DE541673C - Process for the production of place posts with club feet - Google Patents

Process for the production of place posts with club feet

Info

Publication number
DE541673C
DE541673C DEB143444D DEB0143444D DE541673C DE 541673 C DE541673 C DE 541673C DE B143444 D DEB143444 D DE B143444D DE B0143444 D DEB0143444 D DE B0143444D DE 541673 C DE541673 C DE 541673C
Authority
DE
Germany
Prior art keywords
production
pipe
concrete
clubfoot
club
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEB143444D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beton U Tiefbau Ges Mast M B H
Original Assignee
Beton U Tiefbau Ges Mast M B H
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beton U Tiefbau Ges Mast M B H filed Critical Beton U Tiefbau Ges Mast M B H
Priority to DEB143444D priority Critical patent/DE541673C/en
Application granted granted Critical
Publication of DE541673C publication Critical patent/DE541673C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Description

Verfahren zur Herstellung von Ortpfählen mit Klumpfüßen Die Erfindung betrifft ein Verfahren zur Herstellung von Ortpfählen mit Klumpfüßen.Method of making club-footed place stakes The invention relates to a process for the manufacture of club-footed cast-in posts.

Es ist bereits bekannt, bei der Füllung eines Bohrrohres mit Beton eine kolbenartig wirkende Grundplatte zu verwenden, die ein Abflußrohr trägt, das in den unterhalb der Grundplatte liegenden Hohlraum mündet.It is already known when filling a drill pipe with concrete to use a piston-like acting base plate that carries a drain pipe that opens into the cavity below the base plate.

Es ist auch bereits vorgeschlagen worden, zur Sicherung von Rammpfählen gegen Setzen zunächst ein mit einer sich nach unten kegelförmig verjüngenden Kappe abgeschlossenes Blechrohr in den Erdboden einzutreiben, die Kappe mit Hilfe eines zugespitzten und über der Spitze mit Austrittsöffnungen verisehenen Rohres zu durchstoßen und darauf durch dieses Rohr -ein Verfestigungsmittel in das die Pfahlkappe umgebende Erdreich zu bringen. Bei diesem Verfahren kann es vorkommen, daß das infolge des Rammvorganges verdichtete Erdreich das Verfestigungsmittel nur schwer aufnimmt und ein Klumpfuß befriedigenden Umfanges nicht entsteht; auch kann sich das verfestigte, den Klumpfuß bildende Erdreich nicht mit dem in dem Blechrohre eingeschlossenen Beton zu einem einheitlichen Baukörper vereinigen.It has also been proposed to secure driven piles against setting, initially with a cap that tapers conically at the bottom drive closed sheet metal pipe into the ground, the cap with the help of a to pierce the pointed tube, which is provided with outlet openings over the tip and then through this pipe -a solidifying agent in the surrounding of the pole cap To bring earth. With this procedure, it can happen that due to the Ramming compacted soil absorbs the solidifying agent only with difficulty and a clubfoot of satisfactory size does not arise; also the solidified, the soil forming the clubfoot does not coincide with that enclosed in the sheet metal pipes Unite concrete to form a uniform structure.

Die Erfindung besteht darin, daß das zunächst als. Grundwassersteigrohr dienende Abflußrohr nach dem Absenken der Grundplatte weiter eingerammt und dann als Einführungsrohr für die zur Herstellung des Klumpfußes erforderlichen Verfestigungsstoffe verwendet wird. Hierdurch wird das Verfahren vereinfacht. Auch gelingt es auf diese Weise, infolge der großen Berührungsfläche zwischen dem Pfahlende and dem Verfestigungsmittel, einen einheitlichen, aus Klumpfuß und Pfahlschaft bestehenden Baukörper zu erhalten. Hierbei wirkt sich auch der Umstand günstig aus, daß die Verfestigungsmittel infolge des unverdichteten Zustandes des am Pfahlende befindlichen Erdreiches leicht in den Boden zu dessen Verfestigung eindringen können.The invention is that the first as. Groundwater riser pipe serving drain pipe after lowering the base plate further rammed and then as an introduction tube for the solidifying materials required to produce the clubfoot is used. This simplifies the process. It also succeeds on this Way, due to the large contact area between the pile end and the stabilizer, to maintain a uniform structure consisting of clubfoot and pile shaft. The fact that the solidifying agents as a result also has a favorable effect here the uncompacted state of the soil at the end of the pile easily in can penetrate the soil to consolidate it.

