JPS58168720A - Treatment of head of on-site pile - Google Patents
Treatment of head of on-site pileInfo
- Publication number
- JPS58168720A JPS58168720A JP5261282A JP5261282A JPS58168720A JP S58168720 A JPS58168720 A JP S58168720A JP 5261282 A JP5261282 A JP 5261282A JP 5261282 A JP5261282 A JP 5261282A JP S58168720 A JPS58168720 A JP S58168720A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- pile
- water
- tube
- broken
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/005—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】 この発明は、場所打杭における杭頭処理方法に関する。[Detailed description of the invention] The present invention relates to a method for treating a pile head in a cast-in-place pile.
At、場所打杭のコンクリート天は正規の杭天より70
0〜1000ミリメートル位高く打設さn1コンクリー
ト固化後、杭のm1!lt−制し、正規の杭天より上の
部分を破砕除去しているが、この解体KFi相当の人力
を必要とし%騒音も着るしい。At, the concrete height of cast-in-place piles is 70% higher than the regular pile height.
After the concrete hardens, the pile is placed at a height of 0 to 1000 mm (m1)! The part above the regular pile height is crushed and removed using lt-control, but it requires the same amount of manpower as the demolition KFi and is apparently noisy.
この発明Fi、上記事情にもとついてなさr′したもの
て、正規の杭天より上刃の部分についてけコンク1j−
ト強度t−着るしく低下させ、破砕除去するに際して、
その破砕が極めて容易に行なえ、人力節#、およびIk
f減少などの利益奮う吋らnるようにした場所打杭にお
ける杭頭処理方法を提供しようとするKある。This invention Fi, which was made based on the above circumstances, has a conc 1j-
The strength of
Its crushing is extremely easy and requires less human effort and Ik.
Some attempts have been made to provide a pile cap treatment method for cast-in-place piles that offers benefits such as reduction of f.
以下、この@明を図示の実M1例にもとづいて具体的に
説明する。先づ、場所打杭がなさn、正規の杭天1が杭
孔2内にあるようにして、場所打杭のコンクリート3の
打設が行なわ扛る。そして、主鉄筋4は杭天1より上方
に突出している。こO状9で、トレミー管5に上方から
杭孔2内に挿入する。上記トレミー管5には、その先端
に位置して放水装置1116が取付けである。上記放水
装置は、中央の中空環体6aから四方に向けて放射・ぐ
イゾ6bが延設してあり、上記放射ノ母イゾ6bには放
水孔6Cが多数穿設しである。また、上記中空環体6a
に連通するサニーホース7が上記トレミー管5に沿って
配設さ扛ている。そして、上記正規の杭天lより上の位
置管で上記放水妓tg’を降下させた状態で、上記サニ
ーホース7を介して放水装置6に水あるいはベントナイ
ト液などの水と同効物を強制流入させ、放水孔6cより
放出させつつ、上記トレイ−管5を18(f往復回動す
る。こnKよって、正規の杭天1より上方のコンクリー
ト内には多量の水あるい#′i同効物が均等に混入され
る。このオ\の状態で、上記トレイ−管5を上方に徐々
に移動し、上記正規の杭天1よシ上におけるコンクリー
ト中に水または同効物を多量に含有させる。放水装置6
を杭孔2より引き田した債、コンクリートの固化を待っ
て、抗論の周i2!1會掘削し、正規の杭天1より上を
露出させ、この部分を破砕除去する。この場合、この個
処のコンクIJ −トは含水量が多いため、惨めで脆弱
であるから、簡単かつ答易に破砕でき、入力が大幅に節
減できる上、騒音も比較的少なくて作業できる。Hereinafter, this @light will be specifically explained based on the illustrated example of actual M1. First, the cast-in-place pile is removed, and the regular pile top 1 is placed in the pile hole 2, and the concrete 3 of the cast-in-place pile is placed. The main reinforcing bars 4 protrude upward from the pile top 1. This O-shape 9 is inserted into the tremie tube 5 from above into the pile hole 2. A water spray device 1116 is attached to the tremie tube 5 at its tip. The water discharging device has a radiating hole 6b extending in all directions from a central hollow ring 6a, and a large number of water discharging holes 6C are bored in the radiating hole 6b. In addition, the hollow ring body 6a
