Prior art keywords
ground
structures
excavation
bottoming
excavated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9592478A
Other languages
Japanese (ja)
Inventor
Hiroshige Tanaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SEKIYU HANBAI KK
Original Assignee
NIPPON SEKIYU HANBAI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SEKIYU HANBAI KK filed Critical NIPPON SEKIYU HANBAI KK
Priority to JP9592478A priority Critical patent/JPS5523262A/en
Publication of JPS5523262A publication Critical patent/JPS5523262A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE: To improve the excavation efficiency for a bottoming ground by causing structures to float by buoyancy so as to keep the bottoming portions of the structures apart from the bottoming ground and to form an excavation space between the bottoming portions and the ground.
CONSTITUTION: The area surrounded by sheet-pile walls 1 is excavated, and hollow structures each consisting of side walls 4, 5 and a bottom slab 6 are constructed on the excavated ground 3. With water filled in excavation spaces 13, 14, the structures float by buoyancy and the bottom slabs 3 of the structures part from the ground 3, forming an excavation space therebetween, and the ground 3 is excavated down to a new ground 9. After excavation, water is discharged out of the spaces 13, 14 to bottom the bottom slabs 6 of the structures on the newly excavated ground 9, and dotted-line sections 10 are constructed on top of the structures.
COPYRIGHT: (C)1980,JPO&Japio
JP9592478A 1978-08-07 1978-08-07 Construction method for underground structure Pending JPS5523262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9592478A JPS5523262A (en) 1978-08-07 1978-08-07 Construction method for underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9592478A JPS5523262A (en) 1978-08-07 1978-08-07 Construction method for underground structure

Publications (1)

Publication Number Publication Date
JPS5523262A true JPS5523262A (en) 1980-02-19

Family

ID=14150817

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9592478A Pending JPS5523262A (en) 1978-08-07 1978-08-07 Construction method for underground structure

Country Status (1)

Country Link
JP (1) JPS5523262A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625468A (en) * 2016-03-15 2016-06-01 华若延 Underground building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625468A (en) * 2016-03-15 2016-06-01 华若延 Underground building

Similar Documents

Publication Publication Date Title
GB1488474A (en) Method for constructing an industrial plant on land
JPS5523262A (en) Construction method for underground structure
JPS55145214A (en) Constructing method of concrete structure at bottom of water
JPS5530039A (en) Method for constructing underground structures
JPS5330143A (en) Construction method of underground tanks
JPS579909A (en) Construction for quay
JPS5655612A (en) Breakwater
JPS5724727A (en) Sheathing method
JPS56156304A (en) Construction of revetment with composite structure consisting of steel sheet pile and concrete
JPS5712730A (en) Foundation work employing a precast reinforced concrete foundation beam
JPS56119013A (en) Hollow fill-type dam
JPS554471A (en) Method of constructing concrete footing
SU1534142A1 (en) Method of constructing an underground structure
JPS5589524A (en) Constructing method for underground structure
SU1689521A1 (en) Method for construction of open caisson
RU1821514C (en) Method of erecting dam with core and formwork for erecting dam core
JPS548396A (en) Method of constructing concrete floating body
SU821645A1 (en) Dam-adjoining hydraulic power station
JPS576019A (en) Installating method for foundation pile
JPS5748004A (en) Constructing method for harbor structures such as breakwater and quaywall
JPS5595013A (en) Construction of incinerator
JPS5523241A (en) Coupling process for continuous underground wall by use of precast concrete member
JPS56115418A (en) Building of underground wall body
JPS5771925A (en) Construction of continuous underground wall and reference pile used therefor
JPS5751331A (en) Construction of continuous underground wall