In der Zeichnung ist das neue Verfahren in drei aufeinanderfolgenden Stufen veranschaulicht.In the drawing the new procedure is in three consecutive ways Stages illustrated.

Die Herstellung eines Ortspfahles aus Beton o. dgl. geschieht in bekannter Weise derart, daß zunächst das Bohrrohr i in den Erdboden eingeführt und in dieses der frische, plastische Beton zusammen mit dem Bewehrungsgerippe 2 langsam bis zur Sohle gesenkt wird. Das Bewehrungsgerippe ist in bekannter Weise unten mit einer Fußplatte 3 aus Beton o. dgl. verbunden, welche eine öffnung ¢ hat, durch die ein langes, schwachzölliges Rohr 5 (Gasrohr) hindurchgeführt ist. Das Rohr hat an seinem unteren Ende öffnungen 6. Es kann beim Absenken des Armierungsgerippes in bekannter Weise zunächst dazu verwendet werden, etwa im Bohrrohre anstehendes Grundwasser nach oben zu leiten, wobei die Bodenplatte nach Art eines Kolbens im Bohrrohre wirksam ist. Abb. i zeigt den Zeitpunkt des Verfahrens, in dem die Fußplatte 3 bis zum unteren Ende des Bohrrohres abgesenkt ist. Nunmehr wird das schwachzöllige Rohr 5, dessen unteres Ende zu einer Spitze ausgebildet ist, durch Einrammen mit seinem gelochten unteren Teile in das freie Erdreich unter der Sohle des Pfahles vorgetrieben. Hierauf werden unter Druck eine oder mehrere Verfestigungsmittel in das Erdreich gepreßt und dieses dabei in bekannter Weise durch mechanische Bindung oder chemische Beeinflussung verfestigt. In Abb. z ist dieser Zeitpunkt des Verfahrens dargestellt. 7 ist der so entstandene umfangreiche Klumpfuß.The production of a site post made of concrete or the like happens in a known manner Way such that first the drill pipe i inserted into the ground and into this the fresh, plastic concrete together with the reinforcement framework 2 slowly up to Sole is lowered. The reinforcement frame is in a known manner below with a Footplate 3 made of concrete or the like. Connected, which has an opening ¢ through which a long, slightly inch tube 5 (gas tube) is passed through. The pipe has on his lower end openings 6. It can be known when lowering the reinforcement framework Way can initially be used, for example, groundwater in the drill pipes to direct upwards, the bottom plate in the manner of a piston in the drill pipe effective is. Fig. I shows the time of the process in which the footplate 3 to the lower End of the drill pipe is lowered. Now it will weak-inch Tube 5, the lower end of which is formed into a point, by ramming with its perforated lower part into the free earth under the sole of the post driven forward. One or more solidifying agents are then added under pressure the soil pressed and this in a known manner by mechanical bonding solidified or chemical influence. In Fig. Z is this point in time of the procedure shown. 7 is the resulting extensive clubfoot.

Nach dem Einpressen des einen oder der verschiedenen Verfestigungsmittel kann das in der Fußplatte verschiebbar angeordnete Rohr herausgezogen und von neuem verwendet werden. Ebenso wird das innere Bohrrohr angehoben und entfernt. Bei dem hierbei in bekannter Weise erfolgenden Nachstampfen oder Verdichten wird die Betonmasse innig mit dem verfestigten Erdreich verbunden. Abb.3 zeigt die Verbindung von Klumpfuß und Pfahl in diesem Zeitpunkte. Das auch seitlich des Bohrrohres vorgedrungene Verfestigungsmittel und das von ihm verfestigte Erdreich ist mit dem Pfahlschaft fest zu einem einheitlichen, zweckmäßig gestalteten Baukörper verbunden. Die feste Verbindung wird insbesondere auch durch die große waagerechte Verbindungsfläche zwischen Pfahlschaft und Klumpfuß bewirkt.After one or the different solidifying agents have been pressed in the tube, which is slidably arranged in the base plate, can be pulled out and again be used. Likewise, the inner drill pipe is lifted and removed. In which The concrete mass is re-tamped or compacted in a known manner intimately connected with the solidified soil. Fig.3 shows the connection of clubfoot and stake at this point. The solidifying agent that has also penetrated the side of the drill pipe and the earth that he has solidified is solidly integrated with the stake shaft, appropriately designed structure connected. The fixed connection is particular also due to the large horizontal connecting surface between the pole shaft and clubfoot causes.