A sunny hose 7 communicating with the tremie tube 5 is disposed along the tremie tube 5. Then, with the water sprayer tg' lowered from the pipe located above the regular pile top l, water or a substance with the same effect as water, such as bentonite liquid, is forced into the water sprayer 6 via the sunny hose 7. The tray pipe 5 is rotated back and forth by 18 (f) while allowing the water to flow in and discharge from the water discharge hole 6c.As a result, a large amount of water or #'i is in the concrete above the regular pile top 1. In this state, the tray-pipe 5 is gradually moved upwards, and a large amount of water or the same effective substance is mixed into the concrete on the regular pile top 1. Contain.Water spray device 6
Wait for the concrete to solidify after pulling the bond through pile hole 2, excavate the area around the counter area i2!1, expose the area above the regular pile top 1, and crush and remove this part. In this case, the concrete IJ-concrete in this case has a high water content, which makes it miserable and fragile, so it can be easily and easily crushed, which saves a lot of input power, and can be operated with relatively little noise.
このように、この発明によnば、場所打杭のコンクリー
ト打設直後、正規のコンクリート天よυ着干高い位置管
でトレミー管を挿入し、トレイ−管の先端に設けた放水
装置より水teけ同効の液体をコンクリート内に強制注
入し、徐々にトレミー管を引き上け、コンクリート固化
後、杭頭周曲ヲ掘削し、コンクリート天上方のコンクリ
−)(破砕することにより、破砕作業を簡単かつ容J+
1こすると共に、騒音の減少を計ることができ、大幅な
コスト低減ができるという優nた効果がある。In this way, according to the present invention, immediately after concrete is placed on a cast-in-place pile, a tremie pipe is inserted using a regular concrete ceiling pipe at a high position, and water is released from a water spray device installed at the tip of the tray pipe. A liquid with the same effect as the concrete is forcibly injected into the concrete, the tremie pipe is gradually pulled up, and after the concrete hardens, the circumference of the pile head is excavated, and the concrete above the concrete is crushed (by crushing). Easy and convenient J+
1, it has the excellent effect of reducing noise and significantly reducing costs.
第1図はこの発明の実施例を示す放水装置の斜視図、第
2図ないし絹4図1ゴこの発明の方法を作業順序に従っ
て順次示した縦断@面図である。
l・・・・・・杭天、5・・・・・・トレば一管、6・
・・・・・放水装置。
特 許 出 願 人 清水建設株式会社代理人
升壇士 佐藤英昭
ザ
ffい
′″′+3(措
49図
→4(招FIG. 1 is a perspective view of a water spraying device showing an embodiment of the present invention, and FIGS. l...Pile heaven, 5...Treba one pipe, 6.
