter of rectangle stake holes contour line bond length, under pile digger to be set to twice i.e.
It can;
A.4.3 when Delta Region height is greater than a quarter of rectangle stake holes contour line bond length, third time digs stake
Machine drill core position is located on short side center line, is particularly located at the center position for not excavating the short side center line in region;
A.4.4 if the drilling profile and rectangle stake holes contour line that bore for the first time and under third time can surround trigonum
Domain, then follow the steps A.4.2~A.4.3, until the adjacent drilling profile bored lower twice surrounded with rectangle stake holes contour line three
Until a quarter of the angular zone height no more than rectangle stake holes contour line bond length;
A.4.5 such as second and for the third time, the lower drilling profile bored and rectangle stake holes contour line can surround Delta Region,
Execute step A.4.2~A.4.3, until the Delta Region that the adjacent drilling profile bored lower twice is surrounded with rectangle stake holes contour line
Until a quarter of the height no more than rectangle stake holes contour line bond length;
A.4.5 A.4.2 referring to step, as the drilling profile bored under first and second times cannot be enclosed with rectangle stake holes contour line
At Delta Region, then third time pile digger drill core position is located on short side center line, is particularly located in the short side for not excavating region
The center position of heart line, then execute step A.4.4~A.4.5;
Rectangle steel pile casting of the present invention is overall length casing, and steel pile casting interface size is equal with rectangle stake holes contour line,
Length is identical as rectangular pile depth.
The concrete that region pours of backbreaking on the outside of the steel pile casting uses the plain concrete of C15 grade, rapid-hardening.
Described removes the extra earthwork of side wall, the Delta Region that do not cut comprising rotary digging stake and the bottom slump soil body.
In step F, propose that steel pile casting need to carry out after the concrete final set that region of backbreaking pours using manipulator.
Construction method of the present invention has the beneficial effect that
Construction method of the present invention solves artificial digging pile and is crushed into rock inefficiency, and does not allow in the case where environment is complicated quick-fried
Digging is broken, the very big problem of drilling construction difficulty only need to not increase construction cost, and have using conventional rotary drilling machinery equipment
There are the advantages such as speed of fulfiling hole is fast, construction efficiency is high, easy to operate, security risk is low.
Detailed description of the invention
Stake core position view is bored under the first time that Fig. 1 is construction method of the present invention;
Fig. 2 is the rectangle stake holes and rotary digging stake core position view of construction method of the present invention;
Fig. 3 is the rotary digging stake first time pore-forming schematic diagram of construction method of the present invention;
Fig. 4 is second of pore-forming schematic diagram of rotary digging stake of construction method of the present invention;
Fig. 5 is that the manipulator of construction method of the present invention transfers overall length casing schematic diagram;
Fig. 6 is placing concrete schematic diagram on the outside of the casing of construction method of the present invention.
In figure: 1- rectangle stake holes contour line;2,3- short side endpoint;4- short side center line;5- is lower for the first time to bore stake core position;
Second of 6- lower brill stake core position;The Delta Region 7-;It backbreaks on the outside of 8- steel pile casting region.
Specific embodiment
The specific embodiment of technical solution of the present invention is described in detail with reference to the accompanying drawing.
It is illustrated by taking landslide control engineering as an example, slope supporting structure division uses peg board formula retaining wall, pile foundation
Rectangle friction pile having a size of 1.5m × 2.4m.Construction method referring to figure 1 and figure 2, generally comprises following steps:
A. rectangle stake holes unwrapping wire positions
A.1 the contour line of rectangle stake holes 1.5m × 2.4m is determined;
A.2 be 1.5m according to rectangle stake holes contour line bond length, in the market using it is medium-sized or large-scale rotary drilling rig at
Bore dia is determined 0.8~2.5m (remarks: if rotary digging drilling hole bored concrete pile bit diameter is 600mm, practical pore-forming is 670mm)
Rotary pile-digging machine bit diameter is 1.8m;
A.3 lower brill stake core position for the first time is determined along rectangle stake holes contour line longitudinal direction, as shown in Figure 1, cutting using two
The method of point Radius, with two endpoints (2,3) of rectangle stake holes contour line short side for two point of contacts, with rotary pile-digging machine drill bit half
Diameter (0.9m) draws circle, so that the center of circle is fallen in rectangle stake holes contour line short side and is located on the center line 4 in rectangle stake holes contour line, the circle
The heart is first time lower brill stake core position 5;
A.4 using two endpoints of rectangle stake holes contour line another short side as point of contact, according to the side of two point of contact Radius
Method determines second of lower brill stake core position 6;As shown in Fig. 2, calculating a height of 187mm of Delta Region 7, area is less than 966cm2,
It influences less the decentralization of steel pile casting, therefore it is twice that number is bored under rotary pile-digging machine;
A.5 according to the stake core position for boring brill under the positioning twice of number unwrapping wire under rotary pile-digging machine.
