JPS5768415A - Ground improving method - Google Patents

Ground improving method

Info

Publication number
JPS5768415A
JPS5768415A JP14443680A JP14443680A JPS5768415A JP S5768415 A JPS5768415 A JP S5768415A JP 14443680 A JP14443680 A JP 14443680A JP 14443680 A JP14443680 A JP 14443680A JP S5768415 A JPS5768415 A JP S5768415A
Authority
JP
Japan
Prior art keywords
buffer hole
pile
gas pipe
ground
strain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14443680A
Other languages
English (en)
Other versions
JPS617486B2 (ja
Inventor
Yasunori Machida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP14443680A priority Critical patent/JPS5768415A/ja
Publication of JPS5768415A publication Critical patent/JPS5768415A/ja
Publication of JPS617486B2 publication Critical patent/JPS617486B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
JP14443680A 1980-10-17 1980-10-17 Ground improving method Granted JPS5768415A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14443680A JPS5768415A (en) 1980-10-17 1980-10-17 Ground improving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14443680A JPS5768415A (en) 1980-10-17 1980-10-17 Ground improving method

Publications (2)

Publication Number Publication Date
JPS5768415A true JPS5768415A (en) 1982-04-26
JPS617486B2 JPS617486B2 (ja) 1986-03-06

Family

ID=15362156

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14443680A Granted JPS5768415A (en) 1980-10-17 1980-10-17 Ground improving method

Country Status (1)

Country Link
JP (1) JPS5768415A (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018145649A (ja) * 2017-03-03 2018-09-20 鹿島建設株式会社 ケーソンの沈設時の傾斜抑制方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018145649A (ja) * 2017-03-03 2018-09-20 鹿島建設株式会社 ケーソンの沈設時の傾斜抑制方法

Also Published As

Publication number Publication date
JPS617486B2 (ja) 1986-03-06

Similar Documents

Publication Publication Date Title
JPS5768415A (en) Ground improving method
Haswell Thames Cable Tunnel.
JPS5748018A (en) Constructing method for pile foundation with underground wall
JPS57158436A (en) Method of construction of precast concrete underground room
JPS5646031A (en) Constructing method for pile foundation footing with erected trunk
JPS57140421A (en) Construction of large-diameter in-situ cast pile
JPS56100919A (en) Preventing method for liquefaction of sandy ground
JPS57108328A (en) Formation of basement
JPS56142921A (en) Construction work of foundation of structure
SU881254A1 (ru) Способ возведени буронабивной сваи в пучинистых грунтах
JPS5733616A (en) Forming method for steel pipe pile
JPS5781525A (en) Construction of underground continuous wall
JPS57130622A (en) Construction of continuous underground wall
JPS5516172A (en) Excavation work method and apparatus for preventing landslide at ditch scooping
SU850799A1 (ru) Способ определени просадочныхСВОйСТВ гРуНТА
JPS641829A (en) Construction foundation
JPS5740024A (en) Pile driving work
JPS55122926A (en) Construction method of underground structure
JPS559905A (en) Piling foundation structure for structure
JPS6458794A (en) Method of excavation construction and excavator
JPS5880092A (ja) 短管を利用した縦穴堀り工法
JPS554410A (en) Earth retaining method
JPS5631925A (en) Constructing method for pit
NL7505256A (en) Artificial off shore island - with ballast fitted open top vessel as foundation for e.g. oil drilling structure
JPS5585731A (en) Method and apparatus for burying pile