...Water spray device. Patent applicant Agent: Shimizu Corporation
Shodanshi Hideaki Sato the ffii''''+3 (measure 49 figure → 4 (invitation)
Claims (1)
天より若干嶌い位置壇でトレミー管會挿入し、トレミー
管の先端に設けた放水装置よ〉水ta#i同効の液体【
コンクリート内に強制注入し、徐々にトレイ−管を引き
上げ、コンクリート固化後、杭頭周囲′を掘削し、コン
クリート天上方のコンクリート【破砕することt**と
する場所打杭における杭頭処理方法。[Scope of Claims] Immediately after pouring concrete into cast-in-place piles, a tremie pipe is inserted at a position slightly higher than the regular concrete height, and a water discharge device installed at the tip of the tremie pipe has the same effect as water ta#i. liquid【
A pile head treatment method for cast-in-place piles in which concrete is forcibly injected into the concrete, the tray pipe is gradually pulled up, and after the concrete hardens, the area around the pile head is excavated and the concrete above the concrete is crushed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5261282A JPS58168720A (en) | 1982-03-31 | 1982-03-31 | Treatment of head of on-site pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5261282A JPS58168720A (en) | 1982-03-31 | 1982-03-31 | Treatment of head of on-site pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS58168720A true JPS58168720A (en) | 1983-10-05 |
Family
ID=12919613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5261282A Pending JPS58168720A (en) | 1982-03-31 | 1982-03-31 | Treatment of head of on-site pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58168720A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH044927U (en) * | 1990-04-23 | 1992-01-17 | ||
JP2017172247A (en) * | 2016-03-24 | 2017-09-28 | 株式会社熊谷組 | Removal method of solidification object in pile head part of precast pile |
CN110965554A (en) * | 2019-12-21 | 2020-04-07 | 一山(北京)岩土工程有限公司 | Construction method for improving pile head crushing efficiency |
CN110965553A (en) * | 2019-12-21 | 2020-04-07 | 一山(北京)岩土工程有限公司 | High-efficient broken pile head device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS554167A (en) * | 1978-06-26 | 1980-01-12 | Toshiba Corp | Multiplex signal processor |
-
1982
- 1982-03-31 JP JP5261282A patent/JPS58168720A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS554167A (en) * | 1978-06-26 | 1980-01-12 | Toshiba Corp | Multiplex signal processor |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH044927U (en) * | 1990-04-23 | 1992-01-17 | ||
JP2017172247A (en) * | 2016-03-24 | 2017-09-28 | 株式会社熊谷組 | Removal method of solidification object in pile head part of precast pile |
CN110965554A (en) * | 2019-12-21 | 2020-04-07 | 一山(北京)岩土工程有限公司 | Construction method for improving pile head crushing efficiency |
CN110965553A (en) * | 2019-12-21 | 2020-04-07 | 一山(北京)岩土工程有限公司 | High-efficient broken pile head device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107447765B (en) | Side slope construction supported with framed anchor construction | |
CN208415267U (en) | Miniature steel pipe pile prestressed anchor rope combination supporting system | |
JPS58168720A (en) | Treatment of head of on-site pile | |
JPS6255316A (en) | Method and apparatus for forming continuous horizontal columnar wall | |
CN110004946A (en) | The pile top and its soil-slope rapid rescue ruggedized construction, construction method of grouting behind shaft or drift lining miniature steel pipe pile | |
GB1308209A (en) | Method and apparatus for setting anchors in soil or rock | |
CN212003113U (en) | Broken rock mass slip casting is with only thick liquid device | |
JPH09111757A (en) | Pile construction method | |
CN110258553A (en) | A kind of method and construction tool for removing pull rod in soil | |
DE541673C (en) | Process for the production of place posts with club feet | |
JPH0452805B2 (en) | ||
JPS61204417A (en) | Method of forming pile increased in support force at pile tip by bagform substance | |
JPH01247611A (en) | Construction and device for foundation improvement with the joint use of agitator and jet | |
JP2001342624A (en) | Rotary jacked pile, method for burying rotary jacked pile, and foot protection method for for the rotary jacked pile | |
JPS58210211A (en) | Treatment of extra-banking concrete in head of on-site concrete pile | |
JP2772262B2 (en) | Cement milk generator | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS6317338Y2 (en) | ||
JPH02147719A (en) | Sheathing construction method | |
JPS5532809A (en) | Pile foundation practice | |
JPS57108329A (en) | Formation of basement | |
JP3002862U (en) | Driving leg for guard fence | |
JPH04333718A (en) | Crushing of concrete pile head | |
JPS59210125A (en) | Connection of footing iron bars with head of pc-concrete pile | |
JP2512157B2 (en) | Reinforcement method for soft ground |