B. production interface size is 1.5m × 2.4m rectangle overall length steel pile casting.
C. the lower drilled as holes of rotary pile-digging machine gradation, as shown in Figure 3 and Figure 4.
D. overall length casing is transferred in rectangle stake holes using manipulator, as shown in figure 5, in removing Delta Region 7 and bottom
The extra earthwork of the side walls such as portion's slump soil body.
E. it is cast on the outside of steel pile casting at region 8 of backbreaking using the plain concrete of C15 grade, rapid-hardening, as shown in Figure 6.
F. concrete (about 9 hours) after final set at region 8 propose steel pile casting with manipulator.
G. decentralization rectangle steel reinforcement cage and casting concrete formation friction pile.
Foregoing merely illustrate one embodiment of the present of invention, the present invention can also have other various embodiments, without departing substantially from this
In the case where spirit and its essence, those skilled in the art can make according to the present invention it is various it is corresponding change and
Deformation, but these corresponding changes and modifications all should belong to the protection scope of the claims in the present invention.
Claims (9)
1. a kind of rectangle friction pile mechanical hole building construction method, which comprises the following steps:
A. rectangle stake holes unwrapping wire positions
A.1 rectangle stake holes contour line is determined;
A.2 rotary pile-digging machine bit diameter is determined according to rectangle stake holes contour line bond length;
A.3 lower brill stake core position for the first time is determined along rectangle stake holes contour line longitudinal direction;
A.4 it is determined according to rectangle stake holes contour line long side length and bores number under rotary pile-digging machine;
A.5 according to boring under rotary pile-digging machine, the positioning of number unwrapping wire is lower every time to bore stake core position;
B. rectangle steel pile casting is made;
C. rotary pile-digging machine borehole
C.1 the lower drilled as holes of rotary pile-digging machine gradation;
C.2 boring number as follows is more than twice, using jump digging method sequence of construction;
D. rectangle steel pile casting is transferred in rectangle stake holes, removes the extra earthwork of side wall;
E. it backbreaks on the outside of steel pile casting region casting concrete;
F. steel pile casting is proposed;
G. decentralization rectangle steel reinforcement cage and casting concrete formation friction pile.
2. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that step A.2 in, it is described
Rotary pile-digging machine bit diameter need to be more than or equal to rectangle stake holes contour line bond length.
3. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that step A.3 in, along square
Shape stake holes contour line longitudinal direction determines that lower stake core position of boring is using the method for two point of contact Radius for the first time.
4. rectangle friction pile mechanical hole building construction method according to claim 3, which is characterized in that two point of contact Radius sides
The specific steps of method are as follows: with two endpoints of a short side of rectangle stake holes contour line for two point of contacts, with rotary pile-digging machine drill bit
Radius size work is justified, and so that the center of circle is fallen in rectangle stake holes contour line short side and is located on the elongated central line in rectangle stake holes contour line,
The center of circle is lower brill stake core position.
5. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that step A.4 in, rotary digging
The determination method of number is bored under stake machine are as follows:
A.4.1 select two endpoints of the other side short side of rectangle stake holes contour line for two point of contacts, using two point of contact Radius
Method, determine under second brill stake core position;
A.4.2 if the lower drilling profile bored and rectangle stake holes contour line can surround Delta Region twice, and work as trigonum
Number is bored when domain height is not more than a quarter of rectangle stake holes contour line bond length, under pile digger to be set to twice;
A.4.3 when Delta Region height is greater than a quarter of rectangle stake holes contour line bond length, third time pile digger is bored
Core position is located on short side center line, is particularly located at the center position for not excavating the short side center line in region;
A.4.4 such as first time and for the third time, the lower drilling profile bored and rectangle stake holes contour line can surround Delta Region, then hold
Row step A.4.2~A.4.3, until the Delta Region height that the adjacent drilling profile bored lower twice and rectangle stake holes contour line surround
Until a quarter of the degree no more than rectangle stake holes contour line bond length;
A.4.5 such as second and for the third time, the lower drilling profile bored and rectangle stake holes contour line can surround Delta Region, execute
Step A.4.2~A.4.3, until the Delta Region height that the adjacent drilling profile bored lower twice is surrounded with rectangle stake holes contour line
Until a quarter no more than rectangle stake holes contour line bond length;
A.4.6 A.4.2 referring to step, as the drilling profile and rectangle stake holes contour line that bore under first and second times cannot surround three
Angular zone, then third time pile digger drill core position is located on short side center line, is particularly located at the short side center line for not excavating region
Center position, then execute step A.4.4~A.4.5.
6. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that the rectangle steel shield
Cylinder is overall length casing, and steel pile casting interface size is equal with rectangle stake holes contour line, and length is identical as rectangular pile depth.
7. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that outside the steel pile casting
Concrete that region pours backbreak using C15 grade, the plain concrete of rapid-hardening in side.
8. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that in step D, remove side
The extra earthwork of wall, the Delta Region that do not cut comprising rotary digging stake and the bottom slump soil body.
9. rectangle friction pile mechanical hole building construction method according to claim 1, which is characterized in that in step F, using machine
The portable steel pile casting out of tool need to carry out after the concrete final set that region of backbreaking pours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910615879.3A CN110374091B (en) | 2019-07-09 | 2019-07-09 | Mechanical pore-forming construction method for rectangular slide-resistant pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910615879.3A CN110374091B (en) | 2019-07-09 | 2019-07-09 | Mechanical pore-forming construction method for rectangular slide-resistant pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110374091A true CN110374091A (en) | 2019-10-25 |
CN110374091B CN110374091B (en) | 2021-02-19 |
Family
ID=68252543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910615879.3A Active CN110374091B (en) | 2019-07-09 | 2019-07-09 | Mechanical pore-forming construction method for rectangular slide-resistant pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110374091B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820729A (en) * | 2019-11-07 | 2020-02-21 | 云南建投基础工程有限责任公司 | Efficient and safe integrated rapid hole forming method for anti-slide pile rotary excavating machinery |
CN110820733A (en) * | 2019-11-07 | 2020-02-21 | 云南建投基础工程有限责任公司 | Improved mechanical rapid hole forming construction method for simple rectangular slide-resistant pile |
CN111021954A (en) * | 2019-11-18 | 2020-04-17 | 四川农业大学 | Novel anti-slide pile hole forming device and method thereof |
CN112227389A (en) * | 2020-11-03 | 2021-01-15 | 云南交投集团云岭建设有限公司 | Rectangular-section slide-resistant pile combined mechanical pore-forming construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107587840A (en) * | 2017-09-26 | 2018-01-16 | 中铁大桥局集团第五工程有限公司 | A kind of rectangle pile foundation drilling construction method |