Claims (1)

PATENTANSPRUCH: Verfahren zur Herstellung von Ortpfählen mit Klumpfüßen, dadurch gekennzeichnet, daß das bei dem Absenken des Betons auf einer im Bohrrohre kolbenartig wirkenden Grundplatte zunächst als Grundwassersteigrohr dienende Rohr (5) nach dem Absenken des Betons weiter eingerammt und dann als Einführungsrohr für die zur Herstellung des Klumpfußes erforderlichen Verfestigungsstoffe verwendet wird. PATENT CLAIM: A process for the production of cast-in-place piles with club feet, characterized in that the pipe (5), which initially serves as a groundwater riser pipe when the concrete is lowered on a base plate acting like a piston in the drill pipe, continues to be rammed in after the concrete has been lowered and then as an inlet pipe for the production of the clubfoot necessary solidifying agents is used.
DEB143444D 1929-05-03 1929-05-03 Process for the production of place posts with club feet Expired DE541673C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEB143444D DE541673C (en) 1929-05-03 1929-05-03 Process for the production of place posts with club feet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEB143444D DE541673C (en) 1929-05-03 1929-05-03 Process for the production of place posts with club feet

Publications (1)

Publication Number Publication Date
DE541673C true DE541673C (en) 1932-01-12

Family

ID=7000575

Family Applications (1)

Application Number Title Priority Date Filing Date
DEB143444D Expired DE541673C (en) 1929-05-03 1929-05-03 Process for the production of place posts with club feet

Country Status (1)

Country Link
DE (1) DE541673C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1212899B (en) * 1957-10-07 1966-03-17 Beton Und Tiefbau Mast Ag Method and device for the production of in-situ concrete piles
DE2651023A1 (en) * 1975-11-11 1977-05-18 Fondedile Spa PROCESS FOR MANUFACTURING A BASE PILE FOR ALTERNATIVE PRESSURE AND TENSION LOADS
FR2575776A1 (en) * 1985-01-04 1986-07-11 Juei Jse Lin Method of constructing cast-in-place concrete pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1212899B (en) * 1957-10-07 1966-03-17 Beton Und Tiefbau Mast Ag Method and device for the production of in-situ concrete piles
DE2651023A1 (en) * 1975-11-11 1977-05-18 Fondedile Spa PROCESS FOR MANUFACTURING A BASE PILE FOR ALTERNATIVE PRESSURE AND TENSION LOADS
FR2575776A1 (en) * 1985-01-04 1986-07-11 Juei Jse Lin Method of constructing cast-in-place concrete pile

Similar Documents

Publication Publication Date Title
DE541673C (en) Process for the production of place posts with club feet
EP0157188A1 (en) Method for restoring retaining walls
DE1129895B (en) Method and device for the production of a foundation pile with concrete casing
DE2217485A1 (en) METHOD AND APPARATUS FOR MAKING A PILE FROM CONCRETE PAST INTO THE GROUND
DE102005008679A1 (en) Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls
DE616706C (en) Process for the production of plug-like concrete foundation bodies
DE764099C (en) Process and device for the production of reinforced concrete piles
DE593620C (en) Device for the production of concrete stakes
AT135768B (en) Method and device for pressing filling or sealing material into cracked concrete, fissured rock or the like.
DE521440C (en) Process for the production of site stakes from concrete or the like using a Schuettrohr that can be closed by a cap
DE3210186C2 (en)
DE570846C (en) Process for the production of site stakes with clubfoot made of pressed concrete or a similar hardening mass
DE187815C (en)
DE1944644C3 (en) Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process
DE2626762C2 (en) Method of making pile foundations using precast concrete piles
DE2261363A1 (en) FOUNDATION PILE AND PROCEDURE FOR PRODUCING IT
DE417326C (en) Device for the production of concrete stakes in a driving pipe
DE759059C (en) Process for the production of a foundation pile
DE398627C (en) Method for the production of site stakes from concrete by means of a driving pipe
DE1928471A1 (en) Process and device for compacting and draining soil
AT145231B (en) Method of driving pile-driving pipes for the purpose of pouring concrete piles into the ground.
DE893779C (en) Process for the production of mixed foundation piles from reinforced concrete or the like.
DE477215C (en) Process for the production of place stakes
DE1212899B (en) Method and device for the production of in-situ concrete piles
DE605359C (en) Method and device for the production of foundation bodies from concrete, in particular piles, in aggressive waters