CN107905236A (en) * | 2017-11-10 | 2018-04-13 | 中铁隧道集团处有限公司 | The construction method of friction pile churning driven fast pore-creating and concrete placings |
CN108678661A (en) * | 2018-03-22 | 2018-10-19 | 中交路桥北方工程有限公司 | Rectangular friction pile forming hole method and the rectangular drill bit of pore-forming |
CN109630015A (en) * | 2018-11-26 | 2019-04-16 | 中铁二十局集团第二工程有限公司 | A kind of friction pile mechanical hole building method |
CN109681116A (en) * | 2019-01-31 | 2019-04-26 | 四川省交通运输厅交通勘察设计研究院 | A kind of square pile rotary drilling device and its rotary digging method for realizing rectangular pore-forming |
-
2019
- 2019-07-09 CN CN201910615879.3A patent/CN110374091B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107587840A (en) * | 2017-09-26 | 2018-01-16 | 中铁大桥局集团第五工程有限公司 | A kind of rectangle pile foundation drilling construction method |
CN107905236A (en) * | 2017-11-10 | 2018-04-13 | 中铁隧道集团处有限公司 | The construction method of friction pile churning driven fast pore-creating and concrete placings |
CN108678661A (en) * | 2018-03-22 | 2018-10-19 | 中交路桥北方工程有限公司 | Rectangular friction pile forming hole method and the rectangular drill bit of pore-forming |
CN109630015A (en) * | 2018-11-26 | 2019-04-16 | 中铁二十局集团第二工程有限公司 | A kind of friction pile mechanical hole building method |
CN109681116A (en) * | 2019-01-31 | 2019-04-26 | 四川省交通运输厅交通勘察设计研究院 | A kind of square pile rotary drilling device and its rotary digging method for realizing rectangular pore-forming |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820729A (en) * | 2019-11-07 | 2020-02-21 | 云南建投基础工程有限责任公司 | Efficient and safe integrated rapid hole forming method for anti-slide pile rotary excavating machinery |
CN110820733A (en) * | 2019-11-07 | 2020-02-21 | 云南建投基础工程有限责任公司 | Improved mechanical rapid hole forming construction method for simple rectangular slide-resistant pile |
CN110820729B (en) * | 2019-11-07 | 2021-04-16 | 云南建投基础工程有限责任公司 | Efficient and safe integrated rapid hole forming method for anti-slide pile rotary excavating machinery |
CN111021954A (en) * | 2019-11-18 | 2020-04-17 | 四川农业大学 | Novel anti-slide pile hole forming device and method thereof |
CN112227389A (en) * | 2020-11-03 | 2021-01-15 | 云南交投集团云岭建设有限公司 | Rectangular-section slide-resistant pile combined mechanical pore-forming construction method |
Also Published As
Publication number | Publication date |
---|---|
CN110374091B (en) | 2021-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374091A (en) | A kind of rectangle friction pile mechanical hole building construction method | |
CN110617072B (en) | Tunnel excavation construction method for obliquely passing existing operation tunnel at minimum clear distance | |
CN104947690B (en) | Grooving construction method for embedding underground continuous wall into rock | |
CN104806251B (en) | Subsidiary inverted excavation construction method for urban subway station under complex environment | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN104631438B (en) | Long auger guncreting uplift pile construction method | |
CN103882881A (en) | Underwater construction method for bearing platform deeply embedded in rock | |
CN106194193A (en) | The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN102660955A (en) | Quick construction method for foundation pit slope support | |
CN109898521A (en) | A kind of anchored pile supporting and construction method for foundation pit external corner | |
CN110984132B (en) | Construction method for grooving underground diaphragm wall under complex geological condition | |
CN106703059B (en) | Open caisson cross trough-pulling construction method | |
CN103939115A (en) | Semi-subsurface excavation method construction shed tunnel method and structure | |
CN113047844A (en) | Sinking pipe sheet type vertical shaft construction method | |
RU2114957C1 (en) | Method and device for stabilization of earth structure | |
CN105113976A (en) | Wire-brush-bit rotary drilling jig and method for solving bit burying, falling and jamming | |
CN104805830B (en) | Non-shot rock uplift pile construction method | |
CN111561262A (en) | Hole forming method of rotary drilling rig for large-size pile hole in karst area | |
CN111877344A (en) | Old pipe pile breaking method | |
CN103334449A (en) | Square hole girdling cutter and method for performing holing construction of deep cutting stab-pile wall by utilizing same | |
CN111441794B (en) | Underground excavation construction method and structure for rebuilding existing tunnel into double-layer tunnel | |
CN204782730U (en) | Steel brush drill bit rig that circles round | |
CN209569010U (en) | It is a kind of to excavate the caisson cutting edge of sinking suitable for development machine | |
CN206034466U (en) | Foundation ditch or basic groove precipitation system for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |